PURCHASER RESPONSIBILITIES 8.

ALL TECHNICAL DOCUMENTS, INCLUDING BUT NOT LIMITED TO DRAWINGS, DESIGNS, INSTRUCTIONS

1. IT IS THE RESPONSIBILITY OF THE PURCHASER TO INSURE NO PARTIES MAY AT THEIR OWN DISCRETION USE IN ANY MANNER. ANY USE, INCLUDING BUT NOT LIMITED
THAT ALL PROJECT PLANS, SPECIFICATIONS, AND APPLIED TO REPRODUCTION, DISTRIBUTION, FABRICATION, WITHOUT WRITTEN AUTHORIZATION FROM PEB SHALL STRICTLY FACE
LEGAL CONSEQUENCES.
DESIGN LOADS, FULLY MEET THE PROPOSED INTENT AS WELL AS
COMPLY WITH ALL APPLICABLE REQUIREMENTS OF ANY GOVERNING
MATERIALS ASTM DESIGNATIONS
AUTHORITIES. AND TO OBTAIN THE APPROPRIATE APPROVALS AND/OR
PERMITS AS MAY BE REQUIRED FROM CITY, COUNTY, STATE, OR BUILT-UP (PLATES) ASTM A-572 GRADE 50 (OR EQUI.)
HOT ROLLED SECTION JIS G3101-SS400 (OR EQUI.)
FEDERAL AGENCIES.
COLD FORM (SILVER 180TM) NSDC570/NSDH540/ K18 (OR EQUI.)
2. IT IS THE RESPONSIBILITY OF THE PURCHASER TO COMPLETELY COLD FORM (Z275)/ GALVANIZED (Z275) AS 1397 (OR EQUI.)
UNDERSTAND WHAT IS INCLUDING OR ROOF PANEL/ WALL PANEL (ALU-ZINC) ASTM A792 Gr.50-JIS G3321 AZ150(OR EQUI.)
EXCLUDING FROM ARCHITECTURAL PLANS AND/OR SPECIFICATIONS. ROOF PANEL/ WALL PANEL (ALUPEB) ASTM A755/A792 Gr.50-JIS G3322 AZ150 (OR EQUI.)
CABLE BRACING EN12385 (OR EQUI.)
3. IT IS THE RESPONSIBILITY OF THE PURCHASER FOR OVERALL ANCHOR BOLTS JIS G3101-SS400 (OR EQUI.)
PROJECT COORDINATION, INTERFACE, COMPATIBILITY, AND DESIGN HIGH STRENGTH BOLTS (for primary structure) ASTM A325 TYPE 1
CONCERNING ANY MATERIALS NOT FURNISHED BY MACHINE BOLTS (for secondary structure) DIN 933- Grade 4.6
WITH THE SYSTEM TO BE FURNISHED BY SYSTEMS. GENERAL NOTES
THE SPECIFIC DESIGN CRITERIA CONCERNING THIS INTERFACE
BOLT TIGHTENING REQUIREMENTS:
BETWEEN MATERIALS MUST BE FURNISHED BY THE PURCHASER
PRIOR TO RELEASE FOR FABRICATION, OR THE DESIGN ASSUMPTIONS 1/ IT IS THE ERECTOR'S RESPONSIBILITY TO INSPECT THE TYPE OF BOLT ACCORDING TO THE DRAWINGS
OF SYSTEMS WILL GOVERN. DESIGNATE BEFORE INSTALLATION
4. IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN 2/ HIGH STRENGTH BOLTS A325 (DIN 8.8) INSTALLATION SHALL BE ASSURED BY THE FOLLOWING METHODS:
CRITERIA INCLUDING DEFLECTIONS AND NOTIFY SYSTEMS -TURN - OF - NUT
-TORQUE WRENCH
OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE
FOR FABRICATION. 3/ ANCHOR BOLTS AND SHEAR BEARING CONNECTION OF HIGH STRENGTH BOLTS
SHALL BE INSTALLED BY SNUG - TIGHTENED METHOD
5. THE PURCHASER IS RESPONSIBLE FOR THE ACCURATE SETTING
OF ANCHOR BOLTS AND ERECTION OF STEEL IN ACCORDANCE WITH
CONSTRUCTION DRAWINGS ONLY TEMPORARY SUPPORTS, GUYS,
BRACES,FALSE WORK, CRIBBING OR OTHER ELEMENTS REQUIRED
FOR THE ERECTION OPERATION WILL BE DETERMINED, FURNISHED
AND INSTALLED BY THE PURCHASER.

