SUMMARY OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Amount (NRs)
A General Item 21,867,400.08
B Site Clearance and Earthworks 545,897,060.82
C Structural Works 768,534,118.05
D Cross Drainage Works 53,640,636.53
E Pavement Works 392,399,538.00
F Drain Works 132,148,480.49
G Miscellenous Works 173,616,829.56
Base Cost (A+B+C+D+E+F+G) 2,088,104,063.53
VAT @13% of Base Cost 271,453,528.25
Contingency @ 5% of Base Cost 104,405,203.17
Total Cost including VAT & Contingency 2,463,962,794.95
Price adjustment Contingency @ 10% of Base Cost 208,810,406.35
Physical Contingency @ 10% of Base cost 208,810,406.35
Grand Total Cost 2,881,583,607.65
Cost Per Km of the road inclusive of VAT and contingency at Base Cost 88,631,755.21

Prepared by: Checked by: Approved by


2 of 323

Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
SUMMARY OF COST

Remarks
1.05%
26.14%
36.81%
2.57%
18.79%
6.33%
8.31%
100%(I)
II=13% of I
III=5% 0f I
IV=I+II+III
V
VI
VII=IV+V+VI
VIII=IV/27.8 km

Prepared by: Checked by: Approved by


3 of 323
Government of ……….. -n=;=_ -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs) Amount (NRs)
A General Item
Insurance for the loss of damage to works, plant, material,
A.1 equipment, property and personnel injury or death and third Job 1.00 9,000,000.00 9,000,000.00
party as per condition of contract.
Establishing engineers site office including three rooms,
A.2 bathroom, toilet and kitchen facilities, furnitures and well month 36.00 20,000.00 720,000.00
furnished as per details provided in bid document.

Relocation of services and repairing for existing


A.3 infrastructure (houses, water supply pipes,kulos,Temple, PS 1.00 2,000,000.00 2,000,000.00
Foot staircase, Foot trail etc) as instructed by engineer.

Supplying and erecting 1.2m.x 0.75m. size project sign


board in place including 50mm dia. Steel tube, 2mm. thick
A.4 steel plate, cement concrete, painting, writing and No 2.00 9,652.04 19,304.08
supporting steel angle nut and bolit etc. all complete

Carry out maintenance of the existing road/construction


A.5 and traffic diversion to keep the road serviceable:as per 0
specification (SS/SP-100) and instruction of engineer
0 A) During construction Km-mnth 1000.80 8,280.00 8,286,624.00
B) During Defect liability period Km-mnth 333.60 5,520.00 1,841,472.00
Sub - Total (A) 21,867,400.08
B Site Clearance and Earthworks
Clearing of grass, trees, removing roots, breaking sods,
B.1 levelling the surface and safe disposal all complete .(SS/SP Sqm 333600.00 13.08 4,363,488.00
200)

Dismantling Bridge, culvert and other structures including


B.2 stockpiling the reusable materials and diposal of usable
materials within 50 m lead all complete.(SS/SP-202)

(a) Plain cement concrete, 1:3:6 or richer mix Cum 10.00 1,353.58 13,535.80
(b) Reinforced cement concrete work Cum 5.00 1,893.72 9,468.60
(c) Random rubble masonry in cement mortar Cum 35.00 1,371.05 47,986.75
(d)Dismantling of RCC pipes (excluding excavation and
rm 50.00 464.03 23,201.50
refilling). upto 600 mm dia.

Roadway excavation in all type of soils including Rock and


B.3 Cum 5823363.00 90.38 526,315,547.94
safe disposal of materials all complete. (SS/SP - 905)

Formation of embankment including excavation,


B.4 transportation, filling, compaction in layers and watering all Cum 125749.00 120.27 15,123,832.23
complete. (SS/SP - 900)
Sub - Total (B) 545,897,060.82
C Structural Works 0 0.00
Excavation for foundation in all types of soil including rock in
C.1 all conditions including dewatering, relevant lift and safe Cum 273146.98 147.65 40,330,151.59
disposal all complete. (SS/SP-900)
Assembling machine made Gabion boxes/mattresses,
palcing in position including stretching, forming
compartments; tying with bracing wires and tie wires; tying
C.2 down the lid complete; and providing and filling stone / Cum 91460.00 5,122.31 468,486,472.60
boulder in gabion boxes / mattresses etc. including
dressing, beding, bonding and all transporation as per
specification..(SP 2400)

Providing , laying and fixing of geotextile (filter fabrics) all


C.3 Sqm 48833.78 186.02 9,084,059.75
complete. (SS/SP-2400)
Providing and laying Random rubble stone masonry in
cement mortar MM5 including scaffolding, curing, including
C.4 weepholes 100mm dia HDPpipe for weep holes, Cum 22529.14 9,717.35 218,923,538.57
preparation of mortar ,finishing etc. all complete (SS/SP-
2600)
Providing and Placing machine mixed cement concrete
C.5 M10/40 including compaction, curing, testing all complete. Cum 656.87 9,202.05 6,044,550.58
(SS/SP-2000)

Carry out backfilling works behind the structures with


C.6 approved suitable excavated common material spreading in Cum 7502.08 648.15 4,862,473.15
layers, watering and compaction all complete.(SS/SP-900.)

Prepared by: Checked by: Approved by


4 of 323
Government of ……….. -n=;=_ -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs) Amount (NRs)
Carry out backfilling works behind the structures with
C.7 approved suitable filler material spreading in layers, Cum 11011.18 1,889.25 20,802,871.81
watering and compaction all complete (SS/SP-900)
Sub - Total (C) 768,534,118.05
D Cross Drainage Works 0 0.00
Excavation for foundation in all types of soil including rock in
D.1 all conditions including dewatering, relevant lift and safe Cum 6211.43 147.65 917,117.63
disposal all complete. (SS/SP-900)
Providing, laying and levelling of dry stone soling works in
D.2 Cum 9.00 3,034.83 27,313.47
the foundation all complete (SS/SP-2600).
Providing and Placing machine mixed cement concrete
D.3 M15/40 including compaction, curing, testing all complete. Cum 993.55 9,990.50 9,926,061.27
(SS/SP-2000)
Providing and laying Random rubble stone masonry in
cement mortar [ cement(1) : sand(4)] including scaffolding,
D.5 Cum 2086.88 9,717.35 20,278,943.36
curing, preparation of mortar,finishing etc.all complete.
(SS/SP-2600)
Providing and laying reinforcement including cutting,
D.6 bending,binding,fixing in position etc.all complete. (SS/SP- Kg 1716.30 122.91 210,950.43
2600)
Providing , Preparing and Installing form work including
necessary supports and removing after completion for
D.7 Sqm 553.90 525.84 291,262.77
foundation and footings (a) using timber ( soft wood) - Class
F1 finish.
Proving and laying RCC pipes with or without collars jointed
with stiff mixture of cement mortar in the proportion of 1 : 2 (
D.8 Rm
1 cement : 2 fine sand ) including transportation all
complete.(SS/SP 700)
a 60 cm Rm 62.50 9,457.15 591,071.87
b 90 cm Rm 962.50 14,956.50 14,395,631.25
Carry out backfilling works behind the structures with
D.9 common excavated material spreading in layers, watering Cum 2495.05 648.15 1,617,166.65
and compaction all complete.(SS/SP-900.)
Carry out backfilling works behind the structures with
D.10 approved suitable filler material spreading in layers, Cum 449.55 1,889.25 849,312.33
watering and compaction all complete.(SS/SP-900.)
Assembling machine made Gabion boxes/mattresses,
palcing in position including stretching, forming
compartments; tying with bracing wires and tie wires; tying
D.11 down the lid complete; and providing and filling stone / Cum 885.50 5,122.31 4,535,805.50
boulder in gabion boxes / mattresses etc. including
dressing, beding, bonding and all transporation as per
specification.(SP 2400)
Sub - Total (D) 53,640,636.53
E Pavement Works
Preparation of subgrade by grading, watering & compaction
E.1 for upgrading of the road as directed by the engineer all Sq.m 249644.00 30.05 7,501,802
complete. ( SS/SP 1003)
Providing ,laying, spreading , watering, levelling, and
compaction of natural sand gravel subbase work ( grading
E.2 Cum 68114.82 1,647.00 112,185,109
as per table 12.1 of Specs ) as directed by the Engineer all
complete (SS/SP 1201) .
Providing, laying spreading, watering leveling and
compaction of wet mixed crushed stone base course
E.3 material grading as per standard specification including Cum 46788.82 2,865.65 134,080,382
transportation from the source as directed by the Engineer.-
(SS/SP -1202)
Providing and spraying bituminious Prime coat
MC30/MC70 including cleaning the road surface using
E.4 lit 233256.60 187.39 43,709,954
wire,brushes, broom etc. -(Applicationn rate 1ltr/sqm) (SS-
1301,1302).
Supply, Spread and compact 20mm (First coat) and
10mm(Second coat) nominal size chips for double
bituminous surface dressing (DBSD) as per specified
E.5 Ton 8606.46 1,580.36 13,601,305
spreading rates for each layer of surface dressing to meet
all the requirements of special specification all complete.
(SS/SP 1300)

Prepared by: Checked by: Approved by


5 of 323
Government of ……….. -n=;=_ -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs) Amount (NRs)
Supply, load and spray Bitumen grade 80/100 binder for
E.6 lit 441909.61 171.18 75,646,087
surface dressing all complete (SS/SP 1301, 1303)
Providing of cutter (Kerosene)for cutting back all complete
E.7 lit 46808.59 104.27 4,880,732
(1301, 1303)
Provide and apply anti striping agent in the road section as
E.8 Kg 2443.59 325.00 794,167
instructed by site Engineer.
Sub - Total (E) 392,399,538.00
F Drain Works
Earthwork in excavation in all type of soil including rock for
F.1 Cum. 25404.76 123.49 3,137,233.81
drain work and sub-surface drain work
Providing and placing Plum concrete with 60% M 15/40
F.2 concrete and 40% boulders/stones as per specification all Cum. 11650.20 8,154.67 95,003,536.43
complete. (SS/SP-2600)
Providing, laying and levelling of dry stone soling works in
F.3 Cum 8445.60 3,034.83 25,630,960.25
the foundation all complete (SS/SP-2600).
Supplying and place Precast R.C.C. (M20/20) side drain
F.4 cover slab for Drain of size(1.2m*0.5m*0.125m) (SS/SP- Nos. 5000.00 1,675.35 8,376,750.00
2000)
Sub - Total (F) 132,148,480.49
G Miscellenous Works

Providing and erecting "W" metal beam crash barrier


comprising of 3 mm thick corrugated sheet metal beam
crash barrier comprising of 3 mm thick corrugated sheet
metal beam rail, 70 cm above road/ground level fixed on
ISMC Series channel vertical post, 150*75*5 mm spaced 2
G.1 rm 7500.00 8,701.48 65,261,100.00
m c/c, 1.8 m high, 1.1 m below ground/road level, all sheet
paetsand fitment to the galvanized by hot dip process, all
fittings to confirm to IS 1367 and IS 1364, metal beam rail to
be fixed on the vertical post with a spacer of channel
section 150*75*5mm, 330 mm long, all complete (IRC- 7.08)

Supplying and applying Thermoplastic Paint for Road


G.2 marking including cleaning,watering,brooming etc. all sqm 18765.00 1,317.74 24,727,391.10
complete(BS 3262)
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all complete
G.3 Nos. 23.00 2,537.96 58,373.08
as per specification a) Standard KM post
placed at each kilometer. [1503 ]
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all complete
G.4 Nos. 6.00 5,768.93 34,613.58
as per specification b) Bigger kilometer post (placed at
each 5 km.) [1503 ]
G.5 Provision for land acquisition LS 1.00 35,000,000.00 35,000,000.00
G.6 Provision for IEA / IEE impact mitigation measures LS 1.00 35,000,000.00 35,000,000.00
Supplying and fixing in place R.C.C. delineator and guard
G.7 post including excavation, back filling, painting and erection nos. 8340.00 1112.17 9,275,497.80
etc. all complete as per drawing.

Supplying and erecting traffic sign in place including 50mm


dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.8 painting, writing and supporting steel angle nut and bolit etc. Nos. 1000.00 3294.65 3,294,650.00
completea)60 cm dia circular,60cm.equilateral triangle and
60cm x 45cm rectangular shaped sign(single post)

Prepared by: Checked by: Approved by


6 of 323
Government of ……….. -n=;=_ -n=;=_
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST
Name of the road:…………………………….
Chainage:0+000 to ….
S.N. Description of works Unit Quantity Rate, (NRs) Amount (NRs)

Supplying and erecting traffic sign in place including 50mm


dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.9 painting, writing and supporting steel angle nut and bolit etc. Nos. 100.00 9652.04 965,204.00
complete b) 1.2m.x 0.75m. Size bigger traffic sign with back
support and two or more post.

Sub - Total (G) 173,616,829.56


Base Cost (A+B+C+D+E+F+G) 2,088,104,063.53
VAT @13% of Base Cost 271,453,528.25
Contingency @ 5% of Base Cost 104,405,203.17
Total Cost including VAT & Contingency 2,463,962,794.95
Price adjustment Contingency @ 10% of Base Cost 208,810,406.35
Physical Contingency @ 10% of Base cost 208,810,406.35
Grand Total Cost 2,881,583,607.65
Cost Per Km of the road inclusive of VAT and contingency at Base Cost 88,631,755.21

Prepared by: Checked by: Approved by


7 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST

Remarks

Prepared by: Checked by: Approved by


8 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST

Remarks

Prepared by: Checked by: Approved by


9 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST

Remarks

Prepared by: Checked by: Approved by


10 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
0
ABSTRACT OF COST

Remarks

I
II=13% of I
III=5% 0f I
IV=I+II+III
V
VI
VII=IV+V+VI
VIII=IV/27.8 km

Prepared by: Checked by: Approved by


11 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road

DETAIL QUANTITY ESTIMATE


Name of the road:…………………………….
Chainage:0+000 to ….
Length Height
S.N. Description of works Unit No. Breadth (m) Quantity Remarks
(m) (m)
A General Item
Insurance for the loss of damage to works, plant, material,
A.1 equipment, property and personnel injury or death and third Job 1.00 1.00
party as per condition of contract.
Establishing engineers site office including three rooms,
A.2 bathroom, toilet and kitchen facilities, furnitures and well month 36.00 36.00
furnished as per details provided in bid document.
Relocation of services and repairing for existing infrastructure
A.3 (houses, water supply pipes,kulos,Temple, Foot staircase, PS 1.00 1.00
Foot trail etc) as instructed by engineer.
Supplying and erecting 1.2m.x 0.75m. size project sign board
in place including 50mm dia. Steel tube, 2mm. thick steel
A.4 plate, cement concrete, painting, writing and supporting steel No 2.00 2.00
angle nut and bolit etc. all complete

Carry out maintenance of the existing road/construction and


A.5 traffic diversion to keep the road serviceable:as per
specification (SS/SP-100) and instruction of engineer
A) During construction Km-mnth 36 x 27.8 1000.80
B) During Defect liability period Km-mnth 12 x 27.8 333.60
B Site Clearance and Earthworks
Clearing of grass, trees, removing roots, breaking sods,
B.1 levelling the surface and safe disposal all complete .(SS/SP Sqm 27800.00 12.00 333600.00
200)
Dismantling Bridge, culvert and other structures including
B.2 stockpiling the reusable materials and diposal of usable
materials within 50 m lead all complete.(SS/SP-202)
(a) Plain cement concrete, 1:3:6 or richer mix Cum 10.00
(b) Reinforced cement concrete work Cum 5.00
(c) Random rubble masonry in cement mortar Cum 35.00
(d)Dismantling of RCC pipes (excluding excavation and
rm 50.00
refilling). upto 600 mm dia.

Roadway excavation in all type of soils including Rock and


B.3 Cum Calculation refer attached sheet 5823363.00
safe disposal of materials all complete. (SS/SP - 905)
Ordinary Soil Cum 5532194.85
Hard Rock Cum 0.00
Soft Rock cum 291168.15
Formation of embankment including excavation,
B.4 transportation, filling, compaction in layers and watering all Cum 125749.00
complete. (SS/SP - 900)
C Structural Works
Excavation for foundation in all types of soil including rock in
C.1 all conditions including dewatering, relevant lift and safe Cum 273146.98
disposal all complete. (SS/SP-900)
Total 273146.98
Assembling machine made Gabion boxes/mattresses, palcing
in position including stretching, forming compartments; tying
with bracing wires and tie wires; tying down the lid complete;
C.2 and providing and filling stone / boulder in gabion boxes / Cum 91460.00
mattresses etc. including dressing, beding, bonding and all
transporation as per specification..(SP 2400)

Providing , laying and fixing of geotextile (filter fabrics) all


C.3 Sqm Calculation refer attached sheet 48833.78
complete. (SS/SP-2400)
Total 48833.78

Providing and laying Random rubble stone masonry in


cement mortar MM5 including scaffolding, curing, including
C.4 Cum
weepholes 100mm dia HDPpipe for weep holes, preparation
of mortar ,finishing etc. all complete (SS/SP-2600)

For stone masonry retaining and breast wall Calculation refer attached sheet 22529.14
Total 22529.14
Providing and Placing machine mixed cement concrete
C.5 M10/40 including compaction, curing, testing all complete. Cum Calculation refer attached sheet 656.87
(SS/SP-2000)

Prepared by: Checked by: Approved by:


12 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road

DETAIL QUANTITY ESTIMATE


Name of the road:…………………………….
Chainage:0+000 to ….
Length Height
S.N. Description of works Unit No. Breadth (m) Quantity Remarks
(m) (m)
Carry out backfilling works behind the structures with
C.6 approved suitable excavated common material spreading in Cum 7502.08
layers, watering and compaction all complete.(SS/SP-900.)

Total 7502.08
Carry out backfilling works behind the structures with
C.7 approved suitable filler material spreading in layers, watering Cum 11011.18
and compaction all complete (SS/SP-900)
Total 11011.18
D Cross Drainage Works
Excavation for foundation in all types of soil including rock in
D.1 all conditions including dewatering, relevant lift and safe Cum
disposal all complete. (SS/SP-900)
Pipe culvert (90 cm) 77 77.27 5949.79
Slab culvert 3m 2 130.82 261.64
Total 6211.43
Providing, laying and levelling of dry stone soling works in
D.2 Cum
the foundation all complete (SS/SP-2600).
Slab culvert 3m 2 4.50 9.00
Total 9.00
Providing and Placing machine mixed cement concrete
D.3 M15/40 including compaction, curing, testing all complete. Cum
(SS/SP-2000)
Pipe culvert (90 cm) 77 11.93 918.61
Slab culvert 3m 2 37.47 74.94
Total 993.55
Providing and laying Random rubble stone masonry in
D.5 cement mortar [ cement(1) : sand(4)] including scaffolding, Cum
curing, preparation of mortar,finishing etc.all complete.
(SS/SP-2600)
Pipe culvert (90 cm) 77 24.28 1869.56
Slab culvert 3m 2 108.66 217.32
Total 2086.88
Providing and laying reinforcement including cutting,
D.6 bending,binding,fixing in position etc.all complete. (SS/SP- Kg
2600)
Slab culvert 3m 2 858.15 1716.30
Total 1716.30
Providing , Preparing and Installing form work including
necessary supports and removing after completion for
D.7 Sqm
foundation and footings (a) using timber ( soft wood) - Class
F1 finish.
Pipe culvert (90 cm) 77 5.06 389.62
Slab culvert 3m 2 82.14 164.28
Total 553.90
Proving and laying RCC pipes with or without collars jointed
with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1
D.8 Rm
cement : 2 fine sand ) including transportation all complete.
(SS/SP 700)
Pipe culvert (90 cm) 77 12.50 962.50
Pipe culvert (60 cm) 5 12.50 62.50
Total 1025.00
Carry out backfilling works behind the structures with
D.9 common excavated material spreading in layers, watering Cum
and compaction all complete.(SS/SP-900.)
Pipe culvert (90 cm) 77 31.49 2424.73
Slab culvert 3m 2 35.16 70.32
Total 2495.05
Carry out backfilling works behind the structures with
D.10 approved suitable filler material spreading in layers, watering Cum
and compaction all complete.(SS/SP-900.)
Pipe culvert (90 cm) 77 5.55 427.35
Slab culvert 3m 2 11.10 22.20
Total 449.55

Prepared by: Checked by: Approved by:


13 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road

DETAIL QUANTITY ESTIMATE


Name of the road:…………………………….
Chainage:0+000 to ….
Length Height
S.N. Description of works Unit No. Breadth (m) Quantity Remarks
(m) (m)
Assembling machine made Gabion boxes/mattresses, palcing
in position including stretching, forming compartments; tying
with bracing wires and tie wires; tying down the lid complete;
D.11 and providing and filling stone / boulder in gabion boxes / Cum
mattresses etc. including dressing, beding, bonding and all
transporation as per specification.(SP 2400)

Pipe culvert (90 cm) 77 11.50 885.50


Total 885.50
E Pavement Works
Preparation of subgrade by grading, watering & compaction
E.1 for upgrading of the road as directed by the engineer all Sq.m 27800.00 8.98 249644.00
complete. ( SS/SP 1003)
Providing ,laying, spreading , watering, levelling, and
compaction of natural sand gravel subbase work ( grading as
E.2 Cum Calculation refer to attached sheet 68114.82
per table 12.1 of Specs ) as directed by the Engineer all
complete (SS/SP 1201) .

Providing, laying spreading, watering leveling and compaction


of wet mixed crushed stone base course material grading as
E.3 Cum Calculation refer to attached sheet 46788.82
per standard specification including transportation from the
source as directed by the Engineer.-(SS/SP -1202)

Providing and spraying bituminious Prime coat MC30/MC70


E.4 including cleaning the road surface using wire,brushes, lit Calculation refer to attached sheet 233256.60
broom etc. -(Applicationn rate 1ltr/sqm) (SS-1301,1302).

Supply, Spread and compact 20mm (First coat) and


10mm(Second coat) nominal size chips for double bituminous
E.5 surface dressing (DBSD) as per specified spreading rates for Ton Calculation refer to attached sheet 8606.46
each layer of surface dressing to meet all the requirements of
special specification all complete.(SS/SP 1300)

Supply, load and spray Bitumen grade 80/100 binder for


E.6 lit Calculation refer to attached sheet 441909.61
surface dressing all complete (SS/SP 1301, 1303)
Providing of cutter (Kerosene)for cutting back all complete
E.7 lit Calculation refer to attached sheet 46808.59
(1301, 1303)
Provide and apply anti striping agent in the road section as
E.8 Kg Calculation refer to attached sheet 2443.59
instructed by site Engineer.
F Drain Works
Earthwork in excavation in all type of soil including rock for
F.1 Cum. Calculation refer to attached sheet 25404.76
drain work and sub-surface drain work
Providing and placing Plum concrete with 60% M 15/40
F.2 concrete and 40% boulders/stones as per specification all Cum. Refer to attached Calculation Sheet 11650.20
complete. (SS/SP-2600)

Providing, laying and levelling of dry stone soling works in


F.3 Cum Refer to attached Calculation Sheet 8445.60
the foundation all complete (SS/SP-2600).
Supplying and place Precast R.C.C. (M20/20) side drain
F.4 cover slab for Drain of size(1.2m*0.5m*0.125m) (SS/SP- Nos. 5000.00
2000)
G Miscellenous Works

Providing and erecting "W" metal beam crash barrier


comprising of 3 mm thick corrugated sheet metal beam crash
barrier comprising of 3 mm thick corrugated sheet metal
G.1 beam rail, 70 cm above road/ground level fixed on ISMC rm For curve section of road 7500.00
Series channel vertical post, 150*75*5 mm spaced 2 m c/c,
1.8 m high, 1.1 m below ground/road level, all sheet paetsand
fitment to the galvanized by hot dip process, all fittings to
confirm to IS 1367 and IS 1364, metal beam rail to be fixed on
the vertical post with a spacer of channel section
150*75*5mm, 330 mm long, all complete (IRC- 7.08)
Supplying and applying Thermoplastic Paint for Road
G.2 marking including cleaning,watering,brooming etc. all Sqm 18765.00
complete(BS 3262)
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all complete
G.3 Nos. 23 ` 23.00
as per specification
a) Standard KM post placed at each kilometer. [1503 ]

Prepared by: Checked by: Approved by:


14 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road

DETAIL QUANTITY ESTIMATE


Name of the road:…………………………….
Chainage:0+000 to ….
Length Height
S.N. Description of works Unit No. Breadth (m) Quantity Remarks
(m) (m)
Supplying and placing R.C.C. kilometer post including
excavation, back filling, painting and writing etc. all complete
G.4 Nos. 6 6.00
as per specification
b) Bigger kilometer post (placed at each 5 km.) [1503 ]
G.5 Provision for land acquisition LS 1 1.00
G.6 Provision for IEA / IEE impact mitigation measures LS 1 1.00
Supplying and fixing in place R.C.C. delineator and guard
G.7 post including excavation, back filling, painting and erection Nos. 8340.00 8340.00
etc. all complete as per drawing.
Supplying and erecting traffic sign in place including 50mm
dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.8 painting, writing and supporting steel angle nut and bolit etc. Nos. 1000.00 1000.00
complete
a)60 cm dia circular,60cm.equilateral triangle and 60cm x
45cm rectangular shaped sign(single post)
Supplying and erecting traffic sign in place including 50mm
dia. Steel tube, 2mm. thick steel plate, cement concrete,
G.9 painting, writing and supporting steel angle nut and bolit etc. Nos. 100.00 100.00
complete
b) 1.2m.x 0.75m. Size bigger traffic sign with back support
and two or more post.

Prepared by: Checked by: Approved by:


Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR ROADWAY


Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

s
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock

k
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m )
2
Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m )3

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
0+000 0.00 4.04 - - 0.02 - - - - - - - - 95 - 5 - 0 - Ordinary Soil
0+020 20.00 21.46 12.75 255.00 0.29 0.16 3.20 - - - - - - 95 242.25 5 12.75 0 - Ordinary Soil
0+040 20.00 26.25 23.86 477.20 - 0.15 3.00 - - - - - - 95 453.34 5 23.86 0 - Ordinary Soil
0+060 20.00 93.07 59.66 1,193.20 - - - - - - - - - 95 1,133.54 5 59.66 0 - Ordinary Soil
0+080 20.00 70.08 81.58 1,631.60 1.29 0.65 13.00 - 10.00 11.47 114.70 4.01 40.10 95 1,550.02 5 81.58 0 - Ordinary Soil
0+100 20.00 70.70 70.39 1,407.80 - 0.65 13.00 - 20.00 20.28 405.60 0.66 13.20 95 1,337.41 5 70.39 0 - Ordinary Soil
0+120 20.00 87.61 79.16 1,583.20 - - - - 20.00 22.44 448.80 0.66 13.20 95 1,504.04 5 79.16 0 - Ordinary Soil
0+140 20.00 138.57 113.09 2,261.80 - - - - 20.00 34.20 684.00 0.68 13.60 95 2,148.71 5 113.09 0 - Ordinary Soil
0+160 20.00 145.44 142.01 2,840.20 - - - - 20.00 61.80 1,236.00 1.64 32.80 95 2,698.19 5 142.01 0 - Ordinary Soil
0+180 20.00 168.93 157.19 3,143.80 - - - - 20.00 69.42 1,388.40 1.55 31.00 95 2,986.61 5 157.19 0 - Ordinary Soil
0+200 20.00 188.70 178.82 3,576.40 - - - - 20.00 96.39 1,927.80 1.55 31.00 95 3,397.58 5 178.82 0 - Ordinary Soil
0+220 20.00 136.89 162.80 3,256.00 - - - - 20.00 55.63 1,112.60 1.55 31.00 95 3,093.20 5 162.80 0 - Ordinary Soil
0+240 20.00 103.79 120.34 2,406.80 - - - - 20.00 39.98 799.60 1.50 30.00 95 2,286.46 5 120.34 0 - Ordinary Soil
0+260 20.00 82.30 93.05 1,861.00 - - - - 20.00 27.95 559.00 0.66 13.20 95 1,767.95 5 93.05 0 - Ordinary Soil
0+280 20.00 75.42 78.86 1,577.20 - - - - 20.00 24.87 497.40 0.66 13.20 95 1,498.34 5 78.86 0 - Ordinary Soil
0+300 20.00 65.19 70.31 1,406.20 - - - - 20.00 22.49 449.80 0.65 13.00 95 1,335.89 5 70.31 0 - Ordinary Soil
0+320 20.00 58.90 62.05 1,241.00 - - - - 20.00 20.64 412.80 0.72 14.40 95 1,178.95 5 62.05 0 - Ordinary Soil
0+340 20.00 37.83 48.37 967.40 - - - - 20.00 10.26 205.20 - - 95 919.03 5 48.37 0 - Ordinary Soil
0+360 20.00 50.96 44.40 888.00 - - - - 20.00 12.70 254.00 0.92 18.40 95 843.60 5 44.40 0 - Ordinary Soil
0+380 20.00 30.62 40.79 815.80 - - - - 20.00 9.65 193.00 - - 95 775.01 5 40.79 0 - Ordinary Soil
0+400 20.00 31.78 31.20 624.00 0.34 0.17 3.40 - 20.00 10.45 209.00 0.91 18.20 95 592.80 5 31.20 0 - Ordinary Soil
0+420 20.00 39.21 35.50 710.00 - 0.17 3.40 - 20.00 12.91 258.20 0.92 18.40 95 674.50 5 35.50 0 - Ordinary Soil
0+440 20.00 32.46 35.84 716.80 1.48 0.74 14.80 - 20.00 12.61 252.20 1.08 21.60 95 680.96 5 35.84 0 - Ordinary Soil
0+460 20.00 26.47 29.47 589.40 0.45 0.97 19.40 - 20.00 11.68 233.60 0.41 8.20 95 559.93 5 29.47 0 - Ordinary Soil
0+480 20.00 36.41 31.44 628.80 - 0.23 4.60 - 20.00 10.72 214.40 - - 95 597.36 5 31.44 0 - Ordinary Soil
0+500 20.00 28.44 32.43 648.60 0.05 0.03 0.60 - 20.00 11.74 234.80 0.56 11.20 95 616.17 5 32.43 0 - Ordinary Soil
0+520 20.00 22.02 25.23 504.60 0.40 0.23 4.60 - 20.00 9.61 192.20 0.27 5.40 95 479.37 5 25.23 0 - Ordinary Soil
0+540 20.00 20.98 21.50 430.00 0.99 0.70 14.00 - 20.00 11.94 238.80 0.95 19.00 95 408.50 5 21.50 0 - Ordinary Soil
0+560 20.00 13.68 17.33 346.60 9.40 5.20 104.00 - 20.00 4.84 96.80 0.52 10.40 95 329.27 5 17.33 0 - Ordinary Soil
0+580 20.00 15.18 14.43 288.60 3.50 6.45 129.00 - 20.00 1.02 20.40 0.01 0.20 95 274.17 5 14.43 0 - Ordinary Soil
0+600 20.00 162.12 88.65 1,773.00 - 1.75 35.00 - 20.00 29.30 586.00 0.89 17.80 95 1,684.35 5 88.65 0 - Ordinary Soil
0+620 20.00 228.19 195.16 3,903.20 - - - - 20.00 96.75 1,935.00 0.70 14.00 95 3,708.04 5 195.16 0 - Ordinary Soil
0+640 20.00 76.68 152.44 3,048.80 - - - - 20.00 32.17 643.40 0.67 13.40 95 2,896.36 5 152.44 0 - Ordinary Soil
0+660 20.00 37.44 57.06 1,141.20 0.02 0.01 0.20 - 20.00 16.82 336.40 22.61 452.20 95 1,084.14 5 57.06 0 - Ordinary Soil
0+680 20.00 33.65 35.55 711.00 8.81 4.42 88.40 - 20.00 2.50 50.00 0.28 5.60 95 675.45 5 35.55 0 - Ordinary Soil
0+700 20.00 34.79 34.22 684.40 2.57 5.69 113.80 - 20.00 5.64 112.80 1.40 28.00 95 650.18 5 34.22 0 - Ordinary Soil
0+720 20.00 47.91 41.35 827.00 0.32 1.45 29.00 - 20.00 3.25 65.00 0.61 12.20 95 785.65 5 41.35 0 - Ordinary Soil
0+740 20.00 49.90 48.91 978.20 0.42 0.37 7.40 - 20.00 2.77 55.40 0.51 10.20 95 929.29 5 48.91 0 - Ordinary Soil

15 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
0+760 20.00 40.22 45.06 901.20 1.59 1.01 20.20 - 20.00 1.65 33.00 0.17 3.40 95 856.14 5 45.06 0 - Ordinary Soil
0+780 20.00 44.72 42.47 849.40 0.45 1.02 20.40 - 10.00 3.10 31.00 0.53 5.30 95 806.93 5 42.47 0 - Ordinary Soil
0+800 20.00 95.30 70.01 1,400.20 - 0.23 4.60 - - - - - - 95 1,330.19 5 70.01 0 - Ordinary Soil
0+820 20.00 138.92 117.11 2,342.20 - - - - - - - - - 95 2,225.09 5 117.11 0 - Ordinary Soil
0+840 20.00 153.93 146.43 2,928.60 - - - - 10.00 42.59 425.90 0.67 6.70 95 2,782.17 5 146.43 0 - Ordinary Soil
0+860 20.00 237.90 195.92 3,918.40 - - - - 20.00 85.93 1,718.60 3.11 62.20 95 3,722.48 5 195.92 0 - Ordinary Soil
0+880 20.00 310.62 274.26 5,485.20 - - - - 20.00 122.95 2,459.00 1.64 32.80 95 5,210.94 5 274.26 0 - Ordinary Soil
0+900 20.00 293.76 302.19 6,043.80 - - - - 20.00 128.93 2,578.60 1.78 35.60 95 5,741.61 5 302.19 0 - Ordinary Soil
0+920 20.00 279.62 286.69 5,733.80 - - - - 20.00 119.61 2,392.20 1.63 32.60 95 5,447.11 5 286.69 0 - Ordinary Soil
0+940 20.00 297.02 288.32 5,766.40 0.01 0.01 0.20 - 20.00 150.20 3,004.00 1.38 27.60 95 5,478.08 5 288.32 0 - Ordinary Soil
0+960 20.00 276.33 286.68 5,733.60 0.01 0.01 0.20 - 20.00 131.19 2,623.80 1.38 27.60 95 5,446.92 5 286.68 0 - Ordinary Soil
0+980 20.00 231.89 254.11 5,082.20 - 0.01 0.20 - 10.00 120.91 1,209.10 1.36 13.60 95 4,828.09 5 254.11 0 - Ordinary Soil
1+000 20.00 345.53 288.71 5,774.20 - - - - - - - - - 95 5,485.49 5 288.71 0 - Ordinary Soil
1+020 20.00 321.47 333.50 6,670.00 - - - - - - - - - 95 6,336.50 5 333.50 0 - Ordinary Soil
1+040 20.00 275.52 298.50 5,970.00 - - - - - - - - - 95 5,671.50 5 298.50 0 - Ordinary Soil
1+060 20.00 263.11 269.32 5,386.40 - - - - - - - - - 95 5,117.08 5 269.32 0 - Ordinary Soil
1+080 20.00 212.02 237.57 4,751.40 - - - - - - - - - 95 4,513.83 5 237.57 0 - Ordinary Soil
1+100 20.00 194.68 203.35 4,067.00 - - - - - - - - - 95 3,863.65 5 203.35 0 - Ordinary Soil
1+120 20.00 121.49 158.09 3,161.80 - - - - - - - - - 95 3,003.71 5 158.09 0 - Ordinary Soil
1+140 20.00 79.73 100.61 2,012.20 - - - - - - - - - 95 1,911.59 5 100.61 0 - Ordinary Soil
1+160 20.00 58.33 69.03 1,380.60 - - - - - - - - - 95 1,311.57 5 69.03 0 - Ordinary Soil
1+180 20.00 57.48 57.91 1,158.20 - - - - - - - - - 95 1,100.29 5 57.91 0 - Ordinary Soil
1+200 20.00 24.80 41.14 822.80 0.97 0.49 9.80 - 10.00 2.36 23.60 0.33 3.30 95 781.66 5 41.14 0 - Ordinary Soil
1+220 20.00 18.52 21.66 433.20 0.30 0.64 12.80 - 20.00 3.56 71.20 0.67 13.40 95 411.54 5 21.66 0 - Ordinary Soil
1+240 20.00 12.46 15.49 309.80 0.61 0.46 9.20 - 20.00 2.60 52.00 0.42 8.40 95 294.31 5 15.49 0 - Ordinary Soil
1+260 20.00 13.86 13.16 263.20 3.98 2.30 46.00 - 20.00 3.95 79.00 0.64 12.80 95 250.04 5 13.16 0 - Ordinary Soil
1+280 20.00 11.15 12.51 250.20 3.40 3.69 73.80 - 20.00 2.18 43.60 0.48 9.60 95 237.69 5 12.51 0 - Ordinary Soil
1+300 20.00 1.04 6.10 122.00 0.49 1.95 39.00 - 10.00 6.37 63.70 1.75 17.50 95 115.90 5 6.10 0 - Ordinary Soil
1+320 20.00 23.99 12.52 250.40 0.15 0.32 6.40 - - - - - - 95 237.88 5 12.52 0 - Ordinary Soil
1+340 20.00 51.97 37.98 759.60 - 0.08 1.60 - - - - - - 95 721.62 5 37.98 0 - Ordinary Soil
1+360 20.00 18.19 35.08 701.60 0.19 0.10 2.00 - - - - - - 95 666.52 5 35.08 0 - Ordinary Soil
1+380 20.00 14.38 16.29 325.80 11.81 6.00 120.00 - 10.00 5.24 52.40 0.72 7.20 95 309.51 5 16.29 0 - Ordinary Soil
1+400 20.00 2.14 8.26 165.20 10.44 11.13 222.60 57.40 10.00 0.50 5.00 - - 95 156.94 5 8.26 0 - Ordinary Soil
1+420 20.00 52.71 27.43 548.60 - 5.22 104.40 - - - - - - 95 521.17 5 27.43 0 - Ordinary Soil
1+440 20.00 52.42 52.57 1,051.40 0.02 0.01 0.20 - - - - - - 95 998.83 5 52.57 0 - Ordinary Soil
1+460 20.00 0.08 26.25 525.00 5.99 3.01 60.20 - 7.00 1.30 9.10 0.01 0.07 95 498.75 5 26.25 0 - Ordinary Soil
1+480 20.00 - 0.04 0.80 5.81 5.90 118.00 117.20 - - - - - 95 0.76 5 0.04 0 - Ordinary Soil
1+500 20.00 - - - 6.21 6.01 120.20 120.20 7.00 0.87 6.09 0.11 0.77 95 - 5 - 0 - Ordinary Soil
1+520 20.00 1.07 0.54 10.80 1.88 4.05 81.00 70.20 - - - - - 95 10.26 5 0.54 0 - Ordinary Soil
1+540 20.00 2.89 1.98 39.60 4.65 3.27 65.40 25.80 - - - - - 95 37.62 5 1.98 0 - Ordinary Soil
1+560 20.00 0.84 1.87 37.40 3.77 4.21 84.20 46.80 - - - - - 95 35.53 5 1.87 0 - Ordinary Soil
1+580 20.00 14.20 7.52 150.40 - 1.89 37.80 - - - - - - 95 142.88 5 7.52 0 - Ordinary Soil
1+600 20.00 16.13 15.17 303.40 - - - - - - - - - 95 288.23 5 15.17 0 - Ordinary Soil

16 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
1+620 20.00 25.34 20.74 414.80 - - - - - - - - - 95 394.06 5 20.74 0 - Ordinary Soil
1+640 20.00 35.76 30.55 611.00 - - - - - - - - - 95 580.45 5 30.55 0 - Ordinary Soil
1+660 20.00 58.92 47.34 946.80 - - - - - - - - - 95 899.46 5 47.34 0 - Ordinary Soil
1+680 20.00 82.18 70.55 1,411.00 - - - - - - - - - 95 1,340.45 5 70.55 0 - Ordinary Soil
1+700 20.00 100.98 91.58 1,831.60 - - - - - - - - - 95 1,740.02 5 91.58 0 - Ordinary Soil
1+720 20.00 77.10 89.04 1,780.80 - - - - - - - - - 95 1,691.76 5 89.04 0 - Ordinary Soil
1+740 20.00 49.35 63.23 1,264.60 - - - - - - - - - 95 1,201.37 5 63.23 0 - Ordinary Soil
1+760 20.00 61.09 55.22 1,104.40 0.01 0.01 0.20 - - - - - - 95 1,049.18 5 55.22 0 - Ordinary Soil
1+780 20.00 88.78 74.94 1,498.80 - 0.01 0.20 - - - - - - 95 1,423.86 5 74.94 0 - Ordinary Soil
1+800 20.00 107.27 98.03 1,960.60 - - - - - - - - - 95 1,862.57 5 98.03 0 - Ordinary Soil
1+820 20.00 113.79 110.53 2,210.60 - - - - - - - - - 95 2,100.07 5 110.53 0 - Ordinary Soil
1+840 20.00 154.97 134.38 2,687.60 - - - - - - - - - 95 2,553.22 5 134.38 0 - Ordinary Soil
1+860 20.00 156.59 155.78 3,115.60 - - - - - - - - - 95 2,959.82 5 155.78 0 - Ordinary Soil
1+880 20.00 110.88 133.74 2,674.80 - - - - - - - - - 95 2,541.06 5 133.74 0 - Ordinary Soil
1+900 20.00 67.68 89.28 1,785.60 - - - - - - - - - 95 1,696.32 5 89.28 0 - Ordinary Soil
1+920 20.00 100.35 84.02 1,680.40 - - - - - - - - - 95 1,596.38 5 84.02 0 - Ordinary Soil
1+940 20.00 123.37 111.86 2,237.20 - - - - - - - - - 95 2,125.34 5 111.86 0 - Ordinary Soil
1+960 20.00 159.77 141.57 2,831.40 - - - - - - - - - 95 2,689.83 5 141.57 0 - Ordinary Soil
1+980 20.00 175.08 167.43 3,348.60 - - - - - - - - - 95 3,181.17 5 167.43 0 - Ordinary Soil
2+000 20.00 144.55 159.82 3,196.40 - - - - - - - - - 95 3,036.58 5 159.82 0 - Ordinary Soil
2+020 20.00 144.11 144.33 2,886.60 - - - - - - - - - 95 2,742.27 5 144.33 0 - Ordinary Soil
2+040 20.00 129.39 136.75 2,735.00 - - - - - - - - - 95 2,598.25 5 136.75 0 - Ordinary Soil
2+060 20.00 105.61 117.50 2,350.00 - - - - - - - - - 95 2,232.50 5 117.50 0 - Ordinary Soil
2+080 20.00 103.29 104.45 2,089.00 - - - - - - - - - 95 1,984.55 5 104.45 0 - Ordinary Soil
2+100 20.00 95.25 99.27 1,985.40 - - - - - - - - - 95 1,886.13 5 99.27 0 - Ordinary Soil
2+120 20.00 109.40 102.33 2,046.60 - - - - - - - - - 95 1,944.27 5 102.33 0 - Ordinary Soil
2+140 20.00 89.26 99.33 1,986.60 - - - - - - - - - 95 1,887.27 5 99.33 0 - Ordinary Soil
2+160 20.00 72.88 81.07 1,621.40 - - - - - - - - - 95 1,540.33 5 81.07 0 - Ordinary Soil
2+180 20.00 185.75 129.32 2,586.40 - - - - - - - - - 95 2,457.08 5 129.32 0 - Ordinary Soil
2+200 20.00 163.89 174.82 3,496.40 - - - - 10.00 37.62 376.20 0.67 6.70 95 3,321.58 5 174.82 0 - Ordinary Soil
2+220 20.00 100.35 132.12 2,642.40 - - - - 20.00 22.38 447.60 0.66 13.20 95 2,510.28 5 132.12 0 - Ordinary Soil
2+240 20.00 79.37 89.86 1,797.20 - - - - 20.00 16.75 335.00 0.74 14.80 95 1,707.34 5 89.86 0 - Ordinary Soil
2+260 20.00 81.95 80.66 1,613.20 - - - - 10.00 17.44 174.40 0.86 8.60 95 1,532.54 5 80.66 0 - Ordinary Soil
2+280 20.00 102.26 92.11 1,842.20 - - - - - - - - - 95 1,750.09 5 92.11 0 - Ordinary Soil
2+300 20.00 97.16 99.71 1,994.20 - - - - - - - - - 95 1,894.49 5 99.71 0 - Ordinary Soil
2+320 20.00 74.89 86.03 1,720.60 - - - - - - - - - 95 1,634.57 5 86.03 0 - Ordinary Soil
2+340 20.00 47.05 60.97 1,219.40 - - - - - - - - - 95 1,158.43 5 60.97 0 - Ordinary Soil
2+360 20.00 53.77 50.41 1,008.20 - - - - - - - - - 95 957.79 5 50.41 0 - Ordinary Soil
2+380 20.00 46.84 50.31 1,006.20 - - - - - - - - - 95 955.89 5 50.31 0 - Ordinary Soil
2+400 20.00 38.90 42.87 857.40 0.01 0.01 0.20 - - - - - - 95 814.53 5 42.87 0 - Ordinary Soil
2+420 20.00 17.92 28.41 568.20 0.02 0.02 0.40 - - - - - - 95 539.79 5 28.41 0 - Ordinary Soil
2+440 20.00 4.49 11.21 224.20 1.17 0.60 12.00 - 10.00 1.38 13.80 0.29 2.90 95 212.99 5 11.21 0 - Ordinary Soil
2+460 20.00 2.07 3.28 65.60 4.81 2.99 59.80 - 20.00 1.32 26.40 0.21 4.20 95 62.32 5 3.28 0 - Ordinary Soil

17 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
2+480 20.00 10.85 6.46 129.20 3.31 4.06 81.20 - 10.00 1.53 15.30 0.27 2.70 95 122.74 5 6.46 0 - Ordinary Soil
2+500 20.00 151.63 81.24 1,624.80 - 1.66 33.20 - - - - - - 95 1,543.56 5 81.24 0 - Ordinary Soil
2+520 20.00 170.48 161.06 3,221.20 - - - - - - - - - 95 3,060.14 5 161.06 0 - Ordinary Soil
2+540 20.00 117.23 143.86 2,877.20 - - - - - - - - - 95 2,733.34 5 143.86 0 - Ordinary Soil
2+560 20.00 67.05 92.14 1,842.80 - - - - - - - - - 95 1,750.66 5 92.14 0 - Ordinary Soil
2+580 20.00 42.53 54.79 1,095.80 - - - - - - - - - 95 1,041.01 5 54.79 0 - Ordinary Soil
2+600 20.00 18.93 30.73 614.60 - - - - - - - - - 95 583.87 5 30.73 0 - Ordinary Soil
2+620 20.00 3.51 11.22 224.40 2.66 1.33 26.60 - 10.00 1.72 17.20 0.36 3.60 95 213.18 5 11.22 0 - Ordinary Soil
2+640 20.00 0.53 2.02 40.40 6.20 4.43 88.60 48.20 10.00 2.73 27.30 0.58 5.80 95 38.38 5 2.02 0 - Ordinary Soil
2+660 20.00 9.09 4.81 96.20 10.16 8.18 163.60 67.40 - - - - - 95 91.39 5 4.81 0 - Ordinary Soil
2+680 20.00 30.06 19.58 391.60 - 5.08 101.60 - - - - - - 95 372.02 5 19.58 0 - Ordinary Soil
2+700 20.00 37.67 33.87 677.40 - - - - - - - - - 95 643.53 5 33.87 0 - Ordinary Soil
2+720 20.00 27.98 32.83 656.60 - - - - - - - - - 95 623.77 5 32.83 0 - Ordinary Soil
2+740 20.00 17.21 22.60 452.00 0.27 0.14 2.80 - 10.00 1.54 15.40 0.37 3.70 95 429.40 5 22.60 0 - Ordinary Soil
2+760 20.00 9.28 13.25 265.00 2.79 1.53 30.60 - 20.00 2.53 50.60 0.56 11.20 95 251.75 5 13.25 0 - Ordinary Soil
2+780 20.00 3.37 6.33 126.60 2.37 2.58 51.60 - 20.00 1.65 33.00 0.43 8.60 95 120.27 5 6.33 0 - Ordinary Soil
2+800 20.00 10.54 6.96 139.20 1.10 1.74 34.80 - 20.00 0.99 19.80 0.17 3.40 95 132.24 5 6.96 0 - Ordinary Soil
2+820 20.00 7.11 8.83 176.60 6.20 3.65 73.00 - 20.00 5.21 104.20 0.84 16.80 95 167.77 5 8.83 0 - Ordinary Soil
2+840 20.00 5.91 6.51 130.20 5.88 6.04 120.80 - 20.00 2.43 48.60 0.24 4.80 95 123.69 5 6.51 0 - Ordinary Soil
2+860 20.00 14.03 9.97 199.40 10.45 8.17 163.40 - 10.00 13.23 132.30 3.19 31.90 95 189.43 5 9.97 0 - Ordinary Soil
2+880 20.00 36.42 25.23 504.60 1.98 6.22 124.40 - - - - - - 95 479.37 5 25.23 0 - Ordinary Soil
2+900 20.00 49.06 42.74 854.80 - 0.99 19.80 - - - - - - 95 812.06 5 42.74 0 - Ordinary Soil
2+920 20.00 51.49 50.28 1,005.60 - - - - - - - - - 95 955.32 5 50.28 0 - Ordinary Soil
2+940 20.00 28.97 40.23 804.60 4.13 2.07 41.40 - 10.00 5.04 50.40 0.98 9.80 95 764.37 5 40.23 0 - Ordinary Soil
2+960 20.00 38.93 33.95 679.00 3.16 3.65 73.00 - 10.00 6.65 66.50 1.40 14.00 95 645.05 5 33.95 0 - Ordinary Soil
2+980 20.00 174.52 106.73 2,134.60 - 1.58 31.60 - - - - - - 95 2,027.87 5 106.73 0 - Ordinary Soil
3+000 20.00 217.17 195.85 3,917.00 - - - - 10.00 83.38 833.80 0.69 6.90 95 3,721.15 5 195.85 0 - Ordinary Soil
3+020 20.00 205.49 211.33 4,226.60 - - - - 20.00 53.42 1,068.40 0.69 13.80 95 4,015.27 5 211.33 0 - Ordinary Soil
3+040 20.00 115.05 160.27 3,205.40 - - - - 20.00 29.28 585.60 0.66 13.20 95 3,045.13 5 160.27 0 - Ordinary Soil
3+060 20.00 61.81 88.43 1,768.60 - - - - 20.00 26.46 529.20 0.80 16.00 95 1,680.17 5 88.43 0 - Ordinary Soil
3+080 20.00 61.54 61.68 1,233.60 - - - - 20.00 26.45 529.00 0.66 13.20 95 1,171.92 5 61.68 0 - Ordinary Soil
3+100 20.00 92.79 77.17 1,543.40 - - - - 20.00 25.03 500.60 0.66 13.20 95 1,466.23 5 77.17 0 - Ordinary Soil
3+120 20.00 99.40 96.10 1,922.00 - - - - 20.00 27.10 542.00 0.66 13.20 95 1,825.90 5 96.10 0 - Ordinary Soil
3+140 20.00 89.59 94.50 1,890.00 0.01 0.01 0.20 - 20.00 27.48 549.60 0.65 13.00 95 1,795.50 5 94.50 0 - Ordinary Soil
3+160 20.00 75.86 82.73 1,654.60 - 0.01 0.20 - 10.00 27.96 279.60 0.66 6.60 95 1,571.87 5 82.73 0 - Ordinary Soil
3+180 20.00 88.64 82.25 1,645.00 - - - - - - - - - 95 1,562.75 5 82.25 0 - Ordinary Soil
3+200 20.00 64.36 76.50 1,530.00 - - - - - - - - - 95 1,453.50 5 76.50 0 - Ordinary Soil
3+220 20.00 60.69 62.53 1,250.60 - - - - - - - - - 95 1,188.07 5 62.53 0 - Ordinary Soil
3+240 20.00 39.86 50.28 1,005.60 0.34 0.17 3.40 - - - - - - 95 955.32 5 50.28 0 - Ordinary Soil
3+260 20.00 42.04 40.95 819.00 - 0.17 3.40 - - - - - - 95 778.05 5 40.95 0 - Ordinary Soil
3+280 20.00 30.90 36.47 729.40 0.34 0.17 3.40 - 10.00 1.26 12.60 0.29 2.90 95 692.93 5 36.47 0 - Ordinary Soil
3+300 20.00 16.66 23.78 475.60 1.92 1.13 22.60 - 20.00 2.96 59.20 0.81 16.20 95 451.82 5 23.78 0 - Ordinary Soil
3+320 20.00 13.05 14.86 297.20 1.33 1.63 32.60 - 20.00 1.90 38.00 0.48 9.60 95 282.34 5 14.86 0 - Ordinary Soil

18 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
3+340 20.00 16.63 14.84 296.80 0.12 0.73 14.60 - 20.00 1.69 33.80 0.46 9.20 95 281.96 5 14.84 0 - Ordinary Soil
3+360 20.00 18.38 17.51 350.20 1.88 1.00 20.00 - 20.00 3.58 71.60 1.06 21.20 95 332.69 5 17.51 0 - Ordinary Soil
3+380 20.00 22.09 20.24 404.80 0.06 0.97 19.40 - 20.00 1.33 26.60 0.34 6.80 95 384.56 5 20.24 0 - Ordinary Soil
3+400 20.00 24.67 23.38 467.60 2.85 1.46 29.20 - 10.00 1.74 17.40 0.38 3.80 95 444.22 5 23.38 0 - Ordinary Soil
3+420 20.00 52.51 38.59 771.80 - 1.43 28.60 - - - - - - 95 733.21 5 38.59 0 - Ordinary Soil
3+440 20.00 36.60 44.56 891.20 1.00 0.50 10.00 - 10.00 1.98 19.80 0.29 2.90 95 846.64 5 44.56 0 - Ordinary Soil
3+460 20.00 31.08 33.84 676.80 0.08 0.54 10.80 - 10.00 1.65 16.50 0.48 4.80 95 642.96 5 33.84 0 - Ordinary Soil
3+480 20.00 48.47 39.78 795.60 - 0.04 0.80 - - - - - - 95 755.82 5 39.78 0 - Ordinary Soil
3+500 20.00 47.47 47.97 959.40 - - - - - - - - - 95 911.43 5 47.97 0 - Ordinary Soil
3+520 20.00 60.63 54.05 1,081.00 - - - - - - - - - 95 1,026.95 5 54.05 0 - Ordinary Soil
3+540 20.00 48.08 54.36 1,087.20 2.02 1.01 20.20 - - - - - - 95 1,032.84 5 54.36 0 - Ordinary Soil
3+560 20.00 56.47 52.28 1,045.60 - 1.01 20.20 - - - - - - 95 993.32 5 52.28 0 - Ordinary Soil
3+580 20.00 41.40 48.94 978.80 - - - - - - - - - 95 929.86 5 48.94 0 - Ordinary Soil
3+600 20.00 10.59 26.00 520.00 0.70 0.35 7.00 - 7.00 0.62 4.34 0.08 0.56 95 494.00 5 26.00 0 - Ordinary Soil
3+620 20.00 56.69 33.64 672.80 - 0.35 7.00 - - - - - - 95 639.16 5 33.64 0 - Ordinary Soil
3+640 20.00 250.82 153.76 3,075.20 - - - - - - - - - 95 2,921.44 5 153.76 0 - Ordinary Soil
3+660 20.00 258.46 254.64 5,092.80 - - - - - - - - - 95 4,838.16 5 254.64 0 - Ordinary Soil
3+680 20.00 142.50 200.48 4,009.60 - - - - 10.00 52.56 525.60 0.69 6.90 95 3,809.12 5 200.48 0 - Ordinary Soil
3+700 20.00 184.31 163.41 3,268.20 - - - - 20.00 47.46 949.20 0.76 15.20 95 3,104.79 5 163.41 0 - Ordinary Soil
3+720 20.00 118.76 151.54 3,030.80 - - - - 20.00 39.96 799.20 0.67 13.40 95 2,879.26 5 151.54 0 - Ordinary Soil
3+740 20.00 156.46 137.61 2,752.20 - - - - 20.00 42.14 842.80 0.67 13.40 95 2,614.59 5 137.61 0 - Ordinary Soil
3+760 20.00 128.40 142.43 2,848.60 - - - - 20.00 38.97 779.40 0.67 13.40 95 2,706.17 5 142.43 0 - Ordinary Soil
3+780 20.00 111.15 119.78 2,395.60 - - - - 20.00 28.23 564.60 0.65 13.00 95 2,275.82 5 119.78 0 - Ordinary Soil
3+800 20.00 107.07 109.11 2,182.20 - - - - 20.00 24.91 498.20 0.80 16.00 95 2,073.09 5 109.11 0 - Ordinary Soil
3+820 20.00 74.88 90.98 1,819.60 - - - - 20.00 23.38 467.60 0.80 16.00 95 1,728.62 5 90.98 0 - Ordinary Soil
3+840 20.00 94.23 84.56 1,691.20 - - - - 20.00 23.64 472.80 0.66 13.20 95 1,606.64 5 84.56 0 - Ordinary Soil
3+860 20.00 91.92 93.08 1,861.60 - - - - 20.00 22.04 440.80 0.68 13.60 95 1,768.52 5 93.08 0 - Ordinary Soil
3+880 20.00 116.26 104.09 2,081.80 - - - - 10.00 22.63 226.30 0.64 6.40 95 1,977.71 5 104.09 0 - Ordinary Soil
3+900 20.00 110.29 113.28 2,265.60 - - - - - - - - - 95 2,152.32 5 113.28 0 - Ordinary Soil
3+920 20.00 107.17 108.73 2,174.60 - - - - - - - - - 95 2,065.87 5 108.73 0 - Ordinary Soil
3+940 20.00 103.29 105.23 2,104.60 - - - - - - - - - 95 1,999.37 5 105.23 0 - Ordinary Soil
3+960 20.00 76.06 89.68 1,793.60 0.01 0.01 0.20 - - - - - - 95 1,703.92 5 89.68 0 - Ordinary Soil
3+980 20.00 49.29 62.68 1,253.60 - 0.01 0.20 - - - - - - 95 1,190.92 5 62.68 0 - Ordinary Soil
4+000 20.00 75.34 62.32 1,246.40 3.70 1.85 37.00 - 10.00 43.38 433.80 1.45 14.50 95 1,184.08 5 62.32 0 - Ordinary Soil
4+020 20.00 25.01 50.18 1,003.60 6.45 5.08 101.60 - 20.00 20.19 403.80 2.05 41.00 95 953.42 5 50.18 0 - Ordinary Soil
4+040 20.00 19.13 22.07 441.40 1.14 3.80 76.00 - 20.00 4.77 95.40 1.00 20.00 95 419.33 5 22.07 0 - Ordinary Soil
4+060 20.00 9.61 14.37 287.40 2.44 1.79 35.80 - 20.00 3.26 65.20 0.52 10.40 95 273.03 5 14.37 0 - Ordinary Soil
4+080 20.00 9.28 9.45 189.00 7.89 5.17 103.40 - 10.00 3.58 35.80 0.47 4.70 95 179.55 5 9.45 0 - Ordinary Soil
4+100 20.00 8.07 8.68 173.60 9.19 8.54 170.80 - - - - - - 95 164.92 5 8.68 0 - Ordinary Soil
4+120 20.00 8.49 8.28 165.60 9.32 9.26 185.20 19.60 10.00 6.46 64.60 1.18 11.80 95 157.32 5 8.28 0 - Ordinary Soil
4+140 20.00 33.26 20.88 417.60 1.42 5.37 107.40 - 10.00 4.38 43.80 0.91 9.10 95 396.72 5 20.88 0 - Ordinary Soil
4+160 20.00 51.66 42.46 849.20 - 0.71 14.20 - - - - - - 95 806.74 5 42.46 0 - Ordinary Soil
4+180 20.00 32.83 42.25 845.00 2.88 1.44 28.80 - 10.00 6.58 65.80 1.46 14.60 95 802.75 5 42.25 0 - Ordinary Soil

19 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
4+200 20.00 66.73 49.78 995.60 0.34 1.61 32.20 - 10.00 6.04 60.40 1.65 16.50 95 945.82 5 49.78 0 - Ordinary Soil
4+220 20.00 89.37 78.05 1,561.00 - 0.17 3.40 - - - - - - 95 1,482.95 5 78.05 0 - Ordinary Soil
4+240 20.00 81.76 85.57 1,711.40 - - - - - - - - - 95 1,625.83 5 85.57 0 - Ordinary Soil
4+260 20.00 125.55 103.66 2,073.20 - - - - - - - - - 95 1,969.54 5 103.66 0 - Ordinary Soil
4+280 20.00 200.55 163.05 3,261.00 - - - - 10.00 53.30 533.00 0.69 6.90 95 3,097.95 5 163.05 0 - Ordinary Soil
4+300 20.00 203.66 202.11 4,042.20 - - - - 20.00 52.81 1,056.20 0.83 16.60 95 3,840.09 5 202.11 0 - Ordinary Soil
4+320 20.00 206.31 204.99 4,099.80 - - - - 20.00 65.34 1,306.80 0.69 13.80 95 3,894.81 5 204.99 0 - Ordinary Soil
4+340 20.00 219.72 213.02 4,260.40 - - - - 20.00 72.04 1,440.80 0.65 13.00 95 4,047.38 5 213.02 0 - Ordinary Soil
4+360 20.00 202.62 211.17 4,223.40 - - - - 20.00 115.57 2,311.40 0.69 13.80 95 4,012.23 5 211.17 0 - Ordinary Soil
4+380 20.00 200.91 201.77 4,035.40 - - - - 20.00 139.15 2,783.00 1.57 31.40 95 3,833.63 5 201.77 0 - Ordinary Soil
4+400 20.00 218.48 209.70 4,194.00 - - - - 20.00 153.98 3,079.60 1.54 30.80 95 3,984.30 5 209.70 0 - Ordinary Soil
4+420 20.00 232.37 225.43 4,508.60 - - - - 20.00 172.39 3,447.80 1.56 31.20 95 4,283.17 5 225.43 0 - Ordinary Soil
4+440 20.00 306.43 269.40 5,388.00 - - - - 20.00 210.66 4,213.20 1.82 36.40 95 5,118.60 5 269.40 0 - Ordinary Soil
4+460 20.00 298.77 302.60 6,052.00 - - - - 20.00 215.08 4,301.60 2.77 55.40 95 5,749.40 5 302.60 0 - Ordinary Soil
4+480 20.00 295.45 297.11 5,942.20 - - - - 20.00 281.57 5,631.40 8.25 165.00 95 5,645.09 5 297.11 0 - Ordinary Soil
4+500 20.00 260.18 277.82 5,556.40 - - - - 20.00 259.13 5,182.60 5.25 105.00 95 5,278.58 5 277.82 0 - Ordinary Soil
4+520 20.00 258.77 259.48 5,189.60 - - - - 20.00 244.79 4,895.80 4.08 81.60 95 4,930.12 5 259.48 0 - Ordinary Soil
4+540 20.00 231.29 245.03 4,900.60 - - - - 20.00 178.69 3,573.80 1.43 28.60 95 4,655.57 5 245.03 0 - Ordinary Soil
4+560 20.00 211.65 221.47 4,429.40 - - - - 20.00 154.59 3,091.80 1.58 31.60 95 4,207.93 5 221.47 0 - Ordinary Soil
4+580 20.00 244.69 228.17 4,563.40 - - - - 20.00 118.88 2,377.60 1.55 31.00 95 4,335.23 5 228.17 0 - Ordinary Soil
4+600 20.00 259.51 252.10 5,042.00 0.01 0.01 0.20 - 20.00 130.27 2,605.40 1.56 31.20 95 4,789.90 5 252.10 0 - Ordinary Soil
4+620 20.00 227.96 243.74 4,874.80 - 0.01 0.20 - 20.00 157.72 3,154.40 1.58 31.60 95 4,631.06 5 243.74 0 - Ordinary Soil
4+640 20.00 218.73 223.35 4,467.00 - - - - 20.00 185.16 3,703.20 16.28 325.60 95 4,243.65 5 223.35 0 - Ordinary Soil
4+660 20.00 281.15 249.94 4,998.80 - - - - 20.00 214.23 4,284.60 33.65 673.00 95 4,748.86 5 249.94 0 - Ordinary Soil
4+680 20.00 249.00 265.08 5,301.60 - - - - 20.00 194.84 3,896.80 7.42 148.40 95 5,036.52 5 265.08 0 - Ordinary Soil
4+700 20.00 206.26 227.63 4,552.60 - - - - 20.00 148.30 2,966.00 0.65 13.00 95 4,324.97 5 227.63 0 - Ordinary Soil
4+720 20.00 186.46 196.36 3,927.20 - - - - 20.00 142.17 2,843.40 2.66 53.20 95 3,730.84 5 196.36 0 - Ordinary Soil
4+740 20.00 167.18 176.82 3,536.40 - - - - 20.00 106.52 2,130.40 1.57 31.40 95 3,359.58 5 176.82 0 - Ordinary Soil
4+760 20.00 167.75 167.47 3,349.40 - - - - 20.00 70.37 1,407.40 0.65 13.00 95 3,181.93 5 167.47 0 - Ordinary Soil
4+780 20.00 179.27 173.51 3,470.20 - - - - 20.00 51.38 1,027.60 0.64 12.80 95 3,296.69 5 173.51 0 - Ordinary Soil
4+800 20.00 175.99 177.63 3,552.60 - - - - 20.00 45.61 912.20 0.65 13.00 95 3,374.97 5 177.63 0 - Ordinary Soil
4+820 20.00 175.79 175.89 3,517.80 - - - - 20.00 52.33 1,046.60 0.73 14.60 95 3,341.91 5 175.89 0 - Ordinary Soil
4+840 20.00 120.58 148.19 2,963.80 - - - - 20.00 37.41 748.20 0.68 13.60 95 2,815.61 5 148.19 0 - Ordinary Soil
4+860 20.00 79.92 100.25 2,005.00 - - - - 20.00 20.61 412.20 0.89 17.80 95 1,904.75 5 100.25 0 - Ordinary Soil
4+880 20.00 57.07 68.50 1,370.00 - - - - 20.00 14.16 283.20 0.93 18.60 95 1,301.50 5 68.50 0 - Ordinary Soil
4+900 20.00 35.56 46.32 926.40 - - - - 20.00 9.59 191.80 0.90 18.00 95 880.08 5 46.32 0 - Ordinary Soil
4+920 20.00 35.93 35.75 715.00 - - - - 20.00 10.57 211.40 1.00 20.00 95 679.25 5 35.75 0 - Ordinary Soil
4+940 20.00 25.31 30.62 612.40 0.27 0.14 2.80 - 20.00 8.25 165.00 - - 95 581.78 5 30.62 0 - Ordinary Soil
4+960 20.00 28.46 26.89 537.80 0.19 0.23 4.60 - 20.00 8.11 162.20 0.91 18.20 95 510.91 5 26.89 0 - Ordinary Soil
4+980 20.00 25.88 27.17 543.40 - 0.10 2.00 - 20.00 7.70 154.00 - - 95 516.23 5 27.17 0 - Ordinary Soil
5+000 20.00 22.68 24.28 485.60 0.39 0.20 4.00 - 20.00 8.81 176.20 0.27 5.40 95 461.32 5 24.28 0 - Ordinary Soil
5+020 20.00 30.63 26.66 533.20 - 0.20 4.00 - 20.00 8.06 161.20 1.04 20.80 95 506.54 5 26.66 0 - Ordinary Soil
5+040 20.00 37.61 34.12 682.40 - - - - 20.00 10.64 212.80 1.05 21.00 95 648.28 5 34.12 0 - Ordinary Soil

20 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
5+060 20.00 33.66 35.64 712.80 - - - - 20.00 8.78 175.60 1.05 21.00 95 677.16 5 35.64 0 - Ordinary Soil
5+080 20.00 63.05 48.36 967.20 - - - - 20.00 21.18 423.60 0.76 15.20 95 918.84 5 48.36 0 - Ordinary Soil
5+100 20.00 81.17 72.11 1,442.20 - - - - 20.00 25.60 512.00 0.78 15.60 95 1,370.09 5 72.11 0 - Ordinary Soil
5+120 20.00 70.93 76.05 1,521.00 - - - - 20.00 28.04 560.80 0.89 17.80 95 1,444.95 5 76.05 0 - Ordinary Soil
5+140 20.00 62.91 66.92 1,338.40 - - - - 20.00 18.52 370.40 0.77 15.40 95 1,271.48 5 66.92 0 - Ordinary Soil
5+160 20.00 75.18 69.05 1,381.00 0.01 0.01 0.20 - 20.00 26.26 525.20 0.92 18.40 95 1,311.95 5 69.05 0 - Ordinary Soil
5+180 20.00 55.74 65.46 1,309.20 - 0.01 0.20 - 10.00 14.64 146.40 0.86 8.60 95 1,243.74 5 65.46 0 - Ordinary Soil
5+200 20.00 34.16 44.95 899.00 - - - - - - - - - 95 854.05 5 44.95 0 - Ordinary Soil
5+220 20.00 38.99 36.58 731.60 - - - - - - - - - 95 695.02 5 36.58 0 - Ordinary Soil
5+240 20.00 22.46 30.73 614.60 - - - - 10.00 1.11 11.10 0.24 2.40 95 583.87 5 30.73 0 - Ordinary Soil
5+260 20.00 15.41 18.94 378.80 1.55 0.78 15.60 - 20.00 1.97 39.40 0.24 4.80 95 359.86 5 18.94 0 - Ordinary Soil
5+280 20.00 25.00 20.21 404.20 5.71 3.63 72.60 - 20.00 3.61 72.20 0.50 10.00 95 383.99 5 20.21 0 - Ordinary Soil
5+300 20.00 19.68 22.34 446.80 4.98 5.35 107.00 - 20.00 3.61 72.20 0.51 10.20 95 424.46 5 22.34 0 - Ordinary Soil
5+320 20.00 11.98 15.83 316.60 7.29 6.14 122.80 - 20.00 4.59 91.80 0.77 15.40 95 300.77 5 15.83 0 - Ordinary Soil
5+340 20.00 23.04 17.51 350.20 5.99 6.64 132.80 - 20.00 5.65 113.00 1.07 21.40 95 332.69 5 17.51 0 - Ordinary Soil
5+360 20.00 19.21 21.13 422.60 1.83 3.91 78.20 - 10.00 1.27 12.70 0.27 2.70 95 401.47 5 21.13 0 - Ordinary Soil
5+380 20.00 24.89 22.05 441.00 2.08 1.96 39.20 - - - - - - 95 418.95 5 22.05 0 - Ordinary Soil
5+400 20.00 32.03 28.46 569.20 1.57 1.83 36.60 - 10.00 4.18 41.80 0.85 8.50 95 540.74 5 28.46 0 - Ordinary Soil
5+420 20.00 2.55 17.29 345.80 8.60 5.09 101.80 - 20.00 6.14 122.80 1.14 22.80 95 328.51 5 17.29 0 - Ordinary Soil
5+440 20.00 36.68 19.62 392.40 - 4.30 86.00 - 20.00 0.75 15.00 0.12 2.40 95 372.78 5 19.62 0 - Ordinary Soil
5+460 20.00 31.31 34.00 680.00 0.29 0.15 3.00 - 20.00 2.41 48.20 0.76 15.20 95 646.00 5 34.00 0 - Ordinary Soil
5+480 20.00 52.20 41.76 835.20 0.06 0.18 3.60 - 20.00 21.38 427.60 0.89 17.80 95 793.44 5 41.76 0 - Ordinary Soil
5+500 20.00 26.53 39.37 787.40 0.09 0.08 1.60 - 20.00 0.49 9.80 0.07 1.40 95 748.03 5 39.37 0 - Ordinary Soil
5+520 20.00 10.81 18.67 373.40 7.09 3.59 71.80 - 10.00 6.67 66.70 1.37 13.70 95 354.73 5 18.67 0 - Ordinary Soil
5+540 20.00 133.07 71.94 1,438.80 - 3.55 71.00 - - - - - - 95 1,366.86 5 71.94 0 - Ordinary Soil
5+560 20.00 73.92 103.50 2,070.00 0.11 0.06 1.20 - 10.00 2.11 21.10 0.67 6.70 95 1,966.50 5 103.50 0 - Ordinary Soil
5+580 20.00 15.90 44.91 898.20 2.22 1.17 23.40 - 20.00 6.77 135.40 1.63 32.60 95 853.29 5 44.91 0 - Ordinary Soil
5+600 20.00 10.27 13.09 261.80 1.07 1.65 33.00 - 10.00 4.34 43.40 1.00 10.00 95 248.71 5 13.09 0 - Ordinary Soil
5+620 20.00 90.61 50.44 1,008.80 - 0.54 10.80 - - - - - - 95 958.36 5 50.44 0 - Ordinary Soil
5+640 20.00 29.74 60.18 1,203.60 2.93 1.47 29.40 - 10.00 3.45 34.50 0.50 5.00 95 1,143.42 5 60.18 0 - Ordinary Soil
5+660 20.00 35.84 32.79 655.80 6.13 4.53 90.60 - 20.00 6.57 131.40 1.51 30.20 95 623.01 5 32.79 0 - Ordinary Soil
5+680 20.00 23.36 29.60 592.00 6.67 6.40 128.00 - 20.00 16.76 335.20 4.90 98.00 95 562.40 5 29.60 0 - Ordinary Soil
5+700 20.00 22.99 23.18 463.60 7.26 6.97 139.40 - 20.00 20.00 400.00 6.90 138.00 95 440.42 5 23.18 0 - Ordinary Soil
5+720 20.00 - 11.50 230.00 65.54 36.40 728.00 498.00 20.00 8.94 178.80 0.11 2.20 95 218.50 5 11.50 0 - Ordinary Soil
5+740 20.00 47.15 23.58 471.60 0.52 33.03 660.60 189.00 20.00 5.71 114.20 1.51 30.20 95 448.02 5 23.58 0 - Ordinary Soil
5+760 20.00 20.21 33.68 673.60 6.96 3.74 74.80 - 20.00 15.49 309.80 4.35 87.00 95 639.92 5 33.68 0 - Ordinary Soil
5+780 20.00 10.26 15.24 304.80 14.28 10.62 212.40 - 20.00 12.71 254.20 2.80 56.00 95 289.56 5 15.24 0 - Ordinary Soil
5+800 20.00 59.20 34.73 694.60 5.22 9.75 195.00 - 20.00 7.31 146.20 1.72 34.40 95 659.87 5 34.73 0 - Ordinary Soil
5+820 20.00 94.18 76.69 1,533.80 1.84 3.53 70.60 - 20.00 11.80 236.00 3.65 73.00 95 1,457.11 5 76.69 0 - Ordinary Soil
5+840 20.00 30.61 62.40 1,248.00 6.05 3.95 79.00 - 20.00 12.16 243.20 3.21 64.20 95 1,185.60 5 62.40 0 - Ordinary Soil
5+860 20.00 51.01 40.81 816.20 1.66 3.86 77.20 - 20.00 11.62 232.40 3.83 76.60 95 775.39 5 40.81 0 - Ordinary Soil
5+880 20.00 65.31 58.16 1,163.20 0.88 1.27 25.40 - 20.00 4.95 99.00 1.15 23.00 95 1,105.04 5 58.16 0 - Ordinary Soil
5+900 20.00 20.38 42.85 857.00 7.09 3.99 79.80 - 20.00 4.34 86.80 0.50 10.00 95 814.15 5 42.85 0 - Ordinary Soil

