P1 P2

STA. 0+000 STA. 0+160


Jalan Desa

RENCANA DRAINASE

JALAN PAVING

JUDUL KEGIATAN

PAVING DAN DRAINASE


VEROCEMENT RT 06 RW 03
LAYOUT
Skala 1 : NTS JUDUL GAMBAR SKALA

- LAYOUT 1 : NTS

LEMBAR KE
JML GAMBAR :
Paving Stone t.6cm Topi Uskup t.6cm
Verocement
Urugan Abu Batu t.5cm Kanstin 10x20x40cm
Beton Bertulang Urugan Pedel t.10cm Urugan Abu Batu Bawah
10 30 50 Kanstin t.5cm

180
100 200

20
POTONGAN MELINTANG
Skala 1 : 25

21

40
6
6
5
10. 10
30 21

PAVING STONE KANSTIN 10x20x40


TOPI USKUP skala 1 : 10
skala 1 : 10 skala 1 : 10

50 50
10 30 10 10 30 10
JUDUL KEGIATAN
Ø5,5 - 200
PAVING DAN DRAINASE
8 - Ø5,5 VEROCEMENT RT 06 RW 03
30 30
40 40
JUDUL GAMBAR SKALA
10 10 - POT MELINTANG 1 : 25
- DETAIL PAVING 1 : 10

50 Beton K.175 50
- DETAIL VEROCEMEN 1 : 15

DETAIL VEROCEMENT DETAIL PENULANGAN


Skala 1 : 15 Skala 1 : 15 LEMBAR KE
JML GAMBAR :