DIAGRAMA DEL SISTEMA TRONCAL DE INTERCONEXION

CNDC Informe de la Programación de Mediano Plazo may/19 - abr/23

ANEXO 1B
DIAGRAMA UNIFILAR DEL SISTEMA TRONCAL INTERCONECTADO

SANTIVAÑEZ

60-100 [MVAr] 2x219.0 [MW]


2x15 [MVAr] 135.0 [km] MIZQUE
938.6 [MW] 2x427.5 142.5 [MW]
236.2 [km] 3x35 [MVAr] PALILLADA 246.0 [km]
[MW] 255.6 [MW]
H (118.95 MW) UMAPALCA 1x340.0 [MW]
12.0 [km] H (85.56 MW) 77.0 [km]

204.0 [MW] SEHUENCAS


12 [MVAr] 2x155.9 [MW] 2x12
2x18 [MVAr] 87.0 [km]
244.0 [km] [MVAr]
C. BAJO
2x275.0 [MW] 189.0 [MW] H (290.16 MW)
2x9 [MVAr] 142.5 [MW] 22.9 [km] PALCA
35.8 [km] SEHUENCAS
KENKO
142.5 [MW] JUNTAS
2x219.0 [MW] 15 [MVAr]
79.0 [km] SANTIVAÑEZ 219.0 [MW] VINTO 155.9 [MW]
(*) 123.7 [km] 31.0 [km]
142.5 [MW]
VALLE HERMOSO 15.6 [MVAr] PAGADOR MAZOCRUZ RURRENABAQUE
21 [MVAr] T (1.80 MW)
(**) 200.0 [MW]
130.0 [MW] 130.0 [MW] 219.0 [MW] 229.9 [MW] 15 MVAr T (5.0 MW)
130.0 [MW] 130.0 [MW] EL ALTO
59.6 [km] 22.7 [km] 116.7 [km] 25.4 [km] 142.5 [MW]
193.6 [km] 15.8 [km] T (49.85 MW) SAN
95.0 [MW]
146.0 [MW] 142.5 [MW] BUENAVENTURA
142.5 [MW] 40.9 [km] KENKO 142.5 [MW]
S (101.2 MW)
ORURO T (18.70 MW)
VINTO 12 [MVAr] LA CUMBRE
CORANI AROCAGUA
H (64.32 MW) 74.0 [MW] 6.6 [MVAr]
120.1 [km] 119.0 [MW] 90.0 [MW] YUCUMO 31.1 [MW] SAN IGNACIO T (0.73 MW)
MOXOS
74.0 [MW] 74.0 [MW] 74.0 [MW] 47.5 [MW] 7.2 [MVAr] 27.3 [km] 45.0 [km] T (0.35 MW) 118.0 [km] SANTA ANA T (1.62 MW)
74.0 [MW]
38.1 [km] 5.4 [km] JERUYO 29.6 [km] 183.3 [MW] CHUSPIPATA
45.6 [km] 5 [MVAr]
12 [MVAr] MIGUILLAS 55.32 [km] ZONGO 74.0 [MW] CARANAVI TRINIDAD
SAN BORJA
H (21.11 MW) H (157.89 MW) TAQUESI 63.9 [km]
121.0 [km]
12 [MVAr] 47.5 [MW] HUAJI H (89.19 MW)
VALLE HERMOSO QUEHATA 33.3 [MW] 33.3 [MW] 33.3 [MW] 33.3 [MW]
74.0 [MW] KANATA MISICUNI H (30.15 MW) 9 C. MOXOS
6.4 [km] T (116.60 MW) 99.6 [km] H (1.97 MW) 104.5 [km] 40.4 [km] 138.5 [km] 84.8 [km]
H (7.54 MW) H (120.0 MW) 74.0 [MW] [MVAr] T (25.28 MW)
LUCIANITA 90.0 [MW] SAN BORJA
43.3 [km] 74.5 [km]
38.0 [km] CATARICAGUA T (1.80 MW)
POTOSI 38.0 [MW]
23.75 [MW] 74.0 [MW] 18.0 [km] 90.0 [MW]
S. ISABEL 74.0 [MW] 33.5 [km] 11.0 [km]
H (91.11 MW) 4.9 [km] OCURI 12 [MVAr]
31.8 [MW]
23.75 [MW] 7.0 [km]
74.0 [MW] 23.0 [MW] 12 [MVAr] +/-50 STAT
142.5 [MW]
SACABA 74.0 [MW] 47.5 [MW] 47.50 [MW] [MVAr]
COM