21 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
5+920 20.00 11.38 15.88 317.60 9.31 8.20 164.00 - 20.00 2.63 52.60 0.20 4.00 95 301.72 5 15.88 0 - Ordinary Soil
5+940 20.00 81.74 46.56 931.20 - 4.66 93.20 - 20.00 0.51 10.20 0.04 0.80 95 884.64 5 46.56 0 - Ordinary Soil
5+960 20.00 76.61 79.18 1,583.60 0.40 0.20 4.00 - 10.00 2.84 28.40 0.94 9.40 95 1,504.42 5 79.18 0 - Ordinary Soil
5+980 20.00 55.77 66.19 1,323.80 - 0.20 4.00 - - - - - - 95 1,257.61 5 66.19 0 - Ordinary Soil
6+000 20.00 29.22 42.50 850.00 1.44 0.72 14.40 - 10.00 2.93 29.30 0.84 8.40 95 807.50 5 42.50 0 - Ordinary Soil
6+020 20.00 12.19 20.71 414.20 9.44 5.44 108.80 - 20.00 14.89 297.80 3.93 78.60 95 393.49 5 20.71 0 - Ordinary Soil
6+040 20.00 17.81 15.00 300.00 4.75 7.10 142.00 - 20.00 6.00 120.00 1.09 21.80 95 285.00 5 15.00 0 - Ordinary Soil
6+060 20.00 25.96 21.89 437.80 0.60 2.68 53.60 - 20.00 1.30 26.00 0.28 5.60 95 415.91 5 21.89 0 - Ordinary Soil
6+080 20.00 23.45 24.71 494.20 2.24 1.42 28.40 - 20.00 2.33 46.60 0.65 13.00 95 469.49 5 24.71 0 - Ordinary Soil
6+100 20.00 58.70 41.08 821.60 - 1.12 22.40 - 20.00 1.18 23.60 0.23 4.60 95 780.52 5 41.08 0 - Ordinary Soil
6+120 20.00 47.76 53.23 1,064.60 1.40 0.70 14.00 - 20.00 2.45 49.00 0.66 13.20 95 1,011.37 5 53.23 0 - Ordinary Soil
6+140 20.00 53.40 50.58 1,011.60 0.20 0.80 16.00 - 20.00 1.48 29.60 0.39 7.80 95 961.02 5 50.58 0 - Ordinary Soil
6+160 20.00 13.84 33.62 672.40 10.80 5.50 110.00 - 20.00 9.20 184.00 2.12 42.40 95 638.78 5 33.62 0 - Ordinary Soil
6+180 20.00 3.79 8.82 176.40 24.63 17.72 354.40 178.00 20.00 11.73 234.60 2.13 42.60 95 167.58 5 8.82 0 - Ordinary Soil
6+200 20.00 21.70 12.75 255.00 2.91 13.77 275.40 20.40 20.00 5.78 115.60 1.33 26.60 95 242.25 5 12.75 0 - Ordinary Soil
6+220 20.00 14.78 18.24 364.80 5.79 4.35 87.00 - 20.00 4.33 86.60 0.66 13.20 95 346.56 5 18.24 0 - Ordinary Soil
6+240 20.00 28.08 21.43 428.60 0.06 2.93 58.60 - 20.00 1.30 26.00 0.33 6.60 95 407.17 5 21.43 0 - Ordinary Soil
6+260 20.00 11.73 19.91 398.20 5.05 2.56 51.20 - 20.00 2.47 49.40 0.12 2.40 95 378.29 5 19.91 0 - Ordinary Soil
6+280 20.00 0.29 6.01 120.20 7.30 6.18 123.60 3.40 20.00 2.29 45.80 0.20 4.00 95 114.19 5 6.01 0 - Ordinary Soil
6+300 20.00 - 0.15 3.00 16.81 12.06 241.20 238.20 20.00 4.23 84.60 0.51 10.20 95 2.85 5 0.15 0 - Ordinary Soil
6+320 20.00 - - - 40.75 28.78 575.60 575.60 20.00 6.85 137.00 1.10 22.00 95 - 5 - 0 - Ordinary Soil
6+340 20.00 - - - 57.16 48.96 979.20 979.20 20.00 11.86 237.20 3.05 61.00 95 - 5 - 0 - Ordinary Soil
6+360 20.00 - - - 61.26 59.21 1,184.20 1,184.20 10.00 7.82 78.20 1.53 15.30 95 - 5 - 0 - Ordinary Soil
6+380 20.00 - - - 126.07 93.67 1,873.40 1,873.40 - - - - - 95 - 5 - 0 - Ordinary Soil
6+400 20.00 - - - 168.86 147.47 2,949.40 2,949.40 - - - - - 95 - 5 - 0 - Ordinary Soil
6+420 20.00 - - - 172.41 170.64 3,412.80 3,412.80 - - - - - 95 - 5 - 0 - Ordinary Soil
6+440 20.00 - - - 212.31 192.36 3,847.20 3,847.20 - - - - - 95 - 5 - 0 - Ordinary Soil
6+460 20.00 - - - 180.83 196.57 3,931.40 3,931.40 - - - - - 95 - 5 - 0 - Ordinary Soil
6+480 20.00 - - - 71.09 125.96 2,519.20 2,519.20 10.00 8.80 88.00 0.75 7.50 95 - 5 - 0 - Ordinary Soil
6+500 20.00 32.55 16.28 325.60 5.93 38.51 770.20 444.60 20.00 17.49 349.80 5.42 108.40 95 309.32 5 16.28 0 - Ordinary Soil
6+520 20.00 0.28 16.42 328.40 23.75 14.84 296.80 - 20.00 11.69 233.80 2.37 47.40 95 311.98 5 16.42 0 - Ordinary Soil
6+540 20.00 4.49 2.39 47.80 18.21 20.98 419.60 371.80 20.00 17.52 350.40 4.45 89.00 95 45.41 5 2.39 0 - Ordinary Soil
6+560 20.00 11.62 8.06 161.20 4.47 11.34 226.80 65.60 10.00 4.63 46.30 0.88 8.80 95 153.14 5 8.06 0 - Ordinary Soil
6+580 20.00 34.04 22.83 456.60 - 2.24 44.80 - - - - - - 95 433.77 5 22.83 0 - Ordinary Soil
6+600 20.00 35.30 34.67 693.40 0.16 0.08 1.60 - - - - - - 95 658.73 5 34.67 0 - Ordinary Soil
6+620 20.00 4.04 19.67 393.40 8.96 4.56 91.20 - 10.00 1.46 14.60 0.01 0.10 95 373.73 5 19.67 0 - Ordinary Soil
6+640 20.00 - 2.02 40.40 15.93 12.45 249.00 208.60 20.00 5.73 114.60 0.77 15.40 95 38.38 5 2.02 0 - Ordinary Soil
6+660 20.00 22.00 11.00 220.00 0.02 7.98 159.60 - 10.00 1.93 19.30 0.57 5.70 95 209.00 5 11.00 0 - Ordinary Soil
6+680 20.00 54.44 38.22 764.40 - 0.01 0.20 - - - - - - 95 726.18 5 38.22 0 - Ordinary Soil
6+700 20.00 99.87 77.16 1,543.20 - - - - 10.00 107.70 1,077.00 1.58 15.80 95 1,466.04 5 77.16 0 - Ordinary Soil
6+720 20.00 42.02 70.95 1,419.00 0.01 0.01 0.20 - 20.00 25.09 501.80 0.90 18.00 95 1,348.05 5 70.95 0 - Ordinary Soil
6+740 20.00 14.42 28.22 564.40 0.25 0.13 2.60 - 20.00 17.56 351.20 1.65 33.00 95 536.18 5 28.22 0 - Ordinary Soil
6+760 20.00 32.69 23.56 471.20 - 0.13 2.60 - 20.00 29.79 595.80 0.67 13.40 95 447.64 5 23.56 0 - Ordinary Soil

22 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
6+780 20.00 26.8012 29.75 595.00 0.003 - - - 20.00 26.71 534.20 0.66 13.20 95 565.25 5 29.75 0 - Ordinary Soil
6+800 20.00 28.72 27.76 555.20 - - - - 20.00 29.60 592.00 0.80 16.00 95 527.44 5 27.76 0 - Ordinary Soil
6+820 20.00 28.43 28.58 571.60 - - - - 20.00 28.72 574.40 0.70 14.00 95 543.02 5 28.58 0 - Ordinary Soil
6+840 20.00 44.06 36.25 725.00 - - - - 20.00 33.50 670.00 0.79 15.80 95 688.75 5 36.25 0 - Ordinary Soil
6+860 20.00 37.81 40.94 818.80 - - - - 20.00 31.70 634.00 0.66 13.20 95 777.86 5 40.94 0 - Ordinary Soil
6+880 20.00 59.42 48.62 972.40 - - - - 20.00 42.26 845.20 0.68 13.60 95 923.78 5 48.62 0 - Ordinary Soil
6+900 20.00 74.80 67.11 1,342.20 - - - - 20.00 50.55 1,011.00 0.69 13.80 95 1,275.09 5 67.11 0 - Ordinary Soil
6+920 20.00 72.26 73.53 1,470.60 - - - - 20.00 49.51 990.20 0.69 13.80 95 1,397.07 5 73.53 0 - Ordinary Soil
6+940 20.00 58.26 65.26 1,305.20 - - - - 20.00 74.35 1,487.00 0.69 13.80 95 1,239.94 5 65.26 0 - Ordinary Soil
6+960 20.00 79.33 68.80 1,376.00 - - - - 20.00 125.16 2,503.20 1.60 32.00 95 1,307.20 5 68.80 0 - Ordinary Soil
6+980 20.00 85.36 82.35 1,647.00 - - - - 20.00 146.05 2,921.00 1.60 32.00 95 1,564.65 5 82.35 0 - Ordinary Soil
7+000 20.00 91.57 88.47 1,769.40 - - - - 20.00 153.23 3,064.60 1.73 34.60 95 1,680.93 5 88.47 0 - Ordinary Soil
7+020 20.00 120.16 105.87 2,117.40 - - - - 20.00 121.84 2,436.80 1.60 32.00 95 2,011.53 5 105.87 0 - Ordinary Soil
7+040 20.00 85.82 102.99 2,059.80 - - - - 20.00 93.36 1,867.20 2.83 56.60 95 1,956.81 5 102.99 0 - Ordinary Soil
7+060 20.00 101.95 93.89 1,877.80 - - - - 20.00 119.29 2,385.80 1.63 32.60 95 1,783.91 5 93.89 0 - Ordinary Soil
7+080 20.00 124.52 105.17 2,103.40 - - - - 20.00 153.99 3,079.80 1.44 28.80 95 1,998.23 5 105.17 0 - Ordinary Soil
7+100 20.00 142.30 122.13 2,442.60 - - - - 20.00 185.32 3,706.40 1.55 31.00 95 2,320.47 5 122.13 0 - Ordinary Soil
7+120 20.00 125.50 125.01 2,500.20 0.02 0.01 0.20 - 20.00 222.57 4,451.40 1.68 33.60 95 2,375.19 5 125.01 0 - Ordinary Soil
7+140 20.00 152.87 147.59 2,951.80 - - - - 20.00 279.81 5,596.20 3.09 61.80 95 2,804.21 5 147.59 0 - Ordinary Soil
7+160 20.00 147.40 136.45 2,729.00 - 0.01 0.20 - 10.00 317.47 3,174.70 6.91 69.10 95 2,592.55 5 136.45 0 - Ordinary Soil
7+180 20.00 280.74 216.81 4,336.20 - - - - - - - - - 95 4,119.39 5 216.81 0 - Ordinary Soil
7+200 20.00 273.47 210.44 4,208.80 - - - - - - - - - 95 3,998.36 5 210.44 0 - Ordinary Soil
7+220 20.00 349.04 314.89 6,297.80 - - - - - - - - - 95 5,982.91 5 314.89 0 - Ordinary Soil
7+240 20.00 343.48 308.48 6,169.60 - - - - - - - - - 95 5,861.12 5 308.48 0 - Ordinary Soil
7+260 20.00 349.52 349.28 6,985.60 - - - - - - - - - 95 6,636.32 5 349.28 0 - Ordinary Soil
7+280 20.00 356.63 350.06 7,001.20 - - - - - - - - - 95 6,651.14 5 350.06 0 - Ordinary Soil
7+300 20.00 375.73 362.63 7,252.60 - - - - - - - - - 95 6,889.97 5 362.63 0 - Ordinary Soil
7+320 20.00 376.24 366.44 7,328.80 - - - - - - - - - 95 6,962.36 5 366.44 0 - Ordinary Soil
7+340 20.00 381.43 378.58 7,571.60 - - - - - - - - - 95 7,193.02 5 378.58 0 - Ordinary Soil
7+360 20.00 413.65 394.95 7,899.00 - - - - - - - - - 95 7,504.05 5 394.95 0 - Ordinary Soil
7+380 20.00 395.84 388.64 7,772.80 - - - - - - - - - 95 7,384.16 5 388.64 0 - Ordinary Soil
7+400 20.00 458.15 435.90 8,718.00 - - - - - - - - - 95 8,282.10 5 435.90 0 - Ordinary Soil
7+420 20.00 520.54 458.19 9,163.80 - - - - - - - - - 95 8,705.61 5 458.19 0 - Ordinary Soil
7+440 20.00 523.58 490.87 9,817.40 - - - - - - - - - 95 9,326.53 5 490.87 0 - Ordinary Soil
7+460 20.00 491.16 505.85 10,117.00 - - - - - - - - - 95 9,611.15 5 505.85 0 - Ordinary Soil
7+480 20.00 509.23 516.41 10,328.20 - - - - - - - - - 95 9,811.79 5 516.41 0 - Ordinary Soil
7+500 20.00 564.29 527.73 10,554.60 - - - - - - - - - 95 10,026.87 5 527.73 0 - Ordinary Soil
7+520 20.00 540.48 524.86 10,497.20 - - - - - - - - - 95 9,972.34 5 524.86 0 - Ordinary Soil
7+540 20.00 471.61 517.95 10,359.00 - - - - - - - - - 95 9,841.05 5 517.95 0 - Ordinary Soil
7+560 20.00 551.84 546.16 10,923.20 - - - - - - - - - 95 10,377.04 5 546.16 0 - Ordinary Soil
7+580 20.00 553.28 512.45 10,249.00 - - - - - - - - - 95 9,736.55 5 512.45 0 - Ordinary Soil
7+600 20.00 555.13 553.49 11,069.80 - - - - - - - - - 95 10,516.31 5 553.49 0 - Ordinary Soil
7+620 20.00 538.54 545.91 10,918.20 - - - - - - - - - 95 10,372.29 5 545.91 0 - Ordinary Soil

23 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
7+640 20.00 536.41 545.77 10,915.40 - - - - - - - - - 95 10,369.63 5 545.77 0 - Ordinary Soil
7+660 20.00 514.70 526.62 10,532.40 - - - - - - - - - 95 10,005.78 5 526.62 0 - Ordinary Soil
7+680 20.00 533.10 534.76 10,695.20 - - - - - - - - - 95 10,160.44 5 534.76 0 - Ordinary Soil
7+700 20.00 525.30 520.00 10,400.00 - - - - - - - - - 95 9,880.00 5 520.00 0 - Ordinary Soil
7+720 20.00 539.82 536.46 10,729.20 - - - - - - - - - 95 10,192.74 5 536.46 0 - Ordinary Soil
7+740 20.00 737.30 631.30 12,626.00 - - - - - - - - - 95 11,994.70 5 631.30 0 - Ordinary Soil
7+760 20.00 738.40 639.11 12,782.20 - - - - - - - - - 95 12,143.09 5 639.11 0 - Ordinary Soil
7+780 20.00 668.14 702.72 14,054.40 - - - - - - - - - 95 13,351.68 5 702.72 0 - Ordinary Soil
7+800 20.00 601.15 669.78 13,395.60 - - - - - - - - - 95 12,725.82 5 669.78 0 - Ordinary Soil
7+820 20.00 602.05 635.10 12,702.00 - - - - - - - - - 95 12,066.90 5 635.10 0 - Ordinary Soil
7+840 20.00 618.61 609.88 12,197.60 - - - - - - - - - 95 11,587.72 5 609.88 0 - Ordinary Soil
7+860 20.00 615.22 608.64 12,172.80 - - - - - - - - - 95 11,564.16 5 608.64 0 - Ordinary Soil
7+880 20.00 634.77 626.69 12,533.80 - - - - - - - - - 95 11,907.11 5 626.69 0 - Ordinary Soil
7+900 20.00 662.03 638.63 12,772.60 - - - - - - - - - 95 12,133.97 5 638.63 0 - Ordinary Soil
7+920 20.00 746.72 690.75 13,815.00 - - - - - - - - - 95 13,124.25 5 690.75 0 - Ordinary Soil
7+940 20.00 679.53 670.78 13,415.60 - - - - - - - - - 95 12,744.82 5 670.78 0 - Ordinary Soil
7+960 20.00 683.29 715.01 14,300.20 - - - - - - - - - 95 13,585.19 5 715.01 0 - Ordinary Soil
7+980 20.00 728.17 703.85 14,077.00 - - - - - - - - - 95 13,373.15 5 703.85 0 - Ordinary Soil
8+000 20.00 740.84 712.07 14,241.40 - - - - - - - - - 95 13,529.33 5 712.07 0 - Ordinary Soil
8+020 20.00 789.39 758.78 15,175.60 - - - - - - - - - 95 14,416.82 5 758.78 0 - Ordinary Soil
8+040 20.00 810.61 775.73 15,514.60 - - - - - - - - - 95 14,738.87 5 775.73 0 - Ordinary Soil
8+060 20.00 817.57 803.48 16,069.60 - - - - - - - - - 95 15,266.12 5 803.48 0 - Ordinary Soil
8+080 20.00 837.40 824.01 16,480.20 - - - - - - - - - 95 15,656.19 5 824.01 0 - Ordinary Soil
8+100 20.00 812.04 814.81 16,296.20 - - - - - - - - - 95 15,481.39 5 814.81 0 - Ordinary Soil
8+120 20.00 793.09 815.25 16,305.00 - - - - - - - - - 95 15,489.75 5 815.25 0 - Ordinary Soil
8+140 20.00 755.68 783.86 15,677.20 - - - - - - - - - 95 14,893.34 5 783.86 0 - Ordinary Soil
8+160 20.00 738.00 765.55 15,311.00 - - - - - - - - - 95 14,545.45 5 765.55 0 - Ordinary Soil
8+180 20.00 825.03 790.36 15,807.20 - - - - - - - - - 95 15,016.84 5 790.36 0 - Ordinary Soil
8+200 20.00 820.19 779.10 15,582.00 - - - - - - - - - 95 14,802.90 5 779.10 0 - Ordinary Soil
8+220 20.00 884.48 854.76 17,095.20 - - - - - - - - - 95 16,240.44 5 854.76 0 - Ordinary Soil
8+240 20.00 799.06 809.63 16,192.60 - - - - - - - - - 95 15,382.97 5 809.63 0 - Ordinary Soil
8+260 20.00 787.89 836.19 16,723.80 - - - - - - - - - 95 15,887.61 5 836.19 0 - Ordinary Soil
8+280 20.00 761.42 780.24 15,604.80 - - - - - - - - - 95 14,824.56 5 780.24 0 - Ordinary Soil
8+300 20.00 821.06 804.48 16,089.60 0.01 0.01 0.20 - - - - - - 95 15,285.12 5 804.48 0 - Ordinary Soil
8+320 20.00 803.73 782.58 15,651.60 - - - - - - - - - 95 14,869.02 5 782.58 0 - Ordinary Soil
8+340 20.00 693.04 757.05 15,141.00 - 0.01 0.20 - - - - - - 95 14,383.95 5 757.05 0 - Ordinary Soil
8+360 20.00 887.73 845.73 16,914.60 - - - - - - - - - 95 16,068.87 5 845.73 0 - Ordinary Soil
8+380 20.00 803.32 748.18 14,963.60 - - - - - - - - - 95 14,215.42 5 748.18 0 - Ordinary Soil
8+400 20.00 834.76 861.25 17,225.00 - - - - - - - - - 95 16,363.75 5 861.25 0 - Ordinary Soil
8+420 20.00 781.40 792.36 15,847.20 - - - - - - - - - 95 15,054.84 5 792.36 0 - Ordinary Soil
8+440 20.00 776.86 805.81 16,116.20 - - - - - - - - - 95 15,310.39 5 805.81 0 - Ordinary Soil
8+460 20.00 928.10 854.75 17,095.00 - - - - - - - - - 95 16,240.25 5 854.75 0 - Ordinary Soil
8+480 20.00 947.08 861.97 17,239.40 - - - - - - - - - 95 16,377.43 5 861.97 0 - Ordinary Soil

24 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
8+500 20.00 853.41 890.76 17,815.20 - - - - - - - - - 95 16,924.44 5 890.76 0 - Ordinary Soil
8+520 20.00 862.98 905.03 18,100.60 - - - - - - - - - 95 17,195.57 5 905.03 0 - Ordinary Soil
8+540 20.00 873.57 863.49 17,269.80 - - - - - - - - - 95 16,406.31 5 863.49 0 - Ordinary Soil
8+560 20.00 907.34 885.16 17,703.20 - - - - - - - - - 95 16,818.04 5 885.16 0 - Ordinary Soil
8+580 20.00 908.68 891.13 17,822.60 - - - - - - - - - 95 16,931.47 5 891.13 0 - Ordinary Soil
8+600 20.00 946.49 926.92 18,538.40 - - - - - - - - - 95 17,611.48 5 926.92 0 - Ordinary Soil
8+620 20.00 952.36 930.52 18,610.40 - - - - - - - - - 95 17,679.88 5 930.52 0 - Ordinary Soil
8+640 20.00 891.92 919.21 18,384.20 - - - - - - - - - 95 17,464.99 5 919.21 0 - Ordinary Soil
8+660 20.00 888.74 920.55 18,411.00 - - - - - - - - - 95 17,490.45 5 920.55 0 - Ordinary Soil
8+680 20.00 936.70 914.31 18,286.20 - - - - - - - - - 95 17,371.89 5 914.31 0 - Ordinary Soil
8+700 20.00 873.70 881.22 17,624.40 - - - - - - - - - 95 16,743.18 5 881.22 0 - Ordinary Soil
8+720 20.00 947.16 941.93 18,838.60 - - - - - - - - - 95 17,896.67 5 941.93 0 - Ordinary Soil
8+740 20.00 836.45 855.08 17,101.60 - - - - - - - - - 95 16,246.52 5 855.08 0 - Ordinary Soil
8+760 20.00 925.96 936.56 18,731.20 - - - - - - - - - 95 17,794.64 5 936.56 0 - Ordinary Soil
8+780 20.00 1,007.90 922.18 18,443.60 - - - - - - - - - 95 17,521.42 5 922.18 0 - Ordinary Soil
8+800 20.00 1,016.65 971.31 19,426.20 - - - - - - - - - 95 18,454.89 5 971.31 0 - Ordinary Soil
8+820 20.00 940.71 974.31 19,486.20 - - - - - - - - - 95 18,511.89 5 974.31 0 - Ordinary Soil
8+840 20.00 971.79 994.22 19,884.40 - - - - - - - - - 95 18,890.18 5 994.22 0 - Ordinary Soil
8+860 20.00 1,073.70 1,007.21 20,144.20 - - - - - - - - - 95 19,136.99 5 1,007.21 0 - Ordinary Soil
8+880 20.00 1,062.44 1,017.12 20,342.40 - - - - - - - - - 95 19,325.28 5 1,017.12 0 - Ordinary Soil
8+900 20.00 1,042.50 1,058.10 21,162.00 - - - - - - - - - 95 20,103.90 5 1,058.10 0 - Ordinary Soil
8+920 20.00 975.73 1,019.09 20,381.80 - - - - - - - - - 95 19,362.71 5 1,019.09 0 - Ordinary Soil
8+940 20.00 1,084.79 1,063.65 21,273.00 - - - - - - - - - 95 20,209.35 5 1,063.65 0 - Ordinary Soil
8+960 20.00 1,016.27 996.00 19,920.00 - - - - - - - - - 95 18,924.00 5 996.00 0 - Ordinary Soil
8+980 20.00 998.48 1,041.64 20,832.80 - - - - - - - - - 95 19,791.16 5 1,041.64 0 - Ordinary Soil
9+000 20.00 997.94 1,007.11 20,142.20 - - - - - - - - - 95 19,135.09 5 1,007.11 0 - Ordinary Soil
9+020 20.00 1,079.63 1,039.06 20,781.20 0.01 0.01 0.20 - - - - - - 95 19,742.14 5 1,039.06 0 - Ordinary Soil
9+040 20.00 1,096.84 1,047.39 20,947.80 - - - - - - - - - 95 19,900.41 5 1,047.39 0 - Ordinary Soil
9+060 20.00 1,040.30 1,059.97 21,199.40 - 0.01 0.20 - - - - - - 95 20,139.43 5 1,059.97 0 - Ordinary Soil
9+080 20.00 970.52 1,033.68 20,673.60 - - - - - - - - - 95 19,639.92 5 1,033.68 0 - Ordinary Soil
9+100 20.00 973.24 1,006.77 20,135.40 - - - - - - - - - 95 19,128.63 5 1,006.77 0 - Ordinary Soil
9+120 20.00 1,097.02 1,033.77 20,675.40 - - - - - - - - - 95 19,641.63 5 1,033.77 0 - Ordinary Soil
9+140 20.00 1,085.24 1,029.24 20,584.80 - - - - - - - - - 95 19,555.56 5 1,029.24 0 - Ordinary Soil
9+160 20.00 1,063.88 1,080.45 21,609.00 - - - - - - - - - 95 20,528.55 5 1,080.45 0 - Ordinary Soil
9+180 20.00 993.47 1,039.36 20,787.20 - - - - - - - - - 95 19,747.84 5 1,039.36 0 - Ordinary Soil
9+200 20.00 974.60 1,019.24 20,384.80 - - - - - - - - - 95 19,365.56 5 1,019.24 0 - Ordinary Soil
9+220 20.00 1,029.28 1,011.38 20,227.60 - - - - - - - - - 95 19,216.22 5 1,011.38 0 - Ordinary Soil
9+240 20.00 991.86 983.23 19,664.60 - - - - - - - - - 95 18,681.37 5 983.23 0 - Ordinary Soil
9+260 20.00 1,024.32 1,026.80 20,536.00 - - - - - - - - - 95 19,509.20 5 1,026.80 0 - Ordinary Soil
9+280 20.00 962.29 977.08 19,541.60 - - - - - - - - - 95 18,564.52 5 977.08 0 - Ordinary Soil
9+300 20.00 1,040.21 1,032.27 20,645.40 - - - - - - - - - 95 19,613.13 5 1,032.27 0 - Ordinary Soil
9+320 20.00 1,091.17 1,026.73 20,534.60 - - - - - - - - - 95 19,507.87 5 1,026.73 0 - Ordinary Soil
9+340 20.00 1,084.88 1,062.55 21,251.00 - - - - - - - - - 95 20,188.45 5 1,062.55 0 - Ordinary Soil

25 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
9+360 20.00 1,046.08 1,068.63 21,372.60 - - - - - - - - - 95 20,303.97 5 1,068.63 0 - Ordinary Soil
9+380 20.00 924.40 1,004.64 20,092.80 - - - - - - - - - 95 19,088.16 5 1,004.64 0 - Ordinary Soil
9+400 20.00 1,015.40 1,030.74 20,614.80 - - - - - - - - - 95 19,584.06 5 1,030.74 0 - Ordinary Soil
9+420 20.00 1,178.37 1,051.39 21,027.80 - - - - - - - - - 95 19,976.41 5 1,051.39 0 - Ordinary Soil
9+440 20.00 1,183.85 1,099.63 21,992.60 - - - - - - - - - 95 20,892.97 5 1,099.63 0 - Ordinary Soil
9+460 20.00 1,076.73 1,127.55 22,551.00 - - - - - - - - - 95 21,423.45 5 1,127.55 0 - Ordinary Soil
9+480 20.00 1,134.14 1,159.00 23,180.00 - - - - - - - - - 95 22,021.00 5 1,159.00 0 - Ordinary Soil
9+500 20.00 1,020.61 1,048.67 20,973.40 - - - - - - - - - 95 19,924.73 5 1,048.67 0 - Ordinary Soil
9+520 20.00 1,070.77 1,102.46 22,049.20 - - - - - - - - - 95 20,946.74 5 1,102.46 0 - Ordinary Soil
9+540 20.00 1,069.04 1,044.83 20,896.60 - - - - - - - - - 95 19,851.77 5 1,044.83 0 - Ordinary Soil
9+560 20.00 1,076.99 1,073.88 21,477.60 - - - - - - - - - 95 20,403.72 5 1,073.88 0 - Ordinary Soil
9+580 20.00 1,071.40 1,070.22 21,404.40 - - - - - - - - - 95 20,334.18 5 1,070.22 0 - Ordinary Soil
9+600 20.00 939.50 1,008.25 20,165.00 - - - - - - - - - 95 19,156.75 5 1,008.25 0 - Ordinary Soil
9+620 20.00 669.02 870.21 17,404.20 - - - - - - - - - 95 16,533.99 5 870.21 0 - Ordinary Soil
9+640 20.00 1,120.64 1,030.07 20,601.40 - - - - - - - - - 95 19,571.33 5 1,030.07 0 - Ordinary Soil
9+660 20.00 1,083.42 876.22 17,524.40 - - - - - - - - - 95 16,648.18 5 876.22 0 - Ordinary Soil
9+680 20.00 1,003.17 1,061.91 21,238.20 - - - - - - - - - 95 20,176.29 5 1,061.91 0 - Ordinary Soil
9+700 20.00 990.32 1,036.87 20,737.40 - - - - - - - - - 95 19,700.53 5 1,036.87 0 - Ordinary Soil
9+720 20.00 1,007.09 1,005.13 20,102.60 - - - - - - - - - 95 19,097.47 5 1,005.13 0 - Ordinary Soil
9+740 20.00 1,019.17 1,004.75 20,095.00 - - - - - - - - - 95 19,090.25 5 1,004.75 0 - Ordinary Soil
9+760 20.00 973.08 990.09 19,801.80 - - - - - - - - - 95 18,811.71 5 990.09 0 - Ordinary Soil
9+780 20.00 1,026.77 1,022.97 20,459.40 - - - - - - - - - 95 19,436.43 5 1,022.97 0 - Ordinary Soil
9+800 20.00 1,030.31 1,001.70 20,034.00 - - - - - - - - - 95 19,032.30 5 1,001.70 0 - Ordinary Soil
9+820 20.00 970.31 998.54 19,970.80 - - - - - - - - - 95 18,972.26 5 998.54 0 - Ordinary Soil
9+840 20.00 847.80 939.06 18,781.20 - - - - - - - - - 95 17,842.14 5 939.06 0 - Ordinary Soil
9+860 20.00 984.66 977.49 19,549.80 0.07 0.04 0.80 - - - - - - 95 18,572.31 5 977.49 0 - Ordinary Soil
9+880 20.00 989.09 918.45 18,369.00 - - - - - - - - - 95 17,450.55 5 918.45 0 - Ordinary Soil
9+900 20.00 1,056.48 1,020.57 20,411.40 - 0.04 0.80 - - - - - - 95 19,390.83 5 1,020.57 0 - Ordinary Soil
9+920 20.00 1,034.14 1,011.62 20,232.40 - - - - - - - - - 95 19,220.78 5 1,011.62 0 - Ordinary Soil
9+940 20.00 1,045.98 1,051.23 21,024.60 - - - - - - - - - 95 19,973.37 5 1,051.23 0 - Ordinary Soil
9+960 20.00 937.77 985.96 19,719.20 - - - - - - - - - 95 18,733.24 5 985.96 0 - Ordinary Soil
9+980 20.00 931.20 988.59 19,771.80 - - - - - - - - - 95 18,783.21 5 988.59 0 - Ordinary Soil
10+000 20.00 1,112.13 1,024.95 20,499.00 - - - - - - - - - 95 19,474.05 5 1,024.95 0 - Ordinary Soil
10+020 20.00 1,110.48 1,020.84 20,416.80 - - - - - - - - - 95 19,395.96 5 1,020.84 0 - Ordinary Soil
10+040 20.00 1,162.36 1,137.25 22,745.00 - - - - - - - - - 95 21,607.75 5 1,137.25 0 - Ordinary Soil
10+060 20.00 996.26 1,053.37 21,067.40 - - - - - - - - - 95 20,014.03 5 1,053.37 0 - Ordinary Soil
10+080 20.00 1,000.47 1,081.42 21,628.40 - - - - - - - - - 95 20,546.98 5 1,081.42 0 - Ordinary Soil
10+100 20.00 1,015.27 1,005.77 20,115.40 - - - - - - - - - 95 19,109.63 5 1,005.77 0 - Ordinary Soil
10+120 20.00 1,122.83 1,061.65 21,233.00 - - - - - - - - - 95 20,171.35 5 1,061.65 0 - Ordinary Soil
10+140 20.00 1,108.96 1,062.12 21,242.40 - - - - - - - - - 95 20,180.28 5 1,062.12 0 - Ordinary Soil
10+160 20.00 1,111.38 1,117.11 22,342.20 - - - - - - - - - 95 21,225.09 5 1,117.11 0 - Ordinary Soil
10+180 20.00 1,125.62 1,117.29 22,345.80 - - - - - - - - - 95 21,228.51 5 1,117.29 0 - Ordinary Soil
10+200 20.00 1,143.73 1,127.56 22,551.20 - - - - - - - - - 95 21,423.64 5 1,127.56 0 - Ordinary Soil

26 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
10+220 20.00 1,157.22 1,141.42 22,828.40 - - - - - - - - - 95 21,686.98 5 1,141.42 0 - Ordinary Soil
10+240 20.00 1,152.54 1,148.14 22,962.80 - - - - - - - - - 95 21,814.66 5 1,148.14 0 - Ordinary Soil
10+260 20.00 1,147.54 1,152.38 23,047.60 - - - - - - - - - 95 21,895.22 5 1,152.38 0 - Ordinary Soil
10+280 20.00 1,138.47 1,145.51 22,910.20 - - - - - - - - - 95 21,764.69 5 1,145.51 0 - Ordinary Soil
10+300 20.00 1,119.41 1,133.48 22,669.60 - - - - - - - - - 95 21,536.12 5 1,133.48 0 - Ordinary Soil
10+320 20.00 1,103.78 1,121.13 22,422.60 0.05 0.03 0.60 - - - - - - 95 21,301.47 5 1,121.13 0 - Ordinary Soil
10+340 20.00 1,121.29 1,120.35 22,407.00 - - - - - - - - - 95 21,286.65 5 1,120.35 0 - Ordinary Soil
10+360 20.00 1,102.67 1,103.23 22,064.60 - 0.03 0.60 - - - - - - 95 20,961.37 5 1,103.23 0 - Ordinary Soil
10+380 20.00 1,054.24 1,087.77 21,755.40 - - - - - - - - - 95 20,667.63 5 1,087.77 0 - Ordinary Soil
10+400 20.00 1,050.80 1,076.74 21,534.80 - - - - - - - - - 95 20,458.06 5 1,076.74 0 - Ordinary Soil
10+420 20.00 1,056.63 1,055.44 21,108.80 - - - - - - - - - 95 20,053.36 5 1,055.44 0 - Ordinary Soil
10+440 20.00 986.22 1,018.51 20,370.20 - - - - - - - - - 95 19,351.69 5 1,018.51 0 - Ordinary Soil
10+460 20.00 1,086.62 1,071.63 21,432.60 - - - - - - - - - 95 20,360.97 5 1,071.63 0 - Ordinary Soil
10+480 20.00 1,130.21 1,058.22 21,164.40 - - - - - - - - - 95 20,106.18 5 1,058.22 0 - Ordinary Soil
10+500 20.00 1,131.99 1,109.31 22,186.20 - - - - - - - - - 95 21,076.89 5 1,109.31 0 - Ordinary Soil
10+520 20.00 1,076.56 1,103.39 22,067.80 0.01 0.01 0.20 - - - - - - 95 20,964.41 5 1,103.39 0 - Ordinary Soil
10+540 20.00 1,080.88 1,106.44 22,128.80 - - - - - - - - - 95 21,022.36 5 1,106.44 0 - Ordinary Soil
10+560 20.00 1,105.88 1,091.22 21,824.40 - 0.01 0.20 - - - - - - 95 20,733.18 5 1,091.22 0 - Ordinary Soil
10+580 20.00 1,021.77 1,051.33 21,026.60 - - - - - - - - - 95 19,975.27 5 1,051.33 0 - Ordinary Soil
10+600 20.00 1,027.68 1,066.78 21,335.60 - - - - - - - - - 95 20,268.82 5 1,066.78 0 - Ordinary Soil
10+620 20.00 1,035.25 1,028.51 20,570.20 - - - - - - - - - 95 19,541.69 5 1,028.51 0 - Ordinary Soil
10+640 20.00 1,042.52 1,035.10 20,702.00 - - - - - - - - - 95 19,666.90 5 1,035.10 0 - Ordinary Soil
10+660 20.00 1,041.63 1,038.44 20,768.80 - - - - - - - - - 95 19,730.36 5 1,038.44 0 - Ordinary Soil
10+680 20.00 901.69 972.11 19,442.20 - - - - - - - - - 95 18,470.09 5 972.11 0 - Ordinary Soil
10+700 20.00 845.80 943.72 18,874.40 - - - - - - - - - 95 17,930.68 5 943.72 0 - Ordinary Soil
10+720 20.00 1,118.44 1,010.07 20,201.40 - - - - - - - - - 95 19,191.33 5 1,010.07 0 - Ordinary Soil
10+740 20.00 1,080.88 963.34 19,266.80 - - - - - - - - - 95 18,303.46 5 963.34 0 - Ordinary Soil
10+760 20.00 1,077.53 1,097.99 21,959.80 - - - - - - - - - 95 20,861.81 5 1,097.99 0 - Ordinary Soil
10+780 20.00 1,078.85 1,079.87 21,597.40 - - - - - - - - - 95 20,517.53 5 1,079.87 0 - Ordinary Soil
10+800 20.00 1,061.57 1,069.55 21,391.00 - - - - - - - - - 95 20,321.45 5 1,069.55 0 - Ordinary Soil
10+820 20.00 1,059.66 1,069.26 21,385.20 - - - - - - - - - 95 20,315.94 5 1,069.26 0 - Ordinary Soil
10+840 20.00 1,101.21 1,081.39 21,627.80 - - - - - - - - - 95 20,546.41 5 1,081.39 0 - Ordinary Soil
10+860 20.00 1,098.29 1,078.98 21,579.60 - - - - - - - - - 95 20,500.62 5 1,078.98 0 - Ordinary Soil
10+880 20.00 1,029.97 1,065.59 21,311.80 0.01 0.01 0.20 - - - - - - 95 20,246.21 5 1,065.59 0 - Ordinary Soil
10+900 20.00 1,005.63 1,051.96 21,039.20 - - - - - - - - - 95 19,987.24 5 1,051.96 0 - Ordinary Soil
10+920 20.00 930.76 980.37 19,607.40 - 0.01 0.20 - - - - - - 95 18,627.03 5 980.37 0 - Ordinary Soil
10+940 20.00 971.34 988.49 19,769.80 - - - - - - - - - 95 18,781.31 5 988.49 0 - Ordinary Soil
10+960 20.00 997.97 964.37 19,287.40 - - - - - - - - - 95 18,323.03 5 964.37 0 - Ordinary Soil
10+980 20.00 961.94 966.64 19,332.80 - - - - - - - - - 95 18,366.16 5 966.64 0 - Ordinary Soil
11+000 20.00 901.95 949.96 18,999.20 - - - - - - - - - 95 18,049.24 5 949.96 0 - Ordinary Soil
11+020 20.00 906.46 934.20 18,684.00 - - - - - - - - - 95 17,749.80 5 934.20 0 - Ordinary Soil
11+040 20.00 875.91 888.93 17,778.60 - - - - - - - - - 95 16,889.67 5 888.93 0 - Ordinary Soil
11+060 20.00 849.61 878.04 17,560.80 - - - - - - - - - 95 16,682.76 5 878.04 0 - Ordinary Soil

27 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
11+080 20.00 871.28 873.60 17,472.00 - - - - - - - - - 95 16,598.40 5 873.60 0 - Ordinary Soil
11+100 20.00 844.24 846.93 16,938.60 - - - - - - - - - 95 16,091.67 5 846.93 0 - Ordinary Soil
11+120 20.00 824.53 847.91 16,958.20 - - - - - - - - - 95 16,110.29 5 847.91 0 - Ordinary Soil
11+140 20.00 810.55 827.40 16,548.00 - - - - - - - - - 95 15,720.60 5 827.40 0 - Ordinary Soil
11+160 20.00 720.43 772.48 15,449.60 - - - - - - - - - 95 14,677.12 5 772.48 0 - Ordinary Soil
11+180 20.00 654.89 732.72 14,654.40 - - - - - - - - - 95 13,921.68 5 732.72 0 - Ordinary Soil
11+200 20.00 680.85 700.64 14,012.80 - - - - - - - - - 95 13,312.16 5 700.64 0 - Ordinary Soil
11+220 20.00 614.46 634.68 12,693.60 - - - - - - - - - 95 12,058.92 5 634.68 0 - Ordinary Soil
11+240 20.00 595.04 637.95 12,759.00 - - - - - - - - - 95 12,121.05 5 637.95 0 - Ordinary Soil
11+260 20.00 561.94 588.20 11,764.00 - - - - - - - - - 95 11,175.80 5 588.20 0 - Ordinary Soil
11+280 20.00 533.79 564.42 11,288.40 - - - - - - - - - 95 10,723.98 5 564.42 0 - Ordinary Soil
11+300 20.00 546.28 554.11 11,082.20 - - - - - - - - - 95 10,528.09 5 554.11 0 - Ordinary Soil
11+320 20.00 550.45 542.12 10,842.40 - - - - - - - - - 95 10,300.28 5 542.12 0 - Ordinary Soil
11+340 20.00 457.02 501.65 10,033.00 - - - - - - - - - 95 9,531.35 5 501.65 0 - Ordinary Soil
11+360 20.00 460.17 505.31 10,106.20 - - - - - - - - - 95 9,600.89 5 505.31 0 - Ordinary Soil
11+380 20.00 436.79 446.91 8,938.20 - - - - - - - - - 95 8,491.29 5 446.91 0 - Ordinary Soil
11+400 20.00 241.60 350.89 7,017.80 - - - - - - - - - 95 6,666.91 5 350.89 0 - Ordinary Soil
11+420 20.00 418.27 427.53 8,550.60 0.01 0.01 0.20 - - - - - - 95 8,123.07 5 427.53 0 - Ordinary Soil
11+440 20.00 447.33 344.47 6,889.40 - - - - - - - - - 95 6,544.93 5 344.47 0 - Ordinary Soil
11+460 20.00 437.53 427.90 8,558.00 - 0.01 0.20 - - - - - - 95 8,130.10 5 427.90 0 - Ordinary Soil
11+480 20.00 407.78 427.56 8,551.20 0.01 0.01 0.20 - - - - - - 95 8,123.64 5 427.56 0 - Ordinary Soil
11+500 20.00 353.13 395.33 7,906.60 - - - - - - - - - 95 7,511.27 5 395.33 0 - Ordinary Soil
11+520 20.00 359.50 383.64 7,672.80 - 0.01 0.20 - - - - - - 95 7,289.16 5 383.64 0 - Ordinary Soil
11+540 20.00 295.91 324.52 6,490.40 - - - - - - - - - 95 6,165.88 5 324.52 0 - Ordinary Soil
11+560 20.00 359.47 359.49 7,189.80 - - - - - - - - - 95 6,830.31 5 359.49 0 - Ordinary Soil
11+580 20.00 291.55 293.73 5,874.60 - - - - - - - - - 95 5,580.87 5 293.73 0 - Ordinary Soil
11+600 20.00 275.22 317.35 6,347.00 - - - - - - - - - 95 6,029.65 5 317.35 0 - Ordinary Soil
11+620 20.00 242.38 266.97 5,339.40 - - - - - - - - - 95 5,072.43 5 266.97 0 - Ordinary Soil
11+640 20.00 213.27 244.25 4,885.00 - - - - - - - - - 95 4,640.75 5 244.25 0 - Ordinary Soil
11+660 20.00 225.53 233.96 4,679.20 - - - - - - - - - 95 4,445.24 5 233.96 0 - Ordinary Soil
11+680 20.00 268.59 240.93 4,818.60 - - - - - - - - - 95 4,577.67 5 240.93 0 - Ordinary Soil
11+700 20.00 266.80 246.17 4,923.40 - - - - - - - - - 95 4,677.23 5 246.17 0 - Ordinary Soil
11+720 20.00 235.28 251.94 5,038.80 - - - - - - - - - 95 4,786.86 5 251.94 0 - Ordinary Soil
11+740 20.00 264.23 265.52 5,310.40 0.01 0.01 0.20 - - - - - - 95 5,044.88 5 265.52 0 - Ordinary Soil
11+760 20.00 212.04 223.66 4,473.20 - - - - - - - - - 95 4,249.54 5 223.66 0 - Ordinary Soil
11+780 20.00 278.08 271.16 5,423.20 - 0.01 0.20 - - - - - - 95 5,152.04 5 271.16 0 - Ordinary Soil
11+800 20.00 274.53 243.29 4,865.80 - - - - - - - - - 95 4,622.51 5 243.29 0 - Ordinary Soil
11+820 20.00 301.48 289.78 5,795.60 - - - - - - - - - 95 5,505.82 5 289.78 0 - Ordinary Soil
11+840 20.00 326.56 300.55 6,011.00 - - - - - - - - - 95 5,710.45 5 300.55 0 - Ordinary Soil
11+860 20.00 338.69 320.09 6,401.80 - - - - - - - - - 95 6,081.71 5 320.09 0 - Ordinary Soil
11+880 20.00 409.67 368.12 7,362.40 - - - - - - - - - 95 6,994.28 5 368.12 0 - Ordinary Soil
11+900 20.00 458.41 398.55 7,971.00 - - - - - - - - - 95 7,572.45 5 398.55 0 - Ordinary Soil
11+920 20.00 519.38 464.53 9,290.60 - - - - - - - - - 95 8,826.07 5 464.53 0 - Ordinary Soil

28 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
11+940 20.00 562.08 510.25 10,205.00 0.02 0.01 0.20 - - - - - - 95 9,694.75 5 510.25 0 - Ordinary Soil
11+960 20.00 536.56 527.97 10,559.40 - - - - - - - - - 95 10,031.43 5 527.97 0 - Ordinary Soil
11+980 20.00 588.42 575.25 11,505.00 - 0.01 0.20 - - - - - - 95 10,929.75 5 575.25 0 - Ordinary Soil
12+000 20.00 547.27 541.92 10,838.40 - - - - - - - - - 95 10,296.48 5 541.92 0 - Ordinary Soil
12+020 20.00 458.79 523.61 10,472.20 - - - - - - - - - 95 9,948.59 5 523.61 0 - Ordinary Soil
12+040 20.00 520.71 533.99 10,679.80 - - - - - - - - - 95 10,145.81 5 533.99 0 - Ordinary Soil
12+060 20.00 586.61 522.70 10,454.00 - - - - - - - - - 95 9,931.30 5 522.70 0 - Ordinary Soil
12+080 20.00 589.18 554.95 11,099.00 - - - - - - - - - 95 10,544.05 5 554.95 0 - Ordinary Soil
12+100 20.00 556.09 571.35 11,427.00 0.01 0.01 0.20 - - - - - - 95 10,855.65 5 571.35 0 - Ordinary Soil
12+120 20.00 522.02 555.60 11,112.00 - - - - - - - - - 95 10,556.40 5 555.60 0 - Ordinary Soil
12+140 20.00 511.98 534.04 10,680.80 - 0.01 0.20 - - - - - - 95 10,146.76 5 534.04 0 - Ordinary Soil
12+160 20.00 503.27 512.65 10,253.00 - - - - - - - - - 95 9,740.35 5 512.65 0 - Ordinary Soil
12+180 20.00 402.82 457.40 9,148.00 0.01 0.01 0.20 - - - - - - 95 8,690.60 5 457.40 0 - Ordinary Soil
12+200 20.00 446.15 474.71 9,494.20 - - - - - - - - - 95 9,019.49 5 474.71 0 - Ordinary Soil
12+220 20.00 373.55 388.19 7,763.80 - 0.01 0.20 - - - - - - 95 7,375.61 5 388.19 0 - Ordinary Soil
12+240 20.00 475.99 461.07 9,221.40 - - - - - - - - - 95 8,760.33 5 461.07 0 - Ordinary Soil
12+260 20.00 500.41 436.98 8,739.60 - - - - - - - - - 95 8,302.62 5 436.98 0 - Ordinary Soil
12+280 20.00 440.52 458.26 9,165.20 - - - - - - - - - 95 8,706.94 5 458.26 0 - Ordinary Soil
12+300 20.00 426.32 463.37 9,267.40 - - - - - - - - - 95 8,804.03 5 463.37 0 - Ordinary Soil
12+320 20.00 418.73 429.63 8,592.60 - - - - - - - - - 95 8,162.97 5 429.63 0 - Ordinary Soil
12+340 20.00 412.82 419.57 8,391.40 - - - - - - - - - 95 7,971.83 5 419.57 0 - Ordinary Soil
12+360 20.00 372.97 395.85 7,917.00 - - - - - - - - - 95 7,521.15 5 395.85 0 - Ordinary Soil
12+380 20.00 297.79 355.31 7,106.20 - - - - - - - - - 95 6,750.89 5 355.31 0 - Ordinary Soil
12+400 20.00 313.94 343.46 6,869.20 0.01 0.01 0.20 - - - - - - 95 6,525.74 5 343.46 0 - Ordinary Soil
12+420 20.00 308.39 303.09 6,061.80 - - - - - - - - - 95 5,758.71 5 303.09 0 - Ordinary Soil
12+440 20.00 257.70 285.82 5,716.40 - 0.01 0.20 - - - - - - 95 5,430.58 5 285.82 0 - Ordinary Soil
12+460 20.00 287.53 297.96 5,959.20 - - - - - - - - - 95 5,661.24 5 297.96 0 - Ordinary Soil
12+480 20.00 238.60 248.15 4,963.00 - - - - - - - - - 95 4,714.85 5 248.15 0 - Ordinary Soil
12+500 20.00 287.96 287.75 5,755.00 - - - - - - - - - 95 5,467.25 5 287.75 0 - Ordinary Soil
12+520 20.00 309.94 274.27 5,485.40 - - - - - - - - - 95 5,211.13 5 274.27 0 - Ordinary Soil
12+540 20.00 318.25 303.11 6,062.20 0.01 0.01 0.20 - - - - - - 95 5,759.09 5 303.11 0 - Ordinary Soil
12+560 20.00 329.43 319.69 6,393.80 - - - - - - - - - 95 6,074.11 5 319.69 0 - Ordinary Soil
12+580 20.00 342.33 330.29 6,605.80 - 0.01 0.20 - - - - - - 95 6,275.51 5 330.29 0 - Ordinary Soil
12+600 20.00 309.48 319.46 6,389.20 - - - - - - - - - 95 6,069.74 5 319.46 0 - Ordinary Soil
12+620 20.00 287.06 314.70 6,294.00 - - - - - - - - - 95 5,979.30 5 314.70 0 - Ordinary Soil
12+640 20.00 255.44 282.46 5,649.20 - - - - - - - - - 95 5,366.74 5 282.46 0 - Ordinary Soil
12+660 20.00 235.32 261.19 5,223.80 - - - - - - - - - 95 4,962.61 5 261.19 0 - Ordinary Soil
12+680 20.00 182.92 219.18 4,383.60 - - - - - - - - - 95 4,164.42 5 219.18 0 - Ordinary Soil
12+700 20.00 342.32 288.82 5,776.40 - - - - - - - - - 95 5,487.58 5 288.82 0 - Ordinary Soil
12+720 20.00 391.01 286.97 5,739.40 - - - - - - - - - 95 5,452.43 5 286.97 0 - Ordinary Soil
12+740 20.00 394.23 368.28 7,365.60 - - - - - - - - - 95 6,997.32 5 368.28 0 - Ordinary Soil
12+760 20.00 355.02 373.02 7,460.40 - - - - - - - - - 95 7,087.38 5 373.02 0 - Ordinary Soil
12+780 20.00 360.73 377.48 7,549.60 - - - - - - - - - 95 7,172.12 5 377.48 0 - Ordinary Soil

29 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
12+800 20.00 354.35 354.69 7,093.80 - - - - - - - - - 95 6,739.11 5 354.69 0 - Ordinary Soil
12+820 20.00 336.82 348.78 6,975.60 - - - - - - - - - 95 6,626.82 5 348.78 0 - Ordinary Soil
12+840 20.00 359.86 357.11 7,142.20 - - - - - - - - - 95 6,785.09 5 357.11 0 - Ordinary Soil
12+860 20.00 404.72 370.77 7,415.40 - - - - - - - - - 95 7,044.63 5 370.77 0 - Ordinary Soil
12+880 20.00 368.79 364.33 7,286.60 - - - - - - - - - 95 6,922.27 5 364.33 0 - Ordinary Soil
12+900 20.00 349.69 377.21 7,544.20 - - - - - - - - - 95 7,166.99 5 377.21 0 - Ordinary Soil
12+920 20.00 349.19 358.99 7,179.80 - - - - - - - - - 95 6,820.81 5 358.99 0 - Ordinary Soil
12+940 20.00 336.02 342.86 6,857.20 - - - - - - - - - 95 6,514.34 5 342.86 0 - Ordinary Soil
12+960 20.00 355.90 352.55 7,051.00 - - - - - - - - - 95 6,698.45 5 352.55 0 - Ordinary Soil
12+980 20.00 362.87 349.45 6,989.00 - - - - - - - - - 95 6,639.55 5 349.45 0 - Ordinary Soil
13+000 20.00 384.00 369.95 7,399.00 - - - - - - - - - 95 7,029.05 5 369.95 0 - Ordinary Soil
13+020 20.00 309.65 336.26 6,725.20 - - - - - - - - - 95 6,388.94 5 336.26 0 - Ordinary Soil
13+040 20.00 340.78 362.39 7,247.80 - - - - - - - - - 95 6,885.41 5 362.39 0 - Ordinary Soil
13+060 20.00 324.85 317.25 6,345.00 - - - - - - - - - 95 6,027.75 5 317.25 0 - Ordinary Soil
13+080 20.00 316.74 328.76 6,575.20 - - - - - - - - - 95 6,246.44 5 328.76 0 - Ordinary Soil
13+100 20.00 285.95 305.40 6,108.00 - - - - - - - - - 95 5,802.60 5 305.40 0 - Ordinary Soil
13+120 20.00 196.30 256.52 5,130.40 - - - - - - - - - 95 4,873.88 5 256.52 0 - Ordinary Soil
13+140 20.00 155.50 220.73 4,414.60 - - - - - - - - - 95 4,193.87 5 220.73 0 - Ordinary Soil
13+160 20.00 156.82 176.56 3,531.20 - - - - - - - - - 95 3,354.64 5 176.56 0 - Ordinary Soil
13+180 20.00 208.72 182.11 3,642.20 - - - - - - - - - 95 3,460.09 5 182.11 0 - Ordinary Soil
13+200 20.00 199.93 178.38 3,567.60 - - - - - - - - - 95 3,389.22 5 178.38 0 - Ordinary Soil
13+220 20.00 170.87 189.80 3,796.00 - - - - - - - - - 95 3,606.20 5 189.80 0 - Ordinary Soil
13+240 20.00 163.42 181.68 3,633.60 - - - - - - - - - 95 3,451.92 5 181.68 0 - Ordinary Soil
13+260 20.00 225.54 198.21 3,964.20 - - - - - - - - - 95 3,765.99 5 198.21 0 - Ordinary Soil
13+280 20.00 201.03 182.23 3,644.60 - - - - - - - - - 95 3,462.37 5 182.23 0 - Ordinary Soil
13+300 20.00 192.17 208.86 4,177.20 - - - - - - - - - 95 3,968.34 5 208.86 0 - Ordinary Soil
13+320 20.00 220.30 210.67 4,213.40 - - - - - - - - - 95 4,002.73 5 210.67 0 - Ordinary Soil
13+340 20.00 198.45 195.31 3,906.20 - - - - - - - - - 95 3,710.89 5 195.31 0 - Ordinary Soil
13+360 20.00 223.33 221.82 4,436.40 - - - - - - - - - 95 4,214.58 5 221.82 0 - Ordinary Soil
13+380 20.00 193.30 195.88 3,917.60 - - - - - - - - - 95 3,721.72 5 195.88 0 - Ordinary Soil
13+400 20.00 185.70 204.52 4,090.40 - - - - - - - - - 95 3,885.88 5 204.52 0 - Ordinary Soil
13+420 20.00 159.61 176.46 3,529.20 - - - - - - - - - 95 3,352.74 5 176.46 0 - Ordinary Soil
13+440 20.00 171.50 178.60 3,572.00 - - - - - - - - - 95 3,393.40 5 178.60 0 - Ordinary Soil
13+460 20.00 66.25 112.93 2,258.60 - - - - - - - - - 95 2,145.67 5 112.93 0 - Ordinary Soil
13+480 20.00 70.78 121.14 2,422.80 - - - - - - - - - 95 2,301.66 5 121.14 0 - Ordinary Soil
13+500 20.00 215.86 141.06 2,821.20 - - - - - - - - - 95 2,680.14 5 141.06 0 - Ordinary Soil
13+520 20.00 186.19 128.49 2,569.80 - - - - - - - - - 95 2,441.31 5 128.49 0 - Ordinary Soil
13+540 20.00 175.08 195.47 3,909.40 - - - - - - - - - 95 3,713.93 5 195.47 0 - Ordinary Soil
13+560 20.00 187.35 186.77 3,735.40 - - - - - - - - - 95 3,548.63 5 186.77 0 - Ordinary Soil
13+580 20.00 151.55 163.32 3,266.40 - - - - - - - - - 95 3,103.08 5 163.32 0 - Ordinary Soil
13+600 20.00 189.67 188.51 3,770.20 - - - - - - - - - 95 3,581.69 5 188.51 0 - Ordinary Soil
13+620 20.00 217.06 184.31 3,686.20 - - - - - - - - - 95 3,501.89 5 184.31 0 - Ordinary Soil
13+640 20.00 156.77 173.22 3,464.40 - - - - - - - - - 95 3,291.18 5 173.22 0 - Ordinary Soil

30 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
13+660 20.00 162.56 189.81 3,796.20 - - - - - - - - - 95 3,606.39 5 189.81 0 - Ordinary Soil
13+680 20.00 116.38 136.58 2,731.60 0.01 0.01 0.20 - - - - - - 95 2,595.02 5 136.58 0 - Ordinary Soil
13+700 20.00 99.33 130.95 2,619.00 - - - - - - - - - 95 2,488.05 5 130.95 0 - Ordinary Soil
13+720 20.00 92.39 104.39 2,087.80 - 0.01 0.20 - - - - - - 95 1,983.41 5 104.39 0 - Ordinary Soil
13+740 20.00 77.41 88.37 1,767.40 - - - - - - - - - 95 1,679.03 5 88.37 0 - Ordinary Soil
13+760 20.00 80.02 86.21 1,724.20 - - - - - - - - - 95 1,637.99 5 86.21 0 - Ordinary Soil
13+780 20.00 51.43 64.42 1,288.40 - - - - - - - - - 95 1,223.98 5 64.42 0 - Ordinary Soil
13+800 20.00 41.76 60.89 1,217.80 - - - - - - - - - 95 1,156.91 5 60.89 0 - Ordinary Soil
13+820 20.00 12.16 31.80 636.00 9.72 4.86 97.20 - - - - - - 95 604.20 5 31.80 0 - Ordinary Soil
13+840 20.00 14.72 28.24 564.80 10.13 5.07 101.40 - 10.00 17.67 176.70 5.19 51.90 95 536.56 5 28.24 0 - Ordinary Soil
13+860 20.00 13.35 12.76 255.20 8.12 8.92 178.40 - 20.00 14.28 285.60 4.07 81.40 95 242.44 5 12.76 0 - Ordinary Soil
13+880 20.00 14.11 14.42 288.40 3.67 6.90 138.00 - 20.00 9.06 181.20 2.35 47.00 95 273.98 5 14.42 0 - Ordinary Soil
13+900 20.00 11.98 12.67 253.40 0.90 4.51 90.20 - 10.00 2.72 27.20 0.76 7.60 95 240.73 5 12.67 0 - Ordinary Soil
13+920 20.00 38.96 26.54 530.80 - 1.84 36.80 - - - - - - 95 504.26 5 26.54 0 - Ordinary Soil
13+940 20.00 - 5.99 119.80 31.44 16.17 323.40 203.60 10.00 4.12 41.20 0.68 6.80 95 113.81 5 5.99 0 - Ordinary Soil
13+960 20.00 - 19.48 389.60 16.32 8.16 163.20 - 20.00 12.23 244.60 2.76 55.20 95 370.12 5 19.48 0 - Ordinary Soil
13+980 20.00 - - - 14.80 23.12 462.40 462.40 10.00 5.74 57.40 0.85 8.50 95 - 5 - 0 - Ordinary Soil
14+000 20.00 10.52 5.26 105.20 11.66 13.99 279.80 174.60 - - - - - 95 99.94 5 5.26 0 - Ordinary Soil
14+020 20.00 49.13 24.57 491.40 0.34 7.57 151.40 - - - - - - 95 466.83 5 24.57 0 - Ordinary Soil
14+040 20.00 54.45 32.49 649.80 0.29 5.98 119.60 - - - - - - 95 617.31 5 32.49 0 - Ordinary Soil
14+060 20.00 31.63 40.38 807.60 2.89 1.62 32.40 - - - - - - 95 767.22 5 40.38 0 - Ordinary Soil
14+080 20.00 11.46 32.96 659.20 - 0.15 3.00 - - - - - - 95 626.24 5 32.96 0 - Ordinary Soil
14+100 20.00 13.94 22.79 455.80 - 1.45 29.00 - 10.00 1.29 12.90 0.26 2.60 95 433.01 5 22.79 0 - Ordinary Soil
14+120 20.00 9.55 10.51 210.20 - - - - 20.00 1.20 24.00 0.23 4.60 95 199.69 5 10.51 0 - Ordinary Soil
14+140 20.00 7.96 10.95 219.00 3.27 1.64 32.80 - 20.00 2.76 55.20 0.41 8.20 95 208.05 5 10.95 0 - Ordinary Soil
14+160 20.00 7.29 8.42 168.40 4.44 2.22 44.40 - 20.00 9.13 182.60 2.24 44.80 95 159.98 5 8.42 0 - Ordinary Soil
14+180 20.00 10.97 9.47 189.40 19.43 11.35 227.00 37.60 20.00 16.33 326.60 3.52 70.40 95 179.93 5 9.47 0 - Ordinary Soil
14+200 20.00 6.69 6.99 139.80 12.81 8.63 172.60 32.80 20.00 18.84 376.80 6.20 124.00 95 132.81 5 6.99 0 - Ordinary Soil
14+220 20.00 3.93 7.45 149.00 23.95 21.69 433.80 284.80 20.00 10.34 206.80 2.25 45.00 95 141.55 5 7.45 0 - Ordinary Soil
14+240 20.00 26.55 16.62 332.40 3.82 8.32 166.40 - 10.00 8.46 84.60 2.25 22.50 95 315.78 5 16.62 0 - Ordinary Soil
14+260 20.00 7.34 5.64 112.80 84.90 54.43 1,088.60 975.80 - - - - - 95 107.16 5 5.64 0 - Ordinary Soil
14+280 20.00 6.50 16.53 330.60 57.32 30.57 611.40 280.80 10.00 4.63 46.30 0.93 9.30 95 314.07 5 16.53 0 - Ordinary Soil
14+300 20.00 1.41 4.38 87.60 65.67 75.29 1,505.80 1,418.20 20.00 37.27 745.40 16.67 333.40 95 83.22 5 4.38 0 - Ordinary Soil
14+320 20.00 6.47 6.49 129.80 15.54 36.43 728.60 598.80 20.00 21.52 430.40 7.17 143.40 95 123.31 5 6.49 0 - Ordinary Soil
14+340 20.00 1.61 1.51 30.20 32.77 49.22 984.40 954.20 20.00 9.81 196.20 3.58 71.60 95 28.69 5 1.51 0 - Ordinary Soil
14+360 20.00 12.52 9.50 190.00 11.34 13.44 268.80 78.80 20.00 5.66 113.20 0.80 16.00 95 180.50 5 9.50 0 - Ordinary Soil
14+380 20.00 20.59 11.10 222.00 1.88 17.33 346.60 124.60 10.00 2.72 27.20 0.70 7.00 95 210.90 5 11.10 0 - Ordinary Soil
14+400 20.00 28.62 20.57 411.40 - 5.67 113.40 - - - - - - 95 390.83 5 20.57 0 - Ordinary Soil
14+420 20.00 14.96 17.78 355.60 - 0.94 18.80 - 10.00 1.67 16.70 0.40 4.00 95 337.82 5 17.78 0 - Ordinary Soil
14+440 20.00 9.62 19.12 382.40 4.17 2.09 41.80 - 20.00 9.43 188.60 2.33 46.60 95 363.28 5 19.12 0 - Ordinary Soil
14+460 20.00 5.97 10.47 209.40 1.53 0.77 15.40 - 20.00 2.53 50.60 0.64 12.80 95 198.93 5 10.47 0 - Ordinary Soil
14+480 20.00 2.05 5.84 116.80 3.49 3.83 76.60 - 10.00 1.07 10.70 0.17 1.70 95 110.96 5 5.84 0 - Ordinary Soil
14+500 20.00 1.48 3.73 74.60 4.02 2.78 55.60 - - - - - - 95 70.87 5 3.73 0 - Ordinary Soil

31 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
14+520 20.00 3.32 2.69 53.80 0.13 1.81 36.20 - - - - - - 95 51.11 5 2.69 0 - Ordinary Soil
14+540 20.00 3.90 2.69 53.80 5.00 4.51 90.20 36.40 - - - - - 95 51.11 5 2.69 0 - Ordinary Soil
14+560 20.00 10.62 6.97 139.40 1.16 0.65 13.00 - - - - - - 95 132.43 5 6.97 0 - Ordinary Soil
14+580 20.00 4.08 3.99 79.80 6.53 5.77 115.40 35.60 - - - - - 95 75.81 5 3.99 0 - Ordinary Soil
14+600 20.00 27.56 19.09 381.80 1.92 1.54 30.80 - - - - - - 95 362.71 5 19.09 0 - Ordinary Soil
14+620 20.00 20.33 12.21 244.20 3.64 5.09 101.80 - - - - - - 95 231.99 5 12.21 0 - Ordinary Soil
14+640 20.00 26.70 27.13 542.60 5.78 3.85 77.00 - 10.00 6.20 62.00 1.33 13.30 95 515.47 5 27.13 0 - Ordinary Soil
14+660 20.00 14.59 17.46 349.20 9.51 6.58 131.60 - 20.00 3.91 78.20 0.47 9.40 95 331.74 5 17.46 0 - Ordinary Soil
14+680 20.00 9.23 17.97 359.40 12.73 9.26 185.20 - 20.00 4.11 82.20 0.28 5.60 95 341.43 5 17.97 0 - Ordinary Soil
14+700 20.00 16.40 15.50 310.00 4.05 6.78 135.60 - 20.00 9.62 192.40 2.37 47.40 95 294.50 5 15.50 0 - Ordinary Soil
14+720 20.00 12.75 10.99 219.80 6.40 9.57 191.40 - 20.00 2.66 53.20 0.19 3.80 95 208.81 5 10.99 0 - Ordinary Soil
14+740 20.00 26.89 21.65 433.00 1.37 2.71 54.20 - 20.00 4.58 91.60 1.02 20.40 95 411.35 5 21.65 0 - Ordinary Soil
14+760 20.00 73.41 43.08 861.60 0.45 3.43 68.60 - 20.00 5.31 106.20 1.52 30.40 95 818.52 5 43.08 0 - Ordinary Soil
14+780 20.00 8.16 17.53 350.60 17.13 9.25 185.00 - 20.00 7.78 155.60 1.53 30.60 95 333.07 5 17.53 0 - Ordinary Soil
14+800 20.00 30.15 51.78 1,035.60 0.28 0.37 7.40 - 10.00 1.36 13.60 0.33 3.30 95 983.82 5 51.78 0 - Ordinary Soil
14+820 20.00 36.39 22.28 445.60 - 8.57 171.40 - - - - - - 95 423.32 5 22.28 0 - Ordinary Soil
14+840 20.00 20.40 25.28 505.60 - 0.14 2.80 - 10.00 1.42 14.20 0.28 2.80 95 480.32 5 25.28 0 - Ordinary Soil
14+860 20.00 14.17 25.28 505.60 3.99 2.00 40.00 - 20.00 1.74 34.80 0.17 3.40 95 480.32 5 25.28 0 - Ordinary Soil
14+880 20.00 0.86 10.63 212.60 13.34 6.67 133.40 - 20.00 5.47 109.40 0.72 14.40 95 201.97 5 10.63 0 - Ordinary Soil
14+900 20.00 1.78 7.98 159.60 4.73 4.36 87.20 - 20.00 2.96 59.20 0.36 7.20 95 151.62 5 7.98 0 - Ordinary Soil
14+920 20.00 0.59 0.73 14.60 6.01 9.68 193.60 179.00 20.00 0.98 19.60 - - 95 13.87 5 0.73 0 - Ordinary Soil
14+940 20.00 0.39 1.09 21.80 8.20 6.47 129.40 107.60 20.00 2.24 44.80 0.18 3.60 95 20.71 5 1.09 0 - Ordinary Soil
14+960 20.00 1.49 1.04 20.80 7.49 6.75 135.00 114.20 10.00 2.25 22.50 0.17 1.70 95 19.76 5 1.04 0 - Ordinary Soil
14+980 20.00 19.18 9.79 195.80 1.93 5.07 101.40 - - - - - - 95 186.01 5 9.79 0 - Ordinary Soil
15+000 20.00 21.28 11.39 227.80 0.09 3.79 75.80 - - - - - - 95 216.41 5 11.39 0 - Ordinary Soil
15+020 20.00 11.42 15.30 306.00 2.51 2.22 44.40 - 10.00 2.13 21.30 0.18 1.80 95 290.70 5 15.30 0 - Ordinary Soil
15+040 20.00 0.07 10.68 213.60 11.22 5.66 113.20 - 20.00 2.76 55.20 0.18 3.60 95 202.92 5 10.68 0 - Ordinary Soil
15+060 20.00 - 5.71 114.20 11.00 6.76 135.20 21.00 20.00 1.64 32.80 0.03 0.60 95 108.49 5 5.71 0 - Ordinary Soil
15+080 20.00 7.62 3.85 77.00 1.37 6.30 126.00 49.00 20.00 2.49 49.80 0.65 13.00 95 73.15 5 3.85 0 - Ordinary Soil
15+100 20.00 4.89 2.45 49.00 1.97 6.49 129.80 80.80 20.00 1.04 20.80 0.18 3.60 95 46.55 5 2.45 0 - Ordinary Soil
15+120 20.00 - 3.81 76.20 23.80 12.59 251.80 175.60 20.00 3.05 61.00 0.24 4.80 95 72.39 5 3.81 0 - Ordinary Soil
15+140 20.00 6.57 5.73 114.60 8.21 5.09 101.80 - 20.00 2.72 54.40 0.24 4.80 95 108.87 5 5.73 0 - Ordinary Soil
15+160 20.00 28.10 14.05 281.00 0.24 12.02 240.40 - 10.00 1.56 15.60 0.39 3.90 95 266.95 5 14.05 0 - Ordinary Soil
15+180 20.00 30.02 18.30 366.00 - 4.11 82.20 - - - - - - 95 347.70 5 18.30 0 - Ordinary Soil
15+200 20.00 12.52 20.31 406.20 1.08 0.66 13.20 - 10.00 1.99 19.90 0.27 2.70 95 385.89 5 20.31 0 - Ordinary Soil
15+220 20.00 7.38 18.70 374.00 6.54 3.27 65.40 - 20.00 1.66 33.20 0.05 1.00 95 355.30 5 18.70 0 - Ordinary Soil
15+240 20.00 11.26 11.89 237.80 0.78 0.93 18.60 - 20.00 1.46 29.20 0.32 6.40 95 225.91 5 11.89 0 - Ordinary Soil
15+260 20.00 17.01 12.20 244.00 4.44 5.49 109.80 - 20.00 2.58 51.60 0.56 11.20 95 231.80 5 12.20 0 - Ordinary Soil
15+280 20.00 16.65 13.96 279.20 11.35 6.07 121.40 - 20.00 1.80 36.00 0.04 0.80 95 265.24 5 13.96 0 - Ordinary Soil
15+300 20.00 3.12 10.07 201.40 8.41 6.43 128.60 - 20.00 3.00 60.00 0.29 5.80 95 191.33 5 10.07 0 - Ordinary Soil
15+320 20.00 10.51 13.58 271.60 3.48 7.42 148.40 - 20.00 1.60 32.00 0.06 1.20 95 258.02 5 13.58 0 - Ordinary Soil
15+340 20.00 2.25 2.69 53.80 4.57 6.49 129.80 76.00 20.00 1.10 22.00 0.17 3.40 95 51.11 5 2.69 0 - Ordinary Soil
15+360 20.00 - 5.26 105.20 10.90 7.19 143.80 38.60 20.00 2.48 49.60 0.48 9.60 95 99.94 5 5.26 0 - Ordinary Soil

32 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
15+380 20.00 2.82 2.54 50.80 11.20 7.89 157.80 107.00 20.00 0.22 4.40 - - 95 48.26 5 2.54 0 - Ordinary Soil
15+400 20.00 15.93 7.97 159.40 5.54 8.22 164.40 5.00 20.00 2.06 41.20 0.15 3.00 95 151.43 5 7.97 0 - Ordinary Soil
15+420 20.00 21.08 11.95 239.00 0.79 6.00 120.00 - 20.00 2.46 49.20 0.37 7.40 95 227.05 5 11.95 0 - Ordinary Soil
15+440 20.00 - 7.97 159.40 19.43 12.49 249.80 90.40 20.00 1.78 35.60 0.06 1.20 95 151.43 5 7.97 0 - Ordinary Soil
15+460 20.00 2.70 11.89 237.80 10.38 5.59 111.80 - 20.00 4.35 87.00 0.49 9.80 95 225.91 5 11.89 0 - Ordinary Soil
15+480 20.00 6.22 3.11 62.20 2.85 11.14 222.80 160.60 20.00 4.26 85.20 0.66 13.20 95 59.09 5 3.11 0 - Ordinary Soil
15+500 20.00 9.81 6.26 125.20 5.74 8.06 161.20 36.00 20.00 3.27 65.40 0.37 7.40 95 118.94 5 6.26 0 - Ordinary Soil
15+520 20.00 9.68 7.95 159.00 0.94 1.90 38.00 - 20.00 2.17 43.40 0.55 11.00 95 151.05 5 7.95 0 - Ordinary Soil
15+540 20.00 15.33 12.57 251.40 2.01 3.88 77.60 - 20.00 2.12 42.40 0.22 4.40 95 238.83 5 12.57 0 - Ordinary Soil
15+560 20.00 32.52 21.10 422.00 0.43 0.69 13.80 - 10.00 1.33 13.30 0.29 2.90 95 400.90 5 21.10 0 - Ordinary Soil
15+580 20.00 52.41 33.87 677.40 - 1.01 20.20 - - - - - - 95 643.53 5 33.87 0 - Ordinary Soil
15+600 20.00 44.88 38.70 774.00 - 0.22 4.40 - - - - - - 95 735.30 5 38.70 0 - Ordinary Soil
15+620 20.00 44.17 48.29 965.80 - - - - - - - - - 95 917.51 5 48.29 0 - Ordinary Soil
15+640 20.00 7.13 26.01 520.20 3.20 1.60 32.00 - 10.00 2.19 21.90 0.46 4.60 95 494.19 5 26.01 0 - Ordinary Soil
15+660 20.00 0.50 22.34 446.80 6.76 3.38 67.60 - 20.00 3.90 78.00 0.48 9.60 95 424.46 5 22.34 0 - Ordinary Soil
15+680 20.00 1.63 4.38 87.60 5.96 4.58 91.60 4.00 20.00 1.19 23.80 - - 95 83.22 5 4.38 0 - Ordinary Soil
15+700 20.00 3.81 2.16 43.20 6.65 6.71 134.20 91.00 20.00 3.81 76.20 0.45 9.00 95 41.04 5 2.16 0 - Ordinary Soil
15+720 20.00 18.95 10.29 205.80 1.64 3.80 76.00 - 20.00 2.45 49.00 0.29 5.80 95 195.51 5 10.29 0 - Ordinary Soil
15+740 20.00 22.53 13.17 263.40 1.14 3.90 78.00 - 20.00 2.15 43.00 0.28 5.60 95 250.23 5 13.17 0 - Ordinary Soil
15+760 20.00 5.95 12.45 249.00 6.26 3.95 79.00 - 20.00 3.26 65.20 0.36 7.20 95 236.55 5 12.45 0 - Ordinary Soil
15+780 20.00 2.98 12.76 255.20 4.82 2.98 59.60 - 20.00 2.98 59.60 0.35 7.00 95 242.44 5 12.76 0 - Ordinary Soil
15+800 20.00 10.08 8.02 160.40 2.76 4.51 90.20 - 20.00 1.94 38.80 0.17 3.40 95 152.38 5 8.02 0 - Ordinary Soil
15+820 20.00 26.27 14.63 292.60 1.85 3.34 66.80 - 20.00 1.98 39.60 0.20 4.00 95 277.97 5 14.63 0 - Ordinary Soil
15+840 20.00 4.60 7.34 146.80 0.28 1.52 30.40 - 20.00 1.18 23.60 0.25 5.00 95 139.46 5 7.34 0 - Ordinary Soil
15+860 20.00 4.82 15.55 311.00 7.75 4.80 96.00 - 20.00 5.44 108.80 0.81 16.20 95 295.45 5 15.55 0 - Ordinary Soil
15+880 20.00 12.46 8.53 170.60 3.32 1.80 36.00 - 20.00 1.54 30.80 0.08 1.60 95 162.07 5 8.53 0 - Ordinary Soil
15+900 20.00 21.55 13.19 263.80 1.20 4.48 89.60 - 20.00 2.50 50.00 0.34 6.80 95 250.61 5 13.19 0 - Ordinary Soil
15+920 20.00 20.54 16.50 330.00 2.80 3.06 61.20 - 20.00 1.40 28.00 0.05 1.00 95 313.50 5 16.50 0 - Ordinary Soil
15+940 20.00 9.31 15.43 308.60 5.47 3.34 66.80 - 20.00 4.59 91.80 0.68 13.60 95 293.17 5 15.43 0 - Ordinary Soil
15+960 20.00 7.23 13.89 277.80 12.14 7.47 149.40 - 20.00 20.22 404.40 5.65 113.00 95 263.91 5 13.89 0 - Ordinary Soil
15+980 20.00 1.35 5.33 106.60 22.12 13.80 276.00 169.40 20.00 12.51 250.20 2.68 53.60 95 101.27 5 5.33 0 - Ordinary Soil
16+000 20.00 24.60 15.92 318.40 2.45 7.30 146.00 - 20.00 6.94 138.80 1.60 32.00 95 302.48 5 15.92 0 - Ordinary Soil
16+020 20.00 11.42 6.39 127.80 10.39 16.26 325.20 197.40 20.00 6.66 133.20 1.14 22.80 95 121.41 5 6.39 0 - Ordinary Soil
16+040 20.00 20.02 22.31 446.20 7.52 4.99 99.80 - 20.00 11.53 230.60 2.76 55.20 95 423.89 5 22.31 0 - Ordinary Soil
16+060 20.00 33.07 22.25 445.00 4.13 7.26 145.20 - 20.00 5.91 118.20 1.15 23.00 95 422.75 5 22.25 0 - Ordinary Soil
16+080 20.00 28.75 24.39 487.80 4.26 5.89 117.80 - 20.00 6.14 122.80 1.13 22.60 95 463.41 5 24.39 0 - Ordinary Soil
16+100 20.00 4.50 18.79 375.80 8.45 6.29 125.80 - 20.00 7.38 147.60 1.29 25.80 95 357.01 5 18.79 0 - Ordinary Soil
16+120 20.00 1.17 14.96 299.20 13.99 9.13 182.60 - 20.00 9.11 182.20 1.72 34.40 95 284.24 5 14.96 0 - Ordinary Soil
16+140 20.00 0.01 2.26 45.20 67.68 38.07 761.40 716.20 10.00 2.42 24.20 0.30 3.00 95 42.94 5 2.26 0 - Ordinary Soil
16+160 20.00 - 0.59 11.80 102.19 58.09 1,161.80 1,150.00 - - - - - 95 11.21 5 0.59 0 - Ordinary Soil
16+180 20.00 - 0.01 0.20 103.97 85.83 1,716.60 1,716.40 - - - - - 95 0.19 5 0.01 0 - Ordinary Soil
16+200 20.00 21.39 10.70 214.00 0.20 51.20 1,024.00 810.00 7.00 0.79 5.53 0.13 0.91 95 203.30 5 10.70 0 - Ordinary Soil
16+220 20.00 87.83 43.92 878.40 - 51.99 1,039.80 161.40 - - - - - 95 834.48 5 43.92 0 - Ordinary Soil

