Project: Sachal Energy Development Limited Originated by: Asad Ali Shaikh (HSE Engineer HCIEC)
(SEDL) Dated: 20/02/2016

Severity Responsible
Detail of Activity Equipment & Tools used Risk Involved Preventive Measure
Rating Person

 SLIP, TRIP AND 3


 DUMP TRUCK FALL  PROPER EARTHING OF
GENSET
BACKFILLING  LOADER  HIT BY MOVING
2  INSPECTED AND TAGGED Area
OF EXCAVATED MACHINERY
GENSET, WELDING PLANT Authorities.
AREA
 EXCAVATOR AND GRINDERS (concern
HANDTOOLS  PINCH POINTS 2 supervisor)
 FREQUENT INSPECTION OF
 VEHICLE/ DISK
EQUIPMENT 2
 DISK RPM SHOULD ALWAYS
 ROLLOR GREATER THAN
3
 GRINDER’S RPM
 FALL IN
2 PROPER HOUSEKEEPING OF
EXCAVATED
AREA AREA.

 SIMOPS 2

 PERSONNEL
INJURY
2
PROPERTY
LOSS
Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident

Remarks:

_________________________________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________________

_________________________________________________________________________________________________________________________________

HSE Engineer: ____________________

HSE Manager: ____________________ Site Manager: __________________

Page 2 of 2