BILL OF QUANTITIES
xxx Page 1
PALACE LANDSCAPE QUSOUR BILADY FOR CONTRACTING COMPANY LTD.
AL-IBRAHIM PALACE
Bill of Quantities
PROJECT SUMMARY:
SUMMARY Page 2
PALACE LANDSCAPE QUSOUR BILADY FOR CONTRACTING COMPANY LTD.
AL-IBRAHIM PALACE
Bill of Quantities
A. GENERAL WORKS
- Site clearing , including removal within the garden boundaries including site disposal. m² 1,092 6.00 6,552.00
The work includes excavation for tree pits from the established formation level to
required depth as per drawing, including disposal of excavated material off site.
5.0 Backfilling of Light Fill materials from existing elevation up to desired grading level m² 3060 35.00 107,100.00
AL-IBRAHIM PALACE
Bill of Quantities
Rocks to be distributed in the garden 60 - 80cm with 15 to 20cm thick and 70 to 90cm
- LOAD - 3,000.00 By Others
*
Pre-fab concrete pots 80cm height w/ travertino stone cladding (dimension varies refer
- pcs - 1,365.00 By Others
to dwg.)*
Diwaniya @ Zone 20
AL-IBRAHIM PALACE
Bill of Quantities
AL-IBRAHIM PALACE
Bill of Quantities
AL-IBRAHIM PALACE
Bill of Quantities
B. SOFT LANDSCAPING
-
Supply and install the following plant materials, soil and soil additives,
wood support and twine wires and other required materials.
-
Royal Palm (Clear Trunk) 200-250 Nos - 1,848.00
-
Phoenix Dactylifera (Clear Trunk) 300-350 Nos 8 2,260.00
-
Cycas Revulata (Clear Trunk) 100-150 Nos 1 2,500.00
3.0 Shrubs
AL-IBRAHIM PALACE
Bill of Quantities
B. SOFT LANDSCAPING
AL-IBRAHIM PALACE
Bill of Quantities
B. SOFT LANDSCAPING
- Seasonal Plants (Winter and Summer Plants) 10cm Nos 2000 3.00
7.0 Grass
AL-IBRAHIM PALACE
Bill of Quantities
B. SOFT LANDSCAPING
Supply and install Fabric Pocket Vertical Planter including plastic board
- m² 90 1,715.00
backing and fixing accessories
8.1 Finishing
SAR
TOTAL FOR SOFTSCAPE PAGE 4
AL-IBRAHIM PALACE
Bill of Quantities
B. SOFT LANDSCAPING
Total Cost
18,080.00
2,500.00
680.00
490.00
4,039.00
2,065.00
465.00
489.00
1,160.00
1,360.00
850.00
2,100.00
450.00
3,675.00
990.00
39,393.00
Total Cost
1,848.00
360.00
520.00
408.00
2,490.00
1,944.00
540.00
3,645.00
300.00
3,500.00
3,240.00
8,925.00
1,488.00
120.00
340.00
1,092.00
2,900.00
360.00
34,650.00
Total Cost
840.00
600.00
200.00
652.00
400.00
296.00
1,300.00
260.00
128.00
960.00
648.00
6,000.00
19,620.00
5,460.00
37,364.00
Total Cost
2,760.00
750.00
800.00
5,850.00
5,520.00
BY OTHERS
BY OTHERS
BY OTHERS
15,680.00
Total Cost
127,087.00
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
Clearing, chipping and disposal of existing swimming pool wall structure as per
- Lot 1 5,000.00 5,000.00
new drawings
Reinforce Concrete: 30cm Thick Raft Footing Foundation with 2 layer 6-14mm
- m3 28 950.00 26,600.00
dia/m o.c RSB Top and Bottom Eachway
Reinforce Concrete: Varying Thickness Wall with 6-14mm dia/m o.c Vertical
- m3 25 1,050.00 26,250.00
Bars and 6-12mm dia/m o.c Horizontal Bars
1.3 Waterproofing
2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer for
- m² 130 45.00 5,850.00
concrete exposed to soil and water
- 100mm Thick Lean Concrete (before and after waterproofing) m² 158 60.00 9,480.00
SAR 80,835.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 1
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
1.5 Finishing
- Indirect LED Strip Lighting 70Watts - 5 Mtrs. Model: RG-6060-TA by Rishang Lm - 120.00 BY OTHERS
Reinforce Concrete footing, wall and beams, w/ 12mm dia. RSB as per detailed
- m3 10 1,050.00 10,500.00
drawing
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR 11,516.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 2
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
2.3 Waterproofing
- 2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer m² 15 45.00 675.00
2.4 Finishing
IP68 Underwater Lighting 12 Watts LED Stainless Steel Body Model: Annet by
- Set - 1,865.00 BY OTHERS
