Programmed

Substation Activity Description Duration Mason Skilled Labour Steel Fixer Skilled Labour
(Days)
Civil works
A. Substructure
1. Excavation 1
2. Blinding and bitumen application 3 5 10
3. Raft and side wall 5 5 5 60 60
4. Cable trench construction 4 145 145
5. Plinth beams 3 5 5
6. Floor slab 4 5 5 20 20
Subtotal 20 165 170 80 80
B. Superstructure
1. Columns 4 10 10 10 10
2. Block work 7 247 247
3. Roof slab incl. beams 17 30 30 60 60
Subtotal 28 287 287 70 70
C. Finishes:
1. Electrical Conduits 2 10 10
2. Internal, external Plaster 4
3. Internal paint prime coat 2
4. Roof waterproofing 3
5. Window, door, louver exhaust fan frames 2 10 10
6. Internal painting second coat 2
7. External painting first and second coats 4
8. Chequered plate installation 2 10 10
9. Epoxy floor coating 2
10. Doors and windows installation 2
11. Louvers installation 2
12. Backfilling around the substation 1
Subtotal 28 20 20 10 10
Total Hrs 471 476 160 160

Electrical installations
Transformer Installation 2
Ring Main Unit Installation 2
LV Fuse Board Installation 2
Small Power Accessories & Exhaust Fan Installation 6
Earthing system Installation & Earth Connections 12
11 kv Cable Terminations 8
LV Cable Terminations 8
Initial Testing 7
Subtotal 47 0 0 0 0

Substation Works Resource Calculation Base Sheet 1/3


Carpenter Helper Electrician Painter Waterproof/E Skilled Labour Excavator Labourer Back Hoe Dump Truck
poxy Loader

10 20 20
10 20 20
40 40
10 10 20
30 30
20 20
110 120 0 0 0 0 10 60 0 20

40 40

40 40
80 80 0 0 0 0 0 0 0 0

10 10
205 205
205 205
20 20
10 10
205 205
205 205

20 20
10 10
10 10
40 2
30 30 10 822 40 40 0 872 2 0
220 230 10 822 40 40 10 932 2 20

20 20
20 20
20 20
60 60
120 120
80 80
80 80
70 70
0 0 470 0 0 0 0 470 0 0

Substation Works Resource Calculation Base Sheet 2/3


Foreman Asst. Foreman

1 10
1 10
1 10
1 10
1 10
1 10
6 60

1 10
1 10
1 10
3 30

1 10
1 10
1 10
1 10
1 10
1 10
1 10
1 10
1 10
1 10
1 10
1 10
12 120
21 210

1 20
1 20
1 20
1 60
1 120
1 80
1 80
1 70
8 470

Substation Works Resource Calculation Base Sheet 3/3