IRPA IRPA SACACA 97.8 [km] 84.4 [km] 10.0 [km] KARACHIPAMPA
74.0 [MW] 74.0 [MW] 74.0 [MW] 74.0 [MW]
T (11.31 MW) PARAISO
74.0 [MW] 74.0 [MW] 74.0 [MW] CATAVI 7.2 [MVAr] LA PLATA
31.4 [km] 14.9 [km] 5.4 [km] 46.5 [km] 43.2 [km] 43.4 [km] 73.2 [km] 90.0 [MW]
ECEBOL 4.7 [km] 2x27 [MVAr]
12 [MVAr] 38.0 [MW]
12 [MVAr]
23.75 [MW] 7.2 [MVAr] 88.2 [km]
2x160.0 [MW]
230.0 [km]
PARACAYA QOLLPANA 23.75 [MW] 22.0 [MW]
QOLLPANA 16.0 [km]
E (27.0 MW) 1.0 [km]
90.0 [MW] 90.0 [MW] 90.0 [MW]
24.1 [km] 67.7 [km] DON DIEGO
YURA (***) 74.0 [MW]
H (19.04 MW) 22.0 [MW] SUCRE
95.0 [MW] 31.3 [MW]
31.2 [km] 120.6 [km]
ENTRE RIOS 2 57.0 [MW] 57.0 [MW]
T (409.2 MW)
PUNUTUMA MARIACA
74.0 [MW] PADILLA
8.9 [km] (***) 74.0 [MW]
74.0 [MW] 2 x12
140.0 [MW] [MVAr] 33.0 [MW]
104.4 [km] 92.0 [km] 22.0 [MW] 73.0 [km]
ATOCHA 42.9 [km]
ENTRE RIOS 42.0 [MW] MONTEAGUDO
448.0 [MW] T (114.33 MW) UYUNI 12.0 [km]
(***) 74.0 [MW]
0.5 [km]
23.75 [MW] 215.7 [MW] 15
SAN JOSE 448.0 [MW] ARANJUEZ 33.0 [MW]
V. TUNARI CHIMORÉ 4.6 [km] [MVAr]
7.2 [MVAr] 53.0 [km]
1.8 [km] T (35.19 MW)
448.0 [MW] 142.5 [MW] CAMIRI
71.25 [MW] 130.0 [MW] 130.0 [MW] 1.4 [km] 177.0 [km]
45.8 [km] 33.6 [km] CARRASCO 23.75 [MW] 7.2
130.0 [MW] T (138.66 MW) [MVAr] 142.5 [MW]
T (133.36 MW) 71.25 [MW] 1.57 [km] S (60.06 MW) 150.0 [MW]
75.3 [km] BULO S. UYUNI 181.1 [km] YUNCHARA
21 142.5 [MW]
MIGUELITO BULO 34.6 [km] TELAMAYU CARRERAS S (5.72 MW) 15 [MVAr]
[MVAr] SANTA CRUZ TARIJA
333.5 [MW] 71.25 [MW] 140.0 [MW] VENTOLERA
C SAN JOSÉ CARRASCO T (41.95 MW)
3.4 [km] 75.5 [km] 60.8 [MW] S (24.00 MW) 2x24 [MVAr]
H (124.0 MW)
12 21 142.5 [MW] 22.0 [MW] 21 12 [MVAr] 150.0 [MW] 71.25 [MW] 44.2 [km]
2x427.5 [MVAr] 71.0 [MW] [MVAr] 74.2 [km]
[MVAr] 60-100 [MW] 102.0 [km] 93.9 [km] SAN JACINTO
[MVAr] H (7.60 MW)
2x160.0 [MW]
130.0 [MW] 130.0 [MW] 71.25 [MW] 156.0 [km]
74.5 [km] URUBO GUARACACHI 175.8 [MW] 183.5 [MW]
225.6 [km] 12
VILLAMONTES
75 T (345.95 MW) 82.0 [km] [MVAr] 82.9 [km] YAGUACUA
3x35 [MVAr] YAPACANI ARBOLEDA TORRE HUAYCO 24
[MVAr] 142.5 [MW] [MVAr] 12
(*) 2x160.0 [MW] 18
142.5 [MW] [MVAr]
71.25 [MW] [MVAr]
938.6 [MW] 62.0 [km] 155.8 [MW] 138.0 [km] 2x15
185.0 [km] 130.0 [MW] 130.0 [MW] 142.5 [MW] [MVAr]
70.6 [km] 145.0 [km] 90.0 [MW] 157.1 [km] 2x160.0 [MW]
BÉLGICA SUR 52.0 [km] 71.25 [MW]
229.9 [MW] LITIO 2x21
LAS LOMAS 13.4 [km] 142.5 [MW] 15 T (384.09 MW)
12 [MVAr]
[MVAr]
142.5 [MW] 21 142.5 [MW] SALAR GUARAYOS
[MVAr]

