MWC Motorway Construction: Activity ID Activity Name Activity Type

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

Activity ID Activity Name Activity Type

MWC Motorway Construction


MWC.1 Project Concept Determination
A2100 Study of Infrastructer Needs Task Dependent
A2101 Field Review of the Location Task Dependent
MWC.2 Funding Identification
A2102 Cost Estimation Task Dependent
A2103 Secure Budget Task Dependent
MWC.4 Preliminary Engineering
A2104 Surveys Task Dependent
A2105 Design Details Task Dependent
A2106 Assesment of Design Details Task Dependent
A2107 Construction and Procurment Scheduling Task Dependent
MWC.5 Environmental Review
A2108 Social and Environmetal Impact Assesment Task Dependent
MWC.6 Project Clearance Summary
A2109 Project Clearance Task Dependent
MWC.8 Grade Inspection
A2110 Inspection of Site Task Dependent
A2111 Review Design Details Task Dependent
MWC.9 Right of Way Acquisition
A2112 Acquire Land Task Dependent
MWC.10 Bid Letting
A2113 Prepare Contract Documents and Tender Works Task Dependent
A2114 Arrange Bid competition Task Dependent
A2115 Evaluation Task Dependent
A2116 Award Contracts and Tenders Task Dependent
A2117 Mobilization Task Dependent
MWC.3 Technical Queries
A2120 Clearance on Utilities Task Dependent
A2118 Clearance Regarding Drainage Task Dependent
A2119 Clearance Regarding Archetectural Details Task Dependent
MWC.11 Construction
MWC.11.12 Work Implementation
MWC.11.12.13 Utilities Work
A2121 NOC and Approvals Task Dependent
A2122 Surveys Works Task Dependent
A2123 Shop Drawings Task Dependent
A2125 Construction work of Utilities Work Task Dependent
A2470 Completion of Utilities Work Finish Milestone
MWC.11.12.14 Road Works
A2126 Survey Works Task Dependent
A2127 Shopdrawings Layout Task Dependent
MWC.11.12.14.1 Surveying and Setting out
A2128 Selecting the Road Alignment Task Dependent
A2130 Horizontel Alignment Task Dependent
A2129 Vertical Alignment Task Dependent
A2131 Setting Out Cross Sections Task Dependent
MWC.11.12.14.2 Tools and Equipments
A2132 Installing Machinary Task Dependent
MWC.11.12.14.3 Clearing of Site
A2135 Boulder removal Task Dependent
A2133 Bush Clearing Task Dependent
A2134 Tree and Stump removal Task Dependent
A2136 Grubbing Task Dependent
A2137 Site Clearing Task Dependent
MWC.11.12.14.4 Drainage
A2138 Excavation Task Dependent
A2139 Side Drains Task Dependent
A2141 Sub Surface Drains Task Dependent
A2140 Culverts Task Dependent
A2142 Outlet Ditches Task Dependent
A2143 Minor Bridges Task Dependent
MWC.11.12.14.5 Electrical Installation
A2144 Trench Excavation Task Dependent
A2145 Bed Preparation Task Dependent
A2147 Installing Associated Cables Task Dependent
A2146 Laying Underground Cables Task Dependent
A2148 Installing Earth Terminals Task Dependent
A2149 Backfilling and Compaction Task Dependent
MWC.11.12.14.6 Earthworks
A1250 E/W in Filling Task Dependent
A1280 Excavation for Foundation Task Dependent
A1260 E/W in Excavation Task Dependent
A1270 Excavation for Borrow Pits Task Dependent
A1290 Disposal of Surplus Task Dependent
MWC.11.12.14.7 Pavement
A1300 Sub Grade Preparartion Task Dependent
A1310 Sub Base Preparation Task Dependent
A1320 Base Course Preparation Task Dependent
A1330 Wearing Course preparation Task Dependent
A1340 Rigid Pavement Preparation Task Dependent
MWC.11.12.14.8 Compaction
A1400 Applying Compaction Task Dependent
A1410 Checking and Maintaing Quality Standards Task Dependent
MWC.11.12.14.9 Concerete Work
A1420 Making concrete Task Dependent
A1430 Tranporting Concrete Task Dependent
A1440 Pouring Concrete Task Dependent
A1450 Curing Task Dependent
A1460 Quality Testing Task Dependent
MWC.11.12.14.10 Setting Out
A1470 Setting out of Horizontal Alignment Task Dependent
A1480 Setting out of Vertical Alignment Task Dependent
A1490 Setting out of Cross-Sectional Alignment Task Dependent
A1500 Setting Out of Bends Task Dependent
MWC.11.12.14.11 Road Lightening
A1510 Installation of Poles Task Dependent
A1520 Installation of Electricity Distrbution Cabinets Task Dependent
A1530 Instalation of Wiring Task Dependent
MWC.11.12.14.12 Safety barriers and fences
A1550 Installing Flexible Barriers Task Dependent
A1560 Installing Semi Rigid Barriers Task Dependent
A1570 Installing Rigid Barriers Task Dependent
MWC.11.12.14.13 Finishing Road Works
A1590 Installing Trafic Signs/Signals Task Dependent