Ligman Lighting
- Indirect LED Strip Lighting 70Watts - 5 Mtrs. Model: RG-6060-TA by Rishang Lm - 120.00 BY OTHERS
Submersbile Water fall Pump 0.75 Hp 35 GPM @ 6 Mtrs. Head 230 Volts
- Set - 3,735.00 BY OTHERS
Pedrollo or approved equal
- Pipes, Fittings and Valves (50% FROM ORIGINAL AMOUNT) Lot - 1,750.00 BY OTHERS
- Stainless Steel Channel Grade 316 4.6 Mtrs. Length (see details) Lot - 1,910.00 BY OTHERS
SAR 675.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 3
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
- Reinforce Concrete footing & walls with 14mmØ RSB m3 - 1,050.00 BY OTHERS
3.3 Waterproofing
2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer for
- m² - 45.00 BY OTHERS
Fountain
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 4
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
3.4 Finishing
IP68 Underwater Lighting 12 Watts LED Stainless Steel Body Model: Annet by
- Set - 1,865.00 BY OTHERS
Ligman Lighting
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 5
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
- Reinforce Concrete footing & walls with 14mmØ RSB m3 - 1,050.00 BY OTHERS
4.3 Waterproofing
2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer for
- m² - 45.00 BY OTHERS
Fountain
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 6
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
4.4 Finishing
IP68 Underwater Lighting 12 Watts LED Stainless Steel Body Model: Annet by
- Set - 1,865.00 BY OTHERS
Ligman Lighting
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 7
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
- Plastering of honey combs on the exisitng walls before waterproofing application m² - 6.00 By Others
- 100mm Thick Screeding on floor to hide pipes @ water feature basin m² - 70.00 By Others
5.3 Waterproofing
2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer for
- m² 70 45.00 3,150.00
Fountain
5.4 Finishing
SAR 3,150.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 8
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
IP68 Underwater Lighting 12 Watts LED Stainless Steel Body Model: Annet by
- Set - 1,865.00 By Others
Ligman Lighting
Submersbile Water fall Pump 1.0 Hp 40 GPM @ 6 Mtrs. Head 230 Volts Pedrollo
- Set - 3,950.00 By Others
or approved equal
- Pipes, Fittings and Valves (50% FROM ORIGINAL AMOUNT) Lot - 2,170.00 By Others
- Stainless Steel Channel Grade 316 9.1 Mtrs. Length (see details) Lot - 3,500.00 By Others
- Reinforce Concrete wall footing, wall and slab 12mm dia. RSB mesh m3 4 1,050.00 4,200.00
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR 9,364.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 9
6.3 Waterproofing
- 2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer m² 12 45.00 540.00
6.4 Finishing
- 30x30x3cm Travertino Stone Paving ( Material - supply by The Owner m² - 360.00 BY OTHERS
- Indirect LED Strip Lighting 70Watts - 5 Mtrs. Model: RG-6060-TA by Rishang Lm 20 120.00 BY OTHERS
IP68 Underwater Lighting 12 Watts LED Stainless Steel Body Model: Annet by
- Nos. 8 1,865.00 BY OTHERS
Ligman Lighting
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR 540.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 10
- Reinforce Concrete wall footing, wall, including basin w/ 12mm dia. RSB mesh m3 - 1,050.00 By Others
7.3 Waterproofing
- 2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer m² - 45.00 By Others
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 11
7.4 Finishing
Installation of Black Galaxy Granite Cladding 20mm THK Int. & Ext. Wall
- m² - 90.00 BY OTHERS
(Material - supply by The Owner)
- 30x30x3cm Travertino Stone Paving ( Material - supply by The Owner m² - 360.00 BY OTHERS
- Indirect LED Strip Lighting 70Watts - 5 Mtrs. Model: RG-6060-TA by Rishang Lm - 120.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 12
