Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Iranian Gas Engineering & Development Company Client/MC/Consultant:

EPC Contractor:
Kheirgoo - Arsanjan Gas Compressor Stations Project on IGAT VIII
CONTRACT NO.: 98/791218

ITP For Paint Materials

Project ID STAT. Discipline Doc Type Sequence Revision

Contract No: 98/791218 275 800 PI ITP 003 01 Page 1 of 6

ITP For
Paint Materials

00 2/8/2020 ISSUE FOR APPROVAL HTA HTA B.KH


REV. DATE DESCRIPTION PREPARED CHECKED APPROVED
Iranian Gas Engineering & Development Company Client/MC/Consultant:
EPC Contractor:
Kheirgoo - Arsanjan Gas Compressor Stations Project on IGAT VIII
CONTRACT NO.: 98/791218

ITP For Paint Materials

Project ID STAT. Discipline Doc Type Sequence Revision

Contract No: 98/791218 275 800 PI ITP 003 01 Page 1 of 6

TABULATION OF REVISED PAGES

PAGE REV0 REV1 REV2 REV3 PAGE REV0 REV1 REV2 REV3

1 × 26

2 × 27

3 × 28

4 × 29

5 × 30

6 × 31

7 32

8 33

9 34

10 35

11 36

12 37

13 38

14 39

15 40

16 41

17 42

18 43

19 44

20 45

21 46

22 47

23 48

24 49

25 50
Iranian Gas Engineering & Development Company Client/MC/Consultant:
EPC Contractor:
Kheirgoo - Arsanjan Gas Compressor Stations Project on IGAT VIII
CONTRACT NO.: 98/791218

ITP For Paint Materials

Project ID STAT. Discipline Doc Type Sequence Revision

Contract No: 98/791218 275 800 PI ITP 003 01 Page 1 of 6

TABLE OF CONTENT

1. SCOPE ...................................................................................................................... 4

2. GENERAL INFORMATION ...................................................................................... 5

3. REFERENCES .................................................................................................... 5

4. RESPONSIBILITIES ............................................................................... 6

5. INSPECTION & TEST PLAN TABLE ........................................................................ 6


Iranian Gas Engineering & Development Company Client/MC/Consultant:
EPC Contractor:
Kheirgoo - Arsanjan Gas Compressor Stations Project on IGAT VIII
CONTRACT NO.: 98/791218

ITP For Paint Materials

Project ID STAT. Discipline Doc Type Sequence Revision

Contract No: 98/791218 275 800 PI ITP 003 01 Page 1 of 6

2. SCOPE
The scope of the present document is to specify the methods and establish the Quality Control Plan for the
inspection of Paint Materials at Vendor’s shop or warehouse.

3. GENERAL INFORMATION
3.1 Definitions and Terminology
CLIENT: IGEDC

MC/ CONSULTANT: FSEC

CONTRACTOR: SEKAF / RAHBORD ENERGY


THIRD PARTY AGENCY: ARYA SGS

3.2 Project Name


Iranian Gas Engineering & Development Company - Kheirgoo - Arsanjan
Full name:
Gas Compressor Stations Project on IGAT VIII
Location: Kheirgoo - Arsanjan
Contract No.: 98/791218

3.3 Abbreviation
Review documents, It is processed through reviewing any results of inspection or test as a
R: method of ensuring that the inspection or test is performed in accordance with any
approved drawing, procedure, specifications or acceptance criteria.
Spot witness and/or spot check basis A designated point during or following an activity at
which spot inspection or spot examination is required in accordance with the relative
SW: procedure. Work may proceed through the designated spot witness point if the required
party is not present for the previously established activity. Percentage of inspection for spot
determining by client).
Witness Point. A designated point during or following an important activity at which
inspection or examination is required in accordance with the relative procedure. Work may
W:
proceed through the designated witness point if the required party is not present for the
previously established activity. PA shall sign and Stamp the report.
Hold points. A designated point during or following a specific activity. Work may not
H: proceed beyond this point until the inspection has taken place and been witnessed by the
required parties (Witness is Mandatory for continuing the cycle).
Review & Approve, VENDOR shall submit the required documents to the CLIENT /
RA:
CONSULTANT, CONTRACTOR and THIRD PARTY inspector for approval & Stamped.
No Activity, No activity, but has open access to VENDOR, should CLIENT /
N/A CONTRACTOR discrete to visit If Required If Required Means to be required as
specified in the purchase order / specification / standards.
Iranian Gas Engineering & Development Company Client/MC/Consultant:
EPC Contractor:
Kheirgoo - Arsanjan Gas Compressor Stations Project on IGAT VIII
CONTRACT NO.: 98/791218

ITP For Paint Materials

Project ID STAT. Discipline Doc Type Sequence Revision

Contract No: 98/791218 275 800 PI ITP 003 01 Page 1 of 6

4. REFERENCES
Code and Standards

IPS-M-TP-215 MATERIAL AND EQUIPMENT STANDARD FOR EPOXY - POLYAMIDE PRIMER

275-800-PI-SP-008 PAINTING AND COATING SPECIFICATION

5. RESPONSIBILITIES
CONTRACTOR’s Quality Control Personnel is responsible for control and inspection of all kinds of Paint
Materials after manufacturing, as per approved ITP, before inspecting those items by TPA.
Iranian Gas Engineering & Development Company Client/MC/Consultant:
EPC Contractor:
Kheirgoo - Arsanjan Gas Compressor Stations Project on IGAT VIII
CONTRACT NO.: 98/791218

ITP For Welding Materials

Project ID STAT. Discipline Doc Type Sequence Revision

Contract No: 275 800 PI ITP 003 001 Page 1 of 6

INSPECTION POINTS/PARTIRS
ITEM

PROCEDURE/REFEREN VERIFYING
INSPECTION ACTIVITY ACCEPTANCE CRITERIA LOCATION Client/MC/
CE CERITERIA DOCUMENT M SEKAF TPA
Consultant

1 Pre-Inspection Meeting (PIM) OFFICE MOM H H H H

2 Manufactured Documents REPORT H R RA R

3 Material Certification & Identification CERTIFICATE H R RA R

LAB TEST
4 Appearance and Marking Inspection H W R R
RESULTS

IPS-M-TP-215
5 Visual Check REPORT H W R R

SHOP
275-800-PI-SP-008
6 Materials Sample Test REPORT H W R R

7 Packing & Pre-shipment Check PACKING LIST H W W R

8 Release Note IRN H H R R

App
9 Final Book H R R
Documents