180.00 M. (10 UNITS OF 3 CELL BOXES 18.00 M. EXCLUDING 20 MM EXPANSION JOINTS) 6000 25000 25000 25000 25000 25000 25000 25000
H.F.L
R.L. 342.500 M. SOFFIT LEVEL
R.L. 345.150 M.
R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M.
680 343.818
342.877
342.045
341.676
341.659
341.270
341.022
341.254
341.595
341.314
340.960
340.907
341.014
340.637
340.486
340.598
1000 340.328
1020 338.700
1040 338.490
1060 338.347
1080 337.973
1100 337.465
1120 337.806
1140 337.597
1160 337.229
1180 336.962
1200 336.748
1220 336.078
1240 335.124
1260 334.571
1280 334.421
1300 334.232
1320 333.994
1340 333.756
G.L.
IN METER
CHAINAGE
860
880
900
920
940
960
980
800
820
840
700
720
740
760
780
IN M.
TOTAL LENGTH OF BRIDGE BETWEEN FACE OF DIRT WALL 675.00 Mtr. (27 SPANS @ 25.00 MTS. C/C EACH) KATNI SIDE
25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 25000 6000 90.00 M. (5 UNITS OF 3 CELL BOXES 18.00 M. EXCLUDING 20 MM EXPANSION JOINTS) 45000
RCC RETAINING WALL
FORMATION LEVEL
R.L. 347.225 M.
SOFFIT LEVEL
R.L. 345.150 M.
H.F.L
R.L. 342.500 M.
L.W.L.
R.L. 340.000 M.
R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M. R.L. 313.500 M.
1340 333.756
1360 333.517
1380 333.280
1400 333.042
1420 332.799
1440 332.566
1460 332.502
1480 332.616
1500 332.730
1520 332.844
1540 332.958
1560 333.072
1580 333.186
1600 333.300
1620 333.374
1640 333.413
1660 333.450
1680 333.486
1700 333.525
1720 333.542
1740 333.539
1760 333.536
1780 333.532
1800 333.529
1820 334.527
1840 335.626
1860 336.725
1880 337.825
1900 338.396
1920 338.935
1940 339.473
1960 340.012
1980 341.077
2000 342.297
FORMATION LVL.
R.L. 347.225 M. C.L. OF PIER
FORMATION LEVEL RCC RAILING AS NOTES :-
R.L. 347.225 M. PER STD. DRG.
75 MM AV. THK. R.C.C.
75 MM AV. THK. R.C.C. C.L. OF ROADWAY W. C. IN C.C.M:30 FORMATION LEVEL 1. TYPE OF BRIDGE : HIGH LEVEL BRIDGE
RCC I-GIRDER W. C. IN C.C.M:30 FORMATION LVL. R.L. 347.225 M.
SOFFIT LEVEL 2. TOTAL LENGTH OF BRIDGE : 1230.00 MTS.
R.L. 347.225 M.
R.L. 345.150 M.
SOFFIT LEVEL FORMATION LEVEL 3. NOS. OF SPANS : 675.00 MTS. (27 SPAN @ 25.00 Mts. C/C EACH .)
ELASTOMERIC BEARING R.L. 346.550 M.
REAR INNER R.L. 345.150 M. R.L. 346.550 M.
WALL WALL R.C.C. DECK SLAB ALL FILLET R.C.C. DECK SLAB 4. LENGTH OF RCC BOX UNITS : 270.00 MTS.
R.C.C. CHAIR ELASTOMERIC 150x300
BEARING a). BEOHARI SIDE : 180.00 M. (10 UNITS @ 18.00 M. )
FRONT R.C.C. ABT. CAP
WALL
R.C.C. CHAIR b). KATNI SIDE : 90.00 M. (5 UNITS @ 18.00 M. )
R.C.C. PIER CAP 5. LENGTH OF RCC RETAINING WALL : 285.00 MTS.