275.0 [MW] [MVAr]


NUEVA 17.2 [km] 230.0 [MW]
275.0 [MW] 37.4 [km] 47.5 [MW] 2x21
SANTA CRUZ 229.9 [MW] 54.4 [MW] [MVAr]
13.4 [km] 16.5 [km] 81.4 [km]
60-100 [MVAr] BRECHAS WARNES
9 [MVAr] 47.5 [MW]
C WARNES LOS TRONCOS
21 [MVAr] T (559.5 MW) 142.5 [MW] 160.0 [MW] 142.5 [MW]
75 [MVAr] 2x427.5 [MW] 98.8 [km]

(*) 2x163.0 [MW]


142.5 [MW] 119.2 [km] 160.0 [MW] 2x160.0 [MW]
S. JULIAN 98.8 [km] 162.0 [km] DIAGRAMA UNIFILAR DEL STI CON PROYECTOS
GUABIRÁ UNAGRO WARNES IAGSA 12
T(21.0 MW)T(14.0 MW) E(35.40 MW) T(5.0 MW) [MVAr]
2x163.0 [MW] 2x163.0 [MW] T Generación Térmica
142.5 [MW] 59.6 [km] 59.6 [km]
69 kV Proyectos que ingresan en este periodo
H Generación Hidro
S. JULIAN 115 kV (*)
2x338.4 [MW] E (39.6 MW) E Generación Eólica Instalaciones a ser retiradas en este periodo
EL DORADO 51.4 [km] 142.5 [MW] (**)
230 kV Repotenciamiento de líneas
E (54.0 MW) S Generación Solar
500 kV (***) Nueva capacidad condición en anillo.
G Generación Geotérmica
2x9 [MVAr] 142.5 [MW] 22.9 [km] PALCA
35.8 [km] SEHUENCAS
KENKO
142.5 [MW] JUNTAS
2x219.0 [MW] 15 [MVAr]
79.0 [km] SANTIVAÑEZ 219.0 [MW] VINTO 155.9 [MW]
(*) 123.7 [km] 31.0 [km]
142.5 [MW]
VALLE HERMOSO 15.6 [MVAr] PAGADOR MAZOCRUZ RURRENABAQUE
21 [MVAr] T (1.80 MW)
(**) 200.0 [MW]
130.0 [MW] 130.0 [MW] 219.0 [MW] 229.9 [MW] 15 MVAr T (5.0 MW)
130.0 [MW] 130.0 [MW] EL ALTO
59.6 [km] 22.7 [km] 116.7 [km] 25.4 [km] 142.5 [MW]
193.6 [km] 15.8 [km] T (49.85 MW) SAN
95.0 [MW]
146.0 [MW] 142.5 [MW] BUENAVENTURA
142.5 [MW] 40.9 [km] KENKO 142.5 [MW]
S (101.2 MW)
ORURO T (18.70 MW)
VINTO 12 [MVAr] LA CUMBRE
CORANI AROCAGUA
H (64.32 MW) 74.0 [MW] 6.6 [MVAr]
120.1 [km] 119.0 [MW] 90.0 [MW] YUCUMO 31.1 [MW] SAN IGNACIO T (0.73 MW)
MOXOS
74.0 [MW] 74.0 [MW] 74.0 [MW] 47.5 [MW] 7.2 [MVAr] 27.3 [km] 45.0 [km] T (0.35 MW) 118.0 [km] SANTA ANA T (1.62 MW)
74.0 [MW]
38.1 [km] 5.4 [km] JERUYO 29.6 [km] 183.3 [MW] CHUSPIPATA
45.6 [km] 5 [MVAr]
12 [MVAr] MIGUILLAS 55.32 [km] ZONGO 74.0 [MW] CARANAVI SAN BORJA TRINIDAD
H (21.11 MW) H (157.89 MW) TAQUESI 63.9 [km]
121.0 [km]
12 [MVAr] 47.5 [MW] HUAJI H (89.19 MW)
VALLE HERMOSO QUEHATA 33.3 [MW] 33.3 [MW] 33.3 [MW] 33.3 [MW]
74.0 [MW] KANATA MISICUNI H (30.15 MW) 9 C. MOXOS
6.4 [km]
T (116.60 MW) 99.6 [km] H (1.97 MW) 104.5 [km] 40.4 [km] 138.5 [km] 84.8 [km]
H (7.54 MW) H (120.0 MW) 74.0 [MW] [MVAr] T (25.28 MW)
LUCIANITA 90.0 [MW] SAN BORJA
43.3 [km] 74.5 [km]
38.0 [km] CATARICAGUA T (1.80 MW)
POTOSI 38.0 [MW]
23.75 [MW] 74.0 [MW] 18.0 [km] 90.0 [MW]
S. ISABEL 74.0 [MW] 33.5 [km] 11.0 [km]
H (91.11 MW) 4.9 [km] OCURI 12 [MVAr]
31.8 [MW]
23.75 [MW] 7.0 [km]
74.0 [MW] 23.0 [MW] 12 [MVAr] +/-50 STAT
142.5 [MW]
SACABA 74.0 [MW] 47.5 [MW] 47.50 [MW] [MVAr]
COM

