Project Location: Owner: Date: Subject: Detailed Estimate Material Unit Cost Total Cost
Project Location: Owner: Date: Subject: Detailed Estimate Material Unit Cost Total Cost
Location:
Owner:
Date:
Subject: Detailed Estimate
MATERIAL
DESCRIPTION Qty Unit
Item No. Unit Cost Total Cost
GR GENERAL REQUIREMENTS
1 Mobilization and Demobilization 1.00 lot
2 Building Occupancy and permits 1.00 lot
3 Electric water and consumption 1.00 lot
4 Temporary barracks and facilities 1.00 lot
6 Safety requirements 1.00 lot
8 Site clearing and demolition 1.00 lot
Sub-total I
TOTAL
LABOR ITEM