IPC Provision Sum
IPC Provision Sum
Common work
3. TESTING FACILITIES
Providing and Maintaining following Testing Equipments for Material Testing Facilities on Rental Basis for entire project
completion time. Rate shall also include construction of Temporary shed for the installation of Testing Laboratory.
1. Compressive Strength Testing Machine complete Set - 2 Set (including one for district coordination office)
2. Cube Mold - 6 Nos. in each school site
3. Slump Testing Set - 1 in each school site
3 4. Sieve (Coarse and Fine Aggregate) - 1 in each school site Per Month 21.00 40,000.00 840,000.00
5. Weighing Balance - 1 in each school site.
6. Digital Micrometer (Vernier) - 2 set (including one for district coordination office)
7. Measuring Cylinder 1 litre capacity - 1 in each school site
One set of all the above Testing facilities must compulsorily be place at District Co-ordination Office of the Contractor.
Prepared by contractor Checked by Consultant, DSC Verified by(Engineer) Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
4. AS-BUILT DRAWING
Allow for Preparation and Submission of As-Built drawing of the actually completed works along with operation and
4 maintenance manual along with Final Bill as per the contract document (GCC 72 and specification Division-1 - "GENERAL Job 1.00 700,000.00 700,000.00
REQUIREMENTS" article 9-(J) and (K) and the instruction of the Engineer.
TOTAL 4,690,000.00
Prepared by contractor Checked by Consultant, DSC Verified by(Engineer) Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director
Government of Nepal
National Reconstruction Authority
Central Level Project Implementation Unit (Education)
District Level Project Implementation Unit (Education),Gorkha
Emergency School Reconstruction Project (ESRP), JICA Loan No. : NE-P11
Contract Bills
FINAL INTERIM PAYMENT CERTIFICATE
Period: 15th November 2018 to 10th August 2020
Name of School: Shree Dharmawati S. S. School
Name of Contractor:Sharma-A.M Joint Venture
Contract Number:ESRP/MOE/CLPIU/074/075-GORKHA-15
Provisional sum
PROVISIONAL SUM
1. INSURANCE
Insurance of works covering all risk, materials, workmen's and third parties liabilities covering for
1 P.S. 1.00 1,100,000.00 1,100,000.00
entire period of construction plus defects labiality period as per GCC clause No. 19. (Payment Shall
be made in Actual Basis.)
2. PERFORMANCE GUARANTEE
Provisional sum for Bank comission for Performance Guarantee covering for entire construction
2 period plus defect's liability period as per GCC clause No. 59. (Payment shall be made on actual P.S. 1.00 800,000.00 800,000.00
basis.)
TOTAL 1,900,000.00
Prepared by contractor Checked by Consultant, DSC Verified by(Engineer) Recommended by DLPIU Chief Checked and forwarded by CLPIU DPD Approved by CLPIU, project Director