Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Project

Location:
Owner:
Date:
Subject: Detailed Estimate

MATERIAL
DESCRIPTION Qty Unit
Item No. Unit Cost Total Cost

GR GENERAL REQUIREMENTS
1 Mobilization and Demobilization 1.00 lot
2 Building Occupancy and permits 1.00 lot
3 Electric water and consumption 1.00 lot
4 Temporary barracks and facilities 1.00 lot
6 Safety requirements 1.00 lot
8 Site clearing and demolition 1.00 lot
Sub-total I
TOTAL
LABOR ITEM
Unit Cost Total Cost COST

By Client
By Client

You might also like