0 INTRODUCTION
Road pavement damage usually occurs due to traffic load, temperature, moisture content
or the movement of the sub grade and it can be divided into six categories: pavement crack,
surface deformation, surface defects, edge defects, pothole and patch. In overcome the
problem of damage to the road paving, several methods have been introduced to facilitate the
implementation of the parties involved. More efficient maintenance measures will be chosen
to ensure the comfort and safety to the user and to ensure a benefit in the management.
In addition, the failure of the pavement can be classified according to survey any damage
which occurs at the site are classified according to the damage that can be viewed. The failure
are determine and can record in the condition survey data sheet. Research conducted to
determine the Pavement Condition Index (PCI) on the road, whether it is in a nice rating or
not. Numerical rating of the pavement condition that ranges from 0 to 100, with 0 being the
worst possible condition and 100 being the best possible condition.
2.0 BACKGROUND OF STUDY
Site selection for this project in Jalan Parit Sempadan Laut along 200 meters of where
along the road has damages such as alligator cracking, bleeding, corrugation and others. The
road pavement damage can be classified into two types, function damage and structural
damage where the damage occurred due to the increasing traffic load through the area, the
environment and road pavement layer thickness itself.
Furthermore, the function of pavement which like we knew are providing a flat
surface for the movement of vehicles that are more comfortable and safe, receive and
distribute the load of the vehicle below, other than that protect the sub grade from being
exposed to the weather. Studies conducted on the road to investigate the road pavement index
is in good condition or not, and this damage can be done by minor or major maintenance.
3.0 OBJECTIVE
1. Alligator cracking
Alligator or fatigue cracking is a series of interconnecting cracks caused by
fatigue failure of the asphalt concrete surface under repeated traffic loading such
as wheel paths. Alligator cracking is measured in square meters ( length x width ).
2. Bleeding
Bleeding is a film of bituminous material on the pavement surface that creates a
shiny, glass like, reflecting surface that usually become quite sticky and its caused
by excessive asphaltic tars. Bleeding is measure in square meters of surface area
( length x width ).
3. Corrugation
Corrugation is regular transverse undulations, closely spaced alternate valleys and
crests with wave lengths. This type of distress usually caused by traffic action
combined with an unstable pavement surface
4. Edge cracking
Edge defects occur along the interface of flexible pavement and the shoulder, and
are most significant where the shoulder is unsealed.
6. Polished Aggregate
This distress is caused by repeated traffic application when the aggregate in the
surface become smooth, adhesion with vertical tires is considerable reduce. Polish
aggregate is measure m2 of surface area.
7. Potholes
Pothole is a bowl-shaped cavity in the pavement surface resulting from the loss of
wearing course and binder course materials. Measuring the pothole by counting
the number.
8. Slippage Cracking
1. 1 Add up the total quantity of each distress type at each severity level, and record them
in the “Total Severities” section. For example, Fig. 4 shows five entries for the
Distress Type 1, “Alligator Cracking”: 5L, 4L, 4L, 8H, and 6H. The distress at each
2
severity level is summed and entered in the “Total Severity” section as 13 ft (1.2
quantities may be either in square feet (square meters), linear feet (meters), or number
of occurrences, depending on the distress type.
2. Divide the total quantity of each distress type at each severity level from1 by the total
area of the sample unit and multiply by 100 to obtain the percent density of each
distress type and severity.
3. Determine the deduct value (DV) for each distress type and severity level combination
from the distress deduct value curves in Appendix X3.
4. Determine the maximum corrected deduct value (CDV).
The procedure for determining maximum CDV from individual DVs is identical for both AC
and PCC pavement types.
i. 9.5.1 If none or only one individual deduct value is greater than two, the total
value is used in place of the maximum CDV in determining the PCI; otherwise,
maximum CDV must be determined using the procedure described at below.
ii. List the individual deduct values in descending order. For example, in Fig. 4 this
will be 25.1, 23.4, 17.9, 11.2, 7.9, 7.5, 6.9, and 5.3.
iii. Determine the allowable number of deducts, m, from Fig. 5, or using the following
formula (see Eq 4):
m = allowable number of deducts including fractions (must be less than or equal to ten), and
HDV = highest individual deduct value. (For the example in Fig. 4, m= 1 + (9/98)(100-25.1)
= 7.9).
iv. The number of individual deduct values is reduced to the m largest deduct values,
including the fractional part. For the example in Fig. 6, the values are 25.1, 23.4,
17.9, 11.2, 7.9, 7.5, 6.9, and 4.8 (the 4.8 is obtained by multiplying 5.3 by (7.9– 7 =
0.9)). If less than m deduct values are available, all of the deduct values are used.
v. Determine maximum CDV iteratively, as shown in Fig. 6.
a. Determine total deduct value by summing individual deduct values. The total
deduct value is obtained by adding the individual deduct values in 9.5.4, that
is, 104.7.
b. Determine q as the number of deducts with a value greater than 2.0. For
example, in Fig. 6, q=8.
c. Determine the CDV from total deduct value and q by looking up the
appropriate correction curve for AC pavements in Fig. X4.15 in Appendix X3.
d. Reduce the smallest individual deduct value greater than 2.0 to 2.0 and repeat a
to c until q=1
e. Maximum CDV is the largest of the CDVs.
6. Calculate PCI by subtracting the maximum CDV from 100: PCI = 100-max CDV.
7. Fig. 6shows a summary of PCI calculation for the example AC pavement data in Fig.
4. A blank PCI calculation form is included in Fig. 2.
FIG. 2 Flexible Pavement Condition Survey Data Sheet for Sample Unit
6.0 Analysis data
Pavement condition survey is used as a pavement rating method that is based on visual
inspection of pavement distress. The survey will define the Pavement (PCI) which is
Numerical rating of the pavement condition that range from 0 – 100, with 0 being the worst
possible condition and 100 being the best possible condition.