6. THE PURCHASER IS RESPONSIBLE FOR ALL AFFECTS THAT MAY


BE IMPOSED ON FACILITIES, LANDS, ROADS, BUILDINGS, ETC..
LOCATED WITHIN THE PROXIMITY OF THE NEW STRUCTURE, BY THE
NEW STRUCTURE, AFFECTS INCLUDE BUT ARE NOT LIMITED TO
SNOW SLIDING, OR DRIFTING, AND WIND LOADING, SHEDDING, OR
ENGINEERING CALCULATIONS
VORTEX ACTION.
BUILDING CODE: DATE:
16.09.2020
SUBMITTAL FOR APPROVAL
7. UNLESS SPECIFICALLY STATED OTHERWISE WITHIN IBC-2018
MBMA - 2012 DESIGNED BY:
SYSTEMS "PURCHASE OFFER", THE FOLLOWING SHALL GOVERN: Sent on: SUBMITTAL FOR APPROVAL
DESIGN CODES: VMI
a) IN CASE OF DISCREPANCIES BETWEEN AISI - 2001 In order to schedule this project in the most efficient manner, return
CHECKED BY: these drawings marked in RED with your comments WITHIN TWO WEEKS
SYSTEMS STRUCTURAL STEEL DRAWINGS AND AISC - ASD89 LTN
AWS - 2015 from the above mentioned date WITH COLORS OF SHEETING AND TRIM
PLANS FOR OTHER TRADES, THE STRUCTURAL STEEL Any changes made AFTER approval of these drawings will delay the fabrication
DESIGN PARAMETERS ENGINEER'S SEAL and delivery process.
DRAWINGS SHALL GOVERN.
b) SYSTEMS QUALITY CRITERIA, Please supply colors for the sheeting and trim:
AREA#01 ROOF SHEETING: 0.5mm THK. PAINTED (ALU PEB)-PEBROOF-TBE
STANDARD PRACTICE, METHODS AND TOLERANCES. FRAME TYPE: CS WALL SHEETING: 0.5mm THK. PAINTED (ALU PEB)-PEBWALL-TBE
c) WHEN WINDOW AND/OR DOOR OPENINGS HAVE A ROOF SLOPE: CURVED ROOF EAVE GUTTER AND DOWNSPOUT: METAL BY PEB
INSULATION: AIR BUBBLE 4mm ON ROOF WITH ONE SIDE ALUMINUM FACING
COMBINED AREA GREATER THAN 15% OF GROSS WALL AREA BAY SPACING: 6@3.81+2@4.42(M) LINER: N.A.
ON ANY WALL, AND THE BUILDING IS DESIGNED AS LENGTH : 31.699M (CEN. TO OUT OF STEEL COLUMN @ GL.A) SOFFIT: N.A.
"ENCLOSED", THEN THE WINDOWS AND OR DOORS BUILDING WIDTH: 27.127M (OUT TO OUT OF STEEL COLUMN @ GL.1) FACADE: N.A.
REPRESENTING THE EXCESS ABOVE 15% SHALL BE DESIGNED PEAK HEIGHT: 29.566M TRIM: TBE
Trims will be supplied according to the color listed above.
AND DETAILED FOR APPLICABLE LOADING, BY THE PURCHASER. If any trims need to be a different color please make note here.
