Certificate PP Dump PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 39

Question Results

Score 0 of 1
(skipped)
Question:

In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.

Response:

The Planning Strategy of the finished product

The Individual/Collective indicator of the component

The MRP Type of the component

The item category of the component in the BOM

Score 0 of 1
Question:

What are benefits of the Engineering Workbench?


There are 2 correct answers to this question.

Response:

Simultaneous processing of different bill of materials (BOM) items and operations

Undo/redo functionality of planned changes

Simulation of planned changes for costing and mater all requirements planning

Detailed selection of bill of materials (BOM)items and operations

Score 0 of 1
Question:

What are the possible categories for the Business Partner master data object in SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Person

Organization

Vendor

Customer

Group

Score 0 of 1
(skipped)
Question:

Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider?
Please choose the correct answer.

Response:

You have to set one MRP area for every storage location.

MRP Live does NOT support storage locations, but classic MRP still does.
Storage location MRP is replaced by MRP area functionality.

Storage locations are NO longer supported.

Score 0 of 1
(skipped)
Question:

What are the key aspects of SAP S/4HANA?


There are 2 correct answers to this question.

Response:

SAP S/4HANA can be deployed on-premise, in the cloud, or a combination of both.

SAP S/4HANA has minor changes on data model.

SAP S/4HANA increases the data footprint.

SAP S/4HANA is built on SAP HANA

Score 0 of 1
(skipped)
Question:

What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Optimization of the production plan

Long-term production planning

Calculation of inventory buffer size

Source determination for external procurement

Score 0 of 1
(skipped)
Question:

At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be
generated?
Please choose the correct answer.

Response:

The requirements date occurs before that of a firmed planned receipt

The requirement no longer exists

The requirements date occurs that of a firmed planned receipt

A firmed planned receipt cannot be rescheduled

Score 0 of 1
(skipped)
Question:

Which characteristics should a material have for re-order point planning?


There are 2 correct answers to this question.

Response:

Demand remains relatively constant.


Replenishment lead time is known and relatively constant.

Material replenishment is managed by the vendor (VMI).

Seasonal demand is relatively volatile

Score 0 of 1
(skipped)
Question:

What capabilities does SAP S/4HANA embedded analytics provide?


There are 2 correct answers to this question.

Response:

Automatic update of story boards

Strategic analysis

Real time decision support

Comparison of current data with historical data to identify trends

Score 0 of 1
(skipped)
Question:

What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.

Response:

Empty

Wait

In use

Full

Score 0 of 1
(skipped)
Question:

What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit?
There are 2 correct answers to this question.

Response:

CSV files

Staging tables

XML files

Temporary tables

Score 0 of 1
(skipped)
Question:

You want to integrate an existing planned order into Advanced Production Planning. Which report do you use?
Please choose the correct answer.

Response:
/SAPAPO/UPD_LOC_SP_PL

/SAPAPO/CURTO_CREATE

/SAPAPO/CREATE_LOCATION

/SAPAPO/PPDS_DELTA_ORD_TRANS

Score 0 of 1
(skipped)
Question:

Which materials have a negative quantity in a bill of materials or in a recipe?


There are 3 correct answers to this question.

Response:

Continuous flow materials

Bulk materials

Co-products

Waste products

By-products

Score 0 of 1
(skipped)
Question:

Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.

Response:

BOM status

Work center hierarchy

Task list group number

Validity dates

Lot sizes

Score 0 of 1
(skipped)
Question:

A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake.

What impact would this have to other users for this specific production order?
Please choose the correct answer.

Response:

The production manager can still see the capacity requirements

The production operator cannot enter additional confirmations

The warehouse clerk still carry out goods issue transactions


The buyer can still see component reservations

Score 0 of 1
(skipped)
Question:

What information is included in the SAP Readiness Check result for SAP S/4HANA?
There are 3 correct answers to this question.

Response:

Recommended SAP Fiori apps

Inconsistent data tables

Recommended SAP Best Practices

Relevant simplification items

Custom code analysis

Score 0 of 1
(skipped)
Question:

To ensure that the warehouse operator only stages large components in the exact required quality for each production
order, which warehouse material staging method would you recommend?

Please choose the correct answer.

Response:

Pick parts

Release order parts

Crate parts

Kanban

Score 0 of 1
(skipped)
Question:

Which of the following functions can be performed when the production order has the status “Created” (CRTD)?
Please choose the correct answer.

