Download as pdf or txt
Download as pdf or txt
You are on page 1of 108

Offshore Rig Technology

Catalog 2014

TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
2

Introduction
Schlumberger is the industry leader in deepwater
exploration and development services, with a proven
record of success in all environments including deepwater
provinces such as the Gulf of Mexico, the North Sea,
West Africa, and Brazil, as well as emerging areas
including India, Asia, and Australia.
High operation and infrastructure cost in deepwater
environments requires an increased level of equipment
quality and reliability. Our highly qualified personnel
complete the requirement for flawless service provision.
This document highlights Schlumberger offshore
rig technology offerings across a broad range of oilfield
operational domains.

INTRODUCTION 1 of 5 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
3

Rigs ready for startup


Equipping a rig with best-in-class engineered oilfield
equipment before it leaves the shipyard provides many
advantages. In addition to better in-field service delivery,
it ensures the new unit is ready for expected operations
and can start up quickly. The receiving location knows
what to expect, so can better prepare for the rig’s arrival.
Risk of nonproductive time (NPT) is reduced with
thorough modeling and testing of equipment,
and its effective integration.

INTRODUCTION 2 of 5 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
4

Better resource usage


The modular oilfield equipment is designed for minimum
use of deck space and fast installation and rig-up. In many
instances, synergies between equipment and control
systems for multiple field applications can mean less need
for individual service modules, reduced requirement
for personnel on board, and more efficient use of limited
operational space.

Efficient logistics
Installing complex oilfield equipment in remote locations
can present logistical challenges, as well as delays,
and extra costs in import/export and related regulatory
processes. Bringing a fully equipped rig on site to begin
operations can overcome these challenges.

INTRODUCTION 3 of 5 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
5

Rig HSE
requirements supported
Considering health, safety, and environment (HSE) issues
early in the design process allows proper time for analysis
and mitigation of risks, and avoids subsequent compromises
installing and integrating unplanned modules. Installing
the equipment and cabling at the most appropriate time
in the building process, and in a well-controlled shipyard
environment, avoids risks and hazards inherent in installation
in remote ports or at sea.

INTRODUCTION 4 of 5 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
6

Worldwide new-build installation experience


Schlumberger has a wealth of experience designing and installing equipment in new-build rigs
in shipyards around the world. We have installation teams located in areas of highest new-build
activity, and a support organization able to mobilize anywhere in the world. Our teams understand
the importance of early engagement in the installation design and execution process.

Global operations support infrastructure


Schlumberger offers an unrivalled global footprint of local operations bases, with 24/7 technical
support from expert teams strategically located around the world, including Singapore, China,
South Korea, UAE, and USA. Schlumberger has extensive experience of integrated operations
in remote areas and, in addition to industry-leading individual technologies, can provide complete
solutions to complex technical and logistical challenges.

INTRODUCTION 5 of 5 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
7

Contents Cementing
Skid-Mounted Units | Batch Mixers | Liquid Additive Systems | Cement Equipment Package

Solids Control, Cuttings Management, Fluids Processing and Pressure Control


Solids Control | Cuttings Management | Fluids Processing | Pressure Control

Wireline Logging
Formation Evaluation Equipment

Well Testing
Modular Compact Well Test System | Booms and Burners

Surface and Mud Logging


FLAG* Fluid Loss and Gain Detection Service | CLEAR* Cuttings Loading and Wellbore Stability Surveillance Service |
Combined Services Units | Mud Logging Units

Drilling Tools, Tubulars & Inspection


Premium Tubular Products | Rigfloor Sub Packages | Premium Hardbanding | Ezy-Torq Hydraulic Cathead |
Landing Strings | Inspection | Wellbore Cleanup Specialized Tools

TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
8

Cementing
Whatever the drilling environment and however remote the location, ■■ Since 2007, Schlumberger cementing equipment has been
Schlumberger innovative cementing technologies offer a range installed on more than 65 new-build rigs, including jackups,
of solutions to achieve zonal isolation for the life of your well. drillships, and semisubmersibles.
Schlumberger cementing equipment packages are designed ■■ Schlumberger engages with customers at the design
to address overall needs based on our experience and your input. and execution stages with dedicated installation teams
Successful cement jobs present in all major shipbuilding areas, including
■■ deliver slurry consistency ■■ South Korea
■■ control the factors that cause or prevent wet shoes ■■ Singapore
■■ reduce the possibility of fluid contamination points ■■ China
■■ reduce failure rates through operational redundancy. ■■ UAE
■■ USA
■■ Schlumberger has equipment and manufacturing support
in Singapore, close to new-build activity.

CEMENTING: 1 of 38 INTRODUCTION TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
9

Skid-Mounted Cementing Units


The performance and versatility of Schlumberger skid-mounted
cementing units make them ideal for offshore, high-pressure
pumping services. These state-of-the-art units, capable of delivering
up to 3,450 hp, can be used as backup or supplemental mud pumps,
as well as efficient cementing units. Power to drive the pumps comes
from high-performance diesel engines or air-cooled electric motors.
All Schlumberger offshore cementing skids comply fully with
the latest European Community (EC) regulations for safety
and health protection. An integrated bulkhead on the driver
module reduces noise, and remote radiator packages and split
designs allow installation of soundproofed walls.
The skids are fitted with sensors for data acquisition and monitoring
systems, and an optional remote control system permits operation
of the unit from an adjacent control room.
When a Schlumberger Mk-III mixer is used in combination with the
skid, cement-mixing rates of more than 20 bbl/min can be achieved.

CEMENTING: 2 of 38 SKID MOUNTED CEMENTING UNITS TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
10

CPS-763
ELECTRIC
Applications
■■ Deepwater cement slurry mixing and pumping
■■ High-pressure pumping and testing operations
■■ Precision pumping for integrity tests

Benefits
■■ Increased mixing rate capability minimizes job time
■■ Power-take-off-driven cementing pumps, improved
reliability, and smaller footprint
■■ Minimized environmental impact (due to elimination
of diesel tank, radiator, and exhaust pipe requirements)

Features
■■ Electrically driven 1,193 kW (1,600 hhp)
■■ 3-in high-pressure lines for accurate,
high-rate displacement
■■ A high-rate, process-controlled liquid additive
system allows the metering of up to six chemicals
into the mix water stream
■■ Data acquisition and control is handled
by two complete systems for redundancy
and reliability of automated mixing, solids fraction
monitoring, foam process control, and liquid
additive systems

CEMENTING: 3 of 38 SKID MOUNTED CEMENTING UNITS: CPS-763 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
11

Description
One of a range of Schlumberger CPS* cement pumping skids, The 1,193-kW (1,600-hhp) unit can pump at a rate of 3.8 m3/min
the CPS-763 ultradeepwater cementing package is designed (24.4 bbl/min) and can be optionally equipped with a high-
and built for extreme conditions and can be used at working efficiency mixing package of dual SLURRY CHIEF* cement mixing
pressures up to 103 MPa (15,000 psi). equipment Mark III cement mixers. These mixers have average
The CPS-763 has two electrically driven batch mixers which tank capacity rates of 3.5-m3/min (22-bbl/min) for lead slurries
can be integrated for spacer or pill mixing, isolated from and 2 m3/min for standard tail systems.
contamination points.

Specifications Slurry Mixing System


General Model Single or dual CBS-393
Engines Two General Electric GE B22A2 Capacity (single CBS-393) 1-m3 [6-bbl] mixing tub and 3-m3 [18-bbl] averaging
Capability (each motor) 860 kW (1,150 bhp), 690 V tank
Transmissions Two Allison SS 6600 Maximum mixing rate 1,749 L/min
(single CBS 393) [60 sacks of dry cement per min or 11 bbl/min]
Cooling systems Marine cooled (air cool optional)
Triplex Pumps Slurry pumps RA-56
Front Gardner Denver GD-1250 Mix-water pumps RA-45
Plunger diameter 95 mm [3.75 in] Liquid Additive System
Maximum pressure 1,248 bar [18,100 psi] Model Wide range of options, from manual metering types
to fully computerized direct-injection types
Maximum pump rate 81 m3/h [8.47 bbl/min]
Other
Rear Gardner Denver GD-1250
Area classification Zone II package
Plunger diameter 127 mm [5 in]
Process control Redundant control systems
Maximum pressure 702 bar [10,186 psi]
and acquisition
Maximum pump rate 144 m3/h [15.05 bbl/min]
Remote control mode Optional

CEMENTING: 4 of 38 SKID MOUNTED CEMENTING UNITS: CPS-763 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
12

CPS-977
ELECTRIC
Applications
■■ High-pressure pumping
■■ Metering and pumping of mixing and displacement fluids
■■ Recirculating cement

Benefits
■■ Full system redundancies
■■ Direct-driven mixing pumps for improved reliability
and efficiency
■■ Minimized environmental impact (due to elimination
of diesel tank, radiator, and exhaust pipe requirements)

Features
■■ Nonradioactive densitometer
■■ Split skid and bullhead
■■ Full selection fluid ends
■■ Pressurized packing and lube systems
■■ Solid fraction monitoring

CEMENTING: 5 of 38 SKID MOUNTED CEMENTING UNITS: CPS-977 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
13

Description
The CPS-977 cement pumping skid is designed for offshore high- and monitoring system, which allows precise control of slurry
pressure pumping services, delivering up to 2,000 hhp. Two 1,150-bhp density. The CPS-977 features stainless steel displacement tanks,
GE GEB22A3 AC motors power the unit and are cooled using has an adjustable choke valve, and a temporary replacement
a closed-loop seawater circuit. The skid-mounted cementer for mud pumping. This unit is compliant with Zone 2 hazardous area
is equipped with the Advanced Cement Control (ACC) data acquisition regulations and is ABS-CDS certified.

Specifications Slurry Mixing System


General Model Twin CBS-393 mixing systems with Mark III mixers
Engines Two General Electric GEB22 motors and one General Maximum mixing rate 22 bbl/min lead slurry and 15 bbl/min standard
Electric GEB20 tail slurry (60 sacks per min dry cement per mixer)
Capability each 860 kW (1,150 bhp) Volume capacity 6-bbl mixing tub and 18-bbl averaging tank per mixer
Transmissions Allison S8610M with air shift, six speeds Liquid Additive System
Allison S9810M with air shift, seven speeds Model Four x SUP-511 pumps (Waukesha 015U2)
Cooling systems Marine cooled Capability of SUP-511 0.25−11 galUS/min at 100 psi max
Triplex Pumps discharge pressure
Model 1 Gardener Denver GD1250 Series with 33⁄4-in fluid end Model Three x SUP-512 pumps (Waukesha 045U2)
Capability 18,100 psi or 8.9 bpm (FOPI) Capability of SUP-512 1.0–54 galUS/min at 100 psi max discharge pressure
Model 2 Gardener Denver HD2250 Series with 5½ in fluid end
Capability 10,000 psi or 19.3 bpm (IOPI) Flowmeters Micro Motion R050S and R100S, accurate to ± 0.5%
of rate
Discharge manifold 15,000 psi
Other
Displacement tanks Two x 20 bbl stainless steel 316
Area classification Zone II Package–DNV certified
Process control Redundant control systems
and acquisition
Auxiliary equipment Twin 100-bbl batch mixers, electric with independent
drives for each centrifuge and agitator

CEMENTING: 6 of 38 SKID MOUNTED CEMENTING UNITS: CPS-977 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
14

CPS-3000
ELECTRIC
Applications
■■ Mixing and pumping of cement slurries
in deepwater applications
■■ High-pressure pumping and testing operations
■■ Precision pumping for integrity tests

Benefits
■■ Increased mixing rate capability to minimize job time
■■ Complete redundancy of systems

Features
■■ High hhp to allow for metered displacements
and completion pumping operations
■■ The mixing package comprises dual Mark III mixers from
the range of SLURRY CHIEF* cement mixing equipment
with tanks capable of 22-bbl/min rates for lead slurries
and 15-bbl/min rates for standard tail systems
■■ Twin 100-bbl batch mixers can be integrated for spacer
pill mixing, isolated from contamination points
■■ A high-rate, process-controlled, direct-injection liquid
additive system provides the ability to accurately meter
up to seven chemicals into the mix water stream
■■ Accurate control of slurry density

CEMENTING: 7 of 38 SKID MOUNTED CEMENTING UNITS: CPS-3000 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
15

Description
The CPS-3000 is a 3,450-hp unit capable of pumping 26 bbl/min
at pressures up to 15,000 psi (18,000 psi with a high-pressure
manifold). Two complete process control units handle data
acquisition and control for redundancy and reliability of automated
cement mixing, solids fraction monitoring, foam process control,
and liquid additive system.

Specifications Slurry Mixing System


General Model Twin CBS-393 mixing systems with Mark III mixers
Engines Two General Electric GEB22 motors and one General Maximum mixing rate 22 bbl/min lead slurry and 15 bbl/min standard
Electric GEB20 tail slurry (60 sacks per min dry cement per mixer)
Capability each 860 kW (1,150 bhp) Volume capacity 6-bbl mixing tub and 18-bbl averaging tank per mixer
Transmissions Allison S8610M with air shift, six speeds Liquid Additive System
Allison S9810M with air shift, seven speeds Model Four x SUP-511 pumps (Waukesha 015U2)
Cooling systems Marine cooled Capability of SUP-511 0.25−11 galUS/min at 100 psi max
Triplex Pumps discharge pressure
Model 1 Gardener Denver GD1250 Series with 33⁄4-in fluid end Model Three x SUP-512 pumps (Waukesha 045U2)
Capability 18,100 psi or 8.9 bpm (FOPI) Capability of SUP-512 1.0–54 galUS/min at 100 psi max discharge pressure
Model 2 Gardener Denver HD2250 Series with 5½ in fluid end
Capability 10,000 psi or 19.3 bpm (IOPI) Flowmeters Micro Motion R050S and R100S, accurate to ± 0.5%
of rate
Discharge manifold 15,000 psi
Other
Displacement tanks Two x 20 bbl stainless steel 316
Area classification Zone II Package–DNV certified
Process control Redundant control systems
and acquisition
Auxiliary equipment Twin 100-bbl batch mixers, electric with independent
drives for each centrifuge and agitator

CEMENTING: 8 of 38 SKID MOUNTED CEMENTING UNITS: CPS-3000 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
16

CPS-361 Applications
■■ Provides high-pressure pumping services
■■ Metering and pumping of mixing and displacement fluids
■■ Recirculating cement

Benefits
■■ Precision control of slurry density

Features
■■ Mark III mixer from the range of SLURRY CHIEF* cement
mixing equipment with CBS-393
■■ Nonradioactive densitometer
■■ Stainless steel displacement tanks
■■ Adjustable choke valve
■■ Optional CMK 828 solids fraction monitoring

CEMENTING: 9 of 38 SKID MOUNTED CEMENTING UNITS: CPS-361 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
17

Description
The CPS-361 cement pumping skid delivers high-pressure pumping
services (up to 500 hhp) for operations. This split skip with bulkhead
has two 340-bhp electronic diesel engines.
The skid is equipped with Advanced Cement Control (ACC) data
acquisition and monitoring, allowing the precise control of slurry
density. It has a pressurized packing lube system, a full selection
of fluid ends, and can be supplied with a marine cooling kit.

Specifications Slurry Mixing System


General Model CBS-393 mixing system with SLURRY
Model Two Caterpillar C9 wet manifolds CHIEF equipment Mark III mixer
Capability 254 kW [340 bhp] at 2,100 rpm Volume capacity 6-bbl mixing tub and 18-bbl averaging tank per mixer
Transmissions Two Allison 4700-OFS Maximum mixing rate 2,560 kg/min [60 sacks dry cement/min]
Cooling system Two onboard stainless steel radiators Other
Area classification Rig-safe (air-starting, air-intake shut-off valves, Discharge manifold 1,034-bar [15,000-psi] maximum working pressure
spark-arresting muffler, water-cooled exhaust Displacement tanks Two × 1,590–L [2 × 10–bbl] stainless steel 316
manifold, and turbo) Emissions compliance EPA Nonroad Tier III/Euro Nonroad Stage IIIA/IMO
Triplex Pumps Tier 1
Front Serva TPB-600 Option
Plunger diameter 89 mm [3.5 in] Marine cooling Two marine coolers to replace standard onboard
Maximum pressure 689 bar [10,000 psi] radiators
Maximum pump rate 75 m3/h [7.9 bbl/min] Flow rate 2 × 378.5 L [2 × 100 galUS/min]
Rear Serva TPB-600 Flow resistance 18.2 kPa/L [10 psi/galUS]
Plunger diameter 114 mm [4.5 in]
Maximum pressure 434 bar [6,300 psi]
Maximum pump rate 124 m3/h [13 bbl/min]

CEMENTING: 10 of 38 SKID MOUNTED CEMENTING UNITS: CPS-361 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
18

CPS-679 Applications
■■ Provides high-pressure pumping services
■■ Meters and pumps mixing and displacement fluids
■■ Recirculating cement mixer

Benefits
■■ Full system redundancies
■■ Direct-driven mixing pumps for improved reliability
and efficiency

Features
■■ Nonradioactive densitometer
■■ Split skid with bulkhead
■■ Solid fraction monitoring
■■ Temporary replacement for mud pump
■■ Dual human-machine interface (HMI) system

CEMENTING: 11 of 38 SKID MOUNTED CEMENTING UNITS: CPS-679 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
19

Description
The CPS-679 cement pumping skid was designed for offshore This unit features a split design with bulkhead for installation
high-pressure pumping services. Two 715-hp Caterpillar® diesel of a soundproof wall. The remote control system allows local
engines power the unit, and it has an adjustable choke valve and remote operation. It is Zone 2 hazardous area compliant
and stainless steel displacement tanks. The CPS-679 has and ABS-CDS, DNV-OS-E101 certified.
a full selection of fluid ends, a pressurized packing lube system,
and a remote radiator package.

