NAME PROJECT:

PROPOSED DESIGN OF COMMERCIAL BUILDING


FOR ADIL BHAI AT B-17 ISLAMABAD

STRUCTURAL DRAWINGS

PLANNING - TESTING - DESIGNING & DEVELOPMENT


FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
Main Intersection, Peshawar
Ph: +92-333-912-6118, +92-334-843-5340
ENGINEERZ E.mail: gsk.engineerz@gmail.com
GENERAL NOTES
1. BUILDING DESCRIPTION & DESIGN 7. MINIMUM CONCRETE STRENGTHS 14. ACCESSORIES
a. BUILDING IS DESIGNED FOR BASEMENTS + GROUND + 2 STOREY. a. CONCRETE BE TESTED AT IMPORTANT PLACES & STRENGTH BE AS a. BAR SUPPORTS , SPACERS & AND OTHER
DESIGNED AS FRAME STRUCTURE FOR ZONE -2B FOUND. WALLS, BEAMS, SLAB 3000 PSI 28 DAYS CYLINDER STRENGTH ACCESSORIES ARE NOT SHOWN IN DRAWINGS.
b. THE BAR SUPPORTS BE PROVIDES AS APPROVED
b- DESIGN OF STRUCTURE IS BASED ON PAKISTAN BUILDING CODE COLUMNS 4000 PSI 28 DAYS CYLINDER STRENGTH BY ENGINEER
(S.P- 2007) , ACI 318-2005 AND UBC 97.
c. SUPPORTS TO BARS BE SUFFICIENT & STRONG
c- BEARING CAPACITY OF SOIL IS TAKEN AS 0.85 TSF. 8. FORM WORK & REMOVAL SUCH THAT THE STEEL REMAIN IN POSITION
a. FORMWORK TO CONCRETE SHALL BE OF METAL SHEETS DURING CONCRETING.
2. BUILDING LAYOUT OR PLY WOOD.
a. BUILDING LAYOUT BE DONE WRT TO STRUCTURAL DRAWINGS b. THE FORMWORK BE DONE AS PER STRUCTURAL FORMS
MINIMUM CLEAR COVER
AND ARCH DRAWINGS c. FORMWORK BE WATER TIGHT.
b. ANY DIFFERENCE BE DISCUSSED WITH STR. DESIGNER. d. FORMWORK BE REMOVED AS PER FOLLOWING SCHEDULE S.No LOCATION MINIMUM COVER

COLUMNS & SIDE OF BEAMS & WALLS 24 HOURS 1. FOOTING 2" above PCC and 3" on other sides

3. EXCAVATION AND TERMITE TREATMENT SLAB, BOTTOM OF BEAMS 14 DAYS. 2. COLUMN

3. SLAB
a. FOUNDATIONS TO BE PLACED ON WELL COMPACTED SOIL AS PER 3/4"

GEO TECHNIC RECOMMENDATIONS.


9. JOINTS 4. BEAM/PLINTH BEAM

a. EXPANSION JOINTS BE FINALIZED AND GOT APPROVED 5. CONFINING ELEMENT/LINTEL BEAM 1"

b. IN CASE OF FILL / OVERBURDEN REMOVE IT. BY THE RESIDENT ENGINEER.


c. ALL FOUNDATIONS ARE SHOULD BE AT ONE LEVEL EXCEPT MENTIONED. b. EXPANSION JOINT IN THE BUILDING BE PROVIDED AS SHOWN STANDARD HOOKS (ACI 7.1)

ON THE DRAWIGS. BAR


d. PROVIDE TERMITE TREATMENT IN FOUNDATIONS AND IN FLOOR A(in.) B(in.) C(in.)

BEFORE LAYING PCC. 10. STEEL BINDING DIA


3/8" 2.5 2.5 4.5

a. STEEL BARS BE PLACED IN THE FORM AS PER DRAWINGS. 1/2" 2.5 3.0 6.0
4. W:C:S: AGGREGATES AND SIZES b. ALL JUNCTION OF THE BARS / CROSS BE TIED WITH BINDING 5/8" 2.5 4.0 7.5

FRESH WATER: IN ACCORDANCE OF UBC 97 SECTION 1903.4 WIRE. 3/4" 3.0 4.5 9

CEMENT: FRESH PORTLAND CEMENT TO BE USED FOR ALL WORKS.


