1. BACKGROUND
(a) UNICEF is a specialized agency of the United Nations with a mandate to advocate for the
protection of children's rights, to help meet their basic needs and to expand their opportunities
to reach their full potential.
(b) In support to its aid relief programmes and operations, UNICEF Bangladesh is planning to
engage qualified Contractors for the execution of civil works which may include the renovation,
rehabilitation or (re)construction of the followings facilities:
▪ Cold-chain rooms;
▪ Health Clinics;
▪ Primary Schools;
▪ Community centres;
▪ Water Sanitation and Hygiene (WASH);
▪ Warehouses;
▪ Office premises.
(c) Expressions of Interest (EOI) are invited from Contractors wishing to be prequalified to tender
for similar contracts and through the attached questionnaire establishing their capacities to
undertake such works.
2. SCOPE OF WORK
(a) The EOI is the first stage of a multi-stage procurement process. The objective of the EOI process
is to identify and prequalified Contractors that wish to be considered for selection for future
works with UNICEF and have suitable capacity, capability and experience.
(b) An Evaluation Committee comprising representatives of UNICEF will evaluate EOI applications
on the basis of the evaluation criteria set out in Section 4 of this Request for Expressions of
Interest (REOI).
(c) It is expected that prequalified Contractors will be invited to submit Invitations to Bid (ITBs) or
Request for Proposals (RFPs) when needs arise for project implementation purposes.
3. ELIGIBILITY REQUIREMENTS
(a) This REOI for Prequalification is open to all Contractors regularly registered and licensed to
operate in Bangladesh.
(b) To become eligible candidates shall demonstrate to have:
a. minimum of 5 (five) years of experience as a general contractor, and
b. successful completed at least 3 (three) contracts of a nature and complexity
comparable to the construction works required above (Section 1.b).
1
REOI - UNICEF Bangladesh, August 2019
(c) Companies doing business with the United Nations are required to register online with UN
Global Market (www.ungm.org) and accept and comply with the UN Contractor Code of
Conduct (https://www.ungm.org/Public/CodeOfConduct).
4. EVALUATION CRITERIA
(a) Prequalification will be based on meeting the minimum criteria regarding their general and
particular construction experience, financial position, personnel and equipment capabilities,
and other relevant information as demonstrated by the Contractor’s responses in the
Submission Forms attached to this REOI.
(b) Contractors must have cumulated a minimum score of 60% to be prequalified.
(c) Incomplete or inadequate responses, lack of response or misrepresentation in responding to
any questions will affect the evaluation.
(d) Submissions shall be evaluated in accordance with the following criteria:
Weighting (%)
Serial Criteria Form
sub total
Valid company registration and licensed to
1 mandatory
operate in Bangladesh.
Litigations: A consistent history of awards
against the Contractor or any partner of a Joint
2 Venture may result in disqualification of the mandatory
Contractor.
Evidence of minimum of 5 (five) years of
3 mandatory
experience as a general contractor.
Completed at least 3 (three) contracts of a
nature and complexity comparable to the works
4 listed in Section 1.b of this REOI in the capacity mandatory
of a general contractor.
Evidence of the Contractor’s experience and
5 performance on contracts of a similar nature in B 25
Bangladesh.
Evidence of a competitive management
6 structure capable to make provision for suitably C 15
qualified personnel to fill the key positions.
The Contractor shall demonstrate to own, or
have assured access to key items of equipment,
7 in full working order, and that, based on D 10
commitments, they can be available for timely
use in the future contracts.
The Contractor shall also demonstrate that it has
adequate sources of finance to meet the cash
8 E 20
flow requirements on works currently in progress
and for future contract commitments.
2
REOI - UNICEF Bangladesh, August 2019
6. PREQUALIFICATION PROCEDURE
(a) The Submission Forms must be fully completed as per requirements stated in the annexures.
(b) Submission and acceptance of any Prequalification will not constitute a contract or part of a
contract between UNICEF and the Company;
(c) Any conflict of interest or potential conflict of interest either with UNICEF employees/ex-
employees or any other conflict of interest must be fully disclosed to UNICEF in this EoI or as
soon as such conflict or potential conflict becomes apparent. In the event of any conflict or
potential conflict of interest UNICEF shall, in its absolute discretion, decide on the appropriate
course of action. UNICEF reserves the right to evaluate individual or organizational conflict of
interest of the bidder vis-à-vis UNICEF it’s employees;
(d) The company by responding to this EoI agree to be bound by the decision of UNICEF;
(e) UNICEF reserves the following rights for this EoI:-
i. To request any additional information, which is considered relevant for the evaluation;
ii. Visit and inspect the company’s premises and its clients;
iii. Contact clients of the company/referees provided;
3
REOI - UNICEF Bangladesh, August 2019
(a) DUE DATE OF SUBMISSION 19th August 2019, 14.00 hrs (DHAKA TIME)
(b) The EOI responses with accompanying documents can be either submitted by email OR can
be submitted in hard copies to the following address, between 0900 am to 14 pm
UNICEF Bangladesh Country Office
The Reception Desk
4th floor of BSL Office Complex,
1 Minto Road,
Dhaka-1000
(c) Sealed package should be marked as follows
“EOI for Prequalification of Contractors for Construction Works in Bangladesh”
(d) ELECTRONIC SUBMISSION OF EOI (by email)
• All e-mailed submissions must be sent to eoibangladesh@unicef.org, the ONLY
ACCEPTABLE E-MAIL ADDRESS for receipt of Proposals. No other recipient
should be "Cc" or "Bcc" in the e-mail submission.
