1 04.10.2020 15 40 2
2 05.10.2020 22 96 12
4 21.10.20 161 56 12
6 21.10.20 90 15 12
7 24.10.20 88 21 5
8 24.10.20 58 66 11
9 27.10.20 30 22 11
10 30.10.20 113 88 10
11 31.10.20 127 30 6
12 31.10.20 51 90 5
Old grate bar top up was done,4 nos new pressure rollers were fixed,top side wall 4 nos corner pieces replaced with new
one,center casting crack repairing was done(ador),diagonal was found 4274,4275,grate bar expansion gap was kept as 20 to
24 mm,center casting bolt tightness checked,all other general check up was done.
30 nos old grate bar top up was done,all pressure roller were greased,top side wall 4 nos corner pieces replaced with new
one,grate bar expansion gap was maintained as 20 to 24 mm,diagoan found 4274,4272,center casting crack was
repaired(ewac),other general checkes were carried out
All 4 nos front plates were replaced by new one,all 4 nos pressure roller were replaced with new one ,75 nos old grate bar
top up was done,grate bar expansion gap was 20 to 24,top side wall 4 nos corner pieces replaced with new one,diagonal
found 4273,4272,center casting crack was repaired(ewac),other general checkes were carried out
All 4 nos front plates were replaced by new one,all 4 nos pressure roller were replaced with new one ,5 nos old grate bar top
up was done,grate bar expansion gap was 18 to 20 mm,top side wall 4 nos corner pieces replaced with new one,diagonal
found 4273,4272,center casting crack was repaired(ewac),other general checkes were carried out
All 4 nos front plates were replaced by new one,all 4 nos pressure roller were greased ,75 nos old grate bar top up was
done,grate bar expansion gap was 20 to 24,top side wall 4 nos corner pieces replaced with new one,diagonal found
4274,4275,center casting crack was repaired(ador),other general checkes were carried out, end casting bolt manually
tightend
All 4 nos front plates were replaced with new one,all 4 nos pressure roller were greased ,6 nos old grate bar top up was
done,grate bar expansion gap was 20 to 24 mm,top side wall 4 nos corner pieces replaced with new one,diagonal found
4272,4273,center casting crack was repaired(ador)
All 4 nos front plates were replaced with new one,all 4 nos pressure roller were greased ,old grate bars were fixed in 3 rows
& one row was filled with new K K Steel grate bars,grate bar expansion gap was 20 to 24 mm,top side wall 4 nos corner
pieces replaced with new one,diagonal found 4273,4274,center casting crack was repaired(EWAC)
All 4 nos front plates were replaced with new one,all 4 nos pressure roller were replaced with new one ,89 nos. of grate bars
were,grate bar expansion gap was 20 to 24 mm,CCR side all side walls were replaced with new one,diagonal found
4273,4274,center casting crack was repaired(ador)
All 4 nos front plates were replaced with new one,all 4 nos pressure roller were replaced with new one,grate bar expansion
gap was 20 to 24 mm,top side wall 4 nos corner pieces replaced with new one,diagonal found 4272,4272,center casting
crack was repaired(ador)
All 4 nos pressure roller were replaced with new one,grate bar expansion gap was 20 to 24 mm,top side wall 4 nos corner
pieces replaced with new one,diagonal found 4271,4272,center casting crack was repaired(ador)
All 4 nos pressure roller were replaced with new one,60 nos. of grate bars were,grate bar expansion gap was 18 to 22
mm,CCR side all side walls were replaced with new one,diagonal found 4273,4274,center casting crack was repaired(ewac)
All 4 nos pressure rollers were replaced with new one, all 4 nos front plates were replaced,both end casting wheel shafts
were pressed, 3 nos. of wheel bearings were replaced, grate bar expansion gap was 18 to 24 mm,,top side wall 4 nos corner
pieces replaced with new one,diagonal found 4271,4272,center casting crack was repaired(ador)