Specifications Slurry Mixing System


General Model Remote controlled CBS-393 mixing system with
Model Two Caterpillar C18 engines remote controlled SLURRY CHIEF* cement mixing
equipment Mark III mixer
Capability (each) 715 hp at 2,100 rpm
Maximum mixing rate 2,560 kg/min [60 sacks dry cement/min]
Transmissions Two Allison S6610
Volume capacity 6-bbl mixing tub and 18-bbl averaging tank per mixer
Cooling system Two remote radiators
Bulk System
Compliance
Model CUS-122 remote control surge tank
Hazardous area Zone 2 compliant
Capacity total/usable 80 cuft / 70 cuft
Certifications
PLC Control System
ABS-CDS, DNV-OS-E101
PLC cabinet One programmable logic controller cabinet located
Triplex Pumps in the cement control room / electrical switch room
Front pump Gardner Denver GD 1250 series HMI computers Two human–machine interface computers located
Plunger diameter 33/4 in (95 mm) in the cement control room
Maximum pressure 18,100 psi [1,248 bar] Other
Maximum pump rate 6.18 bpm [59 m3/hr] Discharge manifold 1,034-bar [15,000-psi] maximum working pressure
Rear pump Gardner Denver GD 1250 series Displacement tanks 2 × 1,590 L [2 × 10 bbl] stainless steel 316
Plunger diameter 5 in [127 mm]
Maximum pressure 10,186 psi [702 bar]
Maximum pump rate 10.99 bpm [105 m3/hr]

CEMENTING: 12 of 38 SKID MOUNTED CEMENTING UNITS: CPS-679 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
20

CBS-393 Applications
■■ Efficient and flexible method of providing homogeneous
cement slurries at their designed density, solids
fractions, and pump rates
■■ On-the-fly mixing and recirculation of cement slurries
or other fluids

Benefits
■■ The combination of mixing tub and averaging tub enables
fast response when bulk delivery issues or other
discrepancies in slurry quality are observed
■■ The quality and volume of the cement slurry in the mixing
tub is controlled manually or automatically to ensure
a constant density or solids fraction
■■ Maintains a large buffer volume of premixed slurry to enable
pumping operations at designed downhole rates

Features
■■ Recirculating Mark III mixer from the range of SLURRY
CHIEF* cement mixing equipment
■■ Bulk blend control valve
■■ Quick cement slurry shut-off
■■ Six-barrel mixing tub and 18-barrel averaging tank
■■ SlurryAirSeparator* mechanical cement slurry defoamer
■■ Guided radar level sensors
■■ Promass mass flowmeter

CEMENTING: 13 of 38 SKID MOUNTED CEMENTING UNITS: CBS-393 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
21

Description
The CBS-393 slurry mixing system offers mixing rates of up to The cement slurry passes into a six-barrel mixing tub and is
11 bpm, depending on the bulk cement delivery rates and cement continuously recirculated through the Mark III mixer and a Promass
slurry design. The dry cement blend is delivered to the SLURRY CHIEF mass flowmeter. (Note: the 5x6 centrifugal pump is not included with
equipment Mark III mixer by gravity feed from the CUS-122 surge the CBS-393.) The cement slurry is recirculated and transferred
tank via a metering knife gate. It is mixed directly with the mix water to the cement pump unit using a second centrifugal pump prior
delivered to the mixer from a dedicated 5x6 centrifugal pump. to going down hole.

Specifications Slurry Tub cont.


SLURRY CHIEF Equipment Mark III Mixer Width (overall) 6 ft 8 in (2,011 mm)
Length diagonal 54 in (1,372 mm) Height (overall) 8 ft 8 in (2,642 mm)
Width 30 in (762 mm) Dry weight, excl. mixer 3,300 lbs (1,500 kg)
Height 27 in (689 mm) Operating weight, 23,460 lbs (10,641 kg) assuming 20 ppg fluid
Dry weight (without 297 lbs (135 kg) excl. mixer in both tubs
mixing tub) Slurry Mixing Rate Capabilities
Max. mixing capacity 60 sacks dry cement per minute (2,560 kg/min) Density 22 lb/gal 19 lb/gal 17 lb/gal
Density range 11.6 - 22 lb/gal (1.4 to 2.64 sg) (2.64 sg) (2.28 sg) (2.04 sg)
Slurry Tub Bulk delivery rate 2,328 lb/min 5,223 lb/min 5,805 lb/min
(1,056 kg/min) (2,639 kg/min) (2,633 kg/min)
Capacity 6-bbl mixing tub + 18-bbl averaging tub (954 + 2,862 L)
Slurry rate 3 bbl/min 8 bbl/min 11 bbl/min
Length (overall) 9 ft (2,727 mm)

CEMENTING: 14 of 38 SKID MOUNTED CEMENTING UNITS: CBS-393 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
22

CBS-593 Applications
■■ Cementing services
■■ High-power pumping services
■■ Remedial cementing operations

Benefits
■■ The design focuses on reliability, redundancy,
and noise reduction
■■ Full redundancy ensures job completion
■■ Downtime reduced by reliability of equipment
■■ Mixes all slurry types

Features
■■ Power to 388 kW (520 hhp)
■■ Working pressure rating of 68.95 MPa (10,000 psi)
■■ Integrated data acquisition system
■■ Mixing capacity of 60 sacks (dry cement) per minute
■■ Self-sufficient unit, including treating iron

CEMENTING: 15 of 38 SKID MOUNTED CEMENTING UNITS: CBS-593 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
23

Description
This SLURRY CHIEF* cement mixing equipment Mark III mixer is A CemCAT* cementing computer-aided treatment system is used
used in conjunction with a 0.95-m3 (6-bbl) mixing tub which produces to monitor and record treatment parameters and provide a job report.
superior density control and separates the critical mixing stage from Two triplex pumps equip the unit for simultaneous high-energy mixing
downhole pumping. It is also capable of mixing a maximum of 3.2 m3 and downhole pumping or for parallel downhole pumping.
(20 bbl) of cement in batch mode for squeeze and plug operations.

Specifications Slurry Tub (continued)


SLURRY CHIEF Equipment Mark III Mixer Width (overall) 6 ft 8 in (2,011 mm)
Length diagonal 54 in (1,372 mm) Height (overall) 8 ft 8 in (2,642 mm)
Width 30 in (762 mm) Dry weight, excl. mixer 3,300 lbs (1,500 kg)
Height 27 in (689 mm) Operating weight, 23,460 lbs (10,641 kg) assuming 20 ppg fluid
Dry weight (without 297 lbs (135 kg) excl. mixer in both tubs
mixing tub) Slurry Mixing Rate Capabilities
Max. mixing capacity 60 sacks dry cement per minute (2,560 kg/min) Density 22 lb/gal 19 lb/gal 17 lb/gal
Density range 11.6 - 22 lb/gal (1.4 to 2.64 sg) (2.64 sg) (2.28 sg) (2.04 sg)
Slurry Tub Bulk delivery rate 2,328 lb/min 5,223 lb/min 5,805 lb/min
(1,056 kg/min) (2,639 kg/min) (2,633 kg/min)
Capacity 6-bbl mixing tub + 18-bbl averaging tub (954 + 2,862 L)
Slurry rate 3 bbl/min 8 bbl/min 11 bbl/min
Length (overall) 9 ft (2,727 mm)

CEMENTING: 16 of 38 SKID MOUNTED CEMENTING UNITS: CBS-593 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
24

Batch Mixers
Batch mixers are available for the mixing of cement slurries and other
fluids. The units feature two centrifugal pumps for picking up fluids
from remote tanks, recirculating for mixing, and for delivering fluid
to high-pressure pumps.

CBS-957

CBS-965

CEMENTING: 17 of 38 BATCH MIXERS TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
25

CBS-965 Applications
■■ Transfer of fluids from remote sources
■■ Recirculation of cement slurry to blending tanks
■■ Delivery of cement slurry or fluids to pumping unit

Benefits
■■ Allows for individual tank mixing and cross mixing
■■ Handles large volumes of cement slurry
■■ Allows for pneumatic feeding of dry cement directly
to the batch mixer
■■ Uniform cement slurry

Features
■■ Two 150-hp AC electric motors, 690 VAC 60 HZ, 3-phase
■■ Two mixing/pressurizing pumps
■■ Two 50-bbl batch tanks
■■ Pressurized packing lubrication for C-pumps
■■ Hopper and cutting table

CEMENTING: 18 of 38 BATCH MIXERS: CBS-965 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
26

Description
The CBS-965 electric batch mixer skid mixes and recirculates cement
slurry for the pumping unit. The unit is equipped with two 50-bbl
blending tanks capable of handling large volumes of cement slurry.
Two centrifugal pumps are capable of transferring fluids from remote
sources. The pumps also recirculate cement slurry back to the tanks
and discharge fluids to the pumping unit. The unit is equipped with
piping and valves that enable individual mixing and discharge
of the two 50-bbl tanks, as well as cross mixing.

Specifications Unit Specifications


General Length, m [ft] 7,010 mm (23 ft)
Electric motors Two x 150 hp 3-phase AC electric motors, 690 V/60 Width, m [ft] 2,500 mm (8 ft 2 in)
hz, IEC w/ 110 V heater Height
Drive mechanism Transportation mode 3,945 mm (13 ft)
Drive shaft 1,410 series (railing down)
Pulley Gates Railing up 4,380 mm (14 ft 4 in)
Belt Gates predator-5vp Powerband Weight (wet) 15 MT unladen
Agitators 10 hp electric motor driven Lightning agitators Ambient rating 0 to 40 degC
Centrifugal pumps RA56 pumps Option
Batch tanks Two x 50 bbl Remote control available

CEMENTING: 19 of 38 BATCH MIXERS: CBS-965 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
27

CBS-967 Applications
■■ Preparation of various types of liquid/solid blends
to exact specifications for delivery to the pumping unit
■■ High-power pumping services

Benefits
■■ Use of Exd starters and ATEX approved
electrical components
■■ Large volumes of uniform cement slurry
■■ Allows for pneumatic feeding of dry cement directly
to the batch mixer
■■ Transfers fluids from remote sources

Features
■■ Two 150-hp, 480 VAC 60 HZ, explosion-proof IEC motors
(optional 440 VAC, 460 VAC, and 690 VAC)
■■ Two mixing/pressurizing pumps
■■ Two 100-bbl batch tanks
■■ RA-56 C-pumps (2,300-2,400 rpm)
■■ Hopper and cutting table

CEMENTING: 20 of 38 BATCH MIXERS: CBS-967 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
28

Description
The CBS-967 electric batch mixer skid allows the preparation Two centrifugal pumps are capable of recirculating fluid through
of various types of liquid/solid blends to exact specifications the tanks, mixing jet and discharge slurry or fluids to the pumping
for delivery to the pumping unit. The unit is equipped with unit. The cement blender skid meets Zone 2 hazardous area electrical
two 100-bbl blending tanks with agitators to prevent solids settling. requirements for offshore use.

Specifications Unit Specifications


General Length, m [ft] 9,665 mm (31ft 8.5 in)
Electric motors Two x150 hp, 480 VAC/60 HZ explosion-proof IEC Width, m [ft] 2,729 mm (8 ft)
motors. Optional 440 VAC, 460 VAC, 690 VAC Height 4,292 mm (14 ft)
Drive mechanism Weight, dry 19,000 kg (calculated)
Drive shaft 1,410 series Weight, operating 80,000 kg (calculated)
Pulley Gates (1.9 sg fluid)
Belt Gates predator-5vp Powerband Option
Agitators Driven by two x 10 hp, 440 VAC, 60 HZ, explo- Remote control available
sion-proof IEC motors
Centrifugal pumps RA56 pumps
Batch tanks Two x 100 bbl

CEMENTING: 21 of 38 BATCH MIXERS: CBS-967 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
29

CBS-955 Applications
■■ Transfer of fluids from remote sources
■■ Recirculation of cement slurry back to the blending tanks

Benefits
■■ Allows for individual tank mixing and cross mixing
■■ Capable of handling large volumes of cement slurry
■■ Allows for pneumatic feeding of dry cement directly
to the batch mixer

Features
■■ Hydraulic power pack with electronic diesel engine,
EPA Tier 3 and Euro Stage IIIA emission compliant
■■ Two 50-bbl batch tanks
■■ Oil-lubricated centrifugal pump packing
■■ Hopper and cutting table

CEMENTING: 22 of 38 BATCH MIXERS: CBS-955 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
30

Description
This unit is equipped with two 50-bbl blending tanks capable
of handling large volumes of cement slurry. Two centrifugal
pumps are capable of transferring fluids from remote sources.
The pumps also recirculate cement slurry back to the tanks,
mixing jet and discharge fluids to the pumping unit.

Specifications
General
Engines DEUTZ® BF6M1015C
Capability 365 bhp at 1,950 rpm
Gear box Funk™ gearbox, model 28102AA
Drive mechanism
Hydraulic motors Two x Parker® Denison hydraulic vane motor
Hydraulic pumps Two x Parker Denison hydraulic vane pumps
Centrifugal pumps Two x Schlumberger RA-56
Residence tanks Two x 50-bbl capacity
Engine Emissions EPA Nonroad Tier II/Euro Nonroad Stage II
Compliance
Unit Specifications
Length, m [ft] 8.1 [26.6]
Width, m [ft] 2.8 [9]
Height, m [ft] 3.3 [10.8]
Weight, kg [lbm] 15,000 [33,070]
Ambient rating, degC [degF] 0 to 48 [32 to 188.4]

CEMENTING: 23 of 38 BATCH MIXERS: CBS-955 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
31
CEMENTING: BATCH MIXERS: CBS-957 1 of 2

CBS-957 Applications
■■ Blends uniform cement slurry in large amounts
■■ Recirculates cement slurry back to the blending tank
■■ Delivers cement slurry or fluids to the pumping unit

Benefits
■■ Standard unit designed for operations from 0 degC
to 48 degC ambient temperature
■■ Two RA56 centrifugal pumps capable of transferring
fluids from remote sources
■■ Allows for pneumatic feeding of dry cement directly
to the batch mixer
■■ Accurately provides cement slurry to the pumping unit
while greatly reducing cement density fluctuation

Features
■■ Hydraulic power package with electronic diesel engine,
EPA Tier 3 and Euro Stage IIIA
■■ Mixing/pressurize pumps
■■ Two 100-bbl batch tanks
■■ Oil-lubricated centrifugal pump packing
■■ Hopper and cutting table

CEMENTING: 24 of 38 BATCH MIXERS: CBS-957 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
32

Description
The CBS-957 cement batch mixer skid mixes and recirculates cement Two centrifugal pumps are capable of transferring fluids from remote
slurry for the pumping unit. The unit is equipped with two 100-bbl sources. The cement slurry is continuously recirculated and agitated
blending tanks capable of handling large volumes of cement slurry. until ready to be discharged to the pumping unit.

