This document provides a bill of quantities for a concrete work project including a retaining wall with a triangular and rectangular part, and a pad with flange and web sections. It lists 3 items, providing the size, quantity, and description of concrete needed for a retaining wall totaling 37 meters long with triangular and rectangular wall sections and a pad requiring 86.843 cubic meters of concrete in total.
This document provides a bill of quantities for a concrete work project including a retaining wall with a triangular and rectangular part, and a pad with flange and web sections. It lists 3 items, providing the size, quantity, and description of concrete needed for a retaining wall totaling 37 meters long with triangular and rectangular wall sections and a pad requiring 86.843 cubic meters of concrete in total.
This document provides a bill of quantities for a concrete work project including a retaining wall with a triangular and rectangular part, and a pad with flange and web sections. It lists 3 items, providing the size, quantity, and description of concrete needed for a retaining wall totaling 37 meters long with triangular and rectangular wall sections and a pad requiring 86.843 cubic meters of concrete in total.
(L*W*H) (m3) (m) 1 1) Retaining wall 37 a) Wall 0.055 I. Triangular part 3.5 7.123 1 37 0.3 II. Rectangular part 3.5 38.85 1 37 b) Pad 2.01 I. flange 0.45 33.47 1 37 0.4 II. Web 0.5 7.4