115-116 Deluge System Analysis
115-116 Deluge System Analysis
ITEM TO BE SPRAYED DELUGE SYST NO. DELUGE RISER BASIS FOR COVERAGE FP BOD SEC REFERENCE
IN IN FT2 GPM/FT2
115 C001 & L.O. 1 444 138 426 0.5 1.2 255
SYST 1 255
HOSE & MONITOR
ALLOWANCE 1500
TOTAL SYST 1 +
ALLOWANCE 1755
MAXIMUM UNIT DEMAND
1 255
HOSE & MONITOR
ALLOWANCE 1500