PTT VMI LTN VTT
d) THE SUPPLYING OF SEALED ENGINEERING DATA AND DESIGN LOADS
APPROVED WITHOUT CHANGES 2 16.09.2020 ISSUED FOR CONS. / DETAIL 02
DRAWINGS FOR THE METAL BUILDING SYSTEM DOES No changes, proceed with fabrication 1 04.09.2020 ISSUED FOR APPROVAL 01
ROOF DEAD LOAD:
NOT IMPLY OR CONSTITUTE AN AGREEMENT THAT 0 28.05.2020 ISSUED FOR APPROVAL 00
LIVE LOAD: ON ROOF APPROVED AS NOTED (MAY INCLUDE CHANGE ORDER)
SYSTEMS OR ITS DESIGN ENGINEER Fabrication may proceed on the basis of comments indicated.
ON FRAME
THIS SEAL IS INTENDED FOR 7 STOREY SPORT BUILDING
IS ACTING AS THE ENGINEER OF RECORD OR DESIGN PURLIN SPACING: MAX1400 By signing below, I (We) have reviewed all of the information contained in the
PROFESSIONAL FOR A CONSTRUCTION PROJECT. THESE CERTIFACATION OF THE STRUCTURAL approval drawings and have found it to be correct, accurate and consistent with PHONE PYAE NAING
COLLATERAL: ON ROOF
DESIGN OF THE METAL BUILDING SYSTEM my (our) intent and purpose. I (We) accept all of the purchaser responsibilities.
DOCUMENTS ARE SEALED ONLY AS TO THE COMPONENTS WIND SPEED: 161 KM/H 7 STOREY SPORT BUILDING
AND COMPONENTS AS PROVIDED BY I (We) further state the I (we) are authorized to provide acceptance on behalf of
FURNISHED BY SYSTEMS. EXPOSURE: B DESIGN. ANY OVERVIEW OF ALL OTHER the listed company. ZAWANA, THINGANGYUN, YANGON, MYANMAR
OCCUPANCY: II PORTIONS OF THE PROJECT ARE NOT
e) ANY FIELD MODIFICATION OR ALTERATION, OR THE ATTACHMENT WITHIN THE SCOPE OF THIS SEAL Reviewed by: INDEX SHEET
ENCLOSURE: ENCLOSED
OF ANY EQUIPMENT OR COMPONENT TO SYSTEMS 300MM/H
RAINFALL : Signature: QB16067/20
METAL BUILDING SYSTEMS, OR THE OMITTED INSTALLATION SEISMIC: Ss = 0.77, S1 = 0.31 SPECIAL LOADS
OF ANY SPECIFIED PARTS OR PIECES, WITHOUT THE EXPRESS Company:
M-J02379/20
WRITTEN APPROVAL OF SYSTEM SHALL VOID
IT IS THE RESPONSIBILITY OF THE PURCHASER TO VERIFY ALL DESIGN CRITERIA AND NOTIFY PEB Date:
ANY AND ALL WARRANTIES.
OF ANY DISCREPANCIES OR INCONSISTENCIES PRIOR TO RELEASE FOR FABRICATION. B01 A00
DRAWING INDEX DRAWING INDEX
DRG. TITLE DRG. TITLE

