Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

QUANTITY SURVEYING  PROFESSIONAL COURSE

o Earthwork Estimation
All construction projects have cost and a budget. o Building Construction Items Rate
The project becomes efficient and profitable Analysis
when the costs are managed efficiently. It is in o Estimation of Building Materials
the management of the cost and budget that the o Quantity of each type of work
role of the Quantity Surveyor becomes relevant
and vital. From the moment a plan is drawn until o Estimation of Labour Required
the construction project has been completed, a o Estimation of Machinery Required
quantity surveyor is likely to be involved in a o Determining Budget of Project
legal, technical and financial capacity. He (BOQ)
manages and control costs in construction o Reading the District Schedule
projects which may involve use of a range of Rate (DSR).
management procedures and technical tools to o Project Work in MS-Excel
achieve this goal.
He prepares standardized schedule of quantities
of various works involved, construction materials
needed and labour force required for  Advanced Course
accomplishing the projects. This enables the o Professional Course
management to put the works on tender, pick up
the builder who bid lowest price and to prepare
bill of quantities and cost on completion.
+
The technique of measuring quantities from o Estimation of
drawings, sketches and specification prepared by o Minor bridges, Culverts
architects and engineers for the preparation of o Retaining Walls
Tender/Contract documents is known as taking o Highways
off. The quantities so taken are used to prepare o Overhead water tanks.
bills of quantities which usually are in
o Contracts, contractors, forms, etc.
accordance with a published standard method of
measurement (SMM).

Course plan

You might also like