Step Label Added Required NVA - Wait # Process Step (VA, NVA, Process Process Time NVAr) Time Time Walk the customer order to the kitchen NVA 2
Time % of total
Total Value-Added Process Time 0 0.00% 4
Total Non-Value-Added or NVA-r Process Time 2 100.00%
NVA - Wait Time 0 0.00%
Total Lead Time 2 100.00%
Copyright 2019 GoLeanSixSigma.com. All Rights Reserved.
Value-Added Flow Analysis v3.2
Copyright 2019 GoLeanSixSigma.com. All Rights Reserved.
Value-Added Flow Analysis v3.2
Value-Added Flow Analysis
Name: Tracy Process Name: Lunch Order to Delivery
Time Measured Date: 10-Mar In: Minutes Hours Days
(select units)
Value NVA & NVA-
Step Label Added Required NVA - Wait # Process Step (VA, NVA, Process Process Time NVAr) Time Time
1 Walk the customer order to the kitchen NVA 2
2 Check if it's readable NVA 2 3 If not readable, bring back to the waitress NVA 2 4 Ask the waitress to clarify the order NVA 2 5 Walk the customer order back to the kitchen NVA 2 6 Prep cook passes the order to the chef NVA 2 7 Chef assesses the order NVA-r 2 8 Ingredients assembled VA 2 9 Order cooked or prepared VA 7 10 Order plated NVA-r 1 11 Order placed on the warmer/staging NVA 1 12 Order waits for pickup NVA 10 13 Waitress picks up order NVA 2 14 Customer Receives the order VA 1
Time % of total
Total Value-Added Process Time 10 26.32% 76
Total Non-Value-Added or NVA-r Process Time 15 39.47%
NVA - Wait Time 13 34.21%
Total Lead Time 38 100.00%
Copyright 2019 GoLeanSixSigma.com. All Rights Reserved.
Value-Added Flow Analysis v3.2
Copyright 2019 GoLeanSixSigma.com. All Rights Reserved.