A13 SIDEWALL BRACING AT GL.A 0 1 2 A00 INDEX SHEET 0 1 2

A14 SIDEWALL BRACING AT GL.D 0 1 2 AA0 DRAWING LIST 0 1 2

A15 CROSS SECTION GL.B, C, F 0 1 2 AB1 ANCHOR BOLT PLAN 0 1 2

A16 ENDWALL FRAMING AT GL.7 0 1 2 AB2 DETAIL ANCHOR BOLT 0 1 2

A17 ROOF FRAMING PLAN 0 1 2 AB3 DETAIL ANCHOR BOLT 0 1 2

A18 MEZZANINE PLAN LEVEL +3.658M 0 1 2 AB4 DETAIL ANCHOR BOLT 0 1 2

A19 MEZZANINE PLAN LEVEL +7.011M 0 1 2 A01 CROSS SECTION AT GL.1 0 1 2

A20 MEZZANINE PLAN LEVEL +10.059M 0 1 2 A02 DETAIL CONNECTION 0 1 2

A21 MEZZANINE PLAN LEVEL +13.107M 0 1 2 A03 DETAIL CONNECTION 0 1 2

A22 MEZZANINE PLAN LEVEL +16.155M 0 1 2 A03a DETAIL CONNECTION - - 0

A22a MEZZANINE PLAN LEVEL +17.983M - 0 0 A04 CROSS SECTION AT GL.1' 0 1 2

A23 MEZZANINE PLAN LEVEL +19.203M 0 1 2 A05 CROSS SECTION AT GL.2 0 1 2

A24 MEZZANINE PLAN LEVEL +22.251M, +25.453M 0 1 2 A06 CROSS SECTION AT GL.2' 0 1 2

A25 ENDWALL SHEETING AT GL.1 0 1 2 A07 CROSS SECTION AT GL.3 0 1 2

A26 SIDEWALL SHEETING AT GL.A 0 1 2 A08 CROSS SECTION AT GL.3' 0 1 2

A27 ROOF SHEETING PLAN 0 1 2 A09 CROSS SECTION AT GL.4 0 1 2

A28 STAIRCASE#01, 02 - 0 1 A10 CROSS SECTION AT GL.4' 0 1 2

A11 CROSS SECTION AT GL.5 & GL.7 0 1 2

A12 ENDWALL FRAMING AT GL.1 0 1 2

PTT VMI LTN VTT


2 16.09.2020 ISSUED FOR CONS. 02
1 04.09.2020 ISSUED FOR APPROVAL 01
0 28.05.2020 ISSUED FOR APPROVAL 00

7 STOREY SPORT BUILDING


PHONE PYAE NAING
7 STOREY SPORT BUILDING
ZAWANA, THINGANGYUN, YANGON, MYANMAR
DRAWING LIST

QB16067/20

M-J02379/20

B01 AA0
A B C D E F F' G

IMPORTANT NOTES:

1. All dimensions are in mm unless noted otherwise.

2. The customer is responsible for accurate locations of 1


building lines and bench marks at the building site. A1 C C B1 E F
3. The slab or edge beam should be square and level to
within 5mm tolerance. Anchor bolts should be set to
the given dimensions and projection, with maximum
deviation of 5mm. Anchor bolt threads should be
B E1 F1
protected during concreting operation, or thoroughly
cleaned after pouring. All templates should be removed. 1'
A
4. PEB Steel assumes no responsibility or liability for the
column foundations, slab design or construction.
Foundations should be designed as a minimum for the
given reaction loads.

5. The installation of anchor bolts and embedded items B E2


must be done in accordance with the code of Standard 2
Practice for Steel Buildings of AISC section 7. Anchor A C1 C1
bolts and foundation bolts shall be set by the owner 2a
F2
(or his civil contractor) in accordance with
PEB Steel "Issued for Construction Anchor Bolt Plan".
Maximum allowable tolerances are as follows : B
a) 3mm center to center of any two within an 2'
anchor bolt group. A
b) 6mm center to center of adjacent bolt groups.

c) Elevation of the top of anchor bolts +/- 12mm.


B G
d) Maximum accumulation of 6mm per 30 meters
along the established column line of multiple anchor 3
bolt groups but not to exceed a total of 25mm A C1 C1

e) 6mm from the center of any anchor bolt group


to the established column line through that group.

f) The tolerances of paragraphs b, c and d apply to B


to apply to offset dimensions shown on the plans, 3'
measured parallel and perpendicular to the nearest A
established column line for individual columns shown

