SAUDI ARAMCO ID/PIEU -3- July-2018 - REV. 2018.04.00 (Standards Cutoff -April 30, 2018) Rev. 2017.12.

00 31-Dec-17
SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER REPORT DATE

WELDER REPAIR ASSESSMENT and TRACER WELD REPORT-WEEKLY SATR-W-2018 22-Jan-18 WELD
PROJECT TITLE WBS/BI/JO NUMBER CONTRACTOR/SUBCONTRACTOR LOCATION

SAUDI ARAMCO USE ONLY


SATIP ACTIVITY NUMBER CONTRACTOR INSP LEVEL SUBCONTRACTOR INSP LEVEL ARAMCO INSP LEVEL MH's SPENT TRAVEL TIME
SATIP NUMBER

WELDER's NAME WELDER's SYMBOL QUALIFICATIONS

REPAIR WELD RESULTS


WELD PROCESS

R1 R2 R1 R2
REJECTED

NUMBER
NUMBER

NUMBER
WELDED
TRACER

CUT OUT
WELD

WELD

DATE
ITEM

LINE DRAWING INITIAL


WPS

NUMBER NUMBER WELD DEFECTS

NUMBER
REPORT
RESULT

RESULT
NDT NDT NDT NDT REMSRKS

NDT
REPORT REPORT RESULT REPORT RESULT REPORT
NUMBER NUMBER NUMBER NUMBER

1 P1

P2

2 P1

P2

3 P1

P2

4 P1

P2

5 P1

P2

6 P1

P2

7 P1

P2

8 P1

P2

9 P1

P2

10 P1

P2

CONSTRUCTION REPRESENTATIVE NAME SIGN DATE

QC INSPECTOR or SUPERVISOR NAME SIGN DATE

MAIN CONTRACTOR or LSTK CONTRACTOR NAME SIGN DATE

Saudi Aramco: Company General Use


PID REPRESENTATIVE-REVIEWED BY NAME SIGN DATE

Saudi Aramco: Company General Use