The activity of this survey begins with carrying out the inspection for pavement distresses to
the sample unit that has been selected. The measurement of the distress includes its length,
width, depth, diameter and area. The severity of the distresses is when defined according to
low, moderate of high level. Field condition survey sheets are shown in FIG 2 and FIG 6.
11 L 4 4 1.14 2
12 2 2 0.57 0
13 L 1 1 2 0.57 49
13 M 1 1 0.29 58
13 H 1 1 0.29 80
17 M 4 4 1.14 12
SKETCH:
Maximum allowable number of deducts, m
m = 1 + (9/98)(100 – HDV)
= 1 + (9/98)(100 – 79)
= 2.8
Deduct values in descending order: 80, 79, 70, 58, 49, 14, 12, 11, 2, 1, 0
Since the maximum allowable number of deducts is 2.8, therefore only the first 2 and 0.8 of
the 3th deduct value are selected, i.e. 80, 79 and 0.8*70 = 56.
Reduce the smallest individual deduct value to 2 (q is now 2) and determine the CDV.
No
Deduct Values Total q CDV
.
80 79 56 251 3 100
1
80 79 2 161 2 99
2
80 2 2 84 1 84
3
Based on the rating for PCI value of 100 (FIG. 1 Pavement Condition Index (PCI), Rating
Scale, and Suggested Colors), this section (KM 0.462 – 0.562) having Level of Service (LOS)
F of pavement is in failed condition and need to reconstruction.
JALAN PARIT SEMPADAN LAUT (ASPHALT SURFACED ROAD)
CONDITION SURVEY DATA SHEET
BRANCH: TRAFFIC LABORATORY DATE:
UTHM
SURVEYED BY: SAMPLE UNIT: (KM 0.562 – 0.662)
SECTION: SAMPLE AREA: 100m x 3.5m =350 m2
2
01. Alligator 06. Depression (m ) 11. Patching & Utility 16. Shoving (m2)
2
Cracking (m ) Cut Patching ((m2)
02. Bleeding (m2) 07. Edge Cracking(m) 12. Polished 17. Slippage Cracking
Aggregate (m2) (m2)
03. Block Cracking 08. Joint Reflection 13. Potholes (no.) 18. Swell (m2)
(m2) Cracking (m)
04. Bumps and Sags 09. Lane/Shoulder 14. Railroad Crossing 19. Weathering/
(m) Drop Off (m) (m2) Ravelling (m2)
05. Corrugation (m2) 10. Longitudinal & 15. Rutting (m2)
Transverse
Cracking (m)
DISTRES DENSIT DEDUCT
S QUANTITY TOTAL Y VALUE
SURVEY %
11.47 11.47 3.27 22
01 L
10.2 10.2 2.91 33
01 M
40.3 3.3 43.6 43.6 16
09 L
9.6 9.6 9.6 17
10 L
6.3 6.3 6.3 25
10 M
7.5 7.5 7.5 55
10 H
19.5 19.5 5.57 11
11 L
147.2
12 147.25 42.07 10
5
SKETCH:
Maximum allowable number of deducts, m
Deduct values in descending order: 55, 33, 25, 22, 17, 16, 11, 10
Number of deduct values = 8
Since the maximum allowable number of deducts is 5.6, therefore only the first 5 and 0.1 of
the 6th deduct value are selected, i.e. 55, 33, 25, 22, 17 and 0.1*16 = 1.6.
Reduce the smallest individual deduct value to 2 (q is now 5) and determine the CDV.
No
Deduct Values Total q CDV
.
1 55 33 25 22 17 1.6 153.6 6 73
2 55 33 25 22 17 2 154 5 79
3 55 33 25 22 2 2 139 4 78
4 55 33 25 2 2 2 119 3 73
5 55 33 2 2 2 2 96 2 68
6 55 2 2 2 2 2 65 1 64
Maximum CDV = 79
Results of the study have been made and there are various problems that occur on
Jalan Parit Sempadan Laut. This pavement damage can interruptions to consumer. Damage
and failure contributed to the disorder and lead to consumer concerns. Among the most
common failure is identified malfunction and failure of the structure. Therefore, maintenance
work should be carried out.
From the data record that have been taken there are various types of damage that
involves damage to the pavement like alligator cracking, edge cracking and so on. Data were
collected and analyzed at the level or index on the road. Furthermore, the calculations have
been made along 200 meters of the damage and the extent of damage is proved that during the
0 to 100 meter rating for PCI section (KM 0462-0562) having Level of Service (LOS) F of
pavement is in failed condition and need to reconstruction , While, on the road 100 meter to
200 meter rating for PCI section (KM 0562-0662) having Level of Service (LOS) F of
pavement is in failed condition and need to reconstruction. Then along Jalan Parit Sempadan
Laut about 200 meters requires the reconstruction of the road pavement. The construction cost
estimation has been made along the 200 meters of the road. The reconstruction of the road
along the 200 meter estimated total of RM 31993.00 and including 6% GST is RM 33,912.58.
Finally, the construction of the highway is a road structure that largely contributed to
human comfort where it is frequently used by all users. Therefore, the parties involved and the
authorities should always notice the quality of the construction of rural roads or even roads to
user satisfaction can be achieved.
9.0 REFERENCE
1. ASTM D6433 - “Standard practice for Roads and Parking Lots Pavement Condition
Index Surveys”.
2. JKR 20709-2060-92 – “A Guide To The Visual Assessment of Flexible Pavement Surface
Conditions”.