Specifications
General
Engine Caterpillar C9, 350 bhp at 2,200 rpm, dry manifold
Gear box Funk gearbox, model 28102 AA
Drive mechanism
Hydraulic motors Two x Parker Denison vane motors
Hydraulic pumps Two x Parker Denison vane pumps
Centrifugal pumps Two x Schlumberger RA-56 pumps
Agitators Two x Level impeller mixer driven by Poclain®
hydraulic motors
Residence Tanks Two x 100-bbl capacity
Engine Emissions EPA Nonroad Tier III/Euro Nonroad Stage IIIA
Compliance
Unit Specifications
Length, m [ft] 9.6 [31.5]
Width, m [ft] 2.7 [9 ft]
Height, m [ft]
Operational, m [ft] 4.3 [14.1)
Transportation, m [ft] 3.5 [11.5]
Weight, kg [lbm] 16,600 [36,597]
Ambient rating, degC [degF] 0 to 48 [32 to 118]

CEMENTING: 25 of 38 BATCH MIXERS: CBS-957 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
33

Liquid Additive Systems


Our modular systems (such as the CMP-351 unit) deliver metered
amounts of liquid additives to the cement slurry as it is mixed.
Metering of liquid additives adds versatility to the mixing process,
enabling the mixing of various slurry systems from bulk storage
of neat cement.
Metering can be manual or automatic when the CMP-751 liquid
additive system (LAS) metering unit is used. With the CMP-751
unit, electromagnetic flow meters control the additive metered
into displacement tanks.

CMP-754

CMP-756

CEMENTING: 26 of 38 LIQUID ADDITIVE SYSTEMS TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
34

CMP-355 Applications
■■ Meters and delivers liquid additives for cement
slurry blending
■■ Meters up to six different liquid additives into
the displacement tanks

Benefits
■■ Each of the four pneumatic diaphragm pumps
can provide up to 35 gal/min (132.5 l/min) for various
liquid additives, tailored to the cement slurry recipe
■■ The additive metering can be accomplished with
the metering tank or optional computerized metering
racks CMP-751 or CMP-756

Features
■■ Up to six rack-mounted diaphragm pumps with suction
and discharge manifolds
■■ Control panel
■■ Metering rack with up to four tanks. Control valves
and support for installation onto displacement tanks
■■ Two lightning mixers

CEMENTING: 27 of 38 LIQUID ADDITIVE SYSTEMS: CMP-355 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
35

Description
The CMP-355 liquid additive system meters and delivers liquid the rig and dispensed out of the tote tanks, reducing transfer
additives for cement slurry blending. Liquid additives are shipped into of chemicals and cleaning of tanks on location.

Specifications
General 4 Line 6 Line
Pumps Pneumatic - diaphragm type Pneumatic - diaphragm type
Discharge pressure 100 psi (7 bars) 100 psi (7 bars)
Discharge flow rate (each pump) 35 gal/min (132.5 liters/min) 35 gal/min (132.5 liters/min)
Air supply 70 to 115 psi (5 to 9 bars) maximum 150 psi (10 bars) 70 to 115 psi (5 to 9 bars) maximum 150 psi (10 bars)
50 scfm at 100 psi each, 200 scfm total (1,416 l/min each, 50 scfm at 100 psi each, 300 scfm total (1,416 lpm each,
Pump air consumption
5,664 l/min total) 8,496 lpm total)
Operating temperature -4 degF to 158 degF (-20 degC to 70 degC) -4 degF to 158 degF (-20 degC to 70 degC)
Lightning mixers for installation in
Standard (2 each) Standard (2 each)
displacement tanks
15 scfm at 60 psi each, 30 scfm total 15 scfm at 60 psi each, 30 scfm total
Lightning mixers air consumption
(425 lpm each, 850 lpm total) (425 lpm each, 850 lpm total)
Pumps Rack
Length 1,905 mm (75 in) 2,934 mm (9 ft 8 in)
Width 711 mm (28 in) 722 mm (2 ft 4 in)
Height 1,727 mm (68 in) 1,740 mm (5 ft 9 in)
Weight 500 kg (1,100 lbs) 800 kg (1,764 lb)
Metering Tanks
Length 1,070 mm (42 in) 1,842 mm (6 ft)
Width 430 mm (17 in) 908 mm (3 ft)
Height 1,200 mm (47 in) 1,286 mm (4 ft 3 in)
Dry weight 230 kg (960 lbs) 230 kg (960 lbs)
Compartment volumes 3 x 30 gal 4 x 30 gal
Overflow protection Level switches Level switches
Control panel Pneumatic Pneumatic

CEMENTING: 28 of 38 LIQUID ADDITIVE SYSTEMS: CMP-355 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
36

CMP-756 Applications
■■ Meters liquid additives for cement slurry blending
■■ Meters up to six liquid additives to the displacement tanks
to prepare the base fluid

Benefits
■■ High accuracy with four to six different additives which
can be metered simultaneously or in sequence
■■ A programmable logic controller (PLC) enables operator
to remotely control CMP-756 from a human-machine
interface (HMI) computer in the safe area
■■ Can be controlled by a standalone HMI computer with
appropriate software interface

Features
■■ Remote-actuated high- and low-rate pneumatic valves
■■ Other equipment required for operating CMP-756
(not in scope)
■■ Electromagnetic flowmeters measure the additive
quantities, and preset amounts are metered into
the displacement tanks by remote control
■■ Used in conjunction with the CMP-355 pump rack
and proportioning tanks

CEMENTING: 29 of 38 LIQUID ADDITIVE SYSTEMS: CMP-756 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
37

Description
The CMP-756 remote control liquid additive system meters In combination with proportioning tanks, the CMP-756 provides
liquid additives for cement slurry blending. This unit is capable all the advantages of process control while allowing a manual
of high accuracy and up to six different additives can be metered override as backup. The unit is Zone 2 hazardous area compliant.
simultaneously or in sequence.

Specifications
General 4 Line 6 Line
Metering Rack
Overall length Doors closed 1,725 mm (5 ft 8 in); doors open 1,893 mm (6 ft 3 in) Doors closed 2,533 mm (8 ft 4 in); doors open 2,733 mm (9 ft)
Overall width Doors closed 600 mm (2 ft); doors open 940 mm (3 ft 1 in) Doors closed 600 mm (2 ft); doors open 1,000 mm (3 ft 4 in)
Overall height 1,086 mm (3 ft 7 in) 1,086 mm (3 ft 7 in)
Weight 326 kg (719 lb) 425 kg (937 lb)
Flowmeters Electromagnetic Electromagnetic
Application Conductive liquids: four 2-in lines (up to 8 maximum) Conductive liquids: five 2-in lines
Flowmeters - Coriolis mass
Application - Non-conductive liquids: one x 2-in line
Accuracy 2% for a 50-liter volume 2% for a 50-liter volume
Electrical supply 24 VDC 24 VDC
Air supply 70 to 115 psi (5 to 9 bars), maximum 150 psi (10 bars) 70 to 115 psi (5 to 9 bars), maximum 150 psi (10 bars)
Control Cabinet
Material Polyester Polyester
Zone 2 hazardous area compliant Zone 2 hazardous area compliant
Certifications
II 3G Ex nA ib op is [ib] IIB/ IIC T4 - ENC.10 II 3G Ex nA ib op is [ib] IIB/ IIC T4 - ENC.10

CEMENTING: 30 of 38 LIQUID ADDITIVE SYSTEMS: CMP-756 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
38

CMP-751 Applications
■■ Meters liquid additives for cement slurry blending

Benefits
■■ Up to four different additives can be preprogrammed
■■ In combination with a proportioning tank, the CMP-751
provides all the advantages of process control
■■ Allows for a manual override
■■ Electromagnetic flowmeters measure the additive
flow rates and preset amounts are measured remotely
■■ The computerized liquid additive system (LAS) includes
a metering control module and electromagnetic
flowmeters with control valves

Features
■■ Certified for use in Zone 2 hazardous areas
■■ Four electromagnetic flowmeters
■■ Four pneumatic control valves and four pneumatic
restriction valves
■■ Control cabinet
■■ Solenoid valve box

CEMENTING: 31 of 38 LIQUID ADDITIVE SYSTEMS: CMP-751 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
39

Description
The CMP-751 computerized LAS meters liquid additives for cement In combination with a proportioning tank, the CMP-751 provides
slurry blending. The unit is capable of high accuracy and four all the advantages of process control and allows for a manual
different additives can be metered simultaneously or in sequence. override as backup.
Electromagnetic flowmeters measure the additive flow rates The CMP-751 only operates with cementing units that
and preset amounts are measured by remote control flowing into have the Advanced Cement Control (ACC) data acquisition
the displacement tank. The computerized LAS includes a metering and monitoring system.
control module and electromagnetic flowmeters with control valves.

Specifications Control Cabinet


General Overall length 560 mm (22 in)
Metering Rack Overall width 360 mm (15 in)
Overall length 1,692 mm (67 in) Overall height 250 mm (10 in)
Overall width 610 mm (24 in) Material 316L stainless steel
Overall height 1,006 mm (40 in) Electrical supply 380-500 VAC 50 Hz
Unladen weight 310 kg (683 lb) Certification/ EExD IIB T5 (Certificate CESI 02 ATEX 075)/IP65
Flowmeters (4) Four x electromagnetic ingress protection
Application Conductive liquids: four x 2-in lines Solenoid Valve Box
Accuracy 98% for a 50-liter volume Overall length 590 mm (24 in)
Electrical supply 110/220 VAC Overall width 200 mm (8 in)
Overall height 120 mm (5 in)
Material 316L stainless steel

CEMENTING: 32 of 38 LIQUID ADDITIVE SYSTEMS: CMP-751 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
40

CMP-754 Applications
■■ In-line injection of liquid additives into a cement
mixer base fluid

Benefits
■■ Up to six different additives can be preprogrammed
■■ Skid designed for use in Zone 2 hazardous areas
■■ Variable frequency drive (VFD) and programmable logic
controller (PLC) cabinets are designed for safe area

Features
■■ Six positive displacement pumps driven by variable
speed AC motors through gear reducers
■■ Remote-actuated process valves with position feedback
and pneumatic backup control
■■ Six electromagnetic flowmeters (conductive
additive) and one Coriolis mass flowmeter
(nonconductive additive)
■■ VFD cabinet (ENC.14) is provided together with CMP-754
standard package
■■ PLC cabinet is provided as a part of the cementing
pumper skid (CPS) package

CEMENTING: 33 of 38 LIQUID ADDITIVE SYSTEMS: CMP-754 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
41

Description
The CMP-754 continuous liquid additive system controls the base The CMP-754 has two operation modes: remote mode and manual/
fluid rate, which is measured by a flowmeter on the base fluid backup mode. In the remote mode, displacement tanks are bypassed
manifold. Flowmeters on pump discharge measure additive rate as the additives are injected directly into the mix water line.
and adjust pump speed through close loop control. This control In the manual/backup mode, pumps are set to a constant speed
maintains additive concentrations within 98% accuracy of the preset and additives are measured using metering tanks placed on top
value given by the slurry recipe. of the displacement tanks.

Specifications Air supply 70 to 110 psi (5 to 8 bars)


General VFD (ENC.14)
Metering Skid Overall depth 1,400 mm (56 in)
Overall length 3,800 mm (150 in) Overall width 860 mm (34 in)
Overall width 1,430 mm (57 in) Overall height 2,460 mm (97 in)
Overall height 2,052 mm (81 in) Unladen weight 160 kg (353 lb)
Unladen weight 2,800 kg (6,160 lb) Electrical supply 380-500 VAC/3-phase/50-60 Hz/50A/20 kW
Base fluid flowmeter Electromagnetic flowmeter 230 VAC/1-phase/50-60 Hz
Flowmeter 1 Coriolis mass flowmeter Certifications
Flowmeter 2,3,4,5,6 Electromagnetic flowmeter Hazardous area Zone 2 compliant with IEC60079-10
CEC Class 1
Application Conductive liquids: four x 2-in lines
(up to six maximum)
Accuracy 98% for a 50-liter volume
Detailed flowmeter details available on request

CEMENTING: 34 of 38 LIQUID ADDITIVE SYSTEMS: CMP-754 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
42

CMP-351 Applications
■■ This liquid additive system (LAS) is designed to deliver
a predetermined quantity of different liquid additives into
the displacement tanks of the cementing unit

Benefits
■■ Delivers liquid additives for cement blending to metering
tank or metering rack
■■ Constructed of 316L stainless steel for corrosion
resistance and ease of maintenance
■■ Two split tanks consist of two compartments each

Features
■■ Twin-split stainless steel tanks (two compartments each)
■■ Lightning mixers
■■ Metering tank
■■ Remote control panel
■■ Optional metering rack (CMP-751)

CEMENTING: 35 of 38 LIQUID ADDITIVE SYSTEMS: CMP-351 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
43

Description
The CMP-351 LAS is designed to deliver a predetermined quantity Constructed of 316L stainless steel for corrosion resistance
of a number of different liquid additives into the displacement tanks and ease of maintenance, the two split tanks consist
of the cementing unit. of two compartments each.

Specifications Air requirements (maximum) 100 psi at 120 scfm (6.9 bar at 56.6 L/sec)
General Discharge pressure (maximum) 110 psi (7.6 bar)
Metering Skid Discharge flow rate (maximum) 140 GPM (529 L/min)
General assembly part no 100305361 Gauges available Imperial and metric
Nozzle diagram part no 529605000 Metering tank Standard
Load diagram part no 529555000 Control panel Standard
P & ID diagram part no 529604000 Metering rack Standard
Length 3,048 mm (120 in) 3,048 mm Lightning mixers 2
Width 2,440 mm (96 in)
Height 2,413 mm (94 in)
Dry weight 3,000 kg (6,614 lb)
Capacity of compartment 1 3,785 (1,000 gal)
Capacity of compartment 2 1,135 L (300 gal)
Capacity of compartment 3 2,082 L (550 gal)
Capacity of compartment 4 2,839 L (750 gal)

CEMENTING: 36 of 38 LIQUID ADDITIVE SYSTEMS: CMP-351 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
44

Cement Equipment CPS-3000


Package ■■

■■
Remote controlled with local backup
Electrically driven: total of 3,000 hhp, 15,000-psi maximum
allowable working pressure (MAWP)
■■ 22 bpm maximum pump rate

CBS-593
■■ Dual mixing system

CBS-967
■■ Twin 100-bbl batch mixer

CMP-366/756
■■ 6-line liquid additive system

CMS-531/532
■■ CPCS remote control cabin

CUS-916
■■ Dust collector

CUS-916

CEMENTING: 37 of 38 CEMENTING PACKAGE: 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
45

CBS-967 CBS-593

CPS-3000

CEMENTING: 38 of 38 CEMENTING PACKAGE: 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
46

Solids Control, Cuttings Management,


Fluids Processing and Pressure Control
M-I SWACO, a Schlumberger company, designs, manufactures, Specialists at M-I SWACO have put decades of experience,
and services a complete line of variable-motion shakers, expertise, and field-proven technical performance into developing
OEM and replacement shaker screens, centrifuges, and cuttings a line of drilling chokes, separators, and D-GASSERs that
dryers. These technologies are uniquely designed for a range of highly pressure-sensitive
■■ optimize drilling efficiency by minimizing fluid losses applications, including
■■ preserve fluid quality to protect downhole equipment, ■■ managed pressure drilling (MPD)
prevent NPT, and improve drilling performance ■■ underbalanced drilling (UBD)
■■ minimize produced solid and liquid waste volumes. ■■ coiled-tubing (CT)

M-I SWACO cuttings management and fluids processing techniques


■■ frac-plug drillout
further reduce HSE footprint. Specifically ■■ frac flowback
■■ equivalent circulating density (ECD) control
■■ CLEANCUT† cuttings collection and containment system fully
contains drill cuttings and fluid for safe transport ■■ H2S applications
■■ AUTOMATIC TANK CLEANING LITE technology has improved
† ■■ well control
the industry standard for storage tank cleaning by providing ■■ cleanup operations.
ultra-efficient recovery of fluid waste materials.

Mark of M-I SWACO


SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 1 of 17INTRODUCTION TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
47

518 HV Centrifuge Applications


■■ Increased fluid handling and improved solids separation

Benefits
■■ Quasi-axial scroll provides an increased flow area which
minimizes turbulence
■■ Increased flights wear resistance thereby reducing
maintenance requirements
■■ High bowl speed assures a high g-force, solids removal
efficiency percentage and finest cut points
■■ Complete control of g-force and differential settings
for improved separation efficiency
■■ Six bowl speed/differential combinations on fixed drive
units for enhanced simplicity and efficiency

Features
■■ High bowl speed and variable feed pump speed
■■ Variable bowl and scroll speed1
■■ Fixed bowl and differential speed2
■■ Perfectly balanced stainless steel rotating assembly
■■ Programmable logic controller (PLC) control3
Not applicable to fixed drive 2Only applicable to fixed drive 3Only on fully hydraulic drive types
1

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 2 of 17 SOLIDS CONTROL: 518 CENTRIFUGE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
48

Description
518† HV high-volume centrifuge unit replaces the operation of two Increased power for the main drive (50 hp) and back drive
standard 518 centrifuges combined through an increased fluid (15 hp) allows more fluid to be fed into the bowl, while providing
handling capacity and improved solids separation. The 518 HV the necessary torque to remove the increased solids load resulting
centrifuge is designed to handle higher fluid processing rates from the higher feed rate. It features a split pillow block, dual-deck
by providing more power and improving fluid flow. quasi-axial scroll, and tungsten carbide tiles (scroll).

