PMP Lesson 3: Name: Class: Date
PMP Lesson 3: Name: Class: Date
NAME :
CLASS :
PMP Lesson 3
DATE :
20 Questions
a) Create the SOW yourself since you are the b) Look for the SOW in your organizational
project manager process assets (OPAs)
c) Ask your customer to provide you with the d) Ask your CEO to provide you with the SOW
SOW
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 1/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
a) Use product analysis techniques such as b) Break down the project into multiple
product breakdown and systems analysis phases so that the system testing work
to decompose the system testing work package goes into the second project
package phase
c) Decompose the system development work d) Consult the project management plan to
package now and decompose the system determine what to do in this situation
testing work package later
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 2/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
a) Read the project business case b) Review the project scope statement
c) Examine the project management plan d) Start the Identify Stakeholders process as
the assumption log is an output of this
process
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 3/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
10. A Scrum Master talks to you about the impact and value of
servant leadership. What is the person probably referring
to?
c) The idea that an organization can be d) The belief that wishes and requirements of
leaderless and still fully functioning. a leader have no importance.
c) Neither d) Both
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 4/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
a) Change requests surpassing the formal b) Change requests are always a sign of bad
change control processes can lead to planning and should therefore be avoided.
scope creep
c) Professionally managed, change requests d) Change requests should always be handled
can help improving a project and resolving in a controlled and integrative fashion.
emerging problems.
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 5/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
a) 2 b) 14
c) 16 d) 18
a) Re ect the scope exclusion in the b) Capture the exclusion of the jacuzzi tubs in
requirements traceability matrix the exclusion register
c) Record the elimination of the jacuzzi tubs d) Document the status of the change in the
as an issue in the issue log change log
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 6/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
a) describes both the project scope and the b) authorizes the project and the use of
product scope at detail level. organizational resources to meet project
requirements.
c) breaks down the project scope over d) describes all activities which are necessary
several steps to describe the project on to create the project deliverables.
work package level.
a) WBS dictionary, WBS, scope statement b) Product con guration ID and statement of
work
c) Schedule baseline and cost baseline d) The various management plans of the
project
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 7/8
11/24/2020 PMP Lesson 3 | Print - Quizizz
Answer Key
1. c 6. a 11. b 16. c
2. b 7. d 12. c 17. c
3. c 8. c 13. b 18. a
4. d 9. d 14. d 19. b
5. b 10. a 15. a 20. a
https://quizizz.com/print/quiz/5e85744f9e804d001b874240 8/8