11. DRAIN PIPES & SLEEVES 1" 4.0 6.0 12

SAND : LAWRANCEPUR / GHAZI.


AGGREGATES:IN ACCORDANCE OF UBC 97 SECTION 1903.3 a. TOILET WASHING & DRAIN PIPES BE PLACED IN SLAB AT PROPER
DESIGNED POSITION BEFORE CONCRETE.
MARGALLA STONE CRUSHED AGGREGATES SHALL BE AS: b. WHERE PLUMBING AND OTHER PIPES ARE PLACES IN SLAB
STRUCTURAL ELEMENTS MAXIMUM AGGREGATE SIZE ADDITIONAL STEEL BARS BE PROVIDED ABOVE AND BELOW B/2 C

FOUNDATIONS 1.25 " DOWN GRADED TO COVER THE REDUCED STRENGTH.

B/2
COLUMNS & BEAMS 3/4 DOWN GRADED
12. BRICK , CONC BLOCK MASONRY

A
SLABS 3/4" DOWN GRADED
a. FIRST CLASS BRICKS BE USED FOR MASONRY WORK.
3/4" DOWN GRADED MEANS 1/2" AND 3/8" MIX b. BRICKS BE SOACKED IN WATER A DAY BEFORE USE. B

5 REINFORCING STEEL c. CONCRETE BLOCKS BE MOISED JUST BEFORE USE.


d. JOINTS BE 3/8" FILLED WITH CEMENT SAND MORTAR.
a. DESIGN OF STRUCTURE IS BASED ON STEEL DEFORMED e. ALL MORTAR BE MACHINE MIXED.
MAIN STEEL FOR ASTM A 615 f. MORTAR FOR WALLS 8" , 9" SHALL BE 1:5
FOUNDATION, COLUMNS, BEAMS, GRADE - 60 FOR 4" & 4.5" SHALL BE 1:4
g. ALL INTERNAL PARTITIONS 4.5" BRICKS / 6" HOLLOW BLOCKS /
SLABS GRADE - 60 WOODEN PARTITION OUTER 8" HOLLOW / 9" BRICKS OR 12" CAVITY WALLS.
b. SAMPLES OF STEEL BE GOT TESTED BEFORE USE. h. ALL ABOVE ITEM TO BE EXECUTED ,TESTED AND MAITAINED IN ACCORDANCE
6 CONC. MIXING & PLACING OF UBC 1997 CODE STANDARD CHAPTER 21.
a. CONCRETE BE WELL MIXED, VIBRATED, COMPACTED , CURED,
TESTED AND RECORD TO BE MAINTAINED AS PER
13. STEEL BAR SPACING
ACI 318 AND UBC 1997 CHAPTER 19 a. FIRST & LAST BAR IN WALLS & SLAB BE PLACED AT 1/2 OF
b. MIXED CONCRETE BE PLACED IN POSITION WITHIN 15 MINUTES THE SPACING OF BARS.OR JUST GIVE COVER AND PLACE THE BAR
c. MIN WATER IN CONC. GIVES MORE STRENGHT. b. FIRST AND THE LAST HOOP/TIE IN BEAMS & COLUMNS BE
d. TRY 5 TO 6 GALLONS OF WATER / BAG OF CEMENT BE PLACED AT 2" FROM THE SUPPORT.
e. MIXING TIME OF CONCRETE PER BATCH 1.5 MINUTES AFTER c. COLUMN TIES TO BE PROVIDED THROUNGHOUT FROM
ADDING WATER. FOUNDATION TO TOP.

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-i ENGINEERZ E.mail: gsk.engineerz@gmail.com
DEVELOPMENT LENGTH IN TENSION (ACI 21.5.4.1)

DEVELOPMENT LENGTH (INCHES)


BAR fc' = 4,000 psi fy = 60,000 psi
DIA
STRAIGHT BARS WITH STANDARD HOOK

3/8" 18 7.5

1/2" 24 9.5

3/4" 30 14.5

h/2
given in the center portion of column
1" 48 19

Lap Splice, if required, shall be


DEVELOPMENT LENGTH IN TENSION (ACI 21.5.4.1)

DEVELOPMENT LENGTH (INCHES)


BAR fc' = 3,000 psi fy = 60,000 psi
DIA

h
STRAIGHT BARS WITH STANDARD HOOK

1/2" 22 11"

5/8" 30 14"

3/4" 34 17"

h/2
1" 55 22"

SPLICE LENGTH (ACI 21.3.2.4, Class B Splice)

MINIMUM SPLICE LAP LENGTH (INCHES)


BAR fc' = 3,000 psi fy = 40,000 psi
DIA
TENSION COMPRESSION

3/8" 15 - TYPICAL COLUMN DETAIL


1/2" 20 9
Lap in this location, if required. Standard Hook
3/4" 30 15 spacing of stirrup within lap length 3" c/c.