Specifications Differential range


Performance Fixed drive 10 to 79 rpm
Hydraulic capacity 248 GPM 939 LPM VFD 1 to 55 rpm
Operating speed 3,200 rpm FHD 1 to 80 rpm
G-force 1,975 G Weight 159 lbs 72 kg
Sigma value 24,326 ft2 2,260 m2 Motor Specifications
Solids discharge 27 GPM 6.1 m3/h Liquid discharge 8 in Victaulic
Rotating Assembly Solids discharge 21.0 x 13.8 in 530 x 350 mm
Bowl diameter 13.9 in 353.1 mm Feed tube 2 in NPT [male connection]
Bowl length 57.5 in 1,461.1 mm Fixed Drive Type
Pond depth 2.3, 2.42, 2.54 in 58.5, 61.5, 64.5 mm Power 400/460 V - 50/60 Hz, 3 Phase
Scroll type Single lead quasi-axial flow Main drive motor 50 Hp 37 kW
Scroll pitch 4.31 in 109.5 mm Back drive motor 15 Hp 11 kW
Main bearings Grease lubricated VFD Type
Internal bearings Grease lubricated Power 400/460 V - 50/60 Hz, 3 Phase
Feed tube Open ended Main drive motor 50 Hp 37 kW
Gearbox Back drive motor 15 Hp 11 kW
Type Planetary FHD Type
Gear ratio 57:1 Power 400/460 V - 50/60 Hz, 3 Phase
Torque, maximum 2,531 ft-lb 3,432 Nm Main drive motor 60 Hp 45 kW
Hydraulic pump Variable displacement pump

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 3 of 17 SOLIDS CONTROL: 518 CENTRIFUGE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
49

MD-2 Shale Shaker Applications


■■ Primary solids removal from both oil- and water-base
drilling fluids
■■ Flexible fluid distribution

Benefits
■■ Delivers high processing capacities and conveys solids
quickly out of fluid pool
■■ Deceases NPT and removes harmful vapors
■■ Reduces maintenance, drilling, and waste disposal costs
■■ Helps ensure environmental compliance

Features
■■ Patent-pending dual motion: balanced elliptical/
progressive elliptical
■■ Pneumo-hydraulic controls mounted on front of shaker
for deck adjustment. Fluid is a water/low-toxicity
antifreeze mixture
■■ Pneumatic screen clamping system for durable
pre-tensioned composite screens
■■ Dual-deck design with full primary and half-width
scalping decks
■■ Adjusts instantly to changing drilling conditions

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 4 of 17 SOLIDS CONTROL: MD-2 SHALE SHAKER 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
50

Description
By providing primary solids removal from both oil- and water-base Capable of easily switching between balanced elliptical
drilling fluids, the MD-2† dual-deck shale shaker delivers high- and progressive elliptical motions, the MD-2 shaker adapts
capacity separation efficiency and operational flexibility instantly to the continual changes in drilling conditions.
in a value-added footprint. It provides longer screen life, generates
drier cuttings and enhances overall solids control efficiencies.

Specifications Vibratory Motion Type


Dimensions Normal mode 6.5 G
Length 125.0 in 3,175 mm Capacity mode 7G
Width 74.7 in 1,898 mm Motor Specifications
Height at 0° 63.5 in 1,613 mm Voltage 220-690 VAC
Weir height 39.8 inch 1011 mm Speed 1800RPM/60Hz; 1500RPM/50Hz
Weight 6,200 lbs 2,812 kg Certifications UL/cUL, CE, ATEX rated
Screen Deck and Screens
Gross screen area
Scalping deck 16.9 ft2 1.6 m2
Primary decks 33.9 ft2 3.1 m2
Net (API) surface area
Scalping deck 10.6 ft2 1.0 m2
Primary decks 21.1 ft2 2.0 m2
Deck-adjustment system
Scalping deck -1° to +3°
Primary decks +3° to +7°

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 5 of 17 SOLIDS CONTROL: MD-2 SHALE SHAKER 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
51

MD-3 Shale Shaker Applications


■■ Primary solids removal from both oil- and water-base
drilling fluids
■■ Flexible fluid distribution

Benefits
■■ 7.2 G balanced elliptical motion in capacity mode,
6.3 G progressive elliptical motion in efficiency mode
■■ Modular bolting provisions for installation allow flexible
shaker configurations
■■ Composite screen technology increases effective open
area, improves process capacity, and maximizes
screen life

Features
■■ Pneumo-hydraulic controls mounted on front of shaker
for deck adjustment. Fluid is a water/low-toxicity
antifreeze mixture
■■ Pneumatic screen clamping system for durable
pre-tensioned composite screens
■■ Dual-deck design with full primary and half-width
scalping decks
■■ Adjusts instantly to changing drilling conditions
■■ Lightweight screens (<15 lbs [6.8 kg])

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 6 of 17 SOLIDS CONTROL: MD-3 SHALE SHAKER 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
52

Description
The MD-3† triple-deck shale shaker has a small footprint, effective Movement of fluid and cuttings over all three of the unit’s decks
solids-control options, and the ability to adapt quickly to changing maximizes use of the screen area for high-fluid capacity. The ability
drilling conditions, all in a compact, high-performance solution. to adjust deck angles as conditions change is just one of many
features that distinguish the MD-3 shale shaker.

Specifications Screen Deck and Screens (continued)


Dimensions (Parallel Mode) Screen type
Length 103.2 in 2,621 mm Scalping deck Pre-tensioned composite
Width 77.4 in 1,967 mm Primary decks Pre-tensioned composite
Height 67.7 in 1,720 mm Screen clamping
Weight 6,450 lbs 2,926 kg Scalping deck Pneumatic
Dimensions (Series Mode) Primary decks Pneumatic
Length 113.5 in 2,882 mm Vibrating basket Carbon steel
Width 77.4 in 1,967 mm Motor Specifications
Height 67.7 in 1,720 mm Two vibrator motors 460V (220 to 690V available)
Weight 6,780 lb (3,075 kg ATEX, CE, NORSOK and UL-rated
Screen Deck and Screens Motor weight (each) 550 lb 249 kg
Gross screen area
Scalping deck 25.4 ft2 2.4 m2
Primary decks 50.8 ft2 4.7 m2
Net (API) surface area
Scalping deck 15.8 ft2 1.5 m2
Primary decks 31.7 ft2 2.9 m2
Deck-adjustment system
Scalping deck +3° to -1°
Primary decks +8° to +4°

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 7 of 17 SOLIDS CONTROL: MD-3 SHALE SHAKER 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
53

CLEANCUT Cuttings Applications


Collection and ■■ Safe and efficient drill-cuttings containment
and disposal, for compliance with offshore

Transport System
regulatory requirements

Benefits
■■ Minimized crane lifts, improving offshore safety
■■ Flexible installation to suit rig layout with small
equipment footprints
■■ Environmental protection

Features
■■ Fully enclosed and automated conveyance, requiring
minimum personnel involvement
■■ Equipment specified to hazardous-zone classifications
■■ Transfer of untreated cuttings at high rates
■■ Can encompass the entire cuttings supply chain

CLEANCUT † ISO-pump.

CLEANCUT † cuttings blower (CCB M8).

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 8 of 17 CUTTINGS MANAGEMENT: CLEANCUT SYSTEM 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
54

Description to operations including shipping cuttings to shore, inter-field transfer,


The CLEANCUT cuttings collection and transport system from slurrification and disposal, and thermal treatment offshore
M-I SWACO gives operators a flexible solution for improving and onshore. The bulk transfer of drill cuttings from rig to supply
the safety and efficiency of drill-cuttings containment and disposal. boat, and from supply boat to final process location enables large
The system captures the drill cuttings as they exit the shaker volumes of drill cuttings to be handled safely offshore, eliminating
and keeps them contained in a sealed system all the way to final the numerous, potentially risky crane lifts normally required.
processing, using positive pressure pneumatic conveyance. The CLEANCUT system has two main components:
The temporary bulk storage of drill cuttings provided ■■ The CLEANCUT cuttings blower (CCB) is the primary conveyer
by the CLEANCUT system protects drilling logistics from interruption
of cuttings from shakers into the system.
by weather, allowing peak drill-cuttings volumes to be held for later
processing while drilling continues. This flexibility can prevent
■■ The ISO-pump unit is a combination storage vessel and conveying
expensive downtime on critical drilling operations. device built within standard, 20 ft (6.1 m) ISO container
dimensions. (ISO-pumps can be transported fully laden with
The CLEANCUT technology has been extensively field proven
cuttings by supply boat or truck to a discharge location).
in operations worldwide since 2000, adding flexibility and reliability

Specifications CLEANCUT Cuttings Blower (CCB M8) Specifications CLEANCUT ISO-Pump


General General
Weight Weight
Empty 1.65 tons (1.5 tonnes) Empty 6.6 tons (6 tonnes)
Full 2.5 tons (2.3 tonnes) Full 35.8 tons (32.5 tonnes)
Length 55.1 in (1,400 mm) Length 96 in (2,438 mm)
Width 52 in (1,320 mm) Width 102 in (2,591 mm)
Height 100.2 in (2,545 mm) including feed hopper Height 238.5 in (6,059 mm)
Working volume 1.4 bbl/8 ft3 (0.227 m3) Working volume Approx. 95 bbl/530 ft3 (15 m3)
Power 3-phase, 440V, 60 Hz, 10A supply Air supply 116 psi 750 cfm, (8 bar 21 m3/min)
Air supply 116 psi 750 cfm, (8 bar 21 m3/min)

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 9 of 17 CUTTINGS MANAGEMENT: CLEANCUT SYSTEM 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
55

AUTOMATIC TANK Applications

CLEANING LITE
■■ Automated WBM/OBM/SBM/brine tank cleaning
■■ Offshore rigs and supply boats
Benefits
■■ Can eliminate (or greatly reduce) confined space entry
into tanks
■■ Uses small quantity of water to clean tanks by constantly
recycling the wash water
■■ Slop generated is less than 10% of the traditional tank
cleaning methods
■■ Greatly reduces the time taken to clean tanks
Features
■■ ATEX Zone 1 or UL certified water recycling system
■■ Includes all necessary pumps to wash tanks
■■ Programmable tank cleaning machines (TCMs)
strategically located inside tank
■■ High-volume, low-pressure pumps deliver powerful jets
of water and surfactant via the TCMs in the tanks
to break up sediment and wash all internal surfaces
■■ Slop pumps return the slurrified sediment to the recycling
unit to separate the solids and re-use the wash water
■■ Approximately 6.5 m³ of wash water required to clean
all tanks on rig
■■ No heater required for wash water

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 10 of 17 FLUIDS PROCESSING: ATC LITE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
56

Description
The M-I SWACO AUTOMATIC TANK CLEANING (ATC) LITE system This patented system cleans the pit without prevacuuming
is designed to reduce cleaning time and personnel requirements. of the settled solids. It incorporates a full recycling system which
Developed for offshore drilling installations and supply boats, separates out the solids on the fly, allowing the same small volume
the ATC LITE system greatly reduces, and in some cases eliminates, of wash water to be reused tank after tank. It eliminates or vastly
the need for pit and tank entry. reduces confined-space entry and can cut cleaning times
by up to 80%.

Examples of Savings Using the M-I SWACO ATC LITE System


Well 1 Well 2 Well 3 Well 4
Number of tanks cleaned 14 30 29 22
Time saved (hours) 122 90 130 138
Savings (USD) 32,000 25,600 38,400 38,400

Specifications Weight (dry) 5,390 kg (5,090 without expansion pack feed


General pump)
Material Carbon steel Dimensions L x W x H: 3,100 mm x 2,435 mm x 2,708 mm
Structural frame / sheet metal Carbon steel (h = 3,608 mm including handrails)
Voltage 400-690 V (other voltages available) Lifting and handling Crane or fork lift (lift only when empty)
Maximum power 63 kW Lifting approval No offshore lifting certification. (Unit designed
to industrial lifting standard)
consumption
Other certificates Explosion proof: ATEX zone 1 or UL zone 1
Slop processing rate Maximum 44 m3/h (with expansion pack) (class 1 Div. 1)
Total cleaning water capacity 6,500 liters Maximum noise level 83db
Operating temperature 0 degC to 40 degC Expansion pack (optional) Weight: 1,600 kg, dimensions
Air consumption 200 l/min at 5-12 bar (400 l/min w/expansion pack) L x W x H: 1,850 mm x 1,200 mm x 1,950 mm
lifting approval: DNV 2-7.1

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 11 of 17 FLUIDS PROCESSING: ATC LITE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
57

SUPERCHOKE Drilling Applications

Choke
■■ Multiple pressure-sensitive applications: well kicks, well
testing, and well clean-up operations
■■ High-pressure pumping

Benefits
■■ Delivers easy, precise, and reliable well pressure control
during transition operations
■■ Equally effective when mud and gas are flowing
alternately through the choke
■■ Designed and manufactured for H2S service
and abrasive fluid applications

Features
■■ Full system redundancies
■■ Dependable choke-disc design
■■ Designed, manufactured, and monogrammed
in accordance with API 6A and 16C
■■ High-pressure rating
■■ Positive closure

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 12 of 17 PRESSURE CONTROL: SUPERCHOKE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
58

Description
The highly advanced 5K, 10K, and 15K SUPERCHOKE† drilling chokes
are among the industry’s most widely used chokes, particularly
for well kill and high-pressure applications. The SUPERCHOKE drilling
choke delivers easy, precise, and reliable well pressure control
during mud pump startup or shutdown.

Specifications
psi (bar) Length Width Height Weight Temperature Rating Pressure
in (mm) in (mm) in (mm) lb (kg) degF (degC) psi (bar)

10,000 35.7 21.6 11.5 441 -20 to 250 10,000


(689) (906.8) (548.6) (292.1) (200) (-29 to 121) (689)
15,000 43.3 21.6 11.5 600 -20 to 250 15,000
(1,034) (1,099.8) (548.6) (292.1) (272) (-29 to 121) (1,034)
20,000 43.4 24.3 13.2 650 -20 to 250 20,000
(1,378) (1,102.4) (617.2) (335.3) (295) (-29 to 121) (1,378)
Control Consoles
55 27 65 588
Single N/A N/A
(1,397) (686) (1,651) (267)
55 27 69 690
Dual N/A N/A
(1,397) (686) (1,753) (313)

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 13 of 17 PRESSURE CONTROL: SUPERCHOKE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
59

AUTOCHOKE Drilling Applications


Choke ■■ Provides automatic, precise pressure control
for pressure-intensive UBD and MPD applications
■■ High-pressure pumping
■■ Compliance

Benefits
■■ Delivers precise, reliable pressure control
■■ Maintains casing pressure
■■ Simplifies predictable casing and drill pipe
■■ Reduces effects of abrasive solids
■■ Eliminates leakage

Features
■■ Highly responsive control consoles and controls easily
during transition periods
■■ Provides effective control in wide temperature
and pressure ranges
■■ Helps manage ECD
■■ Frac plug drillout operation
■■ Allows ‘hot swapping’ of actuators

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 14 of 17 PRESSURE CONTROL: AUTOCHOKE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
60

Description
The AUTOCHOKE† drilling choke is the cornerstone connections. It is highly effective in H2S and abrasive-fluid
of the M-I SWACO portfolio and continues to set the standard applications. With its capacity to automatically maintain casing
for high-pressure drilling chokes. The 3K, 10K, and 15K AUTOCHOKE pressure, the AUTOCHOKE drilling choke makes stripping pipe
units provide automatic, precise pressure control and incorporate simpler and safer.
the best choke technology available for pressure-intensive UBD
and MPD applications. This pace-setting choke automatically
regulates casing pressure under all conditions, including regulating
mud pump startup or shutdown, and making and breaking drillpipe

Specifications
psi (bar) Length Width Height Weight Temperature Bore Size Pressure API API
in (mm) in (mm) in (mm) lb (kg) Rating in (mm) psi (bar) inlet flange outlet flange
degF (degC) in (mm) in (mm)
10,000 41.51 11.50 16.31 580 -20 to 250 3 10,000 3.06 (78) 3.06 (78)
x 10,000 psi x 10,000 psi
(689) (1054.3) (292.1) (414.3) (263) (-29 to 121) (76) (689) (689 bar) (689 bar)
15,000 44.26 12.50 19.75 700 -20 to 250 3 15,000 3 √15 (77.8) 3 √15 (77.8)
x 15,000 psi x 15,000 psi
(1,034) (1,124.2) (317.5) (501.7) (317.5) (-29 to 121) (76) (1,034) (1,034 bar) (1,034 bar)
Control Consoles
10,000 24 26 55 655
N/A N/A N/A N/A N/A
(689) (610) (660) (1,397) (298)

15,000 35 28.5 55 730


N/A N/A N/A N/A N/A
(1,034) (889) (724) (1,448) (332)

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 15 of 17 PRESSURE CONTROL: AUTOCHOKE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
61

VERSA-CHOKE Drilling Applications


Advanced well-control applications, requiring large trim

Choke
■■

with high pressure and temperature ratings

Benefits
■■ Ease of maintenance: actuators can be replaced
by disassembling internal components
■■ Designed, manufactured, and monogrammed
in accordance with API 6A and 16C
■■ Modular design and components allow configuration
to be customized
■■ Multiple advanced pressure control for pressure-
sensitive applications

Features
■■ Precise position-based control system with worm-gear
hydraulic actuator and piston-style hydraulic actuator
■■ High temperature rating: P-X -20 degF to 350 degF
(-29 degC to 177 degC)
■■ High pressure rating: 5K, 10K, and 15K
■■ Quick-change internal components

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 16 of 17 PRESSURE CONTROL: VERSA-CHOKE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
62

Description
The M-I SWACO 15K VERSA-CHOKE† drilling choke is engineered
for advanced well-control applications, requiring large trim with high
pressure and temperature ratings.
The highly flexible VERSA-CHOKE drilling choke is ideally suited
for high-end pressure management, managed pressure drilling,
underbalanced drilling, frac plug drillouts, and frac flowback.