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
- Reinforce Concrete Slab including pads for each steps m3 - 950.00 BY OTHERS
8.3 Waterproofing
- 2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer m² - 45.00 BY OTHERS
8.4 Finishing
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 13
Installation of Natural Stone Slate waterfall wall
- m² - 90.00 BY OTHERS
(Material - supply by The Owner)
Supply & Install of Natural Wood decking including fixing accessories (African
- m² - 1,215.00 BY OTHERS
Teak)
IP68 Underwater Lighting 12 Watts LED Stainless Steel Body Model: Annet by
- Set - 1,865.00 BY OTHERS
Ligman Lighting
- Small Buried Uplight 12 Volts - 4 Watts IP67 Model: Nevada by Ligman Set - 1,095.00 BY OTHERS
Dry Pump for Water Feature 30 GPM @ 15 Mtrs. Head Single Phase 230Volts -
- Set - 3,950.00 BY OTHERS
Grundfos MQ-Series or approved equal
- Piping and Fittings (50% FROM ORIGINAL AMOUNT) Lot - 5,975.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 14
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
9.3 Waterproofing
- 2 layer 3-4mm Thick Bitumat waterproofing membrane with Black primer m² 21 45.00 BY OTHERS
9.4 Finishing
Supply & Install Natural Wood Coping and Cladding including fixing
- m² 29 1,215.00 BY OTHERS
Accessories (African Teak)
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 15
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
Pre-fab concrete pots 70x70x150cm w/ travertino stone cladding Nos. - 2,160.00 BY OTHERS
- Reinforce Concrete wall, w/ 14mm dia. RSB Vert. & Horizontal rebars m3 4 1,050.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 16
10.3 Finishing
- Reinforce Concrete wall, w/ 14mm dia. RSB Vert. & Horizontal rebars m3 4 1,050.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 17
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
11.3 Finishing
- Coping on top of planter box wall (Material - supply by The Owner) Lm - 80.00 BY OTHERS
- Reinforce Concrete wall, w/ 14mm dia. RSB Vert. & Horizontal rebars m3 - 1,050.00 BY OTHERS
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 18
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
12.3 Finishing
- Coping on top of planter box wall (Material - supply by The Owner) Lm - 80.00 BY OTHERS
- Drilling of Conrete for Rebar installation to existing slab from diwaniya Ls - - BY OTHERS
- Reinforce Concrete wall, w/ 14mm dia. RSB Vert. & Horizontal rebars m3 - 1,050.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 19
13.3 Finishing
- Coping on top of planter box wall (Material - supply by The Owner) Lm - 80.00 BY OTHERS
- Reinforce Concrete wall, w/ 14mm dia. RSB Vert. & Horizontal rebars m3 - 1,050.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 20
14.3 Finishing
- Coping on top of planter box wall (Material - supply by The Owner) m² - 80.00 BY OTHERS
- Installation of Frameless Glass Railings including fixing and accessories Lm - 1,365.00 BY OTHERS
- Installation of Frameless Glass Railings including fixing and accessories Lm - 1,365.00 BY OTHERS
- Installation of Frameless Glass Railings including fixing and accessories Lm - 1,140.00 BY OTHERS
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR -
TOTAL FOR SPECIAL CONSTRUCTION PAGE 21
Frameless Glass Railings @ Main Villa Ground
15.40
Floor Hallway
- Installation of Frameless Glass Railings including fixing and accessories Lm - 1,140.00 BY OTHERS
- Reinforce Concrete footing, column, and beam with 14mm dia. RSB m3 3.3 1,050.00 3,465.00
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR 3,561.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 22
- Reinforce Concrete wall footing 14mm dia. RSB mesh m3 7 1,050.00 7,350.00
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
SAR 9,660.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 23
AL-IBRAHIM PALACE
