Download as pdf
Download as pdf
You are on page 1of 6
Wy KOLONGLOBAL CORPORATION 1No.120, Chilaw Road, Wariyapola, Tel: +94 (0) 37-2268304, Fax: +94 (0)11-2697004 Head Office : Kolon Tower, 11 Kolon-ro, Byeoryang-dong, Gwacheon-si, Gyeonggi-do, Korea Tel, 82-2-3677-6797, Fax. 82-2-3677-S612 ad Ref, No: Deduru-CONS- 80 22 “November, 2018 Project Director, Deduru Oya Water Supply Project, Wijesingha Mawatha, Melwatta, Wariyapola, Dear Madam, PLANT & DESIGN ~ BUILD CONTRACT FOR CIVIL AND M&E WORKS OF DEDURU OYA WATER SUPPLY PROJECT CONTRACT NO - P&D/DOWSP/EDCF/W/DB/2014/01 SUBJECT: Submission of Method Statment for Pipe Laying in Rainy Periods With reference to the above subject, we are submitting herewith attached Method Statement for Pipe Laying in Rainy Periods for your kind review and approval. Your Kind perusal and approval in this regard will be highly appreciated, Yours’ faithfully, 7 a KI CHUL YOON Project Manager Kolon Global Corporation Ce: Consultant - Saman & KECC JV Enclosure: 1. Method Statement for Pipe Laynig in Rainy Periods RE CEIVED 23 Noy on Deduruoya Water Supply Project Page 1 of 1 Method Statement DEDURU OYA WATER SUPPLY PROJECT CONTRACT NO. P&D/DOWSP/EDCF/W/DB/2014/01 METHOD STATEMENT FOR PIPE LAYING IN RAINY PERIODS EMPLOYER F.. National water Supply & Drainage Board CONSULTANT > Saman & KECC Joint Venture CONTRACTOR Wy KOLON GLOBAL CORPORATION Page 1 Method Statement CONTENTS 1. PREPARATION OF WORK 1) Preliminary study and work 2) Sign Boards and Safety Action 2. EXCAVATION 1)Trench excavation in road 2)Dewatering 3)Back filling and compaction 4)Reetification of backfilling compaction Page 2 Method Statement 1, PREPARATION OF WORK 1) Preliminary study and work * Understand the work area by using the key plan ‘© Study the longitudinal section flat plan according to the hydraulic profile. ‘+ Joint inspection along the pipe line traces which will be laid with officers of NWS&DB and the relevant road authority (RDA, PRDA, Pradeshiya Saba etc) and getting permission from the relevant authority. ‘* Inspection of existing Telephone, Electricity, Water and any other line under the proposed pipe trace. * A survey will be carried out along the proposed pipe trace including the culvert inverts and TBM transferring and compared with the given LS drawings. ‘The change of the pipe line will be marked along the road and identify obstacles and permanent features to the proposed trace. 2) Sign Boards and Safety Action ‘* Safety cones, Information board, barricades, waming signals will be placed along the excavation area provide two flagmen beside the construction area to control the traffic whenever necessary. ‘* Ifthe excavation trench crosses the footpath, which made of strong plate will be placed crossing over the trench. * Inthe event of road closure, prior understanding will be taken from relevant authority such as local police station and road maintenance authority. ‘© Appropriate lights are provided for open excavations at night time. Lezend; 18 Information Board Sc Sate Cones BL Barred Samed Pu Plegmen Stee Battoade Tape Figure 01 —_— —.. Page 3 Method Statement 2. EXCAVATION 1)Trench excavation in road © The excavation would be carried out using backhoe machines, mini-excavator or by manually depending on the condition of the road. * If the soil condition is weak (ground is not so solid) in side of the trench should be protected using shoring plates and jacks until the pipe laying. (Figure 02) © Ifthe water table is high, dewater the trench area until the pipe laying by using the pumps. © The excavated soil would be unloaded inside the road as a bund & it may use later for back filling. * After the trench excavation is finished to the required depth, the bed of the trench would be leveled and prepared for laying of the pipes, considering the ground condition. 2)Dewatering ‘© All the time pumping equipment and machinery to be kept in good working conditions for all emergencies ‘* The static water level can be drawn down by using pumps. * Prior commencing pipe laying, itis essential to dewater the trench formation. Pumping well points (0.5x0.5x0.5 m) at every 20m intervals will be provided as below (Figure 02). ‘* Surface runoff will be controlled so as to prevent entry or collection of water on excavation, + In waterlogged ground, steel or timber sheet support system should be used. Backfilling should proceed while the support system is removed. If the area is marshy, the sludge pumps can be use. os Arwen aaron Pt _ParpiegPh Figure 02. ee Page 4 Method Statement 3)Back filling and compaction © Back filling and compaction will be done layer by layer as in drawings. ‘The thickness of the first layer will be soft materials free from stones lesser than 25mm size shall be deposited in top of the bedding to a depth not less than 300mm from the crown of the pipe. ‘The other two layers will be lesser than 300mm thick and will use excavated soil or in case of muddy condition imported soil will be used for backfilling. + Arroller compactor, plate vibrator and Wacker compactor will use for compaction and excessive material will be removed. © Under the wet condition if the excavated material or selected backfilling material cannot be compacted, the compaction work will be held up. * After backfilling and compaction, the excess soil will be removed from the site. 4)Reetification of backfilling compaction ‘* Incase of unable to fulfilling the compaction requirements due to higher moisture content only in selected locations will be separated by barricading for later compaction. Page 5

You might also like