IRPA IRPA SACACA 97.8 [km] 84.4 [km] 10.0 [km] KARACHIPAMPA
74.0 [MW] 74.0 [MW] 74.0 [MW] T (11.31 MW) PARAISO
74.0 [MW] 74.0 [MW] 74.0 [MW] CATAVI 74.0 [MW] 7.2 [MVAr] LA PLATA
31.4 [km] 14.9 [km] 5.4 [km] 46.5 [km] 43.2 [km] 43.4 [km] 73.2 [km] 90.0 [MW]
ECEBOL 4.7 [km] 2x27 [MVAr]
12 [MVAr] 38.0 [MW]
12 [MVAr]
23.75 [MW] 7.2 [MVAr] 88.2 [km]
2x160.0 [MW]
230.0 [km]
PARACAYA QOLLPANA 23.75 [MW] 22.0 [MW]
QOLLPANA 16.0 [km]
E (27.0 MW) 1.0 [km]
90.0 [MW] 90.0 [MW] 90.0 [MW]
24.1 [km] 67.7 [km] DON DIEGO
YURA (***) 74.0 [MW]
H (19.04 MW) 22.0 [MW] SUCRE
95.0 [MW] 31.3 [MW]
31.2 [km] 120.6 [km]
ENTRE RIOS 2 57.0 [MW] 57.0 [MW]
T (409.2 MW)
PUNUTUMA MARIACA
74.0 [MW] PADILLA
8.9 [km] (***) 74.0 [MW]
74.0 [MW] 2 x12
140.0 [MW] [MVAr] 33.0 [MW]
104.4 [km] 92.0 [km] 22.0 [MW] 73.0 [km]
ATOCHA 42.9 [km]
ENTRE RIOS 42.0 [MW] MONTEAGUDO
448.0 [MW] T (114.33 MW) UYUNI 12.0 [km]
(***) 74.0 [MW]
0.5 [km]
23.75 [MW] 215.7 [MW] 15
SAN JOSE 448.0 [MW] 33.0 [MW]
CHIMORÉ 4.6 [km] [MVAr]
7.2 [MVAr] ARANJUEZ
V. TUNARI 1.8 [km] 53.0 [km]
T (35.19 MW)
448.0 [MW] 142.5 [MW] CAMIRI
71.25 [MW] 130.0 [MW] 130.0 [MW] 1.4 [km] 177.0 [km]
45.8 [km] 33.6 [km] CARRASCO 23.75 [MW] 7.2
130.0 [MW] T (138.66 MW) [MVAr] 142.5 [MW]
T (133.36 MW) 71.25 [MW] 1.57 [km] S (60.06 MW) 150.0 [MW]
75.3 [km] BULO 142.5 [MW] S. UYUNI 181.1 [km] YUNCHARA
21 BULO 15 [MVAr]
MIGUELITO [MVAr] 34.6 [km] SANTA CRUZ TELAMAYU CARRERAS TARIJA S (5.72 MW)
333.5 [MW] 71.25 [MW] 140.0 [MW] VENTOLERA
C SAN JOSÉ CARRASCO T (41.95 MW)
3.4 [km] 75.5 [km] 60.8 [MW] S (24.00 MW) 2x24 [MVAr]
H (124.0 MW)
12 21 142.5 [MW] 22.0 [MW] 21 12 [MVAr] 150.0 [MW] 71.25 [MW] 44.2 [km]
2x427.5 [MVAr] 71.0 [MW] [MVAr] 74.2 [km]
[MVAr] 60-100 [MW] 102.0 [km] 93.9 [km] SAN JACINTO
[MVAr] H (7.60 MW)
2x160.0 [MW]
130.0 [MW] 130.0 [MW] 71.25 [MW] 156.0 [km]
74.5 [km] URUBO GUARACACHI 175.8 [MW] 183.5 [MW]
225.6 [km] 12
VILLAMONTES
75 T (345.95 MW) 82.0 [km] [MVAr] 82.9 [km] YAGUACUA
3x35 [MVAr] YAPACANI ARBOLEDA TORRE HUAYCO 24
[MVAr] 142.5 [MW] [MVAr] 12
(*) 2x160.0 [MW] 18
142.5 [MW] [MVAr]
71.25 [MW] [MVAr]
938.6 [MW] 62.0 [km] 155.8 [MW] 138.0 [km] 2x15
185.0 [km] 130.0 [MW] 130.0 [MW] 142.5 [MW] [MVAr]
70.6 [km] 145.0 [km] 90.0 [MW] 157.1 [km] 2x160.0 [MW]
BÉLGICA SUR 52.0 [km] 71.25 [MW]
229.9 [MW] LITIO 2x21
LAS LOMAS 13.4 [km] 142.5 [MW] 15 T (384.09 MW)
12 [MVAr]
[MVAr]
142.5 [MW] 21 142.5 [MW] SALAR GUARAYOS
[MVAr]