33 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
16+240 20.00 19.31 20.35 407.00 3.89 2.05 41.00 - 10.00 6.02 60.20 1.19 11.90 95 386.65 5 20.35 0 - Ordinary Soil
16+260 20.00 12.94 50.39 1,007.80 4.19 2.10 42.00 - 20.00 6.35 127.00 1.23 24.60 95 957.41 5 50.39 0 - Ordinary Soil
16+280 20.00 4.06 11.69 233.80 15.58 9.74 194.80 - 20.00 16.94 338.80 4.20 84.00 95 222.11 5 11.69 0 - Ordinary Soil
16+300 20.00 5.56 9.25 185.00 16.77 10.48 209.60 24.60 20.00 14.66 293.20 3.47 69.40 95 175.75 5 9.25 0 - Ordinary Soil
16+320 20.00 26.56 15.31 306.20 5.85 10.72 214.40 - 20.00 12.24 244.80 3.24 64.80 95 290.89 5 15.31 0 - Ordinary Soil
16+340 20.00 53.83 29.70 594.00 2.14 9.46 189.20 - 20.00 7.28 145.60 1.72 34.40 95 564.30 5 29.70 0 - Ordinary Soil
16+360 20.00 58.97 42.77 855.40 2.60 4.23 84.60 - 20.00 21.28 425.60 7.84 156.80 95 812.63 5 42.77 0 - Ordinary Soil
16+380 20.00 46.11 49.97 999.40 4.69 3.42 68.40 - 10.00 22.95 229.50 9.11 91.10 95 949.43 5 49.97 0 - Ordinary Soil
16+400 20.00 64.28 61.63 1,232.60 - 1.30 26.00 - - - - - - 95 1,170.97 5 61.63 0 - Ordinary Soil
16+420 20.00 161.67 103.89 2,077.80 - 2.35 47.00 - - - - - - 95 1,973.91 5 103.89 0 - Ordinary Soil
16+440 20.00 195.83 130.06 2,601.20 - - - - - - - - - 95 2,471.14 5 130.06 0 - Ordinary Soil
16+460 20.00 125.50 143.59 2,871.80 - - - - - - - - - 95 2,728.21 5 143.59 0 - Ordinary Soil
16+480 20.00 127.70 161.77 3,235.40 - - - - - - - - - 95 3,073.63 5 161.77 0 - Ordinary Soil
16+500 20.00 173.26 149.38 2,987.60 - - - - - - - - - 95 2,838.22 5 149.38 0 - Ordinary Soil
16+520 20.00 177.27 152.49 3,049.80 - - - - - - - - - 95 2,897.31 5 152.49 0 - Ordinary Soil
16+540 20.00 163.86 168.56 3,371.20 - - - - - - - - - 95 3,202.64 5 168.56 0 - Ordinary Soil
16+560 20.00 99.00 138.14 2,762.80 - - - - - - - - - 95 2,624.66 5 138.14 0 - Ordinary Soil
16+580 20.00 72.83 118.35 2,367.00 - - - - - - - - - 95 2,248.65 5 118.35 0 - Ordinary Soil
16+600 20.00 75.12 87.06 1,741.20 - - - - - - - - - 95 1,654.14 5 87.06 0 - Ordinary Soil
16+620 20.00 75.07 73.95 1,479.00 - - - - - - - - - 95 1,405.05 5 73.95 0 - Ordinary Soil
16+640 20.00 121.16 98.14 1,962.80 - - - - - - - - - 95 1,864.66 5 98.14 0 - Ordinary Soil
16+660 20.00 165.01 120.04 2,400.80 - - - - - - - - - 95 2,280.76 5 120.04 0 - Ordinary Soil
16+680 20.00 162.01 141.59 2,831.80 - - - - - - - - - 95 2,690.21 5 141.59 0 - Ordinary Soil
16+700 20.00 162.30 163.66 3,273.20 0.01 0.01 0.20 - - - - - - 95 3,109.54 5 163.66 0 - Ordinary Soil
16+720 20.00 103.65 132.83 2,656.60 - - - - - - - - - 95 2,523.77 5 132.83 0 - Ordinary Soil
16+740 20.00 124.10 143.20 2,864.00 - 0.01 0.20 - - - - - - 95 2,720.80 5 143.20 0 - Ordinary Soil
16+760 20.00 109.84 106.75 2,135.00 - - - - - - - - - 95 2,028.25 5 106.75 0 - Ordinary Soil
16+780 20.00 110.84 117.47 2,349.40 - - - - - - - - - 95 2,231.93 5 117.47 0 - Ordinary Soil
16+800 20.00 65.28 87.56 1,751.20 - - - - - - - - - 95 1,663.64 5 87.56 0 - Ordinary Soil
16+820 20.00 44.91 77.88 1,557.60 1.46 0.73 14.60 - 10.00 4.76 47.60 0.96 9.60 95 1,479.72 5 77.88 0 - Ordinary Soil
16+840 20.00 51.00 58.14 1,162.80 1.45 0.73 14.60 - 10.00 1.83 18.30 0.22 2.20 95 1,104.66 5 58.14 0 - Ordinary Soil
16+860 20.00 98.07 71.49 1,429.80 2.11 1.79 35.80 - - - - - - 95 1,358.31 5 71.49 0 - Ordinary Soil
16+880 20.00 49.66 50.33 1,006.60 4.97 3.21 64.20 - 10.00 9.63 96.30 3.50 35.00 95 956.27 5 50.33 0 - Ordinary Soil
16+900 20.00 32.51 65.29 1,305.80 7.18 4.65 93.00 - 20.00 7.02 140.40 2.38 47.60 95 1,240.51 5 65.29 0 - Ordinary Soil
16+920 20.00 28.57 39.12 782.40 20.39 12.68 253.60 - 20.00 0.15 3.00 - - 95 743.28 5 39.12 0 - Ordinary Soil
16+940 20.00 33.24 32.88 657.60 9.57 8.38 167.60 - 20.00 12.91 258.20 3.46 69.20 95 624.72 5 32.88 0 - Ordinary Soil
16+960 20.00 37.25 32.91 658.20 2.01 11.20 224.00 - 20.00 11.40 228.00 3.48 69.60 95 625.29 5 32.91 0 - Ordinary Soil
16+980 20.00 32.92 33.08 661.60 4.64 7.11 142.20 - 20.00 12.93 258.60 3.70 74.00 95 628.52 5 33.08 0 - Ordinary Soil
17+000 20.00 42.60 39.93 798.60 8.53 5.27 105.40 - 20.00 3.34 66.80 0.83 16.60 95 758.67 5 39.93 0 - Ordinary Soil
17+020 20.00 14.56 23.74 474.80 9.18 6.91 138.20 - 20.00 10.21 204.20 2.24 44.80 95 451.06 5 23.74 0 - Ordinary Soil
17+040 20.00 8.44 25.52 510.40 10.01 9.27 185.40 - 20.00 7.17 143.40 1.73 34.60 95 484.88 5 25.52 0 - Ordinary Soil
17+060 20.00 11.18 12.87 257.40 10.86 10.02 200.40 - 20.00 2.83 56.60 0.56 11.20 95 244.53 5 12.87 0 - Ordinary Soil
17+080 20.00 8.55 8.50 170.00 12.07 11.04 220.80 50.80 20.00 10.54 210.80 2.75 55.00 95 161.50 5 8.50 0 - Ordinary Soil

34 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
17+100 20.00 11.57 11.38 227.60 12.75 11.81 236.20 8.60 20.00 14.43 288.60 4.38 87.60 95 216.22 5 11.38 0 - Ordinary Soil
17+120 20.00 24.87 16.71 334.20 11.36 11.72 234.40 - 20.00 9.30 186.00 2.80 56.00 95 317.49 5 16.71 0 - Ordinary Soil
17+140 20.00 47.00 29.29 585.80 5.78 9.27 185.40 - 20.00 16.52 330.40 5.27 105.40 95 556.51 5 29.29 0 - Ordinary Soil
17+160 20.00 12.21 18.54 370.80 2.65 7.01 140.20 - 20.00 3.25 65.00 0.93 18.60 95 352.26 5 18.54 0 - Ordinary Soil
17+180 20.00 36.30 41.65 833.00 3.72 4.75 95.00 - 20.00 3.02 60.40 0.42 8.40 95 791.35 5 41.65 0 - Ordinary Soil
17+200 20.00 34.70 23.46 469.20 3.53 3.09 61.80 - 10.00 6.17 61.70 1.35 13.50 95 445.74 5 23.46 0 - Ordinary Soil
17+220 20.00 108.78 72.54 1,450.80 - 1.86 37.20 - - - - - - 95 1,378.26 5 72.54 0 - Ordinary Soil
17+240 20.00 156.20 95.45 1,909.00 - 1.77 35.40 - 10.00 45.23 452.30 0.68 6.80 95 1,813.55 5 95.45 0 - Ordinary Soil
17+260 20.00 107.72 108.25 2,165.00 - - - - 20.00 39.28 785.60 1.27 25.40 95 2,056.75 5 108.25 0 - Ordinary Soil
17+280 20.00 71.79 114.00 2,280.00 1.08 0.54 10.80 - 20.00 35.83 716.60 2.07 41.40 95 2,166.00 5 114.00 0 - Ordinary Soil
17+300 20.00 76.91 92.32 1,846.40 - - - - 10.00 25.30 253.00 0.66 6.60 95 1,754.08 5 92.32 0 - Ordinary Soil
17+320 20.00 18.10 44.95 899.00 2.61 1.85 37.00 - - - - - - 95 854.05 5 44.95 0 - Ordinary Soil
17+340 20.00 0.69 38.80 776.00 8.53 4.27 85.40 - - - - - - 95 737.20 5 38.80 0 - Ordinary Soil
17+360 20.00 - 9.05 181.00 21.09 11.85 237.00 56.00 - - - - - 95 171.95 5 9.05 0 - Ordinary Soil
17+380 20.00 22.50 11.60 232.00 9.47 9.00 180.00 - 10.00 2.23 22.30 0.08 0.80 95 220.40 5 11.60 0 - Ordinary Soil
17+400 20.00 28.45 14.23 284.60 2.63 11.86 237.20 - 20.00 4.05 81.00 0.62 12.40 95 270.37 5 14.23 0 - Ordinary Soil
17+420 20.00 6.85 14.68 293.60 10.61 10.04 200.80 - 10.00 5.80 58.00 0.97 9.70 95 278.92 5 14.68 0 - Ordinary Soil
17+440 20.00 41.73 35.09 701.80 0.01 1.32 26.40 - - - - - - 95 666.71 5 35.09 0 - Ordinary Soil
17+460 20.00 84.32 45.59 911.80 - 5.31 106.20 - - - - - - 95 866.21 5 45.59 0 - Ordinary Soil
17+480 20.00 15.46 28.60 572.00 14.45 7.23 144.60 - 10.00 16.81 168.10 4.16 41.60 95 543.40 5 28.60 0 - Ordinary Soil
17+500 20.00 - 42.16 843.20 30.03 15.02 300.40 - 20.00 15.32 306.40 3.43 68.60 95 801.04 5 42.16 0 - Ordinary Soil
17+520 20.00 56.52 35.99 719.80 0.10 7.28 145.60 - 10.00 2.93 29.30 0.97 9.70 95 683.81 5 35.99 0 - Ordinary Soil
17+540 20.00 96.48 48.24 964.80 - 15.02 300.40 - - - - - - 95 916.56 5 48.24 0 - Ordinary Soil
17+560 20.00 94.40 75.46 1,509.20 - 0.05 1.00 - - - - - - 95 1,433.74 5 75.46 0 - Ordinary Soil
17+580 20.00 150.64 123.56 2,471.20 - - - - 10.00 48.34 483.40 0.69 6.90 95 2,347.64 5 123.56 0 - Ordinary Soil
17+600 20.00 85.05 89.73 1,794.60 0.01 0.01 0.20 - 10.00 19.96 199.60 0.94 9.40 95 1,704.87 5 89.73 0 - Ordinary Soil
17+620 20.00 59.16 104.90 2,098.00 - - - - - - - - - 95 1,993.10 5 104.90 0 - Ordinary Soil
17+640 20.00 88.11 86.58 1,731.60 - 0.01 0.20 - 7.00 21.23 148.61 1.02 7.14 95 1,645.02 5 86.58 0 - Ordinary Soil
17+660 20.00 61.46 60.31 1,206.20 - - - - - - - - - 95 1,145.89 5 60.31 0 - Ordinary Soil
17+680 20.00 61.05 74.58 1,491.60 - - - - - - - - - 95 1,417.02 5 74.58 0 - Ordinary Soil
17+700 20.00 45.74 53.60 1,072.00 0.88 0.44 8.80 - 10.00 2.88 28.80 0.90 9.00 95 1,018.40 5 53.60 0 - Ordinary Soil
17+720 20.00 50.01 55.53 1,110.60 0.31 0.16 3.20 - 10.00 2.43 24.30 0.74 7.40 95 1,055.07 5 55.53 0 - Ordinary Soil
17+740 20.00 97.50 71.62 1,432.40 - 0.44 8.80 - - - - - - 95 1,360.78 5 71.62 0 - Ordinary Soil
17+760 20.00 97.41 73.71 1,474.20 - 0.16 3.20 - - - - - - 95 1,400.49 5 73.71 0 - Ordinary Soil
17+780 20.00 66.75 82.13 1,642.60 0.15 0.08 1.60 - 10.00 1.56 15.60 0.40 4.00 95 1,560.47 5 82.13 0 - Ordinary Soil
17+800 20.00 58.13 77.77 1,555.40 0.47 0.24 4.80 - 10.00 2.77 27.70 0.48 4.80 95 1,477.63 5 77.77 0 - Ordinary Soil
17+820 20.00 157.79 112.27 2,245.40 - 0.08 1.60 - - - - - - 95 2,133.13 5 112.27 0 - Ordinary Soil
17+840 20.00 33.63 45.88 917.60 5.23 2.85 57.00 - 10.00 7.86 78.60 1.91 19.10 95 871.72 5 45.88 0 - Ordinary Soil
17+860 20.00 26.78 92.29 1,845.80 6.96 3.48 69.60 - 20.00 7.39 147.80 1.48 29.60 95 1,753.51 5 92.29 0 - Ordinary Soil
17+880 20.00 72.58 53.11 1,062.20 0.03 2.63 52.60 - 10.00 1.93 19.30 0.57 5.70 95 1,009.09 5 53.11 0 - Ordinary Soil
17+900 20.00 59.63 43.21 864.20 - 3.48 69.60 - - - - - - 95 820.99 5 43.21 0 - Ordinary Soil
17+920 20.00 3.81 38.20 764.00 13.56 6.80 136.00 - 10.00 2.70 27.00 0.22 2.20 95 725.80 5 38.20 0 - Ordinary Soil
17+940 20.00 7.53 33.58 671.60 5.78 2.89 57.80 - 20.00 5.73 114.60 0.99 19.80 95 638.02 5 33.58 0 - Ordinary Soil

35 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
17+960 20.00 15.00 9.41 188.20 2.81 8.19 163.80 - 20.00 4.07 81.40 0.61 12.20 95 178.79 5 9.41 0 - Ordinary Soil
17+980 20.00 22.95 15.24 304.80 0.63 3.21 64.20 - 10.00 1.21 12.10 0.25 2.50 95 289.56 5 15.24 0 - Ordinary Soil
18+000 20.00 45.93 30.47 609.40 - 1.41 28.20 - - - - - - 95 578.93 5 30.47 0 - Ordinary Soil
18+020 20.00 5.52 14.24 284.80 11.54 6.09 121.80 - 10.00 9.72 97.20 1.96 19.60 95 270.56 5 14.24 0 - Ordinary Soil
18+040 20.00 - 22.97 459.40 25.60 12.80 256.00 - 20.00 13.17 263.40 2.60 52.00 95 436.43 5 22.97 0 - Ordinary Soil
18+060 20.00 15.93 10.73 214.60 2.54 7.04 140.80 - 20.00 1.87 37.40 0.41 8.20 95 203.87 5 10.73 0 - Ordinary Soil
18+080 20.00 6.60 3.30 66.00 10.54 18.07 361.40 295.40 20.00 6.47 129.40 1.05 21.00 95 62.70 5 3.30 0 - Ordinary Soil
18+100 20.00 16.75 16.34 326.80 4.94 3.74 74.80 - 20.00 4.84 96.80 0.88 17.60 95 310.46 5 16.34 0 - Ordinary Soil
18+120 20.00 39.51 23.06 461.20 1.09 5.82 116.40 - 20.00 2.64 52.80 0.74 14.80 95 438.14 5 23.06 0 - Ordinary Soil
18+140 20.00 54.11 35.43 708.60 - 2.47 49.40 - 20.00 0.48 9.60 0.05 1.00 95 673.17 5 35.43 0 - Ordinary Soil
18+160 20.00 36.16 37.84 756.80 0.49 0.79 15.80 - 20.00 2.03 40.60 0.55 11.00 95 718.96 5 37.84 0 - Ordinary Soil
18+180 20.00 12.23 33.17 663.40 8.20 4.10 82.00 - 20.00 5.72 114.40 1.05 21.00 95 630.23 5 33.17 0 - Ordinary Soil
18+200 20.00 15.57 25.87 517.40 7.66 4.08 81.60 - 20.00 6.04 120.80 1.15 23.00 95 491.53 5 25.87 0 - Ordinary Soil
18+220 20.00 17.87 15.05 301.00 4.14 6.17 123.40 - 20.00 5.71 114.20 1.12 22.40 95 285.95 5 15.05 0 - Ordinary Soil
18+240 20.00 7.75 11.66 233.20 10.68 9.17 183.40 - 20.00 5.49 109.80 0.85 17.00 95 221.54 5 11.66 0 - Ordinary Soil
18+260 20.00 22.88 20.38 407.60 1.11 2.63 52.60 - 20.00 2.45 49.00 0.65 13.00 95 387.22 5 20.38 0 - Ordinary Soil
18+280 20.00 63.30 35.53 710.60 1.68 6.18 123.60 - 20.00 2.99 59.80 0.85 17.00 95 675.07 5 35.53 0 - Ordinary Soil
18+300 20.00 155.36 89.12 1,782.40 29.68 15.40 308.00 - 20.00 0.60 12.00 0.10 2.00 95 1,693.28 5 89.12 0 - Ordinary Soil
18+320 20.00 29.48 46.39 927.80 32.90 17.29 345.80 - 20.00 1.72 34.40 0.26 5.20 95 881.41 5 46.39 0 - Ordinary Soil
18+340 20.00 49.83 102.60 2,052.00 35.07 32.38 647.60 - 20.00 2.22 44.40 0.38 7.60 95 1,949.40 5 102.60 0 - Ordinary Soil
18+360 20.00 38.97 34.23 684.60 10.34 21.62 432.40 - 20.00 9.15 183.00 1.57 31.40 95 650.37 5 34.23 0 - Ordinary Soil
18+380 20.00 - 24.92 498.40 46.66 40.87 817.40 319.00 20.00 1.11 22.20 0.26 5.20 95 473.48 5 24.92 0 - Ordinary Soil
18+400 20.00 0.98 19.98 399.60 74.64 42.49 849.80 450.20 20.00 8.44 168.80 1.91 38.20 95 379.62 5 19.98 0 - Ordinary Soil
18+420 20.00 41.78 20.89 417.80 7.23 26.95 539.00 121.20 20.00 15.40 308.00 4.49 89.80 95 396.91 5 20.89 0 - Ordinary Soil
18+440 20.00 229.73 115.36 2,307.20 - 37.32 746.40 - 20.00 1.17 23.40 0.21 4.20 95 2,191.84 5 115.36 0 - Ordinary Soil
18+460 20.00 191.66 116.72 2,334.40 4.30 5.77 115.40 - 20.00 33.33 666.60 14.13 282.60 95 2,217.68 5 116.72 0 - Ordinary Soil
18+480 20.00 123.02 176.38 3,527.60 6.96 3.48 69.60 - 20.00 15.96 319.20 7.46 149.20 95 3,351.22 5 176.38 0 - Ordinary Soil
18+500 20.00 133.59 162.63 3,252.60 - 2.15 43.00 - 20.00 41.79 835.80 0.68 13.60 95 3,089.97 5 162.63 0 - Ordinary Soil
18+520 20.00 129.83 126.43 2,528.60 - 3.48 69.60 - 20.00 39.54 790.80 0.75 15.00 95 2,402.17 5 126.43 0 - Ordinary Soil
18+540 20.00 53.88 93.74 1,874.80 - - - - 20.00 20.70 414.00 0.73 14.60 95 1,781.06 5 93.74 0 - Ordinary Soil
18+560 20.00 31.90 80.87 1,617.40 0.42 0.21 4.20 - 20.00 1.15 23.00 0.25 5.00 95 1,536.53 5 80.87 0 - Ordinary Soil
18+580 20.00 44.82 49.35 987.00 - - - - 10.00 1.05 10.50 0.23 2.30 95 937.65 5 49.35 0 - Ordinary Soil
18+600 20.00 138.57 85.24 1,704.80 - 0.21 4.20 - - - - - - 95 1,619.56 5 85.24 0 - Ordinary Soil
18+620 20.00 98.28 71.55 1,431.00 - - - - - - - - - 95 1,359.45 5 71.55 0 - Ordinary Soil
18+640 20.00 26.48 82.53 1,650.60 0.29 0.15 3.00 - - - - - - 95 1,568.07 5 82.53 0 - Ordinary Soil
18+660 20.00 3.09 50.69 1,013.80 11.16 5.58 111.60 - 10.00 4.58 45.80 0.53 5.30 95 963.11 5 50.69 0 - Ordinary Soil
18+680 20.00 5.58 16.03 320.60 17.70 9.00 180.00 - 20.00 6.16 123.20 0.75 15.00 95 304.57 5 16.03 0 - Ordinary Soil
18+700 20.00 22.48 12.79 255.80 3.22 7.19 143.80 - 20.00 6.20 124.00 1.34 26.80 95 243.01 5 12.79 0 - Ordinary Soil
18+720 20.00 11.11 8.35 167.00 4.79 11.25 225.00 58.00 20.00 6.06 121.20 1.11 22.20 95 158.65 5 8.35 0 - Ordinary Soil
18+740 20.00 13.48 17.98 359.60 7.73 5.48 109.60 - 20.00 7.65 153.00 1.42 28.40 95 341.62 5 17.98 0 - Ordinary Soil
18+760 20.00 19.72 15.42 308.40 5.05 4.92 98.40 - 20.00 8.89 177.80 2.04 40.80 95 292.98 5 15.42 0 - Ordinary Soil
18+780 20.00 16.57 15.03 300.60 7.01 7.37 147.40 - 20.00 10.97 219.40 2.76 55.20 95 285.57 5 15.03 0 - Ordinary Soil
18+800 20.00 21.87 20.80 416.00 6.25 5.65 113.00 - 10.00 7.50 75.00 1.58 15.80 95 395.20 5 20.80 0 - Ordinary Soil

36 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
18+820 20.00 91.56 54.07 1,081.40 - 3.51 70.20 - - - - - - 95 1,027.33 5 54.07 0 - Ordinary Soil
18+840 20.00 68.16 45.02 900.40 - 3.13 62.60 - - - - - - 95 855.38 5 45.02 0 - Ordinary Soil
18+860 20.00 67.28 79.42 1,588.40 - - - - - - - - - 95 1,508.98 5 79.42 0 - Ordinary Soil
18+880 20.00 51.87 60.02 1,200.40 - - - - 10.00 0.58 5.80 0.06 0.60 95 1,140.38 5 60.02 0 - Ordinary Soil
18+900 20.00 29.95 48.62 972.40 2.53 1.27 25.40 - 20.00 3.05 61.00 0.47 9.40 95 923.78 5 48.62 0 - Ordinary Soil
18+920 20.00 24.78 38.33 766.60 3.34 1.67 33.40 - 20.00 5.47 109.40 1.15 23.00 95 728.27 5 38.33 0 - Ordinary Soil
18+940 20.00 13.56 21.76 435.20 9.23 5.88 117.60 - 20.00 5.83 116.60 1.05 21.00 95 413.44 5 21.76 0 - Ordinary Soil
18+960 20.00 8.73 16.76 335.20 10.72 7.03 140.60 - 20.00 5.43 108.60 0.90 18.00 95 318.44 5 16.76 0 - Ordinary Soil
18+980 20.00 41.51 27.54 550.80 1.07 5.15 103.00 - 10.00 2.04 20.40 0.28 2.80 95 523.26 5 27.54 0 - Ordinary Soil
19+000 20.00 74.30 41.52 830.40 - 5.36 107.20 - - - - - - 95 788.88 5 41.52 0 - Ordinary Soil
19+020 20.00 55.56 48.54 970.80 0.54 0.81 16.20 - - - - - - 95 922.26 5 48.54 0 - Ordinary Soil
19+040 20.00 36.75 55.53 1,110.60 0.83 0.42 8.40 - 7.00 2.43 17.01 0.35 2.45 95 1,055.07 5 55.53 0 - Ordinary Soil
19+060 20.00 77.62 66.59 1,331.80 - 0.27 5.40 - - - - - - 95 1,265.21 5 66.59 0 - Ordinary Soil
19+080 20.00 129.78 83.27 1,665.40 - 0.42 8.40 - - - - - - 95 1,582.13 5 83.27 0 - Ordinary Soil
19+100 20.00 166.20 121.91 2,438.20 - - - - - - - - - 95 2,316.29 5 121.91 0 - Ordinary Soil
19+120 20.00 101.78 115.78 2,315.60 - - - - - - - - - 95 2,199.82 5 115.78 0 - Ordinary Soil
19+140 20.00 36.05 101.13 2,022.60 - - - - - - - - - 95 1,921.47 5 101.13 0 - Ordinary Soil
19+160 20.00 5.00 53.39 1,067.80 12.78 6.39 127.80 - 10.00 12.95 129.50 3.00 30.00 95 1,014.41 5 53.39 0 - Ordinary Soil
19+180 20.00 - 18.03 360.60 33.91 16.96 339.20 - 20.00 8.88 177.60 1.75 35.00 95 342.57 5 18.03 0 - Ordinary Soil
19+200 20.00 11.17 8.09 161.80 8.86 10.82 216.40 54.60 20.00 10.07 201.40 2.31 46.20 95 153.71 5 8.09 0 - Ordinary Soil
19+220 20.00 17.66 8.83 176.60 5.34 19.63 392.60 216.00 20.00 9.16 183.20 2.05 41.00 95 167.77 5 8.83 0 - Ordinary Soil
19+240 20.00 9.67 10.42 208.40 7.74 8.30 166.00 - 20.00 7.01 140.20 1.36 27.20 95 197.98 5 10.42 0 - Ordinary Soil
19+260 20.00 10.08 13.87 277.40 9.31 7.33 146.60 - 20.00 5.46 109.20 0.93 18.60 95 263.53 5 13.87 0 - Ordinary Soil
19+280 20.00 23.79 16.73 334.60 3.04 5.39 107.80 - 20.00 10.12 202.40 2.72 54.40 95 317.87 5 16.73 0 - Ordinary Soil
19+300 20.00 27.63 18.86 377.20 8.04 8.68 173.60 - 20.00 9.49 189.80 2.30 46.00 95 358.34 5 18.86 0 - Ordinary Soil
19+320 20.00 18.79 21.29 425.80 9.82 6.43 128.60 - 20.00 13.52 270.40 3.54 70.80 95 404.51 5 21.29 0 - Ordinary Soil
19+340 20.00 15.29 21.46 429.20 10.33 9.19 183.80 - 20.00 8.42 168.40 1.79 35.80 95 407.74 5 21.46 0 - Ordinary Soil
19+360 20.00 11.63 15.21 304.20 12.60 11.21 224.20 - 20.00 10.30 206.00 2.39 47.80 95 288.99 5 15.21 0 - Ordinary Soil
19+380 20.00 18.25 16.77 335.40 5.24 7.79 155.80 - 20.00 9.07 181.40 2.02 40.40 95 318.63 5 16.77 0 - Ordinary Soil
19+400 20.00 11.02 11.33 226.60 6.56 9.58 191.60 - 20.00 4.16 83.20 0.61 12.20 95 215.27 5 11.33 0 - Ordinary Soil
19+420 20.00 10.65 14.45 289.00 5.27 5.26 105.20 - 20.00 5.12 102.40 0.91 18.20 95 274.55 5 14.45 0 - Ordinary Soil
19+440 20.00 7.88 9.45 189.00 6.29 6.43 128.60 - 20.00 4.47 89.40 0.69 13.80 95 179.55 5 9.45 0 - Ordinary Soil
19+460 20.00 4.09 7.37 147.40 12.99 9.13 182.60 35.20 20.00 8.50 170.00 1.53 30.60 95 140.03 5 7.37 0 - Ordinary Soil
19+480 20.00 2.26 5.07 101.40 18.10 12.20 244.00 142.60 20.00 10.24 204.80 1.88 37.60 95 96.33 5 5.07 0 - Ordinary Soil
19+500 20.00 9.19 6.64 132.80 8.29 10.64 212.80 80.00 20.00 6.63 132.60 1.24 24.80 95 126.16 5 6.64 0 - Ordinary Soil
19+520 20.00 11.97 7.12 142.40 5.07 11.59 231.80 89.40 20.00 3.28 65.60 0.40 8.00 95 135.28 5 7.12 0 - Ordinary Soil
19+540 20.00 4.29 6.74 134.80 7.70 8.00 160.00 25.20 20.00 2.16 43.20 0.18 3.60 95 128.06 5 6.74 0 - Ordinary Soil
19+560 20.00 4.69 8.33 166.60 3.28 4.18 83.60 - 20.00 2.53 50.60 0.58 11.60 95 158.27 5 8.33 0 - Ordinary Soil
19+580 20.00 8.96 6.63 132.60 1.23 4.47 89.40 - 10.00 1.02 10.20 0.18 1.80 95 125.97 5 6.63 0 - Ordinary Soil
19+600 20.00 15.13 9.91 198.20 1.20 2.24 44.80 - - - - - - 95 188.29 5 9.91 0 - Ordinary Soil
19+620 20.00 5.25 7.11 142.20 2.82 2.03 40.60 - 10.00 1.98 19.80 0.17 1.70 95 135.09 5 7.11 0 - Ordinary Soil
19+640 20.00 4.92 10.03 200.60 2.94 2.07 41.40 - 20.00 1.92 38.40 0.16 3.20 95 190.57 5 10.03 0 - Ordinary Soil
19+660 20.00 5.20 5.23 104.60 2.95 2.89 57.80 - 10.00 2.15 21.50 0.20 2.00 95 99.37 5 5.23 0 - Ordinary Soil

37 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
19+680 20.00 19.50 12.21 244.20 0.01 1.48 29.60 - - - - - - 95 231.99 5 12.21 0 - Ordinary Soil
19+700 20.00 25.82 15.51 310.20 - 1.48 29.60 - - - - - - 95 294.69 5 15.51 0 - Ordinary Soil
19+720 20.00 39.17 29.34 586.80 - 0.01 0.20 - - - - - - 95 557.46 5 29.34 0 - Ordinary Soil
19+740 20.00 93.15 59.49 1,189.80 - - - - - - - - - 95 1,130.31 5 59.49 0 - Ordinary Soil
19+760 20.00 126.80 82.99 1,659.80 - - - - - - - - - 95 1,576.81 5 82.99 0 - Ordinary Soil
19+780 20.00 149.08 121.12 2,422.40 - - - - - - - - - 95 2,301.28 5 121.12 0 - Ordinary Soil
19+800 20.00 117.44 122.12 2,442.40 - - - - - - - - - 95 2,320.28 5 122.12 0 - Ordinary Soil
19+820 20.00 93.82 121.45 2,429.00 - - - - - - - - - 95 2,307.55 5 121.45 0 - Ordinary Soil
19+840 20.00 62.69 90.07 1,801.40 - - - - - - - - - 95 1,711.33 5 90.07 0 - Ordinary Soil
19+860 20.00 50.58 72.20 1,444.00 - - - - - - - - - 95 1,371.80 5 72.20 0 - Ordinary Soil
19+880 20.00 39.28 50.99 1,019.80 3.24 1.62 32.40 - - - - - - 95 968.81 5 50.99 0 - Ordinary Soil
19+900 20.00 27.97 39.28 785.60 1.32 0.66 13.20 - 7.00 2.13 14.91 0.26 1.82 95 746.32 5 39.28 0 - Ordinary Soil
19+920 20.00 75.95 57.62 1,152.40 - 1.62 32.40 - - - - - - 95 1,094.78 5 57.62 0 - Ordinary Soil
19+940 20.00 34.23 31.10 622.00 1.67 1.50 30.00 - 7.00 1.17 8.19 0.12 0.84 95 590.90 5 31.10 0 - Ordinary Soil
19+960 20.00 54.07 65.01 1,300.20 0.05 0.03 0.60 - - - - - - 95 1,235.19 5 65.01 0 - Ordinary Soil
19+980 20.00 75.50 54.87 1,097.40 0.01 0.84 16.80 - - - - - - 95 1,042.53 5 54.87 0 - Ordinary Soil
20+000 20.00 25.31 39.69 793.80 - 0.03 0.60 - - - - - - 95 754.11 5 39.69 0 - Ordinary Soil
20+020 20.00 - 37.75 755.00 28.77 14.39 287.80 - - - - - - 95 717.25 5 37.75 0 - Ordinary Soil
20+040 20.00 - 12.66 253.20 98.12 49.06 981.20 728.00 - - - - - 95 240.54 5 12.66 0 - Ordinary Soil
20+060 20.00 - - - 23.59 26.18 523.60 523.60 10.00 2.95 29.50 0.17 1.70 95 - 5 - 0 - Ordinary Soil
20+080 20.00 5.03 2.52 50.40 0.82 49.47 989.40 939.00 20.00 0.72 14.40 0.11 2.20 95 47.88 5 2.52 0 - Ordinary Soil
20+100 20.00 1.20 0.60 12.00 4.35 13.97 279.40 267.40 20.00 3.05 61.00 0.75 15.00 95 11.40 5 0.60 0 - Ordinary Soil
20+120 20.00 1.78 3.41 68.20 3.16 1.99 39.80 - 10.00 1.48 14.80 0.08 0.80 95 64.79 5 3.41 0 - Ordinary Soil
20+140 20.00 2.93 2.07 41.40 1.11 2.73 54.60 13.20 - - - - - 95 39.33 5 2.07 0 - Ordinary Soil
20+160 20.00 4.14 2.96 59.20 0.21 1.69 33.80 - - - - - - 95 56.24 5 2.96 0 - Ordinary Soil
20+180 20.00 2.93 2.93 58.60 0.48 0.80 16.00 - - - - - - 95 55.67 5 2.93 0 - Ordinary Soil
20+200 20.00 3.09 3.62 72.40 4.02 2.12 42.40 - - - - - - 95 68.78 5 3.62 0 - Ordinary Soil
20+220 20.00 1.75 2.34 46.80 6.50 3.49 69.80 23.00 10.00 1.91 19.10 0.35 3.50 95 44.46 5 2.34 0 - Ordinary Soil
20+240 20.00 2.74 2.92 58.40 3.23 3.63 72.60 14.20 20.00 1.01 20.20 0.16 3.20 95 55.48 5 2.92 0 - Ordinary Soil
20+260 20.00 12.52 7.14 142.80 0.44 3.47 69.40 - 10.00 1.46 14.60 0.33 3.30 95 135.66 5 7.14 0 - Ordinary Soil
20+280 20.00 23.24 12.99 259.80 - 1.62 32.40 - - - - - - 95 246.81 5 12.99 0 - Ordinary Soil
20+300 20.00 14.69 13.61 272.20 0.40 0.42 8.40 - 10.00 1.42 14.20 0.33 3.30 95 258.59 5 13.61 0 - Ordinary Soil
20+320 20.00 2.26 12.75 255.00 12.78 6.39 127.80 - 20.00 5.61 112.20 0.75 15.00 95 242.25 5 12.75 0 - Ordinary Soil
20+340 20.00 11.51 13.10 262.00 1.94 1.17 23.40 - 20.00 2.14 42.80 0.23 4.60 95 248.90 5 13.10 0 - Ordinary Soil
20+360 20.00 12.10 7.18 143.60 1.33 7.06 141.20 - 10.00 1.92 19.20 0.45 4.50 95 136.42 5 7.18 0 - Ordinary Soil
20+380 20.00 6.00 8.76 175.20 1.47 1.71 34.20 - - - - - - 95 166.44 5 8.76 0 - Ordinary Soil
20+400 20.00 - 6.05 121.00 11.68 6.51 130.20 9.20 10.00 1.50 15.00 0.19 1.90 95 114.95 5 6.05 0 - Ordinary Soil
20+420 20.00 - 3.00 60.00 26.41 13.94 278.80 218.80 10.00 2.31 23.10 0.06 0.60 95 57.00 5 3.00 0 - Ordinary Soil
20+440 20.00 4.48 2.24 44.80 6.55 9.12 182.40 137.60 - - - - - 95 42.56 5 2.24 0 - Ordinary Soil
20+460 20.00 10.53 5.27 105.40 1.87 14.14 282.80 177.40 - - - - - 95 100.13 5 5.27 0 - Ordinary Soil
20+480 20.00 10.15 7.32 146.40 4.15 5.35 107.00 - 10.00 2.39 23.90 0.46 4.60 95 139.08 5 7.32 0 - Ordinary Soil
20+500 20.00 14.00 12.27 245.40 4.30 3.09 61.80 - 20.00 5.97 119.40 1.19 23.80 95 233.13 5 12.27 0 - Ordinary Soil
20+520 20.00 21.25 15.70 314.00 1.92 3.04 60.80 - 20.00 3.86 77.20 0.72 14.40 95 298.30 5 15.70 0 - Ordinary Soil

38 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
20+540 20.00 7.87 10.94 218.80 10.38 7.34 146.80 - 20.00 12.84 256.80 3.06 61.20 95 207.86 5 10.94 0 - Ordinary Soil
20+560 20.00 12.89 17.07 341.40 5.86 3.89 77.80 - 10.00 8.13 81.30 1.63 16.30 95 324.33 5 17.07 0 - Ordinary Soil
20+580 20.00 64.57 36.22 724.40 - 5.19 103.80 - - - - - - 95 688.18 5 36.22 0 - Ordinary Soil
20+600 20.00 47.18 30.04 600.80 0.06 2.96 59.20 - - - - - - 95 570.76 5 30.04 0 - Ordinary Soil
20+620 20.00 13.26 38.92 778.40 8.15 4.08 81.60 - 10.00 6.26 62.60 1.12 11.20 95 739.48 5 38.92 0 - Ordinary Soil
20+640 20.00 20.19 33.69 673.80 6.75 3.41 68.20 - 20.00 3.71 74.20 0.51 10.20 95 640.11 5 33.69 0 - Ordinary Soil
20+660 20.00 11.19 12.23 244.60 6.91 7.53 150.60 - 20.00 4.51 90.20 0.64 12.80 95 232.37 5 12.23 0 - Ordinary Soil
20+680 20.00 - 10.10 202.00 28.70 17.73 354.60 152.60 20.00 9.30 186.00 1.67 33.40 95 191.90 5 10.10 0 - Ordinary Soil
20+700 20.00 2.46 6.83 136.60 21.97 14.44 288.80 152.20 20.00 12.00 240.00 2.44 48.80 95 129.77 5 6.83 0 - Ordinary Soil
20+720 20.00 4.79 2.40 48.00 16.00 22.35 447.00 399.00 20.00 5.38 107.60 0.87 17.40 95 45.60 5 2.40 0 - Ordinary Soil
20+740 20.00 0.01 1.24 24.80 22.52 22.25 445.00 420.20 20.00 6.33 126.60 1.24 24.80 95 23.56 5 1.24 0 - Ordinary Soil
20+760 20.00 - 2.40 48.00 25.12 20.56 411.20 363.20 20.00 8.78 175.60 1.44 28.80 95 45.60 5 2.40 0 - Ordinary Soil
20+780 20.00 2.34 1.18 23.60 13.43 17.98 359.60 336.00 20.00 4.33 86.60 0.58 11.60 95 22.42 5 1.18 0 - Ordinary Soil
20+800 20.00 4.01 2.01 40.20 14.86 19.99 399.80 359.60 20.00 7.26 145.20 1.28 25.60 95 38.19 5 2.01 0 - Ordinary Soil
20+820 20.00 - 1.17 23.40 25.02 19.23 384.60 361.20 20.00 10.14 202.80 2.14 42.80 95 22.23 5 1.17 0 - Ordinary Soil
20+840 20.00 - 2.01 40.20 36.07 25.47 509.40 469.20 20.00 9.34 186.80 2.27 45.40 95 38.19 5 2.01 0 - Ordinary Soil
20+860 20.00 - - - 50.58 37.80 756.00 756.00 20.00 5.86 117.20 0.93 18.60 95 - 5 - 0 - Ordinary Soil
20+880 20.00 - - - 73.34 54.71 1,094.20 1,094.20 10.00 0.44 4.40 - - 95 - 5 - 0 - Ordinary Soil
20+900 20.00 - - - 115.72 83.15 1,663.00 1,663.00 - - - - - 95 - 5 - 0 - Ordinary Soil
20+920 20.00 - - - 141.72 107.53 2,150.60 2,150.60 - - - - - 95 - 5 - 0 - Ordinary Soil
20+940 20.00 - - - 45.88 80.80 1,616.00 1,616.00 10.00 6.27 62.70 0.79 7.90 95 - 5 - 0 - Ordinary Soil
20+960 20.00 - - - 39.38 90.55 1,811.00 1,811.00 20.00 6.47 129.40 1.39 27.80 95 - 5 - 0 - Ordinary Soil
20+980 20.00 - - - 77.36 61.62 1,232.40 1,232.40 20.00 0.98 19.60 0.01 0.20 95 - 5 - 0 - Ordinary Soil
21+000 20.00 4.72 2.36 47.20 8.17 23.78 475.60 428.40 20.00 3.56 71.20 0.36 7.20 95 44.84 5 2.36 0 - Ordinary Soil
21+020 20.00 18.63 9.32 186.40 4.19 40.78 815.60 629.20 20.00 5.56 111.20 1.08 21.60 95 177.08 5 9.32 0 - Ordinary Soil
21+040 20.00 5.36 5.04 100.80 10.09 9.13 182.60 81.80 20.00 6.84 136.80 1.16 23.20 95 95.76 5 5.04 0 - Ordinary Soil
21+060 20.00 11.70 15.17 303.40 6.19 5.19 103.80 - 20.00 4.44 88.80 0.64 12.80 95 288.23 5 15.17 0 - Ordinary Soil
21+080 20.00 3.39 4.38 87.60 9.03 9.56 191.20 103.60 10.00 3.95 39.50 0.47 4.70 95 83.22 5 4.38 0 - Ordinary Soil
21+100 20.00 3.17 7.44 148.80 13.62 9.91 198.20 49.40 - - - - - 95 141.36 5 7.44 0 - Ordinary Soil
21+120 20.00 10.69 7.04 140.80 3.27 6.15 123.00 - 10.00 3.94 39.40 0.56 5.60 95 133.76 5 7.04 0 - Ordinary Soil
21+140 20.00 31.27 17.22 344.40 0.39 7.01 140.20 - 20.00 1.31 26.20 0.30 6.00 95 327.18 5 17.22 0 - Ordinary Soil
21+160 20.00 17.41 14.05 281.00 4.63 3.95 79.00 - 20.00 6.48 129.60 1.25 25.00 95 266.95 5 14.05 0 - Ordinary Soil
21+180 20.00 23.46 27.37 547.40 0.83 0.61 12.20 - 10.00 2.14 21.40 0.55 5.50 95 520.03 5 27.37 0 - Ordinary Soil
21+200 20.00 - 8.71 174.20 27.40 16.02 320.40 146.20 - - - - - 95 165.49 5 8.71 0 - Ordinary Soil
21+220 20.00 - 11.73 234.60 30.00 15.42 308.40 73.80 - - - - - 95 222.87 5 11.73 0 - Ordinary Soil
21+240 20.00 - - - 44.60 36.00 720.00 720.00 - - - - - 95 - 5 - 0 - Ordinary Soil
21+260 20.00 4.63 2.32 46.40 9.05 19.53 390.60 344.20 7.00 4.62 32.34 0.57 3.99 95 44.08 5 2.32 0 - Ordinary Soil
21+280 20.00 121.46 60.73 1,214.60 - 22.30 446.00 - - - - - - 95 1,153.87 5 60.73 0 - Ordinary Soil
21+300 20.00 236.47 120.55 2,411.00 - 4.53 90.60 - 10.00 57.59 575.90 0.68 6.80 95 2,290.45 5 120.55 0 - Ordinary Soil
21+320 20.00 126.53 124.00 2,480.00 - - - - 20.00 32.41 648.20 0.90 18.00 95 2,356.00 5 124.00 0 - Ordinary Soil
21+340 20.00 44.54 140.51 2,810.20 - - - - 20.00 15.74 314.80 0.87 17.40 95 2,669.69 5 140.51 0 - Ordinary Soil
21+360 20.00 48.26 87.40 1,748.00 - - - - 20.00 15.39 307.80 0.88 17.60 95 1,660.60 5 87.40 0 - Ordinary Soil
21+380 20.00 65.80 55.17 1,103.40 - - - - 20.00 20.27 405.40 0.89 17.80 95 1,048.23 5 55.17 0 - Ordinary Soil

39 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
21+400 20.00 44.34 46.30 926.00 - - - - 20.00 16.38 327.60 0.89 17.80 95 879.70 5 46.30 0 - Ordinary Soil
21+420 20.00 24.55 45.18 903.60 2.79 1.40 28.00 - 20.00 3.03 60.60 0.47 9.40 95 858.42 5 45.18 0 - Ordinary Soil
21+440 20.00 3.84 24.09 481.80 13.30 6.65 133.00 - 20.00 13.26 265.20 3.03 60.60 95 457.71 5 24.09 0 - Ordinary Soil
21+460 20.00 - 12.28 245.60 21.98 12.39 247.80 2.20 20.00 9.43 188.60 1.68 33.60 95 233.32 5 12.28 0 - Ordinary Soil
21+480 20.00 0.13 1.99 39.80 16.75 15.03 300.60 260.80 20.00 6.71 134.20 1.22 24.40 95 37.81 5 1.99 0 - Ordinary Soil
21+500 20.00 - - - 23.66 22.82 456.40 456.40 20.00 14.36 287.20 2.99 59.80 95 - 5 - 0 - Ordinary Soil
21+520 20.00 0.48 0.31 6.20 16.95 16.85 337.00 330.80 20.00 12.42 248.40 2.58 51.60 95 5.89 5 0.31 0 - Ordinary Soil
21+540 20.00 9.31 4.66 93.20 6.86 15.26 305.20 212.00 10.00 4.29 42.90 0.62 6.20 95 88.54 5 4.66 0 - Ordinary Soil
21+560 20.00 68.11 34.30 686.00 - 8.48 169.60 - - - - - - 95 651.70 5 34.30 0 - Ordinary Soil
21+580 20.00 96.71 53.01 1,060.20 - 3.43 68.60 - - - - - - 95 1,007.19 5 53.01 0 - Ordinary Soil
21+600 20.00 344.62 206.37 4,127.40 - - - - - - - - - 95 3,921.03 5 206.37 0 - Ordinary Soil
21+620 20.00 338.60 217.66 4,353.20 - - - - - - - - - 95 4,135.54 5 217.66 0 - Ordinary Soil
21+640 20.00 201.08 272.85 5,457.00 0.01 0.01 0.20 - - - - - - 95 5,184.15 5 272.85 0 - Ordinary Soil
21+660 20.00 163.12 250.86 5,017.20 - - - - - - - - - 95 4,766.34 5 250.86 0 - Ordinary Soil
21+680 20.00 156.46 178.77 3,575.40 - 0.01 0.20 - - - - - - 95 3,396.63 5 178.77 0 - Ordinary Soil
21+700 20.00 145.33 154.23 3,084.60 0.01 0.01 0.20 - - - - - - 95 2,930.37 5 154.23 0 - Ordinary Soil
21+720 20.00 181.97 169.22 3,384.40 - - - - - - - - - 95 3,215.18 5 169.22 0 - Ordinary Soil
21+740 20.00 164.15 154.74 3,094.80 - 0.01 0.20 - - - - - - 95 2,940.06 5 154.74 0 - Ordinary Soil
21+760 20.00 172.52 177.25 3,545.00 - - - - - - - - - 95 3,367.75 5 177.25 0 - Ordinary Soil
21+780 20.00 123.81 143.98 2,879.60 - - - - 10.00 40.57 405.70 0.68 6.80 95 2,735.62 5 143.98 0 - Ordinary Soil
21+800 20.00 84.92 128.72 2,574.40 - - - - 20.00 31.84 636.80 0.75 15.00 95 2,445.68 5 128.72 0 - Ordinary Soil
21+820 20.00 29.71 76.76 1,535.20 2.99 1.50 30.00 - 20.00 6.13 122.60 1.29 25.80 95 1,458.44 5 76.76 0 - Ordinary Soil
21+840 20.00 8.83 46.88 937.60 9.00 4.50 90.00 - 20.00 10.94 218.80 2.45 49.00 95 890.72 5 46.88 0 - Ordinary Soil
21+860 20.00 0.78 15.25 305.00 20.75 11.87 237.40 - 20.00 15.23 304.60 3.33 66.60 95 289.75 5 15.25 0 - Ordinary Soil
21+880 20.00 - 4.42 88.40 38.91 23.96 479.20 390.80 20.00 14.43 288.60 2.66 53.20 95 83.98 5 4.42 0 - Ordinary Soil
21+900 20.00 - 0.39 7.80 32.79 26.77 535.40 527.60 20.00 14.57 291.40 2.89 57.80 95 7.41 5 0.39 0 - Ordinary Soil
21+920 20.00 0.84 0.42 8.40 16.34 27.63 552.60 544.20 20.00 7.58 151.60 1.28 25.60 95 7.98 5 0.42 0 - Ordinary Soil
21+940 20.00 12.39 6.20 124.00 5.62 19.21 384.20 260.20 10.00 4.95 49.50 0.84 8.40 95 117.80 5 6.20 0 - Ordinary Soil
21+960 20.00 50.12 25.48 509.60 0.58 8.46 169.20 - - - - - - 95 484.12 5 25.48 0 - Ordinary Soil
21+980 20.00 247.14 129.77 2,595.40 - 2.81 56.20 - - - - - - 95 2,465.63 5 129.77 0 - Ordinary Soil
22+000 20.00 260.19 155.16 3,103.20 - 0.29 5.80 - 10.00 101.02 1,010.20 0.66 6.60 95 2,948.04 5 155.16 0 - Ordinary Soil
22+020 20.00 225.13 236.14 4,722.80 - - - - 20.00 69.17 1,383.40 0.65 13.00 95 4,486.66 5 236.14 0 - Ordinary Soil
22+040 20.00 102.11 181.15 3,623.00 - - - - 20.00 32.60 652.00 0.67 13.40 95 3,441.85 5 181.15 0 - Ordinary Soil
22+060 20.00 34.38 129.76 2,595.20 0.50 0.25 5.00 - 20.00 2.17 43.40 0.62 12.40 95 2,465.44 5 129.76 0 - Ordinary Soil
22+080 20.00 0.16 51.14 1,022.80 23.04 11.52 230.40 - 20.00 8.42 168.40 1.45 29.00 95 971.66 5 51.14 0 - Ordinary Soil
22+100 20.00 - 17.19 343.80 29.79 15.15 303.00 - 20.00 9.48 189.60 1.83 36.60 95 326.61 5 17.19 0 - Ordinary Soil
22+120 20.00 - 0.08 1.60 40.35 31.70 634.00 632.40 20.00 3.39 67.80 0.55 11.00 95 1.52 5 0.08 0 - Ordinary Soil
22+140 20.00 - - - 46.86 38.33 766.60 766.60 20.00 2.23 44.60 0.32 6.40 95 - 5 - 0 - Ordinary Soil
22+160 20.00 - - - 23.46 31.91 638.20 638.20 10.00 5.50 55.00 0.71 7.10 95 - 5 - 0 - Ordinary Soil
22+180 20.00 156.56 78.28 1,565.60 - 23.43 468.60 - - - - - - 95 1,487.32 5 78.28 0 - Ordinary Soil
22+200 20.00 138.38 69.19 1,383.80 - 11.73 234.60 - 10.00 40.86 408.60 0.67 6.70 95 1,314.61 5 69.19 0 - Ordinary Soil
22+220 20.00 91.59 124.08 2,481.60 - - - - 20.00 31.67 633.40 0.67 13.40 95 2,357.52 5 124.08 0 - Ordinary Soil
22+240 20.00 28.81 83.60 1,672.00 1.00 0.50 10.00 - 20.00 2.23 44.60 0.60 12.00 95 1,588.40 5 83.60 0 - Ordinary Soil

40 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
22+260 20.00 2.04 46.82 936.40 14.84 7.42 148.40 - 20.00 8.00 160.00 1.37 27.40 95 889.58 5 46.82 0 - Ordinary Soil
22+280 20.00 3.15 15.98 319.60 15.41 8.21 164.20 - 20.00 7.16 143.20 1.29 25.80 95 303.62 5 15.98 0 - Ordinary Soil
22+300 20.00 11.04 6.54 130.80 8.17 11.51 230.20 99.40 20.00 6.34 126.80 1.25 25.00 95 124.26 5 6.54 0 - Ordinary Soil
22+320 20.00 6.29 4.72 94.40 11.65 13.53 270.60 176.20 20.00 9.35 187.00 1.84 36.80 95 89.68 5 4.72 0 - Ordinary Soil
22+340 20.00 17.23 14.14 282.80 4.51 6.34 126.80 - 20.00 5.51 110.20 1.03 20.60 95 268.66 5 14.14 0 - Ordinary Soil
22+360 20.00 47.50 26.90 538.00 0.84 6.25 125.00 - 10.00 5.45 54.50 1.26 12.60 95 511.10 5 26.90 0 - Ordinary Soil
22+380 20.00 221.89 119.56 2,391.20 - 2.26 45.20 - - - - - - 95 2,271.64 5 119.56 0 - Ordinary Soil
22+400 20.00 292.64 170.07 3,401.40 - 0.42 8.40 - 10.00 130.50 1,305.00 1.64 16.40 95 3,231.33 5 170.07 0 - Ordinary Soil
22+420 20.00 213.61 217.75 4,355.00 - - - - 20.00 81.70 1,634.00 0.69 13.80 95 4,137.25 5 217.75 0 - Ordinary Soil
22+440 20.00 181.25 236.95 4,739.00 - - - - 20.00 57.21 1,144.20 0.64 12.80 95 4,502.05 5 236.95 0 - Ordinary Soil
22+460 20.00 157.00 185.31 3,706.20 - - - - 20.00 51.61 1,032.20 0.64 12.80 95 3,520.89 5 185.31 0 - Ordinary Soil
22+480 20.00 124.20 152.73 3,054.60 - - - - 20.00 33.20 664.00 0.91 18.20 95 2,901.87 5 152.73 0 - Ordinary Soil
22+500 20.00 56.45 106.73 2,134.60 - - - - 20.00 18.86 377.20 0.76 15.20 95 2,027.87 5 106.73 0 - Ordinary Soil
22+520 20.00 22.99 73.60 1,472.00 3.42 1.71 34.20 - 20.00 6.70 134.00 1.38 27.60 95 1,398.40 5 73.60 0 - Ordinary Soil
22+540 20.00 15.16 35.81 716.20 8.53 4.27 85.40 - 20.00 10.98 219.60 2.48 49.60 95 680.39 5 35.81 0 - Ordinary Soil
22+560 20.00 0.86 11.93 238.60 23.65 13.54 270.80 32.20 20.00 18.94 378.80 4.39 87.80 95 226.67 5 11.93 0 - Ordinary Soil
22+580 20.00 25.02 20.09 401.80 0.33 4.43 88.60 - 20.00 1.42 28.40 0.33 6.60 95 381.71 5 20.09 0 - Ordinary Soil
22+600 20.00 238.68 119.77 2,395.40 - 11.83 236.60 - 20.00 60.53 1,210.60 0.70 14.00 95 2,275.63 5 119.77 0 - Ordinary Soil
22+620 20.00 161.73 93.38 1,867.60 - 0.17 3.40 - 20.00 70.66 1,413.20 0.69 13.80 95 1,774.22 5 93.38 0 - Ordinary Soil
22+640 20.00 195.14 216.91 4,338.20 - - - - 20.00 54.96 1,099.20 0.72 14.40 95 4,121.29 5 216.91 0 - Ordinary Soil
22+660 20.00 111.79 136.76 2,735.20 - - - - 10.00 33.82 338.20 0.75 7.50 95 2,598.44 5 136.76 0 - Ordinary Soil
22+680 20.00 62.33 128.74 2,574.80 - - - - - - - - - 95 2,446.06 5 128.74 0 - Ordinary Soil
22+700 20.00 25.62 68.71 1,374.20 2.45 1.23 24.60 - 10.00 7.09 70.90 1.63 16.30 95 1,305.49 5 68.71 0 - Ordinary Soil
22+720 20.00 20.22 41.28 825.60 3.71 1.86 37.20 - 20.00 6.22 124.40 1.24 24.80 95 784.32 5 41.28 0 - Ordinary Soil
22+740 20.00 6.92 16.27 325.40 11.98 7.22 144.40 - 20.00 8.67 173.40 1.66 33.20 95 309.13 5 16.27 0 - Ordinary Soil
22+760 20.00 - 10.11 202.20 30.29 17.00 340.00 137.80 20.00 14.95 299.00 3.06 61.20 95 192.09 5 10.11 0 - Ordinary Soil
22+780 20.00 - 3.46 69.20 32.09 22.04 440.80 371.60 20.00 12.14 242.80 2.59 51.80 95 65.74 5 3.46 0 - Ordinary Soil
22+800 20.00 0.23 0.12 2.40 28.05 29.17 583.40 581.00 10.00 15.93 159.30 3.43 34.30 95 2.28 5 0.12 0 - Ordinary Soil
22+820 20.00 117.03 58.52 1,170.40 - 16.05 321.00 - - - - - - 95 1,111.88 5 58.52 0 - Ordinary Soil
22+840 20.00 193.11 96.67 1,933.40 - 14.03 280.60 - 10.00 67.76 677.60 0.69 6.90 95 1,836.73 5 96.67 0 - Ordinary Soil
22+860 20.00 204.41 160.72 3,214.40 - - - - 20.00 56.55 1,131.00 0.68 13.60 95 3,053.68 5 160.72 0 - Ordinary Soil
22+880 20.00 176.08 184.60 3,692.00 0.01 0.01 0.20 - 20.00 49.65 993.00 0.68 13.60 95 3,507.40 5 184.60 0 - Ordinary Soil
22+900 20.00 199.87 202.14 4,042.80 - - - - 20.00 55.58 1,111.60 0.69 13.80 95 3,840.66 5 202.14 0 - Ordinary Soil
22+920 20.00 226.99 201.54 4,030.80 - 0.01 0.20 - 20.00 61.11 1,222.20 0.69 13.80 95 3,829.26 5 201.54 0 - Ordinary Soil
22+940 20.00 167.03 183.45 3,669.00 - - - - 20.00 92.79 1,855.80 1.62 32.40 95 3,485.55 5 183.45 0 - Ordinary Soil
22+960 20.00 164.32 195.66 3,913.20 - - - - 20.00 92.32 1,846.40 1.61 32.20 95 3,717.54 5 195.66 0 - Ordinary Soil
22+980 20.00 220.30 193.67 3,873.40 0.01 0.01 0.20 - 20.00 82.96 1,659.20 1.80 36.00 95 3,679.73 5 193.67 0 - Ordinary Soil
23+000 20.00 200.75 182.54 3,650.80 - - - - 20.00 73.81 1,476.20 1.76 35.20 95 3,468.26 5 182.54 0 - Ordinary Soil
23+020 20.00 200.21 210.26 4,205.20 - 0.01 0.20 - 20.00 76.20 1,524.00 1.61 32.20 95 3,994.94 5 210.26 0 - Ordinary Soil
23+040 20.00 174.02 187.39 3,747.80 - - - - 20.00 98.59 1,971.80 1.62 32.40 95 3,560.41 5 187.39 0 - Ordinary Soil
23+060 20.00 216.63 208.42 4,168.40 - - - - 20.00 92.02 1,840.40 1.63 32.60 95 3,959.98 5 208.42 0 - Ordinary Soil
23+080 20.00 225.44 199.73 3,994.60 - - - - 20.00 99.91 1,998.20 1.63 32.60 95 3,794.87 5 199.73 0 - Ordinary Soil
23+100 20.00 261.99 239.31 4,786.20 - - - - 10.00 136.80 1,368.00 1.37 13.70 95 4,546.89 5 239.31 0 - Ordinary Soil

41 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
23+120 20.00 110.45 167.95 3,359.00 - - - - - - - - - 95 3,191.05 5 167.95 0 - Ordinary Soil
23+140 20.00 69.09 165.54 3,310.80 - - - - - - - - - 95 3,145.26 5 165.54 0 - Ordinary Soil
23+160 20.00 25.69 68.07 1,361.40 0.25 0.13 2.60 - - - - - - 95 1,293.33 5 68.07 0 - Ordinary Soil
23+180 20.00 116.93 93.01 1,860.20 0.01 0.01 0.20 - - - - - - 95 1,767.19 5 93.01 0 - Ordinary Soil
23+200 20.00 116.80 71.25 1,425.00 - 0.13 2.60 - - - - - - 95 1,353.75 5 71.25 0 - Ordinary Soil
23+220 20.00 111.39 114.16 2,283.20 - 0.01 0.20 - - - - - - 95 2,169.04 5 114.16 0 - Ordinary Soil
23+240 20.00 98.53 107.67 2,153.40 - - - - - - - - - 95 2,045.73 5 107.67 0 - Ordinary Soil
23+260 20.00 121.95 116.67 2,333.40 - - - - - - - - - 95 2,216.73 5 116.67 0 - Ordinary Soil
23+280 20.00 91.28 94.91 1,898.20 - - - - - - - - - 95 1,803.29 5 94.91 0 - Ordinary Soil
23+300 20.00 35.16 78.56 1,571.20 1.32 0.66 13.20 - 10.00 4.95 49.50 1.04 10.40 95 1,492.64 5 78.56 0 - Ordinary Soil
23+320 20.00 5.25 48.27 965.40 9.71 4.86 97.20 - 20.00 6.68 133.60 1.21 24.20 95 917.13 5 48.27 0 - Ordinary Soil
23+340 20.00 3.00 19.08 381.60 14.58 7.95 159.00 - 20.00 13.48 269.60 2.99 59.80 95 362.52 5 19.08 0 - Ordinary Soil
23+360 20.00 12.80 9.03 180.60 6.36 8.04 160.80 - 20.00 8.37 167.40 1.67 33.40 95 171.57 5 9.03 0 - Ordinary Soil
23+380 20.00 12.40 7.70 154.00 7.09 10.84 216.80 62.80 20.00 8.05 161.00 1.57 31.40 95 146.30 5 7.70 0 - Ordinary Soil
23+400 20.00 22.46 17.63 352.60 1.18 3.77 75.40 - 20.00 2.16 43.20 0.56 11.20 95 334.97 5 17.63 0 - Ordinary Soil
23+420 20.00 46.46 29.43 588.60 0.05 3.57 71.40 - 20.00 1.80 36.00 0.51 10.20 95 559.17 5 29.43 0 - Ordinary Soil
23+440 20.00 9.26 15.86 317.20 6.07 3.63 72.60 - 20.00 7.87 157.40 1.66 33.20 95 301.34 5 15.86 0 - Ordinary Soil
23+460 20.00 - 23.23 464.60 51.82 25.94 518.80 54.20 10.00 5.43 54.30 0.70 7.00 95 441.37 5 23.23 0 - Ordinary Soil
23+480 20.00 - 4.63 92.60 88.50 47.29 945.80 853.20 - - - - - 95 87.97 5 4.63 0 - Ordinary Soil
23+500 20.00 11.07 5.54 110.80 0.71 26.27 525.40 414.60 7.00 2.31 16.17 0.62 4.34 95 105.26 5 5.54 0 - Ordinary Soil
23+520 20.00 38.19 19.10 382.00 2.43 45.47 909.40 527.40 - - - - - 95 362.90 5 19.10 0 - Ordinary Soil
23+540 20.00 47.85 29.46 589.20 - 0.36 7.20 - - - - - - 95 559.74 5 29.46 0 - Ordinary Soil
23+560 20.00 77.73 57.96 1,159.20 - 1.22 24.40 - - - - - - 95 1,101.24 5 57.96 0 - Ordinary Soil
23+580 20.00 72.85 60.35 1,207.00 - - - - - - - - - 95 1,146.65 5 60.35 0 - Ordinary Soil
23+600 20.00 35.45 56.59 1,131.80 0.03 0.02 0.40 - - - - - - 95 1,075.21 5 56.59 0 - Ordinary Soil
23+620 20.00 35.82 54.34 1,086.80 - - - - - - - - - 95 1,032.46 5 54.34 0 - Ordinary Soil
23+640 20.00 203.09 119.27 2,385.40 0.01 0.02 0.40 - - - - - - 95 2,266.13 5 119.27 0 - Ordinary Soil
23+660 20.00 230.19 133.01 2,660.20 - - - - - - - - - 95 2,527.19 5 133.01 0 - Ordinary Soil
23+680 20.00 168.94 186.02 3,720.40 - 0.01 0.20 - - - - - - 95 3,534.38 5 186.02 0 - Ordinary Soil
23+700 20.00 1.60 115.90 2,318.00 8.07 4.04 80.80 - 7.00 3.73 26.11 0.45 3.15 95 2,202.10 5 115.90 0 - Ordinary Soil
23+720 20.00 - 84.47 1,689.40 - - - - - - - - - 95 1,604.93 5 84.47 0 - Ordinary Soil
23+740 20.00 25.78 13.69 273.80 1.08 4.58 91.60 - 10.00 1.63 16.30 0.38 3.80 95 260.11 5 13.69 0 - Ordinary Soil
23+760 20.00 32.68 16.34 326.80 0.61 0.31 6.20 - 20.00 2.09 41.80 0.58 11.60 95 310.46 5 16.34 0 - Ordinary Soil
23+780 20.00 9.62 17.70 354.00 5.32 3.20 64.00 - 20.00 2.34 46.80 0.48 9.60 95 336.30 5 17.70 0 - Ordinary Soil
23+800 20.00 1.59 17.14 342.80 15.42 8.02 160.40 - 20.00 3.81 76.20 0.47 9.40 95 325.66 5 17.14 0 - Ordinary Soil
23+820 20.00 5.14 7.38 147.60 11.19 8.26 165.20 17.60 20.00 5.99 119.80 0.96 19.20 95 140.22 5 7.38 0 - Ordinary Soil
23+840 20.00 17.87 9.73 194.60 2.83 9.13 182.60 - 20.00 3.47 69.40 0.50 10.00 95 184.87 5 9.73 0 - Ordinary Soil
23+860 20.00 25.12 15.13 302.60 1.77 6.48 129.60 - 20.00 4.50 90.00 0.84 16.80 95 287.47 5 15.13 0 - Ordinary Soil
23+880 20.00 24.43 21.15 423.00 2.13 2.48 49.60 - 20.00 3.95 79.00 0.67 13.40 95 401.85 5 21.15 0 - Ordinary Soil
23+900 20.00 0.18 12.65 253.00 21.24 11.51 230.20 - 20.00 10.24 204.80 1.65 33.00 95 240.35 5 12.65 0 - Ordinary Soil
23+920 20.00 - 12.22 244.40 49.98 26.06 521.20 276.80 20.00 3.66 73.20 0.14 2.80 95 232.18 5 12.22 0 - Ordinary Soil
23+940 20.00 3.59 1.89 37.80 10.82 16.03 320.60 282.80 10.00 8.97 89.70 1.74 17.40 95 35.91 5 1.89 0 - Ordinary Soil
23+960 20.00 49.45 24.73 494.60 - 24.99 499.80 5.20 - - - - - 95 469.87 5 24.73 0 - Ordinary Soil

42 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
23+980 20.00 32.04 17.82 356.40 0.06 5.44 108.80 - - - - - - 95 338.58 5 17.82 0 - Ordinary Soil
24+000 20.00 1.21 25.33 506.60 7.14 3.57 71.40 - - - - - - 95 481.27 5 25.33 0 - Ordinary Soil
24+020 20.00 2.75 17.40 348.00 20.80 10.43 208.60 - 7.00 2.50 17.50 0.05 0.35 95 330.60 5 17.40 0 - Ordinary Soil
24+040 20.00 93.57 47.39 947.80 - 3.57 71.40 - - - - - - 95 900.41 5 47.39 0 - Ordinary Soil
24+060 20.00 137.18 69.97 1,399.40 - 10.40 208.00 - - - - - - 95 1,329.43 5 69.97 0 - Ordinary Soil
24+080 20.00 144.07 118.82 2,376.40 - - - - - - - - - 95 2,257.58 5 118.82 0 - Ordinary Soil
24+100 20.00 85.96 111.57 2,231.40 - - - - - - - - - 95 2,119.83 5 111.57 0 - Ordinary Soil
24+120 20.00 34.65 89.36 1,787.20 0.25 0.13 2.60 - - - - - - 95 1,697.84 5 89.36 0 - Ordinary Soil
24+140 20.00 3.81 44.89 897.80 0.82 0.41 8.20 - - - - - - 95 852.91 5 44.89 0 - Ordinary Soil
24+160 20.00 0.12 17.39 347.80 1.32 0.79 15.80 - - - - - - 95 330.41 5 17.39 0 - Ordinary Soil
24+180 20.00 8.83 6.32 126.40 - 0.41 8.20 - - - - - - 95 120.08 5 6.32 0 - Ordinary Soil
24+200 20.00 10.15 5.14 102.80 0.08 0.70 14.00 - - - - - - 95 97.66 5 5.14 0 - Ordinary Soil
24+220 20.00 93.12 50.98 1,019.60 - - - - - - - - - 95 968.62 5 50.98 0 - Ordinary Soil
24+240 20.00 246.97 128.56 2,571.20 0.01 0.05 1.00 - - - - - - 95 2,442.64 5 128.56 0 - Ordinary Soil
24+260 20.00 190.54 141.83 2,836.60 - - - - - - - - - 95 2,694.77 5 141.83 0 - Ordinary Soil
24+280 20.00 148.07 197.52 3,950.40 - 0.01 0.20 - - - - - - 95 3,752.88 5 197.52 0 - Ordinary Soil
24+300 20.00 122.18 156.36 3,127.20 - - - - - - - - - 95 2,970.84 5 156.36 0 - Ordinary Soil
24+320 20.00 125.03 136.55 2,731.00 - - - - - - - - - 95 2,594.45 5 136.55 0 - Ordinary Soil
24+340 20.00 152.65 137.42 2,748.40 0.01 0.01 0.20 - - - - - - 95 2,610.98 5 137.42 0 - Ordinary Soil
24+360 20.00 25.28 75.16 1,503.20 0.78 0.39 7.80 - 7.00 3.48 24.36 1.09 7.63 95 1,428.04 5 75.16 0 - Ordinary Soil
24+380 20.00 37.01 94.83 1,896.60 0.02 0.02 0.40 - - - - - - 95 1,801.77 5 94.83 0 - Ordinary Soil
24+400 20.00 82.24 53.76 1,075.20 - 0.39 7.80 - - - - - - 95 1,021.44 5 53.76 0 - Ordinary Soil
24+420 20.00 62.29 49.65 993.00 - 0.01 0.20 - - - - - - 95 943.35 5 49.65 0 - Ordinary Soil
24+440 20.00 46.56 64.40 1,288.00 - - - - - - - - - 95 1,223.60 5 64.40 0 - Ordinary Soil
24+460 20.00 30.21 46.25 925.00 0.13 0.07 1.40 - 10.00 1.63 16.30 0.44 4.40 95 878.75 5 46.25 0 - Ordinary Soil
24+480 20.00 25.33 35.95 719.00 1.12 0.56 11.20 - 20.00 3.03 60.60 0.88 17.60 95 683.05 5 35.95 0 - Ordinary Soil
24+500 20.00 22.57 26.39 527.80 0.77 0.45 9.00 - 20.00 2.07 41.40 0.54 10.80 95 501.41 5 26.39 0 - Ordinary Soil
24+520 20.00 16.21 20.77 415.40 3.33 2.23 44.60 - 20.00 2.53 50.60 0.63 12.60 95 394.63 5 20.77 0 - Ordinary Soil
24+540 20.00 29.27 25.92 518.40 0.83 0.80 16.00 - 10.00 3.30 33.00 1.02 10.20 95 492.48 5 25.92 0 - Ordinary Soil
24+560 20.00 45.50 30.86 617.20 1.62 2.48 49.60 - - - - - - 95 586.34 5 30.86 0 - Ordinary Soil
24+580 20.00 96.29 62.78 1,255.60 - 0.42 8.40 - - - - - - 95 1,192.82 5 62.78 0 - Ordinary Soil
24+600 20.00 138.39 91.95 1,839.00 0.01 0.82 16.40 - - - - - - 95 1,747.05 5 91.95 0 - Ordinary Soil
24+620 20.00 59.85 78.07 1,561.40 - - - - 10.00 0.89 8.90 0.14 1.40 95 1,483.33 5 78.07 0 - Ordinary Soil
24+640 20.00 12.20 75.30 1,506.00 2.34 1.18 23.60 - 10.00 2.56 25.60 0.62 6.20 95 1,430.70 5 75.30 0 - Ordinary Soil
24+660 20.00 24.35 42.10 842.00 0.30 0.15 3.00 - - - - - - 95 799.90 5 42.10 0 - Ordinary Soil
24+680 20.00 43.66 27.93 558.60 - 1.17 23.40 - - - - - - 95 530.67 5 27.93 0 - Ordinary Soil
24+700 20.00 62.18 43.27 865.40 - 0.15 3.00 - - - - - - 95 822.13 5 43.27 0 - Ordinary Soil
24+720 20.00 20.35 32.01 640.20 1.92 0.96 19.20 - 10.00 2.28 22.80 0.56 5.60 95 608.19 5 32.01 0 - Ordinary Soil
24+740 20.00 34.18 48.18 963.60 0.18 0.09 1.80 - 20.00 1.65 33.00 0.44 8.80 95 915.42 5 48.18 0 - Ordinary Soil
24+760 20.00 19.65 20.00 400.00 0.44 1.18 23.60 - 10.00 1.30 13.00 0.28 2.80 95 380.00 5 20.00 0 - Ordinary Soil
24+780 20.00 60.30 47.24 944.80 - 0.09 1.80 - - - - - - 95 897.56 5 47.24 0 - Ordinary Soil
24+800 20.00 35.63 27.64 552.80 0.33 0.39 7.80 - 10.00 1.25 12.50 0.29 2.90 95 525.16 5 27.64 0 - Ordinary Soil
24+820 20.00 42.32 51.31 1,026.20 0.12 0.06 1.20 - 10.00 1.59 15.90 0.41 4.10 95 974.89 5 51.31 0 - Ordinary Soil

43 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
24+840 20.00 60.55 48.09 961.80 - 0.17 3.40 - - - - - - 95 913.71 5 48.09 0 - Ordinary Soil
24+860 20.00 17.96 30.14 602.80 3.10 1.61 32.20 - 10.00 2.60 26.00 0.68 6.80 95 572.66 5 30.14 0 - Ordinary Soil
24+880 20.00 0.04 30.30 606.00 17.27 8.64 172.80 - 20.00 6.11 122.20 0.80 16.00 95 575.70 5 30.30 0 - Ordinary Soil
24+900 20.00 - 8.98 179.60 34.09 18.60 372.00 192.40 20.00 10.44 208.80 1.39 27.80 95 170.62 5 8.98 0 - Ordinary Soil
24+920 20.00 13.89 6.97 139.40 10.80 14.04 280.80 141.40 10.00 13.98 139.80 3.41 34.10 95 132.43 5 6.97 0 - Ordinary Soil
24+940 20.00 73.67 36.84 736.80 - 17.05 341.00 - - - - - - 95 699.96 5 36.84 0 - Ordinary Soil
24+960 20.00 40.44 27.17 543.40 0.98 5.89 117.80 - - - - - - 95 516.23 5 27.17 0 - Ordinary Soil
24+980 20.00 80.08 76.88 1,537.60 0.04 0.02 0.40 - 10.00 1.72 17.20 0.50 5.00 95 1,460.72 5 76.88 0 - Ordinary Soil
25+000 20.00 77.24 58.84 1,176.80 0.01 0.50 10.00 - 20.00 2.05 41.00 0.56 11.20 95 1,117.96 5 58.84 0 - Ordinary Soil
25+020 20.00 77.68 78.88 1,577.60 0.09 0.07 1.40 - 20.00 1.45 29.00 0.41 8.20 95 1,498.72 5 78.88 0 - Ordinary Soil
25+040 20.00 50.43 63.84 1,276.80 3.18 1.60 32.00 - 20.00 6.03 120.60 1.29 25.80 95 1,212.96 5 63.84 0 - Ordinary Soil
25+060 20.00 9.68 43.68 873.60 9.03 4.56 91.20 - 20.00 6.84 136.80 1.19 23.80 95 829.92 5 43.68 0 - Ordinary Soil
25+080 20.00 24.55 37.49 749.80 1.10 2.14 42.80 - 20.00 1.95 39.00 0.28 5.60 95 712.31 5 37.49 0 - Ordinary Soil
25+100 20.00 29.36 19.52 390.40 7.27 8.15 163.00 - 20.00 5.35 107.00 1.10 22.00 95 370.88 5 19.52 0 - Ordinary Soil
25+120 20.00 14.19 19.37 387.40 1.53 1.32 26.40 - 20.00 3.91 78.20 1.23 24.60 95 368.03 5 19.37 0 - Ordinary Soil
25+140 20.00 5.37 17.37 347.40 3.84 5.56 111.20 - 20.00 1.35 27.00 0.23 4.60 95 330.03 5 17.37 0 - Ordinary Soil
25+160 20.00 0.31 7.25 145.00 7.14 4.34 86.80 - 20.00 2.87 57.40 0.61 12.20 95 137.75 5 7.25 0 - Ordinary Soil
25+180 20.00 3.38 4.38 87.60 3.82 3.83 76.60 - 20.00 1.40 28.00 0.24 4.80 95 83.22 5 4.38 0 - Ordinary Soil
25+200 20.00 0.98 0.65 13.00 7.84 7.49 149.80 136.80 20.00 4.22 84.40 0.67 13.40 95 12.35 5 0.65 0 - Ordinary Soil
25+220 20.00 26.47 14.93 298.60 0.20 2.01 40.20 - 10.00 1.42 14.20 0.36 3.60 95 283.67 5 14.93 0 - Ordinary Soil
25+240 20.00 67.52 34.25 685.00 - 3.92 78.40 - - - - - - 95 650.75 5 34.25 0 - Ordinary Soil
25+260 20.00 81.94 54.21 1,084.20 - 0.10 2.00 - - - - - - 95 1,029.99 5 54.21 0 - Ordinary Soil
25+280 20.00 69.56 68.54 1,370.80 - - - - - - - - - 95 1,302.26 5 68.54 0 - Ordinary Soil
25+300 20.00 77.82 79.88 1,597.60 - - - - - - - - - 95 1,517.72 5 79.88 0 - Ordinary Soil
25+320 20.00 101.44 85.50 1,710.00 - - - - - - - - - 95 1,624.50 5 85.50 0 - Ordinary Soil
25+340 20.00 111.07 94.45 1,889.00 - - - - - - - - - 95 1,794.55 5 94.45 0 - Ordinary Soil
25+360 20.00 83.55 92.50 1,850.00 - - - - - - - - - 95 1,757.50 5 92.50 0 - Ordinary Soil
25+380 20.00 62.12 86.60 1,732.00 - - - - - - - - - 95 1,645.40 5 86.60 0 - Ordinary Soil
25+400 20.00 50.11 66.83 1,336.60 - - - - - - - - - 95 1,269.77 5 66.83 0 - Ordinary Soil
25+420 20.00 38.87 50.50 1,010.00 - - - - - - - - - 95 959.50 5 50.50 0 - Ordinary Soil
25+440 20.00 40.69 45.40 908.00 - - - - - - - - - 95 862.60 5 45.40 0 - Ordinary Soil
25+460 20.00 42.28 40.58 811.60 - - - - - - - - - 95 771.02 5 40.58 0 - Ordinary Soil
25+480 20.00 128.10 84.40 1,688.00 - - - - - - - - - 95 1,603.60 5 84.40 0 - Ordinary Soil
25+500 20.00 151.54 96.91 1,938.20 - - - - - - - - - 95 1,841.29 5 96.91 0 - Ordinary Soil
25+520 20.00 148.50 138.30 2,766.00 - - - - - - - - - 95 2,627.70 5 138.30 0 - Ordinary Soil
25+540 20.00 136.07 143.81 2,876.20 - - - - - - - - - 95 2,732.39 5 143.81 0 - Ordinary Soil
25+560 20.00 122.08 135.29 2,705.80 - - - - - - - - - 95 2,570.51 5 135.29 0 - Ordinary Soil
25+580 20.00 166.13 151.10 3,022.00 - - - - - - - - - 95 2,870.90 5 151.10 0 - Ordinary Soil
25+600 20.00 221.35 171.72 3,434.40 - - - - - - - - - 95 3,262.68 5 171.72 0 - Ordinary Soil
25+620 20.00 213.30 189.72 3,794.40 - - - - - - - - - 95 3,604.68 5 189.72 0 - Ordinary Soil
25+640 20.00 196.15 208.75 4,175.00 - - - - - - - - - 95 3,966.25 5 208.75 0 - Ordinary Soil
25+660 20.00 212.05 212.68 4,253.60 0.01 0.01 0.20 - - - - - - 95 4,040.92 5 212.68 0 - Ordinary Soil
25+680 20.00 218.03 207.09 4,141.80 - - - - - - - - - 95 3,934.71 5 207.09 0 - Ordinary Soil