Response:

A user can schedule a background job to release production orders (transaction COOIS).

A user can trigger material staging via mass processing (transaction COHV).

A user trigger printing of shop floor paper manually (transaction CO02).

A user trigger material availability check via mass processing (transaction COHV)

Score 0 of 1
(skipped)
Question:

What generates capacity requirements in a process order?


Please choose the correct answer.

Response:
Activities

Phases

Operations

Resources

Score 0 of 1
(skipped)
Question:

Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
There are 3 correct answers to this question.

Response:

SAP Field glass

SAP Concur

SAP SuccessFactors

SAP Ariba

SAP S/4HANA

Score 0 of 1
(skipped)
Question:

Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.

Response:

Opening period

Goods receipt processing time

Setup time

Float before and float after production

Score 0 of 1
(skipped)
Question:

How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.

Response:

By eliminating fields for different stock types

By eliminating hybrid tables

By eliminating inventory tables

By eliminating material master tables

By eliminating inventory history tables


Score 0 of 1
(skipped)
Question:

How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.

Response:

By providing multilevel material requirements planning

By providing future demands from demand figures in the past

By providing cross-plant planning and deployment

By providing replenishment proposals with exact times

Score 0 of 1
(skipped)
Question:

The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which
sequence does the system search for the MRP settings?
Please choose the correct answer.

Response:

MRP Group –> Material Master –> Plant Settings

Plant Settings –> MRP Group –> Material Master

Material Master –> Plant Settings –> MRP Group

Material Master –> MRP Group –> Plant Settings

Score 0 of 1
(skipped)
Question:

You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them
automatically copied to production orders?
There are 2 correct answers to this question.

Response:

Material master

Bill of material

Routing header

Work center

Score 0 of 1
(skipped)
Question:

How can you limit the validity of a bill of material (BOM)?


There are 2 correct answers to this question.

Response:

By plant

By industry
By period

By mater al type

Score 0 of 1
(skipped)
Question:

What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question.

Response:

Default values for the item status

Allowed material type

Default unit of measure

Maximum allowed low-level code

Score 0 of 1
(skipped)
Question:

Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.

Response:

SAP Fieldglass

SAP Hybris

SAP Human Capital Management

SAP Visual Enterprise

Concur

Score 0 of 1
(skipped)
Question:

MRP created a planned order for a material that has one single material from stock as a component. What happens to this
dependent requirement when you convert the planned order into a production order?

Please choose the correct answer.

Response:

It is converted into a schedule line.

It is converted into a planned order.

It is converted into a production order.

It is converted into a reservation.

Score 0 of 1
(skipped)
Question:

You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your
customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the
extra demand.
Which is the appropriate planning strategy to use?

Response:

40 – Planning with-final-assembly

50 – Planning without final assembly

20 – Make to order production

10 – Anonymous make-to-stock

Score 0 of 1
(skipped)
Question:

You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials
(BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is
NOT possible.

Which settings do you make to achieve this?


Please choose the correct answer.

Response:

Planning strategy 50 (Planning without final assembly) and the corresponding individual
Collective indicator

Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator

Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP
indicator

Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator

Score 0 of 1
(skipped)
Question:

Which functional capabilities does the Detailed Scheduling Board have?


There are 2 correct answers to this question.

Response:

Enter time-ticket confirmation for production orders

Change planned order quantities

Undo for drag & Drop planning activities

Change sales order quantities

Score 0 of 1
(skipped)
Question:

You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of
the following order types consume the forecast?

There are 2 correct answers to this question.

Response:

Purchase order

Dependent demand
Planned order

Sales order

Score 0 of 1
(skipped)
Question:

Which task list types can have parallel sequences?


There are 2 correct answers to this question.

Response:

Reference operation sets (S)

Routings (N)

Master recipes (2)

Rate routings (R)

Score 0 of 1
(skipped)
Question:

On which of the following levels can you influence the availability check for the components of production orders?
There are 2 correct answers to this question.

Response:

Material master

Production order type

MRP controller

Production controller

Score 0 of 1
(skipped)
Question:

How would you define pegging in the context of Advanced Planning?


Please choose the correct answer.

Response:

An evaluation to verify if there are overstock situations in the balance between receipt and
issue elements after the production planning run.

