The request for information document includes a request to review structural drawings for columns and cores 1, 2, and 3 in the second podium of the Al mazraa tower project. The contractor asks if changes can be made to the structural or architectural drawings based on work already completed on site. The consultant is asked to provide comments on the request by a specified date.
The request for information document includes a request to review structural drawings for columns and cores 1, 2, and 3 in the second podium of the Al mazraa tower project. The contractor asks if changes can be made to the structural or architectural drawings based on work already completed on site. The consultant is asked to provide comments on the request by a specified date.
The request for information document includes a request to review structural drawings for columns and cores 1, 2, and 3 in the second podium of the Al mazraa tower project. The contractor asks if changes can be made to the structural or architectural drawings based on work already completed on site. The consultant is asked to provide comments on the request by a specified date.
Category: Architectural Structural Mechanical Electrical ELV Others
Drawing Reference : Location :
Subject : Reviewing the structural drawings with the architecture
Description: Acording to the last meeting on 23/11/2019 please find attached drawings for what we done in the site for column and core 1,2,3 in secand podioum please tell us if we can change in structural drawings or atchitectural drawings ,
Contractor issue: Nagy farag ON : 21/ 05/ 2020 at : SIGN