SECTION E-E

LAMELLAR SEDIMENTATION 1 LAMELLAR SEDIMENTATION 2 LAMELLAR SEDIMENTATION 3

WL +1152.95 +1152.18 +1151.27 C


L+1152.64 +1153.60
Penstock
1.50 1.50 1.50

T12 T12 T12 T12 T12 T12


M04 M04 M04

Lamellas

LOAD XxXXX daN / fixation


Sames supports in every
lamellar sedimentation

Beam Beam Beam

GL +1150.50 Scrapper Scrapper Scrapper

+1148.41 +1147.69 +1148.41 +1148.41 +1147.69 +1148.41 +1148.41 +1147.69 +1148.41

2.33 2.33 2.33

+1146.69 +1146.69 +1146.69


0.65 0.65 0.65

10.50 10.50 10.50

LEGEND :

CWS = Civil work supply CL = Center line

PS = Process supply (Equipment) GL = Ground level

WL = Water level CW = See formwork drawing

NOTES :

-Levels and dimensions are in meters. They apply to finished structures


-Pipe diameters in millimeters.
-Aluminium handrails: height =1.10 m
-Penstocks , jib crane and electrical agitator fixation : to be determined at a later stage
-Formwork DWG not yet submitted
-The dimensions of the holes and hatches indicate the free passage.

CONSTRUCTION :

-Tolerance : +/- 1 cm Unless stated otherwise - As per international standards.


-The structure must be watertight ( inside and outside )
-The structure must be stable (full or empty)
-1 Tank empty the other full or vice-versa
-For each compartment: compartment can be full, adjacent compartment empty
-The pump concrete base will be confirmed with selected pumps supplier
-Traveling crane loads shall be confirmed with selected supplier

The Employer

THE REPUBLIC OF TANZANIA


MWANZA URBAN WATER SUPPLY AND SANITATION

AUTHORITY

The Financing Partners

The Engineer/consultant

889, rue de la Vieille Poste - CS 89017 -


34965 Montpellier CEDEX 2
FRANCE

The Contractor

LAKE VICTORIA WATER AND SANITATION PROJECT (WATER SUPPLY, WASTEWATER AND SANITATION) FOR MWANZA CITY
AND SATELLITE TOWNS (MISUNGWI, MAGU AND LAMADI)
DESIGN AND BUILD OF BUTIMBA INTAKE, RAW WATER PIPELINE AND WATER TREATMENT PLANT (WTP)
Contract N°: AE/042/2015-2016/W/03c

TITLE:

REMINERALIZATION-COAGULATION-FLOCCULATION-LAMELLAR SEDIMENTATION

SECTION E-E

REF:

Issuer Area Type of document Document number Rev. Status

V C G P 3 0 0 C W D 0 3 0 6 A1 P R E

A xx/xx/2020 CDU FDI FBA FIRST ISSUE

REV DATE PREPARED CHECKED APPROVED OBSERVATIONS/MODIFICATIONS

SCALE FORMAT AREA:

1/50 A0

0 1 2 3 4 5m

This document is the property of Vinci Construction Grands Projets. It cannot be communicated to third parties or reproduced even partially without prior consent