An evaluation that is ordered according to the bill-of-material structure of all related


products and represents the relationship between the receipt and the issue elements.

An evaluation that is ordered according to the network structure of all related products and
represents the coverage of issue elements with receipt elements.

An evaluation to verify if there are mater al or capacity shortages in the network after the
production planning run.

Score 0 of 1
(skipped)
Question:

What is the sequence of the five steps of Demand-Driven Replenishment in SAP S/4HANA?
Please choose the correct answer.

Response:
Analytics, replenishment planning, replenishment execution, buffer positioning, buffer sizing

Analytics, buffer positioning, replenishment planning, buffer sizing, replenishment execution

Analytics, buffer positioning, buffer sizing, replenishment planning, replenishment execution

Analytics, buffer positioning, replenishment planning, replenishment execution, buffer sizing

Score 0 of 1
(skipped)
Question:

Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.

Response:

Parallel processing across servers

Net change planning

MRP list

Planning horizon

Score 0 of 1
(skipped)
Question:

Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.

Response:

Sales orders

Planned independent requirements

Shipments

Material documents

Score 0 of 1
(skipped)
Question:

When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a
consistent look-and-feel.

What types of templates can a developer choose?


There are 3 correct answers to this question.

Response:

Factsheet

Analytical

Maintenance view

Transactional

Web Dynpro
Score 0 of 1
(skipped)
Question:

What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.

Response:

Pre computed aggregation views

Online transaction processing (OLTP)

Extract on, transformation, and loading (ETL)

Online analytical processing (OLAP)

Score 0 of 1
(skipped)
Question:

Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production
flow happens only in physically connected tanks?
Please choose the correct answer.

Response:

Resource network

Work center hierarchy

Setup matrix

Operation network

Score 0 of 1
(skipped)
Question:

What must be used in the system to plan the requirements for different subcontractors separately?

Response:

Planning plant

Production versions

Storage locations

MRP areas

Score 0 of 1
(skipped)
Question:

The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a
source of supply in SAP S/4HANA?
Please choose the correct answer.

Response:

Selection Method

Contract

Purchasing Info Record


Production Version

Score 0 of 1
(skipped)
Question:

Which of these are layers in SAP Best Practice content?


There are 3 correct answers to this question.

Response:

Configuration guides

Process diagrams

Solution packages

Building blocks

Scope items

Score 0 of 1
(skipped)
Question:

Which of the following elements does MRP take into account during net requirement calculation?
There are 2 correct answers to this question.

Response:

Lot size

Purchase orders

Safety stock

Maximum stock level

Score 0 of 1
(skipped)
Question:

You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are
needed?
There are 2 correct answers to this question.

Response:

Run setup minimization heuristics or optimizer.

Create and assign a new graphical object for setup time in the planning board.

Create and assign setup group/setup keys in the production data structure.

Create and assign a setup matrix with setup transition time to the resource

Score 0 of 1
(skipped)
Question:

What is the purpose of a reporting point confirmation in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

To determine the work in progress along the production line


To provide timely updates of inventory management for the staged components

To reduce the total production lead time for along production line

To stage different components for a production line simultaneously

Score 0 of 1
(skipped)
Question:

In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.

Response:

Work Scheduling

Purchasing

Basic Data 1

MRP 4

Score 0 of 1
(skipped)
Question:

Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the
advanced planning flag?
There are 2 correct answers to this question.

Response:

Material

Plant

Work center

Production version

Score 0 of 1
(skipped)
Question:

Which time elements can be reduced by a reduction strategy?


There are 3 correct answers to this question.

Response:

Move time

Queue time

Goods receipt processing time

Float after production

Wait time

Score 0 of 1
(skipped)
Question:
In which of the following master data objects can you define the production order default storage location for a material
component?
There are 2 correct answers to this question.

Response:

BOM, in the item for the material

Work center, in the production supply area

Routing, in the component allocation

Material master of the finished product

Score 0 of 1
(skipped)
Question:

Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question.

Response:

Production overview

Planning file entries

Operation list

Production list

WIP list

Score 0 of 1
(skipped)
Question:

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished
good is received.

Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Please choose the correct answer.

Response:

Planning at assembly level (70)

Make-to-order production (20)

Planning with final assembly (40)

Planning without final assembly (50)

Score 0 of 1
(skipped)
Question:

Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component
availability.

Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.

Response:

The ATP category for restricted-use stock


The checking rule from the business application

The checking control for the order type

The checking group from the material master

Score 0 of 1
(skipped)
Question:

Which capabilities does the Alert monitor have?


There are 3 correct answers to this question.

Response:

Automatically send alerts with Alert Notification Engine

Automatically reschedule in case of overload alerts

Nominate time-dependent substitutes for a planner

Automatically predict alerts in future planning cycles

Generate alerts based on defined threshold values

Score 0 of 1
(skipped)
Question:

When would you use reporting point backflush in repetitive manufacturing?


There are 2 correct answers to this question.

Response:

For production lines with short lead times

When goods issues can wait for final confirmation

When you need to determine the work in progress

You require an up-to-date inventory for components

Score 0 of 1
(skipped)
Question:

Production orders are used for what production type?


Please choose the correct answer.

Response:

Process manufacturing processes

Period and quantity-oriented production

Replenishment controlled by control cycles

Discrete manufacturing processes

Score 0 of 1
(skipped)
Question:

How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:

With respect to a common change status for product and each assembly

With respect to defined separate key dates for product and each assembly

With respect to a defined separate change status for product and each assembly

With respect to a common key date for product and each assembly

Score 0 of 1
(skipped)
Question:

The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?

Response:

It propagates changed sales order priorities to the pegged planned orders

It enables the propagation of network alerts across the bill of materials structure

It links receipts from an alternative location in case of a shortage in the default location

It replaces fixed pegging relationships unless they have been created for stock

Score 0 of 1
(skipped)
Question:

Which material master setting is required to use the repetitive planning table for production with production orders?
Please choose the correct answer.

Response:

A repetitive manufacturing profile must be assigned on the MRP4 view

At least one valid production version must exist on the MRP4 view

An overall profile be assigned on the Work Scheduling view

The Selection Method must be set to “2 Selection by production version”.

Score 0 of 1
(skipped)
Question:

The method in which a production order is credited or debited depends on the variant of cost object controlling (COC).
What basis can be used to carry this out?
There are 2 correct answers to this question.

Response:

Cost-related

Product-related

Milestone-related

Order-related

Score 0 of 1
(skipped)
Question:
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate?
Please choose the correct answer.

Response:

The presence of firmed planned orders

The viability of the proposed solution

The presence of production orders

The priority of the proposed solution

Score 0 of 1
(skipped)
Question:

A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of
cost collectors?
There are 2 correct answers to this question.

Response:

They can be created automatically during month end process.

They can be applied to make-to-stock production order.

They can be used for manufacturing with collective orders.

They can be used for repetitive manufacturing.

Score 0 of 1
(skipped)
Question:

For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.

Response:

Work center

Material master

Contract

Production plant

Score 0 of 1
(skipped)
Question:

What are pillars of SAP Activate?


There are 2 correct answers to this question.

Response:

Guided Configuration

SAP Best Practices

Premium engagement

SAP MaxAttention
Score 0 of 1
(skipped)
Question:

The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock
requirements list. Which of the following will firm planned orders”
There are 2 correct answers to this question.

Response:

Creating a planned order within the planning time fence

Setting a planning time fence in the Material Master Record

Assigning a production scheduling profile

Manually changing the quantity of a planned order

Score 0 of 1
(skipped)
Question:

Which process order function uses a resource network?


Please choose the correct answer.

Response:

Capacity leveling

Resource selection

Capacity planning

Resource scheduling

Score 0 of 1
(skipped)
Question:

A production order is created from a planned order. The system should determine a valid production version. What must
you doing the system for the selection to occur?

Please choose the correct answer.

Response:

Change the production version assignment in the production order using the Read Master
Data function.

Create several production versions with valid dates.

Set the customizing setting Automatic Selection of Production Version active.

Set the customizing setting Manual Selection of Production Version active.

Score 0 of 1
(skipped)
Question:

What steps are possible in a PP/DS production planning run?


There are 3 correct answers to this question.

Response:

Backorder processing

Optimization
Detailed scheduling functions

Heuristics

Demand consumption

Score 0 of 1
(skipped)
Question:

The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.

