G Gulf LLC. P.O. Box 65525, Dubai.

Tel : 04-8852900, Fax 04-8854332


INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…16.../…12…./…2009….

Branch:- Dubai Drawings:- ……


..BSL – 1154 – 01………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 200 …… ……………………………………..….....

Description: .……PUMP ROOM ROOF @ FIRST BASEMENT FLOOR SLAB FOR PLOT 200.

1. Certificate Of Completion

@ …3:00…… p.m. on…16… day /…12.…./….2009…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- ..16…../…12……/…2009……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…24.../…03…./…2010….

Branch:- Dubai Drawings:- ……


..BSL – 1098 – 01A………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 700 …… ……………………………………..….....

Description: .……FORMWORK THIRD FLOOR SLAB GRID 1 TO GRID 18 @ PLOT 700.

1. Certificate Of Completion

@ …12:15…… p.m. on…24… day /…03.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .24…../…03……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…17.../…12…./…2009….

Branch:- Dubai Drawings:- ……


..BSL – 1098 – 01A………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 700 …… ……………………………………..….....

Description: .……ATTIC SLAB @ PLOT 700.

1. Certificate Of Completion

@ …11:30…… a.m. on…17… day /…12.…./….2009…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .17…../…12……/…2009……
G Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…09.../…01…./…2010….

Branch:- Dubai Drawings:- ……


..BSL – 1154 – 01………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 200 …… ……………………………………..….....

Description: .……FORMWORK FOR GROUND FLOOR SLAB FOR PLOT 200.

1. Certificate Of Completion

@ …3:00…… p.m. on…09… day /…01.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- ..09…../…01……/…2010……
G Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…27.../…05…./…2010….

Branch:- Dubai Drawings:- ……


..BSL – 1154 – 01………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 200 …… ……………………………………..….....

Description: .……THIRD FLOOR SLAB FOR PLOT 200.

1. Certificate Of Completion

@ …10:00…… a.m. on…27… day /…05.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .27…../…05……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…21.../…04…./…2010….

Branch:- Dubai . Drawings:- ……


..BSL – 1098 – 01A………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 700 …… ……………………………………..….....

Description: .……FORMWORK FOR 4TH SLAB , GRID 18 – GRID 33 @ PLOT 700 .

1. Certificate Of Completion

@ …04:00…… p.m. on…21… day /…04.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .21…../…04……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…01.../…05…./…2010….

Branch:- Dubai . Drawings:- ……


..BSL – 1098 – 01A………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 700 …… ……………………………………..….....

Description: .……FORMWORK FOR 4TH SLAB , GRID 01 – GRID 18 @ PLOT 700 .

1. Certificate Of Completion

@ …11:30…… a.m. on…01… day /…05.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .01…../…05……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…02.../…06…./…2010….

Branch:- Dubai . Drawings:- ……


..BSL – 1098 – 01A………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 700 …… ……………………………………..….....

Description: .……ROOF FLOOR SLAB @ PLOT 700 .

1. Certificate Of Completion

@ …11:30…… a.m. on…02… day /…06.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .02…../…06……/…2010……
G Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…28.../…06…./…2010….

Branch:- Dubai Drawings:- ……


..BSL – 1154 – 01………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 200 …… ……………………………………..….....

Description: .……FOURTH FLOOR SLAB FOR PLOT 200.

1. Certificate Of Completion

@ …11:00…… a.m. on…28… day /…06.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .28…../…06……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…07.../…07…./…2010….

Branch:- Dubai . Drawings:- ……


..BSL – 1098 – 01A………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY , 2B + G + 4 AUTUMN


CLUSTER @ PLOT 700 …… ……………………………………..….....

Description: .……ROOF FLOOR SLAB FROM GRID 1 TO GRID 18 @ PLOT 700 .

1. Certificate Of Completion

@ …9:30…… a.m. on…07… day /…07.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- ……Gangadhar
Date:- .07…../…07……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…28.../…11…./…2010….

Branch:- Dubai . Drawings:- ……


………….………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C. , SEASONS COMMUNITY .


…… ……………………………………..….....

Description: .……JVC 15G FRV 003 –FIRST FLOOR SLAB.

1. Certificate Of Completion

@ …10:30…… a.m. on…28… day /…11.…./….2010…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- …… Gangadhar
Date:- .28…../…11……/…2010……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…29.../…04…./…2012….

Branch:- Dubai . Drawings:- ……


………….………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C.


…… ……………………………………..….....

Description: .……GROUND FLOOR SLAB 0.45

1. Certificate Of Completion

@ …10:30…… a.m. on…29… day /…04.…./….2012…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

……Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- …… Gangadhar
Date:- .29…../…04……/…2012……
Gulf LLC. P.O. Box 65525, Dubai.
Tel : 04-8852900, Fax 04-8854332
INSPECTION REPORT

Inspected By:…GANGADHAR .A. ….…….……. Date:-…19.../…05…./…2012….

Branch:- Dubai . Drawings:- ……


………….………..……..

Site:- BIN SHAFAR CONTRACTING L.L.C.


…… ……………………………………..….....

Description: .…………………………………………………………………

1. Certificate Of Completion

@ …09:15…… a.m. on…19… day /…05…./….2012…


The above Structure was inspected and found to be proper, capable of withstanding the
Load, and may now be used for the purposes specified.

1A. Brief description of changes from the above drawing:………….………………


…………………………………………………………………………………………………….
…………………………… …………… N/A ………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….
…………………………………………………………………………………………………….

1B. Subject to the following being completed by the erectors:…………………….


…………………………………… N/A …………………………………………………….

2. Notice of Work Requirement

Site Check done. And found to be as per design requirement.


……………………………………… ……………………………………………………….
…………………………………………… …………………………………………………….

Inspected By:-

Signed:- …… Gangadhar
Date:- .19…../…05……/…2012……