PILE CAP TOP LVL. R.C.C SQURE HEAD a). BEOHARI SIDE : 240.00 M.
R.L. 338.600 M. 2200x2200x400
b). KATNI SIDE : 45.00 M.
6. OVER ALL WIDTH : 8.40 M.
R.C.C. SOLID CIRCULAR PIER 2200 DIA
PILE CAP BOTTOM LVL.
OUTER FACE 7. CLEAR CARRIAGE WAY : 7.50 M.
R.L. 336.800 M. VERTICAL WALL
OF BOX UNIT 8. FORMATION LEVEL : R.L. 347.225 M.
PILE CAP TOP LVL. 9. SOFFIT LEVEL : R.L. 345.150 M.
R.L. 341.800 M.
10. L.W.L. : R.L. 340.000 M.
R.C.C. PILE CAP M:30 R.C.C. PILE CAP M:30 11. H.F.L. : R.L. 342.500 M.
PILE CAP BOTTOM LVL. 500 MM THK. R.C.C. BASE SLAB INNER FACE
300MM C.C 500 MM THK. 12. S.B.C. / CRUSHING STRENGTH :- 50 T/sqm
R.L. 340.000 M. 300MM P.C.C 300MM P.C.C M-15 R.C.C. BASE SLAB
6 MM. THK. PERMANENT BOULDER APRON R.L. 336.950 M. BOULDER APRON R.L. 336.950 M.
M-15 APRON M-15 APRON 13. CATCHMENT AREA : 1505.50 SQKM.
MS LINER UP
TO ROCK LEVEL 14. DESIGN DISCHARGE : 66528.000 CUM/SEC
500 MM THK. 15. DESIGN VELOCITY : 5.600 M/SEC
500 MM THK. 500 MM THK. BOULDER + : PILE FOUNDATION (M-35)
16. TYPE OF FOUNDATION
BOULDER + MUROOM BOULDER + MUROOM MUROOM
R.L. 333.450 M. R.L. 333.450 M. 17. TYPE OF SUB-STRUCTURE
6 NOS. BORED CAST IN
SITU R.C.C. PILES 1200 DIA R.C.C. THREE CELL BOX UNIT A) PIER : R.C.C. SOLID CIRCULAR PIER (M-30)
B) ABUTMENT : R.C.C. BOX TYPE (M-30)
CROSS SECTION OF APRON
SITU R.C.C. PILES 1200 DIA C) RCC BOX UNITS : R.C.C. THREE CELL BOX UNIT (M-30)
9 NOS. BORED CAST IN
FOUND. LVL. B) RCC RETAINING WALL : R.C.C. RETAINING WALL (M-30)
R.L. 336.950 M. 150 AV. THK. 18. TYPE OF SUPER -STRUCTURE : R.C.C. I-GIRDER M : 35.
P.C.C. LEVELING
19. TYPE OF BEARING : ELASTOMERIC BEARING
ROCK 2.5 M.
ROADWAY C
DETAILED INVESTIGATION / DESIGN.
150
100
1750
2075 PORTION OF
350 350 INTER MEDIATE 30. CONCRETE PAVEMENT SHALL BE PROVIDED UP TO 5 M. BEYOND
350 DIAPHRAGM TO BE
CAST WITH GIRDER THE POINT WHERE HFL CUT THE G.L. AND BEYOND THAT CONSTRUCTION OF HIGH LEVEL BRIDGE
350
D
PORTION OF
INTER MEDIATE FLEXIBLE PAVEMENT MAY BE PROVIDED. ACROSS SONE RIVER AT BEOHARI-KATNI
DIAPHRAGM TO BE
CAST IN SITU ROAD IN KM 37/10 (VIA-VIJAYSOTA)
1525 600 1775 600 1775 600 1525
SHAHDOL (M.P)
TYP. PLAN OF PIER, PILE CAP TYP. CROSS SECTION OF DECK SLAB GENERAL ARRANGEMENT DRAWING
PLAN OF ABUTMENT