44 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
25+700 20.00 272.77 242.41 4,848.20 - 0.01 0.20 - - - - - - 95 4,605.79 5 242.41 0 - Ordinary Soil
25+720 20.00 304.52 261.28 5,225.60 - - - - - - - - - 95 4,964.32 5 261.28 0 - Ordinary Soil
25+740 20.00 336.92 304.85 6,097.00 - - - - - - - - - 95 5,792.15 5 304.85 0 - Ordinary Soil
25+760 20.00 326.80 315.66 6,313.20 - - - - - - - - - 95 5,997.54 5 315.66 0 - Ordinary Soil
25+780 20.00 332.77 334.85 6,697.00 - - - - - - - - - 95 6,362.15 5 334.85 0 - Ordinary Soil
25+800 20.00 395.93 361.37 7,227.40 - - - - - - - - - 95 6,866.03 5 361.37 0 - Ordinary Soil
25+820 20.00 399.29 366.03 7,320.60 - - - - - - - - - 95 6,954.57 5 366.03 0 - Ordinary Soil
25+840 20.00 588.57 492.25 9,845.00 - - - - - - - - - 95 9,352.75 5 492.25 0 - Ordinary Soil
25+860 20.00 489.84 444.57 8,891.40 - - - - - - - - - 95 8,446.83 5 444.57 0 - Ordinary Soil
25+880 20.00 433.44 511.01 10,220.20 - - - - - - - - - 95 9,709.19 5 511.01 0 - Ordinary Soil
25+900 20.00 384.09 436.97 8,739.40 - - - - - - - - - 95 8,302.43 5 436.97 0 - Ordinary Soil
25+920 20.00 356.70 395.07 7,901.40 - - - - - - - - - 95 7,506.33 5 395.07 0 - Ordinary Soil
25+940 20.00 551.79 467.94 9,358.80 - - - - - - - - - 95 8,890.86 5 467.94 0 - Ordinary Soil
25+960 20.00 493.40 425.05 8,501.00 - - - - - - - - - 95 8,075.95 5 425.05 0 - Ordinary Soil
25+980 20.00 459.98 505.89 10,117.80 - - - - - - - - - 95 9,611.91 5 505.89 0 - Ordinary Soil
26+000 20.00 340.54 416.97 8,339.40 - - - - - - - - - 95 7,922.43 5 416.97 0 - Ordinary Soil
26+020 20.00 450.64 455.31 9,106.20 - - - - - - - - - 95 8,650.89 5 455.31 0 - Ordinary Soil
26+040 20.00 376.94 358.74 7,174.80 - - - - - - - - - 95 6,816.06 5 358.74 0 - Ordinary Soil
26+060 20.00 318.31 384.48 7,689.60 - - - - - - - - - 95 7,305.12 5 384.48 0 - Ordinary Soil
26+080 20.00 326.30 351.62 7,032.40 0.01 0.01 0.20 - - - - - - 95 6,680.78 5 351.62 0 - Ordinary Soil
26+100 20.00 302.65 310.48 6,209.60 - - - - - - - - - 95 5,899.12 5 310.48 0 - Ordinary Soil
26+120 20.00 259.39 292.85 5,857.00 - 0.01 0.20 - 10.00 80.61 806.10 0.70 7.00 95 5,564.15 5 292.85 0 - Ordinary Soil
26+140 20.00 310.74 306.70 6,134.00 - - - - 20.00 78.17 1,563.40 0.70 14.00 95 5,827.30 5 306.70 0 - Ordinary Soil
26+160 20.00 287.67 273.53 5,470.60 - - - - 20.00 66.38 1,327.60 0.69 13.80 95 5,197.07 5 273.53 0 - Ordinary Soil
26+180 20.00 210.28 260.51 5,210.20 - - - - 20.00 49.38 987.60 0.68 13.60 95 4,949.69 5 260.51 0 - Ordinary Soil
26+200 20.00 168.26 227.97 4,559.40 - - - - 20.00 39.96 799.20 0.67 13.40 95 4,331.43 5 227.97 0 - Ordinary Soil
26+220 20.00 140.01 175.15 3,503.00 - - - - 10.00 31.02 310.20 0.67 6.70 95 3,327.85 5 175.15 0 - Ordinary Soil
26+240 20.00 157.26 162.76 3,255.20 - - - - - - - - - 95 3,092.44 5 162.76 0 - Ordinary Soil
26+260 20.00 110.35 125.18 2,503.60 - - - - - - - - - 95 2,378.42 5 125.18 0 - Ordinary Soil
26+280 20.00 47.06 102.16 2,043.20 - - - - - - - - - 95 1,941.04 5 102.16 0 - Ordinary Soil
26+300 20.00 23.06 66.71 1,334.20 - - - - - - - - - 95 1,267.49 5 66.71 0 - Ordinary Soil
26+320 20.00 16.06 31.56 631.20 - - - - - - - - - 95 599.64 5 31.56 0 - Ordinary Soil
26+340 20.00 26.26 24.66 493.20 - - - - - - - - - 95 468.54 5 24.66 0 - Ordinary Soil
26+360 20.00 4.08 10.07 201.40 0.58 0.29 5.80 - - - - - - 95 191.33 5 10.07 0 - Ordinary Soil
26+380 20.00 0.61 13.44 268.80 3.98 1.99 39.80 - 7.00 0.89 6.23 0.12 0.84 95 255.36 5 13.44 0 - Ordinary Soil
26+400 20.00 6.85 5.47 109.40 0.64 0.61 12.20 - - - - - - 95 103.93 5 5.47 0 - Ordinary Soil
26+420 20.00 28.53 14.57 291.40 - 1.99 39.80 - - - - - - 95 276.83 5 14.57 0 - Ordinary Soil
26+440 20.00 23.46 15.16 303.20 - 0.32 6.40 - - - - - - 95 288.04 5 15.16 0 - Ordinary Soil
26+460 20.00 7.13 17.83 356.60 0.94 0.47 9.40 - - - - - - 95 338.77 5 17.83 0 - Ordinary Soil
26+480 20.00 0.02 11.74 234.80 12.25 6.13 122.60 - 7.00 4.41 30.87 0.47 3.29 95 223.06 5 11.74 0 - Ordinary Soil
26+500 20.00 26.33 16.73 334.60 - 0.47 9.40 - - - - - - 95 317.87 5 16.73 0 - Ordinary Soil
26+520 20.00 40.26 20.14 402.80 - 6.13 122.60 - - - - - - 95 382.66 5 20.14 0 - Ordinary Soil
26+540 20.00 41.23 33.78 675.60 - - - - - - - - - 95 641.82 5 33.78 0 - Ordinary Soil

45 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
26+560 20.00 59.44 49.85 997.00 - - - - - - - - - 95 947.15 5 49.85 0 - Ordinary Soil
26+580 20.00 92.72 66.98 1,339.60 - - - - - - - - - 95 1,272.62 5 66.98 0 - Ordinary Soil
26+600 20.00 82.69 71.07 1,421.40 - - - - - - - - - 95 1,350.33 5 71.07 0 - Ordinary Soil
26+620 20.00 52.26 72.49 1,449.80 - - - - - - - - - 95 1,377.31 5 72.49 0 - Ordinary Soil
26+640 20.00 15.61 49.15 983.00 - - - - - - - - - 95 933.85 5 49.15 0 - Ordinary Soil
26+660 20.00 5.10 28.68 573.60 4.44 2.22 44.40 - - - - - - 95 544.92 5 28.68 0 - Ordinary Soil
26+680 20.00 7.71 11.66 233.20 - - - - - - - - - 95 221.54 5 11.66 0 - Ordinary Soil
26+700 20.00 30.72 17.91 358.20 0.01 2.23 44.60 - - - - - - 95 340.29 5 17.91 0 - Ordinary Soil
26+720 20.00 24.39 16.05 321.00 - - - - - - - - - 95 304.95 5 16.05 0 - Ordinary Soil
26+740 20.00 37.25 33.99 679.80 - 0.01 0.20 - - - - - - 95 645.81 5 33.99 0 - Ordinary Soil
26+760 20.00 53.08 38.74 774.80 - - - - - - - - - 95 736.06 5 38.74 0 - Ordinary Soil
26+780 20.00 82.02 59.64 1,192.80 - - - - - - - - - 95 1,133.16 5 59.64 0 - Ordinary Soil
26+800 20.00 81.64 67.36 1,347.20 - - - - - - - - - 95 1,279.84 5 67.36 0 - Ordinary Soil
26+820 20.00 89.69 85.86 1,717.20 - - - - - - - - - 95 1,631.34 5 85.86 0 - Ordinary Soil
26+840 20.00 110.62 96.13 1,922.60 - - - - - - - - - 95 1,826.47 5 96.13 0 - Ordinary Soil
26+860 20.00 98.45 94.07 1,881.40 - - - - - - - - - 95 1,787.33 5 94.07 0 - Ordinary Soil
26+880 20.00 67.19 88.91 1,778.20 - - - - - - - - - 95 1,689.29 5 88.91 0 - Ordinary Soil
26+900 20.00 45.06 71.76 1,435.20 - - - - - - - - - 95 1,363.44 5 71.76 0 - Ordinary Soil
26+920 20.00 32.29 49.74 994.80 - - - - - - - - - 95 945.06 5 49.74 0 - Ordinary Soil
26+940 20.00 44.40 44.73 894.60 - - - - - - - - - 95 849.87 5 44.73 0 - Ordinary Soil
26+960 20.00 14.57 23.43 468.60 3.89 1.95 39.00 - 10.00 2.39 23.90 0.54 5.40 95 445.17 5 23.43 0 - Ordinary Soil
26+980 20.00 2.34 23.37 467.40 5.83 2.92 58.40 - 20.00 2.40 48.00 0.56 11.20 95 444.03 5 23.37 0 - Ordinary Soil
27+000 20.00 14.42 14.50 290.00 1.24 2.57 51.40 - 20.00 2.74 54.80 0.37 7.40 95 275.50 5 14.50 0 - Ordinary Soil
27+020 20.00 12.13 7.24 144.80 2.56 4.20 84.00 - 10.00 2.14 21.40 0.21 2.10 95 137.56 5 7.24 0 - Ordinary Soil
27+040 20.00 16.48 15.45 309.00 0.11 0.68 13.60 - - - - - - 95 293.55 5 15.45 0 - Ordinary Soil
27+060 20.00 11.71 11.92 238.40 0.26 1.41 28.20 - - - - - - 95 226.48 5 11.92 0 - Ordinary Soil
27+080 20.00 1.29 8.89 177.80 5.65 2.88 57.60 - 10.00 1.50 15.00 0.03 0.30 95 168.91 5 8.89 0 - Ordinary Soil
27+100 20.00 7.44 9.58 191.60 12.89 6.58 131.60 - 20.00 2.73 54.60 0.18 3.60 95 182.02 5 9.58 0 - Ordinary Soil
27+120 20.00 6.02 3.66 73.20 8.12 6.89 137.80 64.60 20.00 4.97 99.40 0.64 12.80 95 69.54 5 3.66 0 - Ordinary Soil
27+140 20.00 9.05 8.25 165.00 7.14 10.02 200.40 35.40 10.00 5.13 51.30 0.79 7.90 95 156.75 5 8.25 0 - Ordinary Soil
27+160 20.00 31.30 18.66 373.20 0.05 4.09 81.80 - - - - - - 95 354.54 5 18.66 0 - Ordinary Soil
27+180 20.00 21.73 15.39 307.80 1.14 4.14 82.80 - 10.00 3.05 30.50 0.86 8.60 95 292.41 5 15.39 0 - Ordinary Soil
27+200 20.00 15.53 23.42 468.40 2.45 1.25 25.00 - 20.00 2.02 40.40 0.44 8.80 95 444.98 5 23.42 0 - Ordinary Soil
27+220 20.00 14.43 18.08 361.60 0.53 0.84 16.80 - 20.00 1.48 29.60 0.33 6.60 95 343.52 5 18.08 0 - Ordinary Soil
27+240 20.00 7.73 11.63 232.60 1.09 1.77 35.40 - 20.00 1.26 25.20 0.25 5.00 95 220.97 5 11.63 0 - Ordinary Soil
27+260 20.00 1.61 8.02 160.40 10.00 5.27 105.40 - 20.00 4.83 96.60 0.60 12.00 95 152.38 5 8.02 0 - Ordinary Soil
27+280 20.00 26.38 17.06 341.20 2.91 2.00 40.00 - 10.00 1.69 16.90 0.32 3.20 95 324.14 5 17.06 0 - Ordinary Soil
27+300 20.00 27.67 14.64 292.80 - 5.00 100.00 - - - - - - 95 278.16 5 14.64 0 - Ordinary Soil
27+320 20.00 2.09 14.24 284.80 4.47 3.69 73.80 - 10.00 1.86 18.60 0.12 1.20 95 270.56 5 14.24 0 - Ordinary Soil
27+340 20.00 8.92 18.30 366.00 4.70 2.35 47.00 - 20.00 1.13 22.60 - - 95 347.70 5 18.30 0 - Ordinary Soil
27+360 20.00 29.81 15.95 319.00 2.65 3.56 71.20 - 20.00 1.00 20.00 - - 95 303.05 5 15.95 0 - Ordinary Soil
27+380 20.00 16.15 12.54 250.80 4.68 4.69 93.80 - 20.00 5.52 110.40 1.04 20.80 95 238.26 5 12.54 0 - Ordinary Soil
27+400 20.00 6.25 18.03 360.60 1.06 1.86 37.20 - 20.00 1.02 20.40 0.18 3.60 95 342.57 5 18.03 0 - Ordinary Soil

46 of 323
EARTHWORK CALCULATIONS FOR ROADWAY
Name of the road:…………………………….
Chainage:0+000 to ….
Earthwork in Roadway Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
Excess filling
ge

Length

ks
Road way Cutting Filling Cutting Back filling Ordinary Soil Soft Rock Hard Rock
Length (m)
na

ar
Av area Volume Area Av area Volume Area Area Volume Volume

m
i
ha

Area (m2) Volume (m3) L (m) Vol (m3) Vol (m3) Volume (m3)

Re
(m2) (m3) (m2) (m2) (m3) (m2) (m2) (m3) (m3)
C

% % %
27+420 20.00 11.09 13.62 272.40 5.22 4.95 99.00 - 20.00 2.41 48.20 0.46 9.20 95 258.78 5 13.62 0 - Ordinary Soil
27+440 20.00 6.20 6.23 124.60 1.90 1.48 29.60 - 20.00 1.41 28.20 0.28 5.60 95 118.37 5 6.23 0 - Ordinary Soil
27+460 20.00 3.11 7.10 142.00 6.21 5.72 114.40 - 20.00 2.78 55.60 0.27 5.40 95 134.90 5 7.10 0 - Ordinary Soil
27+480 20.00 3.73 4.97 99.40 10.95 6.43 128.60 29.20 20.00 1.84 36.80 0.08 1.60 95 94.43 5 4.97 0 - Ordinary Soil
27+500 20.00 0.01 1.56 31.20 14.98 10.60 212.00 180.80 20.00 1.48 29.60 0.37 7.40 95 29.64 5 1.56 0 - Ordinary Soil
27+520 20.00 7.80 5.77 115.40 8.10 9.53 190.60 75.20 20.00 8.01 160.20 1.52 30.40 95 109.63 5 5.77 0 - Ordinary Soil
27+540 20.00 36.08 18.05 361.00 0.74 7.86 157.20 - 20.00 2.58 51.60 0.40 8.00 95 342.95 5 18.05 0 - Ordinary Soil
27+560 20.00 49.36 28.58 571.60 0.74 4.42 88.40 - 20.00 5.53 110.60 1.33 26.60 95 543.02 5 28.58 0 - Ordinary Soil
27+580 20.00 58.61 47.35 947.00 0.78 0.76 15.20 - 20.00 9.12 182.40 2.78 55.60 95 899.65 5 47.35 0 - Ordinary Soil
27+600 20.00 14.63 32.00 640.00 11.77 6.26 125.20 - 20.00 13.78 275.60 3.21 64.20 95 608.00 5 32.00 0 - Ordinary Soil
27+620 20.00 13.85 36.23 724.60 3.32 2.05 41.00 - 10.00 4.10 41.00 0.59 5.90 95 688.37 5 36.23 0 - Ordinary Soil
27+640 20.00 14.88 14.76 295.20 0.17 5.97 119.40 - - - - - - 95 280.44 5 14.76 0 - Ordinary Soil
27+660 20.00 15.33 14.59 291.80 - 1.66 33.20 - - - - - - 95 277.21 5 14.59 0 - Ordinary Soil
27+680 20.00 17.33 16.11 322.20 - 0.09 1.80 - - - - - - 95 306.09 5 16.11 0 - Ordinary Soil
27+700 20.00 19.95 17.64 352.80 - - - - - - - - - 95 335.16 5 17.64 0 - Ordinary Soil
27+720 20.00 6.45 11.89 237.80 0.03 0.02 0.40 - - - - - - 95 225.91 5 11.89 0 - Ordinary Soil
27+740 20.00 7.01 13.48 269.60 0.20 0.10 2.00 - - - - - - 95 256.12 5 13.48 0 - Ordinary Soil
27+760 20.00 4.96 5.71 114.20 2.43 1.23 24.60 - - - - - - 95 108.49 5 5.71 0 - Ordinary Soil
27+780 20.00 7.41 7.21 144.20 2.95 1.58 31.60 - - - - - - 95 136.99 5 7.21 0 - Ordinary Soil
27+800 20.00 9.44 7.20 144.00 0.76 1.60 32.00 - 7.00 1.29 9.03 0.26 1.82 95 136.80 5 7.20 0 - Ordinary Soil

Total 27800.00 5823363.00 125749.00 66772.60 273146.98 15730.26 5532194.85 291168.15 0.00

47 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road
Planning and Design Branch

EARTHWORK HAULAGE QUANTITY CALCULATIONS(Beyond 1Km)

Name of the road:…………………………….


Chainage:0+000 to ….
Haulage beyond-1km
Total
Surplus/ Hauled Net Hauled
Cut Fill waste Volume Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³) fill area (m³) Fill) KM. KM. M3-KM
(m³)
1 0+000 4.04 0.02 - 1+200 1.20 0.20 -
2 0+020 21.46 255.00 0.29 3.10 251.90 1+200 1.18 0.18 45.34
3 0+040 26.25 477.10 - 2.90 474.20 1+200 1.16 0.16 75.87
4 0+060 93.07 1,193.20 - - 1,193.20 1+200 1.14 0.14 167.05
5 0+080 81.55 1,746.20 5.30 53.00 1,693.20 1+200 1.12 0.12 203.18
6 0+100 90.98 1,725.30 0.66 59.60 1,665.70 1+200 1.10 0.10 166.57
7 0+120 110.05 2,010.30 0.66 13.20 1,997.10 1+200 1.08 0.08 159.77
8 0+140 172.77 2,828.20 0.68 13.40 2,814.80 1+200 1.06 0.06 168.89
9 0+160 207.24 3,800.10 1.64 23.20 3,776.90 1+200 1.04 0.04 151.08
10 0+180 238.35 4,455.90 1.55 31.90 4,424.00 1+200 1.02 0.02 88.48
11 0+200 285.09 5,234.40 1.55 31.00 5,203.40 1+200 1.00 - -
12 0+220 192.52 4,776.10 1.55 31.00 4,745.10 1+200 0.98 - -
13 0+240 143.77 3,362.90 1.50 30.50 3,332.40 1+200 0.96 - -
14 0+260 110.25 2,540.20 0.66 21.60 2,518.60 1+200 0.94 - -
15 0+280 100.29 2,105.40 0.66 13.20 2,092.20 1+200 0.92 - -
16 0+300 87.68 1,879.70 0.65 13.10 1,866.60 1+200 0.90 - -
17 0+320 79.54 1,672.20 0.72 13.70 1,658.50 1+200 0.88 - -
18 0+340 48.09 1,276.30 - 7.20 1,269.10 1+200 0.86 - -
19 0+360 63.66 1,117.50 0.92 9.20 1,108.30 1+200 0.84 - -
20 0+380 40.27 1,039.30 - 9.20 1,030.10 1+200 0.82 - -
21 0+400 42.23 825.00 1.25 12.50 812.50 1+200 0.80 - -
22 0+420 52.12 943.50 0.92 21.70 921.80 1+200 0.78 - -
23 0+440 45.07 971.90 2.55 34.70 937.20 1+200 0.76 - -
24 0+460 38.15 832.20 0.86 34.10 798.10 1+200 0.74 - -
25 0+480 47.13 852.80 - 8.60 844.20 1+200 0.72 - -
26 0+500 40.18 873.10 0.61 6.10 867.00 1+200 0.70 - -
27 0+520 31.63 718.10 0.67 12.80 705.30 1+200 0.68 - -
28 0+540 32.92 645.50 1.94 26.10 619.40 1+200 0.66 - -
29 0+560 18.52 514.40 9.92 118.60 395.80 1+200 0.64 - -
30 0+580 16.20 347.20 3.51 134.30 212.90 1+200 0.62 - -
31 0+600 191.42 2,076.20 0.89 44.00 2,032.20 1+200 0.60 - -
32 0+620 324.94 5,163.60 0.70 15.90 5,147.70 1+200 0.58 - -
33 0+640 108.85 4,337.90 0.67 13.70 4,324.20 1+200 0.56 - -
34 0+660 54.26 1,631.10 22.63 233.00 1,398.10 1+200 0.54 - -
35 0+680 36.15 904.10 9.09 317.20 586.90 1+200 0.52 - -
36 0+700 40.43 765.80 3.97 130.60 635.20 1+200 0.50 - -
37 0+720 51.16 915.90 0.93 49.00 866.90 1+200 0.48 - -
38 0+740 52.67 1,038.30 0.93 18.60 1,019.70 1+200 0.46 - -
39 0+760 41.87 945.40 1.76 26.90 918.50 1+200 0.44 - -
40 0+780 47.82 896.90 0.98 27.40 869.50 1+200 0.42 - -
41 0+800 95.30 1,431.20 - 9.80 1,421.40 1+200 0.40 - -
42 0+820 138.92 2,342.20 - - 2,342.20 1+200 0.38 - -
43 0+840 196.52 3,354.40 0.67 6.70 3,347.70 1+200 0.36 - -
44 0+860 323.83 5,203.50 3.11 37.80 5,165.70 1+200 0.34 - -
45 0+880 433.57 7,574.00 1.64 47.50 7,526.50 1+200 0.32 - -
46 0+900 422.69 8,562.60 1.78 34.20 8,528.40 1+200 0.30 - -
47 0+920 399.23 8,219.20 1.63 34.10 8,185.10 1+200 0.28 - -
48 0+940 447.22 8,464.50 1.38 30.10 8,434.40 1+200 0.26 - -
49 0+960 407.52 8,547.40 1.39 27.70 8,519.70 1+200 0.24 - -
50 0+980 352.80 7,603.20 1.36 27.50 7,575.70 1+200 0.22 - -
51 1+000 345.53 6,983.30 - 13.60 6,969.70 1+200 0.20 - -
52 1+020 321.47 6,670.00 - - 6,670.00 1+200 0.18 - -
53 1+040 275.52 5,969.90 - - 5,969.90 1+200 0.16 - -
54 1+060 263.11 5,386.30 - - 5,386.30 1+200 0.14 - -
55 1+080 212.02 4,751.30 - - 4,751.30 1+200 0.12 - -
56 1+100 194.68 4,067.00 - - 4,067.00 1+200 0.10 - -
57 1+120 121.49 3,161.70 - - 3,161.70 1+200 0.08 - -
58 1+140 79.73 2,012.20 - - 2,012.20 1+200 0.06 - -
59 1+160 58.33 1,380.60 - - 1,380.60 1+200 0.04 - -
60 1+180 57.48 1,158.10 - - 1,158.10 1+200 0.02 - -
61 1+200 27.16 846.40 1.30 13.00 833.40 1+200 - - - Disposal site
62 1+220 22.08 492.40 0.97 22.70 469.70 1+200 0.02 - -

48 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
63 1+240 15.06 371.40 1.03 20.00 351.40 1+200 0.04 - -
64 1+260 17.81 328.70 4.62 56.50 272.20 1+200 0.06 - -
65 1+280 13.33 311.40 3.88 85.00 226.40 1+200 0.08 - -
66 1+300 7.41 207.40 2.24 61.20 146.20 1+200 0.10 - -
67 1+320 23.99 314.00 0.15 23.90 290.10 1+200 0.12 - -
68 1+340 51.97 759.60 - 1.50 758.10 1+200 0.14 - -
69 1+360 18.19 701.60 0.19 1.90 699.70 1+200 0.16 - -
70 1+380 19.62 378.10 12.53 127.20 250.90 1+200 0.18 - -
71 1+400 2.64 222.60 10.44 229.70 (7.10) 1+200 0.20 - -
72 1+420 52.71 553.50 - 104.40 449.10 1+200 0.22 - -
73 1+440 52.42 1,051.30 0.02 0.20 1,051.10 1+200 0.24 - -
74 1+460 1.38 538.00 6.00 60.20 477.80 1+200 0.26 - -
75 1+480 - 13.80 5.81 118.10 (104.30) 1+200 0.28 - -
76 1+500 0.87 8.70 6.32 121.30 (112.60) 1+200 0.30 - -
77 1+520 1.07 19.40 1.88 82.00 (62.60) 1+200 0.32 - -
78 1+540 2.89 39.60 4.65 65.30 (25.70) 1+200 0.34 - -
79 1+560 0.84 37.30 3.77 84.20 (46.90) 1+200 0.36 - -
80 1+580 14.20 150.40 - 37.70 112.70 1+200 0.38 - -
81 1+600 16.13 303.30 - - 303.30 1+200 0.40 - -
82 1+620 25.34 414.70 - - 414.70 1+200 0.42 - -
83 1+640 35.76 611.00 - - 611.00 1+200 0.44 - -
84 1+660 58.92 946.80 - - 946.80 1+200 0.46 - -
85 1+680 82.18 1,411.00 - - 1,411.00 1+200 0.48 - -
86 1+700 100.98 1,831.60 - - 1,831.60 1+200 0.50 - -
87 1+720 77.10 1,780.80 - - 1,780.80 1+200 0.52 - -
88 1+740 49.35 1,264.50 - - 1,264.50 1+200 0.54 - -
89 1+760 61.09 1,104.40 0.01 0.10 1,104.30 1+200 0.56 - -
90 1+780 88.78 1,498.70 - 0.10 1,498.60 1+200 0.58 - -
91 1+800 107.27 1,960.50 - - 1,960.50 1+200 0.60 - -
92 1+820 113.79 2,210.60 - - 2,210.60 1+200 0.62 - -
93 1+840 154.97 2,687.60 - - 2,687.60 1+200 0.64 - -
94 1+860 156.59 3,115.60 - - 3,115.60 1+200 0.66 - -
95 1+880 110.88 2,674.70 - - 2,674.70 1+200 0.68 - -
96 1+900 67.68 1,785.60 - - 1,785.60 1+200 0.70 - -
97 1+920 100.35 1,680.30 - - 1,680.30 1+200 0.72 - -
98 1+940 123.37 2,237.20 - - 2,237.20 1+200 0.74 - -
99 1+960 159.77 2,831.40 - - 2,831.40 1+200 0.76 - -
100 1+980 175.08 3,348.50 - - 3,348.50 1+200 0.78 - -
101 2+000 144.55 3,196.30 - - 3,196.30 1+200 0.80 - -
102 2+020 144.11 2,886.60 - - 2,886.60 1+200 0.82 - -
103 2+040 129.39 2,735.00 - - 2,735.00 1+200 0.84 - -
104 2+060 105.61 2,350.00 - - 2,350.00 1+200 0.86 - -
105 2+080 103.29 2,089.00 - - 2,089.00 1+200 0.88 - -
106 2+100 95.25 1,985.40 - - 1,985.40 1+200 0.90 - -
107 2+120 109.40 2,046.50 - - 2,046.50 1+200 0.92 - -
108 2+140 89.26 1,986.60 - - 1,986.60 1+200 0.94 - -
109 2+160 72.88 1,621.40 - - 1,621.40 3+160 1.00 - -
110 2+180 185.75 2,586.30 - - 2,586.30 3+160 0.98 - -
111 2+200 201.51 3,872.60 0.67 6.70 3,865.90 3+160 0.96 - -
112 2+220 122.73 3,242.40 0.66 13.30 3,229.10 3+160 0.94 - -
113 2+240 96.12 2,188.50 0.74 14.00 2,174.50 3+160 0.92 - -
114 2+260 99.39 1,955.10 0.86 16.00 1,939.10 3+160 0.90 - -
115 2+280 102.26 2,016.50 - 8.60 2,007.90 3+160 0.88 - -
116 2+300 97.16 1,994.20 - - 1,994.20 3+160 0.86 - -
117 2+320 74.89 1,720.50 - - 1,720.50 3+160 0.84 - -
118 2+340 47.05 1,219.40 - - 1,219.40 3+160 0.82 - -
119 2+360 53.77 1,008.20 - - 1,008.20 3+160 0.80 - -
120 2+380 46.84 1,006.10 - - 1,006.10 3+160 0.78 - -
121 2+400 38.90 857.40 0.01 0.10 857.30 3+160 0.76 - -
122 2+420 17.92 568.20 0.02 0.30 567.90 3+160 0.74 - -
123 2+440 5.87 237.90 1.46 14.80 223.10 3+160 0.72 - -
124 2+460 3.39 92.60 5.02 64.80 27.80 3+160 0.70 - -
125 2+480 12.38 157.70 3.58 86.00 71.70 3+160 0.68 - -
126 2+500 151.63 1,640.10 - 35.80 1,604.30 3+160 0.66 - -
127 2+520 170.48 3,221.10 - - 3,221.10 3+160 0.64 - -
128 2+540 117.23 2,877.10 - - 2,877.10 3+160 0.62 - -
129 2+560 67.05 1,842.80 - - 1,842.80 3+160 0.60 - -
130 2+580 42.53 1,095.80 - - 1,095.80 3+160 0.58 - -
131 2+600 18.93 614.60 - - 614.60 3+160 0.56 - -
132 2+620 5.23 241.60 3.02 30.20 211.40 3+160 0.54 - -
133 2+640 3.26 84.90 6.78 98.00 (13.10) 3+160 0.52 - -
134 2+660 9.09 123.50 10.16 169.40 (45.90) 3+160 0.50 - -
135 2+680 30.06 391.50 - 101.60 289.90 3+160 0.48 - -
136 2+700 37.67 677.30 - - 677.30 3+160 0.46 - -
137 2+720 27.98 656.50 - - 656.50 3+160 0.44 - -

49 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
138 2+740 18.75 467.30 0.64 6.40 460.90 3+160 0.42 - -
139 2+760 11.81 305.60 3.35 39.90 265.70 3+160 0.40 - -
140 2+780 5.02 168.30 2.80 61.50 106.80 3+160 0.38 - -
141 2+800 11.53 165.50 1.27 40.70 124.80 3+160 0.36 - -
142 2+820 12.32 238.50 7.04 83.10 155.40 3+160 0.34 - -
143 2+840 8.34 206.60 6.12 131.60 75.00 3+160 0.32 - -
144 2+860 27.26 356.00 13.64 197.60 158.40 3+160 0.30 - -
145 2+880 36.42 636.80 1.98 156.20 480.60 3+160 0.28 - -
146 2+900 49.06 854.80 - 19.80 835.00 3+160 0.26 - -
147 2+920 51.49 1,005.50 - - 1,005.50 3+160 0.24 - -
148 2+940 34.01 855.00 5.11 51.10 803.90 3+160 0.22 - -
149 2+960 45.58 795.90 4.56 96.70 699.20 3+160 0.20 - -
150 2+980 174.52 2,201.00 - 45.60 2,155.40 3+160 0.18 - -
151 3+000 300.55 4,750.70 0.69 6.90 4,743.80 3+160 0.16 - -
152 3+020 258.91 5,594.60 0.69 13.80 5,580.80 3+160 0.14 - -
153 3+040 144.33 4,032.40 0.66 13.50 4,018.90 3+160 0.12 - -
154 3+060 88.27 2,326.00 0.80 14.60 2,311.40 3+160 0.10 - -
155 3+080 87.99 1,762.60 0.66 14.60 1,748.00 3+160 0.08 - -
156 3+100 117.82 2,058.10 0.66 13.20 2,044.90 3+160 0.06 - -
157 3+120 126.50 2,443.20 0.66 13.20 2,430.00 3+160 0.04 - -
158 3+140 117.07 2,435.70 0.66 13.20 2,422.50 3+160 0.02 - -
159 3+160 103.82 2,208.90 0.66 13.20 2,195.70 3+160 - - - Disposal site
160 3+180 88.64 1,924.60 - 6.60 1,918.00 3+160 0.02 - -
161 3+200 64.36 1,530.00 - - 1,530.00 3+160 0.04 - -
162 3+220 60.69 1,250.50 - - 1,250.50 3+160 0.06 - -
163 3+240 39.86 1,005.50 0.34 3.40 1,002.10 3+160 0.08 - -
164 3+260 42.04 819.00 - 3.40 815.60 3+160 0.10 - -
165 3+280 32.16 742.00 0.63 6.30 735.70 3+160 0.12 - -
166 3+300 19.62 517.80 2.72 33.50 484.30 3+160 0.14 - -
167 3+320 14.95 345.70 1.81 45.30 300.40 3+160 0.16 - -
168 3+340 18.32 332.70 0.58 23.90 308.80 3+160 0.18 - -
169 3+360 21.96 402.80 2.94 35.20 367.60 3+160 0.20 - -
170 3+380 23.42 453.80 0.40 33.40 420.40 3+160 0.22 - -
171 3+400 26.41 498.30 3.23 36.30 462.00 3+160 0.24 - -
172 3+420 52.51 789.20 - 32.30 756.90 3+160 0.26 - -
173 3+440 38.58 910.90 1.29 12.90 898.00 3+160 0.28 - -
174 3+460 32.73 713.10 0.56 18.50 694.60 3+160 0.30 - -
175 3+480 48.47 812.00 - 5.60 806.40 3+160 0.32 - -
176 3+500 47.47 959.40 - - 959.40 3+160 0.34 - -
177 3+520 60.63 1,081.00 - - 1,081.00 3+160 0.36 - -
178 3+540 48.08 1,087.10 2.02 20.20 1,066.90 3+160 0.38 - -
179 3+560 56.47 1,045.50 - 20.20 1,025.30 3+160 0.40 - -
180 3+580 41.40 978.70 - - 978.70 3+160 0.42 - -
181 3+600 11.21 526.10 0.78 7.80 518.30 3+160 0.44 - -
182 3+620 56.69 679.00 - 7.80 671.20 3+160 0.46 - -
183 3+640 250.82 3,075.10 - - 3,075.10 3+160 0.48 - -
184 3+660 258.46 5,092.80 - - 5,092.80 3+160 0.50 - -
185 3+680 195.06 4,535.20 0.69 6.90 4,528.30 3+160 0.52 - -
186 3+700 231.77 4,268.30 0.76 14.50 4,253.80 3+160 0.54 - -
187 3+720 158.72 3,904.90 0.67 14.30 3,890.60 3+160 0.56 - -
188 3+740 198.60 3,573.20 0.67 13.40 3,559.80 3+160 0.58 - -
189 3+760 167.37 3,659.70 0.67 13.40 3,646.30 3+160 0.60 - -
190 3+780 139.38 3,067.50 0.65 13.20 3,054.30 3+160 0.62 - -
191 3+800 131.98 2,713.60 0.80 14.50 2,699.10 3+160 0.64 - -
192 3+820 98.26 2,302.40 0.80 16.00 2,286.40 3+160 0.66 - -
193 3+840 117.87 2,161.30 0.66 14.60 2,146.70 3+160 0.68 - -
194 3+860 113.96 2,318.30 0.68 13.40 2,304.90 3+160 0.70 - -
195 3+880 138.89 2,528.50 0.64 13.20 2,515.30 3+160 0.72 - -
196 3+900 110.29 2,491.80 - 6.40 2,485.40 3+160 0.74 - -
197 3+920 107.17 2,174.60 - - 2,174.60 3+160 0.76 - -
198 3+940 103.29 2,104.60 - - 2,104.60 3+160 0.78 - -
199 3+960 76.06 1,793.50 0.01 0.10 1,793.40 3+160 0.80 - -
200 3+980 49.29 1,253.50 - 0.10 1,253.40 3+160 0.82 - -
201 4+000 118.72 1,680.10 5.15 51.50 1,628.60 3+160 0.84 - -
202 4+020 45.20 1,639.20 8.49 136.40 1,502.80 3+160 0.86 - -
203 4+040 23.90 691.00 2.14 106.30 584.70 3+160 0.88 - -
204 4+060 12.87 367.70 2.96 51.00 316.70 3+160 0.90 - -
205 4+080 12.86 257.30 8.36 113.20 144.10 3+160 0.92 - -
206 4+100 8.07 209.30 9.19 175.50 33.80 3+160 0.94 - -
207 4+120 14.95 230.20 10.50 196.90 33.30 3+160 0.96 - -
208 4+140 37.64 525.90 2.33 128.30 397.60 3+160 0.98 - -
209 4+160 51.66 893.00 - 23.30 869.70 3+160 1.00 - -
210 4+180 39.41 910.70 4.33 43.30 867.40 5+180 1.00 - -
211 4+200 72.77 1,121.80 1.99 63.20 1,058.60 5+180 0.98 - -
212 4+220 89.37 1,621.40 - 19.90 1,601.50 5+180 0.96 - -

50 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
213 4+240 81.76 1,711.30 - - 1,711.30 5+180 0.94 - -
214 4+260 125.55 2,073.10 - - 2,073.10 5+180 0.92 - -
215 4+280 253.85 3,794.00 0.69 6.90 3,787.10 5+180 0.90 - -
216 4+300 256.47 5,103.20 0.83 15.20 5,088.00 5+180 0.88 - -
217 4+320 271.65 5,281.20 0.69 15.20 5,266.00 5+180 0.86 - -
218 4+340 291.76 5,634.10 0.65 13.40 5,620.70 5+180 0.84 - -
219 4+360 318.19 6,099.50 0.69 13.40 6,086.10 5+180 0.82 - -
220 4+380 340.06 6,582.50 1.57 22.60 6,559.90 5+180 0.80 - -
221 4+400 372.46 7,125.20 1.54 31.10 7,094.10 5+180 0.78 - -
222 4+420 404.76 7,772.20 1.56 31.00 7,741.20 5+180 0.76 - -
223 4+440 517.09 9,218.50 1.82 33.80 9,184.70 5+180 0.74 - -
224 4+460 513.85 10,309.40 2.77 45.90 10,263.50 5+180 0.72 - -
225 4+480 577.02 10,908.70 8.25 110.20 10,798.50 5+180 0.70 - -
226 4+500 519.31 10,963.30 5.25 135.00 10,828.30 5+180 0.68 - -
227 4+520 503.56 10,228.70 4.08 93.30 10,135.40 5+180 0.66 - -
228 4+540 409.98 9,135.40 1.43 55.10 9,080.30 5+180 0.64 - -
229 4+560 366.24 7,762.20 1.58 30.10 7,732.10 5+180 0.62 - -
230 4+580 363.57 7,298.10 1.55 31.30 7,266.80 5+180 0.60 - -
231 4+600 389.78 7,533.50 1.57 31.20 7,502.30 5+180 0.58 - -
232 4+620 385.68 7,754.60 1.58 31.50 7,723.10 5+180 0.56 - -
233 4+640 403.89 7,895.70 16.28 178.60 7,717.10 5+180 0.54 - -
234 4+660 495.38 8,992.70 33.65 499.30 8,493.40 5+180 0.52 - -
235 4+680 443.84 9,392.20 7.42 410.70 8,981.50 5+180 0.50 - -
236 4+700 354.56 7,984.00 0.65 80.70 7,903.30 5+180 0.48 - -
237 4+720 328.63 6,831.90 2.66 33.10 6,798.80 5+180 0.46 - -
238 4+740 273.70 6,023.30 1.57 42.30 5,981.00 5+180 0.44 - -
239 4+760 238.12 5,118.20 0.65 22.20 5,096.00 5+180 0.42 - -
240 4+780 230.65 4,687.70 0.64 12.90 4,674.80 5+180 0.40 - -
241 4+800 221.60 4,522.50 0.65 12.90 4,509.60 5+180 0.38 - -
242 4+820 228.12 4,497.20 0.73 13.80 4,483.40 5+180 0.36 - -
243 4+840 157.99 3,861.10 0.68 14.10 3,847.00 5+180 0.34 - -
244 4+860 100.53 2,585.20 0.89 15.70 2,569.50 5+180 0.32 - -
245 4+880 71.23 1,717.60 0.93 18.20 1,699.40 5+180 0.30 - -
246 4+900 45.15 1,163.80 0.90 18.30 1,145.50 5+180 0.28 - -
247 4+920 46.50 916.50 1.00 19.00 897.50 5+180 0.26 - -
248 4+940 33.56 800.60 0.27 12.70 787.90 5+180 0.24 - -
249 4+960 36.57 701.30 1.09 13.60 687.70 5+180 0.22 - -
250 4+980 33.58 701.50 - 10.90 690.60 5+180 0.20 - -
251 5+000 31.49 650.70 0.66 6.60 644.10 5+180 0.18 - -
252 5+020 38.69 701.80 1.04 17.00 684.80 5+180 0.16 - -
253 5+040 48.25 869.40 1.05 20.90 848.50 5+180 0.14 - -
254 5+060 42.44 906.90 1.05 21.00 885.90 5+180 0.12 - -
255 5+080 84.23 1,266.70 0.76 18.10 1,248.60 5+180 0.10 - -
256 5+100 106.77 1,910.00 0.78 15.40 1,894.60 5+180 0.08 - -
257 5+120 98.97 2,057.40 0.89 16.70 2,040.70 5+180 0.06 - -
258 5+140 81.43 1,804.00 0.77 16.60 1,787.40 5+180 0.04 - -
259 5+160 101.44 1,828.70 0.93 17.00 1,811.70 5+180 0.02 - -
260 5+180 70.38 1,718.20 0.86 17.90 1,700.30 5+180 - - - Disposal site
261 5+200 34.16 1,045.40 - 8.60 1,036.80 5+180 0.02 - -
262 5+220 38.99 731.50 - - 731.50 5+180 0.04 - -
263 5+240 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.06 - Err:509
264 5+260 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.08 - Err:509
265 5+280 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.10 - Err:509
266 5+300 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.12 - Err:509
267 5+320 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.14 - Err:509
268 5+340 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.16 - Err:509
269 5+360 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.18 - Err:509
270 5+380 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.20 - Err:509
271 5+400 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.22 - Err:509
272 5+420 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.24 - Err:509
273 5+440 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.26 - Err:509
274 5+460 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.28 - Err:509
275 5+480 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.30 - Err:509
276 5+500 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.32 - Err:509
277 5+520 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.34 - Err:509
278 5+540 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.36 - Err:509
279 5+560 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.38 - Err:509
280 5+580 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.40 - Err:509
281 5+600 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.42 - Err:509
282 5+620 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.44 - Err:509
283 5+640 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.46 - Err:509
284 5+660 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.48 - Err:509
285 5+680 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.50 - Err:509
286 5+700 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.52 - Err:509
287 5+720 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.54 - Err:509

51 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
288 5+740 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.56 - Err:509
289 5+760 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.58 - Err:509
290 5+780 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.60 - Err:509
291 5+800 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.62 - Err:509
292 5+820 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.64 - Err:509
293 5+840 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.66 - Err:509
294 5+860 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.68 - Err:509
295 5+880 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.70 - Err:509
296 5+900 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.72 - Err:509
297 5+920 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.74 - Err:509
298 5+940 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.76 - Err:509
299 5+960 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.78 - Err:509
300 5+980 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.80 - Err:509
301 6+000 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.82 - Err:509
302 6+020 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.84 - Err:509
303 6+040 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.86 - Err:509
304 6+060 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.88 - Err:509
305 6+080 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.90 - Err:509
306 6+100 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.92 - Err:509
307 6+120 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.94 - Err:509
308 6+140 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.96 - Err:509
309 6+160 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 0.98 - Err:509
310 6+180 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.00 - Err:509
311 6+200 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.02 0.02 Err:509
312 6+220 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.04 0.04 Err:509
313 6+240 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.06 0.06 Err:509
314 6+260 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.08 0.08 Err:509
315 6+280 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.10 0.10 Err:509
316 6+300 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.12 0.12 Err:509
317 6+320 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.14 0.14 Err:509
318 6+340 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.16 0.16 Err:509
319 6+360 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.18 0.18 Err:509
320 6+380 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.20 0.20 Err:509
321 6+400 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.22 0.22 Err:509
322 6+420 Err:509 Err:509 Err:509 Err:509 Err:509 5+180 1.24 0.24 Err:509
323 6+440 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.26 0.26 Err:509
324 6+460 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.24 0.24 Err:509
325 6+480 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.22 0.22 Err:509
326 6+500 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.20 0.20 Err:509
327 6+520 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.18 0.18 Err:509
328 6+540 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.16 0.16 Err:509
329 6+560 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.14 0.14 Err:509
330 6+580 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.12 0.12 Err:509
331 6+600 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.10 0.10 Err:509
332 6+620 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.08 0.08 Err:509
333 6+640 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.06 0.06 Err:509
334 6+660 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.04 0.04 Err:509
335 6+680 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.02 0.02 Err:509
336 6+700 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.00 - Err:509
337 6+720 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.98 - Err:509
338 6+740 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.96 - Err:509
339 6+760 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.94 - Err:509
340 6+780 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.92 - Err:509
341 6+800 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.90 - Err:509
342 6+820 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.88 - Err:509
343 6+840 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.86 - Err:509
344 6+860 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.84 - Err:509
345 6+880 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.82 - Err:509
346 6+900 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.80 - Err:509
347 6+920 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.78 - Err:509
348 6+940 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.76 - Err:509
349 6+960 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.74 - Err:509
350 6+980 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.72 - Err:509
351 7+000 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.70 - Err:509
352 7+020 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.68 - Err:509
353 7+040 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.66 - Err:509
354 7+060 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.64 - Err:509
355 7+080 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.62 - Err:509
356 7+100 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.60 - Err:509
357 7+120 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.58 - Err:509
358 7+140 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.56 - Err:509
359 7+160 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.54 - Err:509
360 7+180 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.52 - Err:509
361 7+200 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.50 - Err:509
362 7+220 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.48 - Err:509

52 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
363 7+240 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.46 - Err:509
364 7+260 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.44 - Err:509
365 7+280 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.42 - Err:509
366 7+300 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.40 - Err:509
367 7+320 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.38 - Err:509
368 7+340 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.36 - Err:509
369 7+360 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.34 - Err:509
370 7+380 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.32 - Err:509
371 7+400 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.30 - Err:509
372 7+420 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.28 - Err:509
373 7+440 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.26 - Err:509
374 7+460 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.24 - Err:509
375 7+480 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.22 - Err:509
376 7+500 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.20 - Err:509
377 7+520 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.18 - Err:509
378 7+540 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.16 - Err:509
379 7+560 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.14 - Err:509
380 7+580 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.12 - Err:509
381 7+600 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.10 - Err:509
382 7+620 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.08 - Err:509
383 7+640 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.06 - Err:509
384 7+660 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.04 - Err:509
385 7+680 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.02 - Err:509
386 7+700 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 - - Err:509 Disposal site
387 7+720 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.02 - Err:509
388 7+740 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.04 - Err:509
389 7+760 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.06 - Err:509
390 7+780 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.08 - Err:509
391 7+800 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.10 - Err:509
392 7+820 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.12 - Err:509
393 7+840 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.14 - Err:509
394 7+860 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.16 - Err:509
395 7+880 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.18 - Err:509
396 7+900 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.20 - Err:509
397 7+920 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.22 - Err:509
398 7+940 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.24 - Err:509
399 7+960 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.26 - Err:509
400 7+980 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.28 - Err:509
401 8+000 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.30 - Err:509
402 8+020 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.32 - Err:509
403 8+040 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.34 - Err:509
404 8+060 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.36 - Err:509
405 8+080 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.38 - Err:509
406 8+100 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.40 - Err:509
407 8+120 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.42 - Err:509
408 8+140 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.44 - Err:509
409 8+160 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.46 - Err:509
410 8+180 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.48 - Err:509
411 8+200 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.50 - Err:509
412 8+220 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.52 - Err:509
413 8+240 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.54 - Err:509
414 8+260 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.56 - Err:509
415 8+280 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.58 - Err:509
416 8+300 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.60 - Err:509
417 8+320 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.62 - Err:509
418 8+340 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.64 - Err:509
419 8+360 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.66 - Err:509
420 8+380 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.68 - Err:509
421 8+400 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.70 - Err:509
422 8+420 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.72 - Err:509
423 8+440 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.74 - Err:509
424 8+460 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.76 - Err:509
425 8+480 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.78 - Err:509
426 8+500 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.80 - Err:509
427 8+520 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.82 - Err:509
428 8+540 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.84 - Err:509
429 8+560 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.86 - Err:509
430 8+580 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.88 - Err:509
431 8+600 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.90 - Err:509
432 8+620 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.92 - Err:509
433 8+640 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.94 - Err:509
434 8+660 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.96 - Err:509
435 8+680 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 0.98 - Err:509
436 8+700 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.00 - Err:509
437 8+720 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.02 0.02 Err:509

53 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
438 8+740 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.04 0.04 Err:509
439 8+760 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.06 0.06 Err:509
440 8+780 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.08 0.08 Err:509
441 8+800 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.10 0.10 Err:509
442 8+820 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.12 0.12 Err:509
443 8+840 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.14 0.14 Err:509
444 8+860 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.16 0.16 Err:509
445 8+880 Err:509 Err:509 Err:509 Err:509 Err:509 7+700 1.18 0.18 Err:509
446 8+900 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.10 0.10 Err:509
447 8+920 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.08 0.08 Err:509
448 8+940 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.06 0.06 Err:509
449 8+960 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.04 0.04 Err:509
450 8+980 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.02 0.02 Err:509
451 9+000 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.00 - Err:509
452 9+020 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.98 - Err:509
453 9+040 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.96 - Err:509
454 9+060 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.94 - Err:509
455 9+080 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.92 - Err:509
456 9+100 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.90 - Err:509
457 9+120 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.88 - Err:509
458 9+140 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.86 - Err:509
459 9+160 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.84 - Err:509
460 9+180 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.82 - Err:509
461 9+200 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.80 - Err:509
462 9+220 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.78 - Err:509
463 9+240 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.76 - Err:509
464 9+260 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.74 - Err:509
465 9+280 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.72 - Err:509
466 9+300 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.70 - Err:509
467 9+320 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.68 - Err:509
468 9+340 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.66 - Err:509
469 9+360 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.64 - Err:509
470 9+380 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.62 - Err:509
471 9+400 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.60 - Err:509
472 9+420 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.58 - Err:509
473 9+440 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.56 - Err:509
474 9+460 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.54 - Err:509
475 9+480 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.52 - Err:509
476 9+500 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.50 - Err:509
477 9+520 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.48 - Err:509
478 9+540 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.46 - Err:509
479 9+560 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.44 - Err:509
480 9+580 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.42 - Err:509
481 9+600 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.40 - Err:509
482 9+620 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.38 - Err:509
483 9+640 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.36 - Err:509
484 9+660 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.34 - Err:509
485 9+680 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.32 - Err:509
486 9+700 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.30 - Err:509
487 9+720 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.28 - Err:509
488 9+740 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.26 - Err:509
489 9+760 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.24 - Err:509
490 9+780 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.22 - Err:509
491 9+800 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.20 - Err:509
492 9+820 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.18 - Err:509
493 9+840 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.16 - Err:509
494 9+860 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.14 - Err:509
495 9+880 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.12 - Err:509
496 9+900 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.10 - Err:509
497 9+920 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.08 - Err:509
498 9+940 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.06 - Err:509
499 9+960 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.04 - Err:509
500 9+980 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.02 - Err:509
501 10+000 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 - - Err:509 Disposal site
502 10+020 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.02 - Err:509
503 10+040 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.04 - Err:509
504 10+060 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.06 - Err:509
505 10+080 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.08 - Err:509
506 10+100 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.10 - Err:509
507 10+120 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.12 - Err:509
508 10+140 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.14 - Err:509
509 10+160 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.16 - Err:509
510 10+180 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.18 - Err:509
511 10+200 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.20 - Err:509
512 10+220 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.22 - Err:509

54 of 323
Total
Surplus/ Net Hauled
Cut Fill waste Volume Hauled Distance Hauled Quntity

Remarks
Distance
Chainage of
SN Chainage
Quantity (Cut- Tipping Area
Quantity Quantity
Cut area (m³)
fill area
(m³)
Fill) KM. KM. M3-KM
(m³)
513 10+240 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.24 - Err:509
514 10+260 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.26 - Err:509
515 10+280 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.28 - Err:509
516 10+300 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.30 - Err:509
517 10+320 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.32 - Err:509
518 10+340 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.34 - Err:509
519 10+360 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.36 - Err:509
520 10+380 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.38 - Err:509
521 10+400 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.40 - Err:509
522 10+420 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.42 - Err:509
523 10+440 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.44 - Err:509
524 10+460 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.46 - Err:509
525 10+480 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.48 - Err:509
526 10+500 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.50 - Err:509
527 10+520 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.52 - Err:509
528 10+540 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.54 - Err:509
529 10+560 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.56 - Err:509
530 10+580 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.58 - Err:509
531 10+600 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.60 - Err:509
532 10+620 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.62 - Err:509
533 10+640 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.64 - Err:509
534 10+660 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.66 - Err:509
535 10+680 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.68 - Err:509
536 10+700 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.70 - Err:509
537 10+720 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.72 - Err:509
538 10+740 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.74 - Err:509
539 10+760 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.76 - Err:509
540 10+780 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.78 - Err:509
541 10+800 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.80 - Err:509
542 10+820 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.82 - Err:509
543 10+840 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.84 - Err:509
544 10+860 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.86 - Err:509
545 10+880 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.88 - Err:509
546 10+900 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.90 - Err:509
547 10+920 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.92 - Err:509
548 10+940 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.94 - Err:509
549 10+960 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.96 - Err:509
550 10+980 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 0.98 - Err:509
551 11+000 Err:509 Err:509 Err:509 Err:509 Err:509 10+000 1.00 - Err:509
552 11+020 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.98 - Err:509
553 11+040 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.96 - Err:509
554 11+060 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.94 - Err:509
555 11+080 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.92 - Err:509
556 11+100 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.90 - Err:509
557 11+120 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.88 - Err:509
558 11+140 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.86 - Err:509
559 11+160 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.84 - Err:509
560 11+180 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.82 - Err:509
561 11+200 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.80 - Err:509
562 11+220 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.78 - Err:509
563 11+240 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.76 - Err:509
564 11+260 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.74 - Err:509
565 11+280 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.72 - Err:509
566 11+300 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.70 - Err:509
567 11+320 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.68 - Err:509
568 11+340 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.66 - Err:509
569 11+360 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.64 - Err:509
570 11+380 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.62 - Err:509
571 11+400 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.60 - Err:509
572 11+420 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.58 - Err:509
573 11+440 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.56 - Err:509
574 11+460 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.54 - Err:509
575 11+480 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.52 - Err:509
576 11+500 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.50 - Err:509
577 11+520 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.48 - Err:509
578 11+540 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.46 - Err:509
579 11+560 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.44 - Err:509
580 11+580 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.42 - Err:509
581 11+600 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.40 - Err:509
582 11+620 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.38 - Err:509
583 11+640 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.36 - Err:509
584 11+660 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.34 - Err:509
585 11+680 Err:509 Err:509 Err:509 Err:509 Err:509 12+000 0.32 - Err:509
Total Total Haulage Qty -

55 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

Name of the road:…………………………….


Chainage:0+000 to ….
A) Gabion dismantle works
Quantity for
Total Structure details Total Remarks
Left Right dismantle
Ch. Length Sec area Sec area Right quantity (type of
(m) Height Height(m Left (m3) (m3) structure)
(m2) (m2) (m3)
(m) )
3+700 6.50 2.5 3.5 56.875 56.88 Gabion walls
3+800 13.50 4.5 6.5 394.875 394.88 Gabion walls
6+340 25.00 2.5 3.5 218.75 218.75 Gabion walls
16+300 10.00 3 4.5 135 135.00 Gabion walls
Total 0.00 0.00 0.00 0.00

56 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
0+000 10 0.66 6.60 95 6.27 5 0.33 0 0.00
0+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+040 20 0.60 12.60 95 11.97 5 0.63 0 0.00
0+060 20 0.60 12.00 95 11.40 5 0.60 0 0.00
0+080 20 0.66 12.60 95 11.97 5 0.63 0 0.00
0+100 20 0.51 11.10 95 10.55 5 0.56 0 0.00
0+120 20 1.17 16.80 95 15.96 5 0.84 0 0.00
0+140 20 1.17 23.40 95 22.23 5 1.17 0 0.00
0+160 20 0.96 21.30 95 20.24 5 1.07 0 0.00
0+180 20 0.97 19.30 95 18.34 5 0.97 0 0.00
0+200 20 1.02 19.90 95 18.91 5 1.00 0 0.00
0+220 20 0.98 20.00 95 19.00 5 1.00 0 0.00
0+240 20 0.98 19.60 95 18.62 5 0.98 0 0.00
0+260 20 1.07 20.50 95 19.48 5 1.03 0 0.00
0+280 20 1.06 21.30 95 20.24 5 1.07 0 0.00
0+300 20 1.17 22.30 95 21.19 5 1.12 0 0.00
0+320 20 1.16 23.30 95 22.14 5 1.17 0 0.00
0+340 20 1.11 22.70 95 21.57 5 1.14 0 0.00
0+360 20 1.17 22.80 95 21.66 5 1.14 0 0.00
0+380 20 0.51 16.80 95 15.96 5 0.84 0 0.00
0+400 20 0.51 10.20 95 9.69 5 0.51 0 0.00
0+420 20 0.51 10.20 95 9.69 5 0.51 0 0.00
0+440 20 0.50 10.10 95 9.60 5 0.51 0 0.00
0+460 20 0.51 10.10 95 9.60 5 0.51 0 0.00
0+480 20 0.50 10.10 95 9.60 5 0.51 0 0.00
0+500 20 0.52 10.20 95 9.69 5 0.51 0 0.00
0+520 20 0.51 10.30 95 9.79 5 0.52 0 0.00
0+540 20 0.51 10.20 95 9.69 5 0.51 0 0.00
0+560 20 0.66 11.70 95 11.12 5 0.59 0 0.00
0+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+600 20 1.17 18.30 95 17.39 5 0.92 0 0.00
0+620 20 1.17 23.40 95 22.23 5 1.17 0 0.00
0+640 20 1.17 23.40 95 22.23 5 1.17 0 0.00
0+660 20 0.92 20.90 95 19.86 5 1.05 0 0.00
0+680 20 0.66 15.80 95 15.01 5 0.79 0 0.00
0+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+720 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+740 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
0+800 20 1.32 19.80 95 18.81 5 0.99 0 0.00
0+820 20 0.80 21.20 95 20.14 5 1.06 0 0.00
0+840 20 0.59 13.90 95 13.21 5 0.70 0 0.00
0+860 20 1.02 16.10 95 15.30 5 0.81 0 0.00
0+880 20 0.96 19.80 95 18.81 5 0.99 0 0.00
0+900 20 1.02 19.80 95 18.81 5 0.99 0 0.00
0+920 20 1.02 20.40 95 19.38 5 1.02 0 0.00
0+940 20 1.02 20.40 95 19.38 5 1.02 0 0.00
0+960 20 1.02 20.40 95 19.38 5 1.02 0 0.00
0+980 20 1.02 20.40 95 19.38 5 1.02 0 0.00
1+000 20 1.32 23.40 95 22.23 5 1.17 0 0.00
1+020 20 1.26 25.80 95 24.51 5 1.29 0 0.00
1+040 20 1.26 25.20 95 23.94 5 1.26 0 0.00
1+060 20 1.32 25.80 95 24.51 5 1.29 0 0.00
1+080 20 1.26 25.80 95 24.51 5 1.29 0 0.00

57 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
1+100 20 1.32 25.80 95 24.51 5 1.29 0 0.00
1+120 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+180 20 1.20 25.20 95 23.94 5 1.26 0 0.00
1+200 20 0.66 18.60 95 17.67 5 0.93 0 0.00
1+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+300 20 0.64 13.00 95 12.35 5 0.65 0 0.00
1+320 20 0.66 13.00 95 12.35 5 0.65 0 0.00
1+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
1+400 20 0.60 12.60 95 11.97 5 0.63 0 0.00
1+420 20 1.32 19.20 95 18.24 5 0.96 0 0.00
1+440 20 0.66 19.80 95 18.81 5 0.99 0 0.00
1+460 20 0.36 10.20 95 9.69 5 0.51 0 0.00
1+480 20 - 3.60 95 3.42 5 0.18 0 0.00
1+500 20 - - 95 - 5 0.00 0 0.00
1+520 20 0.52 5.20 95 4.94 5 0.26 0 0.00
1+540 20 0.66 11.80 95 11.21 5 0.59 0 0.00
1+560 20 - 6.60 95 6.27 5 0.33 0 0.00
1+580 20 1.32 13.20 95 12.54 5 0.66 0 0.00
1+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+620 20 1.20 25.20 95 23.94 5 1.26 0 0.00
1+640 20 1.32 25.20 95 23.94 5 1.26 0 0.00
1+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+680 20 1.26 25.80 95 24.51 5 1.29 0 0.00
1+700 20 1.20 24.60 95 23.37 5 1.23 0 0.00
1+720 20 1.32 25.20 95 23.94 5 1.26 0 0.00
1+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+780 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+800 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+820 20 1.26 25.80 95 24.51 5 1.29 0 0.00
1+840 20 1.26 25.20 95 23.94 5 1.26 0 0.00
1+860 20 1.32 25.80 95 24.51 5 1.29 0 0.00
1+880 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+900 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+920 20 1.32 26.40 95 25.08 5 1.32 0 0.00
1+940 20 1.26 25.80 95 24.51 5 1.29 0 0.00
1+960 20 1.26 25.20 95 23.94 5 1.26 0 0.00
1+980 20 1.32 25.80 95 24.51 5 1.29 0 0.00
2+000 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+020 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+060 20 1.26 25.80 95 24.51 5 1.29 0 0.00
2+080 20 1.32 25.80 95 24.51 5 1.29 0 0.00
2+100 20 1.26 25.80 95 24.51 5 1.29 0 0.00
2+120 20 1.32 25.80 95 24.51 5 1.29 0 0.00
2+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+180 20 1.26 25.80 95 24.51 5 1.29 0 0.00

58 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
2+200 20 1.12 23.80 95 22.61 5 1.19 0 0.00
2+220 20 1.17 22.90 95 21.76 5 1.15 0 0.00
2+240 20 1.16 23.30 95 22.14 5 1.17 0 0.00
2+260 20 1.17 23.30 95 22.14 5 1.17 0 0.00
2+280 20 1.32 24.90 95 23.66 5 1.25 0 0.00
2+300 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+320 20 1.20 25.20 95 23.94 5 1.26 0 0.00
2+340 20 1.32 25.20 95 23.94 5 1.26 0 0.00
2+360 20 1.26 25.80 95 24.51 5 1.29 0 0.00
2+380 20 1.26 25.20 95 23.94 5 1.26 0 0.00
2+400 20 1.32 25.80 95 24.51 5 1.29 0 0.00
2+420 20 0.66 19.80 95 18.81 5 0.99 0 0.00
2+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+500 20 1.32 19.80 95 18.81 5 0.99 0 0.00
2+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+560 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+580 20 1.32 26.40 95 25.08 5 1.32 0 0.00
2+600 20 0.66 19.80 95 18.81 5 0.99 0 0.00
2+620 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+640 20 0.60 12.60 95 11.97 5 0.63 0 0.00
2+660 20 0.66 12.60 95 11.97 5 0.63 0 0.00
2+680 20 1.26 19.20 95 18.24 5 0.96 0 0.00
2+700 20 1.26 25.20 95 23.94 5 1.26 0 0.00
2+720 20 0.60 18.60 95 17.67 5 0.93 0 0.00
2+740 20 0.60 12.00 95 11.40 5 0.60 0 0.00
2+760 20 0.66 12.60 95 11.97 5 0.63 0 0.00
2+780 20 0.36 10.20 95 9.69 5 0.51 0 0.00
2+800 20 0.66 10.20 95 9.69 5 0.51 0 0.00
2+820 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+840 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+880 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
2+980 20 1.32 19.80 95 18.81 5 0.99 0 0.00
3+000 20 1.17 24.90 95 23.66 5 1.25 0 0.00
3+020 20 1.07 22.40 95 21.28 5 1.12 0 0.00
3+040 20 1.17 22.40 95 21.28 5 1.12 0 0.00
3+060 20 1.18 23.50 95 22.33 5 1.18 0 0.00
3+080 20 1.17 23.50 95 22.33 5 1.18 0 0.00
3+100 20 1.17 23.40 95 22.23 5 1.17 0 0.00
3+120 20 1.17 23.40 95 22.23 5 1.17 0 0.00
3+140 20 1.17 23.40 95 22.23 5 1.17 0 0.00
3+160 20 1.17 23.40 95 22.23 5 1.17 0 0.00
3+180 20 1.32 24.90 95 23.66 5 1.25 0 0.00
3+200 20 0.60 19.20 95 18.24 5 0.96 0 0.00
3+220 20 0.66 12.60 95 11.97 5 0.63 0 0.00
3+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+280 20 0.60 12.60 95 11.97 5 0.63 0 0.00

59 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
3+300 20 0.60 12.00 95 11.40 5 0.60 0 0.00
3+320 20 0.66 12.60 95 11.97 5 0.63 0 0.00
3+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+380 20 0.60 12.60 95 11.97 5 0.63 0 0.00
3+400 20 0.66 12.60 95 11.97 5 0.63 0 0.00
3+420 20 1.32 19.80 95 18.81 5 0.99 0 0.00
3+440 20 0.66 19.80 95 18.81 5 0.99 0 0.00
3+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+500 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+540 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
3+580 20 0.60 12.60 95 11.97 5 0.63 0 0.00
3+600 20 0.66 12.60 95 11.97 5 0.63 0 0.00
3+620 20 1.32 19.80 95 18.81 5 0.99 0 0.00
3+640 20 1.26 25.80 95 24.51 5 1.29 0 0.00
3+660 20 1.32 25.80 95 24.51 5 1.29 0 0.00
3+680 20 1.17 24.90 95 23.66 5 1.25 0 0.00
3+700 20 1.12 22.90 95 21.76 5 1.15 0 0.00
3+720 20 1.17 22.90 95 21.76 5 1.15 0 0.00
3+740 20 1.06 22.30 95 21.19 5 1.12 0 0.00
3+760 20 1.06 21.20 95 20.14 5 1.06 0 0.00
3+780 20 1.11 21.70 95 20.62 5 1.09 0 0.00
3+800 20 1.12 22.30 95 21.19 5 1.12 0 0.00
3+820 20 1.18 23.00 95 21.85 5 1.15 0 0.00
3+840 20 1.07 22.50 95 21.38 5 1.13 0 0.00
3+860 20 1.17 22.40 95 21.28 5 1.12 0 0.00
3+880 20 1.11 22.80 95 21.66 5 1.14 0 0.00
3+900 20 1.32 24.30 95 23.09 5 1.22 0 0.00
3+920 20 1.32 26.40 95 25.08 5 1.32 0 0.00
3+940 20 1.32 26.40 95 25.08 5 1.32 0 0.00
3+960 20 1.26 25.80 95 24.51 5 1.29 0 0.00
3+980 20 0.66 19.20 95 18.24 5 0.96 0 0.00
4+000 20 0.47 11.30 95 10.74 5 0.57 0 0.00
4+020 20 0.51 9.80 95 9.31 5 0.49 0 0.00
4+040 20 0.66 11.70 95 11.12 5 0.59 0 0.00
4+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+140 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+180 20 0.60 12.60 95 11.97 5 0.63 0 0.00
4+200 20 0.66 12.60 95 11.97 5 0.63 0 0.00
4+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
4+240 20 1.20 18.60 95 17.67 5 0.93 0 0.00
4+260 20 1.26 24.60 95 23.37 5 1.23 0 0.00
4+280 20 1.17 24.30 95 23.09 5 1.22 0 0.00
4+300 20 1.12 22.90 95 21.76 5 1.15 0 0.00
4+320 20 1.17 22.90 95 21.76 5 1.15 0 0.00
4+340 20 1.12 22.90 95 21.76 5 1.15 0 0.00
4+360 20 0.97 20.90 95 19.86 5 1.05 0 0.00
4+380 20 1.02 19.90 95 18.91 5 1.00 0 0.00

60 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
4+400 20 1.02 20.40 95 19.38 5 1.02 0 0.00
4+420 20 1.03 20.50 95 19.48 5 1.03 0 0.00
4+440 20 1.02 20.50 95 19.48 5 1.03 0 0.00
4+460 20 0.99 20.10 95 19.10 5 1.01 0 0.00
4+480 20 1.02 20.10 95 19.10 5 1.01 0 0.00
4+500 20 1.03 20.50 95 19.48 5 1.03 0 0.00
4+520 20 1.02 20.50 95 19.48 5 1.03 0 0.00
4+540 20 0.92 19.40 95 18.43 5 0.97 0 0.00
4+560 20 1.02 19.40 95 18.43 5 0.97 0 0.00
4+580 20 0.93 19.50 95 18.53 5 0.98 0 0.00
4+600 20 1.02 19.50 95 18.53 5 0.98 0 0.00
4+620 20 1.02 20.40 95 19.38 5 1.02 0 0.00
4+640 20 1.03 20.50 95 19.48 5 1.03 0 0.00
4+660 20 0.98 20.10 95 19.10 5 1.01 0 0.00
4+680 20 1.02 20.00 95 19.00 5 1.00 0 0.00
4+700 20 1.02 20.40 95 19.38 5 1.02 0 0.00
4+720 20 1.02 20.40 95 19.38 5 1.02 0 0.00
4+740 20 1.02 20.40 95 19.38 5 1.02 0 0.00
4+760 20 1.17 21.90 95 20.81 5 1.10 0 0.00
4+780 20 1.17 23.40 95 22.23 5 1.17 0 0.00
4+800 20 1.13 23.00 95 21.85 5 1.15 0 0.00
4+820 20 1.12 22.50 95 21.38 5 1.13 0 0.00
4+840 20 1.11 22.30 95 21.19 5 1.12 0 0.00
4+860 20 1.11 22.20 95 21.09 5 1.11 0 0.00
4+880 20 1.17 22.80 95 21.66 5 1.14 0 0.00
4+900 20 1.17 23.40 95 22.23 5 1.17 0 0.00
4+920 20 0.50 16.70 95 15.87 5 0.84 0 0.00
4+940 20 0.51 10.10 95 9.60 5 0.51 0 0.00
4+960 20 0.50 10.10 95 9.60 5 0.51 0 0.00
4+980 20 0.51 10.10 95 9.60 5 0.51 0 0.00
5+000 20 0.51 10.20 95 9.69 5 0.51 0 0.00
5+020 20 0.51 10.20 95 9.69 5 0.51 0 0.00
5+040 20 0.51 10.20 95 9.69 5 0.51 0 0.00
5+060 20 0.51 10.20 95 9.69 5 0.51 0 0.00
5+080 20 1.06 15.70 95 14.92 5 0.79 0 0.00
5+100 20 1.12 21.80 95 20.71 5 1.09 0 0.00
5+120 20 1.11 22.30 95 21.19 5 1.12 0 0.00
5+140 20 1.05 21.60 95 20.52 5 1.08 0 0.00
5+160 20 0.51 15.60 95 14.82 5 0.78 0 0.00
5+180 20 0.51 10.20 95 9.69 5 0.51 0 0.00
5+200 20 0.66 11.70 95 11.12 5 0.59 0 0.00
5+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+400 20 0.60 12.60 95 11.97 5 0.63 0 0.00
5+420 20 0.66 12.60 95 11.97 5 0.63 0 0.00
5+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+480 20 0.51 11.70 95 11.12 5 0.59 0 0.00

61 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
5+500 20 0.66 11.70 95 11.12 5 0.59 0 0.00
5+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+540 20 0.60 12.60 95 11.97 5 0.63 0 0.00
5+560 20 0.60 12.00 95 11.40 5 0.60 0 0.00
5+580 20 0.66 12.60 95 11.97 5 0.63 0 0.00
5+600 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+620 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+640 20 0.60 12.60 95 11.97 5 0.63 0 0.00
5+660 20 0.66 12.60 95 11.97 5 0.63 0 0.00
5+680 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+720 20 - 6.60 95 6.27 5 0.33 0 0.00
5+740 20 0.66 6.60 95 6.27 5 0.33 0 0.00
5+760 20 0.60 12.60 95 11.97 5 0.63 0 0.00
5+780 20 0.66 12.60 95 11.97 5 0.63 0 0.00
5+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+820 20 0.60 12.60 95 11.97 5 0.63 0 0.00
5+840 20 0.60 12.00 95 11.40 5 0.60 0 0.00
5+860 20 0.66 12.60 95 11.97 5 0.63 0 0.00
5+880 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
5+960 20 0.60 12.60 95 11.97 5 0.63 0 0.00
5+980 20 0.66 12.60 95 11.97 5 0.63 0 0.00
6+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+040 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+120 20 0.60 12.60 95 11.97 5 0.63 0 0.00
6+140 20 0.60 12.00 95 11.40 5 0.60 0 0.00
6+160 20 0.66 12.60 95 11.97 5 0.63 0 0.00
6+180 20 0.60 12.60 95 11.97 5 0.63 0 0.00
6+200 20 0.66 12.60 95 11.97 5 0.63 0 0.00
6+220 20 0.60 12.60 95 11.97 5 0.63 0 0.00
6+240 20 0.60 12.00 95 11.40 5 0.60 0 0.00
6+260 20 0.60 12.00 95 11.40 5 0.60 0 0.00
6+280 20 0.65 12.50 95 11.88 5 0.63 0 0.00
6+300 20 - 6.50 95 6.18 5 0.33 0 0.00
6+320 20 - - 95 - 5 0.00 0 0.00
6+340 20 - - 95 - 5 0.00 0 0.00
6+360 20 - - 95 - 5 0.00 0 0.00
6+380 20 - - 95 - 5 0.00 0 0.00
6+400 20 - - 95 - 5 0.00 0 0.00
6+420 20 - - 95 - 5 0.00 0 0.00
6+440 20 - - 95 - 5 0.00 0 0.00
6+460 20 - - 95 - 5 0.00 0 0.00
6+480 20 - - 95 - 5 0.00 0 0.00
6+500 20 0.66 6.60 95 6.27 5 0.33 0 0.00
6+520 20 0.57 12.30 95 11.69 5 0.62 0 0.00
6+540 20 0.66 12.30 95 11.69 5 0.62 0 0.00
6+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00

62 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
6+600 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+620 20 0.66 13.20 95 12.54 5 0.66 0 0.00
6+640 20 0.35 10.10 95 9.60 5 0.51 0 0.00
6+660 20 0.66 10.10 95 9.60 5 0.51 0 0.00
6+680 20 1.32 19.80 95 18.81 5 0.99 0 0.00
6+700 20 0.98 23.00 95 21.85 5 1.15 0 0.00
6+720 20 1.12 21.00 95 19.95 5 1.05 0 0.00
6+740 20 0.51 16.30 95 15.49 5 0.82 0 0.00
6+760 20 0.465 9.75 95 9.26 5 0.49 0 0.00
6+780 20 0.51 9.75 95 9.26 5 0.49 0 0.00
6+800 20 0.51 10.20 95 9.69 5 0.51 0 0.00
6+820 20 0.505 10.15 95 9.64 5 0.51 0 0.00
6+840 20 0.52 10.25 95 9.74 5 0.51 0 0.00
6+860 20 1.17 16.90 95 16.06 5 0.85 0 0.00
6+880 20 1.123 22.93 95 21.78 5 1.15 0 0.00
6+900 20 1.17 22.93 95 21.78 5 1.15 0 0.00
6+920 20 1.11 22.80 95 21.66 5 1.14 0 0.00
6+940 20 1.02 21.30 95 20.24 5 1.07 0 0.00
6+960 20 1.02 20.40 95 19.38 5 1.02 0 0.00
6+980 20 0.93 19.50 95 18.53 5 0.98 0 0.00
7+000 20 1.03 19.60 95 18.62 5 0.98 0 0.00
7+020 20 1.02 20.50 95 19.48 5 1.03 0 0.00
7+040 20 0.975 19.95 95 18.95 5 1.00 0 0.00
7+060 20 1.015 19.90 95 18.91 5 1.00 0 0.00
7+080 20 0.968 19.83 95 18.84 5 0.99 0 0.00
7+100 20 0.985 19.53 95 18.55 5 0.98 0 0.00
7+120 20 1.02 20.05 95 19.05 5 1.00 0 0.00
7+140 20 1.02 20.40 95 19.38 5 1.02 0 0.00
7+160 20 1.02 20.40 95 19.38 5 1.02 0 0.00
7+180 20 1.32 23.40 95 22.23 5 1.17 0 0.00
7+200 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+220 20 1.26 25.20 95 23.94 5 1.26 0 0.00
7+240 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+300 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+320 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+340 20 1.2 25.20 95 23.94 5 1.26 0 0.00
7+360 20 1.32 25.20 95 23.94 5 1.26 0 0.00
7+380 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+400 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+420 20 1.26 25.20 95 23.94 5 1.26 0 0.00
7+440 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+480 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+500 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+560 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+580 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+600 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+620 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+640 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+680 20 1.32 26.40 95 25.08 5 1.32 0 0.00

