ID Resource Name Type Material Label Initials Group Max. Units Std. Rate Ovt.

Rate Cost/Use Accrue At


1 Excavation Top Soil Material E RM9.80 RM0.00 Prorated

2 Excavation Trench Material E RM20.50 RM0.00 Prorated


3 Concrete Material C RM275.00 RM0.00 Prorated
4 Formwork Beam Material F RM51.80 RM0.00 Prorated
5 Formwork Stump Material F RM42.20 RM0.00 Prorated
6 Formwork Footing Material F RM42.20 RM0.00 Prorated
7 Formwork Column Material F RM47.10 RM0.00 Prorated
8 Formwork Slab Material F RM47.00 RM0.00 Prorated
9 R6 beam Material R RM4.30 RM0.00 Prorated
10 R6 column Material R RM4.30 RM0.00 Prorated
11 R6 stump Material R RM4.30 RM0.00 Prorated
12 T10 beam Material T RM4.00 RM0.00 Prorated
13 T12 beam Material T RM4.00 RM0.00 Prorated
14 T10 column Material T RM4.00 RM0.00 Prorated
15 T10 stump Material T RM4.00 RM0.00 Prorated
16 T10 footing Material T RM4.00 RM0.00 Prorated
17 BRC A7 Material B RM102.33 RM0.00 Prorated
18 Sand Material S RM41.00 RM0.00 Prorated
19 Crusher Run Material C RM34.00 RM0.00 Prorated
20 General Labour Work G 8 RM60.00/day RM0.00/hr RM0.00 Prorated
21 Skilled Labour Work S 6 RM95.00/day RM0.00/hr RM0.00 Prorated
22 Semi-Skilled Labour Work S 6 RM75.00/day RM0.00/hr RM0.00 Prorated

23 Excavator Work E 2RM1,000.00/day RM0.00/hr RM0.00 Prorated


24 Concrete Mixer Work C 2 RM420.00/mon RM0.00/hr RM0.00 Prorated
25 Vibrator Material V RM270.00 RM0.00 Prorated
26 Backhoe Work B 1 RM550.00/day RM0.00/hr RM0.00 Prorated

Page 1 WBS KEDUA


Base Calendar Code

Standard
Standard
Standard

Standard
Standard

Standard

Page 2 WBS KEDUA