1" 48 18 L/4

SPLICE LENGTH (ACI 21.3.2.4, Class B Splice)

MINIMUM SPLICE LAP LENGTH (INCHES)


BAR fc' = 3,000 psi fy = 60,000 psi
DIA
SLAB BEAM / COLUMN

1/2" 25 35 2 h (min) 2 h (min)


Stirrups as per actual
Stirrups @ 3" c/c Stirrups @ 3" c/c
5/8" - 44
L
3/4" - 55

1" - 70
TYPICAL BEAM DETAIL

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-ii ENGINEERZ E.mail: gsk.engineerz@gmail.com
GENERAL DETAILS WATER
STOPPER
R.C.C. COLUMN 2'-6" 9"

3T/8
12" 12"

T/5

T/4

T
3"
9"
1
3

9"
#4 dowel bars @ 18"c/c
BRICK/BLOCK MASONRY
TYP. DETAIL OF CONSTRUCTION
DETAIL OF COLUMN WALL TIE DETAIL OF WINDOW JOINT IN RAFT & SLABS
PROJECTION
9"

6" THICH
FLOOR SLAB 2#3@AFTER EIGHT COURSE
BEAM TOP BARS
PRIMARY BEAM
BEAM HOOPS

1 1/2" CL.
TO END OF HOOKS BEAM BARS
ON BEAM BARS

OPEN OPEN
M

3'-"0 3'-"0
INTERIOR BEAM HOOPS SECONDARY BEAM INTERIOR BEAM HOOPS
BEAM BOTTOM BARS
(SMALLER SECTION BEAM)
SECTION AT M-M

12"X18" 1#4 (VERTICAL BARS)


PLINTH BEAM BOTH SIDE OF OPENING

PLAN OF BEAM TO BEAM DETAIL


NOTE:- SECTIONAL ELEVATION OF WALL
1. SHRINKAGE STRIPS MUST BE PROVIDED AT A SPACING OF NOT MORE THAN 100ft.
2. PREFERABLY SHRINKAGE STRIP BE PROVIDED AT CONSTRUCTION JOINT.
3. LOCATION OF SHRINKAGE STRIP BE KEPT AT A DISTANCE OF SPAN/3 FROM THE COLUMN SUPPORT.
4. 3ft WIDE PORTION OF SHRINKAGE STRIP BE KEPT OPEN FOR AT LEAST 3 WEEKS.THE OPENED PORTION SHOULD BE POURED AFTERWARDS.
5. REINFORCEMENT BE LAPPED IN SHRINKAGE STRIPS. ALTERNATIVELY BARS MAY BE SLIGHTLY BENT IN PLAN PARALLEL TO FACE OF SLAB.

BEAM HOOPS
COLUMN HOOPS
1 1/2" CL.COVER
TO END OF HOOKS
ON BEAM BARS BEAM BARS
1 1/2" CL.
TO END OF HOOKS
ON BEAM BARS
COL. HOOPS
Y Y
X X
Column ties are Column ties are
necessary in necessary in
this region this region
INTERIOR BEAM HOOPS
2#4
BEAM HOOPS
2#4

PLAN SECTION TYP. DETAIL OF CONNECTION OF


TYPICAL SEISMIC-RESISTANT JOINT DETAILS COLUMN AND BEAM JOINT FOR SEISMIC FORCE CONTROL PARTITION WALL WITH BEAM
SECTION AT X-X SECTION AT Y-Y & COLUMN FOR SEISMIC LOADING

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-iii ENGINEERZ E.mail: gsk.engineerz@gmail.com
1 2 3
40'
19'-3" 19'-3"

A
C-2 C-1 C-2
17'

B
C-2 C-3 C-2
20'-9"
60'

C-2 C-3 C-2


C
STR-01

20'-9"