SOLIDS CONTROL, CUTTINGS MANAGEMENT, FLUIDS PROCESSING AND PRESSURE CONTROL: 17 of 17 PRESSURE CONTROL: VERSA-CHOKE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
63

Wireline Logging
Schlumberger offers in-house designed, best-in-class, integrated With full compliance to all relevant international offshore regulations,
deepwater and ultradeepwater wireline conveyance solutions. a wireline pulling capability of 22,000 lbf is possible with minimal
The brochure presents operational and HSE risk. The range offers high-efficiency operations,
■■ high-tension offshore units substantial fishing NPT reduction and cost-saving benefits. The
Houston, France, and Singapore teams of rig installation experts
- incorporating state-of-the-art data acquisition systems
ensure seamless wireline setup during deepwater rig construction,
■■ dual drum capstan tension relief movement, or on arrival to location.
■■ revolutionary polymer encapsulated logging cables
- providing a best-in-class telemetry system.

WIRELINE LOGGING: 1 of 7 INTRODUCTION TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
64

OSU-PA/PB Applications
■■ Deepwater high-tension wireline logging operations
■■ High-resolution imaging, logging, and data acquisition
■■ Data analysis and transmission to customers

Benefits
■■ Tool sticking reduction with high-tension
pull capability
■■ Deepwater conveyance of wireline sensors with large
wireline cable drum capacity
■■ Fully automated winch safety shutdown to avoid
unintentional tool sticking or weakpoint breakage
■■ Full compliance with deepwater offshore regulations

Features
■■ Electrical or diesel high-power hydraulic powerpacks
■■ Modular design to address deck space limitations
■■ Superior pulling capability design with full
DNV certification
■■ Active dual drum capstan compatibility for tensions
up to 24,000 lbf winch speed of up to 30 kft/hr
for efficient tool conveyance and retrieval

WIRELINE LOGGING: 2 of 7 FORMATION EVALUATION EQUIPMENT: OSA-PA/PB 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
65

Description
The OSU-PA/PB is one of the flagship range of Schlumberger high- Equipped with the latest eWAFE data acquisition system,
tension deepwater offshore data-acquisition units. With a direct the OSU-PA can efficiently convey very large sensor
continuous pulling capability of 18,000 lbf, the unit can safely convey combinations with proven substantial rig time saving
wireline tools to depths exceeding 31,000 ft. Oscillating mounting and fishing incident minimization.
devices allow cable distances below 30 ft.

Specifications
General
Modules attached footprint 20 x 8 ft
Maximum safe pull 18k lbf
Max winch speed 30k ft/h
Design and climatic rating (-20 to +50 degC)
Capstan compatible
Full automatic winch emergency shutdown system
Certifications
OSU-PA/PB DNV 2.7-1 lifting
DNV 2.22 cable pull and CE marked incl
RoHS and WEEE
ATEX compliant for zone 2, II 3 G IIB T3
DNV 2.7-2

WIRELINE LOGGING: 3 of 7 FORMATION EVALUATION EQUIPMENT: OSA-PA/PB 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
66

Dual Drum Capstan Applications


■■ Deepwater and ultradeepwater high-tension
operations exceeding 10,000 lbf surface
logging tension if the TuffLINE* torque-balanced
composite wireline cable is not used

Benefits
■■ Tension pulls exceeding unit winch capability
and up to 24,000 lbf
■■ Tension relief on unit side minimizes risk of cable
and drum damage due to high tension operations

Features
■■ Compact easy rig-up between unit and well
■■ Six powered sheave configuration allows tension
reduction flexibility
■■ Fully synchronized with the unit winch module
and acts as master to ensure minimum risk of incident
on low tension side

WIRELINE LOGGING: 4 of 7 FORMATION EVALUATION EQUIPMENT: DUAL DRUM CAPSTAN 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
67

Description
The dual drum capstan is a power sheaved tension relief system
mounted on the rig deck between the unit and the well. It allows
high logging tensions in the well, while reducing the cable tension
to safe levels on the winch side. In addition to conveyance equipment
protection, the dual drum capstan provides higher than unit capacity
tensions and the latest capstan can pull up to 24,000 lbf.

Specifications
General
Safe working load 24,000 lbs
Maximum line pull 30,000 lbs
Maximum cable speed 30,000 ft / hr
Footprint 48 in x 98 in
Weight 13,500 lbs
Powered sheaves 6
Sheave diameter 44 in

WIRELINE LOGGING: 5 of 7 FORMATION EVALUATION EQUIPMENT: DUAL DRUM CAPSTAN 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
68

TuffLINE 18000 Applications


■■ Capstan-free wireline high-tension operations
up to 13,000 lbf continuous logging tension
■■ Maximum pull-free logging tension of 18,000 lbf

Benefits
■■ Torque balanced polymer encapsulation and crush-
free core eliminate all standard high-tension
cable limitations
■■ Multiple cycling during stuck-tool
or stationary operations
■■ New-cable seasoning (one-day rig time) eliminated
■■ Unprecedented overpull safety margins 9,000 lbf
■■ Low maintenance (twisting) trip to base frequency

Features
■■ Hard polymer double extrusion crush-free electrical
conductors and core
■■ Polymer encapsulation of inner and outer armors
■■ Torque balanced (zero torque)
■■ High power with AWG 18 size wires
■■ Reduced weight with reduced outer steel armor
leading to reduced friction and higher pull capacity
at downhole tool level
■■ 30% more power and telemetry versus standard
AWG #16 cables

WIRELINE LOGGING: 6 of 7 FORMATION EVALUATION EQUIPMENT: TUFFLINE 18000 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
69

Description
This TuffLINE* torque-balanced composite wireline cable combines The operational risk reduction is 75% compared to standard high
the breakthrough technologies of polymer-filled armors and crush- tension cables. It reduces stuck-tool incidents and wireline-tool NPT,
free electrical cable cores. This eliminates the limitations of current eliminates premature cable breakage and electrical OSU-PB failures,
armored cables, such as torque, cable crush, seasoning, low ends- and reduces logistics of transporting cables to and from cable
free breaking strength, twisting cable maintenance trips, and initial twisting shops. It provides unprecedented overpull safety margins,
permanent cable stretch related depth-control issues. and eliminates the ends-free breaking strength of standard cables.

Specifications
General
Safe working load 18,000 lbf
Ends-fixed beaking strength 28,000 lbf
Ends-free breaking strength 27,000 lbf
Maximum temperature 450 degf / 24 hrs
Cable OD 0.50 In
Cable weight 331 lbs in fresh water
Conductor OD AWG #18
Voltage rating 1250 Vrms center, 80 VRms helical
Conductor current rating 1.61 A

WIRELINE LOGGING: 7 of 7 FORMATION EVALUATION EQUIPMENT: TUFFLINE 18000 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
70

Well Testing
Schlumberger offers the broadest range of testing and measurement Combining field-proven testing experience with reservoir-domain
services available, from exploration and appraisal to development expertise, our teams work with you to prove reservoir potential,
and production. Downhole or at the surface, you can get answers confirm well performance, and improve field productivity.
to questions about Schlumberger testing specialists support testing equipment sales
■■ productivity through Kuala Lumpur, and technical issues are supported with
■■ fluid properties the assistance of our asset base in Singapore. Technologies
manufactured in Singapore include Schlumberger burner booms,
■■ composition
which have been proven in all types of environment with many
■■ flow decades of successful service. Our burner booms have short
■■ pressure delivery times and can be selected as part of a package to suit
■■ temperature. particular conditions.

WELL TESTING: 1 of 21 INTRODUCTION TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
71

Modular Compact Applications

Well Test Systems


■■ Offshore and deepwater testing
■■ Surface well testing, including cleanup operations
■■ Heavy oil operations and permanent rig placements
requiring condensed footprints

Benefits
■■ 50% less rig time and 40% less space required
■■ Quick positioning operations and sea fastening
■■ Fewer personnel required for rig-up
■■ Minimal flowlines, connections, and handling
for safer operations
■■ Fully adaptable to different rig shapes

Features
■■ Greater produced-liquid storage in 320-bbl surge tanks
■■ Multiple tanks to separately store different fluids
■■ Heat tracer on surge tanks provides heat capacity
up to 176 degF [80 degC]
■■ Compatibility with ClearPhase* well test separator mobile
testing discharge treatment
■■ 4,000-bbl/d pump capacity with backup pump included

WELL TESTING: 2 of 21 MODULAR COMPACT WELL TEST SYSTEMS: 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
72

Description
The size and complexity of conventional surface well test equipment
is often challenging, particularly in deepwater and ultradeepwater
operations. The dimensions of offshore rigs demand that well
test equipment is compact, modular, and as streamlined as possible.
In response, Schlumberger has designed modular, compact, surface
well test equipment with optimized packaging that significantly
reduces footprint, minimizes flowlines and connections,
and maximizes efficiency—while ensuring accurate, repeatable
test results.

WELL TESTING: 3 of 21 MODULAR COMPACT WELL TEST SYSTEMS: 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
73

Surface Safety Valve Applications


■■ Testing oil and gas wells with high flow rates,
high wellhead pressures, or for detecting H2S
■■ For wells with hazard operational analysis that require
surface pressure barriers as well as primary valves

Benefits
■■ Prevents overpressure conditions
on downstream equipment
■■ Provides immediate well closure in the event
of downstream equipment failure
■■ Ensures reliable shut-in during harsh
environment operations
■■ Reduces personnel exposure in emergencies
■■ Complies with API-6A (PSL-2 or 3, PR2), H2S (NACE
MR0175), and Fluid Class DD specifications

Features
■■ Fail-safe remote activation and automatic well closure
when loss of control pressure occurs
■■ Double metal-to-metal seals for reliability
■■ Equipped with hammer unions, but can have Grayloc®
or API-6A flanges

WELL TESTING: 4 of 21 MODULAR COMPACT WELL TEST SYSTEMS: SURFACE SAFETY VALVE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
74

Description
The surface safety valve (SSV) is a hydraulically actuated fail-safe The SSV is used to quickly shut in the well choke manifold upstream
gate valve for testing oil and gas wells with high flow rates (>8,000 in the event of overpressure, failure, a leak in downstream equip-
bbl/d [>1,280 m3/d] or 30,000,000 ft3/d [>850,000 m3/d]), high pressures ment, or any other well emergency requiring an immediate shut-in.
(>5,000 psi [>34 MPa]), or for detecting H2S.

Specifications
Model Nominal Working Test Pressure, Temperature Class, Inlet/Outlet Skid Temperature Part Number
Size, Pressure, psi [MPa] degF [degC] Connections Class,
in psi [MPa] degF [degC]
SSV-F 31⁄8 5,000 [34] 10,000 [69] -20 to 250 [-29 to 121] 3-in Fig 1002 female/male -20 [-29] P579050
SSV-GB 21⁄16 10,000 [69] 15,000 [103] -20 to 250 [-29 to 121] 2-in Fig 1502 female/male -20 [-29] P490837
SSV-GH 31⁄16 10,000 [69] 15,000 [103] -20 to 350 [-29 to 177] 3-in Fig 1502 female/male -20 [-29] P798109
SSV-GK 31⁄16 10,000 [69 15,000 [103] -20 to 250 [-29 to 121] 3-in Fig 1502 female/male -20 [-29] P497560
SSV-G 31⁄16 10,000 [69] 15,000 [103] -20 to 250 [-29 to 121] 3-in Fig 1502 female/male -20 [-29] P579049
SSV-GHC 31⁄16 10,000 [69] 15,000 [103] -20 to 350 [-29 to 177] 3-in Fig 1502 female/male -20 [-29] 100368524
SSV-GC 41⁄16 10,000 [69] 15,000 [103] -20 to 250 [-29 to 121] API flange 41⁄16–BX155 -20 [-29] P490007
SSV-GCB 41⁄16 10,000 [69] 15,000 [103] -20 to 250 [-29 to 121] API flange 41⁄16–BX155 -20 [-29] 100131104
SSV-GCC 41⁄16 10,000 [69] 15,000 [103] -50 to 350 [-46 to 177] API flange 41⁄16–BX155 -50 [-46] 100244512
SSV-GCD 41⁄16 10,000 [69] 15,000 [103] -20 to 350 [-29 to 177] API flange 41⁄16–BX155 -20 [-29] 100441762
SSV-GL 51⁄8 10,000 [69] 15,000 [103] -20 to 250 [-29 to 121] Grayloc 6 G52 -20 [-29] 100176331
SSV-HD 31⁄16 15,000 [103] 22,500 [155] -20 to 350 [-29 to 177] API flange 31⁄16–BX154 -20 [-29] P792386
SSV-HF 31⁄16 15,000 [103] 22,500 [155] -20 to 350 [-29 to 177] API flange 31⁄16–BX154 -20 [-29] 100443423

WELL TESTING: 5 of 21 MODULAR COMPACT WELL TEST SYSTEMS: SURFACE SAFETY VALVE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
75

Floor Choke Manifold Applications


■■ Controls flow rate and reduces well pressure before flow
enters processing equipment
■■ Onshore and offshore oil and gas well testing
and cleanup after drilling or workover operations
■■ Flowback after stimulation or workover operations

Benefits
■■ Reduces effluent pressure which helps control the well
and increases safety
■■ Ensures reliable shut-in in harsh environments
■■ Has a seal design that ensures reliability
■■ Allows fast choke changes without interrupting flow

Features
■■ Calibrated orifice controls flow for flow rate reference
■■ Incorporates two pressure ports and one thermowell
■■ Two flow paths, one through fixed choke and another
adjustable choke that can be converted to fixed
■■ Enables fluid sampling, real-time pressure and
temperature monitoring, and chemical injection
■■ Equipped with hammer unions but can be fitted with
Grayloc® or API-6A flanges

WELL TESTING: 6 of 21 MODULAR COMPACT WELL TEST SYSTEMS: FLOOR CHOKE MANIFOLD 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
76

Description
The floor choke manifold (FMF) consists of four manual valves, or five reference, as well as through adjustable chokes, and the well
if a bypass valve is included. It includes a variable choke box, fixed can be put in shut-in condition if required. Complies with API-6A
choke box, and several pressure or sampling ports and thermo-wells (PSL-2, PR2), H2S (NACE MR0175), DNV† Rules, BS‡ 7072, and Fluid
to monitor pressure, temperature, and fluid characteristics. The FMF Class DD specifications; Models FMF-GC and FMF-GCC also comply
design allows the well to flow through calibrated chokes for flow rate with PED 97/23§; while FMF-GCC model is CE†† marked.