Response:

Subcontracting

Vendor consignment

In-house production

Stock transfer

Score 0 of 1
(skipped)
Question:

Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

100% check

Simultaneous

First in first out (FIFO)

By usage probability

Score 0 of 1
(skipped)
Question:

What does it mean for the production planner when MRP works with infinite capacities?
Please choose the correct answer.

Response:

MRP creates capacity requirements only if the work center has sufficient capacity.

MRP assigns capacity requirements automatically to work center is with the earliest
available capacity.

MRP creates capacity requirements without checking the capacity of a work center.

MRP assigns capacity requirements automatically after the last scheduled order on a work
center.

Score 0 of 1
(skipped)
Question:

In Demand-Driven Replenishment, materials are classified according to several criteria. What criteria can you use?
There are 3 correct answers to this question.

Response:
Goods issue value

Minimum order quantity

Usage in bill of materials

Demand variation

Average daily usage

Score 0 of 1
(skipped)
Question:

An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What
determines whether the storage location can be derived from the production version?

Please choose the correct answer.

Response:

Plant Data

MRP Group

MRP Profile

MRP Controller

Score 0 of 1
(skipped)
Question:

What is the difference between co-products and by-products?


Please choose the correct answer.

Response:

Only co-products are identified by a special item category in the bill of material (BOM).

Only by-products have a zero inventory valuation.

Only co-products appear in the process or production order settlement rule.

Only co-products can be manufactured in isolation from the main product.

Score 0 of 1
(skipped)
Question:

Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master
Copier) to create new materials?
There are 2 correct answers to this question.

Response:

Storage location data

Warehouse number data

MRP area data

Production version data


Score 0 of 1
(skipped)
Question:

Which material-specific information can be transferred to a transportation lane in PP/DS?


There are 3 correct answers to this question.

Response:

Production versions

Special procurement keys

Quota arrangements

Outline agreement

Purchasing info records

Score 0 of 1
(skipped)
Question:

When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the
highest priority?
Please choose the correct answer.

Response:

The cross-plant status

The least restrictive status

The plant-specific status

The most restrictive status

What is the valid sequence of key activities in production order processing?


Please choose the correct answer.

Choose one:

Creation, scheduling, release, material withdrawal, confirmation

Creation, release, scheduling, material withdrawal, confirmation

Creation, staging, release, material withdrawal, confirmation

Creation, scheduling, release, variance calculation, confirmation

What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.

Choose one:

APO Demand Planning

Flexible Planning

Integrated Business Planning

PP Standard Sales and Operations Planning


What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.

Choose:

Production Version

Engineering Change Record

Bill of Material

Routing

In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the
reactor. How can you process consumption postings?
Please choose the correct answer.

Choose one:

Kanban

Picking list

Transfer order

Back flushing

Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing.
What is the impact of this decision?
There are 3 correct answers to this question.

Choose:

Production orders are created with sales order reference.

Sales order-specific stock is created

Net requirements calculation is sales order-specific.

Sales order-specific planning run is required.

Storage location MRP areas are required.

Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.

Choose:

Planned delivery time

Planning time fence

Goods receipt processing time

Opening period

Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.

Choose one:

SAP Solution Manager 7.2

SAP Best Practices Explorer


SAP Support Portal

SAP Help Portal

How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.

Choose one:

By creating a user profile and assigning it to the production scheduling profile

By defining a status profile and assigning it to the order type

By activating the user statuses in status and action management

By enhancing the system status customizing table with user statuses

You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.

Choose:

Squeezing in

Backwards

Infinite sequencing

Forward with reverse

What is the first step in the MRP run?


Please choose the correct answer.

Choose one:

Lot size calculation

Source determination

Net requirements calculation

BOM explosion

When can the material availability check occur automatically in a production order?
There are 2 correct answers to this question.

Choose:

At order creation

At order settlement

At order release

At order confirmation

Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are
available?
There are 2 correct answers to this question.

Choose:

Order list
Resource overview

Resource utilization

Production list

What are possible configuration steps when setting up the alert monitor in Advanced Planning?
There are 3 correct answers to this question.

Choose:

Assign the alert profile to the overall profile.

Create object selection variant for transportation lane-related alerts.

Create object selection variant for resource-related alerts

Assign the overall profile to the authorization profile.

Create object selection variant for product-related alerts.

Which document is skipped when SAP EWM is embedded in SAP S/4HANA?


Please choose the correct answer.