A2270 Installing Studs and Road Markings Task Dependent
MWC.11.12.14.14 Completion of road works
A2280 Completion of Road Works Finish Milestone
MWC.11.12.15 Toll Plazas Construction
A1600 Setting Out Task Dependent
A1610 Earth Work Excavation Task Dependent
A1630 Leveling Course Task Dependent
A1620 Sand Filling in Foundation Task Dependent
A1720 Water Supply and Drainage Installation Task Dependent
A1640 Footing Task Dependent
A1650 Column below Grade Beam Task Dependent
A1660 Grade Beam Task Dependent
A1670 Column above Grade Beam Task Dependent
A1680 Beam and Slab Task Dependent
A1690 Brick Work Task Dependent
A1710 Doors and Windows Task Dependent
A1730 Electricity Installation Task Dependent
A1700 Lintel and Sun Shades Task Dependent
A1740 Plastering Task Dependent
A1750 Flooring Task Dependent
A1760 Water Proofing Treatment with Brick-bat Coba over SlabTask Dependent
MWC.11.12.16 Service Area Construction
MWC.11.12.16.1 Petrol Pump Construction
A1790 Station Designing Task Dependent
A1800 Utilities Connection Task Dependent
A1810 Electric Wiring Task Dependent
A1820 Distribution Pipes Installation Task Dependent
MWC.11.12.16.1.1 Building Construction
A1830 Foundation Task Dependent
A1840 Bricks Flooring Task Dependent
A1860 Plant Room Task Dependent
A1870 Office Room Task Dependent
A1880 Tyre Shop Task Dependent
A1850 Metal Roof Task Dependent
A1890 Car Wash Shop Construction and Installation of Carwas Task Dependent
A1910 Compressor and Cooling Plant Task Dependent
A1920 Dryers and filters Task Dependent
MWC.11.12.16.2 Mosque
A1950 Building Construction Task Dependent
A1960 Electric Wiring Task Dependent
A2290 Utilities Connection Task Dependent
A2410 Sanitary and tiles installation Task Dependent
A2420 Painting Task Dependent
A2430 Speakers and Mic Installtion Task Dependent
MWC.11.12.16.3 Tuck Shops and Restaurants
A1970 Building Construction Task Dependent
A1980 Utilities Connection Task Dependent
A2300 Electric Wiring Task Dependent
A2440 tiles installation Task Dependent
A2450 wooden work Task Dependent
A2460 Painting of walls Task Dependent
MWC.11.12.16.4 Toilets
A1990 Building Construction Task Dependent
A2000 Water Connection Installation Task Dependent
A2010 Installing Bathroom Accessories Task Dependent
A2030 Completion of service Area Task Dependent
MWC.17 Other Works
A2050 Monitoring and Controling Task Dependent
A2060 Maintanence Task Dependent
MWC.18 Completion of Project
A2070 Quality Assurance Task Dependent
A2080 Provisional Acceptence Test Task Dependent
A2090 Final Accepatence Test Task Dependent
A2310 Handing Over the Project Finish Milestone
Original Duration Budgeted Total Cost
122
5 500,000
0 200,000
4 300,000
3 300,000
2 200,000
1 100,000
9 1,200,000
4 400,000
2 600,000
1 100,000
2 100,000
2 500,000
2 500,000
2 200,000
2 200,000
3 1,000,000
3 700,000
0 300,000
3 7,800,000
3 7,800,000
11 1,500,000
3 200,000
1 100,000
1 100,000
1 0
5 1,100,000
2 200,000
1 50,000
2 60,000
2 90,000
117
27
13 2,800,000
1 200,000
1 500,000
2 300,000
4 1,800,000
0 0
80 31,000,000
2 300,000
1 400,000
5 800,000
1 200,000
2 200,000
2 200,000
2 200,000
5 2,700,000
5 2,700,000
4 1,000,000
1 600,000
2 400,000
2 500,000
2 300,000
2 200,000
15 4,000,000
4 300,000
5 500,000
5 700,000
5 1,000,000
4 500,000
6 1,000,000
17 2,500,000
4 500,000
6 700,000
2 150,000
3 150,000
2 300,000
4 700,000
22 1,200,000
3 200,000
2 450,000
3 200,000
2 300,000
2 50,000
25 5,000,000
7 500,000
5 850,000
6 850,000
4 1,250,000
3 1,550,000
5 500,000
4 275,000
1 225,000
11 8,000,000
4 2,000,000
4 500,000
4 500,000
6 3,000,000
1 2,000,000
3 500,000
2 100,000
2 100,000
2 150,000
3 150,000
9 1,700,000
4 700,000
2 700,000
3 300,000
3 1,700,000
3 550,000
3 550,000
3 600,000
2 600,000
2 300,000
2 300,000
0
0 100,000
32 8,000,000
2 250,000
3 1,450,000
1 150,000
2 120,000
2 100,000
3 85,000
2 1,135,000
3 1,100,000
2 129,000
3 1,000,000
4 500,000
2 631,000
2 250,000
3 250,000
3 150,000
2 400,000
2 300,000
18 14,000,000
15 4,000,000
0 550,000
3 1,200,000
3 100,000
3 600,000
10
4 125,000
2 125,000
3 400,000
3 300,000
3 200,000
4 50,000
2 50,000
2 150,000
1 150,000
18 3,000,000
10 1,000,000
2 400,000
2 400,000
4 600,000
2 550,000
1 50,000
18 6,000,000
9 2,500,000
2 250,000
2 250,000
4 1,500,000
2 1,000,000
1 500,000
14 1,000,000
7 600,000
3 200,000
3 200,000
1 100,000
5 4,000,000
2 2,500,000
3 1,500,000
7 3,000,000
3 2,000,000
2 500,000
2 500,000
0 0