275.0 [MW] [MVAr]


NUEVA 17.2 [km] 230.0 [MW]
275.0 [MW] 37.4 [km] 47.5 [MW] 2x21
SANTA CRUZ 229.9 [MW] 54.4 [MW] [MVAr]
13.4 [km] 16.5 [km] 81.4 [km]
60-100 [MVAr] BRECHAS WARNES 47.5 [MW]
CNDC C WARNES
160.0 [MW]
LOS TRONCOS Informe de la Programación de Mediano Plazo may/19 - abr/23
9 [MVAr]

75 [MVAr] 2x427.5 [MW] 21 [MVAr] T (559.5 MW) 142.5 [MW] 142.5 [MW]
98.8 [km]

(*) 2x163.0 [MW]


142.5 [MW] 119.2 [km]
S. JULIAN GUABIRÁ UNAGRO WARNES
T(21.0 MW)T(14.0 MW) E(35.40 MW) T(5.0 MW)
IAGSA
ANEXO 1B
160.0 [MW]
98.8 [km] 12
[MVAr]
2x160.0 [MW]
162.0 [km] DIAGRAMA UNIFILAR DEL STI CON PROYECTOS
2x163.0 [MW] 2x163.0 [MW] T Generación Térmica
142.5 [MW] 59.6 [km] 59.6 [km] Proyectos que ingresan en este periodo
DIAGRAMA UNIFILAR DEL SISTEMA TRONCAL INTERCONECTADO H Generación Hidro 69 kV
S. JULIAN (*)
2x338.4 [MW] E Generación Eólica 115 kV Instalaciones a ser retiradas en este periodo
51.4 [km] E (39.6 MW)
EL DORADO 142.5 [MW] (**)
E (54.0 MW)
230 kV Repotenciamiento de líneas
S Generación Solar (***)
500 kV Nueva capacidad condición en anillo.
G Generación Geotérmica