63 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
7+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+780 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+800 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+820 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+840 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+860 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+880 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+900 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+920 20 1.26 25.80 95 24.51 5 1.29 0 0.00
7+940 20 1.32 25.80 95 24.51 5 1.29 0 0.00
7+960 20 1.32 26.40 95 25.08 5 1.32 0 0.00
7+980 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+000 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+020 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+080 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+100 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+120 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+180 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+200 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+220 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+240 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+300 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+320 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+340 20 0.99 23.10 95 21.95 5 1.16 0 0.00
8+360 20 1.26 22.50 95 21.38 5 1.13 0 0.00
8+380 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+400 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+420 20 1.2 25.20 95 23.94 5 1.26 0 0.00
8+440 20 1.32 25.20 95 23.94 5 1.26 0 0.00
8+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+480 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+500 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+540 20 1.2 25.20 95 23.94 5 1.26 0 0.00
8+560 20 1.26 24.60 95 23.37 5 1.23 0 0.00
8+580 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+600 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+620 20 1.26 25.20 95 23.94 5 1.26 0 0.00
8+640 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+660 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+680 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+720 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+740 20 1.2 24.60 95 23.37 5 1.23 0 0.00
8+760 20 1.32 25.20 95 23.94 5 1.26 0 0.00
8+780 20 1.32 26.40 95 25.08 5 1.32 0 0.00

64 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
8+800 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+820 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+840 20 1.32 26.40 95 25.08 5 1.32 0 0.00
8+860 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+880 20 1.32 25.80 95 24.51 5 1.29 0 0.00
8+900 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+920 20 1.2 24.60 95 23.37 5 1.23 0 0.00
8+940 20 1.32 25.20 95 23.94 5 1.26 0 0.00
8+960 20 1.26 25.80 95 24.51 5 1.29 0 0.00
8+980 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+000 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+020 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+040 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+080 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+120 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+140 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+160 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+180 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+200 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+220 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+240 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+280 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+300 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+320 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+340 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+360 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+380 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+400 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+420 20 1.26 25.20 95 23.94 5 1.26 0 0.00
9+440 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+480 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+500 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+520 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+560 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+580 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+600 20 0.765 20.85 95 19.81 5 1.04 0 0.00
9+620 20 0.66 14.25 95 13.54 5 0.71 0 0.00
9+640 20 1.26 19.20 95 18.24 5 0.96 0 0.00
9+660 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+680 20 1.2 25.20 95 23.94 5 1.26 0 0.00
9+700 20 1.32 25.20 95 23.94 5 1.26 0 0.00
9+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+740 20 1.2 25.20 95 23.94 5 1.26 0 0.00
9+760 20 1.32 25.20 95 23.94 5 1.26 0 0.00
9+780 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+800 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+820 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+840 20 1.178 24.38 95 23.16 5 1.22 0 0.00
9+860 20 1.2 23.78 95 22.59 5 1.19 0 0.00
9+880 20 1.32 25.20 95 23.94 5 1.26 0 0.00

65 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
9+900 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+920 20 1.26 25.80 95 24.51 5 1.29 0 0.00
9+940 20 1.32 25.80 95 24.51 5 1.29 0 0.00
9+960 20 1.32 26.40 95 25.08 5 1.32 0 0.00
9+980 20 1.155 24.75 95 23.51 5 1.24 0 0.00
10+000 20 1.26 24.15 95 22.94 5 1.21 0 0.00
10+020 20 1.32 25.80 95 24.51 5 1.29 0 0.00
10+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+060 20 1.26 25.80 95 24.51 5 1.29 0 0.00
10+080 20 1.32 25.80 95 24.51 5 1.29 0 0.00
10+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+120 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+180 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+200 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+220 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+240 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+300 20 1.2 25.20 95 23.94 5 1.26 0 0.00
10+320 20 1.32 25.20 95 23.94 5 1.26 0 0.00
10+340 20 1.26 25.80 95 24.51 5 1.29 0 0.00
10+360 20 1.26 25.20 95 23.94 5 1.26 0 0.00
10+380 20 1.32 25.80 95 24.51 5 1.29 0 0.00
10+400 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+420 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+440 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+480 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+500 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+520 20 1.26 25.80 95 24.51 5 1.29 0 0.00
10+540 20 1.32 25.80 95 24.51 5 1.29 0 0.00
10+560 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+580 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+640 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+680 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+700 20 1.018 23.38 95 22.21 5 1.17 0 0.00
10+720 20 1.32 23.38 95 22.21 5 1.17 0 0.00
10+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+760 20 1.26 25.80 95 24.51 5 1.29 0 0.00
10+780 20 1.26 25.20 95 23.94 5 1.26 0 0.00
10+800 20 1.32 25.80 95 24.51 5 1.29 0 0.00
10+820 20 1.2 25.20 95 23.94 5 1.26 0 0.00
10+840 20 1.32 25.20 95 23.94 5 1.26 0 0.00
10+860 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+880 20 1.26 25.80 95 24.51 5 1.29 0 0.00
10+900 20 1.2 24.60 95 23.37 5 1.23 0 0.00
10+920 20 1.26 24.60 95 23.37 5 1.23 0 0.00
10+940 20 1.32 25.80 95 24.51 5 1.29 0 0.00
10+960 20 1.32 26.40 95 25.08 5 1.32 0 0.00
10+980 20 1.32 26.40 95 25.08 5 1.32 0 0.00

66 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
11+000 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+020 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+080 20 1.26 25.80 95 24.51 5 1.29 0 0.00
11+100 20 1.26 25.20 95 23.94 5 1.26 0 0.00
11+120 20 1.32 25.80 95 24.51 5 1.29 0 0.00
11+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+180 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+200 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+220 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+240 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+300 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+320 20 1.26 25.80 95 24.51 5 1.29 0 0.00
11+340 20 1.32 25.80 95 24.51 5 1.29 0 0.00
11+360 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+380 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+400 20 0.66 19.80 95 18.81 5 0.99 0 0.00
11+420 20 1.2 18.60 95 17.67 5 0.93 0 0.00
11+440 20 1.32 25.20 95 23.94 5 1.26 0 0.00
11+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+480 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+500 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+540 20 0.835 21.55 95 20.47 5 1.08 0 0.00
11+560 20 1.32 21.55 95 20.47 5 1.08 0 0.00
11+580 20 1.26 25.80 95 24.51 5 1.29 0 0.00
11+600 20 1.32 25.80 95 24.51 5 1.29 0 0.00
11+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+640 20 0.77 20.90 95 19.86 5 1.05 0 0.00
11+660 20 1.32 20.90 95 19.86 5 1.05 0 0.00
11+680 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+780 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+800 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+820 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+840 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+860 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+880 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+900 20 1.32 26.40 95 25.08 5 1.32 0 0.00
11+920 20 1.26 25.80 95 24.51 5 1.29 0 0.00
11+940 20 1.26 25.20 95 23.94 5 1.26 0 0.00
11+960 20 1.26 25.20 95 23.94 5 1.26 0 0.00
11+980 20 1.32 25.80 95 24.51 5 1.29 0 0.00
12+000 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+020 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+080 20 1.32 26.40 95 25.08 5 1.32 0 0.00

67 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
12+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+120 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+180 20 0.6 19.20 95 18.24 5 0.96 0 0.00
12+200 20 1.26 18.60 95 17.67 5 0.93 0 0.00
12+220 20 0.715 19.75 95 18.76 5 0.99 0 0.00
12+240 20 1.32 20.35 95 19.33 5 1.02 0 0.00
12+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+300 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+320 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+340 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+360 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+380 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+400 20 1.26 25.80 95 24.51 5 1.29 0 0.00
12+420 20 1.32 25.80 95 24.51 5 1.29 0 0.00
12+440 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+480 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+500 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+540 20 1.26 25.80 95 24.51 5 1.29 0 0.00
12+560 20 1.32 25.80 95 24.51 5 1.29 0 0.00
12+580 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+640 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+660 20 0.6 19.20 95 18.24 5 0.96 0 0.00
12+680 20 0.66 12.60 95 11.97 5 0.63 0 0.00
12+700 20 1.32 19.80 95 18.81 5 0.99 0 0.00
12+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+780 20 1.2 25.20 95 23.94 5 1.26 0 0.00
12+800 20 1.32 25.20 95 23.94 5 1.26 0 0.00
12+820 20 1.2 25.20 95 23.94 5 1.26 0 0.00
12+840 20 1.26 24.60 95 23.37 5 1.23 0 0.00
12+860 20 1.26 25.20 95 23.94 5 1.26 0 0.00
12+880 20 1.32 25.80 95 24.51 5 1.29 0 0.00
12+900 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+920 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+940 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+960 20 1.32 26.40 95 25.08 5 1.32 0 0.00
12+980 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+000 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+020 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+080 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+120 20 1.26 25.80 95 24.51 5 1.29 0 0.00
13+140 20 1.32 25.80 95 24.51 5 1.29 0 0.00
13+160 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+180 20 1.32 26.40 95 25.08 5 1.32 0 0.00

68 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
13+200 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+220 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+240 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+280 20 1.26 25.80 95 24.51 5 1.29 0 0.00
13+300 20 1.32 25.80 95 24.51 5 1.29 0 0.00
13+320 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+340 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+360 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+380 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+400 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+420 20 0.935 22.55 95 21.42 5 1.13 0 0.00
13+440 20 0.6 15.35 95 14.58 5 0.77 0 0.00
13+460 20 0.6 12.00 95 11.40 5 0.60 0 0.00
13+480 20 0.66 12.60 95 11.97 5 0.63 0 0.00
13+500 20 1.32 19.80 95 18.81 5 0.99 0 0.00
13+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+560 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+580 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+600 20 1.26 25.80 95 24.51 5 1.29 0 0.00
13+620 20 1.2 24.60 95 23.37 5 1.23 0 0.00
13+640 20 1.32 25.20 95 23.94 5 1.26 0 0.00
13+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+680 20 1.26 25.80 95 24.51 5 1.29 0 0.00
13+700 20 1.32 25.80 95 24.51 5 1.29 0 0.00
13+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
13+780 20 0.66 19.80 95 18.81 5 0.99 0 0.00
13+800 20 1.32 19.80 95 18.81 5 0.99 0 0.00
13+820 20 0.66 19.80 95 18.81 5 0.99 0 0.00
13+840 20 0.66 13.20 95 12.54 5 0.66 0 0.00
13+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
13+880 20 0.66 13.20 95 12.54 5 0.66 0 0.00
13+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
13+920 20 1.32 19.80 95 18.81 5 0.99 0 0.00
13+940 20 0 13.20 95 12.54 5 0.66 0 0.00
13+960 20 0 - 95 - 5 0.00 0 0.00
13+980 20 0 - 95 - 5 0.00 0 0.00
14+000 20 0.6 6.00 95 5.70 5 0.30 0 0.00
14+020 20 1.2 18.00 95 17.10 5 0.90 0 0.00
14+040 20 1.32 25.20 95 23.94 5 1.26 0 0.00
14+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
14+080 20 0.66 19.80 95 18.81 5 0.99 0 0.00
14+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+120 20 0.6 12.60 95 11.97 5 0.63 0 0.00
14+140 20 0.66 12.60 95 11.97 5 0.63 0 0.00
14+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+200 20 0.165 8.25 95 7.84 5 0.41 0 0.00
14+220 20 0.1 2.65 95 2.52 5 0.13 0 0.00
14+240 20 0.66 7.60 95 7.22 5 0.38 0 0.00
14+260 20 0 6.60 95 6.27 5 0.33 0 0.00
14+280 20 0 - 95 - 5 0.00 0 0.00

69 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
14+300 20 0 - 95 - 5 0.00 0 0.00
14+320 20 0.238 2.38 95 2.26 5 0.12 0 0.00
14+340 20 0 2.38 95 2.26 5 0.12 0 0.00
14+360 20 0.66 6.60 95 6.27 5 0.33 0 0.00
14+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+400 20 0.6 12.60 95 11.97 5 0.63 0 0.00
14+420 20 0.66 12.60 95 11.97 5 0.63 0 0.00
14+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+500 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+540 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+600 20 0.6 12.60 95 11.97 5 0.63 0 0.00
14+620 20 0.66 12.60 95 11.97 5 0.63 0 0.00
14+640 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+660 20 0.6 12.60 95 11.97 5 0.63 0 0.00
14+680 20 0.66 12.60 95 11.97 5 0.63 0 0.00
14+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+720 20 0.6 12.60 95 11.97 5 0.63 0 0.00
14+740 20 0.66 12.60 95 11.97 5 0.63 0 0.00
14+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+820 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+840 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+860 20 0.6 12.60 95 11.97 5 0.63 0 0.00
14+880 20 0.66 12.60 95 11.97 5 0.63 0 0.00
14+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
14+940 20 0.658 13.18 95 12.52 5 0.66 0 0.00
14+960 20 0.66 13.18 95 12.52 5 0.66 0 0.00
14+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+040 20 0.565 12.25 95 11.64 5 0.61 0 0.00
15+060 20 0.11 6.75 95 6.41 5 0.34 0 0.00
15+080 20 0.66 7.70 95 7.32 5 0.39 0 0.00
15+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+120 20 0 6.60 95 6.27 5 0.33 0 0.00
15+140 20 0.66 6.60 95 6.27 5 0.33 0 0.00
15+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+220 20 0.6 12.60 95 11.97 5 0.63 0 0.00
15+240 20 0.66 12.60 95 11.97 5 0.63 0 0.00
15+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+360 20 0.035 6.95 95 6.60 5 0.35 0 0.00
15+380 20 0.66 6.95 95 6.60 5 0.35 0 0.00

70 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
15+400 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+420 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+440 20 0 6.60 95 6.27 5 0.33 0 0.00
15+460 20 0.66 6.60 95 6.27 5 0.33 0 0.00
15+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+500 20 0.6 12.60 95 11.97 5 0.63 0 0.00
15+520 20 0.6 12.00 95 11.40 5 0.60 0 0.00
15+540 20 0.66 12.60 95 11.97 5 0.63 0 0.00
15+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+580 20 1.32 19.80 95 18.81 5 0.99 0 0.00
15+600 20 1.2 25.20 95 23.94 5 1.26 0 0.00
15+620 20 1.32 25.20 95 23.94 5 1.26 0 0.00
15+640 20 0.66 19.80 95 18.81 5 0.99 0 0.00
15+660 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+680 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+720 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+740 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+800 20 0.6 12.60 95 11.97 5 0.63 0 0.00
15+820 20 0.66 12.60 95 11.97 5 0.63 0 0.00
15+840 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+880 20 0.6 12.60 95 11.97 5 0.63 0 0.00
15+900 20 0.66 12.60 95 11.97 5 0.63 0 0.00
15+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
15+940 20 0.6 12.60 95 11.97 5 0.63 0 0.00
15+960 20 0.66 12.60 95 11.97 5 0.63 0 0.00
15+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+040 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+140 20 0 6.60 95 6.27 5 0.33 0 0.00
16+160 20 0 - 95 - 5 0.00 0 0.00
16+180 20 0 - 95 - 5 0.00 0 0.00
16+200 20 0.66 6.60 95 6.27 5 0.33 0 0.00
16+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+300 20 0.6 12.60 95 11.97 5 0.63 0 0.00
16+320 20 0.66 12.60 95 11.97 5 0.63 0 0.00
16+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+400 20 1.32 19.80 95 18.81 5 0.99 0 0.00
16+420 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+440 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+460 20 0.935 22.55 95 21.42 5 1.13 0 0.00
16+480 20 1.32 22.55 95 21.42 5 1.13 0 0.00

71 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
16+500 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+560 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+580 20 1.2 25.20 95 23.94 5 1.26 0 0.00
16+600 20 1.32 25.20 95 23.94 5 1.26 0 0.00
16+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+640 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+680 20 0.655 19.75 95 18.76 5 0.99 0 0.00
16+700 20 1.32 19.75 95 18.76 5 0.99 0 0.00
16+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
16+780 20 0.66 19.80 95 18.81 5 0.99 0 0.00
16+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+820 20 0.6 12.60 95 11.97 5 0.63 0 0.00
16+840 20 0.66 12.60 95 11.97 5 0.63 0 0.00
16+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+880 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
16+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+040 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+140 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+220 20 1.32 19.80 95 18.81 5 0.99 0 0.00
17+240 20 1.17 24.90 95 23.66 5 1.25 0 0.00
17+260 20 0.51 16.80 95 15.96 5 0.84 0 0.00
17+280 20 0.51 10.20 95 9.69 5 0.51 0 0.00
17+300 20 0.465 9.75 95 9.26 5 0.49 0 0.00
17+320 20 0.66 11.25 95 10.69 5 0.56 0 0.00
17+340 20 0.635 12.95 95 12.30 5 0.65 0 0.00
17+360 20 0.178 8.13 95 7.72 5 0.41 0 0.00
17+380 20 0.66 8.38 95 7.96 5 0.42 0 0.00
17+400 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+420 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+500 20 0.185 8.45 95 8.03 5 0.42 0 0.00
17+520 20 0.6 7.85 95 7.46 5 0.39 0 0.00
17+540 20 0.66 12.60 95 11.97 5 0.63 0 0.00
17+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+580 20 0.507 11.67 95 11.09 5 0.58 0 0.00

72 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
17+600 20 0.51 10.17 95 9.66 5 0.51 0 0.00
17+620 20 0.66 11.70 95 11.12 5 0.59 0 0.00
17+640 20 0.455 11.15 95 10.59 5 0.56 0 0.00
17+660 20 0.66 11.15 95 10.59 5 0.56 0 0.00
17+680 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+720 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+740 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+820 20 1.32 19.80 95 18.81 5 0.99 0 0.00
17+840 20 0.66 19.80 95 18.81 5 0.99 0 0.00
17+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+880 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
17+960 20 0.6 12.60 95 11.97 5 0.63 0 0.00
17+980 20 0.66 12.60 95 11.97 5 0.63 0 0.00
18+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+040 20 0.23 8.90 95 8.46 5 0.45 0 0.00
18+060 20 0.66 8.90 95 8.46 5 0.45 0 0.00
18+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+140 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+260 20 0.6 12.60 95 11.97 5 0.63 0 0.00
18+280 20 0.66 12.60 95 11.97 5 0.63 0 0.00
18+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+380 20 0 6.60 95 6.27 5 0.33 0 0.00
18+400 20 0 - 95 - 5 0.00 0 0.00
18+420 20 0.66 6.60 95 6.27 5 0.33 0 0.00
18+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+460 20 0.6 12.60 95 11.97 5 0.63 0 0.00
18+480 20 0.66 12.60 95 11.97 5 0.63 0 0.00
18+500 20 1.17 18.30 95 17.39 5 0.92 0 0.00
18+520 20 1.158 23.28 95 22.12 5 1.16 0 0.00
18+540 20 1.16 23.18 95 22.02 5 1.16 0 0.00
18+560 20 0.66 18.20 95 17.29 5 0.91 0 0.00
18+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+600 20 1.32 19.80 95 18.81 5 0.99 0 0.00
18+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
18+640 20 0.66 19.80 95 18.81 5 0.99 0 0.00
18+660 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+680 20 0.66 13.20 95 12.54 5 0.66 0 0.00

73 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
18+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+720 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+740 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+820 20 1.26 19.20 95 18.24 5 0.96 0 0.00
18+840 20 1.32 25.80 95 24.51 5 1.29 0 0.00
18+860 20 1.26 25.80 95 24.51 5 1.29 0 0.00
18+880 20 0.66 19.20 95 18.24 5 0.96 0 0.00
18+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+920 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
18+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+040 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+080 20 1.32 19.80 95 18.81 5 0.99 0 0.00
19+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
19+120 20 1.32 26.40 95 25.08 5 1.32 0 0.00
19+140 20 0.66 19.80 95 18.81 5 0.99 0 0.00
19+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+180 20 0.01 6.70 95 6.37 5 0.34 0 0.00
19+200 20 0.6 6.10 95 5.80 5 0.31 0 0.00
19+220 20 0.66 12.60 95 11.97 5 0.63 0 0.00
19+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+340 20 0.6 12.60 95 11.97 5 0.63 0 0.00
19+360 20 0.66 12.60 95 11.97 5 0.63 0 0.00
19+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+400 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+420 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+500 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+540 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+600 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+620 20 0.6 12.60 95 11.97 5 0.63 0 0.00
19+640 20 0.66 12.60 95 11.97 5 0.63 0 0.00
19+660 20 0.6 12.60 95 11.97 5 0.63 0 0.00
19+680 20 0.66 12.60 95 11.97 5 0.63 0 0.00
19+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+720 20 0.6 12.60 95 11.97 5 0.63 0 0.00
19+740 20 1.32 19.20 95 18.24 5 0.96 0 0.00
19+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
19+780 20 1.26 25.80 95 24.51 5 1.29 0 0.00

74 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
19+800 20 1.32 25.80 95 24.51 5 1.29 0 0.00
19+820 20 1.26 25.80 95 24.51 5 1.29 0 0.00
19+840 20 0.66 19.20 95 18.24 5 0.96 0 0.00
19+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+880 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+900 20 0.66 13.20 95 12.54 5 0.66 0 0.00
19+920 20 0.6 12.60 95 11.97 5 0.63 0 0.00
19+940 20 0.66 12.60 95 11.97 5 0.63 0 0.00
19+960 20 0.6 12.60 95 11.97 5 0.63 0 0.00
19+980 20 1.26 18.60 95 17.67 5 0.93 0 0.00
20+000 20 1.32 25.80 95 24.51 5 1.29 0 0.00
20+020 20 0.023 13.43 95 12.76 5 0.67 0 0.00
20+040 20 0 0.23 95 0.22 5 0.01 0 0.00
20+060 20 0.22 2.20 95 2.09 5 0.11 0 0.00
20+080 20 0.66 8.80 95 8.36 5 0.44 0 0.00
20+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+140 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+400 20 0.098 7.58 95 7.20 5 0.38 0 0.00
20+420 20 0 0.98 95 0.93 5 0.05 0 0.00
20+440 20 0.66 6.60 95 6.27 5 0.33 0 0.00
20+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+500 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+540 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+560 20 0.6 12.60 95 11.97 5 0.63 0 0.00
20+580 20 1.26 18.60 95 17.67 5 0.93 0 0.00
20+600 20 0.66 19.20 95 18.24 5 0.96 0 0.00
20+620 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+640 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+660 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+680 20 0.015 6.75 95 6.41 5 0.34 0 0.00
20+700 20 0.66 6.75 95 6.41 5 0.34 0 0.00
20+720 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+740 20 0.368 10.28 95 9.77 5 0.51 0 0.00
20+760 20 0 3.68 95 3.50 5 0.18 0 0.00
20+780 20 0.66 6.60 95 6.27 5 0.33 0 0.00
20+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
20+820 20 0.03 6.90 95 6.56 5 0.35 0 0.00
20+840 20 0 0.30 95 0.29 5 0.02 0 0.00
20+860 20 0 - 95 - 5 0.00 0 0.00
20+880 20 0 - 95 - 5 0.00 0 0.00

75 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
20+900 20 0 - 95 - 5 0.00 0 0.00
20+920 20 0 - 95 - 5 0.00 0 0.00
20+940 20 0 - 95 - 5 0.00 0 0.00
20+960 20 0.008 0.08 95 0.08 5 0.00 0 0.00
20+980 20 0 0.08 95 0.08 5 0.00 0 0.00
21+000 20 0.66 6.60 95 6.27 5 0.33 0 0.00
21+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+040 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+140 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+160 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+200 20 0 6.60 95 6.27 5 0.33 0 0.00
21+220 20 0 - 95 - 5 0.00 0 0.00
21+240 20 0 - 95 - 5 0.00 0 0.00
21+260 20 0.66 6.60 95 6.27 5 0.33 0 0.00
21+280 20 1.26 19.20 95 18.24 5 0.96 0 0.00
21+300 20 1.17 24.30 95 23.09 5 1.22 0 0.00
21+320 20 1.065 22.35 95 21.23 5 1.12 0 0.00
21+340 20 0.51 15.75 95 14.96 5 0.79 0 0.00
21+360 20 0.51 10.20 95 9.69 5 0.51 0 0.00
21+380 20 0.51 10.20 95 9.69 5 0.51 0 0.00
21+400 20 0.51 10.20 95 9.69 5 0.51 0 0.00
21+420 20 0.66 11.70 95 11.12 5 0.59 0 0.00
21+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+460 20 0.265 9.25 95 8.79 5 0.46 0 0.00
21+480 20 0.57 8.35 95 7.93 5 0.42 0 0.00
21+500 20 0.06 6.30 95 5.99 5 0.32 0 0.00
21+520 20 0.65 7.10 95 6.75 5 0.36 0 0.00
21+540 20 0.66 13.10 95 12.45 5 0.66 0 0.00
21+560 20 0.6 12.60 95 11.97 5 0.63 0 0.00
21+580 20 1.32 19.20 95 18.24 5 0.96 0 0.00
21+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+640 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+680 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
21+740 20 1.26 25.80 95 24.51 5 1.29 0 0.00
21+760 20 1.32 25.80 95 24.51 5 1.29 0 0.00
21+780 20 1.17 24.90 95 23.66 5 1.25 0 0.00
21+800 20 0.5 16.70 95 15.87 5 0.84 0 0.00
21+820 20 0.66 11.60 95 11.02 5 0.58 0 0.00
21+840 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+860 20 0.658 13.18 95 12.52 5 0.66 0 0.00
21+880 20 0 6.58 95 6.25 5 0.33 0 0.00
21+900 20 0 - 95 - 5 0.00 0 0.00
21+920 20 0.6 6.00 95 5.70 5 0.30 0 0.00
21+940 20 0.66 12.60 95 11.97 5 0.63 0 0.00
21+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
21+980 20 1.32 19.80 95 18.81 5 0.99 0 0.00

76 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
22+000 20 1.17 24.90 95 23.66 5 1.25 0 0.00
22+020 20 1.17 23.40 95 22.23 5 1.17 0 0.00
22+040 20 1.17 23.40 95 22.23 5 1.17 0 0.00
22+060 20 0.6 17.70 95 16.82 5 0.89 0 0.00
22+080 20 0.53 11.30 95 10.74 5 0.57 0 0.00
22+100 20 0.01 5.40 95 5.13 5 0.27 0 0.00
22+120 20 0 0.10 95 0.10 5 0.01 0 0.00
22+140 20 0 - 95 - 5 0.00 0 0.00
22+160 20 0.252 2.52 95 2.39 5 0.13 0 0.00
22+180 20 1.32 15.72 95 14.93 5 0.79 0 0.00
22+200 20 1.17 24.90 95 23.66 5 1.25 0 0.00
22+220 20 1.17 23.40 95 22.23 5 1.17 0 0.00
22+240 20 0.66 18.30 95 17.39 5 0.92 0 0.00
22+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+380 20 1.26 19.20 95 18.24 5 0.96 0 0.00
22+400 20 1.11 23.70 95 22.52 5 1.19 0 0.00
22+420 20 1.17 22.80 95 21.66 5 1.14 0 0.00
22+440 20 1.168 23.38 95 22.21 5 1.17 0 0.00
22+460 20 1.065 22.33 95 21.21 5 1.12 0 0.00
22+480 20 1.17 22.35 95 21.23 5 1.12 0 0.00
22+500 20 0.5 16.70 95 15.87 5 0.84 0 0.00
22+520 20 0.66 11.60 95 11.02 5 0.58 0 0.00
22+540 20 0.6 12.60 95 11.97 5 0.63 0 0.00
22+560 20 0.66 12.60 95 11.97 5 0.63 0 0.00
22+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+600 20 1.125 17.85 95 16.96 5 0.89 0 0.00
22+620 20 1.17 22.95 95 21.80 5 1.15 0 0.00
22+640 20 1.105 22.75 95 21.61 5 1.14 0 0.00
22+660 20 1.16 22.65 95 21.52 5 1.13 0 0.00
22+680 20 0.6 17.60 95 16.72 5 0.88 0 0.00
22+700 20 0.66 12.60 95 11.97 5 0.63 0 0.00
22+720 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+740 20 0.66 13.20 95 12.54 5 0.66 0 0.00
22+760 20 0.03 6.90 95 6.56 5 0.35 0 0.00
22+780 20 0 0.30 95 0.29 5 0.02 0 0.00
22+800 20 0.555 5.55 95 5.27 5 0.28 0 0.00
22+820 20 1.32 18.75 95 17.81 5 0.94 0 0.00
22+840 20 1.17 24.90 95 23.66 5 1.25 0 0.00
22+860 20 1.17 23.40 95 22.23 5 1.17 0 0.00
22+880 20 1.17 23.40 95 22.23 5 1.17 0 0.00
22+900 20 1.17 23.40 95 22.23 5 1.17 0 0.00
22+920 20 1.168 23.38 95 22.21 5 1.17 0 0.00
22+940 20 1.02 21.88 95 20.79 5 1.09 0 0.00
22+960 20 1.02 20.40 95 19.38 5 1.02 0 0.00
22+980 20 0.998 20.18 95 19.17 5 1.01 0 0.00
23+000 20 1 19.98 95 18.98 5 1.00 0 0.00
23+020 20 0.975 19.75 95 18.76 5 0.99 0 0.00
23+040 20 1.02 19.95 95 18.95 5 1.00 0 0.00
23+060 20 1.02 20.40 95 19.38 5 1.02 0 0.00
23+080 20 1.02 20.40 95 19.38 5 1.02 0 0.00

77 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
23+100 20 1.015 20.35 95 19.33 5 1.02 0 0.00
23+120 20 1.32 23.35 95 22.18 5 1.17 0 0.00
23+140 20 1.32 26.40 95 25.08 5 1.32 0 0.00
23+160 20 1.033 23.53 95 22.35 5 1.18 0 0.00
23+180 20 1.32 23.53 95 22.35 5 1.18 0 0.00
23+200 20 1.2 25.20 95 23.94 5 1.26 0 0.00
23+220 20 1.32 25.20 95 23.94 5 1.26 0 0.00
23+240 20 1.32 26.40 95 25.08 5 1.32 0 0.00
23+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
23+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
23+300 20 0.66 19.80 95 18.81 5 0.99 0 0.00
23+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+400 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+420 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+440 20 0.6 12.60 95 11.97 5 0.63 0 0.00
23+460 20 0 6.00 95 5.70 5 0.30 0 0.00
23+480 20 0 - 95 - 5 0.00 0 0.00
23+500 20 0.66 6.60 95 6.27 5 0.33 0 0.00
23+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+540 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+580 20 0.6 12.60 95 11.97 5 0.63 0 0.00
23+600 20 0.66 12.60 95 11.97 5 0.63 0 0.00
23+620 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+640 20 1.32 19.80 95 18.81 5 0.99 0 0.00
23+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
23+680 20 1.32 26.40 95 25.08 5 1.32 0 0.00
23+700 20 0.66 19.80 95 18.81 5 0.99 0 0.00
23+720 20 0 6.60 95 6.27 5 0.33 0 0.00
23+740 20 0.66 6.60 95 6.27 5 0.33 0 0.00
23+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+820 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+840 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+880 20 0.6 12.60 95 11.97 5 0.63 0 0.00
23+900 20 0.49 10.90 95 10.36 5 0.55 0 0.00
23+920 20 0 4.90 95 4.66 5 0.25 0 0.00
23+940 20 0.66 6.60 95 6.27 5 0.33 0 0.00
23+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
23+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+020 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+040 20 1.32 19.80 95 18.81 5 0.99 0 0.00
24+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+080 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+120 20 0.66 19.80 95 18.81 5 0.99 0 0.00
24+140 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+160 20 0.595 12.55 95 11.92 5 0.63 0 0.00
24+180 20 0.66 12.55 95 11.92 5 0.63 0 0.00

78 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
24+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+220 20 1.32 19.80 95 18.81 5 0.99 0 0.00
24+240 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+300 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+320 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+340 20 1.2 25.20 95 23.94 5 1.26 0 0.00
24+360 20 0.66 18.60 95 17.67 5 0.93 0 0.00
24+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+400 20 1.32 19.80 95 18.81 5 0.99 0 0.00
24+420 20 0.66 19.80 95 18.81 5 0.99 0 0.00
24+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+500 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+520 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+540 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+560 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+580 20 1.32 19.80 95 18.81 5 0.99 0 0.00
24+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
24+620 20 0.66 19.80 95 18.81 5 0.99 0 0.00
24+640 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+660 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+680 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+700 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+720 20 0.6 12.60 95 11.97 5 0.63 0 0.00
24+740 20 0.66 12.60 95 11.97 5 0.63 0 0.00
24+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+800 20 0.6 12.60 95 11.97 5 0.63 0 0.00
24+820 20 0.6 12.00 95 11.40 5 0.60 0 0.00
24+840 20 0.66 12.60 95 11.97 5 0.63 0 0.00
24+860 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+880 20 0.507 11.67 95 11.09 5 0.58 0 0.00
24+900 20 0 5.07 95 4.82 5 0.25 0 0.00
24+920 20 0.66 6.60 95 6.27 5 0.33 0 0.00
24+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
24+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
25+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
25+020 20 0.6 12.60 95 11.97 5 0.63 0 0.00
25+040 20 0.66 12.60 95 11.97 5 0.63 0 0.00
25+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
25+080 20 0.66 13.20 95 12.54 5 0.66 0 0.00
25+100 20 0.66 13.20 95 12.54 5 0.66 0 0.00
25+120 20 0.6 12.60 95 11.97 5 0.63 0 0.00
25+140 20 0.6 12.00 95 11.40 5 0.60 0 0.00
25+160 20 0.645 12.45 95 11.83 5 0.62 0 0.00
25+180 20 0.66 13.05 95 12.40 5 0.65 0 0.00
25+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
25+220 20 0.6 12.60 95 11.97 5 0.63 0 0.00
25+240 20 1.32 19.20 95 18.24 5 0.96 0 0.00
25+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+280 20 1.32 26.40 95 25.08 5 1.32 0 0.00

79 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
25+300 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+320 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+340 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+360 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+380 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+400 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+420 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+440 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+460 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+480 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+500 20 1.26 25.80 95 24.51 5 1.29 0 0.00
25+520 20 1.32 25.80 95 24.51 5 1.29 0 0.00
25+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+560 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+580 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+640 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+660 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+680 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+780 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+800 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+820 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+840 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+860 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+880 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+900 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+920 20 0.6 19.20 95 18.24 5 0.96 0 0.00
25+940 20 1.32 19.20 95 18.24 5 0.96 0 0.00
25+960 20 1.32 26.40 95 25.08 5 1.32 0 0.00
25+980 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+000 20 1.2 25.20 95 23.94 5 1.26 0 0.00
26+020 20 1.32 25.20 95 23.94 5 1.26 0 0.00
26+040 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+060 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+080 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+100 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+120 20 1.17 24.90 95 23.66 5 1.25 0 0.00
26+140 20 1.063 22.33 95 21.21 5 1.12 0 0.00
26+160 20 1.17 22.33 95 21.21 5 1.12 0 0.00
26+180 20 1.17 23.40 95 22.23 5 1.17 0 0.00
26+200 20 1.17 23.40 95 22.23 5 1.17 0 0.00
26+220 20 1.065 22.35 95 21.23 5 1.12 0 0.00
26+240 20 1.32 23.85 95 22.66 5 1.19 0 0.00
26+260 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+280 20 1.26 25.80 95 24.51 5 1.29 0 0.00
26+300 20 1.32 25.80 95 24.51 5 1.29 0 0.00
26+320 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+340 20 1.26 25.80 95 24.51 5 1.29 0 0.00
26+360 20 0.66 19.20 95 18.24 5 0.96 0 0.00
26+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00

80 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m )3

Re
% % (m3) % (m3)
26+400 20 0.66 13.20 95 12.54 5 0.66 0 0.00
26+420 20 1.32 19.80 95 18.81 5 0.99 0 0.00
26+440 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+460 20 0.66 19.80 95 18.81 5 0.99 0 0.00
26+480 20 0.488 11.48 95 10.91 5 0.57 0 0.00
26+500 20 1.32 18.08 95 17.18 5 0.90 0 0.00
26+520 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+540 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+560 20 1.26 25.80 95 24.51 5 1.29 0 0.00
26+580 20 1.32 25.80 95 24.51 5 1.29 0 0.00
26+600 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+620 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+640 20 1.26 25.80 95 24.51 5 1.29 0 0.00
26+660 20 0.66 19.20 95 18.24 5 0.96 0 0.00
26+680 20 1.32 19.80 95 18.81 5 0.99 0 0.00
26+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+720 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+740 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+760 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+780 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+800 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+820 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+840 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+860 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+880 20 1.32 26.40 95 25.08 5 1.32 0 0.00
26+900 20 1.26 25.80 95 24.51 5 1.29 0 0.00
26+920 20 0.66 19.20 95 18.24 5 0.96 0 0.00
26+940 20 0.66 13.20 95 12.54 5 0.66 0 0.00
26+960 20 0.66 13.20 95 12.54 5 0.66 0 0.00
26+980 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+000 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+020 20 0.6 12.60 95 11.97 5 0.63 0 0.00
27+040 20 0.66 12.60 95 11.97 5 0.63 0 0.00
27+060 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+080 20 0.6 12.60 95 11.97 5 0.63 0 0.00
27+100 20 0.66 12.60 95 11.97 5 0.63 0 0.00
27+120 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+140 20 0.6 12.60 95 11.97 5 0.63 0 0.00
27+160 20 0.66 12.60 95 11.97 5 0.63 0 0.00
27+180 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+200 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+220 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+240 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+260 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+280 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+300 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+320 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+340 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+360 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+380 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+400 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+420 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+440 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+460 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+480 20 0.66 13.20 95 12.54 5 0.66 0 0.00

81 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

EARTHWORK CALCULATIONS FOR DRAINS


Name of the road:…………………………….
Chainage:0+000 to ….
Road Way Cutting Soil type

s
Ordinary Soil Soft Rock Hard Rock

k
Chainage Length (m) Area (m2) Volume(m3)

ar
Volume Volume

m
Volume (m ) 3

Re
% % (m3) % (m3)
27+500 20 0 6.60 95 6.27 5 0.33 0 0.00
27+520 20 0.66 6.60 95 6.27 5 0.33 0 0.00
27+540 20 0.6 12.60 95 11.97 5 0.63 0 0.00
27+560 20 0.66 12.60 95 11.97 5 0.63 0 0.00
27+580 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+600 20 0.6 12.60 95 11.97 5 0.63 0 0.00
27+620 20 0.66 12.60 95 11.97 5 0.63 0 0.00
27+640 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+660 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+680 20 1.32 19.80 95 18.81 5 0.99 0 0.00
27+700 20 1.32 26.40 95 25.08 5 1.32 0 0.00
27+720 20 0.66 19.80 95 18.81 5 0.99 0 0.00
27+740 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+760 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+780 20 0.66 13.20 95 12.54 5 0.66 0 0.00
27+800 20 0.66 13.20 95 12.54 5 0.66 0 0.00

Total 27810 25404.76 24134.92 1270.73 0

82 of 323
ks
ar
m
Re

83 of 323
ks
ar
m
Re

84 of 323
ks
ar
m
Re

85 of 323
ks
ar
m
Re

86 of 323
ks
ar
m
Re

87 of 323
ks
ar
m
Re

88 of 323
ks
ar
m
Re

89 of 323
ks
ar
m
Re

90 of 323
ks
ar
m
Re

91 of 323
ks
ar
m
Re

92 of 323
ks
ar
m
Re

93 of 323
ks
ar
m
Re

94 of 323
ks
ar
m
Re

95 of 323
ks
ar
m
Re

96 of 323
ks
ar
m
Re

97 of 323
ks
ar
m
Re

98 of 323
ks
ar
m
Re

99 of 323
ks
ar
m
Re

100 of 323
ks
ar
m
Re

101 of 323
ks
ar
m
Re

102 of 323
ks
ar
m
Re

103 of 323
ks
ar
m
Re

104 of 323
ks
ar
m
Re

105 of 323
ks
ar
m
Re

106 of 323
ks
ar
m
Re

107 of 323
ks
ar
m
Re

108 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
0+020 20 6 13.5 270 270.00 160.00
0+040 20 4 7 140 140.00 104.00
0+060 20 6 13.5 270 270.00 160.00
0+080 20 6 13.5 270 270.00 160.00
0+100 20 7 17.5 350 350.00 188.00
0+120 20 7 17.5 350 350.00 188.00
0+140 20 7 17.5 350 350.00 188.00
0+160 15 6 13.5 202.5 202.50 120.00
0+360 15 4 7 105 105.00 78.00
0+380 20 7 17.5 350 350.00 188.00
0+400 20 9 27 540 540.00 244.00
0+420 20 6 13.5 270 270.00 160.00
0+440 20 6 13.5 270 270.00 160.00
0+460 20 6 13.5 270 270.00 160.00
0+480 20 5 10 200 200.00 132.00
0+500 20 4 7 140 140.00 104.00
0+520 20 4 7 140 140.00 104.00
0+540 15 3 4.5 67.5 67.50 57.00
1+080 15 9 27 405 405.00 183.00
1+100 20 9 27 540 540.00 244.00
1+120 20 8 22 440 440.00 216.00
1+140 20 7 17.5 350 350.00 188.00
1+160 20 6 13.5 270 270.00 160.00
1+180 20 5 10 200 200.00 132.00
1+200 20 6 13.5 270 270.00 160.00
1+220 20 4 7 140 140.00 104.00
1+240 20 4 7 140 140.00 104.00
1+260 20 3 4.5 90 90.00 76.00
1+280 20 4 7 140 140.00 104.00
1+300 20 4 7 140 140.00 104.00
1+320 20 4 7 140 140.00 104.00
1+340 20 4 7 140 140.00 104.00
1+360 20 6 13.5 270 270.00 160.00
1+380 20 6 13.5 270 270.00 160.00
1+400 20 6 13.5 270 270.00 160.00
1+420 20 7 17.5 350 350.00 188.00
1+440 20 8 22 440 440.00 216.00
1+460 20 6 13.5 270 270.00 160.00
1+480 20 7 17.5 350 350.00 188.00
1+500 20 6 13.5 270 270.00 160.00
1+520 20 6 13.5 270 270.00 160.00

109 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
1+540 20 4 7 140 140.00 104.00
1+560 15 4 7 105 105.00 78.00
1+600 15 6 13.5 202.5 202.50 120.00
1+620 20 5 10 200 200.00 132.00
1+640 20 7 17.5 350 350.00 188.00
1+660 20 7 17.5 350 350.00 188.00
1+680 20 11 38.5 770 770.00 300.00
1+700 20 10 32.5 650 650.00 272.00
1+720 20 10 32.5 650 650.00 272.00
1+740 20 8 22 440 440.00 216.00
1+760 20 6 13.5 270 270.00 160.00
1+780 20 4 7 140 140.00 104.00
1+800 20 4 7 140 140.00 104.00
1+820 15 3 4.5 67.5 67.50 57.00
2+080 15 5 10 150 150.00 99.00
2+100 20 5 10 200 200.00 132.00
2+120 15 4 7 105 105.00 78.00
3+140 15 7 17.5 262.5 262.50 141.00
3+160 20 8 22 440 440.00 216.00
3+180 20 7 17.5 350 350.00 188.00
3+200 20 9 27 540 540.00 244.00
3+220 20 10 32.5 650 650.00 272.00
3+240 20 10 32.5 650 650.00 272.00
3+260 20 8 22 440 440.00 216.00
3+280 20 5 10 200 200.00 132.00
3+300 15 7 17.5 262.5 262.50 141.00
3+740 15 3 4.5 67.5 67.50 57.00
3+760 15 5 10 150 150.00 99.00
5+360 10 3 4.5 45 45.00 38.00
5+400 15 3 4.5 67.5 67.50 57.00
5+420 20 4 7 140 140.00 104.00
5+440 20 4 7 140 140.00 104.00
5+460 20 5 10 200 200.00 132.00
5+480 20 5 10 200 200.00 132.00
5+500 20 5 10 200 200.00 132.00
5+520 20 6 13.5 270 270.00 160.00
5+540 20 8 22 440 440.00 216.00
5+560 20 7 17.5 350 350.00 188.00
5+580 20 7 17.5 350 350.00 188.00
5+600 20 6 13.5 270 270.00 160.00
5+620 20 11 38.5 770 770.00 300.00

110 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
5+640 20 11 38.5 770 770.00 300.00
5+660 20 10 32.5 650 650.00 272.00
5+680 20 9 27 540 540.00 244.00
5+700 20 8 22 440 440.00 216.00
5+720 20 9 27 540 540.00 244.00
5+740 20 6 13.5 270 270.00 160.00
5+760 20 9 27 540 540.00 244.00
5+780 20 6 13.5 270 270.00 160.00
5+800 20 5 10 200 200.00 132.00
5+820 20 5 10 200 200.00 132.00
5+840 20 6 13.5 270 270.00 160.00
5+860 15 5 10 150 150.00 99.00
6+200 15 5 10 150 150.00 99.00
6+220 20 6 13.5 270 270.00 160.00
6+240 20 7 17.5 350 350.00 188.00
6+260 15 4 7 105 105.00 78.00
6+600 10 4 7 70 70.00 52.00
6+960 15 4 7 105 105.00 78.00
6+980 20 8 22 440 440.00 216.00
7+000 15 5 10 150 150.00 99.00
7+720 15 4 7 105 105.00 78.00
7+740 20 5 10 200 200.00 132.00
7+760 20 6 13.5 270 270.00 160.00
7+780 20 4 7 140 140.00 104.00
7+800 20 4 7 140 140.00 104.00
7+820 20 5 10 200 200.00 132.00
7+840 15 6 13.5 202.5 202.50 120.00
11+240 15 3 4.5 67.5 67.50 57.00
11+260 20 6 13.5 270 270.00 160.00
11+280 20 8 22 440 440.00 216.00
11+300 20 8 22 440 440.00 216.00
11+320 15 9 27 405 405.00 183.00
11+500 10 3 4.5 45 45.00 38.00
15+720 15 4 7 105 105.00 78.00
15+740 20 4 7 140 140.00 104.00
15+760 20 5 10 200 200.00 132.00
15+780 20 5 10 200 200.00 132.00
15+800 20 5 10 200 200.00 132.00
15+820 20 6 13.5 270 270.00 160.00
15+840 20 7 17.5 350 350.00 188.00
15+860 20 6 13.5 270 270.00 160.00

111 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
15+880 20 5 10 200 200.00 132.00
15+900 20 4 7 140 140.00 104.00
15+920 20 4 7 140 140.00 104.00
15+940 20 5 10 200 200.00 132.00
15+960 20 5 10 200 200.00 132.00
15+980 20 5 10 200 200.00 132.00
16+000 20 6 13.5 270 270.00 160.00
16+020 20 4 7 140 140.00 104.00
16+040 20 5 10 200 200.00 132.00
16+060 15 5 10 150 150.00 99.00
16+260 15 6 13.5 202.5 202.50 120.00
16+280 20 6 13.5 270 270.00 160.00
16+300 15 6 13.5 202.5 202.50 120.00
16+840 15 7 17.5 262.5 262.50 141.00
16+860 20 5 10 200 200.00 132.00
16+880 20 7 17.5 350 350.00 188.00
16+900 20 8 22 440 440.00 216.00
16+920 20 8 22 440 440.00 216.00
16+940 20 5 10 200 200.00 132.00
16+960 20 6 13.5 270 270.00 160.00
16+980 20 4 7 140 140.00 104.00
17+000 20 5 10 200 200.00 132.00
17+020 20 5 10 200 200.00 132.00
17+040 20 8 22 440 440.00 216.00
17+060 20 9 27 540 540.00 244.00
17+080 20 7 17.5 350 350.00 188.00
17+100 20 8 22 440 440.00 216.00
17+120 20 7 17.5 350 350.00 188.00
17+140 20 8 22 440 440.00 216.00
17+160 20 8 22 440 440.00 216.00
17+180 15 8 22 330 330.00 162.00
17+220 15 8 22 330 330.00 162.00
17+240 20 8 22 440 440.00 216.00
17+260 20 8 22 440 440.00 216.00
17+280 20 6 13.5 270 270.00 160.00
17+300 20 6 13.5 270 270.00 160.00
17+320 20 9 27 540 540.00 244.00
17+340 20 9 27 540 540.00 244.00
17+360 20 5 10 200 200.00 132.00
17+380 15 7 17.5 262.5 262.50 141.00
17+460 10 3 4.5 45 45.00 38.00

112 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
18+020 15 6 13.5 202.5 202.50 120.00
18+040 15 6 13.5 202.5 202.50 120.00
18+080 15 4 7 105 105.00 78.00
18+100 20 8 22 440 440.00 216.00
18+120 15 6 13.5 202.5 202.50 120.00
18+300 15 4 7 105 105.00 78.00
18+320 20 10 32.5 650 650.00 272.00
18+340 20 9 27 540 540.00 244.00
18+360 20 7 17.5 350 350.00 188.00
18+380 15 5 10 150 150.00 99.00
18+440 15 4 7 105 105.00 78.00
18+460 20 6 13.5 270 270.00 160.00
18+480 20 10 32.5 650 650.00 272.00
18+500 15 9 27 405 405.00 183.00
18+560 15 9 27 405 405.00 183.00
18+580 20 9 27 540 540.00 244.00
18+600 20 6 13.5 270 270.00 160.00
18+620 15 4 7 105 105.00 78.00
18+920 15 10 32.5 487.5 487.50 204.00
18+940 20 6 13.5 270 270.00 160.00
18+960 20 5 10 200 200.00 132.00
18+980 15 4 7 105 105.00 78.00
19+040 15 3 4.5 67.5 67.50 57.00
19+060 20 5 10 200 200.00 132.00
19+080 15 5 10 150 150.00 99.00
19+120 10 4 7 70 70.00 52.00
19+160 10 6 13.5 135 135.00 80.00
19+200 10 5 10 100 100.00 66.00
19+620 15 4 7 105 105.00 78.00
19+640 15 4 7 105 105.00 78.00
19+860 15 4 7 105 105.00 78.00
19+880 15 3 4.5 67.5 67.50 57.00
20+660 10 6 13.5 135 135.00 80.00
21+360 15 9 27 405 405.00 183.00
21+380 20 10 32.5 650 650.00 272.00
21+400 20 9 27 540 540.00 244.00
21+420 20 9 27 540 540.00 244.00
21+440 20 7 17.5 350 350.00 188.00
21+460 20 7 17.5 350 350.00 188.00
21+480 20 8 22 440 440.00 216.00
21+500 15 3 4.5 67.5 67.50 57.00

113 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
21+760 15 5 10 150 150.00 99.00
21+780 20 13 52 1040 1040.00 356.00
21+800 20 12 45 900 900.00 328.00
21+820 20 11 38.5 770 770.00 300.00
21+840 20 14 59.5 1190 1190.00 384.00
21+860 20 14 59.5 1190 1190.00 384.00
21+880 20 10 32.5 650 650.00 272.00
21+900 20 10 32.5 650 650.00 272.00
21+920 15 8 22 330 330.00 162.00
21+960 10 4 7 70 70.00 52.00
22+000 15 6 13.5 202.5 202.50 120.00
22+020 20 6 13.5 270 7 17.5 350 620.00 348.00
22+040 20 4 7 140 8 22 440 580.00 320.00
22+060 20 10 32.5 650 650.00 272.00
22+080 20 15 67.5 1350 1350.00 412.00
22+100 20 13 52 1040 1040.00 356.00
22+120 20 12 45 900 900.00 328.00
22+140 15 11 38.5 577.5 577.50 225.00
22+240 15 10 32.5 487.5 9 27 405 892.50 387.00
22+260 20 13 52 1040 9 27 540 1580.00 600.00
22+280 20 13 52 1040 9 27 540 1580.00 600.00
22+300 20 13 52 1040 1040.00 356.00
22+320 20 13 52 1040 1040.00 356.00
22+340 20 14 59.5 1190 1190.00 384.00
22+360 20 15 67.5 1350 1350.00 412.00
22+380 20 15 67.5 1350 1350.00 412.00
22+400 20 13 52 1040 1040.00 356.00
22+420 20 14 59.5 1190 1190.00 384.00
22+440 20 14 59.5 1190 1190.00 384.00
22+460 15 13 52 780 780.00 267.00
22+560 10 6 13.5 135 135.00 80.00
22+680 15 13 52 780 780.00 267.00
22+700 20 13 52 1040 1040.00 356.00
22+720 20 11 38.5 770 770.00 300.00
22+740 15 10 32.5 487.5 487.50 204.00
22+820 15 5 10 150 150.00 99.00
22+840 20 11 38.5 770 770.00 300.00
22+860 20 15 67.5 1350 1350.00 412.00
22+880 20 15 67.5 1350 1350.00 412.00
22+900 20 13 52 1040 1040.00 356.00
22+920 20 12 45 900 900.00 328.00

114 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
22+940 15 10 32.5 487.5 487.50 204.00
26+120 15 3 4.5 67.5 67.50 57.00
26+140 20 3 4.5 90 90.00 76.00
26+160 20 4 7 140 140.00 104.00
26+180 20 7 17.5 350 350.00 188.00
26+200 20 10 32.5 650 650.00 272.00
26+220 20 10 32.5 650 650.00 272.00
26+240 20 11 38.5 770 770.00 300.00
26+260 20 10 32.5 650 650.00 272.00
26+280 15 9 27 405 405.00 183.00
26+640 15 3 4.5 67.5 67.50 57.00
26+660 20 4 7 140 140.00 104.00
26+680 15 9 27 405 405.00 183.00
26+740 15 9 27 405 405.00 183.00
26+760 15 4 7 105 105.00 78.00
26+860 15 5 10 150 150.00 99.00
26+880 15 6 13.5 202.5 202.50 120.00
26+940 15 4 7 105 105.00 78.00
26+960 20 7 17.5 350 350.00 188.00
26+980 15 8 22 330 330.00 162.00
27+140 15 3 4.5 67.5 67.50 57.00
27+160 20 8 22 440 440.00 216.00
27+180 15 3 4.5 67.5 67.50 57.00
27+340 15 3 4.5 67.5 67.50 57.00
27+360 15 4 7 105 105.00 78.00
28+560 15 3 4.5 67.5 67.50 57.00
28+580 20 4 7 140 140.00 104.00
28+600 20 5 10 200 200.00 132.00
28+620 20 7 17.5 350 350.00 188.00
28+640 20 10 32.5 650 650.00 272.00
28+660 20 10 32.5 650 650.00 272.00
28+680 20 9 27 540 540.00 244.00
28+700 20 10 32.5 650 650.00 272.00
28+720 20 10 32.5 650 650.00 272.00
28+740 20 11 38.5 770 770.00 300.00
28+760 15 10 32.5 487.5 487.50 204.00
29+940 15 5 10 150 150.00 99.00
29+960 20 5 10 200 200.00 132.00
29+980 20 5 10 200 200.00 132.00
30+000 20 8 22 440 440.00 216.00
30+020 15 10 32.5 487.5 487.50 204.00

115 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
30+140 15 3 4.5 67.5 67.50 57.00
30+160 20 3 4.5 90 90.00 76.00
30+180 20 3 4.5 90 90.00 76.00
30+200 20 4 7 140 140.00 104.00
30+220 20 8 22 440 440.00 216.00
30+240 20 8 22 440 440.00 216.00
30+260 20 8 22 440 440.00 216.00
30+280 20 5 10 200 200.00 132.00
30+300 20 7 17.5 350 350.00 188.00
30+320 20 6 13.5 270 270.00 160.00
30+340 20 6 13.5 270 270.00 160.00
30+360 20 9 27 540 540.00 244.00
30+380 20 8 22 440 440.00 216.00
30+400 20 7 17.5 350 350.00 188.00
30+420 20 7 17.5 350 350.00 188.00
30+440 15 6 13.5 202.5 202.50 120.00
30+820 15 6 13.5 202.5 202.50 120.00
30+840 20 3 4.5 90 90.00 76.00
30+860 20 7 17.5 350 350.00 188.00
30+880 15 3 4.5 67.5 67.50 57.00
31+060 15 3 4.5 67.5 67.50 57.00
31+080 15 5 10 150 150.00 99.00
31+140 10 4 7 70 70.00 52.00
31+180 15 7 17.5 262.5 262.50 141.00
31+200 20 6 13.5 270 270.00 160.00
31+220 20 5 10 200 200.00 132.00
31+240 15 3 4.5 67.5 67.50 57.00
31+580 15 5 10 150 150.00 99.00
31+600 20 6 13.5 270 270.00 160.00
31+620 20 8 22 440 440.00 216.00
31+640 20 9 27 540 540.00 244.00
31+660 20 9 27 540 540.00 244.00
31+680 20 6 13.5 270 270.00 160.00
31+700 20 8 22 440 440.00 216.00
31+720 20 9 27 540 540.00 244.00
31+740 20 10 32.5 650 650.00 272.00
31+760 15 11 38.5 577.5 577.50 225.00
31+980 15 0 5 10 150 150.00 99.00
32+000 20 0 8 22 440 440.00 216.00
32+020 20 0 4 7 140 140.00 104.00
32+040 20 0 5 10 200 200.00 132.00

116 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
32+060 20 0 6 13.5 270 270.00 160.00
32+080 20 0 10 32.5 650 650.00 272.00
32+100 20 0 12 45 900 900.00 328.00
32+120 15 0 12 45 675 675.00 246.00
32+320 15 5 10 150 150.00 99.00
32+340 20 6 13.5 270 270.00 160.00
32+360 20 6 13.5 270 270.00 160.00
32+380 20 12 45 900 900.00 328.00
32+400 20 13 52 1040 1040.00 356.00
32+420 20 14 59.5 1190 1190.00 384.00
32+440 20 12 45 900 900.00 328.00
32+460 20 13 52 1040 1040.00 356.00
32+480 20 9 27 540 540.00 244.00
32+500 20 7 17.5 350 350.00 188.00
32+520 20 8 22 440 440.00 216.00
32+540 20 10 32.5 650 650.00 272.00
32+560 20 10 32.5 650 650.00 272.00
32+580 20 12 45 900 900.00 328.00
32+600 20 10 32.5 650 650.00 272.00
32+620 15 6 13.5 202.5 202.50 120.00
34+140 15 3 4.5 67.5 67.50 57.00
34+160 20 4 7 140 140.00 104.00
34+180 20 3 4.5 90 90.00 76.00
34+200 15 3 4.5 67.5 67.50 57.00
36+660 15 5 10 150 150.00 99.00
36+680 20 4 7 140 140.00 104.00
36+700 15 4 7 105 105.00 78.00
36+780 15 4 7 105 105.00 78.00
36+800 20 6 13.5 270 270.00 160.00
36+820 20 6 13.5 270 270.00 160.00
36+840 20 3 4.5 90 90.00 76.00
36+860 15 3 4.5 67.5 67.50 57.00
36+920 15 3 4.5 67.5 67.50 57.00
36+940 20 4 7 140 140.00 104.00
36+960 20 3 4.5 90 90.00 76.00
36+980 20 8 22 440 440.00 216.00
37+000 15 6 13.5 202.5 202.50 120.00
37+580 15 4 7 105 105.00 78.00
37+600 20 5 10 200 200.00 132.00
37+620 20 8 22 440 440.00 216.00
37+640 20 3 4.5 90 90.00 76.00

117 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
37+660 20 11 38.5 770 770.00 300.00
37+680 20 5 10 200 200.00 132.00
37+700 15 6 13.5 202.5 202.50 120.00
37+940 10 8 22 220 220.00 108.00
38+120 15 3 4.5 67.5 67.50 57.00
38+140 20 4 7 140 140.00 104.00
38+160 20 3 4.5 90 90.00 76.00
38+180 15 3 4.5 67.5 67.50 57.00
38+280 10 3 4.5 45 45.00 38.00
38+420 15 7 17.5 262.5 262.50 141.00
38+440 20 10 32.5 650 650.00 272.00
38+460 20 11 38.5 770 770.00 300.00
38+480 20 5 10 200 200.00 132.00
38+500 20 5 10 200 200.00 132.00
38+520 15 3 4.5 67.5 67.50 57.00
38+560 15 3 4.5 67.5 67.50 57.00
38+580 15 5 10 150 150.00 99.00
38+660 10 3 4.5 45 45.00 38.00
38+740 15 5 10 150 150.00 99.00
38+760 20 3 4.5 90 90.00 76.00
38+780 20 3 4.5 90 90.00 76.00
38+800 15 3 4.5 67.5 67.50 57.00
38+960 15 6 13.5 202.5 202.50 120.00
38+980 20 6 13.5 270 270.00 160.00
39+000 20 5 10 200 200.00 132.00
39+020 20 5 10 200 200.00 132.00
39+040 20 7 17.5 350 350.00 188.00
39+060 20 6 13.5 270 270.00 160.00
39+080 20 6 13.5 270 270.00 160.00
39+100 20 4 7 140 140.00 104.00
39+120 15 3 4.5 67.5 67.50 57.00
39+920 15 6 13.5 202.5 202.50 120.00
39+940 20 14 59.5 1190 1190.00 384.00
39+960 20 11 38.5 770 770.00 300.00
39+980 20 7 17.5 350 350.00 188.00
40+000 20 9 27 540 540.00 244.00
40+020 20 7 17.5 350 350.00 188.00
40+040 15 4 7 105 105.00 78.00
40+200 15 6 13.5 202.5 202.50 120.00
40+220 20 9 27 540 540.00 244.00
40+240 20 9 27 540 540.00 244.00

118 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
40+260 20 9 27 540 540.00 244.00
40+280 20 8 22 440 440.00 216.00
40+300 20 7 17.5 350 350.00 188.00
40+320 20 5 10 200 200.00 132.00
40+340 20 6 13.5 270 270.00 160.00
40+360 20 6 13.5 270 270.00 160.00
40+380 20 7 17.5 350 350.00 188.00
40+400 20 6 13.5 270 270.00 160.00
40+420 20 8 22 440 440.00 216.00
40+440 20 7 17.5 350 350.00 188.00
40+460 15 6 13.5 202.5 202.50 120.00
40+580 15 5 10 150 150.00 99.00
40+600 20 7 17.5 350 350.00 188.00
40+620 20 4 7 140 140.00 104.00
40+640 20 3 4.5 90 90.00 76.00
40+660 20 4 7 140 140.00 104.00
40+680 15 4 7 105 105.00 78.00
41+620 15 7 17.5 262.5 262.50 141.00
41+640 20 6 13.5 270 270.00 160.00
41+660 20 7 17.5 350 350.00 188.00
41+680 20 5 10 200 200.00 132.00
41+700 15 3 4.5 67.5 67.50 57.00
42+320 15 7 17.5 262.5 262.50 141.00
42+340 20 7 17.5 350 350.00 188.00
42+360 20 9 27 540 540.00 244.00
42+380 20 8 22 440 440.00 216.00
42+400 20 5 10 200 200.00 132.00
42+420 15 3 4.5 67.5 67.50 57.00
43+000 15 3 4.5 67.5 67.50 57.00
43+020 20 4 7 140 140.00 104.00
43+040 20 3 4.5 90 90.00 76.00
43+060 20 4 7 140 140.00 104.00
43+080 20 10 32.5 650 650.00 272.00
43+100 20 9 27 0.00 244.00
43+120 20 8 22 440 440.00 216.00
43+140 15 7 17.5 262.5 262.50 141.00
43+180 15 4 7 105 105.00 78.00
43+200 20 4 7 140 140.00 104.00
43+220 15 4 7 105 105.00 78.00
43+520 15 6 13.5 202.5 202.50 120.00
43+540 20 7 17.5 350 350.00 188.00

119 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
43+560 20 7 17.5 350 350.00 188.00
43+580 20 7 17.5 350 350.00 188.00
43+600 20 6 13.5 270 270.00 160.00
43+620 20 5 10 200 200.00 132.00
43+640 20 5 10 200 200.00 132.00
43+660 20 4 7 140 140.00 104.00
43+680 20 6 13.5 270 270.00 160.00
43+700 20 4 7 140 140.00 104.00
43+720 20 3 4.5 90 90.00 76.00
43+740 20 4 7 140 140.00 104.00
43+760 20 4 7 140 140.00 104.00
43+780 15 4 7 105 105.00 78.00
43+900 10 6 13.5 135 135.00 80.00
44+640 15 6 13.5 202.5 202.50 120.00
44+660 20 9 27 540 540.00 244.00
44+680 20 9 27 540 540.00 244.00
44+700 20 8 22 440 440.00 216.00
44+720 20 8 22 440 440.00 216.00
44+740 20 8 22 440 440.00 216.00
44+760 20 9 27 540 540.00 244.00
44+780 20 9 27 540 540.00 244.00
44+800 20 8 22 440 440.00 216.00
44+820 20 4 7 140 140.00 104.00
44+840 20 4 7 140 140.00 104.00
44+860 20 4 7 140 140.00 104.00
44+880 20 4 7 140 140.00 104.00
44+900 20 7 17.5 350 350.00 188.00
44+920 20 8 22 440 440.00 216.00
44+940 20 11 38.5 770 770.00 300.00
44+960 20 5 10 200 200.00 132.00
44+980 20 4 7 140 140.00 104.00
45+000 15 4 7 105 105.00 78.00
45+400 15 4 7 105 105.00 78.00
45+420 20 5 10 200 200.00 132.00
45+440 20 10 32.5 650 650.00 272.00
45+460 20 8 22 440 440.00 216.00
45+480 20 8 22 440 440.00 216.00
45+500 20 9 27 540 540.00 244.00
45+520 20 5 10 200 200.00 132.00
45+540 20 3 4.5 90 90.00 76.00
45+560 20 3 4.5 90 90.00 76.00

120 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
45+580 20 4 7 140 140.00 104.00
45+600 20 7 17.5 350 350.00 188.00
45+620 20 9 27 540 540.00 244.00
45+640 20 7 17.5 350 350.00 188.00
45+660 15 5 10 150 150.00 99.00
47+340 15 6 13.5 202.5 202.50 120.00
47+360 20 8 22 440 440.00 216.00
47+380 20 7 17.5 350 350.00 188.00
47+400 20 7 17.5 350 350.00 188.00
47+420 20 3 4.5 90 90.00 76.00
47+440 15 3 4.5 67.5 67.50 57.00
48+540 15 5 10 150 150.00 99.00
48+560 20 5 10 200 200.00 132.00
48+580 15 9 27 405 405.00 183.00
48+620 10 5 10 100 100.00 66.00
48+940 15 3 4.5 67.5 67.50 57.00
48+960 20 6 13.5 270 270.00 160.00
48+980 20 8 22 440 440.00 216.00
49+000 20 9 27 540 540.00 244.00
49+020 20 9 27 540 540.00 244.00
49+040 20 12 45 900 900.00 328.00
49+060 15 7 17.5 262.5 262.50 141.00
50+040 15 4 7 105 105.00 78.00
50+060 20 4 7 140 140.00 104.00
50+080 20 4 7 140 140.00 104.00
50+100 20 4 7 140 140.00 104.00
50+120 20 9 27 540 540.00 244.00
50+140 20 10 32.5 650 650.00 272.00
50+160 20 10 32.5 650 650.00 272.00
50+180 20 8 22 440 440.00 216.00
50+200 15 8 22 330 330.00 162.00
50+260 15 8 22 330 330.00 162.00
50+280 20 11 38.5 770 770.00 300.00
50+300 20 8 22 440 440.00 216.00
50+320 20 5 10 200 200.00 132.00
50+340 20 6 13.5 270 270.00 160.00
50+360 20 8 22 440 440.00 216.00
50+380 15 11 38.5 577.5 577.50 225.00
50+740 15 4 7 105 105.00 78.00
50+760 20 3 4.5 90 90.00 76.00
50+780 20 3 4.5 90 90.00 76.00

121 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Gabion Retaining / Gabion Retaining /
Breast wall Breast Wall
Length Total Volume Geotextile(
Chainage Remarks
(m) Left side Right side (m3) m2)

Area( Volume Area( Volume


Height Height
m2) (m3) m2) (m3)
50+800 20 4 7 140 140.00 104.00
50+820 20 5 10 200 200.00 132.00
50+840 20 6 13.5 270 270.00 160.00
50+860 20 9 27 540 540.00 244.00
50+880 20 8 22 440 440.00 216.00
50+900 20 5 10 200 200.00 132.00
50+920 20 5 10 200 200.00 132.00
50+940 15 4 7 105 105.00 78.00
56+560 15 3 4.5 67.5 67.50 57.00
56+580 15 5 10 150 150.00 99.00
59+160 15 4 7 105 105.00 78.00
59+180 20 4 7 140 140.00 104.00
59+200 20 4 7 140 140.00 104.00
59+220 20 4 7 140 140.00 104.00
59+240 20 3 4.5 90 90.00 76.00
59+260 20 3 4.5 90 90.00 76.00
59+280 20 7 17.5 350 350.00 188.00
59+300 20 6 13.5 270 270.00 160.00
59+320 20 3 4.5 90 90.00 76.00
59+340 20 6 13.5 270 270.00 160.00
59+360 20 6 13.5 270 270.00 160.00
59+380 20 6 13.5 270 270.00 160.00
59+400 15 8 22 330 330.00 162.00
Total 0 0 0 0 0

122 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road
Planning Monitoring and Evaluation Unit

QUANTITY CALCULATIONS FOR GABION RETAINING WALL


Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)

