QUOTATION

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

November 20, 2020

Attention: Engr. Rudy Nui

Project: EDSA GRAND RESIDENCE

Location: EDSA

Owner: BBC

Subject: FIRE PROTECTION WORKS @ Ground Floor Food Panda

TOTAL
MATERIAL LABOR COST TOTAL
DESCRIPTION QTY UNIT UNIT
COST
UNIT COST TOTAL UNIT COST TOTAL COST
(B.I "Superior" Sch. 40 Std. Pipes and Fittings)
B.I Pipes Sch.I 40 std              
50mm dia 6 lm 266 1,596 93.1 1,117.20 359.1 2,713.20
25mm dia 36 lm 206.15 7,421.40 72.15 2,597.49 278.3 10,018.89
Tee                
25x25 4 pcs 179.76 719.04 62.92 251.66 242.68 970.7
25x15 4 pcs 160.01 640.04 56 224.01 216.01 864.05
Elbow                
25x90 26 pcs 169.25 4,400.50 59.24 1,540.18 228.49 5,940.68
Reducer                
25x25 4 pcs 116 464 40.6 162.4 156.6 626.4
25x15 6 pcs 91.06 546.36 31.87 191.23 122.93 737.59
Sprinkler head side-
4 pcs 238.05 952.2 83.32 499.91 321.37 1,452.11
wall type
Miscellaneous 1 lot 1,000.00 1,000.00 350 350 1,350 1,350
   
Sub total               24,673.62

Terms of Payment: 50% Down Payment, 50% Upon Completion, No Retention.

Warranty: One (1) year against inherent defect on workmanship.

Submitted by:

Ariel M. Sande

Sub-con