Choose one:

Warehouse order

Outbound delivery request

Outbound delivery order

Warehouse task

The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient
way to handle last minute demands and protect the current production plan?

There are 2 correct answers to this question.

Choose:

In the material master record, set MRP type to P4 and a planning time fence on the
replenishment lead time of the material

In the material master record, set MRP type to P1 and a planning time fence on the
replenishment lead time of the material

In the stock requirements list, set a manual firming fence for a date based on the
replenishment lead time of the material

Manually firm all planned orders for materials within the replenishment lead time of the
material

In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.

Choose one:

Mixed MRP indicator

Storage Location MRP Indicator

Dependent Requirements indicator


Individual/Collective Indicator

Which master data object governs the relationship between supply source and demand source in the Kanban process?
Please choose the correct answer.

Choose one:

Control cycle

Replenishment strategy

Rate routing

Production supply area

What are some of the advantages of using Kanban?


There are 2 correct answers to this question.

Choose:

It is mostly accomplished by manual postings

Replenishments are created close to the actual need

It is a simplified form of production control

Replenishments are based on centralized planning

You have maintained the parameters for simple discontinuation in the material master of a component. Which business
process will be affected if the available stock is zero and the discontinuation date is in the past?

Please choose the correct answer.

Choose one:

Backflushing

Kanban

Material requirements planning

Production order release

What does a line hierarchy in repetitive manufacturing represent?


Please choose the correct answer.

Choose one:

A production line with more than one work center

A production line with prioritized alternative work centers

A production line with a parallel sequence in the routing

A production line with an alternative sequence in the routing

What are drawbacks of the separation of OLTP and OLAP?


There are 4 correct answers to this question.

Choose:

The OLAP system needs to write back the data to the OLTP system

Only the OLAP system has the latest data


Batch process are required to keep OLTP and OLAP in sync

Multiple copies of the data exist

Only the OLAP system has a predefined subset of the data

Which advanced functionality has been embedded in SAP S/4HANA?


There are 3 correct answers to this question.

Choose:

Available-to-promise

Supply Network Planning

Capacity planning

Demand planning

Backorder processing

For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.

Choose:

Plant

Production version

Material

Work center

How can you limit the number of master data objects to be created when the manufacturing process is the same for many
different products?
Please choose the correct answer.

Choose one:

By assigning different materials to the same routing

By assigning the same production version to different materials

By creating routings with alternative sequences

By creating routings with parallel sequences

In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?
There are 2 correct answers to this question.

Choose:

Use a specific MRP type.

Use a specific material status.

Use a specific material group

Use a specific MRP controller.


A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the
automatic GR?
There are 2 correct answers to this question.

Choose:

Scheduling margin key

Confirmation profile

Production scheduling profile

Operation control key

Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.

Choose:

Purchase orders

Transfers from batch to batch

Collective orders

Planned orders

Stock transfers

Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.

Choose one:

Production order header status

Warehouse transfer order status

Production order total order quantity

Shop floor information system

You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have?
There are 2 correct answers to this question.

Choose:

Model a separate resource in the production data structure.

Model a transportation resource in the location master.

Model a resource inbound in the location master.

Model a handling resource in the location master and goods receipt time in the mater all
master.

You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.

Choose:

Order type determination

Planning selection
Actual cost calculation

Master data selection

Capacity requirements determination

Which of the following objects can you release so that the business transactions for process order execution and process
management can be executed?
There are 2 correct answers to this question.

Choose:

Individual control recipes

Individual operations

Individual process instructions

Individual phases

Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode
selection?
Please choose the correct answer.

Choose one:

When multiple operations are maintained for one product

When multiple production versions are maintained for one product

When alternate resources are used within one operation

When multiple planned orders exist on one resource

What are the consequences when you assign a planned order to a production line manually, using the planning table in
repetitive manufacturing?
Please choose the correct answer.

Choose one:

The planned order generates capacity requirements.

The planned order's components are copied o the picking list.

The planned order's component availability is checked

The planned order is converted a production order.

What are some of the SAP Fiori user types?


There are 3 correct answers to this question.

Choose:

Business partner

Developer

Expert

Employee

Occasional
How can you set up the supply source for the SAP Kanban process?
There are 3 correct answers to this question.

