QUOTATION
QUOTATION
QUOTATION
Location: EDSA
Owner: BBC
TOTAL
MATERIAL LABOR COST TOTAL
DESCRIPTION QTY UNIT UNIT
COST
UNIT COST TOTAL UNIT COST TOTAL COST
(B.I "Superior" Sch. 40 Std. Pipes and Fittings)
B.I Pipes Sch.I 40 std
50mm dia 6 lm 266 1,596 93.1 1,117.20 359.1 2,713.20
25mm dia 36 lm 206.15 7,421.40 72.15 2,597.49 278.3 10,018.89
Tee
25x25 4 pcs 179.76 719.04 62.92 251.66 242.68 970.7
25x15 4 pcs 160.01 640.04 56 224.01 216.01 864.05
Elbow
25x90 26 pcs 169.25 4,400.50 59.24 1,540.18 228.49 5,940.68
Reducer
25x25 4 pcs 116 464 40.6 162.4 156.6 626.4
25x15 6 pcs 91.06 546.36 31.87 191.23 122.93 737.59
Sprinkler head side-
4 pcs 238.05 952.2 83.32 499.91 321.37 1,452.11
wall type
Miscellaneous 1 lot 1,000.00 1,000.00 350 350 1,350 1,350
Sub total 24,673.62
Submitted by:
Ariel M. Sande
Sub-con