Bill of Quantities
C. SPECIAL CONSTRUCTION
Reinforced concrete footing, wall footing, column and wall w/ 12mm dia. RSB,
- 8mm dia. secondary RSB m3 26 1,050.00 27,300.00
SAR 35,751.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 24
SAR 155,052.00
TOTAL FOR SPECIAL CONSTRUCTION PAGE 1 + P2 + ...P24
AL-IBRAHIM PALACE
D. HARDSCAPING
- Excavation of soil to reduce the sandy soil for walkway and roadway area m3 72 12.00 864.00
Reinforced concrete slab 150mm thick with layer of 10mm steel mesh space @
- m² 241 142.50 34,342.50
0.20m C/C
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 40 45.00 1,800.00
concrete exposed to soil and water with protection
1.2 Finishing
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 45,006.50
TOTAL FOR HARDSCAPE PAGE 1
AL-IBRAHIM PALACE
D. HARDSCAPING
1.24 Kerbs
SAR 6,020.00
TOTAL FOR HARDSCAPE PAGE 2
AL-IBRAHIM PALACE
D. HARDSCAPING
- Excavation of soil to reduce the sandy soil for walkway and roadway area m3 92 12.00 1,104.00
Reinforced concrete slab 150mm thick with layer of 10mm steel mesh space @
- m² 305 142.50 43,462.50
0.20m C/C
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 63 45.00 2,835.00
concrete exposed to soil and water with protection
2.2 Finishing
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 58,759.50
TOTAL FOR HARDSCAPE PAGE 3
2.22 Kerbs
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 6,510.00
TOTAL FOR HARDSCAPE PAGE 4
AL-IBRAHIM PALACE
D. HARDSCAPING
- Excavation of soil to reduce the sandy soil for walkway and roadway area m3 40 12.00 480.00
Reinforced concrete slab 150mm thick with layer of 10mm steel mesh space @
- m² 138 142.50 19,665.00
0.20m C/C
- CMU block work 20 x 20 x 40 cm (0.40 m height) with plaster Lm 45 40.00 1,800.00
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 24 45.00 1,080.00
concrete exposed to soil and water with protection
3.2 Finishing
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 24,643.00
TOTAL FOR HARDSCAPE PAGE 5
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR -
TOTAL FOR HARDSCAPE PAGE 6
AL-IBRAHIM PALACE
D. HARDSCAPING
- Excavation of soil to reduce the sandy soil for walkway and roadway area m3 38 12.00 456.00
Reinforced concrete slab 150mm thick with layer of 10mm steel mesh space @
- m² 128 142.50 18,240.00
0.20m C/C
- CMU block work 20 x 20 x 40 cm (0.40 m height) with plaster Lm 45 40.00 1,800.00
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 24 45.00 1,080.00
concrete exposed to soil and water with protection
4.2 Finishing
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 23,122.00
TOTAL FOR HARDSCAPE PAGE 7
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR -
TOTAL FOR HARDSCAPE PAGE 8
AL-IBRAHIM PALACE
D. HARDSCAPING
Reinforced concrete slab 100mm thick with layer of 8mm steel mesh space @
- m² 211 85.00 17,935.00
0.20m C/C
- CMU block work 20 x 20 x 40 cm (0.40 m height) with plaster Lm 10 40.00 400.00
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 4 45.00 180.00
concrete exposed to soil and water with protection
5.2 Finishing
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 20,246.00
TOTAL FOR HARDSCAPE PAGE 9
Reinforced concrete slab 100mm thick with layer of 8mm steel mesh space @
- m² 183 85.00 15,555.00
0.20m C/C
- CMU block works 20 x 20 x 40 cm (1.10 m height) with plaster Lm 8 90.00 720.00
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 9.6 45.00 432.00
concrete exposed to soil and water with protection
6.2 Finishing
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 18,247.00
TOTAL FOR HARDSCAPE PAGE 10
AL-IBRAHIM PALACE
D. HARDSCAPING
Reinforced concrete slab 100mm thick with layer of 8mm steel mesh space @
- m² 144 85.00 12,240.00
0.20m C/C
- CMU block works 20 x 20 x 40 cm (1.10 m height) with plaster Lm 8 90.00 720.00
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