Specifications and Codes,


Model Max Choke Size Hard Facing Tapping Points Number Dimensions Weight,
(Fixed or Adjustable), (Colmonoy®) and Type Upstream and (L × W × H), ft [m] lbm [kg]
in [mm] Downstream
FMF-F 2 [50.8] 5 3 × 1⁄2-NPT 6.23 × 5.90 × 3.28 [1.90 × 1.80 × 1.00] 3,800 [1,724]
FMF-BFB 2 [50.8] 5 3 × 1⁄2-NPT 7.88 × 6.66 × 3.28 [2.40 × 2.03 × 1.00] 6,250 [2,835]
FMF-FC 3 [76.2] 5 3 × 1⁄2-NPT 7.55 × 7.05 × 3.94 [2.30 × 2.15 × 1.20] 6,504 [2,950]
FMF-FCB 3 [76.2] 5 3 × 1⁄2-NPT 9.22 × 8.89 × 3.56 [2.81 × 2.71 × 1.085] 6,613 [3,000]
FMF-FCC 3 [76.2] 5 3 × 1⁄2-NPT 7.55 × 7.05 × 3.94 [2.30 × 2.15 × 1.20] 6,504 [2,950]
FMF-BG 2 [50.8] 75 3 × 1⁄2-NPT 8.44 × 7.35 × 3.28 [2.57 × 2.24 × 1.00] 5,512 [2,500]
FMF-G 2 [50.8] 75 3 × 1⁄2-NPT 6.55 × 6.55 × 3.28 [2.00 × 2.00 × 1.00] 4,500 [2,041]
FMF-GK 2 [50.8] 75 3 × 1⁄2-NPT 6.55 × 6.55 × 3.28 [2.00 × 2.00 × 1.00] 4,500 [2,041]
FMF-GB 2 [50.8] 75 3 × 1⁄2-NPT 6.55 × 6.55 × 3.28 [2.00 × 2.00 × 1.00] 4,500 [2,041]
FMF-GH 2 [50.8] 75 3 × 1⁄2-NPT 7.00 × 6.89 × 3.28 [2.15 × 2.10 × 1.00] 4,500 [2,041]
FMF-GC 3 [76.2] 75 3 × 1⁄2-NPT 8.86 × 6.89 × 3.28 [2.70 × 2.10 × 1.00] 8,900 [4,045]
FMF-GCC 3 [76.2] 75 3 × 1⁄2-NPT 8.86 × 6.89 × 3.28 [2.70 × 2.10 × 1.00] 8,900 [4,045]
FMF-GL 3 [76.2] 75 3 × 1⁄2-NPT 9.35 × 7.40 × 7.67 [2.85 × 2.26 × 2.34] 12,500 [5,670]
FMF-HD 2 [50.8] 75 3 × 9⁄16 Autoclave 8.35 × 7.03 × 3.89 [2.55 × 2.15 × 1.17] 5,512 [2,500]
FMF-HDK 2 [50.8] 75 3 × 9⁄16 Autoclave 8.35 × 7.03 × 3.89 [2.55 × 2.15 × 1.17] 5,512 [2,500]
FMF-HL 2 [50.8] 75 6 × 9⁄16 Autoclave 14.17 x 6.34 x 6.76 [4.32 x 1.93 x 2.06 ] 16,535 [7,500]
Det Norske Veritas ‡ Complies with British Standard Code of Practice for Inspection and Repair of Offshore Containers §Complies with European Pressure Equipment Directive 97/23

Conformité Européenne
††

WELL TESTING: 7 of 21 MODULAR COMPACT WELL TEST SYSTEMS: FLOOR CHOKE MANIFOLD 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
77

Steam-Heat Exchanger Applications


■■ Onshore and offshore exploration, development,
and production well testing after cleanup

Benefits
■■ Separates effluents for fluid metering and sampling
before disposal
■■ Provides single-phase surface sampling and flow
metering over a wide range of flow rates
■■ Maintains constant pressure and liquid levels to optimize
measurement accuracy
■■ Reduces separation problems caused by foam,
carryover, and carry under
■■ Accommodates small quantities of solids

Features
■■ Automatic control valve for steam entry and steam trap
with steam compensate outlet
■■ Internal tube bundle for effluent traffic
■■ Safety relief valve and temperature controller
■■ Glass-wool insulation with aluminum jacket
■■ Choke between inlet and outlet to allow preheating
of effluent

WELL TESTING: 8 of 21 MODULAR COMPACT WELL TEST SYSTEMS: STEAM-HEAT EXCHANGE 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
78

Description
Steam-heat exchangers are used to raise the temperature in which safety regulations do not permit the use of indirect-fired
of the well’s effluents to prevent hydrate formation, reduce viscosity, heaters. The steam-heat exchanger requires an adequate steam
and break down emulsions for efficient separation of oil and water. supply for operation. Some rigs have a sufficient steam supply,
Because the steam-heat exchangers virtually eliminate fire risk, but usually a steam generator is required.
they are used on offshore platforms and in other work conditions

Specifications
Model STX-FA, STX-FB, STX-CCN STX-GA, STX-GB STX-CCR STX-HA, STX-HB
STX-BC
Service H2S H2S H2S H2S H2S
Fluid class DD DD DD DD DD
Vessel size, in × ft [cm × m] 51 × 13 [130 × 3.96] 42 × 15 [106 × 4.57] 51 × 13 [130 × 3.96] 51 × 13 [130 × 3.96] 51 × 13 [130 × 3.96]
Working pressure, psi [MPa]
Coil 5,000 [34] 10,000 [69] 10,000 [69] 15,000 [103] 15,000 [103]
Vessel 235 [1.6] 235 [1.6] 235 [1.6] 235 [1.6] 235 [1.6]
Working temperature, degF [degC] -4 to 350 [-20 to 177] -4 to 320 [-20 to 160] -4 to 350 [-20 to 177] -4 to 320 [-20 to 160] -4 to 350 [-20 to 177]
Steam consumption, lbm/h [kg/h] 5,000 [2,268] 5,000 [2,268] 5,000 [2,268] 5,000 [2,268] 5,000 [2,268]
Effluent inlet 3-in Fig 1002 female 3-in Fig 1502 female 3-in Fig 1502 female 3-in Fig 2202 female 3-in Grayloc®
Effluent outlet 3-in Fig 1002 male 3-in Fig 1502 male 3-in Fig 1502 male 3-in Fig 2202 male 3-in Grayloc
Steam inlet 2-in Fig 206 female 3-in Fig 206 female 2-in Fig 206 female 3-in Fig 206 female 2-in Fig 206 female
Steam outlet 2-in Fig 206 male 3-in Fig 206 male 2-in Fig 206 male 3-in Fig 206 male 2-in Fig 206 male
Footprint, ft × ft [m × m] 21.3 × 8.07 21.3 × 7.7 21.3 × 8.07 21.3 × 7.7 21.3 × 8.07
[6.50 × 2.46] [6.50 × 2.34] [6.50 × 2.46] [6.50 × 2.34] [6.50 × 2.46]
Height, ft [m]
Unit only 8.86 [2.70] 8.5 [2.60] 8.86 [2.70] 8.5 [2.60] 8.86 [2.70]
With safety valves na† 11.5 [3.50] na 11.5 [3.50] na
Weight, lbm [kg] 26,455 [12,000] 26,896 [12,200] 30,865 [14,000] 34,172 [15,500] 34,172 [15,500]

Not applicable ‡American Society of Mechanical Engineers

WELL TESTING: 9 of 21 MODULAR COMPACT WELL TEST SYSTEMS: STEAM-HEAT EXCHANGE 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
79

Conventional Horizontal Applications


Separator ■■ Onshore and offshore exploration, development,
and production well testing after cleanup

Benefits
■■ Separates effluents for fluid metering and sampling
before disposal
■■ Provides single-phase surface sampling and flow
metering over a wide range of flow rates
■■ Maintains constant pressure and liquid levels to optimize
measurement accuracy
■■ Reduces separation problems caused by foam,
carryover, and carry under
■■ Accommodates small quantities of solids

Features
■■ Wide range of vessel sizes for different flow rates
■■ Single-phase flow metering on oil and water outlets
using positive displacement (FLOCO®), proportional
velocity (ROTON®), or mass (Coriolis) flowmeters
■■ Gas metering with orifice diameters or mass flowmeter
■■ Pneumatic control valves on gas and oil outlets
■■ Fitted with deflector place, coalescing plates, foam
and vortex breaker, weir plate, and mist extractor

WELL TESTING: 10 of 21 MODULAR COMPACT WELL TEST SYSTEMS: CONVENTIONAL HORIZONTAL SEPARATOR 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
80

Description
The conventional horizontal separator is designed to separate on the separation process for high-quality flow measurements.
well effluent into three phases for onshore and offshore well The conventional horizontal separator has sand-jet line for fast
testing. It can operate as a stand-alone unit or in combination cleaning, sampling points for all phases, two relief valves to protect
with the PhaseTester* portable multiphase well testing equipment against overpressure, and complies with ASME† VIII, Div. 1 or 2, H2S
with Vx* multiphase well testing technology, reducing dependency (NACE MR0175).

Specifications
Model Vessel Size, Working Temperature Range, Maximum Oil Flow Rate Maximum Gas Flow Rate, Liquid Meters (Water) Gas Meter DnV Part
in × ft [cm × m] Pressure, psi degF [degC] (with 1-min retention time) MMcf/d [m3/d] Rating Number
[kpa], at 100 2.7-1
degF [38 degC] High Level Low Level High Level Low Level

SEP-JA/JAB (trailer-mounted) 24 × 6 [61 × 1.8] 2,000 [13,789] 32 to 212 [0 to 100] 1,000 [160] - - 15 [425,000] FLOCO 1 in (FLOCO 1 in) Orifice, 3 in No 100071039,
100137764
SEP-HFE (heliportable) 36 × 10 [91 × 3.1] 600 [4,137] -4 to 212 [-20 to 100] 10,500 [1,669] 2,600 [413] 10.8 [306,000] 28 [792,000] Two FLOCO 2 in (none) Orifice, 4 in No M836948

SEP-HFF (heliportable) 36 × 10 [91 × 3.1] 600 [4,137] 32 to 212 [0 to 100] 10,500 [1,669] 2,600 [413] 0.8 [306,000] 28 [792,000] Two FLOCO 2 in (none) Orifice, 4 in No P792049

SEP-SGF 36 × 10 [91 × 3.1] 720 [4,964] 32 to 212 [0 to 100] 10,500 [1,669] 2,600 [413] 10.8 [306,000] 25 [708,000] FLOCO 2 in and FLOCO 1 in (FLOCO 2 in) Orifice, 4 in No M837655

SEP-C 42 × 10 [107 × 3.1] 1,440 [9,928] -4 to 300 [-20 to 149] 14,400 [2,289] 6,650 [1,057] 25.0 [708,000] 60 [1,698,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in Yes P791354

SEV-SKL 42 × 10 [107 × 3.1] 1,440 [9,928] 32 to 212 [0 to 100] 14,400 [2,289] 6,650 [1,057] 25.0 [708,000] 60 [1,698,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in No M837020

SEP-SKN 42 × 10 [107 × 3.1] 1,440 [9,928] -4 to 212 [-20 to 100] 14,400 [2,289] 6,650 [1,057] 25.0 [708,000] 60 [1,698,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in No M870576

SEP-T 42 × 10 [107 × 3.1] 1,440 [9,928] 32 to 212 [0 to 100] 14,400 [2,289] 6,650 [1,057] 25.0 [708,000] 60 [1,698,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in No P585700

SEP-TE 42 × 10 [107 × 3.5] 1,440 [9,928] 32 to 212 [0 to 100] 14,400 [2,289] 6,650 [1,057] 25.0 [708,000] 60 [1,698,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in Yes P488073

SEP-W 42 × 10 [107 × 3.5] 1,440 [9,928] 32 to 300 [0 to 149] 14,400 [2,289] 6,650 [1,057] 25.0 [708,000] 60 [1,698,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in No P778478

SEP-G 42 × 15 [107 × 4.6] 720 [4,964] -4 to 300 [-20 to 149] 23,800 [3,784] 10,500 [1,669] 18.0 [509,000] 41 [1,160,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in No P775867

SEP-NE 48 × 12.5 [122 × 3.8] 1,440 [9,928] 32 to 300 [0 to 149] 16,500 [2,623] 12,300 [1,956] 75.0 [2,123,000] 90 [2,547,000] Coriolis (Coriolis) 2 Coriolis Yes P486474

SEP-NF 48 × 12.5 [122 × 3.8] 1,440 [9,928] -4 to 300 [-20 to 149] 16,500 [2,623] 12,300 [1,956] 75.0 [2,123,000] 90 [2,547,000] Coriolis (Coriolis) 2 Coriolis Yes P487218

SEP-NFW (winterized) 48 × 12.5 [122 × 3.8] 1,440 [9,928] -4 to 300 [-20 to 149] 16,500 [2,623] 12,300 [1,956] 75.0 [2,123,000] 90 [2,547,000] Coriolis (Coriolis) 2 Coriolis Yes 100244518

SEP-NG 48 × 12.5 [122 × 3.8] 1,440 [9,928] 32 to 212 [0 to 100] 16,500 [2,623] 12,300 [1,956] 75.0 [2,123,000] 90 [2,547,000] ROTRON 3 in and FLOCO 2 in (FLOCO 2 in) Orifice, 6 in Yes P489506
SEPL-E 48 × 18 [122 × 5.5] 1,440 [9,928] -4 to 300 [-20 to 149] 30,000 [4,770] 18,000 [2,862] 75.0 [2,123,000] 105 [2,973,000] 2 Coriolis (Coriolis) Coriolis Yes 100767111

Full product sheet at www.slb.com/sep

WELL TESTING: 11 of 21 MODULAR COMPACT WELL TEST SYSTEMS: CONVENTIONAL HORIZONTAL SEPARATOR 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
81

Vertical Surge Tank Applications


■■ Offshore operations
■■ Conditions where indirect-fired heaters are not allowed

Benefits
■■ Liquid flow rate, shrinkage factor, and meter factor
measurement
■■ Sight glasses or magnetic level indicators
■■ Automatic pressure control valve that is normally open
on gas outlets
■■ Constant backpressure maintenance when used
as a second-stage separator
■■ Bypass manifold that allows isolating the surge tank from
the flow process

Features
■■ Large-volume dead-oil sampling
■■ Single or double compartments
■■ High- and low-level alarm on each compartment
■■ Diverter, vortex breaker, and stiffening rings
■■ Sampling points and pressure and temperature ports

WELL TESTING: 12 of 21 MODULAR COMPACT WELL TEST SYSTEMS: VERTICAL SURGE TANK 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
82

Description
The vertical surge tank (VST) H2S service vessel is designed to store The VST usually consists of either a single- or a double-compartment
liquid hydrocarbons after separation. It is used to measure liquid flow vessel and has a level-measuring system with sight glasses
rates and the combined shrinkage and meter factor. It can also be or magnetic levels. Dual-compartment VSTs are used to empty
used as a second-stage separator and can hold a constant backpres- one tank compartment while filling another. To prevent overpressure
sure by using its automatic pressure control valve on the gas outlet. and overfilling, a pressure-relief valve and alarm systems are fitted.