C-2 C-1 C-2


D

BASEMENT FLOOR
COLUMNS KEY PLAN
1 2 3
40'
19'-3" 19'-3"

A
C-2 C-1 C-2
17'

B
C-2 C-3 C-2
20'-9"
60'

C-2 C-3 C-2


STR-02

C
20'-9"

C-2 C-1 C-2


D

GROUND FLOOR
COLUMNS KEY PLAN
1 2 3
40'
19'-3" 19'-3"

A
C-2 C-1 C-2
17'

B
C-2 C-3 C-2
20'-9"
60'

O.T.S

C-2 C-3 C-2


C
STR-03

20'-9"

C-2 C-1 C-2


D
BALCONY BALCONY
BALCONY

FIRST FLOOR
COLUMNS KEY PLAN
1 2 3
40'
19'-3" 19'-3"

A
C-2 C-1 C-2
17'

B
C-2 C-3 C-2
20'-9"
60'

O.T.S

C-2 C-3 C-2


C
STR-04

20'-9"

C-2 C-1 C-2


D

SECOND FLOOR
COLUMNS KEY PLAN
1 2 3
40'
19'-3" 19'-3"

A
17'

B B

B
20'-9"

A A
60'

21" THICK
RAFT

C
STR-05

B B
20'-9"

EXCAVATION & FOUNDATION LAYOUT PLAN


1 2 3
40'
19'-3" 19'-3"

10' 10'

A
#4@5"c/c #4@5"c/c

#4@5"c/c

#4@5"c/c
10'

10'
(10'x10') (10'x10')
17'

B 10' B
(10'x10')

#6@4"c/c
B
10'

#6@4"c/c

21" THICK
20'-9"

RAFT
A A
60'

10'

(10'x10')
#6@4"c/c

C
10'
STR-06

#6@4"c/c

B B
20'-9"

(10'x10') (10'x10')
#4@5"c/c

#4@5"c/c
10'

10'

#4@5"c/c #4@5"c/c
D
10' 10'

ADDITIONAL BOTTOM REINFORCEMENT DETAIL PLAN


1 2 3
40'
19'-3" 19'-3"

#4@8"c/c
17'

B B

21" THICK
20'-9"

RAFT
A A
60'
STR-07

#4@8"c/c

B B
20'-9"

BOTTOM REINFORCEMENT DETAIL PLAN


1 2 3
40'
19'-3" 19'-3"

40'
#6@5"c/c
18'-9"
17'

B B

40'
#6@5"c/c
18'-9"
20'-9"

A A
60'

#6@10"c/c
59'-6"
STR-08

21" THICK
B RAFT B
22'-6"
20'-9"

#6@5"c/c

40'

TOP REINFORCEMENT DETAIL PLAN


1'-6" 1'-6" 1'-6"

RCC RCC RCC


COLUMN COLUMN COLUMN

TOP BARS TOP BARS


#6@10"c/c #6@10"c/c
#6@5"c/c #6@5"c/c
F.F.L F.F.L
3"

3"
2'-3"

1'-9"

1'-9"
21" th. RAFT 21" th. RAFT

2'-3"
3"
3"

3" th. P.C.C (1:4:8)

#4@8"c/c 10'x10' ADDITIONAL BOTTOM BARS #6@4"c/c BW #4@8"c/c


SECTION AT A-A #4@8"c/c #4@8"c/c
BOTTOM BARS BOTTOM BARS
1'-6" 1'-6" 1'-6"

RCC RCC RCC


COLUMN COLUMN COLUMN

TOP BARS TOP BARS


#6@5"c/c #6@5"c/c
#6@5"c/c #6@5"c/c
F.F.L F.F.L
3"

3"
2'-3"

1'-9"

1'-9"
21" th. RAFT 21" th. RAFT

2'-3"
3"
3"

3" th. P.C.C (1:4:8)

#4@8"c/c 10'x10' ADDITIONAL BOTTOM BARS #6@4"c/c BW #4@8"c/c


SECTION AT B-B #4@8"c/c #4@8"c/c
BOTTOM BARS BOTTOM BARS

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-09 ENGINEERZ E.mail: gsk.engineerz@gmail.com
GROUND FLOOR

+0'-0" From
9" TH. WALL
Road Level

#4@6"c/c (V) #4@9"c/c (V) 9"


