Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

M
M OSBL ISBL 117-1/2"-NG-6402-3CB1S- N

3CB1S 1CB1S01

BATTERY LIMITS
117-1/2"-N-6401-1CB1S01- N
117-0051 D853

GWCY01
GWCS01 CWCS01 GWCS01 NNF

L
L
31577 117-0052
TO 117-HPU1-XXXX

1/2" PI
PCV 1/2"

GWCY01
SET @ 70 PSIG XXX

GWCY01
BATTERY LIMIT CONDITIONS DESIGN OPERATING XXX
INSTR.

3/4"
PSIG o
PSIG o 2" NOTE 4 NITROGEN
SERVICE: NATURAL GAS F F 4" 4"
138-8"-NG-10001-3CB1S- N PIPING
C853 138-0453-02 117-0051 31564

GWCY01
NOTES: - - 450 200 GBCF01 GBCF01 GBCF01 GBCF01 NATURAL GAS FROM HEADER K
3CB1S 1CB1S
K

GWCY01
J
J BATTERY LIMIT CONDITIONS DESIGN OPERATING IP-P1-137-117-0002
HYDROGEN B IMPORT HYDROGEN
SERVICE: IMPORT HYDROGEN PSIG o
F PSIG o
F 137-3"-HY-0208-3CB1S- N 2"x1" 117-2"-HY-0057-3CB1S- N 117-2"-HY-0057-3CB1S- N
36250 137-0437 31578 117-0056
GWCS01 GWCS01
NOTES: 525 250 475 110 FROM PROCESS TO 117-HPU1-XXXX
INTERCONNECT MINIMUM

H
H

GWCY01
BATTERY LIMIT CONDITIONS DESIGN OPERATING IP-P1-117-137-0003
HYDROGEN HYDROGEN PRODUCT
SERVICE: HYDROGEN PRODUCT PSIG o
F PSIG o
F 137-8"-HY-0185-3CB1S- N 117-6"-HY-0055-3CB1S- N 117-6"-HY-0055-3CB1S- N
137-0435 36251 117-0075 31563
NOTES: 355 150 300 100 GBCF01 CWCS01 GBCF01
TO PROCESS FROM PRODUCT METERING
INTERCONNECT MINIMUM

G
G MINIMUM

GWCY02
BATTERY LIMIT CONDITIONS DESIGN OPERATING IP-P2-117-138-0004
NP STEAM EXPORT STEAM
SERVICE: EXPORT STEAM PSIG o
F PSIG o
F 138-8"-SS-6043-6CB1S01-4.0 "H 117-8"-SS-0095-6CB1S01-4.0 "H 117-8"-SS-0095-6CB1S01-4.0 "H
138-0430 36252 117-0061 31565
GDCB07

GDCF04
GDCF04

WARM-UP
NOTES: 750 765 150 430 TO UTILITIES FROM 117-HPU1-XXXX

3"
LINE
INTERCONNECT
GWCY02

IP-P2-117-138-0004A
2" 2" F
F

LWCS02 GWCS02 GWCY02

BATTERY LIMIT CONDITIONS DESIGN OPERATING IP-P2-138-117-0006


BOILER FEED WATER BFW MAKE-UP
SERVICE: BFW MAKE-UP PSIG o
F PSIG o
F 138-6"-BFW-6165-6CB1S01-2.0 "H 117-6"-BFW-0077-6CB1S01-2.0 "H 117-6"-BFW-0077-6CB1S01-2.0 "H
36253 138-0440 31579 117-0068
GWCY02

GDCF04
GDCF06

NOTES: 1260 300 890 250 FROM UTILITIES GDCF04 TO 117-HPU1-XXXX


2"

INTERCONNECT LO
E
E
MINIMUM

NOTE 3
BATTERY LIMIT CONDITIONS DESIGN OPERATING IP-P2-117-138-0007
HYDROCARBON FLARE FLARE HEADER
SERVICE: FLARE HEADER PSIG o
F PSIG o
F 138-24"-FL-6302-1CB2S- N LO 117-24"-FL-0221-1CB1S- N 117-24"-FL-0221-1CB1S- N
138-0458.02 31568 117-0085 31567
FREE DRAINING FREE DRAINING
NOTES: 50 676 0.5 115 TO UTILITIES GWCY01 TO 117-HPU1-D-015 TO 117-HPU1-D-015 FROM 117-HPU1-XXX D
D INTERCONNECT
SP GATE VALVE
w/ POSITION
0028 INDICATOR

\ISBL\115\117-DG-PR05-0050.pid Last Modified . . 05/25/2018 10:04:50 BY GLeottau


GWCY01
GWCY01

BATTERY LIMIT CONDITIONS DESIGN OPERATING IP-P2-138-117-0008


FUEL GAS REFINERY FUEL GAS
SERVICE: REFINERY FUEL GAS PSIG o
F PSIG o
F 138-6"-FG-6319-1CB1S- N 117-3"-FG-6001-1CB1S- N 117-3"-FG-6001-1CB1S- N
36254 138-0452.01 31566 117-0078
GWCY01
GWCY01

NOTES: 130 250 70 115 GACF01 GACF01


FROM UTILITIES TO REFORMER BURNERS C
C INTERCONNECT

MINIMUM

0 CC-VRP-GRC-PFO-U117-xxx E.P.C xxx xx xx xxxx B


B REFINERIA DE CARTAGENA
CLIENT
NO. REVISION DRAWN CK'D APP'D DATE
APPD
NOTES:

1. FOR SYMBOLS AND GENERAL NOTES SEE P&IDs 000-DG-PR07-0001/0002/0003.


PRELIMINAR PIPING & INSTRUMENTATION DIAGRAM
NO VALIDO PARA CONSTRUCCIÓN 3 AS BUILT - REVISED JVM AJV AJV - 27-Aug-15 HYDROGEN PLANT - 50 MM SCFD
2. ALL INSTRUMENT, SP, AND TP TAGS SHALL HAVE "115" AS A PREFIX.
REFINERIA DE 2 AS BUILT DPS SM SM - 10-Aug-14 BATTERY LIMIT PROCESS TIE-INS
3.GATE VALVE TO BE INSTALLED WITH THE WHEEL HORIZONTAL OR BELOW, LOCKED OPEN, AND CARTAGENA S.A. A
FINAL ISSUED FOR CONSTRUCTION
A WITH A POSITION INDICATOR. THIS IS TO AVOID VALVE GATE FROM FALLING INTO THE VALVE
BODY ON SPINDLE FAILURE.
1 DBR RFC DCD RaBe 14-Nov-11
CARTAGENA REFINERY EXPANSION PROJECT
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ("CB&I"). IT MAY CONTAIN INFORMATION DESCRIBING TECHNOLOGY OWNED BY
0 ISSUED FOR CONSTRUCTION - - - - 18-Feb-11 CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK BEING PERFORMED BY CB&I. REPRODUCTION IN
WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN PERMISSION OF CB&I. IT IS FOR: REFINERIA DE CARTAGENA S.A.
4. LOCATE 117-PI-1271 WITHIN TWO FEET OF 117-PCV-1269. TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.

MECH; COM; SEE; INST; PIP;


CLIENT
NO. REVISION DRAWN CK'D APP'D
APP'D
DATE PROJECT NO: 166000 DWG NO: 117-DG-PR05-0050 REV: B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like