- m² 9.6 45.00 432.00
concrete exposed to soil and water with protection
7.2 Finishing
SAR 14,584.00
TOTAL FOR HARDSCAPE PAGE 11
AL-IBRAHIM PALACE
D. HARDSCAPING
- Disposal/removal of excavated area and filling up depressed area m3 194 6.00 1,164.00
Reinforced concrete slab 100mm thick with layer of 8mm steel mesh space @
- m² 865 85.00 73,525.00
0.20m C/C
- CMU block works 20 x 20 x 40 cm (1.10 m height) with plaster Lm 110 90.00 9,900.00
- CMU block works 20 x 20 x 40 cm (0.40 m height) with plaster Lm 284 35.00 9,940.00
1 Layer 3-4mm thk. bitumat waterproofing membrane with black primer for
m² 252 45.00 11,340.00
concrete exposed to soil and water with protection
9.2 Finishing
SAR 110,255.00
TOTAL FOR HARDSCAPE PAGE 12
AL-IBRAHIM PALACE
D. HARDSCAPING
10.23 Travertino Slab from Covered Courtyard Main Villa to Gate 2 Entrance
- 300x80x3cm m² 29 - BY OTHERS
10.24 Travertino Slab from Covered Courtyard Main Villa to Feature Planter 1
- 202x80x3cm m² 2 - BY OTHERS
- 202x60x3cm m² 20 - BY OTHERS
- 80x80x3cm m² 25 - BY OTHERS
10.26 Travertino Slab from Staircase besides Swimming to Open Sitting Area
- 300x80x3cm m² 8 - BY OTHERS
- 200x60x3cm m² 6 - BY OTHERS
- 80x80x3cm m² 75 - BY OTHERS
AL-IBRAHIM PALACE
D. HARDSCAPING
- 180x60x3cm m² 9 - BY OTHERS
- 80x80x3cm m² 21 - BY OTHERS
- 70x70x3cm m² 16 - BY OTHERS
10.31 Travertino Slab from near Diwaniya Staircase to Main Villa guest entry
- 242x60x3cm m² 21 - BY OTHERS
- at Diwaniya m² 76 - BY OTHERS
SAR -
TOTAL FOR HARDSCAPE PAGE 14
AL-IBRAHIM PALACE
D. HARDSCAPING
- Excavation of soil to reduce the sandy soil for walkway and roadway area m3 17 12.00 204.00
Reinforced concrete slab 100mm thick with layer of 8mm steel mesh space @
- m² 54 85.00 4,590.00
0.20m C/C
11.02 Tread, Riser & Landing @ Gate 1 Main Villa Family Entry
Tread m² 3 - BY OTHERS
Riser Lm 6 - BY OTHERS
Landing m² 6 - BY OTHERS
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR 8,752.00
TOTAL FOR HARDSCAPE PAGE 15
11.03 Tread, Riser & Landing @ Gate 2 Main Villa Family Entry
Tread m² 3 - BY OTHERS
Riser Lm 6 - BY OTHERS
Landing m² 10 - BY OTHERS
Riser Lm 34 - BY OTHERS
Tread m² 40 - BY OTHERS
Tread m² 14 - BY OTHERS
Riser Lm 49 - BY OTHERS
Tread m² 15 - BY OTHERS
Riser Lm 47 - BY OTHERS
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR -
TOTAL FOR HARDSCAPE PAGE 16
Tread m² 2 - BY OTHERS
Riser Lm 8 - BY OTHERS
11.08 Tread, Riser & Landing @ Gate 1 Main Villa Guest Entry
Tread m² 3 - BY OTHERS
Riser Lm 6 - BY OTHERS
Landing m² 7 - BY OTHERS
11.09 Tread, Riser & Landing @ Gate 2 Main Villa Guest Entry
Tread m² 4 - BY OTHERS
Riser Lm 8 - BY OTHERS
Tread m² 2 - BY OTHERS
Riser Lm 17 - BY OTHERS
AL-IBRAHIM PALACE
D. HARDSCAPING
SAR -
TOTAL FOR HARDSCAPE PAGE 17
AL-IBRAHIM PALACE
D. HARDSCAPING
Reinforced concrete slab 100mm thick with layer of 8mm steel mesh space @
- m² 106 85.00 9,010.00
0.20m C/C
12.3 Finishing
Supply & Install of 10 x 100 x 2cm Natural Wood Flooring including fixing
- m² - 1,215.00 BY OTHERS
Accessories (African Teak)
SAR 10,282.00
TOTAL FOR HARDSCAPE PAGE 18
SAR 346,427.00
TOTAL FOR HARDSCAPE PAGE 1 + P2 + P3 + ...P18
AL-IBRAHIM PALACE
Landscaping, Irrigation and Other Works
Bill of Quantities
E. IRRIGATION SYSTEM
1.2 uPVC pipe class 5 for laterals and distribution line including fittings.
AL-IBRAHIM PALACE
Landscaping, Irrigation and Other Works
Bill of Quantities
E. IRRIGATION SYSTEM
1.6 Sprinklers
- Pop-up Spray Sprinklers 3 Mtr. Radius Nos 62 28.00 1,736.00
AL-IBRAHIM PALACE
Landscaping, Irrigation and Other Works
Bill of Quantities
E. IRRIGATION SYSTEM
AL-IBRAHIM PALACE
Landscaping, Irrigation and Other Works
Bill of Quantities
E. IRRIGATION SYSTEM
SUMMARY:
TOTAL FOR IRRIGATION WORKS PAGE 1 SAR 46,877.00
AL-IBRAHIM PALACE
Landscaping, Irrigation and Other Works
Bill of Quantities
E. IRRIGATION SYSTEM