Specifications and Codes


Model Connections Dimensions Weight, Applied Codes
(L × W × H), lbm [kg]
Oil Gas Oil Water Pressure ft [m]
Inlet Outlet Outlet Outlet Safety
Valve
VST-A 3-in 4-in 3-in 3-in 4-in 8.04 × 7.87 × 20.0 13,420 ASME† VIII Div. 1, ASME/ANSI‡ B31.3,
Fig 602 Fig 602 Fig 602 Fig 602 Fig 602 [2.45 × 2.4 × 6.1] [6,100] H2S (NACE MR0175)
female male male male male
VST-B 3-in 4-in 3-in 3-in 4-in 8.04 × 7.87 × 20.0 13,420 ASME VIII Div. 1, ASME/ANSI B31.3,
Fig 602 Fig 602 Fig 602 Fig 602 Fig 602 [2.45 × 2.4 × 6.1] [6,100]] H2S (NACE MR0175)
female male male male male
VST-D 3-in 4-in 3-in 3-in 4-in 8.53 × 7.87 × 24.27 24,765 ASME VIII Div. 1, ASME/ANSI B31.3,
Fig 602 Fig 602 Fig 602 Fig 602 Fig 602 [2.6 × 2.4 × 7.4] [11,400] H2S (NACE MR0175)
female male male male male
VST-BB 3-in 4-in 3-in 3-in 4-in 8.04 × 7.87 × 20.0 13,420 ASME VIII Div. 1, ASME/ANSI B31.3,
Fig 602 Fig 602 Fig 602 Fig 602 Fig 602 [2.45 × 2.4 × 6.1] [6,100] H2S (NACE MR0175)
female male male male male
VST-FA 3-in 4-in 3-in 3-in 4-in 8.53 × 7.87 × 24.27 27,000 ASME VIII Div. 1, ASME/ANSI B31.3,
Fig 602 Fig 602 Fig 602 Fig 602 Fig 602 [2.6 × 2.4 × 7.4] [12,000] H2S (NACE MR0175)
female male male male male
VST-FW 3-in 4-in 3-in 3-in 4-in 8.53 × 7.87 × 24.27 29,762 ASME VIII Div. 1 (U-Stamp), ASME/
(winterized) Fig 602 Fig 602 Fig 602 Fig 602 Fig 602 [2.6 × 2.4 × 7.4] [13,500] ANSI B31.3, H2S (NACE MR0175), DNV
female male male male male 2.7-1
American Society of Mechanical Engineers ‡American National Standards Institute

WELL TESTING: 13 of 21 MODULAR COMPACT WELL TEST SYSTEMS: VERTICAL SURGE TANK 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
83

U-Boom Applications
■■ Support for, and access to, the burner and piping during
offshore well tests

Benefits
■■ Reduces heat radiation and fire risks for increased
rig personnel safety
Additional gas line ■■ Allows access to the burner and supports pipes that
Pilot line Water-wall screen line
are laterally positioned on the boom sides which supply
Cable the burner with air, water, oil, and propane
Oil line Air line ■■ The rotating base enables horizontal and vertical
positioning of the boom and burner
Water line Gas line ■■ H2S service suitability

Features
■■ Modular design
■■ Rig mounted with rotating base plate and guy lines
■■ Available with two or three sections
■■ Piping for oil, water with filter, air with check valve,
U-Boom.
and propane, in addition to one gas flare

WELL TESTING: 14 of 21 BOOMS AND BURNERS: U-BOOM 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
84

Description
Burners dispose of oil produced at the surface during offshore well Horizontal guy lines help orientate the boom, and vertical guy lines
tests, ensuring flares are kept at a safe distance from the rig. fixed to the rig’s main structure support the boom. The boom
To reduce heat radiation onto an offshore platform or drillship is positioned slightly above horizontal so that any oil left in the piping
and to protect rig personnel, burners are supported by long booms. after flaring operations does not leak out. To ensure nonhazardous
The U-boom consists of two sections that extend approximately burning in changing wind directions, two booms are typically
60 ft [18 m]. By adding an intermediate section, the boom installed on opposite sides of the drilling platform or drillship.
can be lengthened to approximately 85 ft [26 m].

Specifications
Model UBM-DA UBM-EA UBM-F UBM-G
Service H2S H2S H2S H2S
Length, ft [m] 60 [18] 85 [26] 60 [18] 85 [26]
Width, ft [m] 2.92 [0.89] 2.92 [0.89] 2.92 [0.89] 2.92 [0.89]
Weight, lbm [kg] 10,803 [4,900] 15,212 [6,900] 10,803 [4,900] 15,212 [6,900]
Working temperature, degF [degC] -4 to 212 [-20 to 100] -4 to 212 [-20 to 100] 32 to 212 [0 to 100] 32 to 212 [0 to 100]
Wind capacity,† mi/h [km/h] 99 [160] lateral velocity 99 [160] lateral velocity 99 [160] lateral velocity 99 [160] lateral velocity
Connections, Fig. 602 female/male
Air, in [mm] 4 [101.6] 4 [101.6] 4 [101.6] 4 [101.6]
Oil, in [mm] 3 [76.2] 3 [76.2] 3 [76.2] 3 [76.2]
Gas‡, in [mm] 3 [76.2] 3 [76.2] 3 [76.2] 3 [76.2]
Water, in [mm] 3 [76.2] 3 [76.2] 3 [76.2] 3 [76.2]
Applicable codes ANSI§ B31.3 ANSI B31.3 ANSI B31.3 ANSI B31.3
Dynamic, no ice Optional 4-in [101.6-mm] and 6-in [152.4-mm] connections are available. American National Standards Institute
† ‡ §

WELL TESTING: 15 of 21 BOOMS AND BURNERS: U-BOOM 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
85

V-Boom Applications
■■ Support for, and access to, the burner and piping during
offshore well tests

Benefits
■■ Reduces heat radiation and fire risk for increased
rig personnel safety
■■ The heavy-duty design allows the V-boom to withstand
Foot section
winds to 100 mi/h [161 km/h] and ice thickness
to 2 in [5 cm]
Pilot line ■■ H2S service suitability
Water screen Air line
■■ The rotating base enables horizontal and vertical
Oil line Pilot Water line
cable positioning of the boom and burner
Head section
Gas line (optional) Gas line
Features
■■ Modular design
■■ Rig mounted with a rotating base plate and guy lines
■■ Available with two or three sections
■■ Piping for oil, water with filter, air with check valve,
V-Boom.
and propane, in addition to one gas flare

WELL TESTING: 16 of 21 BOOMS AND BURNERS: V-BOOM 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
86

Description
The V-boom, designed for use in the North Sea, is a heavy-duty The boom axis is positioned slightly above horizontal, so any oil left
triangular modular design. A two-section V-boom measures in the piping after flaring operations will not leak out. To ensure
approximately 60 ft [18 m] in length. Adding an intermediate section nonhazardous burning in changing wind directions, two V-booms are
increases the boom length to approximately 85 ft [26 m]. Horizontal typically installed on opposite sides of the drilling platform or drillship.
guy lines are used to orientate the boom. Vertical guy lines fixed
to the rig’s main structure support the boom.

Specifications
Model UBB-A UBB-B
Service H2S H2S
Length, ft [m] 85 [26] 60 [18]
Width, ft [m] 3.6 [1.1] 3.6 [1.1]
Weight, lbm [kg] 16,980 [7,700] 11,680 [5,300]
Working temperature, degF [degC] -4 to 212 [-20 to 100] -4 to 212 [-20 to 100]
Connections, Fig. 602 female/male
Air, in [mm] 4 [101.6] 4 [101.6]
Oil, in [mm] 3 [76.2] 3 [76.2]
Gas†, in [mm] 4 [101.6] 4 [101.6]
Water, in [mm] 3 [76.2] 3 [76.2]
Applicable codes ASME‡, B31.3, DNV§ NPD†† ASME B31.3, DNV, NPD

Optional 4-in [101.6-mm] and 6-in [152.4-mm] gas line connections are available. §Det Norske Veritas
Norwegian Petroleum Directorate. ‡American Society of Mechanical Engineers
††

WELL TESTING: 17 of 21 BOOMS AND BURNERS: V-BOOM 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
87

Green Dragon Burner Applications


■■ Provides clean disposal of the oil produced during
offshore and well testing operations

Benefits
■■ Cleaner, safer oil disposal during testing
■■ Gas and electric ignition

Features
■■ Three or four burner heads
■■ Pneumatic actuators on oil and air valves
■■ Pneumatic control panel
■■ Rotation system
■■ Swivel joint distribution

WELL TESTING: 18 of 21 BOOMS AND BURNERS: Green Dragon BURNER 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
88

Description
The Green Dragon* high-efficiency burner provides clean
disposal of the oil produced during well testing. This burner
consists of pneumatic actuators on the oil and air valves with
pneumatic control panel for high-efficiency burning and rotation
control. A rotation system and swivel joint distributor allow ease
of use and it has a gas pilot light and electric ignition.

Specifications
Model BRN-HBD BRN-HCB
Service H2S H2S
Heads 3 4
Working pressure, psi [kPa] 300 [2,068] 300 [2,068]
Capacity at working pressure, bbl/d [m3/d] 7,000 [1,113] 10,000 [1,590]†
Temperature, degF [degC] 32 to 200 [0 to 93] 32 to 200 [0 to 93]
Power supply 110/220 VAC 110/220 VAC
Oil inlet 3-in Fig. 206 3-in Fig. 206
Water inlet 3-in Fig. 206 3-in Fig. 206
Air inlet 2-in Fig. 206 2-in Fig. 206
Footprint, ft [m] 5.4 × 4.4 [1.65 × 1.33] 5.4 × 4.4 [1.65 × 1.33]
Height, ft [m] 11.6 [3.53] 8.3 [2.53]
Weight, lbm [kg] 2,090 [950] 2,530 [1,150]

Using the high-rate kit.

WELL TESTING: 19 of 21 BOOMS AND BURNERS: Green Dragon BURNER 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
89

EverGreen Burner Applications


■■ Offshore and onshore exploration and development well
testing and cleanup operations
■■ Operations in environmentally sensitive areas
■■ Heavy and waxy oil production

Benefits
■■ Reduces environmental impact during well testing
■■ Efficient and cost-effective alternative to oil storage
■■ Accommodates low oil flow rates and adverse
wind conditions
■■ Performs a fallout-free and smokeless combustion
of liquid hydrocarbons produced during well testing

Features
■■ Operates efficiently with up to 25% water cut
■■ Built-in shutoff valve
■■ Integral design of water screens
■■ Large operating range with optional multirate kit
■■ Special skid (EBSK) is available for onshore operations

WELL TESTING: 20 of 21 BOOMS AND BURNERS: EverGreen BURNER 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
90

Description
The EverGreen* minimal environmental impact well effluent burner to reduce heat radiation. It is also fitted with an automatic shutoff
is a single-head, 12-nozzle, well test oil burner for onshore valve that prevents oil spillage at the beginning and end of a burning
and offshore exploration and development well testing and cleanup. run. A high turn-down (1:5) feature can be further extended to 1:30
The burner geometry makes extensive use of pneumatic atomization using the multirate kit (BMRK) option, which allows the user to select
and enhanced air induction. The burner is equipped with twin pilots, the number of operating nozzles.
a flame-front ignition system (BRFI), and a built-in water screen

Specifications
Model BRNH-A BRNH-B
Number of nozzles 12 1
Nozzles size, in [mm] 0.75 [19] 0.75 [19]
Working pressure, psi [kPa] 960 [6,619] 960 [6,619]
Test pressure, psi [kPa] 1,440 [9,929] 1,440 [9,929]
Min oil flow rate, bbl/d [m3/d] at psi [kPa] 3,000 [477] at 40 [276] 250 [40] at 40 [276]
Max oil flow rate, bbl/d [m3/d] at psi [kPa] 15,000 [2,385] at 240 [1,655] 1,250 [199] at 240 [1,655]
Overall dimensions (L × W × H), ft [m] 14.8 [4.50] × 4.1 [1.25] × 8.2 [2.50] 11.5 [3.50] × 3.1 [1.00] × 4.9 [1.50]
Weight, lbm [kg] 2,072 [940] 331 [150]
Water screen, lbm [kg] 110 [50] N/A
Transportation package, lbm [kg] 353 [160] N/A
Full product sheet at www.slb.com/evergreen

WELL TESTING: 21 of 21 BOOMS AND BURNERS: EverGreen BURNER 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
91

Surface and Mud Logging


Geoservices, a Schlumberger company, is the industry leader ■■ Our combined services units are built to the highest standards
in mud logging services, focusing on drilling performance, wellbore and certified for hazardous oilfield operations.
quality, and surface formation evaluation. As deepwater and other ■■ The combined services units serve as office, laboratory,
increasingly complex drilling programs become more common, and data processing center for Schlumberger personnel
the extent of the possible risk grows. Modern rigs require more and rig supervisors.
sophisticated mud logging equipment to mitigate such risks ■■ Our dedicated installation team, based in Singapore, enables
and provide real-time data on drilling performance and wellbore
us to engage with customers at the design and installation stages.
stability.
Using our state-of-the-art data acquisition systems, we deliver
■■ Geoservices specialized rig equipment accurately measures
services that provide decision-ready information about well status
inflow and outflow of drilling fluids and cuttings for early detection
and drilling performance, helping to drill better wells more safely
of drilling or geological anomalies.
and more efficiently.

SURFACE AND MUD LOGGING: 1 of 9 INTRODUCTION TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
92

FLAG Fluid Loss and Applications


Gain Detection Service ■■

■■
Rapid kick and loss detection
Wellbore ballooning characterization
■■ Drilling fluid displacement, cement displacement,
and free fall monitoring

Benefits
■■ Improves well safety
■■ Reduces NPT
■■ Suitable for deepwater, HPHT, slimhole, and conventional
wells on any type of rig
■■ Lowers environmental risk
■■ Has a dedicated support technician for supervision
of design, installation, and commissioning

Features
■■ Coriolis flowmeter
■■ Reliable differential flow-out corrected for heave,
flowline effect, and reciprocation
■■ Accurate monitoring during drilling, circulating, pipe
connecting, tripping, or cementing
■■ User-friendly visual displays, alarms,and quality control
■■ Stand-alone capability

SURFACE AND MUD LOGGING: 2 of 9 FLAG SERVICE 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
93

Description
Fluid influx or loss can potentially lead to loss of control of a well, intelligent to help prevent false alarms. This makes it an ideal tool
resulting in risk to life and property, and damage to the environment. to detect any primary well control failure. The service provides
The FLAG* fluid loss and gain detection service has an essential early accurate flow measurements, monitoring fluid displacement
warning system that is highly sensitive to fluctuations, but sufficiently accurately without being influenced by pit transfer, especially
during cementing operations.

Specifications Temperature
10-in Coriolis Flowmeter 12-in Coriolis Flowmeter Output Modbus Modbus
Sensor Accuracy ±1 degC ± 0.5% ±1 degC ± 0.5%
Measurement method Coriolis effect Coriolis effect Volume Flow
Sensor type Micro Motion® CMFHC3M Micro Motion CMFHC4M Output 4 to 20 mA; Modbus 4 to 20 mA; Modbus
Transmitter model 2500 2500 Measurement range†, ‡ 0 to 45,000 L/min 0 to 54,400 L/min
Fittings 10-in ASME B16.5 CL150 12-in ASME B16.5 CL150 Zero stability 2.3 L/min 3.5 L/min
Ambient temperature -40 to 60 degC -40 to 60 degC Accuracy§ +0.1% +0.1%
Fluid temperature -40 to 204 degC -40 to 204 degC Safety
Power supply 24 V DC, 5 W 24 V DC, 5 W Safety standard Intrinsically safe Intrinsically safe
Measurements Ex marking
Mass Flow
IECEx Ex ib IIB/IIC T1–T5 Gb Ex ib IIB/IIC T1–T5 Gb
Output Modbus® Modbus
ATEX II 2G Ex ib IIB/IIC T1–T5 Gb II 2G Ex ib IIB/IIC T1–T5 Gb
Measurement range† 0 to 45,000 kg/min 0 to 54,400 kg/min II 2D Ex ib IIIC T†† °C Dc IP 66 II 2D Ex ib IIIC T†† °C Dc IP 66
Zero stability 2.3 kg/min 3.5 kg/min
CSA/CSA C-US Class I, Div. 1, Groups C and D Class I, Div. 1, Groups C and D
Accuracy ±0.1% ±0.1% Class I, Div. 2, Groups A, B, C, and D Class I, Div. 2, Groups A, B, C, and D
Density Class II, Div. 1, Groups E, F, and G Class II, Div. 1, Groups E, F, and G
Output 4 to 20 mA; Modbus 4 to 20 mA; Modbus
Measurement range 0 to 5,000 kg/m3 0 to 5,000 kg/m3 † The maximum flow rate the complete system can handle depends on the bypass and flowline geometry
and is determined following a rig survey. ‡ The measurement range for the volume flow depends on the fluid density.
Accuracy ±0.5 kg/m3 ±0.5 kg/m3 § The Coriolis sensor is part of the Flag service; the given accuracy is for the measurement only and is not representative
of the kick detection accuracy. †† For ambient and process temperature limits, refer to the temperature graphs.