6. PEB STEEL LTD(PEBSL) assumes structures. QTY. SYM. SIZE


When required for calculations, no responsibility or
liability for the existing concrete PEB will assume B G M20

concrete strength of f'c=3700 psi. 4 M24

A C1 C1 M30
7. Before commencing the erection of this building
M36
the erector must read the PEB Erection Manual.
M42
8. In case of descrepancies between PEB Steel structural
M48
steel plans or other trades, PEB Steel plans govern. B
(AISC - ASD89) STRAIGHT ANCHOR BOLT DETAIL
4'
9. It is important to check that the drawing revision number A
shown on each sheet matches with revision in the
PTT VMI LTN VTT
drawing transmittal for the same sheet. PEB Steel ISSUED FOR CONS.
2 16.09.2020 02
keeps a master list showing the latest revision number 1 04.09.2020 ISSUED FOR APPROVAL 01
and date for each engineering document issued. In case A2 C2 C2 B 0 28.05.2020 ISSUED FOR APPROVAL 00

you have any doubt whether you have the latest revision, 5
you should clear it out by contacting our 7 STOREY SPORT BUILDING
CUSTOMER SERVICE MANAGER at our head office/plant D PHONE PYAE NAING
Tel.Nos.08-38475475 or 6
7 STOREY SPORT BUILDING
the PEB Steel's Area office nearest to you.
ZAWANA, THINGANGYUN, YANGON, MYANMAR
10. Building must be erected in strict accordance with D1
D2 ANCHOR BOLT PLAN ANCHOR BOLT PLAN
PEB Steel drawings 7
Any deviation must have prior approval from PEB Steel. QB16067/20
11. PEB Steel will not accept responsibility for any variations
or omissions which do not have their written consent. M-J02379/20
C D'
B01 AB1
D
A A A

1' 5
TO
1'
4'
TO
5

ANCHOR BOLT DETAIL A ANCHOR BOLT DETAIL A1 ANCHOR BOLT DETAIL A2 ANCHOR BOLT DETAIL B
D

1 1' B C

B 4 2
TO 3
C

PTT VMI LTN VTT


2 16.09.2020 ISSUED FOR CONS. 02
1 04.09.2020 ISSUED FOR APPROVAL 01
0 28.05.2020 ISSUED FOR APPROVAL 00

7 STOREY SPORT BUILDING


PHONE PYAE NAING
7 STOREY SPORT BUILDING
ZAWANA, THINGANGYUN, YANGON, MYANMAR
DETAIL ANCHOR BOLT

QB16067/20

M-J02379/20

ANCHOR BOLT DETAIL B1 ANCHOR BOLT DETAIL C ANCHOR BOLT DETAIL C1 B01 AB2
7
B C
E
6 7

5 B C C

D'

ANCHOR BOLT DETAIL C2 ANCHOR BOLT DETAIL D ANCHOR BOLT DETAIL D1 ANCHOR BOLT DETAIL D2 ANCHOR BOLT DETAIL E

D E
D
E F

1' 2 3
4

PTT VMI LTN VTT


2 16.09.2020 ISSUED FOR CONS. 02
1 04.09.2020 ISSUED FOR APPROVAL 01
0 28.05.2020 ISSUED FOR APPROVAL 00

7 STOREY SPORT BUILDING


PHONE PYAE NAING
7 STOREY SPORT BUILDING
ZAWANA, THINGANGYUN, YANGON, MYANMAR
DETAIL ANCHOR BOLT

QB16067/20

M-J02379/20

ANCHOR BOLT DETAIL E1 ANCHOR BOLT DETAIL E2 ANCHOR BOLT DETAIL F ANCHOR BOLT DETAIL G B01 AB3
F' G

1' 2

2a

ANCHOR BOLT DETAIL F1 ANCHOR BOLT DETAIL F2

PTT VMI LTN VTT


2 16.09.2020 ISSUED FOR CONS. 02
1 04.09.2020 ISSUED FOR APPROVAL 01
0 28.05.2020 ISSUED FOR APPROVAL 00

7 STOREY SPORT BUILDING


PHONE PYAE NAING
7 STOREY SPORT BUILDING
ZAWANA, THINGANGYUN, YANGON, MYANMAR
DETAIL ANCHOR BOLT

QB16067/20

M-J02379/20

B01 AB4