Choose:

Using stock transfer reservations for stock transfer

Using run schedule quantities for in-house production

Using purchasing costs for automated source prioritization

Using purchase orders for external procurement

Using quotations for internal and external procurement

Which of the following is an advantage of MRP Live and NOT available in classical MRP?
There are 2 correct answers to this question.

Choose:

MRP Live can plan materials with recursive BOMs

MRP Live can priorities demand from sales orders

MRP Live can propose alternative solutions

MRP Live can create production orders automatically

What are the three transition scenarios for an S/4HANA implementation?


There are 3 correct answers to this question.

Response:

New implementation

System activation

Landscape transformation

System upgrade

System conversion

Which of the following apply to MRP Live?


There are 2 correct answers to this question.

Choose:

The BAdIs for classical MRP also apply to MRP Live.

Planned orders need to be converted to purchase requisitions for externally procured


materials.

The definition of the planning scope is more flexible.

The sequence of planning materials is calculated across plants.

Which of the following business processes are controlled by production order type-dependent parameters?
There are 2 correct answers to this question.

Choose:

Inspection during production


Engineering change management

Planning

Implementation

Which actions does the system perform by default when you save a confirmation for a finished product in repetitive
manufacturing?
There are 3 correct answers to this question.

Choose:

Material staging for next order in sequence

Posting of production costs to the production cost collector

Archiving of documents for assembly scrap

Reduction of associated capacity requirements

Posting of goods receipt for the product

A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any
automatic rescheduling activity by the system.

Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

Choose one:

Finite resource and finite strategy

Infinite resource and infinite strategy

Finite resource and infinite strategy

Infinite resource and finite strategy

In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.

Choose one:

Cost collector

Bill of material

Production version

Repetitive manufacturing profile

You want to perform capacity availability checks on your production orders. What must be set for this to occur?
There are 2 correct answers to this question.

Choose:

Checking control must have an overall profile assigned in customizing.

Checking rule and group must be assigned.

Indicator Relevant for finite scheduling must be set

PRT Availability check must be set.


Which time elements are part of a routing operation?
There are 3 correct answers to this question.

Choose:

Move time

Pick/pack time

Float before production

Queue time

Wait time

Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.

Choose:

Advances in the three-tier architecture approach

Big and affordable memory

Capability to add to server landscape and scale

Wide adoption of web standards such as Service oriented architecture

Multi core processors enabling parallelism of tasks

What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.

Choose:

Material to bill of materials (BOM) assignment

Routing to sequence assignment

Material to production version assignment

Component assignment

Material to routing assignment

Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?
There are 2 correct answers to this question.

Choose:

Run MRP with automatic selection of production version.

Run PP/DS heuristics for repetitive manufacturing.

Run MRP with quota arrangement.

Assign planned orders manual lying the planning table.

What are the advantages of the new MRP Live in SAP S/4HANA compared to the classic MRP from SAP ECC?
There are 2 correct answers to this question.

Choose:

MRP Live optimizes multi-level make-to-order planning.


The MRP Live planning scope is more flexible.

MRP Live reads and writes data in parallel threads.

MRP Live writes MRP lists during the run.

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of
material shortage. What must you do?
There are 2 correct answers to this question.

Choose:

Add the agreement to the source list and mark it for MRP relevance

Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

Add the agreement to the quota arrangement and mark it for MRP relevance.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in
production. How can you identify all affected finished goods stocks?

Please choose the correct answer.

Choose one:

Use the batch information cockpit.

Use the material where-used report.

Use the material staging report.

Use batch determination.

You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials
(BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is
NOT possible.

Which settings do you make to achieve this?


Please choose the correct answer.

Response:

Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator

Planning strategy 50 (Planning without final assembly) and the corresponding individual
Collective indicator

Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator

Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP
indicator

You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished
good is received.

Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Please choose the correct answer.

Response:

Planning at assembly level (70)

Planning without final assembly (50)


Planning with final assembly (40)

Make-to-order production (20)

What are attributes of the SAP S/4HANA Simplification list?


There are 3 correct answers to this question.

Choose:

It details transaction and solution capabilities at a functional level

It is only a grouping of related technical simplifications

It contains references to the relevant training material

It was created for better planning and estimation of your way to S/4HANA

It can have a business and a technical impact

A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has
been set to backwards with a consumption period of 12 days.

Starting from when are the 12 days counted backwards?


Please choose the correct answer.

