8a Sump Load Calculation
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
Load calculation
(a) Load calculation for sump :
Unit Weight of Soil = 18.00 kN/m3
F.G.L = 4m
(10.1 x1.7 )
Total Rectangular load (surcharge pressure) = 3.3 kN/m2
(0 +10.1)
Total Triangular load (submerged pressure+water pressure = 10.1 kN/m2
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
(2 x10 )
Total Rectangular load (surcharge pressure) = 3.3 kN/m2
Rectangular Sump:
a)Water Pressure inside the sump (short wall)
( 2.5 )
( 2.5 x 10.1 )
( 2.5 x 0 )
( 2.5 )
( 2.5 x 10.1 )
( 2.5 x 0 )
Design, Engineering, Build and Commissioning of 120 MLD Capacity Sewage Treatment Plant in
Project: Zone - II at Kodungaiyur with Sequential Batch Reactor (SBR) with Power Generation from Bio-Gas
including Operation and Maintenance for ten years at Chennai.
Title: Structural Design Calculation of Primary sludge thickener I for 120MLD STP at kodungaiyur
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
h/d = 0.288
= 5.110 sec
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
Ah = 0.08
(0.16 / 2 )
Ah = 0.014
(0.16*1.5*0.47)/(2*4)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
Circumferential angle φ = 0
Qiw = 0.86
(0.866*(1-((0/4.61)^2))*TANH(0.866*16/4.61)
(0.86*0.08*1029.56*9.81*4.61*COS(PI()/180*0)/1000
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(0.866*0.08*1029.56*9.81*4.61*SINH(1.732*8/4.61))/COSH(0.866*8/4.61)/1000
case I y=0
Qcw = 0.348
(0.5625*COSH(3.674*0/16))/COSH(3.674*4.61/16)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(0.348*0.08*1029.56*9.81*4.61*16)*(1-((1/3)*COS(PI()/180*0)*COS(PI()/180*0)))*COS(PI()/180*0)/(1000)
case ii y=h
= 0.563
(0.5625*COSH(3.674*4.61/16))/COSH(3.674*4.61/16)
(0.563*0.014*1029.56*9.81*4.61*16)*(1-((1/3)*COS(PI()/180*0)*COS(PI()/180*0)))*COS(PI()/180*0)/1000
= 0.23
(1.125*((8/16)-(4/3)*(8/16)^3)*sech(3.674*4.61/16)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(0.23*0.014*1029.56*9.81*16)
(0.08*25*0.45*9.81)
Av = 0.05
((2/3)*(0.16*1.5*2.5/(2*4)
Pv = 2.3 kN/m2
(0.05*(1029.56*9.81*4.61*(1-0/4.61)/1000)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(SQRT((3.2+8.83)^2+(3.91^2)+(2.3^2))
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
Grade of concrete M = 30
h/L = 0.205
(5.8*2*SQRT(1029.56))/(SQRT(0.35/9.735)*(27386127875.2583)
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(5*SQRT(9.735/9.81)
Ah = 0.08
(0.16 / 2 )
Ah = 0.014
(0.16*1.5*0.48)/(2*4)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
Circumferential angle φ = 0
Qiw = 0.87
(0.866*(1-((0/2)^2))*TANH(0.866*9.735/2)
(0.87*0.08*1029.56*9.81*2)/1000
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
Qib = 1.000
(SINH(1.732*4.8675/2))/COSH(0.866*9.735/2)
(1*0.08*1029.56*9.81*2)/1000)
Case i) y=0
Qcw = 0.342
(0.4165*COSH(3.162*0/9.735))/COSH(3.162*2/9.735)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(0.342*0.08*1029.56*9.81*2*9.735)/(1000)
= 0.417
(0.4165*COSH(3.162*2/9.735))/COSH(3.162*2/9.735)
(0.417*0.014*1029.56*9.81*2*9.735)/1000
= 0.31
(1.125*((4.8675/9.735)-(4/3)*(4.8675/9.735)^3)*sech(3.162*2/9.735)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(0.31*0.014*1029.56*9.81*9.735)
(0.08*25*0.35*9.81)
Av = 0.05
((2/3)*(0.16*1.5*2.5/(2*4)
Pv = 1.01 kN/m2
(0.05*(1029.56*9.81*2*(1-0/2)/1000)
L&T Construction Public Health and Municipal
Water & Effluent Treatment IC - Wastewater BU Engineering Department
DOCUMENT NO. REV
Project : Construction of Decentralized Sewage
Treatment Plants with any proven Technology including
LE160315-C-WW-SW-DC-3236 A
receiving sumps cum pumping stations, Providing
Sewer Network stem in entire city including
construction of Conventional Manholes & Precast
Manholes, House Sewer Connections and Allied Works, DESIGNED CHECKED APPROVED SHEET
O&M for a period of 5 years complete, in Nellore
Municipal Corporation.
Title : Design Calculation for 55 MLD RSPH at Allipuram NVK JTP TGB
(SQRT((1.4+6.87)^2+(1.15^2)+(1.01^2))