ALL TECHNICAL DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS, DESIGNS, INSTRUCTIONS
1. IT IS THE RESPONSIBILITY OF THE PURCHASER TO INSURE NO PARTIES MAY AT THEIR OWN DISCRETION USE IN ANY MANNER. ANY USE, INCLUDING BUT NOT LIMITED
THAT ALL PROJECT PLANS, SPECIFICATIONS, AND APPLIED TO REPRODUCTION, DISTRIBUTION, FABRICATION, WITHOUT WRITTEN AUTHORIZATION FROM PEB SHALL STRICTLY FACE
LEGAL CONSEQUENCES.
DESIGN LOADS, FULLY MEET THE PROPOSED INTENT AS WELL AS
COMPLY WITH ALL APPLICABLE REQUIREMENTS OF ANY GOVERNING
MATERIALS ASTM DESIGNATIONS
AUTHORITIES. AND TO OBTAIN THE APPROPRIATE APPROVALS AND/OR
PERMITS AS MAY BE REQUIRED FROM CITY, COUNTY, STATE, OR BUILT-UP (PLATES) ASTM A-572 GRADE 50 (OR EQUI.)
HOT ROLLED SECTION JIS G3101-SS400 (OR EQUI.)
FEDERAL AGENCIES.
COLD FORM (SILVER 180TM) NSDC570/NSDH540/ K18 (OR EQUI.)
2. IT IS THE RESPONSIBILITY OF THE PURCHASER TO COMPLETELY COLD FORM (Z275)/ GALVANIZED (Z275) AS 1397 (OR EQUI.)
UNDERSTAND WHAT IS INCLUDING OR ROOF PANEL/ WALL PANEL (ALU-ZINC) ASTM A792 Gr.50-JIS G3321 AZ150(OR EQUI.)
EXCLUDING FROM ARCHITECTURAL PLANS AND/OR SPECIFICATIONS. ROOF PANEL/ WALL PANEL (ALUPEB) ASTM A755/A792 Gr.50-JIS G3322 AZ150 (OR EQUI.)
CABLE BRACING EN12385 (OR EQUI.)
3. IT IS THE RESPONSIBILITY OF THE PURCHASER FOR OVERALL ANCHOR BOLTS JIS G3101-SS400 (OR EQUI.)
PROJECT COORDINATION, INTERFACE, COMPATIBILITY, AND DESIGN HIGH STRENGTH BOLTS (for primary structure) ASTM A325 TYPE 1
CONCERNING ANY MATERIALS NOT FURNISHED BY MACHINE BOLTS (for secondary structure) DIN 933- Grade 4.6
WITH THE SYSTEM TO BE FURNISHED BY SYSTEMS. GENERAL NOTES
THE SPECIFIC DESIGN CRITERIA CONCERNING THIS INTERFACE
BOLT TIGHTENING REQUIREMENTS:
BETWEEN MATERIALS MUST BE FURNISHED BY THE PURCHASER
PRIOR TO RELEASE FOR FABRICATION, OR THE DESIGN ASSUMPTIONS 1/ IT IS THE ERECTOR'S RESPONSIBILITY TO INSPECT THE TYPE OF BOLT ACCORDING TO THE DRAWINGS
OF SYSTEMS WILL GOVERN. DESIGNATE BEFORE INSTALLATION
4. IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN 2/ HIGH STRENGTH BOLTS A325 (DIN 8.8) INSTALLATION SHALL BE ASSURED BY THE FOLLOWING METHODS:
CRITERIA INCLUDING DEFLECTIONS AND NOTIFY SYSTEMS -TURN - OF - NUT
-TORQUE WRENCH
OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE
FOR FABRICATION. 3/ ANCHOR BOLTS AND SHEAR BEARING CONNECTION OF HIGH STRENGTH BOLTS
SHALL BE INSTALLED BY SNUG - TIGHTENED METHOD
5. THE PURCHASER IS RESPONSIBLE FOR THE ACCURATE SETTING
OF ANCHOR BOLTS AND ERECTION OF STEEL IN ACCORDANCE WITH
CONSTRUCTION DRAWINGS ONLY TEMPORARY SUPPORTS, GUYS,
BRACES,FALSE WORK, CRIBBING OR OTHER ELEMENTS REQUIRED
FOR THE ERECTION OPERATION WILL BE DETERMINED, FURNISHED
AND INSTALLED BY THE PURCHASER.
A24 MEZZANINE PLAN LEVEL +22.251M, +25.453M 0 1 2 A06 CROSS SECTION AT GL.2' 0 1 2
QB16067/20
M-J02379/20
B01 AA0
A B C D E F F' G
IMPORTANT NOTES:
A C1 C1 M30
7. Before commencing the erection of this building
M36
the erector must read the PEB Erection Manual.
M42
8. In case of descrepancies between PEB Steel structural
M48
steel plans or other trades, PEB Steel plans govern. B
(AISC - ASD89) STRAIGHT ANCHOR BOLT DETAIL
4'
9. It is important to check that the drawing revision number A
shown on each sheet matches with revision in the
PTT VMI LTN VTT
drawing transmittal for the same sheet. PEB Steel ISSUED FOR CONS.
2 16.09.2020 02
keeps a master list showing the latest revision number 1 04.09.2020 ISSUED FOR APPROVAL 01
and date for each engineering document issued. In case A2 C2 C2 B 0 28.05.2020 ISSUED FOR APPROVAL 00
you have any doubt whether you have the latest revision, 5
you should clear it out by contacting our 7 STOREY SPORT BUILDING
CUSTOMER SERVICE MANAGER at our head office/plant D PHONE PYAE NAING
Tel.Nos.08-38475475 or 6
7 STOREY SPORT BUILDING
the PEB Steel's Area office nearest to you.
ZAWANA, THINGANGYUN, YANGON, MYANMAR
10. Building must be erected in strict accordance with D1
D2 ANCHOR BOLT PLAN ANCHOR BOLT PLAN
PEB Steel drawings 7
Any deviation must have prior approval from PEB Steel. QB16067/20
11. PEB Steel will not accept responsibility for any variations
or omissions which do not have their written consent. M-J02379/20
C D'
B01 AB1
D
A A A
1' 5
TO
1'
4'
TO
5
ANCHOR BOLT DETAIL A ANCHOR BOLT DETAIL A1 ANCHOR BOLT DETAIL A2 ANCHOR BOLT DETAIL B
D
1 1' B C
B 4 2
TO 3
C
QB16067/20
M-J02379/20
ANCHOR BOLT DETAIL B1 ANCHOR BOLT DETAIL C ANCHOR BOLT DETAIL C1 B01 AB2
7
B C
E
6 7
5 B C C
D'
ANCHOR BOLT DETAIL C2 ANCHOR BOLT DETAIL D ANCHOR BOLT DETAIL D1 ANCHOR BOLT DETAIL D2 ANCHOR BOLT DETAIL E
D E
D
E F
1' 2 3
4
QB16067/20
M-J02379/20
ANCHOR BOLT DETAIL E1 ANCHOR BOLT DETAIL E2 ANCHOR BOLT DETAIL F ANCHOR BOLT DETAIL G B01 AB3
F' G
1' 2
2a
QB16067/20
M-J02379/20
B01 AB4