SURFACE AND MUD LOGGING: 3 of 9 FLAG SERVICE 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
94

CLEAR Cuttings Loading Applications


and Wellbore Stability ■■

■■
Extended-reach drilling and highly deviated wells
Difficult hole cleaning conditions

Surveillance Service Unstable wellbores, and shale, oil, and gas drilling
■■

Benefits
■■ Lowers NPT and maximizes ROP by monitoring
and optimizing hole cleaning
■■ Improves safety with early detection of wellbore
instability (caving) and formation damage through
excess returns
■■ Avoids stuck pipe incidents caused by packoff
■■ Minimizes off-bottom circulation time
■■ Facilitate casing running and landing

Features
■■ Four strain gauges per shaker to measure
cuttings recovery
■■ Digital measurements for improved accuracy
■■ Data availability soon after cuttings return to surface
■■ Wellsite and remote monitoring
■■ Customizable displays including comparison of measured
and theoretical volumes

SURFACE AND MUD LOGGING: 4 of 9 CLEAR SERVICE 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
95

Description
The CLEAR* cuttings loading and wellbore stability surveillance is converted into an equivalent volume of dry cuttings, which
service monitors hole cleaning effectiveness and wellbore instability. can be compared with the theoretical volume of formation drilled.
The weight of cuttings reaching the surface is continuously A cuttings flowmeter (CFM), located at the end of each shale shaker,
measured and analyzed by the service. incorporates a weighing tray positioned to catch cuttings as they
By comparing measured and theoretical volumes, the service fall off the screen. The tray is locked in position for a fixed interval,
provides early detection of inadequate hole cleaning and excess cuttings are accumulated and weighed via strain gauges.
returns caused by wellbore instability (caving) or damage. The equipment does not obstruct access to the shale shakers.
Because the coating of mud on cuttings can vary considerably, It complies with the EU Atmospheres Explosive (ATEX) directive
a correction factor—the equivalent dry cuttings ratio (EDCR)— for use in explosive environments and is Underwriter Laboratories
is applied to account for this variation. The wet cuttings weight of Canada (ULC), and European Conformance (CE) rated.

Specifications
Length 1.854 m (6.083 ft)
Width 0.501 m (1.644 ft)
Minimum:1.043 m (3.422 ft)
Height
Maximum:1.103 m (3.619 ft)
Minimum free space
0.111 m (0.364 ft)
required under shaker
Weight 145 kg (320 lb)
Strain gauges 4
Paddle volume 28 liters (7.4 gal)
Sensor nominal sensitivity 2 mV/V (+1%)
Sensor nominal load 100 kg (220 lb)
Air supply 6 bar minimum

SURFACE AND MUD LOGGING: 5 of 9 CLEAR SERVICE 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
96

Combined Services Unit Applications


■■ The unit provides a purpose-built, climate-controlled
environment onshore or offshore
■■ Units are built to the highest standards and certified
for hazardous oilfield operations

Benefits
■■ The unit is fully equipped to serve as an office,
laboratory, and data processing center
■■ Construction may be adapted to specific local conditions
including extreme cold, heliportable rigs, tropical forests,
and deserts
■■ It is pressurized to enable operations in hazardous,
potentially explosive environments.
■■ Has a shutdown control system
■■ Sample-processing equipment

Features
■■ Separate workstations and laboratory equipment
■■ Three independent air-conditioning systems
■■ High-quality secured electrical circuit
■■ Heating modules and drying oven
■■ Secured chemical storage

SURFACE AND MUD LOGGING: 6 of 9 COMBINED SERVICES UNIT 1 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
97

Description
The Combined Services unit provides a purpose-built, climate- The fully equipped cabin serves as a center for collating and analyz-
controlled environment onshore or offshore. The unit houses ing geological data acquired while drilling, and surface and downhole
personnel, instruments, and data acquisition systems, irrespective drilling parameters. Data can be relayed to the customer’s computer
of external climate conditions. It can accommodate up to six people stations on location or to remote offices via communications link.
full-time, with room for temporary visitors.

Combo Mud Logging Cabin Specifications (Ratings A, B, C)


Fire A60
Structural DNV 2.7.1
Electrical and shutdown systems DNV 2.7.2
Power Supply
Input 3-phase 380 V, 480 V, 600 V, 690 V 50 or 60 Hz
Output 3-phase and single-phase 220 to 240 V
Power Consumption
Standard 18 KVA
Optional 36 KVA (with enhanced gas analyzer)
Water Supply 600 kPa [87 psi]
Working Temperature
Standard -20 to 50 degC
Optional -40 to 50 degC
Ratings Model A Model B Model C
Dimensions 10.0 x 2.90 x 2.85 m 10.0 x 2.90 x 2.80 m 10.0 x 2.90 x 2.80 m
Weight
Maximum gross weight 19 t 18 t 20 t
Payload 3t 3t 3t
Tare weight 16 t 15 t 17 t
Certification Level Zone 1 certification Zone 2 certification CE-Zone 2 certification

SURFACE AND MUD LOGGING: 7 of 9 COMBINED SERVICES UNIT 2 of 2 TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
98

ST2 and ST3 Applications


Mud Logging Units ■■ The units provide purpose-built, climate-controlled
environments for Geoservices mud logging instruments
and data acquisition systems at the wellsite,
both onshore and offshore

Benefits
■■ The ST2 and ST3 cabins are fully equipped to serve
as offices, laboratories, and data processing centers
■■ Cabins are pressurized to enable operations
in hazardous, potentially explosive environments
■■ Pressurization and shutdown control system
■■ Construction may be adapted to specific local conditions
such as extreme cold, heliportable rigs, tropical forests,
and deserts

Features
■■ DNV 2.7.1 and 2.7.2 certified for hazardous
oilfield operations
■■ High-quality secured electrical circuit
■■ Laboratory equipment and two instrument racks
■■ Two independent air-conditioning systems
■■ Sample-processing equipment and heating modules
■■ Secured chemical storage

SURFACE AND MUD LOGGING: 8 of 9 ST2 AND ST3 MUD LOGGING UNITS 1 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
99

Description
ST2 and ST3 mud logging cabins provide purpose-built, climate- Processed data can be relayed to the customer’s computer
controlled environments for Geoservices mud logging instruments stations on location or to remote offices via a communications
and data acquisition systems at the wellsite. The fully equipped units link. Both the ST2 and ST3 mud logging cabins can accommodate
serve as centers for collating and analyzing drilling parameters up to four people full-time.
and geological data acquired while drilling.

Mud Logging Cabin Specifications


Ratings ST2 ST3
Fire A60 A60
Structural DNV 2.7.1 DNV 2.7.1
Electrical and shutdown
DNV 2.7.2 DNV 2.7.2
systems
Dimensions LWH 7.30 x 2.59 x 2.75 m 7.70 x 2.90 x 2.75 m
Weight ST3 Standard ST3 Xcold ST3 Norsok
(Worldwide use) (For use within (Complies with standards
Europe only) for Norway)
Maximum gross weight 15.0 t 13.5 t 14.0 t 15.5 t
Payload 3.0 t 2.5 t 2.5 t 2.5 t
Tare weight 12.0 t 11.0 t 11.5 t 13.0 t
Power Supply
Input 3-phase 380 V, 480 V, 600 V, 690 V, 50 or 60 Hz 3-phase 380 V, 415 V, 440 V, 480 V, 600 V, 690 V 50 or 60 Hz
Output 220 to 240 V 220 to 240 V & 110 V
Power Consumption
Standard 18 kVA 18 kVA (3-phase power required)
36 kVA (with enhanced gas analyzer) 36 kVA (with enhanced gas analyzer)
Water supply 600 kPa [87 psi] 600 kPa [87 psi]
Working Temperature ST3 Standard ST3 Xcold ST3 Norsok
Standard -20 to 50 degC -20 to 50 degC -40 to 50 degC -20 to 50 degC
Optional -40 to 50 degC
Certification Level Zone 1 Zone 1 (standard model for worldwide use) CE-Zone 2 (Xcold model for use within Europe)
CE-Zone 2-NORSOK (complies with standards for Norway)

SURFACE AND MUD LOGGING: 9 of 9 ST2 AND ST3 MUD LOGGING UNITS 2 of 2 TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
100

Drilling Tools, Tubulars, and Inspection


DRILCO, now part of Schlumberger, has an established organization Major products and services include
and infrastructure to support your new-build rigs and operations ■■ premium tubular products (including to customer spec)
worldwide. DRILCO offers a comprehensive selection of premium ■■ drill collars (including advice on connections)
drilling tools, tubulars, and subs, as well as inspection, machine
shop, and hardbanding services—all provided by qualified ■■ DRILCO Hevi-Wate transition drillpipe
DRILCO personnel. ■■ premium drill pipe (27⁄8 in to 75⁄8 in Grades E, X, G, and S,
M-I SWACO, a Schlumberger company, offers an all-inclusive line and Range 2 and Range 3 lengths)
of high-efficiency specialized tools for wellbore clean-up operations ■■ rig floor sub packages to meet the complete range
able to address the most complex well designs, conditions, of drilling operations
and fluid types. ■■ premium hardbanding
■■ Ezy-Torq* hydraulic cathead (40,000 to 150,000 ft.lbs
of smooth, accurate torque)
■■ landing strings (heavy-wall drillpipe wall thickness 0.5 in
and above)
■■ inspection and repair at your rig site or from a DRILCO
service center (worldwide network)
■■ wellbore cleanup specialized tools.

DRILLING TOOLS, TUBULARS AND INSPECTION: 1 of 8 INTRODUCTION TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
101

Premium Tubular Products


DRILCO offers a full line of premium tubular products manufactured DRILCO Hevi-Wate transition drillpipe
in accordance with API, a range of other industry standards, The industry standard for an intermediate-weight drillstem member,
or customer-specific guidelines. All tubulars are available to order the DRILCO Hevi-Wate transition drillpipe is available in standard,
with premium rotary shoulder connections and durable hardbanding spiral, and nonmagnetic design. Designed and built for easier
material. The global manufacturing capability of DRILCO ensures handling by the rig crew, Hevi-Wate drillpipe uses a unique center
your tubulars are manufactured near the final destination, reducing upset wear pad or spiral to increase tube life while reducing hole
transportation costs. drag and differential sticking problems.

Drill collars Premium drill pipe


Because drill collars are the most common components DRILCO provides a complete range of drill pipe in nominal sizes
of bottomhole assemblies (BHAs) and used in varied applications from 27⁄8 in to 75⁄8 in (Grades E, X, G, and S) and with a wide range
and conditions, DRILCO manufactures them to specifications more of API and non-standard wall thicknesses in both Range 2
stringent than API requirements. The performance of every DRILCO and Range 3 lengths. Special sizes and proprietary grades
drill collar is ensured through the care DRILCO takes in materials are available on an individual order basis.
specification, heat treatment, machining, and inspection. In addition,
DRILCO technical representatives help in the selection of optimum
connections and features for trouble-free BHA performance.

www.DRILCO.com

DRILLING TOOLS, TUBULARS AND INSPECTION: 2 of 8 PREMIUM TUBULAR PRODUCTS TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
102

Rigfloor Sub Packages


DRILCO offers complete sub packages that will help ensure
a successful start to your drilling operation. Complete packages
eliminate the problems associated with acquiring equipment from
multiple sources.
DRILCO subs are heat-treated to meet or exceed API specifications
for drillpipe tool joint mechanical properties. All subs are available
with connection type and style for specific customer requirements.
Precision-machined API connections are standard, and all
connections are protected by a phosphate surface coating
to minimize galling. Proprietary connections machined by licensed
vendors and managed by DRILCO are also available. Only vendors
authorized to apply the API monogram are used for subs required
to conform to API Specification 7D.

www.DRILCO.com

DRILLING TOOLS, TUBULARS AND INSPECTION: 3 of 8 RIGFLOOR SUB PACKAGES TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
103

Premium Hardbanding
Defender premium hardbanding wires wear to the casing. In harsh, remote environments with strong winds,
DRILCO tubulars are available with Defender premium hardbanding Defender ULTRA hardbanding wire operates with or without shielding
wires. Manufactured using the highest grade of materials, gas to provide a premium hardband not otherwise available.
these wires can be applied over previous DRILCO applications
(and other existing hardbanding materials) and offer solutions Defender NON-MAG ELITE metal-cored hardbanding wire
for both openhole and cased hole applications, as well as application Defender NON-MAG ELITE* metal-cored hardbanding wire
on nonmagnetic tubulars. for nonmagnetic drill collars and flex pipe is enhanced with
a tungsten drop that disperses evenly throughout. The wire
Defender MAX metal-cored hardbanding wire protects nonmagnetic drill collars and flex pipe when applied
Defender MAX* metal-cored hardbanding wire also operates to standard austenitic stainless steels, chromium-manganese,
in openhole or cased hole applications. In openhole and nitrogen-bearing austenitic stainless steels. The metal-cored
applications, tungsten carbide is dropped into the molten hardband. hardband is a tough, corrosion-resistant, highly alloyed austenitic
The matrix is designed and formulated to hold the carbide throughout deposit with a typical permeability value of 1.005. Its formulation
the hardband’s life cycle. Designed with a low coefficient of friction provides consistent and uniform arc transfer with low fumes
for casing-friendly applications, Defender MAX hardbanding to optimize performance.
wire is a combination of crack-free, nonporous, deposited,
work-hardening hardband.

Defender ULTRA flux-cored hardbanding wire


Defender ULTRA* flux-cored hardbanding wire is designed
and formulated to provide a combination of crack-free
and nonporous deposited hardband. Defender ULTRA hardbanding
wire provides optimal protection to the tool joint while minimizing
www.DRILCO.com

DRILLING TOOLS, TUBULARS AND INSPECTION: 4 of 8 PREMIUM HARDBANDING TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
104

Ezy-Torq Hydraulic Cathead


The DRILCO Ezy-Torq hydraulic cathead delivers 40,000
to 150,000 ft.lbf of smooth and accurate torque to make up today’s
premium and standard tubular connections. For applications less
than 40,000 ft.lbf, a calibrated load cell is required. This is a key capa-
bility when it comes to applying correct connection torque, reducing
wear on expensive drillstring components and avoiding potential
connection failures. To fit individual operating parameters and rig
requirements, the Ezy-Torq hydraulic cathead can be fitted with
high-temperature components for operating in harsh environments
and is available in three power systems.

www.DRILCO.com

DRILLING TOOLS, TUBULARS AND INSPECTION: 5 of 8 EZY-TORQ HYDRAULIC CATHEAD TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
105

Landing Strings
Landing strings are made up of heavy-wall drill pipe (0.5-in wall
or greater) and are used for operations where regular drill pipe lacks
sufficient tensile strength to carry a load, such as running casing
and liner. The typical landing string configuration is as follows
■■ 65⁄8-in OD
■■ V150 Tube Grade and API 120 ksi tool joints
■■ Range III
■■ API 65⁄8-in FH Connections
■■ 0.813-in wall
■■ Longer tool joints (19-in box and 16-in pin) with internal coating
DRILCO can customize landing strings to meet specific requirements
adhering to both API and a range of other industry specifications.

www.DRILCO.com

DRILLING TOOLS, TUBULARS AND INSPECTION: 6 of 8 LANDING STRINGS TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
106

Inspection
Inspection and repair at the workshop or your rig site
Using the latest nondestructive testing equipment, highly trained
and qualified DRILCO personnel provide a full range of drilling
rig inspection and repair services at your rig site, ship yards,
or through the DRILCO worldwide network of service centers.

DRILCO API-approved inspections of drill collars, drillpipe, Hevi-Wate


transition drillpipe, and other premium downhole tools are reliable,
efficient, and available electronically for review and analysis.
Inspection of risers is available in select locations.

www.DRILCO.com

DRILLING TOOLS, TUBULARS AND INSPECTION: 7 of 8 INSPECTION TOC


Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
107

Wellbore Cleanup Specialized Tools


M-I SWACO, a Schlumberger company, offers an all-inclusive Tools include
line of high-efficiency specialized tools for wellbore cleanup ■■ BOP cleaning
operations capable of addressing the most complex ■■ Casing cleaning
well designs, conditions, and fluid types.
■■ Riser cleaning
This new generation of specialized tools is the result
of an industrywide study of best practices in wellbore cleanup ■■ Wellhead cleaning
techniques. These fit-for-purpose tools remove all mud residues ■■ Circulating tools
and other debris that can damage completion and impede ■■ Debris recovery
production. They are engineered for single-pass cleanups, ■■ Liner top testing
which reduces NPT and project costs.

To learn more or find specific product sheets and specifications, visit:


www.miswaco.com/specializedtools

Magnosweep II Multiback
Drilstring Magnet Wellbore
Displacement
Tool

DRILLING TOOLS, TUBULARS AND INSPECTION: 8 of 8 WELLBORE CLEANUP SPECIALIZED TOOLS TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection
*Mark of Schlumberger
Other company, product, and service names
are the properties of their respective owners.
Copyright © 2014 Schlumberger. All rights reserved. 14-of-0156

TOC
Solids Control, Cuttings Management, Drilling Tools,
Cementing Wireline Logging Well Testing Surface and Mud Logging
Fluids Processing and Pressure Control Tubulars & Inspection

You might also like