Choose one:

From the dependent requirement date of the material

From the requested delivery date of the related finished good

From the availability date of the related finished good

From the planned independent requirement date of the material

You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination
logic when a planned order is created?
Please choose the correct answer.

Choose one:

Costs

Delivery date

Component availability

Vendor rating

Quota arrangement

In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.

Choose one:

Define selection profiles

Define production scheduling profile

Define scheduling parameters for production orders

Define order-type-dependent parameter


Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question.

Choose:

In the requirements class

In the MRP group

In the plant parameters

In the material master

How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.

Choose:

Use a planning strategy with requirements consumption

Set the requirements reduction indicator in the requirements class

Reorganize planned independent requirements

Maintain adjustment parameter in the MRP group

With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud
implementation?
Please choose the correct answer.

Choose one:

Maintain Business Catalogs

Configure Your Solution

Manage Licenses

Manage Your Solution

What are properties of MRP Live?


There are 2 correct answers to this question.

Choose:

It is executed on the database server

Data is read sequentially from the database tables

The code is written in SQL Script

It uses the same BAdis as classic MRP

In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.

Choose one:

Control recipe
Process order
Process message
PI sheet

Process order
Control recipe
Process message
PI sheet

Control recipe
Process order
PI sheet
Process message

Process order
Control recipe
PI sheet
Process message

Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.

Choose:

SAP Visual Enterprise

Concur

SAP Hybris

SAP Human Capital Management

SAP Fieldglass

What is a typical transportation processing SAP Transportation Management?


Please choose the correct answer.

Choose one:

Order Management, Transportation Planning, Freight Costing and Settlement,


Transportation Execution, Analytics and Reporting

Transportation Planning, Transportation Execution, Order Management, Freight Costing


and Settlement, Analytics and Reporting

Transportation Planning, Order Management, Transportation Execution, Freight Costing


and Settlement, Analytics and Reporting

Order Management, Transportation Planning, Transportation Execution, Freight Costing


and Settlement, Analytics and Reporting

What are possible configuration steps when setting up the alert monitor in Advanced Planning?
There are 3 correct answers to this question.

Choose:

Assign the alert profile to the overall profile.

Create object selection variant for resource-related alerts

Create object selection variant for product-related alerts.

Assign the overall profile to the authorization profile.

Create object selection variant for transportation lane-related alerts.

Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Choose:

Expected goods receipt

Slotting

Handling Unit Management

Labor Management

Yard Management

What are prerequisites for using batch derivation?


There are 2 correct answers to this question.

Choose:

Process instructions

Receiver-sender relationships

Batch where-used list

Batch determination selection conditions

Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.

Choose:

Elimination of document index tables

Elimination of customer master tables

Elimination of LIS tables for rebates

Elimination of status tables

Elimination of output condition tables

When do you recommend the use of repetitive manufacturing?


There are 2 correct answers to this question.

Choose:

High product stability

Low product stability

High product complexity

Low product complexity

Question:

Your customer complains about incorrect duration for production order operations. What time elements could cause the
issue?
There are 3 correct answers to this question.

Response:

Tear down time


Processing time

Queue time

Floating time

Move time

You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly
operations. How do you account for potentials crap of the high-value material?

Please choose the correct answer.

Choose one:

Enter the operation scrap and set the net indicator in the component of the bill of mater al
of the assembly.

Enter the component scrap in the material

master of the assembly and set the net indicator in the routing operation where the
component is used

Enter the assembly scrap in the material master of the component and set the net
indicator in the component of the bill of material of the assembly.

Enter the component scrap in the component of the bill of material of the assembly and
leave the net indicator initial in the bill of material.

During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible
production plan?
There are 3 correct answers to this question.

Choose:

Use a bucket-oriented capacity check

Use optimization with respect to set-up times

Use rescheduling with an alternative mode

Use DS heuristic “Schedule Sequence”

Use multilevel MRP run for the products on the resource

In which data objects do you maintain the production in as the work center for repetitive manufacturing?
There are 2 correct answers to this question.

Choose:

Routing

Repetitive manufacturing profile

Production cost collector

Production version

Question:

When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the
following actions are also performed by default?
There are 2 correct answers to this question.

Response:
Reduction of the capacity requirements

Staging of components for the next order in the sequence

Posting of production costs to cost collector

Archiving of backflush documents

You might also like