2-#6

Architect

6"
LANDING SLAB

As Per
#4@9"c/c (H) #4@12"c/c (H)

15"
9"
#3@6"c/c

3-#6

LANDING BEAM LB-1


DETAIL FOR STAIRS
OUT SIDE IN SIDE

9" WIDE
WATER
STOPER P.C.C (1:4:8) TYPICAL REINFORCEMENT DETAIL OF STAIR CASE

BASEMEVTFLOOR
3" 3"
2'-3"

1'-9"

P.C.C (1:4:8)

R.C.C SHEAR WALL DETAIL

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-10 ENGINEERZ E.mail: gsk.engineerz@gmail.com
4'
6" 3' 6"

6"
#3@6"c/c #3@6"c/c #3@6"c/c
#3@6"c/c

4'

3'
12-#8 12-#8 8-#8
1'-6"

1'-6"

1'-6"

1'-3"
8-#6
4-#6 4-#6 4-#6

6"
1'-3"
1'-6" 1'-6" 1'-6"
PLAN OF SUMP PIT

#3@6"c/c #3@6"c/c #3@6"c/c


#3@6"c/c
4'
6" 3' 6"
8-#8 8-#8 4-#8
1'-6"

1'-6"

1'-6"

1'-3"
8-#6 B.F.F.L
4-#6 4-#6 4-#6

1'-3"
RAFT RAFT
1'-6" 1'-6" 1'-6"

#4@6"c/c
#3@6"c/c #3@6"c/c #3@6"c/c #3@6"c/c
#4@10"c/c

1'
#6@6"c/c
12-#8 12-#8 12-#8 8-#8
2'

2'

2'

2'
4-#6 4-#6 4-#6 4-#6

1'-6"
#6@6"c/c

3"
1' 1' 1' 1'

TYPICAL SECTION OF SUMP PIT

SUMP PIT DETAIL

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-11 ENGINEERZ E.mail: gsk.engineerz@gmail.com
6" 6"
9" 11'-6" 9"
#4@6"c/c BW
#4@6"c/c #4@6"c/c

IN LET
6" TH. SLAB OUT LET

2'
F.L FREE BOARD F.L

RAFT RAFT

5'

#4@6"c/c V #4@6"c/c V

HAUNCH #4@12"c/c H #4@12"c/c H


9"X9" #6@6"c/c BW 8" WATER
STOPPER
21" TH. RAFT #6@8"c/c BW
1'-9"
4"

P.C.C (1:4:8)

TYPICAL SECTION OF U.G.W.TANK


REINFORCEMENT DETAIL (SIZE 11'-6"x6'-6")

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-12 ENGINEERZ E.mail: gsk.engineerz@gmail.com
1 2 3
40'
19'-3" 19'-3"

A GF-B1 GF-B1 GF-B1

GF-B1
GF-B2
17'

GF-B1 GF-B1
B
GF-B1

GF-B1
GF-B2
20'-9"
60'

GF-B1 GF-B1
C
STR-13

GF-B1

GF-B1
GF-B2
20'-9"

GF-B1 GF-B1
D

BASEMENT FLOOR
BEAMS KEY PLAN

NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

#4@5"c/c #4@5"c/c
17'

#4@6"c/c
#4@6"c/c

#4@5"c/c #4@5"c/c
20'-9"
60'

#4@5"c/c
#4@5"c/c

C
STR-14

#4@5"c/c #4@5"c/c
20'-9"

#4@5"c/c
#4@5"c/c

BASEMENT FLOOR PLAN


SLAB REINFORCEMENT DETAIL
BOTTOM BARS

NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

A
#4@5"c/c #4@5"c/c

4'

4'
#4@5"c/c #4@5"c/c #4@5"c/c
17'

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c
5'-3"

5'-3"
B
6'

6'
#4@5"c/c #4@5"c/c #4@5"c/c
20'-9"

4'-6" 6' 6' 4'-6"


60'

6'

6'

C
STR-15

#4@5"c/c #4@5"c/c
6'

6'

#4@5"c/c #4@5"c/c #4@5"c/c


20'-9"

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c
5'

5'

BASEMENT FLOOR PLAN


TOP BARS
SLAB REINFORCEMENT DETAIL

NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.
1 2 3
40'
19'-3" 19'-3"

B1

B1
B2
A
GF-B1 GF-B1
GF-B1

GF-B1
GF-B2
17'

