SECTION C-C

REMINERALIZATION REMINERALIZATION REMINERALIZATION


CHAMBER 1 CHAMBER 2 CHAMBER 3

Jib crane Jib crane

+1153.60 WL +1153.00 WL +1153.00 WL +1153.00


Agitator Agitator Agitator

+1150.60 +1150.60

GL +1150.50

T02 T11 T02 T11 T02


+1148.41

0.50
0.50

0.50
T03 T03

0.40 +1146.67 0.40 +1146.67 0.40

T10 T10
2.00 2.00 2.00

7.50 2.70 7.50 2.70 7.50

LEGEND :
SECTION D-D
CWS = Civil work supply CL = Center line

PS = Process supply (Equipment) GL = Ground level

WL = Water level CW = See formwork drawing


FLOCCULATION CHAMBER 1 FLOCCULATION CHAMBER 2 FLOCCULATION CHAMBER 3

NOTES :

-Levels and dimensions are in meters. They apply to finished structures


-Pipe diameters in millimeters.
1.50 1.50 1.50
-Aluminium handrails: height =1.10 m
-Penstocks , jib crane and electrical agitator fixation : to be determined at a later stage
+1153.60 WL +1152.97 +1152.62 WL +1152.97 +1152.62 WL +1152.97 +1152.62
-Formwork DWG not yet submitted
WEIR WEIR WEIR
-The dimensions of the holes and hatches indicate the free passage.

CONSTRUCTION :

-Tolerance : +/- 1 cm Unless stated otherwise - As per international standards.


-The structure must be watertight ( inside and outside )
-The structure must be stable (full or empty)
-1 Tank empty the other full or vice-versa
0.53

T09 T09 -For each compartment: compartment can be full, adjacent compartment empty
-The pump concrete base will be confirmed with selected pumps supplier
Agitator M03 Agitator M03 Agitator M03 -Traveling crane loads shall be confirmed with selected supplier
on concrete block on concrete block on concrete block
Ht : 10cm Ht : 10cm Ht : 10cm

The Employer
+1150.60 +1150.60

GL +1150.50 THE REPUBLIC OF TANZANIA


4.21

MWANZA URBAN WATER SUPPLY AND SANITATION

AUTHORITY

The Financing Partners


T08 T08

+1148.41 +1148.41 +1148.41

The Engineer/consultant

+1146.67 +1146.67 889, rue de la Vieille Poste - CS 89017 -


34965 Montpellier CEDEX 2
FRANCE

The Contractor

T06 T06 T06

T05 T05
LAKE VICTORIA WATER AND SANITATION PROJECT (WATER SUPPLY, WASTEWATER AND SANITATION) FOR MWANZA CITY
AND SATELLITE TOWNS (MISUNGWI, MAGU AND LAMADI)
DESIGN AND BUILD OF BUTIMBA INTAKE, RAW WATER PIPELINE AND WATER TREATMENT PLANT (WTP)
7.50 2.70 7.50 2.70 7.50
Contract N°: AE/042/2015-2016/W/03c

TITLE:

REMINERALIZATION-COAGULATION-FLOCCULATION-LAMELLAR SEDIMENTATION

SECTIONS C-C and D-D

REF:

Issuer Area Type of document Document number Rev. Status

V C G P 3 0 0 C W D 0 3 0 5 A1 P R E

A xx/xx/2020 CDU FDI FBA FIRST ISSUE

REV DATE PREPARED CHECKED APPROVED OBSERVATIONS/MODIFICATIONS

SCALE FORMAT AREA:

1/50 A0

0 1 2 3 4 5m

This document is the property of Vinci Construction Grands Projets. It cannot be communicated to third parties or reproduced even partially without prior consent
in writing © COPYRIGHT
A0