Q 7 (I) Given Data
Q 7 (I) Given Data
Q 7 (I) Given Data
Given Data:
Design Sanity Sewer
Population = 7000 Persons
WC = 400 Lpcd
Solution:
400
WC = 7000 x
1000
= 2800 m3/d
= 0.032 m3/s
Avg Sewer Flow = 0.8 x 0.032
= 0.026 m3/s
Peak Factor
14
M=1+
4+ √ 7
= 3.1067
Peak Sewer Flow = 3.1 x 0.026 = 0.0807 m3/s
π d2
83.3 x 10−3 = (0.6)
4
d = 420 mm
Commercial available pipe = 460 mm
Calculation of slope
2 1
1
V = R3 S 2
n
1 d 23 12
0.6 = x( ) ˑː d = 0.46
0.013 4 S
S = 1.087 x 10−3
1
S = 1m in 919.19 m ˑː
S
1m
919.19 m
Q 7 (iii)
Given Data:
Max. Discharge = 650 L/r = peak sewer flow
n = 0.013
Gradient = 0.0001
Solution:
1 d 23 12
V= x( )
n 4 S
1 d 23 1
0.7 = x ( ) (0.0001 ¿ ¿ 2
0.013 4
d = 3472 mm
Available dia. = 3500 mm