+1150.60 +1150.60
GL +1150.50
0.50
0.50
0.50
T03 T03
T10 T10
2.00 2.00 2.00
LEGEND :
SECTION D-D
CWS = Civil work supply CL = Center line
NOTES :
CONSTRUCTION :
T09 T09 -For each compartment: compartment can be full, adjacent compartment empty
-The pump concrete base will be confirmed with selected pumps supplier
Agitator M03 Agitator M03 Agitator M03 -Traveling crane loads shall be confirmed with selected supplier
on concrete block on concrete block on concrete block
Ht : 10cm Ht : 10cm Ht : 10cm
The Employer
+1150.60 +1150.60
AUTHORITY
The Engineer/consultant
The Contractor
T05 T05
LAKE VICTORIA WATER AND SANITATION PROJECT (WATER SUPPLY, WASTEWATER AND SANITATION) FOR MWANZA CITY
AND SATELLITE TOWNS (MISUNGWI, MAGU AND LAMADI)
DESIGN AND BUILD OF BUTIMBA INTAKE, RAW WATER PIPELINE AND WATER TREATMENT PLANT (WTP)
7.50 2.70 7.50 2.70 7.50
Contract N°: AE/042/2015-2016/W/03c
TITLE:
REMINERALIZATION-COAGULATION-FLOCCULATION-LAMELLAR SEDIMENTATION
REF:
V C G P 3 0 0 C W D 0 3 0 5 A1 P R E
1/50 A0
0 1 2 3 4 5m
This document is the property of Vinci Construction Grands Projets. It cannot be communicated to third parties or reproduced even partially without prior consent
in writing © COPYRIGHT
A0