0+080 7.00 - 6.00 13.50 94.50 94.50 53.20


0+560 10.00 - 5.00 10.00 100.00 100.00 62.00
0+580 10.00 - 3.00 4.50 45.00 45.00 34.00
0+680 10.00 6.00 13.50 135.00 - 135.00 76.00
0+700 20.00 5.00 10.00 200.00 - 200.00 124.00
0+720 20.00 3.00 4.50 90.00 - 90.00 68.00
0+740 20.00 3.00 4.50 90.00 - 90.00 68.00
0+760 20.00 3.00 4.50 90.00 - 90.00 68.00
0+780 10.00 3.00 4.50 45.00 - 45.00 34.00
1+200 10.00 - 3.00 4.50 45.00 45.00 34.00
1+220 20.00 - 3.00 4.50 90.00 90.00 68.00
1+240 20.00 - 3.00 4.50 90.00 90.00 68.00
1+260 20.00 - 5.00 10.00 200.00 200.00 124.00
1+280 20.00 - 3.00 4.50 90.00 90.00 68.00
1+300 10.00 - 4.00 7.00 70.00 70.00 48.00
1+380 10.00 - 6.00 13.50 135.00 135.00 76.00
1+400 10.00 - 3.00 4.50 45.00 45.00 34.00
1+460 7.00 3.00 4.50 31.50 - 31.50 23.80
2+820 10.00 - 5.00 10.00 100.00 100.00 62.00
2+840 20.00 - 4.00 7.00 140.00 140.00 96.00
2+860 10.00 - 8.00 22.00 220.00 220.00 104.00
2+940 10.00 - 5.00 10.00 100.00 100.00 62.00
2+960 10.00 - 5.00 10.00 100.00 100.00 62.00
3+440 7.00 3.00 4.50 31.50 - 31.50 23.80
4+000 10.00 - 4.00 7.00 70.00 70.00 48.00
4+020 20.00 - 5.00 10.00 200.00 200.00 124.00
4+040 20.00 - 4.00 7.00 140.00 140.00 96.00
4+060 20.00 - 4.00 7.00 140.00 140.00 96.00
4+080 20.00 - 5.00 10.00 200.00 200.00 124.00
4+100 20.00 - 5.00 10.00 200.00 200.00 124.00
4+120 20.00 - 6.00 13.50 270.00 270.00 152.00
4+140 10.00 - 4.00 7.00 70.00 70.00 48.00
4+180 10.00 - 5.00 10.00 100.00 100.00 62.00
4+200 10.00 - 4.00 7.00 70.00 70.00 48.00
5+260 10.00 - 3.00 4.50 45.00 45.00 34.00
5+280 20.00 - 4.00 7.00 140.00 140.00 96.00
5+300 20.00 - 4.00 7.00 140.00 140.00 96.00
5+320 20.00 - 5.00 10.00 200.00 200.00 124.00
5+340 10.00 - 5.00 10.00 100.00 100.00 62.00
5+400 10.00 - 4.00 7.00 70.00 70.00 48.00
5+420 10.00 - 6.00 13.50 135.00 135.00 76.00
5+520 7.00 - 6.00 13.50 94.50 94.50 53.20
5+580 10.00 - 5.00 10.00 100.00 100.00 62.00
5+600 10.00 - 4.00 7.00 70.00 70.00 48.00
5+640 10.00 - 4.00 7.00 70.00 70.00 48.00
5+660 20.00 - 6.00 13.50 270.00 270.00 152.00
5+680 20.00 - 8.00 22.00 440.00 440.00 208.00
5+700 20.00 - 9.00 27.00 540.00 540.00 236.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
5+720 20.00 - 10.00 32.50 650.00 650.00 264.00
5+740 20.00 - 4.00 7.00 140.00 140.00 96.00
5+760 20.00 - 8.00 22.00 440.00 440.00 208.00
5+780 20.00 - 8.00 22.00 440.00 440.00 208.00
5+800 20.00 - 6.00 13.50 270.00 270.00 152.00
5+820 20.00 - 6.00 13.50 270.00 270.00 152.00
5+840 20.00 - 7.00 17.50 350.00 350.00 180.00
5+860 20.00 - 6.00 13.50 270.00 270.00 152.00
5+880 20.00 - 4.00 7.00 140.00 140.00 96.00
5+900 20.00 - 5.00 10.00 200.00 200.00 124.00
5+920 10.00 - 4.00 7.00 70.00 70.00 48.00
6+020 10.00 - 8.00 22.00 220.00 220.00 104.00
6+040 10.00 - 5.00 10.00 100.00 100.00 62.00
6+160 10.00 - 7.00 17.50 175.00 175.00 90.00
6+180 20.00 - 9.00 27.00 540.00 540.00 236.00
6+200 20.00 - 5.00 10.00 200.00 200.00 124.00
6+220 10.00 - 5.00 10.00 100.00 100.00 62.00
6+260 10.00 - 4.00 7.00 70.00 70.00 48.00
6+280 20.00 - 4.00 7.00 140.00 140.00 96.00
6+300 20.00 - 4.00 7.00 140.00 140.00 96.00
6+320 20.00 - 6.00 13.50 270.00 270.00 152.00
6+340 20.00 - 10.00 32.50 650.00 650.00 264.00
6+360 20.00 - 10.00 32.50 650.00 650.00 264.00
6+380 20.00 - 10.00 32.50 650.00 650.00 264.00
6+400 20.00 - 10.00 32.50 650.00 650.00 264.00
6+420 20.00 - 10.00 32.50 650.00 650.00 264.00
6+440 20.00 - 10.00 32.50 650.00 650.00 264.00
6+460 20.00 - 10.00 32.50 650.00 650.00 264.00
6+480 20.00 10.00 32.50 650.00 9.00 27.00 540.00 1,190.00 516.00
6+500 20.00 8.00 22.00 440.00 - 440.00 208.00
6+520 20.00 9.00 27.00 540.00 - 540.00 236.00
6+540 20.00 10.00 32.50 650.00 - 650.00 264.00
6+560 10.00 5.00 10.00 100.00 - 100.00 62.00
6+620 10.00 4.00 7.00 70.00 - 70.00 48.00
6+640 10.00 6.00 13.50 135.00 - 135.00 76.00
13+820 10.00 - 7.00 17.50 175.00 175.00 90.00
13+840 20.00 - 9.00 27.00 540.00 540.00 236.00
13+860 20.00 - 8.00 22.00 440.00 440.00 208.00
13+880 10.00 - 6.00 13.50 135.00 135.00 76.00
13+940 10.00 - 8.00 22.00 220.00 220.00 104.00
13+960 20.00 - 8.00 22.00 440.00 440.00 208.00
13+980 10.00 - 6.00 13.50 135.00 135.00 76.00
14+140 10.00 - 4.00 7.00 70.00 70.00 48.00
14+160 20.00 - 6.00 13.50 270.00 270.00 152.00
14+180 20.00 - 10.00 32.50 650.00 650.00 264.00
14+200 20.00 - 8.00 22.00 440.00 440.00 208.00
14+220 20.00 - 7.00 17.50 350.00 350.00 180.00
14+240 20.00 - 6.00 13.50 270.00 270.00 152.00
14+260 20.00 - 8.00 22.00 440.00 440.00 208.00
14+280 20.00 - 4.00 7.00 140.00 140.00 96.00
14+300 20.00 - 10.00 32.50 650.00 650.00 264.00
14+320 20.00 - 10.00 32.50 650.00 650.00 264.00
14+340 20.00 - 7.00 17.50 350.00 350.00 180.00
14+360 10.00 - 6.00 13.50 135.00 135.00 76.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
14+440 7.00 - 6.00 13.50 94.50 94.50 53.20
14+640 10.00 - 6.00 13.50 135.00 135.00 76.00
14+660 20.00 - 6.00 13.50 270.00 270.00 152.00
14+680 20.00 - 6.00 13.50 270.00 270.00 152.00
14+700 20.00 - 6.00 13.50 270.00 270.00 152.00
14+720 20.00 - 4.00 7.00 140.00 140.00 96.00
14+740 20.00 - 4.00 7.00 140.00 140.00 96.00
14+760 20.00 - 4.00 7.00 140.00 140.00 96.00
14+780 10.00 - 7.00 17.50 175.00 175.00 90.00
14+860 10.00 - 4.00 7.00 70.00 70.00 48.00
14+880 20.00 - 6.00 13.50 270.00 270.00 152.00
14+900 20.00 - 4.00 7.00 140.00 140.00 96.00
14+920 20.00 - 3.00 4.50 90.00 90.00 68.00
14+940 20.00 - 4.00 7.00 140.00 140.00 96.00
14+960 10.00 - 4.00 7.00 70.00 70.00 48.00
15+020 10.00 - 3.00 4.50 45.00 45.00 34.00
15+040 20.00 - 4.00 7.00 140.00 140.00 96.00
15+060 10.00 - 3.00 4.50 45.00 45.00 34.00
15+120 10.00 - 4.00 7.00 70.00 70.00 48.00
15+140 10.00 - 4.00 7.00 70.00 70.00 48.00
15+200 10.00 - 3.00 4.50 45.00 45.00 34.00
15+220 10.00 - 3.00 4.50 45.00 45.00 34.00
15+280 10.00 - 4.00 7.00 70.00 70.00 48.00
15+300 20.00 - 4.00 7.00 140.00 140.00 96.00
15+320 10.00 - 3.00 4.50 45.00 45.00 34.00
15+380 10.00 - 3.00 4.50 45.00 45.00 34.00
15+400 20.00 - 4.00 7.00 140.00 140.00 96.00
15+420 20.00 - 3.00 4.50 90.00 90.00 68.00
15+440 20.00 - 4.00 7.00 140.00 140.00 96.00
15+460 20.00 - 5.00 10.00 200.00 200.00 124.00
15+480 20.00 - 4.00 7.00 140.00 140.00 96.00
15+500 10.00 - 4.00 7.00 70.00 70.00 48.00
15+540 7.00 - 3.00 4.50 31.50 31.50 23.80
15+660 10.00 - 4.00 7.00 70.00 70.00 48.00
15+680 20.00 - 3.00 4.50 90.00 90.00 68.00
15+700 20.00 - 4.00 7.00 140.00 140.00 96.00
15+720 20.00 - 3.00 4.50 90.00 90.00 68.00
15+740 20.00 - 3.00 4.50 90.00 90.00 68.00
15+760 20.00 - 4.00 7.00 140.00 140.00 96.00
15+780 20.00 - 4.00 7.00 140.00 140.00 96.00
15+800 20.00 - 3.00 4.50 90.00 90.00 68.00
15+820 10.00 - 3.00 4.50 45.00 45.00 34.00
15+860 10.00 - 5.00 10.00 100.00 100.00 62.00
15+880 20.00 - 3.00 4.50 90.00 90.00 68.00
15+900 20.00 - 3.00 4.50 90.00 90.00 68.00
15+920 20.00 - 3.00 4.50 90.00 90.00 68.00
15+940 20.00 - 5.00 10.00 200.00 200.00 124.00
15+960 20.00 - 9.00 27.00 540.00 540.00 236.00
15+980 20.00 - 9.00 27.00 540.00 540.00 236.00
16+000 20.00 - 5.00 10.00 200.00 200.00 124.00
16+020 20.00 - 6.00 13.50 270.00 270.00 152.00
16+040 20.00 - 7.00 17.50 350.00 350.00 180.00
16+060 20.00 - 5.00 10.00 200.00 200.00 124.00
16+080 20.00 - 5.00 10.00 200.00 200.00 124.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
16+100 20.00 - 6.00 13.50 270.00 270.00 152.00
16+120 20.00 - 7.00 17.50 350.00 350.00 180.00
16+140 20.00 - 10.00 32.50 650.00 650.00 264.00
16+160 20.00 - 10.00 32.50 650.00 650.00 264.00
16+180 10.00 - 10.00 32.50 325.00 325.00 132.00
16+240 10.00 5.00 10.00 100.00 - 100.00 62.00
16+260 20.00 5.00 10.00 200.00 - 200.00 124.00
16+280 20.00 9.00 27.00 540.00 - 540.00 236.00
16+300 20.00 9.00 27.00 540.00 - 540.00 236.00
16+320 20.00 7.00 17.50 350.00 - 350.00 180.00
16+340 20.00 5.00 10.00 200.00 - 200.00 124.00
16+360 20.00 8.00 22.00 440.00 - 440.00 208.00
16+380 10.00 9.00 27.00 270.00 - 270.00 118.00
16+820 10.00 - 4.00 7.00 70.00 70.00 48.00
16+840 10.00 - 3.00 4.50 45.00 45.00 34.00
16+880 10.00 - 7.00 17.50 175.00 175.00 90.00
16+900 20.00 - 7.00 17.50 350.00 350.00 180.00
16+920 20.00 - 6.00 13.50 270.00 270.00 152.00
16+940 20.00 - 8.00 22.00 440.00 440.00 208.00
16+960 20.00 - 6.00 13.50 270.00 270.00 152.00
16+980 20.00 - 7.00 17.50 350.00 350.00 180.00
17+000 20.00 - 6.00 13.50 270.00 270.00 152.00
17+020 20.00 - 7.00 17.50 350.00 350.00 180.00
17+040 20.00 - 7.00 17.50 350.00 350.00 180.00
17+060 20.00 - 6.00 13.50 270.00 270.00 152.00
17+080 20.00 - 8.00 22.00 440.00 440.00 208.00
17+100 20.00 - 9.00 27.00 540.00 540.00 236.00
17+120 20.00 - 8.00 22.00 440.00 440.00 208.00
17+140 10.00 - 8.00 22.00 220.00 220.00 104.00
17+180 10.00 - 4.00 7.00 70.00 70.00 48.00
17+200 10.00 - 5.00 10.00 100.00 100.00 62.00
17+380 10.00 - 5.00 10.00 100.00 100.00 62.00
17+400 20.00 - 4.00 7.00 140.00 140.00 96.00
17+420 10.00 - 6.00 13.50 135.00 135.00 76.00
17+480 10.00 - 9.00 27.00 270.00 270.00 118.00
17+500 10.00 - 10.00 32.50 325.00 325.00 132.00
17+800 7.00 - 3.00 4.50 31.50 31.50 23.80
17+840 10.00 - 6.00 13.50 135.00 135.00 76.00
17+860 10.00 - 6.00 13.50 135.00 135.00 76.00
17+920 10.00 - 5.00 10.00 100.00 100.00 62.00
17+940 20.00 - 5.00 10.00 200.00 200.00 124.00
17+960 10.00 - 4.00 7.00 70.00 70.00 48.00
18+020 10.00 - 7.00 17.50 175.00 175.00 90.00
18+040 10.00 - 9.00 27.00 270.00 270.00 118.00
18+080 10.00 - 6.00 13.50 135.00 135.00 76.00
18+100 10.00 - 5.00 10.00 100.00 100.00 62.00
18+180 10.00 - 6.00 13.50 135.00 135.00 76.00
18+200 20.00 - 6.00 13.50 270.00 270.00 152.00
18+220 20.00 - 5.00 10.00 200.00 200.00 124.00
18+240 10.00 - 6.00 13.50 135.00 135.00 76.00
18+300 10.00 - 8.00 22.00 220.00 220.00 104.00
18+320 20.00 - 9.00 27.00 540.00 540.00 236.00
18+340 20.00 - 9.00 27.00 540.00 540.00 236.00
18+360 20.00 - 7.00 17.50 350.00 350.00 180.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
18+380 20.00 - 6.00 13.50 270.00 270.00 152.00
18+400 20.00 - 7.00 17.50 350.00 350.00 180.00
18+420 10.00 - 8.00 22.00 220.00 220.00 104.00
18+460 10.00 - 10.00 32.50 325.00 325.00 132.00
18+480 10.00 - 9.00 27.00 270.00 270.00 118.00
18+660 10.00 - 5.00 10.00 100.00 100.00 62.00
18+680 20.00 - 6.00 13.50 270.00 270.00 152.00
18+700 20.00 - 5.00 10.00 200.00 200.00 124.00
18+720 20.00 - 5.00 10.00 200.00 200.00 124.00
18+740 20.00 - 6.00 13.50 270.00 270.00 152.00
18+760 20.00 - 6.00 13.50 270.00 270.00 152.00
18+780 20.00 - 7.00 17.50 350.00 350.00 180.00
18+800 10.00 - 6.00 13.50 135.00 135.00 76.00
18+900 10.00 - 4.00 7.00 70.00 70.00 48.00
18+920 20.00 - 5.00 10.00 200.00 200.00 124.00
18+940 20.00 - 6.00 13.50 270.00 270.00 152.00
18+960 20.00 - 6.00 13.50 270.00 270.00 152.00
18+980 10.00 - 3.00 4.50 45.00 45.00 34.00
19+040 7.00 - 3.00 4.50 31.50 31.50 23.80
19+160 10.00 - 8.00 22.00 220.00 220.00 104.00
19+180 20.00 - 10.00 32.50 650.00 650.00 264.00
19+200 20.00 - 7.00 17.50 350.00 350.00 180.00
19+220 20.00 - 6.00 13.50 270.00 270.00 152.00
19+240 20.00 - 6.00 13.50 270.00 270.00 152.00
19+260 20.00 - 6.00 13.50 270.00 270.00 152.00
19+280 20.00 - 6.00 13.50 270.00 270.00 152.00
19+300 20.00 - 7.00 17.50 350.00 350.00 180.00
19+320 20.00 - 8.00 22.00 440.00 440.00 208.00
19+340 20.00 - 7.00 17.50 350.00 350.00 180.00
19+360 20.00 - 8.00 22.00 440.00 440.00 208.00
19+380 20.00 - 6.00 13.50 270.00 270.00 152.00
19+400 20.00 - 5.00 10.00 200.00 200.00 124.00
19+420 20.00 - 5.00 10.00 200.00 200.00 124.00
19+440 20.00 - 5.00 10.00 200.00 200.00 124.00
19+460 20.00 - 7.00 17.50 350.00 350.00 180.00
19+480 20.00 - 8.00 22.00 440.00 440.00 208.00
19+500 20.00 - 6.00 13.50 270.00 270.00 152.00
19+520 20.00 - 4.00 7.00 140.00 140.00 96.00
19+540 10.00 - 4.00 7.00 70.00 70.00 48.00
19+620 10.00 - 3.00 4.50 45.00 45.00 34.00
19+640 20.00 - 3.00 4.50 90.00 90.00 68.00
19+660 10.00 - 3.00 4.50 45.00 45.00 34.00
19+900 7.00 - 3.00 4.50 31.50 31.50 23.80
19+940 7.00 - 3.00 4.50 31.50 31.50 23.80
20+060 7.00 - 6.00 13.50 94.50 94.50 53.20
20+120 7.00 - 3.00 4.50 31.50 31.50 23.80
20+320 10.00 - 6.00 13.50 135.00 135.00 76.00
20+340 10.00 - 3.00 4.50 45.00 45.00 34.00
20+420 7.00 - 5.00 10.00 70.00 70.00 43.40
20+500 10.00 - 5.00 10.00 100.00 100.00 62.00
20+520 20.00 - 4.00 7.00 140.00 140.00 96.00
20+540 20.00 - 8.00 22.00 440.00 440.00 208.00
20+560 10.00 - 6.00 13.50 135.00 135.00 76.00
20+620 10.00 - 6.00 13.50 135.00 135.00 76.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
20+640 20.00 - 5.00 10.00 200.00 200.00 124.00
20+660 20.00 - 5.00 10.00 200.00 200.00 124.00
20+680 20.00 - 9.00 27.00 540.00 540.00 236.00
20+700 20.00 - 9.00 27.00 540.00 540.00 236.00
20+720 20.00 - 7.00 17.50 350.00 350.00 180.00
20+740 20.00 - 8.00 22.00 440.00 440.00 208.00
20+760 20.00 - 8.00 22.00 440.00 440.00 208.00
20+780 20.00 - 6.00 13.50 270.00 270.00 152.00
20+800 20.00 - 7.00 17.50 350.00 350.00 180.00
20+820 20.00 - 9.00 27.00 540.00 540.00 236.00
20+840 20.00 - 10.00 32.50 650.00 650.00 264.00
20+860 20.00 - 10.00 32.50 650.00 650.00 264.00
20+880 20.00 - 10.00 32.50 650.00 650.00 264.00
20+900 20.00 - 10.00 32.50 650.00 650.00 264.00
20+920 20.00 - 10.00 32.50 650.00 650.00 264.00
20+940 20.00 - 10.00 32.50 650.00 650.00 264.00
20+960 20.00 - 10.00 32.50 650.00 650.00 264.00
20+980 20.00 - 10.00 32.50 650.00 650.00 264.00
21+000 20.00 - 4.00 7.00 140.00 140.00 96.00
21+020 20.00 - 5.00 10.00 200.00 200.00 124.00
21+040 20.00 - 6.00 13.50 270.00 270.00 152.00
21+060 20.00 - 5.00 10.00 200.00 200.00 124.00
21+080 20.00 - 5.00 10.00 200.00 200.00 124.00
21+100 20.00 - 7.00 17.50 350.00 350.00 180.00
21+120 10.00 - 4.00 7.00 70.00 70.00 48.00
21+160 7.00 - 5.00 10.00 70.00 70.00 43.40
21+200 10.00 - 7.00 17.50 175.00 175.00 90.00
21+220 20.00 - 7.00 17.50 350.00 350.00 180.00
21+240 20.00 - 9.00 27.00 540.00 540.00 236.00
21+260 10.00 - 5.00 10.00 100.00 100.00 62.00
21+420 10.00 4.00 7.00 70.00 - 70.00 48.00
21+440 20.00 8.00 22.00 440.00 - 440.00 208.00
21+460 20.00 8.00 22.00 440.00 - 440.00 208.00
21+480 20.00 7.00 17.50 350.00 - 350.00 180.00
21+500 20.00 9.00 27.00 540.00 - 540.00 236.00
21+520 20.00 8.00 22.00 440.00 - 440.00 208.00
21+540 10.00 5.00 10.00 100.00 - 100.00 62.00
21+820 10.00 - 5.00 10.00 100.00 100.00 62.00
21+840 20.00 - 7.00 17.50 350.00 350.00 180.00
21+860 20.00 - 9.00 27.00 540.00 540.00 236.00
21+880 20.00 - 10.00 32.50 650.00 650.00 264.00
21+900 20.00 - 10.00 32.50 650.00 650.00 264.00
21+920 20.00 - 7.00 17.50 350.00 350.00 180.00
21+940 10.00 - 5.00 10.00 100.00 100.00 62.00
22+080 10.00 8.00 22.00 220.00 - 220.00 104.00
22+100 20.00 9.00 27.00 540.00 - 540.00 236.00
22+120 20.00 9.00 27.00 540.00 - 540.00 236.00
22+140 20.00 9.00 27.00 540.00 - 540.00 236.00
22+160 10.00 7.00 17.50 175.00 - 175.00 90.00
22+260 10.00 - 7.00 17.50 175.00 175.00 90.00
22+280 20.00 - 7.00 17.50 350.00 350.00 180.00
22+300 20.00 - 6.00 13.50 270.00 270.00 152.00
22+320 20.00 - 7.00 17.50 350.00 350.00 180.00
22+340 20.00 - 5.00 10.00 200.00 200.00 124.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
22+360 10.00 - 4.00 7.00 70.00 70.00 48.00
22+520 10.00 5.00 10.00 100.00 - 100.00 62.00
22+540 20.00 7.00 17.50 350.00 - 350.00 180.00
22+560 10.00 10.00 32.50 325.00 - 325.00 132.00
22+700 10.00 - 5.00 10.00 100.00 100.00 62.00
22+720 20.00 - 5.00 10.00 200.00 200.00 124.00
22+740 20.00 - 7.00 17.50 350.00 350.00 180.00
22+760 20.00 - 10.00 32.50 650.00 650.00 264.00
22+780 20.00 - 10.00 32.50 650.00 650.00 264.00
22+800 10.00 - 10.00 32.50 325.00 325.00 132.00
23+300 10.00 - 4.00 7.00 70.00 70.00 48.00
23+320 20.00 - 6.00 13.50 270.00 270.00 152.00
23+340 20.00 - 8.00 22.00 440.00 440.00 208.00
23+360 20.00 - 6.00 13.50 270.00 270.00 152.00
23+380 10.00 - 6.00 13.50 135.00 135.00 76.00
23+440 10.00 - 6.00 13.50 135.00 135.00 76.00
23+460 20.00 - 10.00 32.50 650.00 650.00 264.00
23+480 10.00 - 10.00 32.50 325.00 325.00 132.00
23+700 10.00 - 4.00 7.00 70.00 70.00 48.00
23+720 10.00 - 4.00 7.00 70.00 70.00 48.00
23+800 10.00 - 6.00 13.50 135.00 135.00 76.00
23+820 20.00 - 6.00 13.50 270.00 270.00 152.00
23+840 20.00 - 4.00 7.00 140.00 140.00 96.00
23+860 20.00 - 4.00 7.00 140.00 140.00 96.00
23+880 20.00 - 4.00 7.00 140.00 140.00 96.00
23+900 20.00 - 8.00 22.00 440.00 440.00 208.00
23+920 20.00 - 9.00 27.00 540.00 540.00 236.00
23+940 10.00 - 7.00 17.50 175.00 175.00 90.00
24+000 10.00 - 6.00 13.50 135.00 135.00 76.00
24+020 10.00 - 6.00 13.50 135.00 135.00 76.00
24+140 10.00 - 3.00 4.50 45.00 45.00 34.00
24+160 10.00 - 3.00 4.50 45.00 45.00 34.00
24+880 10.00 - 6.00 13.50 135.00 135.00 76.00
24+900 20.00 - 9.00 27.00 540.00 540.00 236.00
24+920 10.00 - 8.00 22.00 220.00 220.00 104.00
25+040 10.00 - 5.00 10.00 100.00 100.00 62.00
25+060 20.00 - 6.00 13.50 270.00 270.00 152.00
25+080 20.00 - 3.00 4.50 90.00 90.00 68.00
25+100 10.00 - 6.00 13.50 135.00 135.00 76.00
25+200 7.00 - 5.00 10.00 70.00 70.00 43.40
26+480 7.00 5.00 10.00 70.00 - 70.00 43.40
27+000 10.00 3.00 4.50 45.00 - 45.00 34.00
27+020 10.00 3.00 4.50 45.00 - 45.00 34.00
27+080 10.00 3.00 4.50 45.00 - 45.00 34.00
27+100 20.00 5.00 10.00 200.00 - 200.00 124.00
27+120 20.00 5.00 10.00 200.00 - 200.00 124.00
27+140 10.00 5.00 10.00 100.00 - 100.00 62.00
27+260 7.00 5.00 10.00 70.00 - 70.00 43.40
27+320 10.00 3.00 4.50 45.00 - 45.00 34.00
27+340 20.00 3.00 4.50 90.00 - 90.00 68.00
27+360 20.00 3.00 4.50 90.00 - 90.00 68.00
27+380 10.00 5.00 10.00 100.00 - 100.00 62.00
27+460 10.00 4.00 7.00 70.00 - 70.00 48.00
27+480 10.00 4.00 7.00 70.00 - 70.00 48.00
QUANTITY CALCULATIONS FOR GABION RETAINING WALL
Name of the road:…………………………….
Chainage:0+000 to ….
Structure Details
Left Right Geotextile
Ch. Length (m) Total Vol (m3) Remarks
Height Area Height Area m2
Vol (m3) Vol (m3)
(m) (m2) (m) (m2)
27+520 10.00 6.00 13.50 135.00 - 135.00 76.00
27+540 20.00 3.00 4.50 90.00 - 90.00 68.00
27+560 20.00 4.00 7.00 140.00 - 140.00 96.00
27+580 20.00 5.00 10.00 200.00 - 200.00 124.00
27+600 10.00 8.00 22.00 220.00 - 220.00 104.00
27+620 10.00 4.00 7.00 70.00 - 70.00 48.00

Total 5,969.00 13,203.00 78,257.00 91,460.00 46,830.20


Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

Masonry Retaining Structure Quantity Calculation


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total Geotextile
Length (m) PCC for Granular Filter
Volume (m3) (m2)
the base material (m3)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

0+440 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87


0+460 10.00 - - 2.25 2.144 21.44 21.44 1.35 5.93 2.13
0+500 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
0+520 20.00 - - 2.00 1.751 35.02 35.02 2.40 10.40 3.74
0+540 10.00 - - 3.00 3.554 35.54 35.54 1.80 8.10 2.92
1+500 7.00 2.50 2.575 18.03 - - 18.03 1.05 4.66 1.68
2+440 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
2+460 20.00 2.50 2.575 51.50 - - 51.50 3.00 13.30 4.79
2+480 10.00 2.50 2.575 25.75 - - 25.75 1.50 6.65 2.39
2+620 10.00 - - 2.50 2.575 25.75 25.75 1.50 6.65 2.39
2+640 10.00 - - 3.50 4.687 46.87 46.87 2.10 9.58 3.45
2+740 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
2+760 20.00 - - 3.00 3.554 71.08 71.08 3.60 16.20 5.83
2+780 20.00 - - 2.00 1.751 35.02 35.02 2.40 10.40 3.74
2+800 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
3+280 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
3+300 20.00 3.25 4.101 82.02 - - 82.02 3.90 17.70 6.37
3+320 20.00 2.75 3.045 60.90 - - 60.90 3.30 14.75 5.31
3+340 20.00 2.00 1.751 35.02 - - 35.02 2.40 10.40 3.74
3+360 20.00 3.50 4.687 93.74 - - 93.74 4.20 19.15 6.89
3+380 20.00 1.75 1.397 27.94 - - 27.94 2.10 9.00 3.24

131 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total Geotextile
Length (m) PCC for Granular Filter
Volume (m3) (m2)
the base material (m3)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

3+400 10.00 3.00 3.554 35.54 - - 35.54 1.80 8.10 2.92


3+460 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
3+600 7.00 1.50 1.082 7.57 - - 7.57 0.63 2.66 0.96
5+000 7.00 - - 2.00 1.751 12.26 12.26 0.84 3.64 1.31
5+240 7.00 - - 1.50 1.082 7.57 7.57 0.63 2.66 0.96
5+360 7.00 - - 2.00 1.751 12.26 12.26 0.84 3.64 1.31
5+440 10.00 - - 1.25 0.805 8.05 8.05 0.75 3.13 1.13
5+460 10.00 - - 2.50 2.575 25.75 25.75 1.50 6.65 2.39
5+500 7.00 - - 1.25 0.805 5.64 5.64 0.53 2.19 0.79
5+560 7.00 - - 2.25 2.144 15.01 15.01 0.95 4.15 1.49
5+940 10.00 - - 1.00 0.567 5.67 5.67 0.60 2.50 0.90
5+960 10.00 - - 2.75 3.045 30.45 30.45 1.65 7.38 2.66
6+000 7.00 - - 3.20 3.988 27.92 27.92 1.34 6.09 2.19
6+060 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
6+080 20.00 - - 3.00 3.554 71.08 71.08 3.60 16.20 5.83
6+100 20.00 - - 1.50 1.082 21.64 21.64 1.80 7.60 2.74
6+120 20.00 - - 3.00 3.554 71.08 71.08 3.60 16.20 5.83
6+140 10.00 - - 2.00 1.751 17.51 17.51 1.20 5.20 1.87
6+240 7.00 - - 1.75 1.397 9.78 9.78 0.74 3.15 1.13
6+660 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
6+740 7.00 - - 2.50 2.575 18.03 18.03 1.05 4.66 1.68
6+800 7.00 - - 1.25 0.805 5.64 5.64 0.53 2.19 0.79
13+900 7.00 - - 2.75 3.045 21.32 21.32 1.16 5.16 1.86
14+100 10.00 - - 1.50 1.082 10.82 10.82 0.90 3.80 1.37
14+120 10.00 - - 1.5 1.082 10.82 10.82 0.90 3.80 1.37
14+380 7.00 - - 3.0 3.554 24.88 24.88 1.26 5.67 2.04
14+420 7.00 - - 1.8 1.465 10.26 10.26 0.76 3.26 1.17
14+460 10.00 - - 2.8 3.144 31.44 31.44 1.68 7.53 2.71

132 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total Geotextile
Length (m) PCC for Granular Filter
Volume (m3) (m2)
the base material (m3)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

14+480 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87


14+800 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
14+840 7.00 - - 1.5 1.082 7.57 7.57 0.63 2.66 0.96
15+080 10.00 - - 2.8 3.144 31.44 31.44 1.68 7.53 2.71
15+100 10.00 - - 1.8 1.465 14.65 14.65 1.08 4.65 1.67
15+160 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
15+240 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
15+260 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
15+340 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
15+360 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
15+520 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
15+560 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
15+640 7.00 - - 3.0 3.554 24.88 24.88 1.26 5.67 2.04
15+840 7.00 - - 1.8 1.465 10.26 10.26 0.76 3.26 1.17
16+200 7.00 1.50 1.082 7.57 - - 7.57 0.63 2.66 0.96
17+160 7.00 - - 3.3 4.215 29.51 29.51 1.39 6.30 2.27
17+260 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
17+280 10.00 - - 3.5 4.687 46.87 46.87 2.10 9.58 3.45
17+520 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
17+700 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
17+720 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39
17+780 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
17+880 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
17+980 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
18+060 7.00 - - 3.0 3.554 24.88 24.88 1.26 5.67 2.04
18+120 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
18+140 20.00 - - 1.0 0.567 11.34 11.34 1.20 5.00 1.80
18+160 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39

133 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total Geotextile
Length (m) PCC for Granular Filter
Volume (m3) (m2)
the base material (m3)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

18+260 10.00 - - 2.8 3.144 31.44 31.44 1.68 7.53 2.71


18+280 10.00 - - 3.3 4.215 42.15 42.15 1.98 9.00 3.24
18+440 7.00 - - 1.5 1.082 7.57 7.57 0.63 2.66 0.96
18+560 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
18+580 10.00 - - 1.5 1.082 10.82 10.82 0.90 3.80 1.37
18+880 7.00 - - 1.0 0.567 3.97 3.97 0.42 1.75 0.63
19+560 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
19+580 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
20+080 10.00 - - 1.5 1.082 10.82 10.82 0.90 3.80 1.37
20+100 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
20+220 10.00 - - 2.8 3.144 31.44 31.44 1.68 7.53 2.71
20+240 20.00 - - 2.0 1.751 35.02 35.02 2.40 10.40 3.74
20+260 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
20+300 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
20+360 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
20+400 7.00 - - 3.0 3.554 24.88 24.88 1.26 5.67 2.04
20+480 7.00 - - 3.0 3.554 24.88 24.88 1.26 5.67 2.04
21+140 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
21+180 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
22+060 7.00 2.50 2.575 18.03 - - 18.03 1.05 4.66 1.68
22+240 7.00 - - 2.8 3.144 22.01 22.01 1.18 5.27 1.90
22+580 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
23+400 10.00 - - 2.8 3.144 31.44 31.44 1.68 7.53 2.71
23+420 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
23+500 7.00 - - 2.5 2.575 18.03 18.03 1.05 4.66 1.68
23+740 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39
23+760 20.00 - - 2.5 2.575 51.50 51.50 3.00 13.30 4.79
23+780 10.00 - - 3.5 4.687 46.87 46.87 2.10 9.58 3.45

134 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total Geotextile
Length (m) PCC for Granular Filter
Volume (m3) (m2)
the base material (m3)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

23+980 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31


24+360 7.00 3.00 3.554 24.88 - - 24.88 1.26 5.67 2.04
24+460 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
24+480 20.00 3.00 3.554 71.08 - - 71.08 3.60 16.20 5.83
24+500 20.00 2.50 2.575 51.50 - - 51.50 3.00 13.30 4.79
24+520 20.00 3.50 4.687 93.74 - - 93.74 4.20 19.15 6.89
24+540 10.00 3.00 3.554 35.54 - - 35.54 1.80 8.10 2.92
24+620 10.00 - - 1.3 0.857 8.57 8.57 0.78 3.28 1.18
24+640 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
24+720 10.00 - - 3.0 3.554 35.54 35.54 1.80 8.10 2.92
24+740 20.00 - - 2.0 1.751 35.02 35.02 2.40 10.40 3.74
24+760 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
24+800 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
24+820 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
24+860 7.00 - - 3.5 4.687 32.81 32.81 1.47 6.70 2.41
24+980 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
25+000 20.00 - - 2.0 1.751 35.02 35.02 2.40 10.40 3.74
25+020 10.00 - - 2.0 1.751 17.51 17.51 1.20 5.20 1.87
25+120 10.00 - - 3.5 4.687 46.87 46.87 2.10 9.58 3.45
25+140 20.00 - - 2.8 3.144 62.88 62.88 3.36 15.05 5.42
25+160 20.00 - - 3.5 4.687 93.74 93.74 4.20 19.15 6.89
25+180 10.00 - - 2.5 2.575 25.75 25.75 1.50 6.65 2.39
25+220 7.00 - - 2.0 1.751 12.26 12.26 0.84 3.64 1.31
26+380 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
26+960 10.00 3.50 4.687 46.87 - - 46.87 2.10 9.58 3.45
26+980 10.00 3.50 4.687 46.87 - - 46.87 2.10 9.58 3.45
27+180 10.00 3.00 3.554 35.54 - - 35.54 1.80 8.10 2.92
27+200 20.00 3.00 3.554 71.08 - - 71.08 3.60 16.20 5.83

135 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Left side Right side Volume of 0.25m thk.


Total Geotextile
Length (m) PCC for Granular Filter
Volume (m3) (m2)
the base material (m3)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

27+220 20.00 2.00 1.751 35.02 - - 35.02 2.40 10.40 3.74


27+240 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
27+280 7.00 2.50 2.575 18.03 - - 18.03 1.05 4.66 1.68
27+400 10.00 2.00 1.751 17.51 - - 17.51 1.20 5.20 1.87
27+420 20.00 3.50 4.687 93.74 - - 93.74 4.20 19.15 6.89
27+440 10.00 2.25 2.144 21.44 - - 21.44 1.35 5.93 2.13
27+500 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31
27+800 7.00 2.00 1.751 12.26 - - 12.26 0.84 3.64 1.31

Total 1510.00 1270.05 2551.97 3822.02 217.81 964.33 347.10

136 of 323
Remarks

137 of 323
Remarks

138 of 323
Remarks

139 of 323
Remarks

140 of 323
Remarks

141 of 323
Remarks

142 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

Masonry Retaining Structure Quantity Calculation


Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Remarks
Left side Right side Volume of 0.25m thk.
Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Area(m2) Volume (m ) 3
Height Area(m2) Volume (m ) 3

0+100 10 5 4.957 0 - 1.26 13.18 4.74


0+120 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+140 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+160 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
0+180 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
0+200 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
0+220 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
0+240 20 5 4.957 99.14 3 2.141 42.82 141.96 4.02 42.15 15.17
0+260 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+280 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+300 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+320 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
0+340 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+360 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+380 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+400 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+420 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+440 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+460 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+480 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+500 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+520 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
0+540 10 3 2.141 21.41 0 21.41 0.75 7.90 2.84
0+600 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
0+620 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
0+640 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49

143 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Remarks
Left side Right side Volume of 0.25m thk.
Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Area(m2) Volume (m ) 3
Height Area(m2) Volume (m )
3

0+660 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74


0+840 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
0+860 20 2.5 1.611 32.22 5 4.957 99.14 131.36 3.77 39.50 14.22
0+880 20 2.5 1.611 32.22 5 4.957 99.14 131.36 3.77 39.50 14.22
0+900 20 2.5 1.611 32.22 5 4.957 99.14 131.36 3.77 39.50 14.22
0+920 20 3 2.141 42.82 5 4.957 99.14 141.96 4.02 42.15 15.17
0+940 20 5 4.957 99.14 5 4.957 99.14 198.28 5.03 52.70 18.97
0+960 20 5 4.957 99.14 5 4.957 99.14 198.28 5.03 52.70 18.97
0+980 10 5 4.957 49.57 5 4.957 49.57 99.14 2.51 26.35 9.49
2+200 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
2+220 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
2+240 20 0 4 3.410 68.2 68.20 2.01 21.05 7.58
2+260 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
3+000 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
3+020 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+040 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+060 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+080 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+100 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+120 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+140 20 0 5 4.957 99.14 99.14 2.51 26.35 9.49
3+160 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
3+680 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
3+700 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+720 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+740 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+760 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+780 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+800 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+820 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+840 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+860 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
3+880 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74

144 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Remarks
Left side Right side Volume of 0.25m thk.
Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Area(m2) Volume (m ) 3
Height Area(m2) Volume (m )
3

4+000 10 6 6.782 67.82 0 67.82 1.51 15.80 5.69


4+020 10 4 3.410 34.1 0 34.10 1.01 10.53 3.79
4+280 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
4+300 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
4+320 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
4+340 20 6 6.782 135.64 5 4.957 99.14 234.78 5.53 57.95 20.86
4+360 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+380 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+400 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+420 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+440 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+460 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+480 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+500 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+520 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+540 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+560 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+580 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+600 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+620 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+640 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+660 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+680 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+700 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+720 20 6 6.782 135.64 4 3.410 68.2 203.84 5.03 52.65 18.95
4+740 20 6 6.782 135.64 3 2.141 42.82 178.46 4.52 47.40 17.06
4+760 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+780 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+800 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+820 20 6 6.782 135.64 0 135.64 3.02 31.60 11.38
4+840 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
4+860 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
4+880 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69

145 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Remarks
Left side Right side Volume of 0.25m thk.
Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Area(m2) Volume (m ) 3
Height Area(m2) Volume (m )
3

4+900 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69


4+920 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
4+940 20 3 2.141 42.82 0 42.82 1.51 15.80 5.69
4+960 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
4+980 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+000 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+020 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+040 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+060 20 2.5 1.611 32.22 0 32.22 1.26 13.15 4.73
5+080 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+100 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+120 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+140 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+160 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
5+180 10 4 3.410 34.1 0 34.10 1.01 10.53 3.79
5+480 7 4 3.410 23.87 0 23.87 0.70 7.37 2.65
6+700 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
6+720 20 4 3.410 68.2 0 68.20 2.01 21.05 7.58
6+740 10 4 3.410 34.1 0 34.10 1.01 10.53 3.79
6+760 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+780 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+800 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+820 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+840 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+860 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+880 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+900 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+920 20 5 4.957 99.14 0 99.14 2.51 26.35 9.49
6+940 20 5 4.957 99.14 2.5 1.611 32.22 131.36 3.77 39.50 14.22
6+960 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
6+980 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
7+000 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06
7+020 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06

146 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Remarks
Left side Right side Volume of 0.25m thk.
Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Area(m2) Volume (m ) 3
Height Area(m2) Volume (m )
3

7+040 20 5 4.957 99.14 4 3.410 68.2 167.34 4.52 47.40 17.06


7+060 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+080 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+100 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+120 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+140 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
7+160 10 5 4.957 49.57 4 3.410 34.1 83.67 2.26 23.70 8.53
17+240 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+260 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+280 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+300 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+580 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
17+600 10 3 2.141 21.41 0 21.41 0.75 7.90 2.84
17+640 7 3 2.141 14.987 0 14.99 0.53 5.53 1.99
18+500 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
18+520 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
18+540 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
21+300 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
21+320 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+340 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+360 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+380 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+400 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
21+780 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
21+800 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+000 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69
22+020 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69
22+040 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+200 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+220 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+400 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+420 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+440 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69

147 of 323
Masonry Retaining Structure Quantity Calculation
Name of the road:…………………………….
Chainage:0+000 to ….
Structure quantity
Retaining wall Retaining Wall
Chainage

Remarks
Left side Right side Volume of 0.25m thk.
Total
Length (m) PCC for Granular Filter Geotextile (m2)
Volume (m3)
the base material (m3)
Height Area(m2) Volume (m ) 3
Height Area(m2) Volume (m ) 3

22+460 10 0 6 6.782 67.82 67.82 1.51 15.80 5.69


22+480 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
22+500 10 0 4 3.410 34.1 34.10 1.01 10.53 3.79
22+600 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+620 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+640 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+660 10 5 4.957 49.57 0 49.57 1.26 13.18 4.74
22+840 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+860 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+880 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+900 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+920 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
22+940 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
22+960 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
22+980 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+000 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+020 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+040 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+060 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+080 10 3 2.141 21.41 5 4.957 49.57 70.98 2.01 21.08 7.59
23+100 10 5 4.957 49.57 5 4.957 49.57 99.14 2.51 26.35 9.49
26+120 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+140 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+160 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+180 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+200 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74
26+220 10 0 5 4.957 49.57 49.57 1.26 13.18 4.74

Total 2914.00 10613.82 6085.02 16698.84 439.44 4603.60 1657.15

148 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS


Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)

0+000 10.00 Side Drain D2 0.28 2.80 0.16 1.60 - - - -


0+020 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - - - -
0+040 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - - - -
0+060 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - - - -
0+080 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - - - -
0+100 20.00 Side Drain D2 0.28 5.60 0.16 3.20 - - - -
0+120 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+140 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+160 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+180 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+200 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+220 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+360 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
0+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
0+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+680 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
0+700 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
0+720 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
0+740 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
0+760 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
0+780 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
0+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
0+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

149 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
1+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
1+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+440 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+460 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+480 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+500 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+520 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+540 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+560 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
1+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
1+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

150 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
2+420 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
2+440 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
2+460 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
2+480 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
2+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
2+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
2+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
3+200 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+220 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+240 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+260 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+280 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+300 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+320 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+340 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+360 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+380 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+400 20.00 - - - - Side Drain D3 0.26 5.20 0.13 2.60
3+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+440 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+460 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+480 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+500 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+520 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+540 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+560 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+580 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+600 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
3+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

151 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
3+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
3+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
4+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
4+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

152 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
4+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
5+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
5+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
5+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
5+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
5+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

153 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
6+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+500 40.00 - - - - Side Drain D 0.10 4.00 0.13 5.20
6+520 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+540 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+560 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+580 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+600 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+620 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+640 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+660 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
6+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
6+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+900 120.00 Side Drain D 0.10 12.00 0.13 15.60 Side Drain D 0.10 12.00 0.13 15.60
6+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
6+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

154 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
7+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
7+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

155 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
8+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
8+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
9+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
9+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60

156 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
10+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+200 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+220 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+240 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+260 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+280 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+300 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+320 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+340 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+360 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+380 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+400 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+420 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+440 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+460 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+480 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+500 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+520 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+540 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+560 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
10+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+200 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+220 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+240 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+260 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+280 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+300 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+320 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+340 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+360 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+380 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60

157 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
11+400 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+420 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+440 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+460 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+480 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+500 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+520 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+540 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+560 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
11+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+060 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+080 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+100 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+120 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+140 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+160 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+180 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+200 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+220 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+240 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+260 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+280 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+300 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+320 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+340 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+360 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+380 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+400 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+420 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+440 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+460 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+480 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+500 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+520 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+540 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+560 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60

158 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
12+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
12+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
12+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
13+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

159 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
13+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
13+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
14+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
14+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
14+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
14+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
14+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

160 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
15+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
15+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
15+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
15+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
15+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+200 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+220 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+240 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+260 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+280 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+300 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+320 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+340 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+360 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+380 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
16+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

161 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
16+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
16+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
16+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
17+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
17+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

162 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
17+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
17+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
17+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
18+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
18+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

163 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
19+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
19+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
19+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
20+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
20+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
20+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

164 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
20+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
20+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
20+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
21+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
21+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
21+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
21+340 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+360 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+380 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+400 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+420 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+440 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+460 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+480 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+500 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+520 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+540 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+560 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
21+580 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+600 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+620 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60

165 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
21+640 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+660 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+680 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+700 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+720 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+740 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+760 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+780 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
21+800 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+820 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+840 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+860 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+880 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+900 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+920 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+940 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+960 20.00 Side Drain D3 0.26 5.20 0.13 2.60 - - - -
21+980 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
22+000 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
22+020 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
22+040 20.00 Side Drain D3 0.26 5.20 0.13 2.60 Side Drain D3 0.26 5.20 0.13 2.60
22+060 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+080 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+100 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+120 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+140 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+160 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+500 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+520 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+540 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+560 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+580 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
22+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
22+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

166 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
22+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
22+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+240 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+260 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+280 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+300 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+320 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+340 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+360 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+380 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+400 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+460 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+480 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
23+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
23+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
24+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
24+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
24+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
24+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -

167 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
24+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+220 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+360 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+380 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+400 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+420 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+440 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+460 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+480 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+500 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+520 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+540 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+560 20.00 - - - - Side Drain D2 0.28 5.60 0.16 3.20
24+580 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+600 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
24+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+920 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+940 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+960 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
24+980 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+000 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+020 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+040 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+060 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+080 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+100 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+120 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+140 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+160 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+180 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+200 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+220 20.00 Side Drain D 0.10 2.00 0.13 2.60 - - - -
25+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+360 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+380 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+400 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+420 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+440 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+460 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20

168 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
25+480 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+500 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+520 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+540 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+560 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+580 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+600 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+620 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+640 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+660 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+680 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+700 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+720 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+740 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+760 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+780 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+800 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+820 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+840 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+860 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+880 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+900 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+920 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+940 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+960 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
25+980 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+000 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+020 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+040 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+060 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+080 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+100 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+120 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+140 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+160 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+180 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+200 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+220 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+240 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+260 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+280 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+300 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+320 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+340 20.00 Side Drain D2 0.28 5.60 0.16 3.20 Side Drain D2 0.28 5.60 0.16 3.20
26+360 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+380 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+400 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+420 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+440 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+460 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+480 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+500 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+520 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+540 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+560 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+580 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+600 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+620 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+640 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+660 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+720 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+740 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60

169 of 323
DETAIL QUANTITY CALCULATIONS FOR DRAINWORKS
Name of the road:…………………………….
Chainage:0+000 to ….

Left Right

Chainage DrainLength Plum Concrete Plum Concrete


Dr. Type Wall Area Base Volume Dr. Type Wall Volume Base Area Volume
Volume (m³)
(m²) Area (m²) (m³) Area (m²) (m³) (m²) (m³)
26+760 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+780 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+800 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+820 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+840 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+860 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+880 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+900 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
26+920 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+940 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+960 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
26+980 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+000 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+020 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+040 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+060 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+080 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+100 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+120 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+140 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+160 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+180 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+200 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+220 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+240 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+260 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+280 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+300 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+320 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+340 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+360 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+380 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+400 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+420 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+440 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+460 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+480 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+500 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+520 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+540 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+560 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+580 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+600 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+620 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+640 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+660 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+680 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
27+700 20.00 Side Drain D 0.10 2.00 0.13 2.60 Side Drain D 0.10 2.00 0.13 2.60
27+720 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+740 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+760 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+780 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60
27+800 20.00 - - - - Side Drain D 0.10 2.00 0.13 2.60

Total 27910.00 3427.20 3320.20 2636.80 2266.00


`
Total drain Length= 42,170.00 m
Plum concrete qty= 11650.20 cum
Total qty of stone soling work under drain bed = 8445.60 cum
Slab Cover for Buid up areas= 5,000.00 Nos

170 of 323
Remarks

171 of 323
Remarks

172 of 323
Remarks

173 of 323
Remarks

174 of 323
Remarks

175 of 323
Remarks

176 of 323
Remarks

177 of 323
Remarks

178 of 323
Remarks

179 of 323
Remarks

180 of 323
Remarks

181 of 323
Remarks

182 of 323
Remarks

183 of 323
Remarks

184 of 323
Remarks

185 of 323
Remarks

186 of 323
Remarks

187 of 323
Remarks

188 of 323
Remarks

189 of 323
Remarks

190 of 323
Remarks

191 of 323
Remarks

192 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATION FOR TRAPEZOIDAL (Side Drain A) COVER FOR SIDE DRAIN (PER 20 Rm.)
Name of the road:…………………………….
Chainage:0+000 to ….
Item
Description of works No. Length (m) Breadth (m) Height (m)
No.
For Cover Works(1.2m x 0.5m x 0.125m) 1 no.
1 PCC work for RCC in M20/20 in cover 1 0.5 1.200 0.125
Wt(Kg) per
2 Reinforcement Work meter
12 mm dia Bottom Main bars @ 15 cm c/c (Top & Bottom) 4 1.150 0.887
10 mm dia Distribution bars @ 20 cm c/c (Top & Bottom) 6.75 0.450 0.62
Total
3 Formwork
For cover 1 0.5 1.200 0.125

193 of 323
20 Rm.)

Quantity Per no

0.075
Wt(Kg) per Rm
span
4.0802
1.88325
5.963

0.425

194 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATION FOR SIDE DRAIN (PER 20 Rm.)


Name of the road:…………………………….
Chainage:0+000 to ….
Item Quantity Per
Description of works No. Length (m) Breadth (m) Height (m) Sec area
No. m

1 PCC work for bed in M20/20 1 1.0 1.200 0.100 0.120 0.120
PCC work for slope in M20/20 1 1.0 0.263 0.050 0.013 0.013
total M20/20= 0.133
2 MM5 Stone mesonry side wall 1 1.0 0.263 0.263 0.263
A=(0.25*0.45)+(0.5*(0.275+0.475)*0.4)

195 of 323
Unit

cum
cum

196 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

MATRICES OF CROSS DRAINAGE WORKS


Name of the road:…………………………….
Chainage:0+000 to ….
Existing Proposed Proposed
NP3 RCC Slab
Chainage Length Hume culvert
(Km) (m) pipe 0.6 0.9 0.6 (span
culvert dia dia dia 0.9 dia m) 2 3 4 5 6

0+578 12.5 0.9 - - - 1 - - - - -


0+939 10 0.9 - - - 1 - - - - -
1+399 10 0.9 - - - 1 - - - - -
1+898 10 0.9 - - - 1 - - - - -
1+995 10 0.9 - - - 1 - - - - -
2+343 10 0.9 - - - 1 - - - - -
2+478 10 0.9 - - - 1 - - - - -
2+662 10 0.9 - - - 1 - - - - -
2+957 10 0.9 - - - 1 - - - - -
3+343 10 0.9 - - - 1 - - - - -
3+446 10 0.9 - - - 1 - - - - -
3+605 12.5 0.9 - - - 1 - - - - -
3+829 10 0.9 - - - 1 - - - - -
4+124 10 0.9 - - - 1 - - - - -
4+591 10 0.9 - - - 1 - - - - -
5+258 10 0.9 - - - 1 - - - - -
5+424 10 0.9 - - - 1 - - - - -
5+518 10 0.9 - - - 1 - - - - -
5+719 10 0.9 - - - 1 - - - - -
5+919 10 0.9 - - - 1 - - - - -
6+018 10 0.9 - - - 1 - - - - -
6+386 10 0.9 - - - 1 - - - - -
6+633 10 0.9 - - - 1 - - - - -
6+747 10 0.9 - - - 1 - - - - -
7+047 10 0.9 - - - 1 - - - - -
7+539 10 0.9 - - - 1 - - - - -
8+112 10 0.9 - - - 1 - - - - -
8+580 10 0.9 - - - 1 - - - - -
9+015 12.5 0.9 - - - 1 - - - - -
9+463 12.5 0.9 - - - 1 - - - - -
9+891 12.5 0.9 - - - 1 - - - - -
10+147 12.5 0.9 - - - 1 - - - - -
10+578 12.5 0.9 - - - 1 - - - - -
10+908 12.5 0.9 - - - 1 - - - - -
11+282 10 0.9 - - - 1 - - - - -
11+730 10 0.9 - - - 1 - - - - -
12+160 10 0.9 - - - 1 - - - - -
12+687 12.5 0.9 - - - 1 - - - - -
13+187 12.5 0.9 - - - 1 - - - - -
MATRICES OF CROSS DRAINAGE WORKS
Name of the road:…………………………….
Chainage:0+000 to ….
Existing Proposed Proposed
NP3 RCC Slab
Chainage Length Hume culvert
(Km) (m) pipe 0.6 0.9 0.6 (span
culvert dia dia dia 0.9 dia m) 2 3 4 5 6

13+517 12.5 0.9 - - - 1 - - - - -


13+824 12.5 0.9 - - - 1 - - - - -
14+257 12.5 0.9 - - - 1 - - - - -
14+565 12.5 0.9 - - - 1 - - - - -
14+791 10 0.9 - - - 1 - - - - -
14+998 10 0.9 - - - 1 - - - - -
15+371 12.5 0.9 - - - 1 - - - - -
15+678 12.5 0.9 - - - 1 - - - - -
15+982 12.5 0.9 - - - 1 - - - - -
16+307 12.5 0.9 - - - 1 - - - - -
16+722 12.5 0.9 - - - 1 - - - - -
17+087 12.5 0.9 - - - 1 - - - - -
17+343 12.5 0.9 - - - 1 - - - - -
18+038 12.5 0.9 - - - 1 - - - - -
18+237 12.5 0.9 - - - 1 - - - - -
18+690 12.5 0.9 - - - 1 - - - - -
19+147 12.5 0.9 - - - 1 - - - - -
19+658 12.5 0.9 - - - 1 - - - - -
20+042 - - - - 3 - 1 - - -
20+229 12.5 0.9 - - - 1 - - - - -
20+556 12.5 0.9 - - - 1 - - - - -
21+018 12.5 0.9 - - - 1 - - - - -
21+265 12.5 0.9 - - - 1 - - - - -
21+548 12.5 0.9 - - - 1 - - - - -
21+947 12.5 0.9 - - - 1 - - - - -
22+168 12.5 0.9 - - - 1 - - - - -
22+358 12.5 0.9 - - - 1 - - - - -
22+581 12.5 0.9 - - - 1 - - - - -
22+811 12.5 0.9 - - - 1 - - - - -
23+309 12.5 0.9 - - - 1 - - - - -
23+719 - - - - 3 - 1 - - -
24+134 12.5 0.9 - - - 1 - - - - -
24+522 12.5 0.9 - - - 1 - - - - -
24+926 12.5 0.9 - - - 1 - - - - -
25+201 12.5 0.9 - - - 1 - - - - -
25+680 12.5 0.9 - - - 1 - - - - -
26+058 12.5 0.9 - - - 1 - - - - -
26+484 12.5 0.9 - - - 1 - - - - -
26+671 12.5 0.9 - - - 1 - - - - -
27+246 12.5 0.9 - - - 1 - - - - -

Total - - - 77 - 2 - - -
Total no of Hume Pipe 900mm Proposed = 77
MATRICES OF CROSS DRAINAGE WORKS
Name of the road:…………………………….
Chainage:0+000 to ….
Existing Proposed Proposed
NP3 RCC Slab
Chainage Length Hume culvert
(Km) (m) pipe 0.6 0.9 0.6 (span
culvert dia dia dia 0.9 dia m) 2 3 4 5 6

Total no of 3m Slab culvert Proposed = 2


ansport

WORKS

Remarks

Propose PC dia 0.9m


Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Proposed PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
WORKS

Remarks

Propose PC dia 0.9m


Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Proposed Slab Culvert
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Proposed Slab Culvert
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Propose PC dia 0.9m
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

MATRICES OF CROSS DRAINAGE WORKS


Name of the road:…………………………….

Chainage:0+000 to ….
NP3 RCC NP3 RCC
Chainage
Hume pipe Hume pipe Bridge Length Remarks
(Km)
Culvert Culvert
60cm dia 90cm dia
0+050 1 10m PROPOSED PC 0.6M
0+860 1 10m PROPOSED PC 0.6M
1+263 1 10m EXISTING PC
1+690 1 9m PROPOSED PC 0.6M
1+844 1 10m EXISTING BRIDGE SPAN 14M
2+660 1 9m PROPOSED PC 0.6M
2+809 1 9m EXISTING PC
3+126 1 10m EXISTING PC
3+419 1 10m EXISTING PC
3+590 1 10m PROPOSED PC 0.6M
3+714 1 10m EXISTING PC
3+877 1 10m EXISTING PC
4+099 1 9m EXISTING PC
4+137 1 9m EXISTING PC
4+469 1 9m PROPOSED PC 0.6M
4+650 1 10m PROPOSED PC 0.6M
5+590 1 10m PROPOSED PC 0.6M
6+272 1 9m EXISTING PC
6+336 1 10m EXISTING PC
6+710 1 9m PROPOSED PC 0.6M
6+824 1 10m EXISTING PC
7+038 1 9m EXISTING PC
7+230 1 10m PROPOSED PC 0.6M
7+357 1 9m EXISTING PC
7+890 1 10m PROPOSED PC 0.6M
8+272 1 10m EXISTING PC
8+306 1 10m EXISTING PC
8+660 1 9m PROPOSED PC 0.6M
8+870 1 9m PROPOSED PC 0.6M
9+370 1 9m PROPOSED PC 0.6M
9+610 1 9m PROPOSED PC 0.6M
9+970 1 9m PROPOSED PC 0.6M
10+147 1 10m EXISTING BRIDGE SPAN 10M
10+195 1 9m EXISTING PC
10+818 1 10m EXISTING PC
11+129 1 10m EXISTING PC
11+423 1 10m EXISTING PC
11+590 1 10m PROPOSED PC 0.6M
Existing 19 2
Total 17 0 0

202 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Pipe Culvert (60 dia)

Name of the road:…………………………….


Chainage:0+000 to …. Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
Assumptions: diameter of pipe with its wall thickness= 0.75 m
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m length of catchpit= 1.5 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m width of catchpit= 1.5 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation
Assuming that the D/S headwall excavation
i) D/S Head Wall 1 3.00 1.50 1.25 5.63 m³ height is half of the total height
ii) U/S Head wall with Catchpit 1 4.32 3.61 1.92 29.94 m³
iii) Pipe portion 1 10.67 0.95 2.44 24.73 m³
v) PCC lining Assuming that the U/S excavation height
a) At U/S Head wall with Catchpit 1 4.32 3.61 0.10 1.56 m³ including head wall and catchpit is taken as
b) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³ average height of U/S headwall & Catchpit
c) Below pipe portion 1 10.67 0.95 0.10 1.01 m³
63.32 m³

2. Stone Masonry Works (M5)


i) D/S Head Wall 1 3.00 1.00 2.65 7.95 m³
deduction for pipe -1 0.96 0.44 - 0.42 m³
ii) U/S Head wall 1 3.00 0.75 2.38 5.36 m³
deduction for pipe -1 0.87 0.44 - 0.38 m³
iii) U/S Head wall of Catchpit 1 4.12 0.51 1.45 3.05 m³
iv) Side walls 2 1.50 0.75 2.38 5.36 m³
v)catchpit base 1 2.10 2.10 0.30 1.32 m³
vi) Parapet 2 3.00 0.30 0.40 0.72 m³
22.96 m³

203 of 323
Quantity Estimate of Pipe Culvert (60 dia)

Name of the road:…………………………….


Chainage:0+000 to …. Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
Assumptions: diameter of pipe with its wall thickness= 0.75 m
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m length of catchpit= 1.5 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m width of catchpit= 1.5 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m
3. Concrete Works (M15/40)
i) At U/S Head wall with Catchpit 1 4.32 3.42 0.10 1.48 m³
ii) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
iii) Below hume pipe 1 12.50 0.80 0.10 10.00 m³
11.93 m³

4. Back Fill
i) Carriage way 1 10.67 0.95 2.44 24.73 m³
deduction for pipe -1 10.67 0.95 - 10.14 m³
ii) U/S Head wall with Catchpit 1 4.32 0.36 1.45 2.26 m³
iii) Side walls 2 1.50 0.60 2.38 4.28 m³
21.13 m³

5. 60cm internal dia RCC Hume Pipe (NP3) 1 12.50 12.50 rm

6. Gabion Works
i) U/S Protection works 1 4.00 1.00 1.00 4.00 m³
ii)D/S Protection 1 3.00 3.00 0.50 4.50 m³
2 3.00 1.00 0.50 3.00 m³
11.50 m³
7. Formwork
i) Below D/S Head Wall 1 9.40 0.10 0.94 m²
ii) U/S Head wall with Catchpit 1 15.88 0.10 1.59 m²
iii) for Bedding Concrete 2 12.50 0.10 2.50
5.03 m²

8. Filter(Pervious) Material behind wall structures


i) D/S Head Wall 1 3.00 0.20 2.65 1.59 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
ii) U/S Head wall 1 3.00 0.20 2.38 1.43 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
iii) U/S Head wall of Catchpit 1 4.12 0.20 1.45 1.19 m³
iv) Side walls 2 1.50 0.20 2.38 1.43 m³
5.46 m³

204 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Pipe Culvert (60 dia) Extension

Name of the road:…………………………….


Chainage:0+000 to …. Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
Assumptions: diameter of pipe with its wall thickness= 0.75 m
Downstream head wall Height = 2.50 m Upstream headwall height = 2.00 m length of catchpit= 1.5 m
Pavement Thickness = 0.35 m Pipe length = 5.00 m width of catchpit= 1.5 m
height of sidewall= 2.00 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation
Assuming that the D/S headwall excavation
i) D/S Head Wall 1 3.00 1.50 1.25 5.63 m³ height is half of the total height
ii) U/S Head wall with Catchpit 1 3.90 3.40 1.73 22.94 m³
iii) Pipe portion 1 3.38 0.95 2.25 7.22 m³
v) PCC lining Assuming that the U/S excavation height
a) At U/S Head wall with Catchpit 1 3.90 3.40 0.10 1.33 m³ including head wall and catchpit is taken as
b) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³ average height of U/S headwall & Catchpit
c) Below pipe portion 1 3.38 0.95 0.10 0.32 m³
37.89 m³

2. Stone Masonry Works (M5)


i) D/S Head Wall 1 3.00 1.00 2.65 7.95 m³
deduction for pipe -1 0.96 0.44 - 0.42 m³
ii) U/S Head wall 1 3.00 0.65 2.00 3.90 m³
deduction for pipe -1 0.66 0.44 - 0.29 m³
iii) U/S Head wall of Catchpit 1 3.70 0.51 1.45 2.74 m³
iv) Side walls 2 1.50 0.65 2.00 3.90 m³
v)catchpit base 1 2.10 2.10 0.30 1.32 m³
vi) Parapet 2 3.00 0.30 0.40 0.72 m³
19.82 m³

3. Concrete Works (M15/40)


i) At U/S Head wall with Catchpit 1 3.90 3.23 0.10 1.26 m³
ii) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
iii) Below hume pipe 1 5.00 0.80 0.10 4.00 m³
Quantity Estimate of Pipe Culvert (60 dia) Extension

Name of the road:…………………………….


Chainage:0+000 to …. Diff. in height between u/s & d/s headwall= 0.75 m
Lean concrete thickness= 0.1 m
Assumptions: diameter of pipe with its wall thickness= 0.75 m
Downstream head wall Height = 2.50 m Upstream headwall height = 2.00 m length of catchpit= 1.5 m
Pavement Thickness = 0.35 m Pipe length = 5.00 m width of catchpit= 1.5 m
height of sidewall= 2.00 m Height of upstream wall of catchpit= 1.45 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
5.71 m³

4. Back Fill
i) Carriage way 1 3.38 0.95 2.25 7.22 m³
deduction for pipe -1 3.38 0.95 - 3.21 m³
ii) U/S Head wall with Catchpit 1 3.90 0.36 1.45 2.04 m³
iii) Side walls 2 1.50 0.50 2.00 3.00 m³
9.05 m³

5. 60cm internal dia RCC Hume Pipe (NP3) 1 5.00 5.00 rm

6. Gabion Works
i) U/S Protection works 1 4.00 1.00 1.00 4.00 m³
ii)D/S Protection 1 3.00 3.00 0.50 4.50 m³
2 3.00 1.00 0.50 3.00 m³
11.50 m³
7. Formwork
i) Below D/S Head Wall 1 9.40 0.10 0.94 m²
ii) U/S Head wall with Catchpit 1 14.66 0.10 1.47 m²
iii) for Bedding Concrete 2 5.00 0.10 1.00
3.41 m²

8. Filter(Pervious) Material behind wall structures


i) D/S Head Wall 1 3.00 0.20 2.65 1.59 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
ii) U/S Head wall 1 3.00 0.20 2.00 1.20 m³
deduction for pipe -1 0.44 0.20 - 0.09 m³
iii) U/S Head wall of Catchpit 1 3.70 0.20 1.45 1.07 m³
iv) Side walls 2 1.50 0.20 2.00 1.20 m³
4.88 m³
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Pipe Culvert (90 dia)

Name of the road:…………………………….


Chainage:0+000 to …. Diff. in height between u/s & d/s headwall= 0.75 m
Assumptions: Lean concrete thickness= 0.1 m
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m diameter of pipe with its wall thickness= 1.10 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m length of catchpit= 1.5 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.80 m width of catchpit= 1.5 m
Length of head wall(U/S & D/S)= 3.00 m

Length Breadth Height


Description of Works Nos. Quantity Units
(m) (m) (m)
1. Earth Excavation
Assuming that the D/S headwall excavation
i) D/S Head Wall 1 3.00 1.50 1.25 5.63 m³ height is half of the total height
ii) U/S Head wall with Catchpit 1 4.32 3.80 2.09 34.31 m³
iii) Pipe portion 1 10.67 1.30 2.44 33.85 m³
v) PCC lining Assuming that the U/S excavation height
a) At U/S Head wall with Catchpit 1 4.32 3.80 0.10 1.64 m³ including head wall and catchpit is taken as
b) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³ average height of U/S headwall & Catchpit
c) Below pipe portion 1 10.67 1.30 0.10 1.39 m³
77.27 m³

2. Stone Masonry Works (M5)


i) D/S Head Wall 1 3.00 1.00 2.65 7.95 m³
deduction for pipe -1 0.96 0.95 - 0.91 m³
ii) U/S Head wall 1 3.00 0.80 2.38 5.71 m³
deduction for pipe -1 0.87 0.95 - 0.83 m³
iii) U/S Head wall of Catchpit 1 4.12 0.65 1.80 4.82 m³
iv) Side walls 2 1.50 0.80 2.38 5.71 m³
v)catchpit base 1 1.70 1.70 0.30 0.87 m³
vi) Parapet 2 3.00 0.40 0.40 0.96 m³
24.28 m³

3. Concrete Works (M15/40)


i) At U/S Head wall with Catchpit 1 4.32 3.59 0.10 1.55 m³
ii) Below D/S Head wall 1 3.00 1.50 0.10 0.45 m³
iii) Below hume pipe 1 12.50 1.20 0.10 15.00 m³
17.00 m³

207 of 323
Quantity Estimate of Pipe Culvert (90 dia)

Name of the road:…………………………….


Chainage:0+000 to …. Diff. in height between u/s & d/s headwall= 0.75 m
Assumptions: Lean concrete thickness= 0.1 m
Downstream head wall Height = 2.50 m Upstream headwall height = 2.38 m diameter of pipe with its wall thickness= 1.10 m
Pavement Thickness = 0.35 m Pipe length = 12.50 m length of catchpit= 1.5 m
height of sidewall= 2.38 m Height of upstream wall of catchpit= 1.80 m width of catchpit= 1.5 m
Length of head wall(U/S & D/S)= 3.00 m

4. Back Fill
i) Carriage way 1 10.67 1.30 2.44 33.85 m³
deduction for pipe -1 10.67 0.95 - 10.14 m³
ii) U/S Head wall with Catchpit 1 4.32 0.45 1.80 3.50 m³
iii) Side walls 2 1.50 0.60 2.38 4.28 m³
31.49 m³

5. 90cm internal dia RCC Hume Pipe (NP3) 1 12.50 12.50 rm

6. Gabion Works
i) U/S Protection works 1 4.00 1.00 1.00 4.00 m³
ii)D/S Protection 1 3.00 3.00 0.50 4.50 m³
2 3.00 1.00 0.50 3.00 m³
11.50 m³
7. Formwork
i) Below D/S Head Wall 1 9.40 0.10 0.94 m²
ii) U/S Head wall with Catchpit 1 16.22 0.10 1.62 m²
iii) for Bedding Concrete 2 12.50 0.10 2.50
5.06 m²

8. Filter(Pervious) Material behind wall structures


i) D/S Head Wall 1 3.00 0.20 2.65 1.59 m³
deduction for pipe -1 0.95 0.20 - 0.19 m³
ii) U/S Head wall 1 3.00 0.20 2.38 1.43 m³
deduction for pipe -1 0.95 0.20 - 0.19 m³
iii) U/S Head wall of Catchpit 1 4.12 0.20 1.80 1.48 m³
iv) Side walls 2 1.50 0.20 2.38 1.43 m³
5.55 m³

208 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY ESTIMATE OF 3m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 3 Total Width of road = 7.8
D= 1.05
D1= 2.5 L= 4.54 T= 0.3
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.15
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

Earthwork in Foundation
1
Excavation in Hard soil
Cum
a Main Abutment Cum 2 7.8 1.9625 1.45 45.48
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 7.902 0.3 1 4.74
c Bed
under slab Cum 1 7.8 2.4 0.5 9.36
U/s and d/s under slab Cum 2 6.451 4.3 0.5 27.74
Total 130.82 2 261.640

2 15mm Stone soling


a Main Abutment Cum 2 7.8 1.9625 0.15 4.59
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 9.09 2 18.180
3 PCC M15/40
a Main Abutment Cum 2 7.8 1.16625 0.45 8.19
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 7.8 3 0.2 4.68
U/s and d/s under slab Cum 2 6.451 4.3 0.2 11.10
Total 37.47 2 74.940
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 7.8 1.16625 2.5 45.48
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 7.902 0.3 0.6 2.84
c Bed (Boulder pitching)
under slab Cum 1 7.8 3 0.3 7.02
U/s and d/s under slab Cum 2 6.451 4.3 0.3 16.64
Total 108.66 2 217.320

5 M25/20 grade RCC


a abutment cap Cum 2 7.8 0.1755 2.74
b Slab Cum 1 7.8 4.54 0.3 10.62
d Kerb part Cum 2 7.8 Cs area= 0.1225 1.91
Total 15.27 2 30.540
TOTAL QUANTITY ESTIMATE OF 3m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 3 Total Width of road = 7.8
D= 1.05
D1= 2.5 L= 4.54 T= 0.3
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.15
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
6 Reinforcement Steel Fe500 Length kg/m

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 7.80 99.11 773.058 773.06

b Parapet and kerb(including


a6,a7 types) kg 85.09 85.09
Total 858.15 2 1716.300
7 2mm thick Tartfelt Sheet Sqm 2 7.80 0.57 8.89
Total 8.89 2 17.780
8
Granular Filter Material Filling
Abutment Cum 2 7.80 0.25 1.5 5.85
Wing wall Cum 4 5 0.25 1.05 5.25
Total 11.10 2 22.200

9 Form Work Sqm


Slab Sqm 1 7.80 Perim= 7.8 60.84
Side of Slab transverse to road Sqm 2 7.80 0.3 4.68
Side of Slab along the road Sqm 2 4.54 0.8 7.26
Abutment Cap Sqm 2 7.80 0.6 9.36
Total 82.14 2 164.280
10 Back filling
a Main Abutment Cum 2 7.8 1.9625 1.45 17.7567
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 35.16 2 70.320

11 110mm Dia. HDPE Pipe at


weep holes 12.50 2 25.000
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Earthquake emergency Assistance Project
Kupondole,Lalitpur

TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 11.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 11.8 1.775 1.45 55.68
b Wing Walls Cum 4 4.4 1.32 1.45 33.69
c Cutoff Wall Cum 2 8.31376 0.3 1 4.99
c Bed
under slab Cum 1 11.8 3.4 0.5 20.06
U/s and d/s under slab Cum 2 6.35688 3.784 0.5 24.05
Total 138.47 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 11.8 1.775 0.15 6.28
b Wing Walls Cum 4 4.4 1.32 0.15 3.48
Total 9.76 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 11.8 1.0725 0.45 11.39
b Wing Walls Cum 4 4.4 1.32 0.45 10.45
c Bed
under slab Cum 1 11.8 4 0.2 9.44
U/s and d/s under slab Cum 2 6.35688 3.784 0.2 9.62
Total 40.90 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 11.8 1.0725 2.2 55.68
b Wing Walls Cum 4 4.4 Area(avg)= 1.585 27.90
c Cutoff Wall Cum 2 8.31376 0.3 0.6 2.99
c Bed (Boulder pitching)
under slab Cum 1 11.8 4 0.3 14.16
U/s and d/s under slab Cum 2 6.35688 3.784 0.3 14.43
Total 115.16 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 11.8 0.1915 4.52
b Slab Cum 1 11.8 5.54 0.38 24.84
d Kerb part Cum 2 11.8 Cs area= 0.1225 2.89
Total 32.25 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 11.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 11.80 179.99 2123.882 2123.88
Parapet and kerb(including
b
a6,a7 types) kg 101.04 101.04
Total 2224.92 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 11.80 0.57 13.45
Total 13.45 0 0.000
8
Granular Filter Material Filling
Abutment Cum 2 11.80 0.25 1.5 8.85
Wing wall Cum 4 4.4 0.25 1.05 4.62
Total 13.47 0 0.000

9 Form Work Sqm


Slab Sqm 1 11.80 Perim= 11.8 139.24
Side of Slab transverse to road Sqm 2 11.80 0.38 8.97
Side of Slab along the road Sqm 2 5.54 0.88 9.75
Abutment Cap Sqm 2 11.80 0.76 17.94
Total 175.90 0 0.000
10 Back filling
a Main Abutment Cum 2 11.8 1.775 1.45 24.2962
b Wing Walls Cum 4 4.4 1.32 1.45 13.47456
Total 37.77 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 15.54 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT EXTENSION


Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 4.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 4.8 1.775 1.45 22.65
b Wing Walls Cum 4 4.4 1.32 1.45 33.69
c Cutoff Wall Cum 2 8.31376 0.3 1 4.99
c Bed
under slab Cum 1 4.8 3.4 0.5 8.16
U/s and d/s under slab Cum 2 6.35688 3.784 0.5 24.05
Total 93.54 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 4.8 1.775 0.15 2.56
b Wing Walls Cum 4 4.4 1.32 0.15 3.48
Total 6.04 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 4.8 1.0725 0.45 4.63
b Wing Walls Cum 4 4.4 1.32 0.45 10.45
c Bed
under slab Cum 1 4.8 4 0.2 3.84
U/s and d/s under slab Cum 2 6.35688 3.784 0.2 9.62
Total 28.54 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 4.8 1.0725 2.2 22.65
b Wing Walls Cum 4 4.4 Area(avg)= 1.585 27.90
c Cutoff Wall Cum 2 8.31376 0.3 0.6 2.99
c Bed (Boulder pitching)
under slab Cum 1 4.8 4 0.3 5.76
U/s and d/s under slab Cum 2 6.35688 3.784 0.3 14.43
Total 73.73 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 4.8 0.1915 1.84
b Slab Cum 1 4.8 5.54 0.38 10.10
d Kerb part Cum 2 4.8 Cs area= 0.1225 1.18
Total 13.12 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 4m SPANNED SLAB CULVERT EXTENSION
Assumption values(refer Typical drawing)
Height of Abutment H1 2.2 Span= 4 Total Width of road = 4.8
D= 0.75
D1= 2.2 L= 5.54 T= 0.38
Lw= 4.4 Bw1 1.32 T1= 0.2
B= 1.375 Bw2 0.96 T2= 0.15
F1= 3.784 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 4.80 179.99 863.952 863.95
Parapet and kerb(including
b
a6,a7 types) kg 101.04 101.04
Total 964.99 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 4.80 0.57 5.47
Total 5.47 0 0.000
8
Granular Filter Material Filling
Abutment Cum 2 4.80 0.25 1.5 3.60
Wing wall Cum 4 4.4 0.25 1.05 4.62
Total 8.22 0 0.000

9 Form Work Sqm


Slab Sqm 1 4.80 Perim= 4.8 23.04
Side of Slab transverse to road Sqm 2 4.80 0.38 3.65
Side of Slab along the road Sqm 2 5.54 0.88 9.75
Abutment Cap Sqm 2 4.80 0.76 7.30
Total 43.74 0 0.000
10 Back filling
a Main Abutment Cum 2 4.8 1.775 1.45 9.8832
b Wing Walls Cum 4 4.4 1.32 1.45 13.47456
Total 23.36 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 9.10 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of New Pipe Culvert


Dia of Pipe= 60 cm
Height of Head wall= 3.5 m
Name of the road:…………………………….
Chainage:0+000 to ….
Total no
Sn Description of Works unit No Length (m) Width (m) Height (m) Quantity
of PC
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Head Wall Cum 1 2.5 1.55 1 3.875
b Catch Pit Cum 1 2.5 2.5 1.6 10
c Pipe Line Cum 1 10 0.8 1.1 8.8
Total 0 17
2 PCC M15 Cum
a Head Wall Cum 1 2.5 1.95 0.2 0.975
b Catch Pit Cum 1 2.5 2.5 0.1 0.63
c Pipe Line Cum 1 8.5 0.75 0.1 0.64
Total 0 17
3 RRM in 1:4 cement mortar Cum
a Head Wall Cum 1 2.5 1.025 3.5 8.97
b Catch Pit Cum 1 2.3 2.3 1.5 7.94
Additional masonry works for
site condition Cum 8.0 0.5 1.5 0.00
Total 16.91
Deduction
a Pipe portion Head wall Cum 1 0.43 (0.95*PI()*(D2)/4) 0.43
b Pipe portion Catch Pit Cum 1 0.20 (0.95*PI()*(D2)/4) 0.20
c Catch Pit Cum 1 1.00 1.2 1.2 1.44
d Inlet Drain Cum 2 0.5 0.45 0.4 0.18
Total Deduction 2.25
Total after deduction 0.00 17.00
Transportation and Laying of
4
Hume Pipe Rm 1 10 0.00 17.00
Back filling work including Pipe Line Excavation Volume-
5
compaction Cum 1 (7.45*PI()*(D2)/4) 0.00 17.00

215 of 323
Remarks

216 of 323
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Earthquake emergency Assistance Project
Kupondole,Lalitpur

TOTAL QUANTITY ESTIMATE OF 5m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 5 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 7 T= 0.42
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 11.8 1.9625 1.45 68.81
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 9.902 0.3 1 5.94
c Bed
under slab Cum 1 11.8 4.4 0.5 25.96
U/s and d/s under slab Cum 2 7.451 4.3 0.5 32.04
Total 176.25 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 11.8 1.9625 0.15 6.95
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 11.45 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 11.8 1.16625 0.45 12.39
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 11.8 5 0.2 11.80
U/s and d/s under slab Cum 2 7.451 4.3 0.2 12.82
Total 50.51 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 11.8 1.16625 2.5 68.81
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 9.902 0.3 0.6 3.56
c Bed (Boulder pitching)
under slab Cum 1 11.8 5 0.3 17.70
U/s and d/s under slab Cum 2 7.451 4.3 0.3 19.22
Total 145.97 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 11.8 0.238 5.62
b Slab Cum 1 11.8 6.54 0.42 32.41
d Kerb part Cum 2 11.8 Cs area= 0.1225 2.89
Total 40.92 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 5m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 5 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 7 T= 0.42
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 11.80 211.12 2491.216 2491.22
Parapet and kerb(including
b
a6,a7 types) kg 127.04 127.04
Total 2618.26 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 11.80 0.57 13.45
Total 13.45 0 0.000
8
Granular Filter Material Filling
Abutment Cum 2 11.80 0.25 1.5 8.85
Wing wall Cum 4 5 0.25 1.05 5.25
Total 14.10 0 0.000

9 Form Work Sqm


Slab Sqm 1 11.80 Perim= 11.8 139.24
Side of Slab transverse to road Sqm 2 11.80 0.42 9.91
Side of Slab along the road Sqm 2 6.54 0.92 12.03
Abutment Cap Sqm 2 11.80 0.84 19.82
Total 181.00 0 0.000
10 Back filling
a Main Abutment Cum 2 11.8 1.9625 1.45 26.8627
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 44.26 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 16.18 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT EXTENSION


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 4.8
D= 1.05
D1= 2.5 L= 5.54 T= 0.38
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.15
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 4.8 1.9625 1.45 27.99
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 10.902 0.3 1 6.54
c Bed
under slab Cum 1 4.8 5.4 0.5 12.96
U/s and d/s under slab Cum 2 7.951 4.3 0.5 34.19
Total 125.18 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 4.8 1.9625 0.15 2.83
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 7.33 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 4.8 1.16625 0.45 5.04
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 4.8 6 0.2 5.76
U/s and d/s under slab Cum 2 7.951 4.3 0.2 13.68
Total 37.98 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 4.8 1.16625 2.5 27.99
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 10.902 0.3 0.6 3.92
c Bed (Boulder pitching)
under slab Cum 1 4.8 6 0.3 8.64
U/s and d/s under slab Cum 2 7.951 4.3 0.3 20.51
Total 97.74 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 4.8 0.1915 1.84
b Slab Cum 1 4.8 7.54 0.38 13.75
d Kerb part Cum 2 4.8 Cs area= 0.1225 1.18
Total 16.77 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT EXTENSION
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 4.8
D= 1.05
D1= 2.5 L= 5.54 T= 0.38
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.15
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 4.80 312.67 1500.816 1500.82
Parapet and kerb(including
b
a6,a7 types) kg 144.06 144.06
Total 1644.88 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 4.80 0.57 5.47
Total 5.47 0 0.000
8
Granular Filter Material Filling
Abutment Cum 2 4.80 0.25 1.5 3.60
Wing wall Cum 4 5 0.25 1.05 5.25
Total 8.85 0 0.000

9 Form Work Sqm


Slab Sqm 1 4.80 Perim= 4.8 23.04
Side of Slab transverse to road Sqm 2 4.80 0.38 3.65
Side of Slab along the road Sqm 2 7.54 0.88 13.27
Abutment Cap Sqm 2 4.80 0.76 7.30
Total 47.26 0 0.000
10 Back filling
a Main Abutment Cum 2 4.8 1.9625 1.45 10.9272
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 28.33 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 9.74 0 0.000
Government of Nepal
Ministry of Federal Affairs & Local Development
Central Level Project Implementation Unit (CLPIU)
Earthquake emergency Assistance Project
Kupondole,Lalitpur

TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT


Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 8.4 T= 0.46
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity
Earthwork in Foundation
1
Excavation in Hard soil Cum
a Main Abutment Cum 2 11.8 1.9625 1.45 68.81
b Wing Walls Cum 4 5 1.5 1.45 43.50
c Cutoff Wall Cum 2 10.902 0.3 1 6.54
c Bed
under slab Cum 1 11.8 5.4 0.5 31.86
U/s and d/s under slab Cum 2 7.951 4.3 0.5 34.19
Total 184.90 0 0.000

2 15mm Stone soling


a Main Abutment Cum 2 11.8 1.9625 0.15 6.95
b Wing Walls Cum 4 5 1.5 0.15 4.50
Total 11.45 0 0.000
3 PCC M15/40
a Main Abutment Cum 2 11.8 1.16625 0.45 12.39
b Wing Walls Cum 4 5 1.5 0.45 13.50
c Bed
under slab Cum 1 11.8 6 0.2 14.16
U/s and d/s under slab Cum 2 7.951 4.3 0.2 13.68
Total 53.73 0 0.000
4 RRM in 1:4 cement mortar
a Main Abutment Cum 2 11.8 1.16625 2.5 68.81
b Wing Walls Cum 4 5 Area(avg)= 1.834 36.68
c Cutoff Wall Cum 2 10.902 0.3 0.6 3.92
c Bed (Boulder pitching)
under slab Cum 1 11.8 6 0.3 21.24
U/s and d/s under slab Cum 2 7.951 4.3 0.3 20.51
Total 151.16 0 0.000

5 M25/20 grade RCC


a abutment cap Cum 2 11.8 0.246 5.81
b Slab Cum 1 11.8 7.54 0.46 40.93
d Kerb part Cum 2 11.8 Cs area= 0.1225 2.89
Total 49.63 0 0.000
6 Reinforcement Steel Fe500 Length kg/m
TOTAL QUANTITY ESTIMATE OF 6m SPANNED SLAB CULVERT
Assumption values(refer Typical drawing)
Height of Abutment H1 2.5 Span= 6 Total Width of road = 11.8
D= 1.05
D1= 2.5 L= 8.4 T= 0.46
Lw= 5 Bw1 1.5 T1= 0.2
B= 1.5625 Bw2 0.96 T2= 0.2
F1= 4.3 A 0.77
Name of the road:…………………………….
Total Total
Sn Description of Works unit No L (m) W (m) H (m) Qty per no
no Quantity

a Slab and abutment


cap(including
a1,a2,a3,a4,a5,s1,s2,s3 types) kg 11.80 312.67 3689.506 3689.51
Parapet and kerb(including
b
a6,a7 types) kg 144.06 144.06
Total 3833.57 0 0.000
7 2mm thick Tartfelt Sheet Sqm 2 11.80 0.57 13.45
Total 13.45 0 0.000
8
Granular Filter Material Filling
Abutment Cum 2 11.80 0.25 1.5 8.85
Wing wall Cum 4 5 0.25 1.05 5.25
Total 14.10 0 0.000

9 Form Work Sqm


Slab Sqm 1 11.80 Perim= 11.8 139.24
Side of Slab transverse to road Sqm 2 11.80 0.46 10.86
Side of Slab along the road Sqm 2 7.54 0.96 14.48
Abutment Cap Sqm 2 11.80 0.92 21.71
Total 186.29 0 0.000
10 Back filling
a Main Abutment Cum 2 11.8 1.9625 1.45 26.8627
b Wing Walls Cum 4 5 1.5 1.45 17.4
Total 44.26 0 0.000

11 110mm Dia. HDPE Pipe at


weep holes 16.18 0 0.000
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of New Pipe Culvert


Dia of Pipe= 90 cm
Height of Head wall= 3.5 m

Name of the road:…………………………….