GF-B1 GF-B1
B
GF-B1

GF-B1
GF-B3

GF-B2
20'-9"
60'
STR-16

C
GF-B1 GF-B1
GF-B1

GF-B1
GF-B2
20'-9"

GF-B1 GF-B1
D
B1

B1
B2

GROUND FLOOR NOTE:


BEAMS KEY PLAN *ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

#4@5"c/c #4@5"c/c
17'

#4@6"c/c
#4@6"c/c

#4@7"c/c #4@5"c/c
20'-9"
60'

#4@5"c/c
#4@6"c/c
STR-17

#4@5"c/c #4@5"c/c
20'-9"

#4@5"c/c
#4@5"c/c

BOTTOM BARS

GROUND FLOOR PLAN NOTE:


SLAB REINFORCEMENT DETAIL *ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

3'

3'
A
#4@5"c/c #4@5"c/c

4'

4'
#4@5"c/c #4@5"c/c #4@5"c/c
17'

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c
5'-3"

5'-3"
B
6'

6'
#4@5"c/c #4@5"c/c #4@5"c/c
20'-9"

3' 3' 6' 4'-6"


60'

6'

6'

C
STR-18

#4@5"c/c #4@5"c/c
6'

6'

#4@5"c/c #4@5"c/c #4@5"c/c


20'-9"

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c
5'

5'

D
3'

3'

GROUND FLOOR PLAN


SLAB REINFORCEMENT DETAIL TOP BARS

NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.
1 2 3
40'
19'-3" 19'-3"

B1

B1
B2
A
GF-B1 GF-B1 GF-B1

GF-B1
GF-B2
17'

GF-B1 GF-B1
B

CB-1
GF-B1

GF-B3

GF-B2
20'-9"

GF-B1
CB-1
60'

CB-1

C
STR-19

GF-B1 GF-B1
GF-B1

GF-B1
GF-B2
20'-9"

GF-B1 GF-B1
D
B1

B1
B2

FIRST FLOOR
BEAMS KEY PLAN
NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

#4@5"c/c #4@5"c/c
17'

#4@6"c/c
#4@6"c/c

B
#4@5"c/c

#4@7"c/c #4@5"c/c
20'-9"

#4@5"c/c
60'

#4@6"c/c

#4@5"c/c

C
STR-20

#4@5"c/c #4@5"c/c
20'-9"

#4@5"c/c
#4@5"c/c

FIRST FLOOR PLAN


BOTTOM BARS
SLAB REINFORCEMENT DETAIL
NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

3'

3'
A
#4@5"c/c #4@5"c/c

4'

4'
#4@5"c/c #4@5"c/c #4@5"c/c
17'

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c

5'-3"

5'-3"
B
#4@5"c/c
6'

6'
4'-6"

#4@5"c/c #4@5"c/c
20'-9"

3' 3' 6'


60'

#4@5"c/c
6'

6'

4'-6"

#4@5"c/c #4@5"c/c
6'

6'
STR-21

#4@5"c/c #4@5"c/c #4@5"c/c


20'-9"

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c
5'

5'

D
3'

3'

FIRST FLOOR PLAN


SLAB REINFORCEMENT DETAIL
TOP BARS

NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.
1 2 3
40'
19'-3" 19'-3"

B1

B1
B2
A
GF-B1 GF-B1
GF-B1

GF-B1
GF-B2
17'

GF-B1 GF-B1
B

CB-1
GF-B1

GF-B3

GF-B2
20'-9"

GF-B1
CB-1
60'

CB-1

C
STR-22

GF-B1 GF-B1
GF-B1

GF-B1
GF-B2
20'-9"

GF-B1 GF-B1
D
B1

B1
B2

SECOND FLOOR
BEAMS KEY PLAN
NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

#4@5"c/c #4@5"c/c
17'

#4@6"c/c
#4@6"c/c

B
#4@5"c/c

#4@7"c/c #4@5"c/c
20'-9"

#4@5"c/c
60'

#4@6"c/c

#4@5"c/c

C
STR-23

#4@5"c/c #4@5"c/c
20'-9"

#4@5"c/c
#4@5"c/c

SECOND FLOOR PLAN


BOTTOM BARS
SLAB REINFORCEMENT DETAIL
NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
1 2 3
40'
19'-3" 19'-3"

