Professional Documents
Culture Documents
Beer Cup Challenge 6.0: Region Quarry Fixed Cost (Per SQ FT.)
Beer Cup Challenge 6.0: Region Quarry Fixed Cost (Per SQ FT.)
6.0
Region Asgard Ragnarök
Quarry Trondheim Viborg Ribe Hedeby
Fixed Cost (per sq ft.)
Land Lease 59 61 56 51
Building 21 22 25 24
Tools & Machinery 38 36 33 42
Total FC 118 119 114 117
Variable Cost (per cup
produced)
Wages 0.20 0.18 0.49 0.31
Dragon Labor 0.22 0.19 0.14 0.17
Total VC 0.42 0.37 0.63 0.48
53 35 33 54 51 55
27 39 40 15 19 18
35 30 29 39 42 37
115 104 102 108 112 110
ual Budget (Krona) 5,000,000 kr. Jötunn Blue Dragonite Mineral 1 Mineral 2
Rate / KG 335 150 170
Ratio 7 2 4
Mineral 3
140
2
Mineral 3
160
2
Mineral 3
110
3