Quantity Take Off Bored Pile and King Post
Quantity Take Off Bored Pile and King Post
BORED PILE
No of Piles
Adopted Total Pile Length
Area Pile Diameter (mm) for each
Pile Length (m) in Soil (m)
section
KING POST
No of Piles
Area UC Member Size for each UC Member Length
(kg/m) Weight (kg)
section
STATION 356 X 406 X 340 13 340 18
ENTRANCE A 356 X 406 X 340 8 340 12
Per Pile
% of Total
Pile Length in Rock Diameter % of Main Shear Concrete
No Shear Reinforcem
(m) (mm) Bar Steel Link Volume (m3)
Link ent (%)
Per Sections
UC Member
Weight (tonnage)
79.56
32.64
Per Pile Per Sections
Rebar
Rebar Rebar Weight Rebar
Weight Concrete Rebar Volume Rebar Weight
Volume (tonnage) Weight
(kg) Volume (m3) (m3) (kg)
(m3) [+15%] (tonnage)
[+15%]
UNDERGROUND UNDERGROUND
18 13 79.6 9.2 8.2 1.0 25 T 20 T12 - 150 94.0 11.1
STATION STATION
356 x 406 x 340
ENTRANCE A 12 8 32.7 ENTRANCE A 15.2 14.2 1.0 25 T 20 T12 - 150 96.0 11.3