3'

3'
A
#4@5"c/c #4@5"c/c

4'

4'
#4@5"c/c #4@5"c/c #4@5"c/c
17'

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c

5'-3"

5'-3"
B
#4@5"c/c
6'

6'
4'-6"

#4@5"c/c #4@5"c/c
20'-9"

3' 3' 6'


60'

#4@5"c/c
6'

6'

4'-6"

#4@5"c/c #4@5"c/c
6'

6'
STR-24

#4@5"c/c #4@5"c/c #4@5"c/c


20'-9"

4'-6" 6' 6' 4'-6"

#4@5"c/c #4@5"c/c
5'

5'

D
3'

3'

SECOND FLOOR PLAN


SLAB REINFORCEMENT DETAIL
TOP BARS

NOTE:
*ALL SLABS ARE 6" THICK EXCEPT MENTIONED.
*STAIRS & PODIUMS WILL BE CONSTRUCTED ACCORDINGLY.
*SPACING OF DISTRIBUTION BARS FOR NEGATIVE REINFORCEMENT MUST BE KEPT AS #3@12"c/c.
L
L/3 L/3 L/3 1'-3" 1'-3"
7-#6 3-#6 4-#6 3-#6 7-#6 7-#6 3-#6 4-#6
7-#6
(EXTRA) (EXTRA) (EXTRA)
6"

6"

6"
1'-9"

1'-9"
#3@5"c/c #3@5"c/c #3@5"c/c
1'-3"

1'-3"

1'-3"
5-#6 1 2 5-#6 1 5-#6 5-#6 1 5-#6 7-#6
2-#6(EXTRA)

3/4*L

L
L/3 L/3 L/3 1' 1'
7-#6 3-#6 4-#6 3-#6 7-#6 7-#6 3-#6 4-#6
7-#6
(EXTRA) (EXTRA) (EXTRA)
6"

6"

6"
1'-9"

1'-9"
#3@5"c/c #3@5"c/c #3@5"c/c
1'-3"

1'-3"

1'-3"
5-#6 3 4 5-#6 3 5-#6 5-#6 3 5-#6 7-#6
2-#6(EXTRA)

3/4*L

L
L/3 L/3 L/3 1' 1'
5-#6 2-#6 3-#6 2-#6 5-#6 5-#6 2-#6
5-#6 3-#6
(EXTRA) (EXTRA) (EXTRA)
6"

6"

6"
1'-6"

1'-6"
#3@6"c/c #3@6"c/c #3@6"c/c
1'

1'

1'
3-#6 5 6 3-#6 5 3-#6 3-#6 5 3-#6 5-#6
2-#6(EXTRA)

3/4*L

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-25 ENGINEERZ E.mail: gsk.engineerz@gmail.com
TYPICAL LINTEL BEAM DETAILS
6" 2'-6" 6" 1' 6' 1'

2'-6" OPENING 6'-0" OPENING

9" 3'-6" 9" 1'-3" 8' 1'-3"

3'-6" OPENING 8'-0" OPENING

6" 3' 6" 1'-6" 10' 1'-6"

3'-0" OPENING 10'-0" OPENING

1' 4' 1' 1'-6" 12' 1'-6"

4'-0" OPENING 12'-0" OPENING

9"
1
4"
2 9" 9" 4-#4
2-#4 3-#4 4-#4

9"
#3@9"c/c
6"

6"

6"

#3@9"c/c #3@9"c/c #3@6"c/c

2-#4 3-#4 4-#4 4-#6

ON DOORS UP TO ON WINDOWS FROM ON WINDOWS FROM


4'-0" TO 6'-0" OPENING 5'-0" OPENING 4'-0" TO 8'-0" OPENING 9'-0" TO 12'-0" OPENING

PLANNING - TESTING - DESIGNING & DEVELOPMENT


STR Z.A GSK-CB-19 SEPTEMBER, 2020 FLAT NO.205 & 206 2nd Floor, Afzal Tower Phase 3,
PROPOSED DESIGN OF COMMERCIAL BUILDING Main Intersection, Peshawar
FOR ADIL BHAI AT B-17 ISLAMABAD Ph: +92-333-912-6118, +92-334-843-5340
ISLAMABAD T.Z.R N.T.S STR-26 ENGINEERZ E.mail: gsk.engineerz@gmail.com