Professional Documents
Culture Documents
Dayly Report
Dayly Report
会社名 Company name 作 業 内 容 Work Items 安全指示 Safety points 人員 Labor 人員 Labor 備 考 Note
連絡事項 NOTE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
DATE
T-A 32, CHAIN LINK FENCE AND
3+65.6 STEEL POSTS T-D 09
END
CONC 1+67.1 1+67.1 T-D 08
SEAWALL
T-D 07
N
T-A 31, HANDRAIL T-D 06
T-D 05
T-D 04
EXST BOAT RAMP
AC LEGEND :
T-D 03
DESCRIPTION
EXST REMOVAL NEW DESCRIPTION T-BR, CONC SLAB T-D 02
L
CHAIN LINK FENCE AND
CONC POST
MARK
2+00
MOLDED FENDERS
K
0+00 STATION DESIGNATION T-B 17, PAINT SURFACE
SOLICITATION NO.:
W912HV-20-R-0003
W912HV-20-C-0003
279
279
279
CONTRACT NO.:
ISSUE DATE:
J T-B 18, PAINT SURFACE
SCALE:
478705_C-104
T-B 20, PAINT SURFACE
FILE NAME:
AC T-B 15, PAINT SURFACE
MASANORI KINA
SUBMITTED BY:
DESIGNED BY:
CHECKED BY:
SEA T-B 22, REPAIR CONC SPALL
M. UEHARA
DRAWN BY:
1+00
S. SUZUKI
I T-B 14, PAINT SURFACE
K. ASATO
AC
SIZE:
ISO A1
T-A 20, REPAIR CONC T-B 23, PAINT SURFACE
3+00 CRACK T-B 13, PAINT SURFACE T-B 21
APO AP 96376-5132
EMAIL: beigunbu@oonaka.co.jp
CRACK
T-B 24, REPAIR
END
2+45
CONC SPALL SEA
T-A 09, REPAIR CONC CRAFT BERTH
G CRACK
0+00
T-A 08, REPAIR CONC BEGIN
SEAWALL
CRACK CRAFT BERTH
00
AC
1+
AC T-B 11, PAINT SURFACE
WATERFRONT REPAIRS
2+55.8 T-A 06, REPAIR CONC
FY19 DLADWCF
CRACK
1+13.9
1+
56
D .1 T-A 05, REPAIR CONC
CRACK
TETRAPODS
T-A 04, REPAIR CONC
CRACK
C
0+24.6
T-A 13, HANDRAIL
T-A 15, REPAIR CONC EXST CONC
CRACK SEAWALL
T-A 14, REPAIR CONC
B SPALL
SEA
SEA
T-A 01, RESET
TETRAPODS SHEET ID
0+43.1
1+98
BLDG ID
OO N
2+19.3 GRAPHIC SCALE
FL WA
D
A
MODIFIED PLAN KIN
5M 0 10 20 30M C-104
A10
2+00
TETRAPODS 1/300
B
SCALE : 1/300
EB
STATUS