Meticulous Planning Engineer applying knowledge of plant operations to ensure the cost- effective completion
of various projects. Committed to determining the optimal sequence of operations at the work site while
implementing efficient construction methods. Specialize in meeting deadlines and ensuring compliance with
safetystandards.
EDUCATION QUALIFICATION
❖ B.E. Mechanical Engineer (2005 – 2009) from India
❖ M.B.A Production Management (2010 to 2012) from India
❖ Diploma in Project Planning Management (using Primavera P6)
TECHNICAL SKILLS
❖ Diploma in Primavera P6
❖ Microsoft Excel
❖ Microsoft Word
❖ Microsoft Project
❖ Microsoft Outlook
❖ Microsoft Dynamics (ERP)
EMPLOYMENT
Tendering Manager
Mousa A Bahman Trading Establishment, Kuwait.
From September 2019 to May 2020
Job Roles & Responsibilities:
• Review of information about demands and derivation of supply and proposal preparations
• Clarification of bid conditions and management of the tender preparation.
• Monitoring of the bid management in order to ensure it is aligned with the organization's
requirements.
• Contribution in cost and price calculations.
• Coordination of tender reviews and deadlines and adjust them to the frameworks given by
the clients.
• Managing the development of plans for tender process activities to achieve targets.
• Coordinate with management and other partners and complete all the stages of work
leading to the submission of bids.
• Keep a track of the tender bid opening the result.
• Manage the relationship with the clients.
• E Tender on Various E Tendering Websites of Governmental Departments, Agencies,
Listed Companies and other E Tendering Websites.
• Day to day dealing with manufactures for the updates and queries regarding Tenders
Planning Engineer
HOT Engineering & Construction Co. (KSCC), Kuwait.
From April 2016 to September 2019
Job Roles & Responsibilities:
• Understand work scope, quantity and familiar with logical sequences in terms of
engineering and construction disciplines.
• Understand WBS structure and work with management and project team in the
development of work break down structure for progress measurement, scheduling,
cost estimating and project control.
• Prepare and manage overall master schedule integrating work breakdown structure
using scheduling software.
• Understand contractual matter, earn value method, familiar withscope
management and change control.
• Coordinate schedule from multiple contractors and incorporatethe
information gathered into the overall project master schedule.
• Prepare cost estimation and schedule bar chart plan considering all in puts
(manpower, equipments and materials) availability, production and construction
sequences.
• Develop work method of statement or procedure as required.
• Understand and able to utilize planning tools such as MS Excel, MS Project, Primavera
and ERP.
• Develop and update resource histogram weekly or monthly as required.
• Develop ‘S’ curve for the projects.
• Evaluate allocation of resources and provide recommendations to maintain required
progress.
• Develop and implement plan versus actual progress charts (histograms/S curves).
Reports and analyses deviations from plan.
• Track, monitor and forecast progress of all activities and deliverable such as products,
engineering documents, fabrication status and construction of all discipline.
• Analyze gaps between the planned and actual progress and highlight the areas of
concern which required action of the associate task member.
• Perform probabilistic analysis of completion dates and potential alternatives. Present risk
based analysis of most likely completion and expected deviation range.
• Prepare and update three weeks and one month look-ahead schedule that reflect the
priority activities.
• Liaises with all team leaders and/or members to communicate required completion dates
and interface between functional team/operational team and project team.
• Participate all meeting (i.e schedule review meeting, progress meeting, coordination
meeting, review meeting).
Planning Engineer
SKS Group Co. W.L.L / KNPC, Kuwait,
From May 2012 to April 2016
Job Roles & Responsibilities:
Major Projects
• Design & Installation of Oil Containment and Detection System for the Pipe Lines
from NTF to NorthPier (KOC). (Contract Value: KD 10,713,000).
• Civil foundation works at GC-31 (Dodsal/KOC). (Contract Value: KD 844,339.260)
• Mechanical (welding) pipeline works GC30. (CG/ L&T /KOC). (Contract Value: KD
355,000)
• Procurement, Construction & Installation of Mechanical, Civil, Electrical &
Instrumentation Works in KNPC MAA Refinery – CA/3903 (Contract Value: KD