Download as pdf or txt
Download as pdf or txt
You are on page 1of 66

BIBIYANA-III, 400 MW

COMBINED CYCLE POWER PROJECT


OWNER:
BANGLADESH POWER DEVELOPMENT BOARD
(BPDB)

OWNER’S CONSULTANT:
JV - NOFEAR AND MEPC

EPC CONTRACTOR:
MARUBENI CORPORATION

EPC SUB CONTRACTOR:


LARSEN & TOUBRO LIMITED
(INDIA)
L&T’S CONSULTANT:
L&T–SARGENT & LUNDY LIMITED
(INDIA)

CONTRACT NO.: 09856 CONTRACT DATE: 26/12/12


AMENDMENT NO.: 10015 AMENDMENT DATE: 30/06/15
PACKAGE NAME: LV SWITCHGEAR

PACKAGE SUPPLIER: L&T – ELECTRICAL & AUTOMATION

TITLE:
SCHEME DIAGRAM FOR 3: I/C +1 B/C

DOC/DRG No.: LD16008-UB01-01-BFA-140021 REV.: D PAGE No.: 64

ISSUED FOR
INFORMATION APPROVAL
CONSTRUCTION AS BUILT

REVISION STATUS:
PREPARED REVIEWED APPROVED
REV. NAME
NAME DATE DATE NAME DATE
MECH ELEC CIVIL C&I SES
A VVB 13-02-2017 - VVB - - - 13-02-2017 HAD 13-02-2017

B VVB 07-04-2017 - VVB - - - 07-04-2017 HAD 07-04-2017

C VBV 02-05-2017 - VBV - - - 02-05-2017 HAD 02-05-2017

D MMB 29-11-2017 - VBV - - - 29-11-2017 HAD 29-11-2017


BIBIYANA-III, 400 MW COMBINED CYCLE
POWER PROJECT
BANGLADESH POWER DEVELOPMENT BOARD L&T EAIC

Rev.: C
SCHEME DIAGRAM FOR 3: I/C +1 B/C
Date : 29-NOV-17

Doc. No: LD16008-UB01-01-BFA-140021 Page : 64

REVISION SUMMARY SHEET

REV. DETAILS / DESCRIPTION DATE


A REVISION A 13-02-2017

B REVISION B 07-04-2017

C REVISION C 02-05-2017

D AS BUILT 07-12-2017

You might also like