• All e-mail communication in relation to the submission must clearly indicate
“EOI for Prequalification of Contractors for Construction Works in
Bangladesh” in the "Subject" line of the e-mail.
8. ENQUIRIES
(a) Interested Companies are encouraged to contact UNICEF during the EOI stage should they have
any queries regarding any aspect of this EoI. Requests for clarification shall be in writing by
email and UNICEF will respond to the queries in writing by email.
(b) All enquiries in relation to this EoI submission must be sent by email to:
E-Mail: eoibangladesh@unicef.org
Subject: Enquiry: “EOI for Prequalification of Contractors for Construction Works in
Bangladesh” [Company Name], no later than 15 August 2019.
4
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
Submission Forms
In order to be considered as a potential Contractor, interested Contractors should return the following
forms as indicated in Section 6 of this REOI, including the Letter of Expression of Interest duly complete and
signed. Additional verification of any information submitted may be requested.
Note: The order and format of the items requested as presented in the forms here below must be
preserved.
5
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
Date:
To:
1. Being duly authorized to represent and act on behalf of __________________ (hereinafter referred to
as “the Contractor”), and having reviewed and fully understood all of the prequalification requirements
and information provided, the undersigned hereby applies for prequalification to bid to construction
works undertaken by UNICEF Bangladesh.
3. UNICEF and its authorized representatives are hereby authorized to conduct any inquiries or
investigations to verify the statements, documents, and information submitted in connection with this
application, and to seek clarification from our other Agencies and Clients regarding any financial and
technical aspects. This Letter of Expression of Interest will also serve as authorization to any individual or
authorized representative of any institution referred to in the supporting information to provide such
information deemed necessary and as requested by your selves to verify statements and information
provided in this application, such as the resources, experience, and competence of the Contractor.
4. UNICEF and its authorized representatives may contact the following persons for further information:
6
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
6. The undersigned declare that the statements made and the information provided in the duly completed
application are complete, true, and correct in every detail.
Name of Contractor:
Address:
Date:
Undersigned by:
Designation of Undersigned:
Group Members:
1)
2)
Etc....
Member 1:
Address:
Date:
Undersigned by:
Designation of Undersigned:
Member 2:
Address:
Date:
Undersigned by:
Designation of Undersigned:
7
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
2. Full Address:
3. Telephone: Fax: Email: Webpage:
4. Company’s registration No*: Expire Date: License Class/Category: *Attach registration certificate
5. Type of Company: Private Limited Company, Public Limited Company, other:
9. Does the Contractor satisfy the eligibility requirements contained in this REOI-Section.3? Yes No
13. Is the Contractor relying on the capacity or qualifications of a parent company? Yes No
14. Is the Contractor involved in any litigation, current or during the last five (5) years? Yes No
15. If answered “Yes” please provide information regarding the parties concerned, and the disputed amounts and awards.
Year Award for or Against the Contractor Name of Client, cause of litigation, and matter in dispute Disputed amount (in BDT)
8
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
Part 1: EXPERIENCE OF SIMILAR REOI PROJECTS (AS LISTED IN THIS REOI-SECTION 1) IN THE LAST 5 YEARS
Name of Project and Project Description (health clinics, Building floor Contract Completion
Client Name Date started
Geographic Location schools, community centres, offices,.) area (m2) Value (BDT) Date
9
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
FORM C - EXPERIENCE OF EACH KEY PERSONNEL (a separate form is to be completed for each key personnel)
Part 1: KEY STAFF IDENTIFICATION
Name of Key Personnel
Date Commenced with company
Position Title
10
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
Part 5:DETAIL OF THE COMPANY AVERAGE NUMBER OF PERSON EMPLOYED FOR THE LAST 3 FULL YEARS
11
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
12
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
1. The Contractor should state the annual turnover, for Civil Engineering Construction Work only, in terms of the amounts billed to clients for each year for
work in progress or completed at the end of the period reported. The annual periods should be the last three (3) completed financial years.
In case of Joint Venture this should be done for each member of the group.
3. State the Contractor’s current outstanding workload value: BDT [total amount]
7. Does the Contractor hold Professional Indemnity Insurance? Yes No If “Yes” please state value in BDT:
8. Does the Contractor hold Employers Liability Insurance? Yes No If “Yes” please state value in BDT:
9. Does the Contractor hold Public Liability Insurance? Yes No If “Yes” please state value in BDT:
13
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
1. Indicate with which recognised Quality Control Systems Standards the Contractor is registered. (Please provide a copy of the certificate)
ISO9001 Environmental Management
None
2. In case of “other standards” or “internal procedures”, please provide some details of the other standard below:
3. How does the Contractor ensure that the quality of its works are to a high standard?
4. Does the Contractor have a Safety Management System certified by a recognised independent authority? Yes No
5. How does the Contractor ensure the health and safety of its personnel both in the office and on site?
14
EOI - Expression of Interest - UNICEF Bangladesh, August 2019
FORM G - REFERENCES
Contractors shall seek Client References in respect of at least three (3) projects similar to the services
required here. The Contractor shall note that the non-provision of client references with original
signatures may result in the Contractor receiving a lower score for this section of EOI.
Further Comments: