20.

00

A B C D
6.42 3.42 4.93 4.93

0.15
01 C3 C3
---------------- ----------------
300X600mm 300X600mm

3.29
02
C3 C3
---------------- ----------------
300X600mm 300X600mm

3.29
03 C3
---------------- C3
300X600mm ----------------
300X600mm
3.29

0.15
20.00

04 C2 C3
------------ ---------------- C3
230X380mm 300X600mm ----------------
300X600mm

GENERAL NOTES
3.29

architectural and service drawings and ambiguity if any

0.15
should be brought to the notice of the design engineers.

05 C3 C3 REINFORCING STEEL
C2
------------ ---------------- ----------------
230X380mm 300X600mm 300X600mm
TMT- 500 conforming to IS:1705-1987 with maximum yeild
stress of 500 MPA noted on drawings as 'Tor'.
3.44

CONCRETE

M-25 Grade having 25N/mm2 compressive strength at 28 days and


shall be conforming to IS:456-2000.

0.15
06 COVER
C1 C1 C1
---------------- ---------------- ----------------
300X450mm 300X450mm 300X450mm shall be
Columns - 40 mm
Beams - 25 mm
3.10

Slab - 20 mm
0.30

DESIGN FOR BEARING CAPACITY OF SOIL


0.15

0.15
07 C1 C1
LAP LENGTH (Ld)
---------------- C1 ---------------- C1
300X450mm ---------------- 300X450mm ----------------
300X450mm 300X450mm of bar.

BEAM COLUMN JUNCTION


SCHEDULE OF COLUMN REINFORCEMENT:
bars shall be gradually bent at a slope of 1:6 and placed clear
off column bars. Under no circumstances, column vertical bars
FOOTING SIZES BELOW GL ABOVE GL BELOW GL ABOVE GL TIES shall be bent to accomodate beam bars.
MKD. in the portion of junction, at the spacing indicated. However, if
L B D D REINFORCEMENT REINFORCEMENT REINFORCEMENT the beams are connected on the four directions of column, the
stirrup spacing should be doubled. In case of difficulty in
providing closed stirrups, U-type stirrups may be provided,
extending into the beam by length, Ld=50 x dia.

CONSTRUCTION DETAILS

close to 0.2L near supports for the bottom reinforcement and close
to mid-span for top reinforcement

joint should be approved by engineer at site. Construction joint


should be quarter span of beams and slabs. In no condition
construction joint shall be at the support or mid span.

DRAWING NO-03
CONSTRUCTION OF COMMUNITY HALL AT POCHAMMA COLONYWARD NO-13 , 0 2.5 5 7.5 12.5
IN MANIKONDA MUNICIPALITY' Flat No: 401, Topaz Complex, Amrutahills,