Chainage:0+000 to ….
Total no
Sn Description of Works unit No Length (m) Width (m) Height (m) Quantity Remarks
of PC
1 Earthwork in Foundation
Excavation in Hard soil Cum
a Head Wall Cum 1 3.6 1.55 1 5.58
b Catch Pit Cum 1 2.6 2.6 1.9 12.844
c Pipe Line Cum 1 10 1.15 1.4 16.1
Total 0 0 0
2 PCC M15 Cum
a Head Wall Cum 1 3.6 1.95 0.2 1.404
b Catch Pit Cum 1 2.6 2.6 0.1 0.68
c Pipe Line Cum 1 8.5 1 0.1 0.85
Total 0 0 0
3 RRM in 1:4 cement mortar Cum
a Head Wall Cum 1 3.6 1.025 3.5 12.92
b Catch Pit Cum 1 2.4 2.4 1.8 10.37
Additional masonry works for
site condition Cum 8.0 0.5 1.5 0.00
Total 23.29
Deduction
a Pipe portion Head wall Cum 1 0.90 (0.95*PI()*(D2)/4) 0.90
b Pipe portion Catch Pit Cum 1 0.43 (0.95*PI()*(D2)/4) 0.43
c Catch Pit Cum 1 1.00 1.2 1.5 1.8
d Inlet Drain Cum 2 0.5 0.45 0.4 0.18
Total Deduction 3.31
Total after deduction 0.00 0.00 0
Transportation and Laying of
4
Hume Pipe Rm 1 10 0.00 0.00 0
Back filling work including Pipe Line Excavation Volume-
5
compaction Cum 1 (7.45*PI()*(D2)/4) 0.00 0.00 0
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY CALCULATION OF 10m SPANNED CAUSEWAY


Name of the road:…………………………….
Chainage:0+000 to ….
Item Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Total nos Total Quantity Unit
No. Unit
Earthwork in excavation
1 in foundation 1 10 9 0.45 - 0 - cu.m.

2 Stone soling on bed 1 10 7 0.2 - 0 - cu.m.

P.C.C. work in M20


4 in RCC slab 1 10 7 0.15 - 0 - cu.m.

5 Reinforcement steel work 10 mm bar@ 200mm c/c(parallel to road length) 0.00


10 mm bar @ 200mm c/c (transverse to road) 0.00
Total 0.00 0 - Kg
6 Formwork 3 34 0.2 0 0 - Sqm
0
Supply of machine made gabion boxes for
7 u/s and d/s protections 6 10 1 1.00 0.00 0 - cu.m.
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Causeway 10 m span


Assumptions:
Span = 10.00 m
Slab Width = 11.00 m
Slab thickness = 0.20 m
Bed PCC thickness 0.075 m
Bed Stone Soling 0.15 m
Total Depth = 0.43 m
Main Bars = 12 dia @ 300 c/c
Distribution Bar 12 dia @ 300 c/c
Side Slope = 7.00% Transverse Beam Thickness 0.4 m
Longitudinal dowel bars = 12 dia @ 300 c/c Height of D/S headwall = 3 m
Transverse dowel bars = 12 dia @ 300 c/c U/S Longitudinal Beam Height 1 m
Stirrups 8 dia @ 300 c/c Longitudinal Beam Thickness 0.3 m
Name of the road:…………………………….
Chainage:0+000 to ….
Length Breadth Height Quantity Total
Description of Works Nos. No Units
(m) (m) (m) per no Quantity
1. Earthwork in Excavation
Middle portion 1 3.33 11.00 0.430 15.75 m³
Approaching portion 2 3.34 11.00 0.430 31.60 m³
D/S head wall (CRRM) 1 10.00 1.80 2.250 40.50 m³
U/S Gabion Protection 1 6.67 3.00 0.500 10.01 m³
D/S Gabion Protection 1 6.67 3.00 0.500 10.01 m³
107.87 - - m³

2. 15cm thick stone soling


Causeway slab 1 10.02 11.00 0.15 16.53 m³
D/S head wall (CRRM) 1 10.00 1.80 0.15 2.70 m³
19.23 - - m³

3. Bed PCC (M15/40)


Causeway slab 1 10.02 11.00 0.075 8.27 m³
D/S head wall (CRRM) 1 10.00 1.80 0.075 1.35 m³
9.62 - - m³
4. Concrete Work (M20/20)
Causeway slab 1 10.02 11.00 0.20 22.04 m³
Cut off Beam Longitudinal U/S 1 10.02 0.30 1.00 3.01 m³
Cut off Beam Longitudinal D/S 1 10.02 0.70 0.50 3.51 m³
Cutt off Beam Transverse 2 11.00 0.30 0.20 1.32 m³
29.88 - - m³
5. Reinforcement
a) Main bar T1(12mm Ф) (6 Panal) 72.67 5.70 @ 0.89kg/m 368.65 kg.
b) Distribution bar T2(12mm Ф) (6 Panal) 116 3.53 @ 0.89kg/m 364.44 kg.
c) U/S Longitudinal Beam Main Bar 6 9.92 @ 0.89kg/m 52.97 kg.
d) D/S Longitudinal Beam Main Bar 6 9.92 @ 0.89kg/m 52.97 kg.
e) U/SLongitudinal Beam Stirrup 36 2.48 @ 0.39kg/m 34.82 kg.
f) D/S Longitudinal Beam Stirrup 36 2.28 @ 0.39kg/m 32.01 kg.
g) Main Bar Transverse Beam(inner) 8 10.90 @ 0.89kg/m 77.61 kg.
h) Main Bar Transverse Beam(inner) 8 11.40 @ 0.89kg/m 81.17
i) Transverse Beam Stirrup 77 1.34 @ 0.39kg/m 40.24 kg.
j) Longitudinal joint (12mm Ф) 34.33 0.75 @ 0.89kg/m 22.92 kg.
k) Transverse joint(12mm Ф) 74 0.75 @ 0.89kg/m 49.40 kg.
Total Reinforcement Qty = 1,177.20 - - kg.

6. Formwork (2*L/3+2*B/2)*6 1 106.00 0.20 21.20 - - m²

7. Coursed random rubble masonry in M5 cement


sand mortar
D/S head wall (CRRM) 1 10.00 1.15 3.00 34.50 m³
34.50 - - m³
8. Gabion apron
U/S Protection Works 1 6.67 3.00 0.50 10.01 m³
2 3.00 1.00 0.50 3.00 m³
D/S Protection Works 1 6.67 3.00 0.50 10.01 m³
2 3.00 1.00 0.50 13.01 m³
36.03 - - m³

9. Filter Material behind wall structure 1 10.00 0.25 1.80 4.50 - - m³

225 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TOTAL QUANTITY CALCULATION OF 12m SPANNED CAUSEWAY


Name of the road:…………………………….
Chainage:0+000 to ….
Item Quantity per
Description of works No. Length (m) Breadth (m) Height (m) Total nos Total Quantity Unit
No. Unit
Earthwork in excavation
1 in foundation 1 12 9 0.45 - 0 - cu.m.
-
2 Stone soling on bed 1 12 7 0.2 - 0 - cu.m.
-
P.C.C. work in M20
4 in RCC slab 1 12 7 0.15 - 0 - cu.m.
-
5 Reinforcement steel work 10 mm bar@ 200mm c/c(parallel to road length) 0.00
10 mm bar @ 200mm c/c (transverse to road) 0.00
Total 0.00 0 - Kg
6 Formwork 3 38 0.2 0 0 - Sqm
0
Supply of machine made gabion boxes for
7 u/s and d/s protections 6 12 1 1.00 0.00 0 - cu.m.
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Quantity Estimate of Causeway 12 m span


Assumptions:
Span = 12.00 m
Slab Width = 8.00 m
Slab thickness = 0.20 m
Bed PCC thickness 0.075 m
Bed Stone Soling 0.15 m
Total Depth = 0.43 m
Main Bars = 12 dia @ 300 c/c
Distribution Bar 12 dia @ 300 c/c
Side Slope = 7.00% Transverse Beam Thickness 0.4 m
Longitudinal dowel bars = 12 dia @ 300 c/c Height of D/S headwall = 3 m
Transverse dowel bars = 12 dia @ 300 c/c U/S Longitudinal Beam Height 1 m
Stirrups 8 dia @ 300 c/c Longitudinal Beam Thickness 0.3 m
Name of the road:…………………………….
Chainage:0+000 to ….
Length Breadth Height Quantity Total
Description of Works Nos. No Units
(m) (m) (m) per no Quantity
1. Earthwork in Excavation
Middle portion 1 4.00 8.00 0.430 13.76 m³
Approaching portion 2 4.01 8.00 0.430 27.59 m³
D/S head wall (CRRM) 1 12.00 1.80 2.250 48.60 m³
U/S Gabion Protection 1 8.00 3.00 0.500 12.00 m³
D/S Gabion Protection 1 8.00 3.00 0.500 12.00 m³
113.95 - - m³

2. 15cm thick stone soling


Causeway slab 1 12.02 8.00 0.15 14.42 m³
D/S head wall (CRRM) 1 12.00 1.80 0.15 3.24 m³
17.66 - - m³

3. Bed PCC (M15/40)


Causeway slab 1 12.02 8.00 0.075 7.21 m³
D/S head wall (CRRM) 1 12.00 1.80 0.075 1.62 m³
8.83 - - m³
4. Concrete Work (M20/20)
Causeway slab 1 12.02 8.00 0.20 19.23 m³
Cut off Beam Longitudinal U/S 1 12.02 0.30 1.00 3.61 m³
Cut off Beam Longitudinal D/S 1 12.02 0.70 0.50 4.21 m³
Cutt off Beam Transverse 2 8.00 0.30 0.20 0.96 m³
28.01 - - m³
5. Reinforcement
a) Main bar T1(12mm Ф) (6 Panal) 86 4.20 @ 0.89kg/m 321.47 kg.
b) Distribution bar T2(12mm Ф) (6 Panal) 86 4.20 @ 0.89kg/m 321.47 kg.
c) U/S Longitudinal Beam Main Bar 6 11.92 @ 0.89kg/m 63.65 kg.
d) D/S Longitudinal Beam Main Bar 6 11.92 @ 0.89kg/m 63.65 kg.
e) U/SLongitudinal Beam Stirrup 42 2.48 @ 0.39kg/m 40.62 kg.
f) D/S Longitudinal Beam Stirrup 42 2.28 @ 0.39kg/m 37.35 kg.
g) Main Bar Transverse Beam(inner) 8 7.90 @ 0.89kg/m 56.25 kg.
h) Main Bar Transverse Beam(inner) 8 8.40 @ 0.89kg/m 59.81
i) Transverse Beam Stirrup 57 1.34 @ 0.39kg/m 29.79 kg.
j) Longitudinal joint (12mm Ф) 41 0.75 @ 0.89kg/m 27.37 kg.
k) Transverse joint(12mm Ф) 54 0.75 @ 0.89kg/m 36.05 kg.
Total Reinforcement Qty = 1,057.48 - - kg.

6. Formwork (2*L/3+2*B/2)*6 1 96.00 0.20 19.20 - - m²

7. Coursed random rubble masonry in M5 cement


sand mortar
D/S head wall (CRRM) 1 12.00 1.15 3.00 41.40 m³
41.40 - - m³
8. Gabion apron
U/S Protection Works 1 8.00 3.00 0.50 12.00 m³
2 3.00 1.00 0.50 3.00 m³
D/S Protection Works 1 8.00 3.00 0.50 12.00 m³
2 3.00 1.00 0.50 15.00 m³
42.00 - - m³

9. Filter Material behind wall structure 1 12.00 0.25 1.80 5.40 - - m³

227 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0

QUANTITY CALCULATIONS FOR PAVEMENT


Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm side shoulder
Subbase for Shoulder Quantity estimate for DBST surface
Total
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

0+000 0 7.00 1.75 0.88 - 1.40 0.70 - - 0.53 - - - - - - - - DBST


0+020 20 7.92 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
0+040 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
0+060 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
0+080 20 8.02 2.01 2.08 41.60 1.60 1.66 33.20 3.00 0.53 10.60 181.20 212.00 23.56 3.62 134.84 13.33 3.16 DBST
0+100 20 7.62 1.91 1.96 39.20 1.52 1.56 31.20 3.00 0.53 10.60 171.40 200.54 22.28 3.43 125.14 12.25 2.95 DBST
0+120 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.20 188.60 20.96 3.22 115.04 11.13 2.72 DBST
0+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+160 20 8.18 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 166.80 195.16 21.68 3.34 120.58 11.75 2.84 DBST
0+180 20 7.90 1.98 2.02 40.40 1.58 1.61 32.20 3.00 0.53 10.60 175.80 205.69 22.85 3.52 129.49 12.74 3.04 DBST
0+200 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
0+220 20 7.50 1.88 1.82 36.40 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
0+240 20 7.00 1.75 1.82 36.40 1.40 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
0+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+320 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+340 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+440 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+460 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+480 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+500 20 7.42 1.86 1.88 37.60 1.48 1.50 30.00 3.00 0.53 10.60 164.80 192.82 21.42 3.30 118.60 11.53 2.80 DBST
0+520 20 7.00 1.75 1.81 36.20 1.40 1.44 28.80 3.00 0.53 10.60 159.20 186.26 20.70 3.18 113.06 10.91 2.68 DBST
0+540 20 7.18 1.80 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 156.80 183.46 20.38 3.14 110.68 10.65 2.62 DBST
0+560 20 7.26 1.82 1.81 36.20 1.45 1.45 29.00 3.00 0.53 10.60 159.40 186.50 20.72 3.19 113.26 10.93 2.68 DBST
0+580 20 8.70 2.18 2.00 40.00 1.74 1.60 32.00 3.00 0.53 10.60 174.60 204.28 22.70 3.49 128.30 12.61 3.02 DBST
0+600 20 8.90 2.23 2.21 44.20 1.78 1.76 35.20 3.00 0.53 10.60 191.00 223.47 24.83 3.82 144.54 14.41 3.38 DBST
0+620 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
0+640 20 7.37 1.84 2.04 40.80 1.47 1.63 32.60 3.00 0.53 10.60 177.70 207.91 23.10 3.55 131.37 12.95 3.08 DBST
0+660 20 7.60 1.90 1.87 37.40 1.52 1.50 30.00 3.00 0.53 10.60 164.70 192.70 21.41 3.29 118.50 11.52 2.80 DBST
0+680 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
0+700 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
228 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

0+720 20 7.53 1.88 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.30 187.55 20.84 3.21 114.15 11.03 2.70 DBST
0+740 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.30 187.55 20.84 3.21 114.15 11.03 2.70 DBST
0+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+780 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+800 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
0+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
0+880 20 8.03 2.01 1.88 37.60 1.61 1.51 30.20 3.00 0.53 10.60 165.30 193.40 21.49 3.31 119.10 11.58 2.81 DBST
0+900 20 7.00 1.75 1.88 37.60 1.40 1.51 30.20 3.00 0.53 10.60 165.30 193.40 21.49 3.31 119.10 11.58 2.81 DBST
0+920 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
0+940 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
0+960 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
0+980 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
1+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+060 20 7.76 1.94 1.85 37.00 1.55 1.48 29.60 3.00 0.53 10.60 162.60 190.24 21.14 3.25 116.42 11.29 2.75 DBST
1+080 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 162.60 190.24 21.14 3.25 116.42 11.29 2.75 DBST
1+100 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
1+120 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
1+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+160 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
1+180 20 7.22 1.81 1.85 37.00 1.44 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
1+200 20 7.73 1.93 1.87 37.40 1.55 1.50 30.00 3.00 0.53 10.60 164.50 192.47 21.39 3.29 118.31 11.50 2.79 DBST
1+220 20 7.00 1.75 1.84 36.80 1.40 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
1+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+280 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
1+300 20 7.59 1.90 2.03 40.60 1.52 1.62 32.40 3.00 0.53 10.60 176.90 206.97 23.00 3.54 130.58 12.86 3.07 DBST
1+320 20 8.60 2.15 2.03 40.60 1.72 1.62 32.40 3.00 0.53 10.60 176.90 206.97 23.00 3.54 130.58 12.86 3.07 DBST
1+340 20 8.46 2.12 2.14 42.80 1.69 1.71 34.20 3.00 0.53 10.60 185.60 217.15 24.13 3.71 139.19 13.82 3.26 DBST
1+360 20 8.60 2.15 2.14 42.80 1.72 1.71 34.20 3.00 0.53 10.60 185.60 217.15 24.13 3.71 139.19 13.82 3.26 DBST
1+380 20 8.79 2.20 2.18 43.60 1.76 1.74 34.80 3.00 0.53 10.60 188.90 221.01 24.56 3.78 142.46 14.18 3.33 DBST
1+400 20 8.90 2.23 2.22 44.40 1.78 1.77 35.40 3.00 0.53 10.60 191.90 224.52 24.95 3.84 145.43 14.51 3.40 DBST
1+420 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
1+440 20 7.85 1.96 2.10 42.00 1.57 1.68 33.60 3.00 0.53 10.60 182.50 213.53 23.73 3.65 136.13 13.48 3.19 DBST
1+460 20 7.56 1.89 1.93 38.60 1.51 1.54 30.80 3.00 0.53 10.60 169.10 197.85 21.98 3.38 122.86 12.00 2.90 DBST
1+480 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
1+500 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
1+520 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
1+540 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST

229 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

1+560 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
1+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+660 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
1+680 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
1+700 20 8.53 2.13 2.09 41.80 1.71 1.68 33.60 3.00 0.53 10.60 182.30 213.29 23.70 3.65 135.93 13.45 3.19 DBST
1+720 20 7.48 1.87 2.00 40.00 1.50 1.61 32.20 3.00 0.53 10.60 175.10 204.87 22.76 3.50 128.80 12.66 3.03 DBST
1+740 20 8.60 2.15 2.01 40.20 1.72 1.61 32.20 3.00 0.53 10.60 175.80 205.69 22.85 3.52 129.49 12.74 3.04 DBST
1+760 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
1+780 20 7.09 1.77 1.96 39.20 1.42 1.57 31.40 3.00 0.53 10.60 171.90 201.12 22.35 3.44 125.63 12.31 2.96 DBST
1+800 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.90 182.40 20.27 3.12 109.79 10.55 2.60 DBST
1+820 20 8.22 2.06 1.91 38.20 1.64 1.52 30.40 3.00 0.53 10.60 167.20 195.62 21.74 3.34 120.98 11.79 2.85 DBST
1+840 20 8.90 2.23 2.15 43.00 1.78 1.71 34.20 3.00 0.53 10.60 186.20 217.85 24.21 3.72 139.79 13.88 3.27 DBST
1+860 20 8.17 2.04 2.14 42.80 1.63 1.71 34.20 3.00 0.53 10.60 185.70 217.27 24.14 3.71 139.29 13.83 3.26 DBST
1+880 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 166.70 195.04 21.67 3.33 120.48 11.74 2.84 DBST
1+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
1+920 20 7.50 1.88 1.82 36.40 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
1+940 20 8.60 2.15 2.02 40.40 1.72 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88 3.52 129.69 12.76 3.05 DBST
1+960 20 8.57 2.14 2.15 43.00 1.71 1.72 34.40 3.00 0.53 10.60 186.70 218.44 24.27 3.73 140.28 13.94 3.28 DBST
1+980 20 7.13 1.78 1.96 39.20 1.43 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36 3.44 125.73 12.32 2.96 DBST
2+000 20 7.00 1.75 1.77 35.40 1.40 1.42 28.40 3.00 0.53 10.60 156.30 182.87 20.32 3.13 110.19 10.59 2.61 DBST
2+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+040 20 7.21 1.80 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 157.10 183.81 20.42 3.14 110.98 10.68 2.63 DBST
2+060 20 7.00 1.75 1.78 35.60 1.40 1.42 28.40 3.00 0.53 10.60 157.10 183.81 20.42 3.14 110.98 10.68 2.63 DBST
2+080 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
2+100 20 7.52 1.88 1.93 38.60 1.50 1.54 30.80 3.00 0.53 10.60 169.20 197.96 22.00 3.38 122.96 12.01 2.90 DBST
2+120 20 7.90 1.98 1.93 38.60 1.58 1.54 30.80 3.00 0.53 10.60 169.20 197.96 22.00 3.38 122.96 12.01 2.90 DBST
2+140 20 7.31 1.83 1.91 38.20 1.46 1.52 30.40 3.00 0.53 10.60 167.10 195.51 21.72 3.34 120.88 11.78 2.85 DBST
2+160 20 8.90 2.23 2.03 40.60 1.78 1.62 32.40 3.00 0.53 10.60 177.10 207.21 23.02 3.54 130.78 12.88 3.07 DBST
2+180 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
2+200 20 8.25 2.06 2.15 43.00 1.65 1.72 34.40 3.00 0.53 10.60 186.50 218.21 24.25 3.73 140.09 13.92 3.28 DBST
2+220 20 7.20 1.80 1.93 38.60 1.44 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
2+240 20 7.56 1.89 1.85 37.00 1.51 1.48 29.60 3.00 0.53 10.60 162.60 190.24 21.14 3.25 116.42 11.29 2.75 DBST
2+260 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
2+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+360 20 8.13 2.03 1.89 37.80 1.63 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
2+380 20 7.00 1.75 1.89 37.80 1.40 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST

230 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

2+400 20 7.61 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.10 188.49 20.94 3.22 114.94 11.12 2.72 DBST
2+420 20 7.90 1.98 1.94 38.80 1.58 1.55 31.00 3.00 0.53 10.60 170.10 199.02 22.11 3.40 123.85 12.11 2.92 DBST
2+440 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
2+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+480 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
2+500 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
2+520 20 7.85 1.96 2.06 41.20 1.57 1.65 33.00 3.00 0.53 10.60 179.50 210.02 23.34 3.59 133.16 13.15 3.12 DBST
2+540 20 7.00 1.75 1.86 37.20 1.40 1.49 29.80 3.00 0.53 10.60 163.50 191.30 21.26 3.27 117.32 11.39 2.77 DBST
2+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+580 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
2+600 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
2+620 20 7.70 1.93 1.92 38.40 1.54 1.53 30.60 3.00 0.53 10.60 168.00 196.56 21.84 3.36 121.77 11.88 2.87 DBST
2+640 20 8.54 2.14 2.04 40.80 1.71 1.63 32.60 3.00 0.53 10.60 177.40 207.56 23.06 3.55 131.08 12.91 3.08 DBST
2+660 20 8.20 2.05 2.10 42.00 1.64 1.68 33.60 3.00 0.53 10.60 182.40 213.41 23.71 3.65 136.03 13.46 3.19 DBST
2+680 20 7.36 1.84 1.95 39.00 1.47 1.56 31.20 3.00 0.53 10.60 170.60 199.60 22.18 3.41 124.34 12.17 2.93 DBST
2+700 20 7.59 1.90 1.87 37.40 1.52 1.50 30.00 3.00 0.53 10.60 164.50 192.47 21.39 3.29 118.31 11.50 2.79 DBST
2+720 20 7.39 1.85 1.88 37.60 1.48 1.50 30.00 3.00 0.53 10.60 164.80 192.82 21.42 3.30 118.60 11.53 2.80 DBST
2+740 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.90 185.91 20.66 3.18 112.76 10.88 2.67 DBST
2+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+880 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
2+900 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
2+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
2+960 20 8.81 2.20 1.98 39.60 1.76 1.58 31.60 3.00 0.53 10.60 173.10 202.53 22.50 3.46 126.82 12.44 2.98 DBST
2+980 20 8.90 2.23 2.22 44.40 1.78 1.77 35.40 3.00 0.53 10.60 192.10 224.76 24.97 3.84 145.63 14.53 3.40 DBST
3+000 20 8.87 2.22 2.23 44.60 1.77 1.78 35.60 3.00 0.53 10.60 192.70 225.46 25.05 3.85 146.22 14.60 3.41 DBST
3+020 20 7.00 1.75 1.99 39.80 1.40 1.59 31.80 3.00 0.53 10.60 173.70 203.23 22.58 3.47 127.41 12.51 3.00 DBST
3+040 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
3+060 20 7.16 1.79 1.87 37.40 1.43 1.50 30.00 3.00 0.53 10.60 164.60 192.58 21.40 3.29 118.40 11.51 2.80 DBST
3+080 20 7.00 1.75 1.77 35.40 1.40 1.42 28.40 3.00 0.53 10.60 156.60 183.22 20.36 3.13 110.48 10.63 2.62 DBST
3+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

231 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

3+240 20 7.13 1.78 1.77 35.40 1.43 1.42 28.40 3.00 0.53 10.60 156.30 182.87 20.32 3.13 110.19 10.59 2.61 DBST
3+260 20 7.80 1.95 1.87 37.40 1.56 1.50 30.00 3.00 0.53 10.60 164.30 192.23 21.36 3.29 118.11 11.47 2.79 DBST
3+280 20 7.55 1.89 1.92 38.40 1.51 1.54 30.80 3.00 0.53 10.60 168.50 197.15 21.91 3.37 122.27 11.94 2.88 DBST
3+300 20 7.46 1.87 1.88 37.60 1.49 1.50 30.00 3.00 0.53 10.60 165.10 193.17 21.46 3.30 118.90 11.56 2.81 DBST
3+320 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
3+340 20 7.64 1.91 1.89 37.80 1.53 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58 3.32 119.79 11.66 2.83 DBST
3+360 20 8.03 2.01 1.96 39.20 1.61 1.57 31.40 3.00 0.53 10.60 171.70 200.89 22.32 3.43 125.43 12.29 2.95 DBST
3+380 20 7.75 1.94 1.98 39.60 1.55 1.58 31.60 3.00 0.53 10.60 172.80 202.18 22.46 3.46 126.52 12.41 2.98 DBST
3+400 20 8.45 2.11 2.03 40.60 1.69 1.62 32.40 3.00 0.53 10.60 177.00 207.09 23.01 3.54 130.68 12.87 3.07 DBST
3+420 20 7.38 1.85 1.98 39.60 1.48 1.59 31.80 3.00 0.53 10.60 173.30 202.76 22.53 3.47 127.02 12.46 2.99 DBST
3+440 20 7.56 1.89 1.87 37.40 1.51 1.50 30.00 3.00 0.53 10.60 164.40 192.35 21.37 3.29 118.21 11.48 2.79 DBST
3+460 20 7.54 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58 3.32 119.79 11.66 2.83 DBST
3+480 20 7.17 1.79 1.84 36.80 1.43 1.47 29.40 3.00 0.53 10.60 162.10 189.66 21.07 3.24 115.93 11.23 2.74 DBST
3+500 20 7.00 1.75 1.77 35.40 1.40 1.42 28.40 3.00 0.53 10.60 156.70 183.34 20.37 3.13 110.58 10.64 2.62 DBST
3+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
3+540 20 7.73 1.93 1.84 36.80 1.55 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
3+560 20 7.38 1.85 1.89 37.80 1.48 1.52 30.40 3.00 0.53 10.60 166.10 194.34 21.59 3.32 119.89 11.67 2.83 DBST
3+580 20 7.91 1.98 1.92 38.40 1.58 1.53 30.60 3.00 0.53 10.60 167.90 196.44 21.83 3.36 121.67 11.87 2.87 DBST
3+600 20 7.50 1.88 1.93 38.60 1.50 1.54 30.80 3.00 0.53 10.60 169.10 197.85 21.98 3.38 122.86 12.00 2.90 DBST
3+620 20 8.60 2.15 2.02 40.40 1.72 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88 3.52 129.69 12.76 3.05 DBST
3+640 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
3+660 20 7.73 1.93 2.04 40.80 1.55 1.64 32.80 3.00 0.53 10.60 178.30 208.61 23.18 3.57 131.97 13.01 3.10 DBST
3+680 20 7.00 1.75 1.84 36.80 1.40 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
3+700 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
3+720 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
3+740 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
3+760 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
3+780 20 7.41 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.10 186.15 20.68 3.18 112.96 10.90 2.68 DBST
3+800 20 7.56 1.89 1.87 37.40 1.51 1.50 30.00 3.00 0.53 10.60 164.70 192.70 21.41 3.29 118.50 11.52 2.80 DBST
3+820 20 7.34 1.84 1.87 37.40 1.47 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
3+840 20 7.43 1.86 1.85 37.00 1.49 1.48 29.60 3.00 0.53 10.60 162.70 190.36 21.15 3.25 116.52 11.30 2.75 DBST
3+860 20 7.48 1.87 1.87 37.40 1.50 1.50 30.00 3.00 0.53 10.60 164.10 192.00 21.33 3.28 117.91 11.45 2.79 DBST
3+880 20 7.60 1.90 1.89 37.80 1.52 1.51 30.20 3.00 0.53 10.60 165.80 193.99 21.55 3.32 119.59 11.64 2.82 DBST
3+900 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
3+920 20 7.44 1.86 1.88 37.60 1.49 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
3+940 20 8.01 2.00 1.93 38.60 1.60 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
3+960 20 8.44 2.11 2.06 41.20 1.69 1.65 33.00 3.00 0.53 10.60 179.50 210.02 23.34 3.59 133.16 13.15 3.12 DBST
3+980 20 8.02 2.01 2.06 41.20 1.60 1.65 33.00 3.00 0.53 10.60 179.60 210.13 23.35 3.59 133.25 13.16 3.13 DBST
4+000 20 7.80 1.95 1.98 39.60 1.56 1.58 31.60 3.00 0.53 10.60 173.20 202.64 22.52 3.46 126.92 12.45 2.99 DBST
4+020 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
4+040 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
4+060 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST

232 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

4+080 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+120 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
4+140 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
4+160 20 7.11 1.78 1.84 36.80 1.42 1.47 29.40 3.00 0.53 10.60 162.10 189.66 21.07 3.24 115.93 11.23 2.74 DBST
4+180 20 7.42 1.86 1.82 36.40 1.48 1.45 29.00 3.00 0.53 10.60 160.30 187.55 20.84 3.21 114.15 11.03 2.70 DBST
4+200 20 7.00 1.75 1.81 36.20 1.40 1.44 28.80 3.00 0.53 10.60 159.20 186.26 20.70 3.18 113.06 10.91 2.68 DBST
4+220 20 8.12 2.03 1.89 37.80 1.62 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
4+240 20 7.00 1.75 1.89 37.80 1.40 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
4+260 20 7.77 1.94 1.85 37.00 1.55 1.48 29.60 3.00 0.53 10.60 162.70 190.36 21.15 3.25 116.52 11.30 2.75 DBST
4+280 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 162.70 190.36 21.15 3.25 116.52 11.30 2.75 DBST
4+300 20 8.26 2.07 1.91 38.20 1.65 1.53 30.60 3.00 0.53 10.60 167.60 196.09 21.79 3.35 121.37 11.84 2.86 DBST
4+320 20 7.05 1.76 1.92 38.40 1.41 1.53 30.60 3.00 0.53 10.60 168.10 196.68 21.85 3.36 121.87 11.89 2.87 DBST
4+340 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.50 181.94 20.22 3.11 109.40 10.51 2.60 DBST
4+360 20 8.04 2.01 1.88 37.60 1.61 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
4+380 20 7.35 1.84 1.93 38.60 1.47 1.54 30.80 3.00 0.53 10.60 168.90 197.61 21.96 3.38 122.66 11.98 2.89 DBST
4+400 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.50 185.45 20.61 3.17 112.37 10.84 2.66 DBST
4+420 20 7.06 1.77 1.76 35.20 1.41 1.41 28.20 3.00 0.53 10.60 155.60 182.05 20.23 3.11 109.49 10.52 2.60 DBST
4+440 20 8.60 2.15 1.96 39.20 1.72 1.57 31.40 3.00 0.53 10.60 171.60 200.77 22.31 3.43 125.33 12.28 2.95 DBST
4+460 20 8.22 2.06 2.11 42.20 1.64 1.68 33.60 3.00 0.53 10.60 183.20 214.34 23.82 3.66 136.82 13.55 3.21 DBST
4+480 20 8.50 2.13 2.10 42.00 1.70 1.67 33.40 3.00 0.53 10.60 182.20 213.17 23.69 3.64 135.83 13.44 3.18 DBST
4+500 20 7.07 1.77 1.95 39.00 1.41 1.56 31.20 3.00 0.53 10.60 170.70 199.72 22.19 3.41 124.44 12.18 2.93 DBST
4+520 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.70 182.17 20.24 3.11 109.59 10.53 2.60 DBST
4+540 20 7.29 1.82 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 157.90 184.74 20.53 3.16 111.77 10.77 2.65 DBST
4+560 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 157.90 184.74 20.53 3.16 111.77 10.77 2.65 DBST
4+580 20 7.10 1.78 1.77 35.40 1.42 1.41 28.20 3.00 0.53 10.60 156.00 182.52 20.28 3.12 109.89 10.56 2.61 DBST
4+600 20 7.00 1.75 1.77 35.40 1.40 1.41 28.20 3.00 0.53 10.60 156.00 182.52 20.28 3.12 109.89 10.56 2.61 DBST
4+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+640 20 7.06 1.77 1.76 35.20 1.41 1.41 28.20 3.00 0.53 10.60 155.60 182.05 20.23 3.11 109.49 10.52 2.60 DBST
4+660 20 8.60 2.15 1.96 39.20 1.72 1.57 31.40 3.00 0.53 10.60 171.60 200.77 22.31 3.43 125.33 12.28 2.95 DBST
4+680 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
4+700 20 7.45 1.86 2.01 40.20 1.49 1.61 32.20 3.00 0.53 10.60 175.50 205.34 22.82 3.51 129.20 12.71 3.04 DBST
4+720 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.50 186.62 20.74 3.19 113.36 10.95 2.68 DBST
4+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
4+820 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
4+840 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
4+860 20 7.30 1.83 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54 3.16 111.87 10.78 2.65 DBST
4+880 20 7.30 1.83 1.83 36.60 1.46 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
4+900 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54 3.16 111.87 10.78 2.65 DBST

233 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

4+920 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
4+940 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
4+960 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
4+980 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
5+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+080 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
5+100 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
5+120 20 7.95 1.99 1.93 38.60 1.59 1.54 30.80 3.00 0.53 10.60 169.10 197.85 21.98 3.38 122.86 12.00 2.90 DBST
5+140 20 7.73 1.93 1.96 39.20 1.55 1.57 31.40 3.00 0.53 10.60 171.80 201.01 22.33 3.44 125.53 12.30 2.95 DBST
5+160 20 7.00 1.75 1.84 36.80 1.40 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
5+180 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
5+200 20 7.47 1.87 1.96 39.20 1.49 1.57 31.40 3.00 0.53 10.60 171.70 200.89 22.32 3.43 125.43 12.29 2.95 DBST
5+220 20 8.60 2.15 2.01 40.20 1.72 1.61 32.20 3.00 0.53 10.60 175.70 205.57 22.84 3.51 129.39 12.73 3.04 DBST
5+240 20 8.20 2.05 2.10 42.00 1.64 1.68 33.60 3.00 0.53 10.60 183.00 214.11 23.79 3.66 136.62 13.53 3.20 DBST
5+260 20 7.62 1.91 1.98 39.60 1.52 1.58 31.60 3.00 0.53 10.60 173.20 202.64 22.52 3.46 126.92 12.45 2.99 DBST
5+280 20 7.90 1.98 1.95 39.00 1.58 1.55 31.00 3.00 0.53 10.60 170.20 199.13 22.13 3.40 123.95 12.12 2.92 DBST
5+300 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
5+320 20 8.30 2.08 1.92 38.40 1.66 1.53 30.60 3.00 0.53 10.60 168.00 196.56 21.84 3.36 121.77 11.88 2.87 DBST
5+340 20 8.02 2.01 2.05 41.00 1.60 1.63 32.60 3.00 0.53 10.60 178.20 208.49 23.17 3.56 131.87 13.00 3.10 DBST
5+360 20 7.04 1.76 1.89 37.80 1.41 1.51 30.20 3.00 0.53 10.60 165.60 193.75 21.53 3.31 119.39 11.62 2.82 DBST
5+380 20 7.75 1.94 1.85 37.00 1.55 1.48 29.60 3.00 0.53 10.60 162.90 190.59 21.18 3.26 116.72 11.32 2.76 DBST
5+400 20 7.65 1.91 1.93 38.60 1.53 1.54 30.80 3.00 0.53 10.60 169.00 197.73 21.97 3.38 122.76 11.99 2.89 DBST
5+420 20 8.20 2.05 1.98 39.60 1.64 1.59 31.80 3.00 0.53 10.60 173.50 203.00 22.56 3.47 127.22 12.49 2.99 DBST
5+440 20 7.58 1.90 1.98 39.60 1.52 1.58 31.60 3.00 0.53 10.60 172.80 202.18 22.46 3.46 126.52 12.41 2.98 DBST
5+460 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 160.80 188.14 20.90 3.22 114.64 11.09 2.71 DBST
5+480 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
5+500 20 7.70 1.93 2.04 40.80 1.54 1.63 32.60 3.00 0.53 10.60 178.00 208.26 23.14 3.56 131.67 12.98 3.09 DBST
5+520 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06 3.24 115.83 11.22 2.74 DBST
5+540 20 7.94 1.99 1.87 37.40 1.59 1.50 30.00 3.00 0.53 10.60 164.40 192.35 21.37 3.29 118.21 11.48 2.79 DBST
5+560 20 7.71 1.93 1.96 39.20 1.54 1.57 31.40 3.00 0.53 10.60 171.50 200.66 22.30 3.43 125.24 12.27 2.95 DBST
5+580 20 7.84 1.96 1.95 39.00 1.57 1.56 31.20 3.00 0.53 10.60 170.50 199.49 22.17 3.41 124.25 12.16 2.93 DBST
5+600 20 7.97 1.99 1.98 39.60 1.59 1.58 31.60 3.00 0.53 10.60 173.10 202.53 22.50 3.46 126.82 12.44 2.98 DBST
5+620 20 8.60 2.15 2.07 41.40 1.72 1.66 33.20 3.00 0.53 10.60 180.70 211.42 23.49 3.61 134.34 13.28 3.15 DBST
5+640 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
5+660 20 7.19 1.80 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 156.90 183.57 20.40 3.14 110.78 10.66 2.63 DBST
5+680 20 7.24 1.81 1.81 36.20 1.45 1.45 29.00 3.00 0.53 10.60 159.30 186.38 20.71 3.19 113.16 10.92 2.68 DBST
5+700 20 7.00 1.75 1.78 35.60 1.40 1.43 28.60 3.00 0.53 10.60 157.40 184.16 20.46 3.15 111.28 10.71 2.64 DBST
5+720 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
5+740 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST

234 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

5+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+780 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
5+800 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
5+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+840 20 7.49 1.87 1.81 36.20 1.50 1.45 29.00 3.00 0.53 10.60 159.90 187.08 20.79 3.20 113.75 10.99 2.69 DBST
5+860 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.90 187.08 20.79 3.20 113.75 10.99 2.69 DBST
5+880 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
5+900 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
5+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
5+940 20 8.15 2.04 1.90 38.00 1.63 1.52 30.40 3.00 0.53 10.60 166.50 194.81 21.65 3.33 120.29 11.72 2.84 DBST
5+960 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 166.50 194.81 21.65 3.33 120.29 11.72 2.84 DBST
5+980 20 7.74 1.94 1.85 37.00 1.55 1.48 29.60 3.00 0.53 10.60 162.40 190.01 21.11 3.25 116.23 11.26 2.75 DBST
6+000 20 8.60 2.15 2.05 41.00 1.72 1.64 32.80 3.00 0.53 10.60 178.40 208.73 23.19 3.57 132.07 13.02 3.10 DBST
6+020 20 7.72 1.93 2.04 40.80 1.54 1.63 32.60 3.00 0.53 10.60 178.20 208.49 23.17 3.56 131.87 13.00 3.10 DBST
6+040 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
6+060 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
6+080 20 8.03 2.01 2.03 40.60 1.61 1.63 32.60 3.00 0.53 10.60 177.30 207.44 23.05 3.55 130.98 12.90 3.08 DBST
6+100 20 8.20 2.05 2.03 40.60 1.64 1.63 32.60 3.00 0.53 10.60 177.30 207.44 23.05 3.55 130.98 12.90 3.08 DBST
6+120 20 7.60 1.90 1.98 39.60 1.52 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
6+140 20 7.47 1.87 1.89 37.80 1.49 1.51 30.20 3.00 0.53 10.60 165.70 193.87 21.54 3.31 119.49 11.63 2.82 DBST
6+160 20 7.90 1.98 1.93 38.60 1.58 1.54 30.80 3.00 0.53 10.60 168.70 197.38 21.93 3.37 122.46 11.96 2.89 DBST
6+180 20 7.42 1.86 1.92 38.40 1.48 1.53 30.60 3.00 0.53 10.60 168.20 196.79 21.87 3.36 121.97 11.90 2.88 DBST
6+200 20 8.20 2.05 1.96 39.20 1.64 1.56 31.20 3.00 0.53 10.60 171.20 200.30 22.26 3.42 124.94 12.23 2.94 DBST
6+220 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
6+240 20 7.21 1.80 1.93 38.60 1.44 1.54 30.80 3.00 0.53 10.60 169.10 197.85 21.98 3.38 122.86 12.00 2.90 DBST
6+260 20 7.36 1.84 1.82 36.40 1.47 1.46 29.20 3.00 0.53 10.60 160.70 188.02 20.89 3.21 114.54 11.08 2.71 DBST
6+280 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
6+300 20 7.36 1.84 1.80 36.00 1.47 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
6+320 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
6+340 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
6+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
6+380 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
6+400 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
6+420 20 7.56 1.89 1.97 39.40 1.51 1.58 31.60 3.00 0.53 10.60 172.60 201.94 22.44 3.45 126.32 12.39 2.97 DBST
6+440 20 7.82 1.96 1.93 38.60 1.56 1.54 30.80 3.00 0.53 10.60 168.80 197.50 21.94 3.38 122.56 11.97 2.89 DBST
6+460 20 8.90 2.23 2.10 42.00 1.78 1.67 33.40 3.00 0.53 10.60 182.20 213.17 23.69 3.64 135.83 13.44 3.18 DBST
6+480 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
6+500 20 7.73 1.93 2.08 41.60 1.55 1.67 33.40 3.00 0.53 10.60 181.30 212.12 23.57 3.63 134.94 13.34 3.16 DBST
6+520 20 7.00 1.75 1.84 36.80 1.40 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
6+540 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
6+560 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
6+580 20 7.48 1.87 1.81 36.20 1.50 1.45 29.00 3.00 0.53 10.60 159.80 186.97 20.77 3.20 113.65 10.98 2.69 DBST

235 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

6+600 20 8.20 2.05 1.96 39.20 1.64 1.57 31.40 3.00 0.53 10.60 171.80 201.01 22.33 3.44 125.53 12.30 2.95 DBST
6+620 20 7.25 1.81 1.93 38.60 1.45 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
6+640 20 8.20 2.05 1.93 38.60 1.64 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
6+660 20 8.39 2.10 2.08 41.60 1.68 1.66 33.20 3.00 0.53 10.60 180.90 211.65 23.52 3.62 134.54 13.30 3.15 DBST
6+680 20 8.60 2.15 2.13 42.60 1.72 1.70 34.00 3.00 0.53 10.60 184.90 216.33 24.04 3.70 138.50 13.74 3.24 DBST
6+700 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
6+720 20 8.01 2.00 2.08 41.60 1.60 1.66 33.20 3.00 0.53 10.60 181.10 211.89 23.54 3.62 134.74 13.32 3.16 DBST
6+740 20 7.80 1.95 1.98 39.60 1.56 1.58 31.60 3.00 0.53 10.60 173.10 202.53 22.50 3.46 126.82 12.44 2.98 DBST
6+760 20 7.73 1.93 1.94 38.80 1.55 1.56 31.20 3.00 0.53 10.60 170.30 199.25 22.14 3.41 124.05 12.13 2.92 DBST
6+780 20 7.00 1.75 1.84 36.80 1.40 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
6+800 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
6+820 20 7.34 1.84 1.91 38.20 1.47 1.53 30.60 3.00 0.53 10.60 167.40 195.86 21.76 3.35 121.18 11.81 2.86 DBST
6+840 20 7.57 1.89 1.87 37.40 1.51 1.49 29.80 3.00 0.53 10.60 164.10 192.00 21.33 3.28 117.91 11.45 2.79 DBST
6+860 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.70 188.02 20.89 3.21 114.54 11.08 2.71 DBST
6+880 20 7.29 1.82 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 157.90 184.74 20.53 3.16 111.77 10.77 2.65 DBST
6+900 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 157.90 184.74 20.53 3.16 111.77 10.77 2.65 DBST
6+920 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
6+940 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
6+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
6+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+000 20 7.17 1.79 1.77 35.40 1.43 1.42 28.40 3.00 0.53 10.60 156.70 183.34 20.37 3.13 110.58 10.64 2.62 DBST
7+020 20 8.90 2.23 2.01 40.20 1.78 1.61 32.20 3.00 0.53 10.60 175.70 205.57 22.84 3.51 129.39 12.73 3.04 DBST
7+040 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
7+060 20 7.54 1.89 2.06 41.20 1.51 1.65 33.00 3.00 0.53 10.60 179.40 209.90 23.32 3.59 133.06 13.13 3.12 DBST
7+080 20 7.04 1.76 1.83 36.60 1.41 1.46 29.20 3.00 0.53 10.60 160.80 188.14 20.90 3.22 114.64 11.09 2.71 DBST
7+100 20 7.02 1.76 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.60 182.05 20.23 3.11 109.49 10.52 2.60 DBST
7+120 20 7.00 1.75 1.76 35.20 1.40 1.40 28.00 3.00 0.53 10.60 155.20 181.58 20.18 3.10 109.10 10.47 2.59 DBST
7+140 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
7+160 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
7+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+200 20 7.63 1.91 1.83 36.60 1.53 1.47 29.40 3.00 0.53 10.60 161.30 188.72 20.97 3.23 115.14 11.14 2.72 DBST
7+220 20 8.20 2.05 1.98 39.60 1.64 1.59 31.80 3.00 0.53 10.60 173.30 202.76 22.53 3.47 127.02 12.46 2.99 DBST
7+240 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
7+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+360 20 7.33 1.83 1.79 35.80 1.47 1.44 28.80 3.00 0.53 10.60 158.30 185.21 20.58 3.17 112.17 10.81 2.66 DBST
7+380 20 7.00 1.75 1.79 35.80 1.40 1.44 28.80 3.00 0.53 10.60 158.30 185.21 20.58 3.17 112.17 10.81 2.66 DBST
7+400 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
7+420 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST

236 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

7+440 20 7.85 1.96 2.06 41.20 1.57 1.65 33.00 3.00 0.53 10.60 179.50 210.02 23.34 3.59 133.16 13.15 3.12 DBST
7+460 20 7.00 1.75 1.86 37.20 1.40 1.49 29.80 3.00 0.53 10.60 163.50 191.30 21.26 3.27 117.32 11.39 2.77 DBST
7+480 20 7.86 1.97 1.86 37.20 1.57 1.49 29.80 3.00 0.53 10.60 163.60 191.41 21.27 3.27 117.41 11.40 2.77 DBST
7+500 20 8.60 2.15 2.06 41.20 1.72 1.65 33.00 3.00 0.53 10.60 179.60 210.13 23.35 3.59 133.25 13.16 3.13 DBST
7+520 20 7.98 2.00 2.08 41.60 1.60 1.66 33.20 3.00 0.53 10.60 180.80 211.54 23.50 3.62 134.44 13.29 3.15 DBST
7+540 20 7.00 1.75 1.88 37.60 1.40 1.50 30.00 3.00 0.53 10.60 164.80 192.82 21.42 3.30 118.60 11.53 2.80 DBST
7+560 20 8.17 2.04 1.90 38.00 1.63 1.52 30.40 3.00 0.53 10.60 166.70 195.04 21.67 3.33 120.48 11.74 2.84 DBST
7+580 20 7.86 1.97 2.01 40.20 1.57 1.60 32.00 3.00 0.53 10.60 175.30 205.10 22.79 3.51 129.00 12.68 3.03 DBST
7+600 20 8.20 2.05 2.01 40.20 1.64 1.61 32.20 3.00 0.53 10.60 175.60 205.45 22.83 3.51 129.29 12.72 3.04 DBST
7+620 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
7+640 20 7.64 1.91 1.83 36.60 1.53 1.47 29.40 3.00 0.53 10.60 161.40 188.84 20.98 3.23 115.24 11.15 2.73 DBST
7+660 20 7.81 1.95 1.93 38.60 1.56 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
7+680 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.10 190.83 21.20 3.26 116.92 11.34 2.76 DBST
7+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+740 20 8.90 2.23 1.99 39.80 1.78 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62 3.48 127.71 12.54 3.00 DBST
7+760 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
7+780 20 8.28 2.07 2.15 43.00 1.66 1.72 34.40 3.00 0.53 10.60 186.80 218.56 24.28 3.74 140.38 13.95 3.28 DBST
7+800 20 7.00 1.75 1.91 38.20 1.40 1.53 30.60 3.00 0.53 10.60 167.80 196.33 21.81 3.36 121.57 11.86 2.87 DBST
7+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+840 20 7.50 1.88 1.82 36.40 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
7+860 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
7+880 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
7+900 20 7.28 1.82 1.85 37.00 1.46 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
7+920 20 8.15 2.04 1.93 38.60 1.63 1.55 31.00 3.00 0.53 10.60 169.30 198.08 22.01 3.39 123.06 12.02 2.90 DBST
7+940 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 166.50 194.81 21.65 3.33 120.29 11.72 2.84 DBST
7+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
7+980 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
8+000 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
8+020 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
8+040 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
8+060 20 7.37 1.84 1.80 36.00 1.47 1.44 28.80 3.00 0.53 10.60 158.70 185.68 20.63 3.17 112.56 10.86 2.67 DBST
8+080 20 8.60 2.15 2.00 40.00 1.72 1.60 32.00 3.00 0.53 10.60 174.70 204.40 22.71 3.49 128.40 12.62 3.02 DBST
8+100 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
8+120 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
8+140 20 7.71 1.93 2.04 40.80 1.54 1.63 32.60 3.00 0.53 10.60 178.10 208.38 23.15 3.56 131.77 12.99 3.09 DBST
8+160 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 162.10 189.66 21.07 3.24 115.93 11.23 2.74 DBST
8+180 20 7.78 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
8+200 20 8.60 2.15 2.05 41.00 1.72 1.64 32.80 3.00 0.53 10.60 178.80 209.20 23.24 3.58 132.46 13.07 3.11 DBST
8+220 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
8+240 20 7.36 1.84 2.00 40.00 1.47 1.60 32.00 3.00 0.53 10.60 174.60 204.28 22.70 3.49 128.30 12.61 3.02 DBST
8+260 20 7.63 1.91 1.88 37.60 1.53 1.50 30.00 3.00 0.53 10.60 164.90 192.93 21.44 3.30 118.70 11.54 2.80 DBST

237 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

8+280 20 7.00 1.75 1.83 36.60 1.40 1.47 29.40 3.00 0.53 10.60 161.30 188.72 20.97 3.23 115.14 11.14 2.72 DBST
8+300 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
8+320 20 7.38 1.85 1.92 38.40 1.48 1.53 30.60 3.00 0.53 10.60 167.80 196.33 21.81 3.36 121.57 11.86 2.87 DBST
8+340 20 8.20 2.05 1.95 39.00 1.64 1.56 31.20 3.00 0.53 10.60 170.80 199.84 22.20 3.42 124.54 12.19 2.93 DBST
8+360 20 8.15 2.04 2.05 41.00 1.63 1.64 32.80 3.00 0.53 10.60 178.50 208.85 23.21 3.57 132.17 13.04 3.10 DBST
8+380 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 166.50 194.81 21.65 3.33 120.29 11.72 2.84 DBST
8+400 20 7.83 1.96 1.86 37.20 1.57 1.49 29.80 3.00 0.53 10.60 163.30 191.06 21.23 3.27 117.12 11.36 2.77 DBST
8+420 20 7.00 1.75 1.86 37.20 1.40 1.49 29.80 3.00 0.53 10.60 163.30 191.06 21.23 3.27 117.12 11.36 2.77 DBST
8+440 20 8.46 2.12 1.94 38.80 1.69 1.55 31.00 3.00 0.53 10.60 169.60 198.43 22.05 3.39 123.35 12.06 2.91 DBST
8+460 20 8.90 2.23 2.18 43.60 1.78 1.74 34.80 3.00 0.53 10.60 188.60 220.66 24.52 3.77 142.16 14.15 3.32 DBST
8+480 20 8.80 2.20 2.22 44.40 1.76 1.77 35.40 3.00 0.53 10.60 192.00 224.64 24.96 3.84 145.53 14.52 3.40 DBST
8+500 20 7.00 1.75 1.98 39.60 1.40 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
8+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
8+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
8+560 20 7.66 1.92 1.84 36.80 1.53 1.47 29.40 3.00 0.53 10.60 161.60 189.07 21.01 3.23 115.43 11.18 2.73 DBST
8+580 20 8.20 2.05 1.99 39.80 1.64 1.59 31.80 3.00 0.53 10.60 173.60 203.11 22.57 3.47 127.31 12.50 2.99 DBST
8+600 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
8+620 20 8.04 2.01 2.03 40.60 1.61 1.63 32.60 3.00 0.53 10.60 177.40 207.56 23.06 3.55 131.08 12.91 3.08 DBST
8+640 20 7.00 1.75 1.88 37.60 1.40 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
8+660 20 7.06 1.77 1.76 35.20 1.41 1.41 28.20 3.00 0.53 10.60 155.60 182.05 20.23 3.11 109.49 10.52 2.60 DBST
8+680 20 7.88 1.97 1.87 37.40 1.58 1.50 30.00 3.00 0.53 10.60 164.40 192.35 21.37 3.29 118.21 11.48 2.79 DBST
8+700 20 7.00 1.75 1.86 37.20 1.40 1.49 29.80 3.00 0.53 10.60 163.80 191.65 21.29 3.28 117.61 11.42 2.78 DBST
8+720 20 8.13 2.03 1.89 37.80 1.63 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
8+740 20 7.00 1.75 1.89 37.80 1.40 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
8+760 20 8.25 2.06 1.91 38.20 1.65 1.53 30.60 3.00 0.53 10.60 167.50 195.98 21.78 3.35 121.28 11.83 2.86 DBST
8+780 20 8.90 2.23 2.15 43.00 1.78 1.72 34.40 3.00 0.53 10.60 186.50 218.21 24.25 3.73 140.09 13.92 3.28 DBST
8+800 20 8.77 2.19 2.21 44.20 1.75 1.77 35.40 3.00 0.53 10.60 191.70 224.29 24.92 3.83 145.23 14.49 3.39 DBST
8+820 20 7.00 1.75 1.97 39.40 1.40 1.58 31.60 3.00 0.53 10.60 172.70 202.06 22.45 3.45 126.42 12.40 2.97 DBST
8+840 20 7.16 1.79 1.77 35.40 1.43 1.42 28.40 3.00 0.53 10.60 156.60 183.22 20.36 3.13 110.48 10.63 2.62 DBST
8+860 20 8.20 2.05 1.92 38.40 1.64 1.54 30.80 3.00 0.53 10.60 168.60 197.26 21.92 3.37 122.36 11.95 2.88 DBST
8+880 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
8+900 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
8+920 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
8+940 20 8.41 2.10 1.93 38.60 1.68 1.54 30.80 3.00 0.53 10.60 169.10 197.85 21.98 3.38 122.86 12.00 2.90 DBST
8+960 20 7.27 1.82 1.96 39.20 1.45 1.57 31.40 3.00 0.53 10.60 171.80 201.01 22.33 3.44 125.53 12.30 2.95 DBST
8+980 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 157.70 184.51 20.50 3.15 111.57 10.75 2.64 DBST
9+000 20 7.22 1.81 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 157.20 183.92 20.44 3.14 111.08 10.69 2.63 DBST
9+020 20 8.60 2.15 1.98 39.60 1.72 1.58 31.60 3.00 0.53 10.60 173.20 202.64 22.52 3.46 126.92 12.45 2.99 DBST
9+040 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
9+060 20 7.88 1.97 2.06 41.20 1.58 1.65 33.00 3.00 0.53 10.60 179.80 210.37 23.37 3.60 133.45 13.18 3.13 DBST
9+080 20 7.00 1.75 1.86 37.20 1.40 1.49 29.80 3.00 0.53 10.60 163.80 191.65 21.29 3.28 117.61 11.42 2.78 DBST
9+100 20 7.16 1.79 1.77 35.40 1.43 1.42 28.40 3.00 0.53 10.60 156.60 183.22 20.36 3.13 110.48 10.63 2.62 DBST

238 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

9+120 20 8.90 2.23 2.01 40.20 1.78 1.61 32.20 3.00 0.53 10.60 175.60 205.45 22.83 3.51 129.29 12.72 3.04 DBST
9+140 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
9+160 20 8.36 2.09 2.16 43.20 1.67 1.73 34.60 3.00 0.53 10.60 187.60 219.49 24.39 3.75 141.17 14.04 3.30 DBST
9+180 20 7.00 1.75 1.92 38.40 1.40 1.54 30.80 3.00 0.53 10.60 168.60 197.26 21.92 3.37 122.36 11.95 2.88 DBST
9+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+220 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
9+240 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
9+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+280 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
9+300 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
9+320 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
9+340 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
9+360 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
9+380 20 7.03 1.76 1.76 35.20 1.41 1.41 28.20 3.00 0.53 10.60 155.30 181.70 20.19 3.11 109.20 10.48 2.59 DBST
9+400 20 8.08 2.02 1.89 37.80 1.62 1.52 30.40 3.00 0.53 10.60 166.10 194.34 21.59 3.32 119.89 11.67 2.83 DBST
9+420 20 8.60 2.15 2.09 41.80 1.72 1.67 33.40 3.00 0.53 10.60 181.80 212.71 23.63 3.64 135.43 13.40 3.17 DBST
9+440 20 8.20 2.05 2.10 42.00 1.64 1.68 33.60 3.00 0.53 10.60 183.00 214.11 23.79 3.66 136.62 13.53 3.20 DBST
9+460 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
9+480 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
9+500 20 8.11 2.03 1.99 39.80 1.62 1.59 31.80 3.00 0.53 10.60 174.10 203.70 22.63 3.48 127.81 12.55 3.01 DBST
9+520 20 7.00 1.75 1.89 37.80 1.40 1.51 30.20 3.00 0.53 10.60 166.10 194.34 21.59 3.32 119.89 11.67 2.83 DBST
9+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+600 20 8.07 2.02 1.89 37.80 1.61 1.51 30.20 3.00 0.53 10.60 165.70 193.87 21.54 3.31 119.49 11.63 2.82 DBST
9+620 20 8.60 2.15 2.09 41.80 1.72 1.67 33.40 3.00 0.53 10.60 181.70 212.59 23.62 3.63 135.33 13.39 3.17 DBST
9+640 20 7.80 1.95 2.05 41.00 1.56 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
9+660 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
9+680 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
9+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+720 20 7.38 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 158.80 185.80 20.64 3.18 112.66 10.87 2.67 DBST
9+740 20 7.56 1.89 1.87 37.40 1.51 1.50 30.00 3.00 0.53 10.60 164.40 192.35 21.37 3.29 118.21 11.48 2.79 DBST
9+760 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
9+780 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
9+800 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
9+820 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
9+840 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
9+860 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
9+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
9+900 20 7.87 1.97 1.86 37.20 1.57 1.49 29.80 3.00 0.53 10.60 163.70 191.53 21.28 3.27 117.51 11.41 2.78 DBST
9+920 20 7.08 1.77 1.87 37.40 1.42 1.50 30.00 3.00 0.53 10.60 164.50 192.47 21.39 3.29 118.31 11.50 2.79 DBST
9+940 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.80 182.29 20.25 3.12 109.69 10.54 2.60 DBST

239 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

9+960 20 7.12 1.78 1.77 35.40 1.42 1.41 28.20 3.00 0.53 10.60 156.20 182.75 20.31 3.12 110.09 10.58 2.61 DBST
9+980 20 7.90 1.98 1.88 37.60 1.58 1.50 30.00 3.00 0.53 10.60 165.20 193.28 21.48 3.30 119.00 11.57 2.81 DBST
10+000 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
10+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+040 20 7.50 1.88 1.82 36.40 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
10+060 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
10+080 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
10+100 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
10+120 20 7.00 1.75 1.82 36.40 1.40 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
10+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+340 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
10+360 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
10+380 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
10+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+440 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
10+460 20 7.23 1.81 1.90 38.00 1.45 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
10+480 20 7.90 1.98 1.90 38.00 1.58 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
10+500 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
10+520 20 7.12 1.78 1.88 37.60 1.42 1.50 30.00 3.00 0.53 10.60 165.20 193.28 21.48 3.30 119.00 11.57 2.81 DBST
10+540 20 7.21 1.80 1.79 35.80 1.44 1.43 28.60 3.00 0.53 10.60 158.30 185.21 20.58 3.17 112.17 10.81 2.66 DBST
10+560 20 8.03 2.01 1.91 38.20 1.61 1.53 30.60 3.00 0.53 10.60 167.40 195.86 21.76 3.35 121.18 11.81 2.86 DBST
10+580 20 7.00 1.75 1.88 37.60 1.40 1.51 30.20 3.00 0.53 10.60 165.30 193.40 21.49 3.31 119.10 11.58 2.81 DBST
10+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+660 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
10+700 20 7.72 1.93 1.84 36.80 1.54 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
10+720 20 8.33 2.08 2.01 40.20 1.67 1.61 32.20 3.00 0.53 10.60 175.50 205.34 22.82 3.51 129.20 12.71 3.04 DBST
10+740 20 7.60 1.90 1.99 39.80 1.52 1.60 32.00 3.00 0.53 10.60 174.30 203.93 22.66 3.49 128.01 12.57 3.01 DBST
10+760 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
10+780 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST

240 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

10+800 20 7.52 1.88 1.89 37.80 1.50 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
10+820 20 7.55 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 165.70 193.87 21.54 3.31 119.49 11.63 2.82 DBST
10+840 20 7.90 1.98 1.94 38.80 1.58 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
10+860 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
10+880 20 7.45 1.86 1.92 38.40 1.49 1.54 30.80 3.00 0.53 10.60 168.50 197.15 21.91 3.37 122.27 11.94 2.88 DBST
10+900 20 7.37 1.84 1.85 37.00 1.47 1.48 29.60 3.00 0.53 10.60 163.20 190.94 21.22 3.26 117.02 11.35 2.77 DBST
10+920 20 8.20 2.05 1.95 39.00 1.64 1.56 31.20 3.00 0.53 10.60 170.70 199.72 22.19 3.41 124.44 12.18 2.93 DBST
10+940 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
10+960 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
10+980 20 7.76 1.94 1.96 39.20 1.55 1.57 31.40 3.00 0.53 10.60 171.60 200.77 22.31 3.43 125.33 12.28 2.95 DBST
11+000 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 162.60 190.24 21.14 3.25 116.42 11.29 2.75 DBST
11+020 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+040 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+080 20 7.73 1.93 1.84 36.80 1.55 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
11+100 20 7.80 1.95 1.94 38.80 1.56 1.56 31.20 3.00 0.53 10.60 170.30 199.25 22.14 3.41 124.05 12.13 2.92 DBST
11+120 20 8.16 2.04 2.00 40.00 1.63 1.60 32.00 3.00 0.53 10.60 174.60 204.28 22.70 3.49 128.30 12.61 3.02 DBST
11+140 20 8.60 2.15 2.10 42.00 1.72 1.68 33.60 3.00 0.53 10.60 182.60 213.64 23.74 3.65 136.22 13.49 3.19 DBST
11+160 20 7.59 1.90 2.03 40.60 1.52 1.62 32.40 3.00 0.53 10.60 176.90 206.97 23.00 3.54 130.58 12.86 3.07 DBST
11+180 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 160.90 188.25 20.92 3.22 114.74 11.10 2.71 DBST
11+200 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
11+220 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
11+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+280 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
11+300 20 8.09 2.02 2.00 40.00 1.62 1.60 32.00 3.00 0.53 10.60 174.90 204.63 22.74 3.50 128.60 12.64 3.02 DBST
11+320 20 8.54 2.14 2.08 41.60 1.71 1.67 33.40 3.00 0.53 10.60 181.30 212.12 23.57 3.63 134.94 13.34 3.16 DBST
11+340 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 170.40 199.37 22.15 3.41 124.15 12.14 2.92 DBST
11+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+400 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+420 20 7.10 1.78 1.87 37.40 1.42 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
11+440 20 8.14 2.04 1.91 38.20 1.63 1.53 30.60 3.00 0.53 10.60 167.40 195.86 21.76 3.35 121.18 11.81 2.86 DBST
11+460 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 178.40 208.73 23.19 3.57 132.07 13.02 3.10 DBST
11+480 20 7.89 1.97 2.01 40.20 1.58 1.61 32.20 3.00 0.53 10.60 175.90 205.80 22.87 3.52 129.59 12.75 3.04 DBST
11+500 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 172.90 202.29 22.48 3.46 126.62 12.42 2.98 DBST
11+520 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
11+540 20 7.70 1.93 1.84 36.80 1.54 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06 3.24 115.83 11.22 2.74 DBST
11+560 20 8.20 2.05 1.99 39.80 1.64 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62 3.48 127.71 12.54 3.00 DBST
11+580 20 7.90 1.98 2.02 40.40 1.58 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88 3.52 129.69 12.76 3.05 DBST
11+600 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
11+620 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST

241 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

11+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+660 20 7.09 1.77 1.76 35.20 1.42 1.41 28.20 3.00 0.53 10.60 155.90 182.40 20.27 3.12 109.79 10.55 2.60 DBST
11+680 20 8.20 2.05 1.91 38.20 1.64 1.53 30.60 3.00 0.53 10.60 167.90 196.44 21.83 3.36 121.67 11.87 2.87 DBST
11+700 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
11+720 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
11+740 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+760 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+780 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+800 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
11+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
11+860 20 7.17 1.79 1.77 35.40 1.43 1.42 28.40 3.00 0.53 10.60 156.70 183.34 20.37 3.13 110.58 10.64 2.62 DBST
11+880 20 8.20 2.05 1.92 38.40 1.64 1.54 30.80 3.00 0.53 10.60 168.70 197.38 21.93 3.37 122.46 11.96 2.89 DBST
11+900 20 7.74 1.94 2.00 40.00 1.55 1.60 32.00 3.00 0.53 10.60 174.40 204.05 22.67 3.49 128.11 12.58 3.01 DBST
11+920 20 8.20 2.05 2.00 40.00 1.64 1.60 32.00 3.00 0.53 10.60 174.40 204.05 22.67 3.49 128.11 12.58 3.01 DBST
11+940 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
11+960 20 7.11 1.78 1.92 38.40 1.42 1.53 30.60 3.00 0.53 10.60 168.10 196.68 21.85 3.36 121.87 11.89 2.87 DBST
11+980 20 8.60 2.15 1.97 39.40 1.72 1.57 31.40 3.00 0.53 10.60 172.10 201.36 22.37 3.44 125.83 12.33 2.96 DBST
12+000 20 7.27 1.82 1.99 39.80 1.45 1.59 31.80 3.00 0.53 10.60 173.70 203.23 22.58 3.47 127.41 12.51 3.00 DBST
12+020 20 7.06 1.77 1.80 36.00 1.41 1.43 28.60 3.00 0.53 10.60 158.30 185.21 20.58 3.17 112.17 10.81 2.66 DBST
12+040 20 7.37 1.84 1.81 36.20 1.47 1.44 28.80 3.00 0.53 10.60 159.30 186.38 20.71 3.19 113.16 10.92 2.68 DBST
12+060 20 8.60 2.15 2.00 40.00 1.72 1.60 32.00 3.00 0.53 10.60 174.70 204.40 22.71 3.49 128.40 12.62 3.02 DBST
12+080 20 8.67 2.17 2.16 43.20 1.73 1.73 34.60 3.00 0.53 10.60 187.70 219.61 24.40 3.75 141.27 14.05 3.30 DBST
12+100 20 7.76 1.94 2.06 41.20 1.55 1.64 32.80 3.00 0.53 10.60 179.30 209.78 23.31 3.59 132.96 13.12 3.12 DBST
12+120 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 162.60 190.24 21.14 3.25 116.42 11.29 2.75 DBST
12+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
12+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
12+180 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
12+200 20 7.33 1.83 1.91 38.20 1.47 1.53 30.60 3.00 0.53 10.60 167.30 195.74 21.75 3.35 121.08 11.80 2.86 DBST
12+220 20 7.00 1.75 1.79 35.80 1.40 1.44 28.80 3.00 0.53 10.60 158.30 185.21 20.58 3.17 112.17 10.81 2.66 DBST
12+240 20 7.34 1.84 1.80 36.00 1.47 1.44 28.80 3.00 0.53 10.60 158.40 185.33 20.59 3.17 112.27 10.82 2.66 DBST
12+260 20 7.80 1.95 1.90 38.00 1.56 1.52 30.40 3.00 0.53 10.60 166.40 194.69 21.63 3.33 120.19 11.70 2.84 DBST
12+280 20 7.45 1.86 1.91 38.20 1.49 1.53 30.60 3.00 0.53 10.60 167.50 195.98 21.78 3.35 121.28 11.83 2.86 DBST
12+300 20 7.66 1.92 1.89 37.80 1.53 1.51 30.20 3.00 0.53 10.60 166.10 194.34 21.59 3.32 119.89 11.67 2.83 DBST
12+320 20 7.90 1.98 1.95 39.00 1.58 1.56 31.20 3.00 0.53 10.60 170.60 199.60 22.18 3.41 124.34 12.17 2.93 DBST
12+340 20 7.88 1.97 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 172.80 202.18 22.46 3.46 126.52 12.41 2.98 DBST
12+360 20 7.00 1.75 1.86 37.20 1.40 1.49 29.80 3.00 0.53 10.60 163.80 191.65 21.29 3.28 117.61 11.42 2.78 DBST
12+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
12+400 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
12+420 20 7.03 1.76 1.91 38.20 1.41 1.53 30.60 3.00 0.53 10.60 167.30 195.74 21.75 3.35 121.08 11.80 2.86 DBST
12+440 20 7.60 1.90 1.83 36.60 1.52 1.47 29.40 3.00 0.53 10.60 161.30 188.72 20.97 3.23 115.14 11.14 2.72 DBST
12+460 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST

242 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

12+480 20 7.90 1.98 1.94 38.80 1.58 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10 3.40 123.75 12.10 2.92 DBST
12+500 20 7.64 1.91 1.95 39.00 1.53 1.56 31.20 3.00 0.53 10.60 170.40 199.37 22.15 3.41 124.15 12.14 2.92 DBST
12+520 20 7.55 1.89 1.90 38.00 1.51 1.52 30.40 3.00 0.53 10.60 166.90 195.27 21.70 3.34 120.68 11.76 2.85 DBST
12+540 20 7.90 1.98 1.94 38.80 1.58 1.55 31.00 3.00 0.53 10.60 169.50 198.32 22.04 3.39 123.26 12.05 2.90 DBST
12+560 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
12+580 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
12+600 20 7.59 1.90 1.94 38.80 1.52 1.55 31.00 3.00 0.53 10.60 169.90 198.78 22.09 3.40 123.65 12.09 2.91 DBST
12+620 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 160.90 188.25 20.92 3.22 114.74 11.10 2.71 DBST
12+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
12+660 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
12+680 20 7.90 1.98 1.94 38.80 1.58 1.55 31.00 3.00 0.53 10.60 169.60 198.43 22.05 3.39 123.35 12.06 2.91 DBST
12+700 20 7.01 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.10 192.00 21.33 3.28 117.91 11.45 2.79 DBST
12+720 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.10 192.00 21.33 3.28 117.91 11.45 2.79 DBST
12+740 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
12+760 20 7.86 1.97 1.98 39.60 1.57 1.58 31.60 3.00 0.53 10.60 172.60 201.94 22.44 3.45 126.32 12.39 2.97 DBST
12+780 20 7.56 1.89 1.93 38.60 1.51 1.54 30.80 3.00 0.53 10.60 169.20 197.96 22.00 3.38 122.96 12.01 2.90 DBST
12+800 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
12+820 20 7.08 1.77 1.83 36.60 1.42 1.47 29.40 3.00 0.53 10.60 161.40 188.84 20.98 3.23 115.24 11.15 2.73 DBST
12+840 20 7.87 1.97 1.87 37.40 1.57 1.50 30.00 3.00 0.53 10.60 164.50 192.47 21.39 3.29 118.31 11.50 2.79 DBST
12+860 20 8.60 2.15 2.06 41.20 1.72 1.65 33.00 3.00 0.53 10.60 179.70 210.25 23.36 3.59 133.35 13.17 3.13 DBST
12+880 20 7.94 1.99 2.07 41.40 1.59 1.66 33.20 3.00 0.53 10.60 180.40 211.07 23.45 3.61 134.05 13.24 3.14 DBST
12+900 20 7.90 1.98 1.99 39.80 1.58 1.59 31.80 3.00 0.53 10.60 173.40 202.88 22.54 3.47 127.12 12.47 2.99 DBST
12+920 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
12+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
12+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
12+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+000 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
13+020 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
13+040 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
13+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+080 20 7.47 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.70 186.85 20.76 3.19 113.55 10.97 2.69 DBST
13+100 20 7.80 1.95 1.91 38.20 1.56 1.53 30.60 3.00 0.53 10.60 167.70 196.21 21.80 3.35 121.47 11.85 2.86 DBST
13+120 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
13+140 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
13+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+260 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
13+280 20 7.20 1.80 1.89 37.80 1.44 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58 3.32 119.79 11.66 2.83 DBST
13+300 20 7.00 1.75 1.78 35.60 1.40 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41 3.14 110.88 10.67 2.63 DBST

243 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

13+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+380 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
13+400 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
13+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+440 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
13+460 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
13+480 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
13+500 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
13+520 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
13+540 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
13+560 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
13+580 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
13+600 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
13+620 20 7.40 1.85 1.88 37.60 1.48 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
13+640 20 7.01 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.10 186.15 20.68 3.18 112.96 10.90 2.68 DBST
13+660 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.10 195.51 21.72 3.34 120.88 11.78 2.85 DBST
13+680 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
13+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+740 20 7.72 1.93 1.84 36.80 1.54 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
13+760 20 8.20 2.05 1.99 39.80 1.64 1.59 31.80 3.00 0.53 10.60 174.20 203.81 22.65 3.48 127.91 12.56 3.01 DBST
13+780 20 7.90 1.98 2.02 40.40 1.58 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88 3.52 129.69 12.76 3.05 DBST
13+800 20 7.40 1.85 1.92 38.40 1.48 1.53 30.60 3.00 0.53 10.60 168.00 196.56 21.84 3.36 121.77 11.88 2.87 DBST
13+820 20 8.20 2.05 1.95 39.00 1.64 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
13+840 20 8.19 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 178.90 209.31 23.26 3.58 132.56 13.08 3.11 DBST
13+860 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 166.90 195.27 21.70 3.34 120.68 11.76 2.85 DBST
13+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
13+900 20 7.50 1.88 1.82 36.40 1.50 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
13+920 20 7.90 1.98 1.93 38.60 1.58 1.54 30.80 3.00 0.53 10.60 169.00 197.73 21.97 3.38 122.76 11.99 2.89 DBST
13+940 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
13+960 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
13+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+000 20 7.74 1.94 1.85 37.00 1.55 1.48 29.60 3.00 0.53 10.60 162.40 190.01 21.11 3.25 116.23 11.26 2.75 DBST
14+020 20 7.03 1.76 1.85 37.00 1.41 1.48 29.60 3.00 0.53 10.60 162.70 190.36 21.15 3.25 116.52 11.30 2.75 DBST
14+040 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.30 181.70 20.19 3.11 109.20 10.48 2.59 DBST
14+060 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
14+080 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
14+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

244 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

14+160 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
14+180 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
14+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+280 20 7.58 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 160.80 188.14 20.90 3.22 114.64 11.09 2.71 DBST
14+300 20 7.84 1.96 1.93 38.60 1.57 1.55 31.00 3.00 0.53 10.60 169.20 197.96 22.00 3.38 122.96 12.01 2.90 DBST
14+320 20 7.90 1.98 1.97 39.40 1.58 1.58 31.60 3.00 0.53 10.60 172.40 201.71 22.41 3.45 126.13 12.36 2.97 DBST
14+340 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
14+360 20 7.42 1.86 1.92 38.40 1.48 1.53 30.60 3.00 0.53 10.60 168.20 196.79 21.87 3.36 121.97 11.90 2.88 DBST
14+380 20 7.80 1.95 1.91 38.20 1.56 1.52 30.40 3.00 0.53 10.60 167.20 195.62 21.74 3.34 120.98 11.79 2.85 DBST
14+400 20 7.90 1.98 1.97 39.40 1.58 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36 3.44 125.73 12.32 2.96 DBST
14+420 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
14+440 20 7.53 1.88 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.30 187.55 20.84 3.21 114.15 11.03 2.70 DBST
14+460 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 165.90 194.10 21.57 3.32 119.69 11.65 2.82 DBST
14+480 20 8.13 2.03 1.96 39.20 1.63 1.57 31.40 3.00 0.53 10.60 171.90 201.12 22.35 3.44 125.63 12.31 2.96 DBST
14+500 20 7.00 1.75 1.89 37.80 1.40 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
14+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+560 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
14+580 20 7.87 1.97 1.98 39.60 1.57 1.58 31.60 3.00 0.53 10.60 172.70 202.06 22.45 3.45 126.42 12.40 2.97 DBST
14+600 20 7.21 1.80 1.89 37.80 1.44 1.51 30.20 3.00 0.53 10.60 165.80 193.99 21.55 3.32 119.59 11.64 2.82 DBST
14+620 20 8.60 2.15 1.98 39.60 1.72 1.58 31.60 3.00 0.53 10.60 173.10 202.53 22.50 3.46 126.82 12.44 2.98 DBST
14+640 20 8.02 2.01 2.08 41.60 1.60 1.66 33.20 3.00 0.53 10.60 181.20 212.00 23.56 3.62 134.84 13.33 3.16 DBST
14+660 20 7.00 1.75 1.88 37.60 1.40 1.50 30.00 3.00 0.53 10.60 165.20 193.28 21.48 3.30 119.00 11.57 2.81 DBST
14+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+760 20 7.68 1.92 1.84 36.80 1.54 1.47 29.40 3.00 0.53 10.60 161.80 189.31 21.03 3.24 115.63 11.20 2.73 DBST
14+780 20 8.20 2.05 1.99 39.80 1.64 1.59 31.80 3.00 0.53 10.60 173.80 203.35 22.59 3.48 127.51 12.52 3.00 DBST
14+800 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
14+820 20 8.11 2.03 2.04 40.80 1.62 1.63 32.60 3.00 0.53 10.60 178.10 208.38 23.15 3.56 131.77 12.99 3.09 DBST
14+840 20 7.00 1.75 1.89 37.80 1.40 1.51 30.20 3.00 0.53 10.60 166.10 194.34 21.59 3.32 119.89 11.67 2.83 DBST
14+860 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
14+880 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
14+900 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
14+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
14+980 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST

245 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

15+000 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
15+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
15+040 20 7.43 1.86 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.30 186.38 20.71 3.19 113.16 10.92 2.68 DBST
15+060 20 8.60 2.15 2.01 40.20 1.72 1.61 32.20 3.00 0.53 10.60 175.30 205.10 22.79 3.51 129.00 12.68 3.03 DBST
15+080 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
15+100 20 7.01 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.10 200.19 22.24 3.42 124.84 12.22 2.94 DBST
15+120 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.10 195.51 21.72 3.34 120.88 11.78 2.85 DBST
15+140 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
15+160 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
15+180 20 8.35 2.09 1.92 38.40 1.67 1.54 30.80 3.00 0.53 10.60 168.50 197.15 21.91 3.37 122.27 11.94 2.88 DBST
15+200 20 8.60 2.15 2.12 42.40 1.72 1.70 34.00 3.00 0.53 10.60 184.50 215.87 23.99 3.69 138.11 13.70 3.23 DBST
15+220 20 8.14 2.04 2.10 42.00 1.63 1.68 33.60 3.00 0.53 10.60 182.40 213.41 23.71 3.65 136.03 13.46 3.19 DBST
15+240 20 7.94 1.99 2.02 40.40 1.59 1.61 32.20 3.00 0.53 10.60 175.80 205.69 22.85 3.52 129.49 12.74 3.04 DBST
15+260 20 8.60 2.15 2.07 41.40 1.72 1.66 33.20 3.00 0.53 10.60 180.40 211.07 23.45 3.61 134.05 13.24 3.14 DBST
15+280 20 8.38 2.10 2.13 42.60 1.68 1.70 34.00 3.00 0.53 10.60 184.80 216.22 24.02 3.70 138.40 13.73 3.24 DBST
15+300 20 8.20 2.05 2.08 41.60 1.64 1.66 33.20 3.00 0.53 10.60 180.80 211.54 23.50 3.62 134.44 13.29 3.15 DBST
15+320 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
15+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
15+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
15+380 20 8.28 2.07 1.91 38.20 1.66 1.53 30.60 3.00 0.53 10.60 167.80 196.33 21.81 3.36 121.57 11.86 2.87 DBST
15+400 20 8.60 2.15 2.11 42.20 1.72 1.69 33.80 3.00 0.53 10.60 183.80 215.05 23.89 3.68 137.41 13.62 3.22 DBST
15+420 20 8.24 2.06 2.11 42.20 1.65 1.69 33.80 3.00 0.53 10.60 183.40 214.58 23.84 3.67 137.02 13.57 3.21 DBST
15+440 20 8.20 2.05 2.06 41.20 1.64 1.65 33.00 3.00 0.53 10.60 179.40 209.90 23.32 3.59 133.06 13.13 3.12 DBST
15+460 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
15+480 20 8.02 2.01 2.03 40.60 1.60 1.62 32.40 3.00 0.53 10.60 177.20 207.32 23.04 3.54 130.88 12.89 3.07 DBST
15+500 20 7.90 1.98 2.00 40.00 1.58 1.59 31.80 3.00 0.53 10.60 174.20 203.81 22.65 3.48 127.91 12.56 3.01 DBST
15+520 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
15+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
15+560 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
15+580 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
15+600 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
15+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
15+640 20 7.65 1.91 1.83 36.60 1.53 1.47 29.40 3.00 0.53 10.60 161.50 188.96 21.00 3.23 115.34 11.17 2.73 DBST
15+660 20 7.00 1.75 1.83 36.60 1.40 1.47 29.40 3.00 0.53 10.60 161.50 188.96 21.00 3.23 115.34 11.17 2.73 DBST
15+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
15+700 20 7.13 1.78 1.77 35.40 1.43 1.42 28.40 3.00 0.53 10.60 156.30 182.87 20.32 3.13 110.19 10.59 2.61 DBST
15+720 20 7.80 1.95 1.87 37.40 1.56 1.50 30.00 3.00 0.53 10.60 164.30 192.23 21.36 3.29 118.11 11.47 2.79 DBST
15+740 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
15+760 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
15+780 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
15+800 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
15+820 20 8.01 2.00 1.99 39.80 1.60 1.59 31.80 3.00 0.53 10.60 174.10 203.70 22.63 3.48 127.81 12.55 3.01 DBST

246 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

15+840 20 7.84 1.96 1.98 39.60 1.57 1.59 31.80 3.00 0.53 10.60 173.50 203.00 22.56 3.47 127.22 12.49 2.99 DBST
15+860 20 7.66 1.92 1.94 38.80 1.53 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10 3.40 123.75 12.10 2.92 DBST
15+880 20 7.48 1.87 1.90 38.00 1.50 1.52 30.40 3.00 0.53 10.60 166.40 194.69 21.63 3.33 120.19 11.70 2.84 DBST
15+900 20 7.31 1.83 1.85 37.00 1.46 1.48 29.60 3.00 0.53 10.60 162.90 190.59 21.18 3.26 116.72 11.32 2.76 DBST
15+920 20 7.90 1.98 1.91 38.20 1.58 1.52 30.40 3.00 0.53 10.60 167.10 195.51 21.72 3.34 120.88 11.78 2.85 DBST
15+940 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
15+960 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
15+980 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
16+000 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
16+020 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
16+040 20 7.66 1.92 1.99 39.80 1.53 1.59 31.80 3.00 0.53 10.60 173.60 203.11 22.57 3.47 127.31 12.50 2.99 DBST
16+060 20 7.56 1.89 1.91 38.20 1.51 1.52 30.40 3.00 0.53 10.60 167.20 195.62 21.74 3.34 120.98 11.79 2.85 DBST
16+080 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
16+100 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
16+120 20 7.10 1.78 1.77 35.40 1.42 1.41 28.20 3.00 0.53 10.60 156.00 182.52 20.28 3.12 109.89 10.56 2.61 DBST
16+140 20 7.50 1.88 1.83 36.60 1.50 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
16+160 20 7.28 1.82 1.85 37.00 1.46 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
16+180 20 8.90 2.23 2.03 40.60 1.78 1.62 32.40 3.00 0.53 10.60 176.80 206.86 22.98 3.54 130.48 12.85 3.06 DBST
16+200 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
16+220 20 8.02 2.01 2.12 42.40 1.60 1.69 33.80 3.00 0.53 10.60 184.20 215.51 23.95 3.68 137.81 13.66 3.23 DBST
16+240 20 7.00 1.75 1.88 37.60 1.40 1.50 30.00 3.00 0.53 10.60 165.20 193.28 21.48 3.30 119.00 11.57 2.81 DBST
16+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+360 20 7.04 1.76 1.76 35.20 1.41 1.41 28.20 3.00 0.53 10.60 155.40 181.82 20.20 3.11 109.30 10.49 2.59 DBST
16+380 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.40 181.82 20.20 3.11 109.30 10.49 2.59 DBST
16+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+420 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
16+440 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
16+460 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
16+480 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+520 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
16+540 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
16+560 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
16+580 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
16+600 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
16+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+640 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
16+660 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST

247 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

16+680 20 8.60 2.15 2.07 41.40 1.72 1.65 33.00 3.00 0.53 10.60 180.00 210.60 23.40 3.60 133.65 13.20 3.14 DBST
16+700 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
16+720 20 8.38 2.10 2.13 42.60 1.68 1.70 34.00 3.00 0.53 10.60 184.80 216.22 24.02 3.70 138.40 13.73 3.24 DBST
16+740 20 7.46 1.87 1.99 39.80 1.49 1.59 31.80 3.00 0.53 10.60 173.40 202.88 22.54 3.47 127.12 12.47 2.99 DBST
16+760 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
16+780 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
16+800 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
16+820 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
16+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+860 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
16+880 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
16+900 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
16+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
16+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+000 20 7.92 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
17+020 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
17+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+080 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+100 20 7.78 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
17+120 20 8.06 2.02 1.99 39.80 1.61 1.59 31.80 3.00 0.53 10.60 173.40 202.88 22.54 3.47 127.12 12.47 2.99 DBST
17+140 20 8.20 2.05 2.04 40.80 1.64 1.63 32.60 3.00 0.53 10.60 177.60 207.79 23.09 3.55 131.27 12.94 3.08 DBST
17+160 20 7.66 1.92 1.99 39.80 1.53 1.59 31.80 3.00 0.53 10.60 173.60 203.11 22.57 3.47 127.31 12.50 2.99 DBST
17+180 20 7.90 1.98 1.95 39.00 1.58 1.56 31.20 3.00 0.53 10.60 170.60 199.60 22.18 3.41 124.34 12.17 2.93 DBST
17+200 20 7.22 1.81 1.90 38.00 1.44 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
17+220 20 7.81 1.95 1.88 37.60 1.56 1.50 30.00 3.00 0.53 10.60 165.30 193.40 21.49 3.31 119.10 11.58 2.81 DBST
17+240 20 7.90 1.98 1.97 39.40 1.58 1.57 31.40 3.00 0.53 10.60 172.10 201.36 22.37 3.44 125.83 12.33 2.96 DBST
17+260 20 7.21 1.80 1.89 37.80 1.44 1.51 30.20 3.00 0.53 10.60 166.10 194.34 21.59 3.32 119.89 11.67 2.83 DBST
17+280 20 8.20 2.05 1.93 38.60 1.64 1.54 30.80 3.00 0.53 10.60 169.10 197.85 21.98 3.38 122.86 12.00 2.90 DBST
17+300 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
17+320 20 8.40 2.10 2.08 41.60 1.68 1.66 33.20 3.00 0.53 10.60 181.00 211.77 23.53 3.62 134.64 13.31 3.16 DBST
17+340 20 7.90 1.98 2.04 40.80 1.58 1.63 32.60 3.00 0.53 10.60 178.00 208.26 23.14 3.56 131.67 12.98 3.09 DBST
17+360 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
17+380 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
17+400 20 7.59 1.90 1.94 38.80 1.52 1.55 31.00 3.00 0.53 10.60 169.90 198.78 22.09 3.40 123.65 12.09 2.91 DBST
17+420 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 160.90 188.25 20.92 3.22 114.74 11.10 2.71 DBST
17+440 20 7.74 1.94 1.85 37.00 1.55 1.48 29.60 3.00 0.53 10.60 162.40 190.01 21.11 3.25 116.23 11.26 2.75 DBST
17+460 20 7.90 1.98 1.96 39.20 1.58 1.57 31.40 3.00 0.53 10.60 171.40 200.54 22.28 3.43 125.14 12.25 2.95 DBST
17+480 20 7.08 1.77 1.88 37.60 1.42 1.50 30.00 3.00 0.53 10.60 164.80 192.82 21.42 3.30 118.60 11.53 2.80 DBST
17+500 20 7.90 1.98 1.88 37.60 1.58 1.50 30.00 3.00 0.53 10.60 164.80 192.82 21.42 3.30 118.60 11.53 2.80 DBST

248 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

17+520 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
17+540 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
17+560 20 7.17 1.79 1.85 37.00 1.43 1.48 29.60 3.00 0.53 10.60 162.70 190.36 21.15 3.25 116.52 11.30 2.75 DBST
17+580 20 7.00 1.75 1.77 35.40 1.40 1.42 28.40 3.00 0.53 10.60 156.70 183.34 20.37 3.13 110.58 10.64 2.62 DBST
17+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+640 20 7.63 1.91 1.83 36.60 1.53 1.47 29.40 3.00 0.53 10.60 161.30 188.72 20.97 3.23 115.14 11.14 2.72 DBST
17+660 20 8.20 2.05 1.98 39.60 1.64 1.59 31.80 3.00 0.53 10.60 173.30 202.76 22.53 3.47 127.02 12.46 2.99 DBST
17+680 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
17+700 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
17+720 20 7.68 1.92 1.99 39.80 1.54 1.59 31.80 3.00 0.53 10.60 173.80 203.35 22.59 3.48 127.51 12.52 3.00 DBST
17+740 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 161.80 189.31 21.03 3.24 115.63 11.20 2.73 DBST
17+760 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
17+780 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
17+800 20 8.03 2.01 2.00 40.00 1.61 1.60 32.00 3.00 0.53 10.60 174.30 203.93 22.66 3.49 128.01 12.57 3.01 DBST
17+820 20 8.20 2.05 2.03 40.60 1.64 1.63 32.60 3.00 0.53 10.60 177.30 207.44 23.05 3.55 130.98 12.90 3.08 DBST
17+840 20 7.84 1.96 2.01 40.20 1.57 1.61 32.20 3.00 0.53 10.60 175.40 205.22 22.80 3.51 129.10 12.69 3.03 DBST
17+860 20 8.17 2.04 2.00 40.00 1.63 1.60 32.00 3.00 0.53 10.60 175.10 204.87 22.76 3.50 128.80 12.66 3.03 DBST
17+880 20 8.60 2.15 2.10 42.00 1.72 1.68 33.60 3.00 0.53 10.60 182.70 213.76 23.75 3.65 136.32 13.50 3.19 DBST
17+900 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
17+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
17+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+020 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
18+040 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
18+060 20 7.36 1.84 1.90 38.00 1.47 1.52 30.40 3.00 0.53 10.60 166.60 194.92 21.66 3.33 120.38 11.73 2.84 DBST
18+080 20 7.06 1.77 1.81 36.20 1.41 1.44 28.80 3.00 0.53 10.60 159.20 186.26 20.70 3.18 113.06 10.91 2.68 DBST
18+100 20 7.00 1.75 1.76 35.20 1.40 1.41 28.20 3.00 0.53 10.60 155.60 182.05 20.23 3.11 109.49 10.52 2.60 DBST
18+120 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
18+140 20 7.66 1.92 1.94 38.80 1.53 1.55 31.00 3.00 0.53 10.60 169.60 198.43 22.05 3.39 123.35 12.06 2.91 DBST
18+160 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 161.60 189.07 21.01 3.23 115.43 11.18 2.73 DBST
18+180 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
18+200 20 7.60 1.90 1.94 38.80 1.52 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10 3.40 123.75 12.10 2.92 DBST
18+220 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
18+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+340 20 7.11 1.78 1.77 35.40 1.42 1.41 28.20 3.00 0.53 10.60 156.10 182.64 20.29 3.12 109.99 10.57 2.61 DBST

249 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

18+360 20 7.90 1.98 1.88 37.60 1.58 1.50 30.00 3.00 0.53 10.60 165.10 193.17 21.46 3.30 118.90 11.56 2.81 DBST
18+380 20 7.52 1.88 1.93 38.60 1.50 1.54 30.80 3.00 0.53 10.60 169.20 197.96 22.00 3.38 122.96 12.01 2.90 DBST
18+400 20 7.80 1.95 1.92 38.40 1.56 1.53 30.60 3.00 0.53 10.60 168.20 196.79 21.87 3.36 121.97 11.90 2.88 DBST
18+420 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
18+440 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
18+460 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
18+480 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
18+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+520 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
18+540 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
18+560 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
18+580 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
18+600 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
18+620 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
18+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+660 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
18+680 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
18+700 20 7.66 1.92 1.95 39.00 1.53 1.56 31.20 3.00 0.53 10.60 170.60 199.60 22.18 3.41 124.34 12.17 2.93 DBST
18+720 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 161.60 189.07 21.01 3.23 115.43 11.18 2.73 DBST
18+740 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
18+760 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
18+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+820 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
18+840 20 8.09 2.02 2.04 40.80 1.62 1.63 32.60 3.00 0.53 10.60 177.90 208.14 23.13 3.56 131.57 12.97 3.09 DBST
18+860 20 7.90 1.98 2.00 40.00 1.58 1.60 32.00 3.00 0.53 10.60 174.90 204.63 22.74 3.50 128.60 12.64 3.02 DBST
18+880 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
18+900 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
18+920 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
18+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
18+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+000 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
19+020 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
19+040 20 7.20 1.80 1.93 38.60 1.44 1.54 30.80 3.00 0.53 10.60 169.00 197.73 21.97 3.38 122.76 11.99 2.89 DBST
19+060 20 7.36 1.84 1.82 36.40 1.47 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
19+080 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
19+100 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
19+120 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
19+140 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
19+160 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
19+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

250 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

19+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+260 20 7.38 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 158.80 185.80 20.64 3.18 112.66 10.87 2.67 DBST
19+280 20 7.46 1.87 1.86 37.20 1.49 1.49 29.80 3.00 0.53 10.60 163.40 191.18 21.24 3.27 117.22 11.37 2.77 DBST
19+300 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
19+320 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
19+340 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
19+360 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
19+380 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
19+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+460 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
19+480 20 7.78 1.95 1.97 39.40 1.56 1.57 31.40 3.00 0.53 10.60 171.80 201.01 22.33 3.44 125.53 12.30 2.95 DBST
19+500 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
19+520 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
19+540 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
19+560 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
19+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+660 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+700 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
19+720 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
19+740 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
19+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+800 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
19+820 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
19+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
19+920 20 8.20 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
19+940 20 7.13 1.78 1.92 38.40 1.43 1.54 30.80 3.00 0.53 10.60 168.30 196.91 21.88 3.37 122.07 11.91 2.88 DBST
19+960 20 7.80 1.95 1.87 37.40 1.56 1.50 30.00 3.00 0.53 10.60 164.30 192.23 21.36 3.29 118.11 11.47 2.79 DBST
19+980 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
20+000 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
20+020 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST

251 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

20+040 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
20+060 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
20+080 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
20+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+140 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
20+160 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
20+180 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
20+200 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
20+220 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
20+240 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
20+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+300 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
20+320 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
20+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+400 20 7.20 1.80 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41 3.14 110.88 10.67 2.63 DBST
20+420 20 7.00 1.75 1.78 35.60 1.40 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41 3.14 110.88 10.67 2.63 DBST
20+440 20 7.38 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 158.80 185.80 20.64 3.18 112.66 10.87 2.67 DBST
20+460 20 7.21 1.80 1.83 36.60 1.44 1.46 29.20 3.00 0.53 10.60 160.90 188.25 20.92 3.22 114.74 11.10 2.71 DBST
20+480 20 7.00 1.75 1.78 35.60 1.40 1.42 28.40 3.00 0.53 10.60 157.10 183.81 20.42 3.14 110.98 10.68 2.63 DBST
20+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+540 20 8.04 2.01 1.88 37.60 1.61 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
20+560 20 8.20 2.05 2.03 40.60 1.64 1.63 32.60 3.00 0.53 10.60 177.40 207.56 23.06 3.55 131.08 12.91 3.08 DBST
20+580 20 8.20 2.05 2.05 41.00 1.64 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
20+600 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
20+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+640 20 7.48 1.87 1.81 36.20 1.50 1.45 29.00 3.00 0.53 10.60 159.80 186.97 20.77 3.20 113.65 10.98 2.69 DBST
20+660 20 7.70 1.93 1.90 38.00 1.54 1.52 30.40 3.00 0.53 10.60 166.80 195.16 21.68 3.34 120.58 11.75 2.84 DBST
20+680 20 7.00 1.75 1.84 36.80 1.40 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06 3.24 115.83 11.22 2.74 DBST
20+700 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
20+720 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
20+740 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
20+760 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
20+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
20+840 20 7.26 1.82 1.79 35.80 1.45 1.43 28.60 3.00 0.53 10.60 157.60 184.39 20.49 3.15 111.47 10.74 2.64 DBST
20+860 20 7.71 1.93 1.88 37.60 1.54 1.50 30.00 3.00 0.53 10.60 164.70 192.70 21.41 3.29 118.50 11.52 2.80 DBST

252 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

20+880 20 8.60 2.15 2.04 40.80 1.72 1.63 32.60 3.00 0.53 10.60 178.10 208.38 23.15 3.56 131.77 12.99 3.09 DBST
20+900 20 8.47 2.12 2.14 42.80 1.69 1.71 34.20 3.00 0.53 10.60 185.70 217.27 24.14 3.71 139.29 13.83 3.26 DBST
20+920 20 7.39 1.85 1.99 39.80 1.48 1.59 31.80 3.00 0.53 10.60 173.60 203.11 22.57 3.47 127.31 12.50 2.99 DBST
20+940 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.90 185.91 20.66 3.18 112.76 10.88 2.67 DBST
20+960 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
20+980 20 7.46 1.87 1.86 37.20 1.49 1.49 29.80 3.00 0.53 10.60 163.60 191.41 21.27 3.27 117.41 11.40 2.77 DBST
21+000 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
21+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+060 20 7.47 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.70 186.85 20.76 3.19 113.55 10.97 2.69 DBST
21+080 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.70 186.85 20.76 3.19 113.55 10.97 2.69 DBST
21+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+140 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
21+160 20 7.58 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 166.80 195.16 21.68 3.34 120.58 11.75 2.84 DBST
21+180 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 160.80 188.14 20.90 3.22 114.64 11.09 2.71 DBST
21+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+260 20 8.01 2.00 1.88 37.60 1.60 1.50 30.00 3.00 0.53 10.60 165.10 193.17 21.46 3.30 118.90 11.56 2.81 DBST
21+280 20 8.90 2.23 2.12 42.40 1.78 1.69 33.80 3.00 0.53 10.60 184.10 215.40 23.93 3.68 137.71 13.65 3.23 DBST
21+300 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
21+320 20 7.40 1.85 2.04 40.80 1.48 1.63 32.60 3.00 0.53 10.60 178.00 208.26 23.14 3.56 131.67 12.98 3.09 DBST
21+340 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
21+360 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+460 20 7.36 1.84 1.80 36.00 1.47 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
21+480 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
21+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+560 20 7.67 1.92 1.84 36.80 1.53 1.47 29.40 3.00 0.53 10.60 161.70 189.19 21.02 3.23 115.53 11.19 2.73 DBST
21+580 20 8.60 2.15 2.04 40.80 1.72 1.63 32.60 3.00 0.53 10.60 177.70 207.91 23.10 3.55 131.37 12.95 3.08 DBST
21+600 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
21+620 20 7.19 1.80 1.98 39.60 1.44 1.58 31.60 3.00 0.53 10.60 172.90 202.29 22.48 3.46 126.62 12.42 2.98 DBST
21+640 20 7.00 1.75 1.78 35.60 1.40 1.42 28.40 3.00 0.53 10.60 156.90 183.57 20.40 3.14 110.78 10.66 2.63 DBST
21+660 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

253 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

21+720 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
21+740 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
21+760 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
21+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+800 20 7.88 1.97 1.86 37.20 1.58 1.49 29.80 3.00 0.53 10.60 163.80 191.65 21.29 3.28 117.61 11.42 2.78 DBST
21+820 20 7.25 1.81 1.89 37.80 1.45 1.52 30.40 3.00 0.53 10.60 166.30 194.57 21.62 3.33 120.09 11.69 2.83 DBST
21+840 20 7.00 1.75 1.78 35.60 1.40 1.43 28.60 3.00 0.53 10.60 157.50 184.28 20.48 3.15 111.38 10.73 2.64 DBST
21+860 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
21+880 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
21+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
21+960 20 8.83 2.21 1.98 39.60 1.77 1.59 31.80 3.00 0.53 10.60 173.30 202.76 22.53 3.47 127.02 12.46 2.99 DBST
21+980 20 8.90 2.23 2.22 44.40 1.78 1.78 35.60 3.00 0.53 10.60 192.30 224.99 25.00 3.85 145.83 14.55 3.41 DBST
22+000 20 8.50 2.13 2.18 43.60 1.70 1.74 34.80 3.00 0.53 10.60 189.00 221.13 24.57 3.78 142.56 14.19 3.33 DBST
22+020 20 7.00 1.75 1.94 38.80 1.40 1.55 31.00 3.00 0.53 10.60 170.00 198.90 22.10 3.40 123.75 12.10 2.92 DBST
22+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+080 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
22+100 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
22+120 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
22+140 20 7.42 1.86 1.81 36.20 1.48 1.44 28.80 3.00 0.53 10.60 159.20 186.26 20.70 3.18 113.06 10.91 2.68 DBST
22+160 20 8.60 2.15 2.01 40.20 1.72 1.60 32.00 3.00 0.53 10.60 175.20 204.98 22.78 3.50 128.90 12.67 3.03 DBST
22+180 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
22+200 20 7.43 1.86 2.01 40.20 1.49 1.61 32.20 3.00 0.53 10.60 175.30 205.10 22.79 3.51 129.00 12.68 3.03 DBST
22+220 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.30 186.38 20.71 3.19 113.16 10.92 2.68 DBST
22+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+260 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
22+280 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
22+300 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
22+320 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+340 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+360 20 8.19 2.05 1.90 38.00 1.64 1.52 30.40 3.00 0.53 10.60 166.90 195.27 21.70 3.34 120.68 11.76 2.85 DBST
22+380 20 8.90 2.23 2.14 42.80 1.78 1.71 34.20 3.00 0.53 10.60 185.90 217.50 24.17 3.72 139.49 13.85 3.26 DBST
22+400 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
22+420 20 7.00 1.75 1.99 39.80 1.40 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62 3.48 127.71 12.54 3.00 DBST
22+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+480 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+500 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
22+520 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
22+540 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST

254 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

22+560 20 7.63 1.91 1.90 38.00 1.53 1.52 30.40 3.00 0.53 10.60 166.90 195.27 21.70 3.34 120.68 11.76 2.85 DBST
22+580 20 8.60 2.15 2.03 40.60 1.72 1.63 32.60 3.00 0.53 10.60 177.30 207.44 23.05 3.55 130.98 12.90 3.08 DBST
22+600 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
22+620 20 7.28 1.82 1.99 39.80 1.46 1.59 31.80 3.00 0.53 10.60 173.80 203.35 22.59 3.48 127.51 12.52 3.00 DBST
22+640 20 7.48 1.87 1.85 37.00 1.50 1.48 29.60 3.00 0.53 10.60 162.60 190.24 21.14 3.25 116.42 11.29 2.75 DBST
22+660 20 7.56 1.89 1.88 37.60 1.51 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
22+680 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
22+700 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
22+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+760 20 7.36 1.84 1.80 36.00 1.47 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
22+780 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
22+800 20 8.07 2.02 1.89 37.80 1.61 1.51 30.20 3.00 0.53 10.60 165.70 193.87 21.54 3.31 119.49 11.63 2.82 DBST
22+820 20 8.90 2.23 2.13 42.60 1.78 1.70 34.00 3.00 0.53 10.60 184.70 216.10 24.01 3.69 138.30 13.72 3.24 DBST
22+840 20 8.90 2.23 2.23 44.60 1.78 1.78 35.60 3.00 0.53 10.60 193.00 225.81 25.09 3.86 146.52 14.63 3.42 DBST
22+860 20 7.16 1.79 2.01 40.20 1.43 1.61 32.20 3.00 0.53 10.60 175.60 205.45 22.83 3.51 129.29 12.72 3.04 DBST
22+880 20 7.00 1.75 1.77 35.40 1.40 1.42 28.40 3.00 0.53 10.60 156.60 183.22 20.36 3.13 110.48 10.63 2.62 DBST
22+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
22+980 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
23+000 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
23+020 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
23+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+060 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+080 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+140 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
23+160 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
23+180 20 7.26 1.82 1.89 37.80 1.45 1.51 30.20 3.00 0.53 10.60 165.60 193.75 21.53 3.31 119.39 11.62 2.82 DBST
23+200 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 157.60 184.39 20.49 3.15 111.47 10.74 2.64 DBST
23+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+240 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
23+260 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
23+280 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
23+300 20 7.40 1.85 1.86 37.20 1.48 1.49 29.80 3.00 0.53 10.60 163.60 191.41 21.27 3.27 117.41 11.40 2.77 DBST
23+320 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
23+340 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
23+360 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
23+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

255 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

23+400 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+480 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+500 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+520 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
23+540 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
23+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+620 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+640 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+660 20 7.60 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
23+680 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
23+700 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
23+720 20 0.00 - 0.95 19.00 - 0.76 15.20 3.00 0.53 10.60 91.00 106.47 11.83 1.82 45.54 3.41 1.18 DBST
23+740 20 7.36 1.84 0.92 18.40 1.47 0.74 14.80 3.00 0.53 10.60 88.60 103.66 11.52 1.77 43.16 3.15 1.12 DBST
23+760 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
23+780 20 7.36 1.84 1.84 36.80 1.47 1.47 29.40 3.00 0.53 10.60 162.20 189.77 21.09 3.24 116.03 11.24 2.74 DBST
23+800 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 158.60 185.56 20.62 3.17 112.46 10.85 2.66 DBST
23+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+840 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+880 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+900 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+920 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+940 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
23+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+000 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
24+020 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
24+040 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
24+060 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
24+080 20 7.80 1.95 2.05 41.00 1.56 1.64 32.80 3.00 0.53 10.60 179.00 209.43 23.27 3.58 132.66 13.09 3.11 DBST
24+100 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
24+120 20 7.20 1.80 1.88 37.60 1.44 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
24+140 20 7.00 1.75 1.78 35.60 1.40 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41 3.14 110.88 10.67 2.63 DBST
24+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+180 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
24+200 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
24+220 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST

256 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

24+240 20 8.26 2.07 2.11 42.20 1.65 1.69 33.80 3.00 0.53 10.60 183.60 214.81 23.87 3.67 137.21 13.60 3.21 DBST
24+260 20 7.00 1.75 1.91 38.20 1.40 1.53 30.60 3.00 0.53 10.60 167.60 196.09 21.79 3.35 121.37 11.84 2.86 DBST
24+280 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+300 20 8.12 2.03 1.89 37.80 1.62 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
24+320 20 8.20 2.05 2.04 40.80 1.64 1.63 32.60 3.00 0.53 10.60 178.20 208.49 23.17 3.56 131.87 13.00 3.10 DBST
24+340 20 7.50 1.88 1.97 39.40 1.50 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36 3.44 125.73 12.32 2.96 DBST
24+360 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
24+380 20 7.50 1.88 1.88 37.60 1.50 1.50 30.00 3.00 0.53 10.60 165.00 193.05 21.45 3.30 118.80 11.55 2.81 DBST
24+400 20 7.00 1.75 1.82 36.40 1.40 1.45 29.00 3.00 0.53 10.60 160.00 187.20 20.80 3.20 113.85 11.00 2.70 DBST
24+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+480 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
24+500 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
24+520 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
24+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+560 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
24+580 20 7.80 1.95 1.97 39.40 1.56 1.57 31.40 3.00 0.53 10.60 172.00 201.24 22.36 3.44 125.73 12.32 2.96 DBST
24+600 20 8.20 2.05 2.00 40.00 1.64 1.60 32.00 3.00 0.53 10.60 175.00 204.75 22.75 3.50 128.70 12.65 3.03 DBST
24+620 20 7.90 1.98 2.02 40.40 1.58 1.61 32.20 3.00 0.53 10.60 176.00 205.92 22.88 3.52 129.69 12.76 3.05 DBST
24+640 20 7.78 1.95 1.97 39.40 1.56 1.57 31.40 3.00 0.53 10.60 171.80 201.01 22.33 3.44 125.53 12.30 2.95 DBST
24+660 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 162.80 190.48 21.16 3.26 116.62 11.31 2.76 DBST
24+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+700 20 7.48 1.87 1.81 36.20 1.50 1.45 29.00 3.00 0.53 10.60 159.80 186.97 20.77 3.20 113.65 10.98 2.69 DBST
24+720 20 7.25 1.81 1.84 36.80 1.45 1.48 29.60 3.00 0.53 10.60 162.30 189.89 21.10 3.25 116.13 11.25 2.75 DBST
24+740 20 7.57 1.89 1.85 37.00 1.51 1.48 29.60 3.00 0.53 10.60 163.20 190.94 21.22 3.26 117.02 11.35 2.77 DBST
24+760 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 166.70 195.04 21.67 3.33 120.48 11.74 2.84 DBST
24+780 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
24+800 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
24+820 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
24+840 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
24+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
24+880 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
24+900 20 7.18 1.80 1.89 37.80 1.44 1.51 30.20 3.00 0.53 10.60 165.80 193.99 21.55 3.32 119.59 11.64 2.82 DBST
24+920 20 8.20 2.05 1.93 38.60 1.64 1.54 30.80 3.00 0.53 10.60 168.80 197.50 21.94 3.38 122.56 11.97 2.89 DBST
24+940 20 7.68 1.92 1.99 39.80 1.54 1.59 31.80 3.00 0.53 10.60 173.80 203.35 22.59 3.48 127.51 12.52 3.00 DBST
24+960 20 7.90 1.98 1.95 39.00 1.58 1.56 31.20 3.00 0.53 10.60 170.80 199.84 22.20 3.42 124.54 12.19 2.93 DBST
24+980 20 7.14 1.79 1.89 37.80 1.43 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
25+000 20 7.11 1.78 1.79 35.80 1.42 1.43 28.60 3.00 0.53 10.60 157.50 184.28 20.48 3.15 111.38 10.73 2.64 DBST
25+020 20 7.80 1.95 1.87 37.40 1.56 1.49 29.80 3.00 0.53 10.60 164.10 192.00 21.33 3.28 117.91 11.45 2.79 DBST
25+040 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
25+060 20 7.30 1.83 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54 3.16 111.87 10.78 2.65 DBST

257 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

25+080 20 7.40 1.85 1.84 36.80 1.48 1.47 29.40 3.00 0.53 10.60 162.00 189.54 21.06 3.24 115.83 11.22 2.74 DBST
25+100 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
25+120 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
25+140 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
25+160 20 7.22 1.81 1.83 36.60 1.44 1.46 29.20 3.00 0.53 10.60 161.20 188.60 20.96 3.22 115.04 11.13 2.72 DBST
25+180 20 8.20 2.05 1.93 38.60 1.64 1.54 30.80 3.00 0.53 10.60 169.20 197.96 22.00 3.38 122.96 12.01 2.90 DBST
25+200 20 8.14 2.04 2.05 41.00 1.63 1.64 32.80 3.00 0.53 10.60 178.40 208.73 23.19 3.57 132.07 13.02 3.10 DBST
25+220 20 7.08 1.77 1.91 38.20 1.42 1.53 30.60 3.00 0.53 10.60 167.20 195.62 21.74 3.34 120.98 11.79 2.85 DBST
25+240 20 7.46 1.87 1.82 36.40 1.49 1.46 29.20 3.00 0.53 10.60 160.40 187.67 20.85 3.21 114.25 11.04 2.70 DBST
25+260 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+280 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
25+300 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+320 20 7.80 1.95 1.85 37.00 1.56 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
25+340 20 7.80 1.95 1.95 39.00 1.56 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
25+360 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
25+380 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+400 20 7.02 1.76 1.76 35.20 1.40 1.40 28.00 3.00 0.53 10.60 155.20 181.58 20.18 3.10 109.10 10.47 2.59 DBST
25+420 20 7.46 1.87 1.82 36.40 1.49 1.45 29.00 3.00 0.53 10.60 159.80 186.97 20.77 3.20 113.65 10.98 2.69 DBST
25+440 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+460 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+480 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+500 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
25+520 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+540 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+580 20 7.46 1.87 1.81 36.20 1.49 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
25+600 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+620 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+640 20 7.46 1.87 1.87 37.40 1.49 1.49 29.80 3.00 0.53 10.60 164.20 192.11 21.35 3.28 118.01 11.46 2.79 DBST
25+660 20 7.00 1.75 1.81 36.20 1.40 1.45 29.00 3.00 0.53 10.60 159.60 186.73 20.75 3.19 113.45 10.96 2.69 DBST
25+680 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+720 20 7.20 1.80 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41 3.14 110.88 10.67 2.63 DBST
25+740 20 7.90 1.98 1.89 37.80 1.58 1.51 30.20 3.00 0.53 10.60 166.00 194.22 21.58 3.32 119.79 11.66 2.83 DBST
25+760 20 7.44 1.86 1.92 38.40 1.49 1.54 30.80 3.00 0.53 10.60 168.40 197.03 21.89 3.37 122.17 11.92 2.88 DBST
25+780 20 7.42 1.86 1.86 37.20 1.48 1.49 29.80 3.00 0.53 10.60 163.60 191.41 21.27 3.27 117.41 11.40 2.77 DBST
25+800 20 7.90 1.98 1.92 38.40 1.58 1.53 30.60 3.00 0.53 10.60 168.20 196.79 21.87 3.36 121.97 11.90 2.88 DBST
25+820 20 7.81 1.95 1.97 39.40 1.56 1.57 31.40 3.00 0.53 10.60 172.10 201.36 22.37 3.44 125.83 12.33 2.96 DBST
25+840 20 7.00 1.75 1.85 37.00 1.40 1.48 29.60 3.00 0.53 10.60 163.10 190.83 21.20 3.26 116.92 11.34 2.76 DBST
25+860 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
25+880 20 7.30 1.83 1.79 35.80 1.46 1.43 28.60 3.00 0.53 10.60 158.00 184.86 20.54 3.16 111.87 10.78 2.65 DBST
25+900 20 8.60 2.15 1.99 39.80 1.72 1.59 31.80 3.00 0.53 10.60 174.00 203.58 22.62 3.48 127.71 12.54 3.00 DBST

258 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

25+920 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
25+940 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
25+960 20 7.00 1.75 1.95 39.00 1.40 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
25+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+020 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+040 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+060 20 7.26 1.82 1.79 35.80 1.45 1.43 28.60 3.00 0.53 10.60 157.60 184.39 20.49 3.15 111.47 10.74 2.64 DBST
26+080 20 7.00 1.75 1.79 35.80 1.40 1.43 28.60 3.00 0.53 10.60 157.60 184.39 20.49 3.15 111.47 10.74 2.64 DBST
26+100 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+120 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+140 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+160 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+240 20 7.58 1.90 1.83 36.60 1.52 1.46 29.20 3.00 0.53 10.60 160.80 188.14 20.90 3.22 114.64 11.09 2.71 DBST
26+260 20 7.80 1.95 1.93 38.60 1.56 1.54 30.80 3.00 0.53 10.60 168.80 197.50 21.94 3.38 122.56 11.97 2.89 DBST
26+280 20 7.41 1.85 1.90 38.00 1.48 1.52 30.40 3.00 0.53 10.60 167.10 195.51 21.72 3.34 120.88 11.78 2.85 DBST
26+300 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.10 186.15 20.68 3.18 112.96 10.90 2.68 DBST
26+320 20 7.20 1.80 1.78 35.60 1.44 1.42 28.40 3.00 0.53 10.60 157.00 183.69 20.41 3.14 110.88 10.67 2.63 DBST
26+340 20 7.40 1.85 1.83 36.60 1.48 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
26+360 20 8.20 2.05 1.95 39.00 1.64 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
26+380 20 7.60 1.90 1.98 39.60 1.52 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
26+400 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
26+420 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+440 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+460 20 7.40 1.85 1.80 36.00 1.48 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
26+480 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
26+500 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
26+520 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
26+540 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
26+560 20 7.40 1.85 1.85 37.00 1.48 1.48 29.60 3.00 0.53 10.60 163.00 190.71 21.19 3.26 116.82 11.33 2.76 DBST
26+580 20 7.00 1.75 1.80 36.00 1.40 1.44 28.80 3.00 0.53 10.60 159.00 186.03 20.67 3.18 112.86 10.89 2.67 DBST
26+600 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+620 20 7.56 1.89 1.82 36.40 1.51 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
26+640 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
26+660 20 7.56 1.89 1.89 37.80 1.51 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
26+680 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
26+700 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+720 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

259 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

26+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+820 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+840 20 8.60 2.15 1.95 39.00 1.72 1.56 31.20 3.00 0.53 10.60 171.00 200.07 22.23 3.42 124.74 12.21 2.94 DBST
26+860 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
26+880 20 8.60 2.15 2.15 43.00 1.72 1.72 34.40 3.00 0.53 10.60 187.00 218.79 24.31 3.74 140.58 13.97 3.29 DBST
26+900 20 7.11 1.78 1.97 39.40 1.42 1.57 31.40 3.00 0.53 10.60 172.10 201.36 22.37 3.44 125.83 12.33 2.96 DBST
26+920 20 7.90 1.98 1.88 37.60 1.58 1.50 30.00 3.00 0.53 10.60 165.10 193.17 21.46 3.30 118.90 11.56 2.81 DBST
26+940 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
26+960 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
26+980 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+000 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+020 20 7.48 1.87 1.81 36.20 1.50 1.45 29.00 3.00 0.53 10.60 159.80 186.97 20.77 3.20 113.65 10.98 2.69 DBST
27+040 20 7.56 1.89 1.88 37.60 1.51 1.51 30.20 3.00 0.53 10.60 165.40 193.52 21.50 3.31 119.20 11.59 2.81 DBST
27+060 20 7.00 1.75 1.82 36.40 1.40 1.46 29.20 3.00 0.53 10.60 160.60 187.90 20.88 3.21 114.44 11.07 2.71 DBST
27+080 20 7.48 1.87 1.81 36.20 1.50 1.45 29.00 3.00 0.53 10.60 159.80 186.97 20.77 3.20 113.65 10.98 2.69 DBST
27+100 20 8.20 2.05 1.96 39.20 1.64 1.57 31.40 3.00 0.53 10.60 171.80 201.01 22.33 3.44 125.53 12.30 2.95 DBST
27+120 20 7.60 1.90 1.98 39.60 1.52 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
27+140 20 7.60 1.90 1.90 38.00 1.52 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST
27+160 20 7.00 1.75 1.83 36.60 1.40 1.46 29.20 3.00 0.53 10.60 161.00 188.37 20.93 3.22 114.84 11.11 2.72 DBST
27+180 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+200 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+220 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+240 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+260 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+280 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
27+300 20 7.49 1.87 1.93 38.60 1.50 1.54 30.80 3.00 0.53 10.60 168.90 197.61 21.96 3.38 122.66 11.98 2.89 DBST
27+320 20 7.17 1.79 1.83 36.60 1.43 1.47 29.40 3.00 0.53 10.60 161.60 189.07 21.01 3.23 115.43 11.18 2.73 DBST
27+340 20 8.60 2.15 1.97 39.40 1.72 1.58 31.60 3.00 0.53 10.60 172.70 202.06 22.45 3.45 126.42 12.40 2.97 DBST
27+360 20 7.38 1.85 2.00 40.00 1.48 1.60 32.00 3.00 0.53 10.60 174.80 204.52 22.72 3.50 128.50 12.63 3.02 DBST
27+380 20 7.90 1.98 1.92 38.40 1.58 1.53 30.60 3.00 0.53 10.60 167.80 196.33 21.81 3.36 121.57 11.86 2.87 DBST
27+400 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
27+420 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
27+440 20 7.00 1.75 1.87 37.40 1.40 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
27+460 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+480 20 8.44 2.11 1.93 38.60 1.69 1.55 31.00 3.00 0.53 10.60 169.40 198.20 22.02 3.39 123.16 12.03 2.90 DBST
27+500 20 8.60 2.15 2.13 42.60 1.72 1.71 34.20 3.00 0.53 10.60 185.40 216.92 24.10 3.71 139.00 13.79 3.25 DBST
27+520 20 7.52 1.88 2.02 40.40 1.50 1.61 32.20 3.00 0.53 10.60 176.20 206.15 22.91 3.52 129.89 12.78 3.05 DBST
27+540 20 7.00 1.75 1.82 36.40 1.40 1.45 29.00 3.00 0.53 10.60 160.20 187.43 20.83 3.20 114.05 11.02 2.70 DBST
27+560 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+580 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

260 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

27+600 20 7.90 1.98 1.87 37.40 1.58 1.49 29.80 3.00 0.53 10.60 164.00 191.88 21.32 3.28 117.81 11.44 2.78 DBST
27+620 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
27+640 20 7.90 1.98 1.98 39.60 1.58 1.58 31.60 3.00 0.53 10.60 173.00 202.41 22.49 3.46 126.72 12.43 2.98 DBST
27+660 20 7.22 1.81 1.90 38.00 1.44 1.51 30.20 3.00 0.53 10.60 166.20 194.45 21.61 3.32 119.99 11.68 2.83 DBST
27+680 20 7.07 1.77 1.79 35.80 1.41 1.43 28.60 3.00 0.53 10.60 157.90 184.74 20.53 3.16 111.77 10.77 2.65 DBST
27+700 20 8.20 2.05 1.91 38.20 1.64 1.53 30.60 3.00 0.53 10.60 167.70 196.21 21.80 3.35 121.47 11.85 2.86 DBST
27+720 20 7.00 1.75 1.90 38.00 1.40 1.52 30.40 3.00 0.53 10.60 167.00 195.39 21.71 3.34 120.78 11.77 2.85 DBST

261 of 323
QUANTITY CALCULATIONS FOR PAVEMENT
Name of the road:…………………………….
Chainage:0+000 to ….

Base for one


Subbase Course 250mm Base Course 200mm Subbase for Shoulder Quantity estimate for DBST surface
Total side shoulder
Length Pavement
Width 1st Layer ( 20mm Nominal Chips ) Application rate of 2nd Layer ( 10mm Nominal Chips ) Application rate of

Remarks
Mean Mean Prime coat
Chainage Area Volume Area Volume Volume Area Volume (Application rate 1 1.3 ltr/Sqm(90% bitumen(1.17ltr/Sqm) and 1.1 ltr/Sqm(90% bitumin(0.99ltr/Sqm) and
Area Area ltr/sqm) 10%kerosene(0.13ltr/Sqm)) 10%kerosene(0.11ltr/Sqm))

20mm Nominal 10 mm Nominal


Bitumen 80/100 Kerosene as Cutter Bitumen 80/100 Kerosene as Cutter
m m Sqm Sqm Cum Sqm Sqm Cum Cum Sqm Cum as Binder (Lit) (Lit)
Chips(20-
as Binder (Lit) (Lit)
Chips(10-
22Kg/Sqm) Ton 12Kg/Sqm) Ton

27+740 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+760 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+780 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST
27+800 20 7.00 1.75 1.75 35.00 1.40 1.40 28.00 3.00 0.53 10.60 155.00 181.35 20.15 3.10 108.90 10.45 2.59 DBST

Average Width 7.48 m 1.50


Nos. Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
Quantity to be deducted
Slab culvert 3m 3.00 2 (8.98) (8.98) (0.90) (3.60)

Length Nos. Qty Qty Qty Qty Qty Qty Qty Qty Qty Qty
Quantity to be added
Average pavement width For branch roads (m) 6
Branch Road 15.00 50 900.00 900.00 112.50 450.00 4500.00 5265.00 585.00 94.50 4455.00 495.00 49.50

Final Total 27794.00 52934.42 42507.22 4281.60 15180.40 233256.60 272910.14 30323.87 4669.33 168999.47 16484.72 3937.13

Total subbase including shoulder = 68114.82 cum


Total base = 46788.82 cum
Total chips for surface dressing = 8606.46 ton

262 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
Err:509

DETAILED QUANTITY ESTIMATE FOR DBST

Name of the road:…………………………….

Work Details Chainage No Length,m Breadth, m Height/Depth, m Qnty., Sqm Remarks

1st Layer ( 20mm Nominal Chips ) 0+000 to 19+000 1 0.00 7.00 0


Total 0

Items Application Rate Rate SBSD Area Total Qnty. Unit Remarks

Bitumen 80/100 1.17 1.30 Lit/sqm 0.00 0.00 Lit.

Kerosene as Cutter 0.13 10 % cutter 0.00 0.00 Lit.


20mm Nominal Chips 20.00 Kg/Sqm 0.00 0.00 Ton

Work Details Chainage No Length,m Breadth, m Height/Depth, m Qnty., Sqm Remarks

2nd Layer ( 10mm Nominal Chips ) 0+000 to 19+000 1 0.00 7.00 0


Total 0

Items Application Rate Rate SBSD Area Total Qnty. Unit Remarks

Bitumen 80/100 0.99 1.10 Lit/sqm 0.00 0.00 Lit.


Kerosene as Cutter 0.11 10 % cutter 0.00 0.00 Lit.
10 mm Nominal Chips 10.00 Kg/Sqm 0.00 0.00 Ton

Summary
Items Total Qnty. Unit
Bitumen 80/100 0.00 Lit.
Kerosene as cutter 0.00 Lit.
20 mm Nominal chips 0.00 Ton
10 mm Nominal chips 0.00 Ton

263 of 323
Government of ………..
Ministry of Physical Infrastructure and Transport
Department of Road
0
Err:509

QUANTITY CALCULATION FOR STONE MASONRY BREAST WALL


Name of the road:…………………………….
Structure quantity

Retaining wall Retaining Wall


Chainage Total Volume Volume of PCC for Remarks
Length (m)
(m3) the baseand top
Left side Right side

Height Area(m2) Volume (m )


3
Height Area(m2) Volume (m3)
12+080 0 0.00 5 3.046 0.00 0.00 0.00
12+160 0 0.00 5 3.046 0.00 0.00 0.00
12+180 0 0.00 5 3.046 0.00 0.00 0.00
12+200 0 0.00 5 3.046 0.00 0.00 0.00
12+220 0 0.00 5 3.046 0.00 0.00 0.00
16+340 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+360 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+380 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+400 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+420 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+440 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
16+460 0 4 2.389 0.00 6 3.433 0.00 0.00 0.00
17+440 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+460 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+480 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+500 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+520 0 5 2.949 0.00 5 2.911 0.00 0.00 0.00
17+540 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+560 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+580 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+600 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+620 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+640 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
Structure quantity

Retaining wall Retaining Wall


Chainage Total Volume Volume of PCC for Remarks
Length (m)
(m3) the baseand top
Left side Right side

Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)


17+660 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+680 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+700 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+720 0 6 3.479 0.00 6 3.433 0.00 0.00 0.00
17+740 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+760 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+780 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+800 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+820 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+840 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+860 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+880 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+900 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+920 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+940 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+960 0 9 5.068 0.00 9 4.999 0.00 0.00 0.00
17+980 0 0.00 9 4.999 0.00 0.00 0.00
18+980 0 4 2.487 0.00 4 2.487 0.00 0.00 0.00
19+000 0 4 2.487 0.00 4 2.487 0.00 0.00 0.00
Total 0 0 0 0.00 0
#REF!
#REF!
#REF!
#REF!

DETAILED QUANTITY ESTIMATE BOX CULVERT(4m SPAN)

#REF!

Item Total
Description of works No. Length Breadth Height Quantity Unit
No. Quantity
(m) (m) (m)

1 Earthwork in excavation in foundation


Box part of culvert 1 8.00 4.00 0.45 14.40 cu.m.
Wing Walls(height varying part) 4 1.50 2.30 1.80 24.84 cu.m.
Wing Walls(height constant part) 4 6.70 2.00 1.80 96.48
Inlet apron 1 7.50 0.45 3.38
Outlet apron 1 7.50 0.45 3.38 cu.m.
u/s Cut off Wall 1 6.00 0.30 2.50 4.50
d/s Cut off Wall 1 6.00 0.30 2.00 3.60 cu.m.
Total = 150.58 cu.m. 150.58

3 P.C.C work in 1:2:4 in foundation bed & floors :


Box part of culvert 1 8.00 4.00 0.15 4.80 cu.m.
Wing Walls(height varying part) 4 1.50 2.30 0.15 2.07 cu.m.
Wing Walls(height constant part) 4 6.70 2.00 0.15 8.04
Inlet apron 1 7.50 0.15 1.13
Outlet apron 1 7.50 0.15 1.13 cu.m.
u/s Cut off Wall 1 6.00 0.30 0.15 0.27
d/s Cut off Wall 1 6.00 0.30 0.15 0.27 cu.m.
Total = 17.71 cu.m. 17.71

5 P.C.C. work in in M25 RCC


Approach slab 2 8.00 3.50 0.30 16.80
top slab 1 8.00 4.00 0.43 13.76
bottom slab 1 8.00 9.80 0.42 32.93

back walls 2 8.00 0.14 2.24


side walls 2 8.00 0.50 3.00 24.00
fillets 4 8.00 0.01 0.32
mid walls 0 8.00 0.30 3.00 0.00
Wing walls(foundation)
a)near culvert part 4 6.70 2.30 0.50 30.82
b)towards end part 4 1.50 2.00 0.50 6.00
Wing walls(stem)
a)near culvert part 4 6.70 0.17 1.70 7.75
b)towards end part 4 1.50 0.30 1.70 3.06
Total = 137.68 cu.m. 137.68
Steel work for the reinforcement of
RCC slab including bending, centring
6 & binding in position
kg per
Culvert part with parapet 1 8.00 meter x 6336.70 50693.60 kg.
Total reinf. In 1
Wing walls 4 wing wall 812.24 3248.96
Total = 53942.56 53942.56
7 Back filling work in abutment back 33 % of e/w 49.69 Cum 49.69
Summary of rates .

Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Road Design and planning Branch
Planning Monitoring and Evaluation unit
Final sum rates
Specification Rate (
S.N. Norms No BOQ Description Language Unit
Clause No. NRs.)

1 2.02 201 Clearing of grass, removing roots breaking sods, levelling the surface and disposal all complete [201 ] m2 13.08

Providing, jointing and laying HDP pipes (110 mm/125mm outer diameter) with or without collar etc.
2 7.01.a 701
complete in place as per specification. [701 ]
m 351.10

Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff mixture
3 7.02.iii 701
of cement mortar in the proportion of 1 : 2 ( 1 cement : 2 fine sand ). [701 ]
m 14,956.50

4 9.01.a 905 Road way excavation in soft soil including disposal all complete. [905 ] m3 426.42
Road way excavation in Hard soil / Gravel / Boulder mixed soil including disposal upto 10 m and lift upto 1.5
5 9.01.b 905
m etc. all complete as per specification. [905 ]
m3 568.56

Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per
6 9.01.c 905
specification. [905 ]
m3 1,563.54

Earthwork excavation in soft soil for drain and trenches including shoring, struting, bracing, sheeting and
7 9.02.a 905
disposal all complete. [905 ]
m3 511.70

Earthwork excavation in Hard soil/Gravels/Boulder mixed soil for drain and trenches including shoring,
8 9.02.b 905 struting, bracing, sheeting and disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification m3 852.84
[905 ]

Earthwork excavation in soft rock for drain and trenches including shoring, struting, bracing, sheeting and
9 9.02.c 905
disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification [905 ]
m3 1,705.68

Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and
10 9.10.a 908
watering etc completefor depth of foundation upto 1.5m . [908 ]
m3 1,889.25

Backfilling in layers in foundation pits,trenches with common excavated material etc including compaction
11 9.10.a 908
and watering etc complete for depth of foundation upto 1.5m . [908 ]
m3 648.15

Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in
12 10.05.a 1003
common soil. [1003 ]
m2 30.05

Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as
13 12.01 1201
per table 12.1 of standard specification. [1201 ]
m3 1,647.00

Supplying and erecting traffic sign in place including 50mm dia. 2 steel tube, 2mm. thick steel plate, cement
14 15.01.b 1501 concrete, painting, writing and supporting steel angle nut and bolt etc. complete for size 1.2m.x 0.75m with no 9,652.04
back support. [1501 ]
Providing , Preparing and Installing form work including necessary supports and removing after completion
15 18.01 1804, 1805
for foundation and footings . [1804, 1805 ]
m2 525.84

Providing and placing machine mixed M15/40 cement concrete for the foundation and footing etc. including
16 20.01.a.02 2000
compaction, curing, testing etc. all complete as per specification and drawing. [2000 ]
m3 9,990.50

Providing and placing machine mixed M20/40 cement concrete for the foundation and footing etc. including
17 20.01.a.03 2000
compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing. [2000 ]
m3 11,239.76

Providing and placing machine mixed M20/20 cement concrete for the foundation and footing etc. including
18 20.01.a.04 2000
compaction, curing, testing etc. all complete as per specification and drawing. [2000 ]
m3 11,451.41

Providing and placing machine mixed M25/20 cement concrete for the foundation and footing etc. including
19 20.01.a.05 2000
compaction, curing, testing and lead 30m. etc. all complete as per specification and drawing. [2000 ]
m3 13,199.30

Providing and laying Reinforcement ( diameter upto 8 mm) including cutting, bending, binding, fixing in
20 20.07.01 2000
position etc. all complete as per specification and drawing. [2000 ]
mt 127,436.46

Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm) including cutting, bending,
21 20.07.02 2000
binding, fixing in position etc. all complete as per specification and drawing. [2000 ]
mt 122,872.27

Providing and laying Reinforcement ( diameter above 16 mm) including cutting, bending, binding, fixing in
22 20.07.03 2000
position etc. all complete as per specification and drawing. [2000 ]
mt 118,425.30

23 24.09 3110 Providing, laying, fixing in positions of Geo-textile (filter fabrics). [3110 ] m2 186.02
26.01, 6.05
24 old
2602, 2603 Providing, laying and levelling of dry stone soling works in the foundation all complete. [2602, 2603 ] m3 3,034.83

Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including
25 26.04.b 2607 scaffolding, curing, preparation of mortar etc. complete, masoned height 0-5m, lead 30m (manual mixing), m3 10,138.33
mortar 35% [2607 ]
269 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No BOQ Description Language Unit Rate ( NRs.)
Clause No.
B Maintainance works
1 107 Carrying out the routine maintenance of the existing road during the construction Period Km-mnth 8280.00
2 107 Carrying out the routine maintenance of the existing road during Defect Liability Period. Km-mnth 5520.00
A Site Clearance and Earthwork rates
3 2.02 201 Clearing of grass, removing roots breaking sods, levelling the surface and disposal 10 m. Sq.m 13.08
Scarifying existing granular/bituminous road surface for carrying out the required operations necessary to
1.b 201 Sq.m 8.17
complete the work. This includes handling, salvaging, stacking and disposing of scarified material up to a lead of 100 m along the lead route.
9.01.b 905 Road way excavation in Hard soil / Gravel / Boulder mixed soil including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification. [905 ] RM 568.56
9.01.c 905 Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification. [905 ] RM 1,563.54
9.01.d 905 Road way excavation in hard rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification. [905 ] RM 6,822.72
900.02 900 Earthwork excavation in hard soil by bulldozer RM 28.20
900.03 900 Earthwork excavation in soft rock by bulldozer RM 39.23
900.04 900 Earthwork excavation in hard rock by bulldozer RM 45.70
Earthwork excavation in Hard Soil (10% Manual and 90% Equipment) RM 85.05
Earthwork excavation in Soft Rock (10% Manual and 90% Equipment) RM 191.66
Earthwork excavation in hard Rock (10% Manual and 90% Equipment) RM 723.41
4 905, 900 Roadway excavation in all type of soils including Rock and safe disposal of materials all complete. (SS/SP - 900) (Weighted rate) Cu.m 90.38
Formation of embankment including compaction in layers not exceeding 150 mm compacted depth, watering and haulage 10 m etc. all complete as per specification
5 909 Cu.m 120.27
(ii)using equipments.
2.18 202 Dismantling gabion works including stockpiling the reusable materials and disposal of reusable materials within 50m lead. Cu.m 660.35
6 8.04.03 800 Haulage of excessive cut materials using Machinary beyond 1 km length Cu.m 57.00
Excavation and disposal of slides including haulage distance upto 50m (by machine)
905 Cu.m 184.47

B Structural works rates


Excavation for foundation through all types of soil including relevant lift and disposal upto 20m.
9.07.01.a 907 Cu.m 1,137.12
(a) Depth upto 1.5 m
907 Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete usng Equipment (average rate) Cu.m 37.71
7 907 Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment) Cu.m 147.65

Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying
9 2400 Spec. cl. No: Norms down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per Cu.m 5,122.31
2041(1st specification.
ammendment 2050)

2400 Spec. cl. No: Norms Providing and filling stones into Gabion crates all complete as per specification along with reuse of stones/rubbles from existing ones.as per Engineers direction Cu.m 1,596.02
2041(1st (SS/SP-2400).
ammendment 2050)
10 24.09 2404, 3110 Providing, laying and fixing of Geo-textile (filter fabrics), lead 30m Sq.m 186.02
Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. complete,
11 26.03.b 2602 2603 2607 Cu.m 9,717.35
masoned height 0-5m, lead 30m (machine mixing), mortar 35%
Providing and placing machine mixed M10/40 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all
12 20.01.a.1 2000 Cu.m 9,202.05
complete as per specification and drawing.
14 908 Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and watering etc complete,lead 10 m Cu.m 1,889.25
Backfilling in layers in foundation pits,trenches etc including compaction and watering etc complete,lead 10 m
15 9.10.a 908 Cu.m 648.15
a) Depth of foundation upto 1.5m

Prepared By: Checked By: Approved By:


270 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No BOQ Description Language Unit Rate ( NRs.)
Clause No.
C Cross Drainage works rates
Excavation for foundation through all types of soil including relevant lift and disposal upto 20m.
9.07.01.a 907 Cu.m 1,137.12
(a) Depth upto 1.5 m
907 Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete usng Equipment (average rate) Cu.m 37.71
16 907 Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment) Cu.m 147.65

Norms 2041(1st
17 24.02.04 Providing, laying and levelling of dry stone soling works in the foundation all complete. Cu.m 3,034.83
ammendment 2050)

18 20.01.a.2 2000 Providing and placing machine mixed M15/40 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all comple Cu.m 9,990.50
Providing and placing machine mixed M20/20 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all
19 20.03.a.i 2000 Cu.m 11451.41
complete as per specification and drawing.
Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. complete,
20 26.04.b 2607 Cu.m 9,717.35
masoned height 0-5m, lead 30m (manual mixing), mortar 35%
Providing and laying Reinforcement ( diameter upto 8 mm) including cutting, bending, binding, fixing in position etc. all complete as per specification and drawing.
20.07.01 2000 mt 127,436.46
[2000 ]
Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm) including cutting, bending, binding, fixing in position etc. all complete as per
20.07.02 2000 mt 122,872.27
specification and drawing. [2000 ]
Providing and laying Reinforcement ( diameter above 16 mm) including cutting, bending, binding, fixing in position etc. all complete as per specification and
20.07.03 2000 mt 118,425.30
drawing. [2000 ]

21 2000 Providing and laying Reinforcement of all size including cutting, bending, binding, fixing in position etc. all complete as per specification and drawing. [2000 ] mt 122,911.34

22 18.01 1804, 1805 Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings . [1804, 1805 ] sqm 525.84
Proving and laying RCC pipes of diameter 600 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement : 2
23 7.02.1 701 RM 9,457.15
fine sand ) , lead upto 100m.
Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement : 2
24 7.02.03 701 RM 14,956.50
fine sand ) , lead upto 100m.
Backfilling in layers in foundation pits,trenches etc including compaction and watering etc complete,lead 10 m
25 Norms No. 908 Cu.m 648.15
a) Depth of foundation upto 1.5m
26 908 Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and watering etc complete,lead 10 m 1,889.25

Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying
28 2400 Spec. cl. No: Norms down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per Cu.m 5,122.31
2041(1st specification.
ammendment 2050)
D Pavement work rates
29 10.05.b 1003 Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in gravel & boulder mixed soil. Sq.m 30.05

30 12.01 1201 Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as per table 12.1 of standard specification lead upto 10m. Cu.m 1,647.00
31 12.07 1202 Providing, laying, spreading, watering, levelling and compaction of crusher run materials for base course with lead up to 10 m (1202) Cu.m 2,865.65
32 13.03 1301 1302 Providing and spraying bituminous prime coat MC30/MC70 including cleaning the road surface using wire, brushes, broom etc. before applying prime coat lit 187.39

Supply, Spread and compact 20mm (First coat) and 10mm(Second coat) nominal size chips for double bituminous surface dressing (DBSD) as per specified
33 13.05.05 1301 1303 ton 1,580.36
spreading rates for each layer of surface dressing to meet all the requirements of special specification all complete.(SS/SP 1300)
Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Bitumen binder
34 13.05.01 1301 1303 lit 171.18
for surface dressing
Prepared By: Checked By: Approved By:
271 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

FINAL SUM RATE


Name of the road:…………………………….
Chainage:0+000 to ….
Specification
S.N. Norms No BOQ Description Language Unit Rate ( NRs.)
Clause No.
Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Cutter for
35 13.05.03 1301 1303 lit 104.27
bitumen grade 80/100
13.06.01 1301 1304 Providing and applying semi-grouting with compaction 50mm thick (bitumin spray rate=3.5ltr/m2) (SS/SP-1301,1304) sqm 643.61
E Side drain works rates
36 905 Excavation for drain in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment) Cu.m 123.49
Supplying and place Precast R.C.C. (M20/20) side drain cover slab for Drain of size(1.2m*0.5m*0.125m) Nos 1675.35
13 7.01 701 Providing HDP pipes (110 mm/125mm outer diameter) for weepholes complete in place as per specification. rm 351.10
F Miscellaneous Items
Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as per specification
39 15.03.a 1503 no 2,537.96
a) Standard KM post placed at each kilometer.
Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as per specification
40 15.03.b 1503 no 5,768.93
b) Bigger kilometer post (placed at each 5 km.)

Provide and erecting "W" metal beam crashbarrier comprising of 3.43mm thick corrugated sheet metal beam rail, 70cm above road/ground level,fixed on ISMC
41 irc 7.08 serises channel vertical post, 150*75*5 mm spaced 2m c/c,1.8m high,1.1m below ground/road level,all steel paetsand fitment to be galvanized by hot dip process,all rm 8,701.48
fittings to confirm to IS 1367 and IS 1364,metal beam rail to be fixed on the vertical post with a spacer of chaneel section 150*75*5mm 330mm long, all complete

42 15.02 a 1502 Supplying and applying Thermoplastic Paint for Road marking including cleaning,watering,brooming etc. all complete sqm 1,317.74
43 15.04 1504 Supplying and fixing in place R.C.C. delineator and guard post including excavation, back filling, painting and erection etc. all complete as per drawing. no 1,112.17
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel angle nut
44 15.01.b 1501 and bolit etc. complete no 3,294.65
a)60 cm dia circular,60cm.equilateral triangle and 60cm x 45cm rectangular shaped sign(single post)
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel angle nut
45 15.01.b 1501 and bolit etc. complete no 9,652.04
b) 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post.

Prepared By: Checked By: Approved By:


1 of 323
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

RATE ANALYSIS
Description of works: Clearing of grass, removing roots breaking sods, levelling the surface and disposal 10 m.
Unit : 1 m2
Spec. cl. No: 201
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.02 Unskilled md 0.0230 480.00 11.04 Tools and plants % 3.00 0.33

Sub total of A = 11.04 Sub total of B = 0.00 Sub total of C = 0.33


Sub total of A +B + C = 11.37 Contractor's overhead expenses 15% = 1.71 Rate = 13.08

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of usable materials within 50 m lead for
(a) Plain cement concrete, 1:4:8 or leaner mix Unit : 1 m3
Spec. cl. No: 202

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.01 Skilled md 0.050 775.00 38.75 Tools and plants % 3.00 21.32

Unskilled md 1.4 480.00 672.00

Sub total of A = 710.75 Sub total of B = 0.00 Sub total of C = 21.32


Sub total of A +B + C = 732.07 Contractor's overhead expenses 15% = 109.81 Rate = 841.88

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of usable materials within 50 m lead for
(b) Plain cement concrete, 1:3:6 or richer mix Unit : 1 m3
Spec. cl. No: 202

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.02 Skilled md 0.050 775.00 38.75 Tools and plants % 3.00 34.28

Unskilled md 2.3 480.00 1104.00

Sub total of A = 1142.75 Sub total of B = 0.00 Sub total of C = 34.28


Sub total of A +B + C = 1177.03 Contractor's overhead expenses 15% = 176.55 Rate = 1353.58

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of usable materials within 50 m lead for
(c) Reinforced cement concrete work Unit : 1 m3
Spec. cl. No: 202

Prepared By Checked By Approved By


2 of 323

RATE ANALYSIS
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.03 Skilled md 0.050 775.00 38.75 Tools and plants % 3.00 47.96

Unskilled md 3.25 480.00 1560.00

Sub total of A = 1598.75 Sub total of B = 0.00 Sub total of C = 47.96


Sub total of A +B + C = 1646.71 Contractor's overhead expenses 15% = 247.01 Rate = 1893.72

Description of works: Dismantling Bridge, culvert and other structures including stockpiling the reusable materials and diposal of usable materials within 50 m lead for
(e) Random rubble masonry in cement mortar Unit : 1 m3
Spec. cl. No: 202

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.08.05 Skilled md 0.100 775.00 77.50 Tools and plants % 3.00 34.72

Unskilled md 2.25 480.00 1080.00

Sub total of A = 1157.50 Sub total of B = 0.00 Sub total of C = 34.72


Sub total of A +B + C = 1192.22 Contractor's overhead expenses 15% = 178.83 Rate = 1371.05

Description of works: Dismantling of RCC pipes (excluding excavation and refilling).


i) upto 600 mm dia. Unit : 1 rm.
Spec. cl. No: 202

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.17.i Skilled md 0.01 775.00 7.75 Tools and plant 3.00% of L.C. 5.99

Unskilled md 0.40 480.00 192.00

Sub total of A = 199.75 Sub total of B = 0.00 Sub total of C = 5.99


Sub total of A +B + C = 205.74 Contractor's overhead expenses 15% = 30.86 Unit Rate = 236.60

Description of works: Dismantling of RCC pipes (excluding excavation and refilling).


ii) above 600 mm dia. Unit : 1 rm.
Spec. cl. No: 202

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.17.ii Skilled md 0.01 775.00 7.75 Tools and plant 3.00% of L.C. 11.75

Unskilled md 0.80 480.00 384.00

Sub total of A = 391.75 Sub total of B = 0.00 Sub total of C = 11.75


Sub total of A +B + C = 403.50 Contractor's overhead expenses 15% = 60.53 Unit Rate = 464.03

Prepared By Checked By Approved By


3 of 323

RATE ANALYSIS
Description of works: Scarifying existing granular/bituminous road surface for carrying out the required operations necessary to complete the work (SS/SP-201).
Unit : 1 m2
Spec. cl. No: 201

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Motorg\ Grader 125-175 HP with effective


1.b Skilled md 0.00 775.00 0.00 Diesel ltr 0.04 89.38 3.58 0.0022 1600 3.52
blade length=2.5m and 0.3m of overlap
hr
Unskilled md 0.00 480.00 0.00

Sub total of A = 0.00 Sub total of B = 3.58 Sub total of C = 3.52


Sub total of A +B + C = 7.10 Contractor's overhead expenses 15% = 1.07 Unit Rate = 8.17

Description of works: Dismantling gabion works including stockpiling the reusable materials and disposal of reusable materials within 50m lead.
Unit : 1 m3
Spec. cl. No: 202

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

2.18 Skilled md 0.10 775.00 77.50 Tools and plant 3.00% of L.C. 16.72

Unskilled md 1.00 480.00 480.00

Sub total of A = 557.50 Sub total of B = 0.00 Sub total of C = 16.72


Sub total of A +B + C = 574.22 Contractor's overhead expenses 15% = 86.13 Unit Rate = 660.35

Prepared By Checked By Approved By


4 of 323

RATE ANALYSIS
Description of works: Providing HDP pipes (110 mm/125mm outer diameter) for weepholes complete in place as per specification.
Unit : 50 m
Spec. cl. No: 701
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

7.01 Skilled md 3.0 775.00 2325.00 HDP pipe m 50.00 230.00 11500.00 Generator (<2kva) hr. 8.00 150.00

Unskilled md 3.0 480.00 1440.00 Petrol lit 5.00 0.00 Screw Jack hr. 8.00 20.00
electric heating plate hr. 8.00 20.00

Sub total of A = 3765.00 Sub total of B = 11500.00 Sub total of C = 0.00


Sub total of A +B + C = 15265.00 Contractor's overhead expenses 15% = 2289.75 Rate (50 m)= 17554.75

Rate (1 m ) 351.10

Description of works: Proving and laying RCC pipes of diameter 600 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of
1 : 2 ( 1 cement : 2 fine sand ) , lead upto 100m. Unit : 1 rm
Spec. cl. No: 701
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

7.02.1 Skilled md 0.281 775.00 217.77 RCC Pipe m 1.0 7100.83 7100.83 Ballies, crow, bars, chain , pulleys , block
3.00% of total cost 239.52
Unskilled md 1.094 525.12 Cement kg 6.813 111.25 and ropes etc.
480.00 16.33
Sand m3 0.009 802.58 7.22

Jute kg 0.219 100.00 21.90

Sub total of A = 742.89 Sub total of B = 7241.20 Sub total of C = 239.52


Sub total of A +B + C = 8223.61 Contractor's overhead expenses 15% = 1233.54 Unit Rate = 9457.15

Description of works: Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement : 2 fine sand ) ,
lead upto 100m.
Unit : 1 rm
Spec. cl. No: 701

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

7.02.03 Skilled md 0.344 775.00 266.60 RCC Pipe m 1.0 11414.58 11414.58 Ballies, crow, bars, chain , pulleys , block
3.00% of total cost 378.80
Unskilled md 1.562 749.76 Cement kg 9.062 147.98 and ropes etc.
480.00 16.33
Sand m3 0.013 802.58 10.43

Jute kg 0.375 100.00 37.50

Sub total of A = 1016.36 Sub total of B = 11610.49 Sub total of C = 378.80


Sub total of A +B + C = 13005.65 Contractor's overhead expenses 15% = 1950.85 Unit Rate = 14956.50

Prepared By Checked By Approved By


5 of 323

RATE ANALYSIS
Description of works: Road way excavation in Hard soil / Gravel / Boulder mixed soil including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification.
Unit : 1 m3
Spec. cl. No: 905

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.01.b Unskilled md 1.000 480.00 480.00 Tools and plant 3.00% of L.C. 14.40

Sub total of A = 480.00 Sub total of B = 0.00 Sub total of C = 14.40


Sub total of A +B + C = 494.40 Contractor's overhead expenses 15% = 74.16 Unit Rate = 568.56

Description of works: Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification.
Unit : 1 m3
Spec. cl. No: 905

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.01.c Unskilled md 2.750 480.00 1320.00 Tools and plant 3.00% of L.C. 39.60

Sub total of A = 1320.00 Sub total of B = 0.00 Sub total of C = 39.60


Sub total of A +B + C = 1359.60 Contractor's overhead expenses 15% = 203.94 Unit Rate = 1563.54

Description of works: Road way excavation in hard rock including disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification.
Unit : 1 m3
Spec. cl. No: 905

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.01.d Unskilled md 12.000 480.00 5760.00 Tools and plant 3.00% of L.C. 172.80

Sub total of A = 5760.00 Sub total of B = 0.00 Sub total of C = 172.80


Sub total of A +B + C = 5932.80 Contractor's overhead expenses 15% = 889.92 Unit Rate = 6822.72

Prepared By Checked By Approved By


6 of 323

RATE ANALYSIS
Description of works: Earthwork excavation in hard soil by bulldozer
Unit : 1 m3
Spec. cl. No: 900
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

900.02. Unskilled md 0.010 480.00 4.80 Diesel Lit 0.132 89.38 11.79816 Bulldozer hr 0.00440 1800.00 7.92

Sub total of A = 4.80 Sub total of B = 11.80 Sub total of C = 7.92


Sub total of A +B + C = 24.52 Contractor's overhead expenses 15% = 3.68 Unit Rate = 28.20

Description of works: Earthwork excavation in soft rock by bulldozer


Unit : 1 m3
Spec. cl. No: 900
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

900.03 Unskilled md 0.010 480.00 4.80 Diesel Lit 0.195 89.38 17.4291 Bulldozer hr 0.00660 1800.00 11.88

Sub total of A = 4.80 Sub total of B = 17.43 Sub total of C = 11.88


Sub total of A +B + C = 34.11 Contractor's overhead expenses 15% = 5.12 Unit Rate = 39.23

Description of works: Earthwork excavation in hard rock by bulldozer


Unit : 1 m3
Spec. cl. No: 900

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

900.04 Unskilled md 0.010 480.00 4.80 Diesel Lit 0.258 89.38 23.06004 Bulldozer hr 0.00660 1800.00 11.88

Sub total of A = 4.80 Sub total of B = 23.06 Sub total of C = 11.88


Sub total of A +B + C = 39.74 Contractor's overhead expenses 15% = 5.96 Unit Rate = 45.70

Description of works: Earthwork excavation in B.M.S / Hard Soil (10% Manual and 90% Equipment)
Unit : 1 m3

Manual (A) Equipment (B)

% Rate Amount % Rate Amount

10 494.40 49.44 90 24.52 24.52

Sub total of A = 49.44 Sub total of B = 24.52


Sub total of A +B 73.96 Contractor's overhead expenses 15% = 11.09 Unit Rate = 85.05

Prepared By Checked By Approved By


7 of 323

RATE ANALYSIS
Description of works: Earthwork excavation in Soft Rock (10% Manual and 90% Equipment)
Unit : 1 m3

Manual (A) Equipment (B)


Norms No.
% Rate Amount % Rate Amount

10 1359.60 135.96 90 34.11 30.699

Sub total of A = 135.96 Sub total of B = 30.70

Sub total of A +B 166.66 Contractor's overhead expenses 15% = 25.00 Unit Rate = 191.66

Description of works: Earthwork excavation in hard Rock (10% Manual and 90% Equipment)
Unit : 1 m3

Manual (A) Equipment (B)


Norms No.
% Rate Amount % Rate Amount

10 5932.80 593.28 90 39.74 35.766

Sub total of A = 593.28 Sub total of B = 35.77

Sub total of A +B 629.05 Contractor's overhead expenses 15% = 94.36 Unit Rate = 723.41

Roadway excavation in all type of soils including Rock and safe disposal of materials all complete. (SS/SP - 900) (Weighted rate)
Unit : 1 m3
Description of works: Quantity Rate Weighted Rate
Earthwork excavation in hard Rock (10% Manual and 90% Equipment) 0.00 723.41

Earthwork excavation in Soft Rock (10% Manual and 90% Equipment) 291168.15 191.66 90.38

Earthwork excavation in B.M.S / Hard Soil (10% Manual and 90% Equipment) 5532194.85 85.05

Description of works: Formation of embankment including compaction in layers not exceeding 150 mm compacted depth, watering and haulage 10 m etc. all complete as per specification (ii)using
equipments.
Unit : 1 m3
Spec. cl. No: 909

Manual (A) Equipment (B)


Norms No.
% Rate Amount % Rate Amount

10 846.05 84.61 90 39.62 35.658

Unit Rate = 120.27

Prepared By Checked By Approved By


8 of 323

RATE ANALYSIS
Description of works: Excavation for foundation through all types of soil including relevant lift and disposal upto 20m.
(a) Depth upto 1.5 m Unit : 1 m3
Spec. cl. No: 907

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.07.01.a Unskilled md 2.000 480.00 960.00 Tools and plant 3.00% of L.C. 28.80

Sub total of A = 960.00 Sub total of B = 0.00 Sub total of C = 28.80


Sub total of A +B + C = 988.80 Contractor's overhead expenses 15% = 148.32 Unit Rate = 1137.12

Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete usng Equipment (average rate) Unit : 1 m3
Description of works: Rate Average Rate
Earthwork Excavation in Hard soil 28.20

Earthwork exavation in soft rock 39.23 37.71

Earthwork exavation in Hard rock 45.70

Description of works: Excavation for foundation in all type of soils including Rock and safe disposal of materials all complete (10% Manual and 90% Equipment)
Unit : 1 m3
Spec. cl. No: 907
Manual (A) Equipment (B)
Norms No.
% Rate Amount % Rate Amount

10 1137.12 113.71 90 37.71 33.939

Unit Rate = 147.65

Description of works: Backfilling in layers in foundation pits,trenches etc with approved filler material including compaction and watering etc complete,lead 10 m
a) Depth of foundation upto 1.5m Unit : 1 m3
Spec. cl. No: 908

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.10.a Unskilled md 1.140 480.00 547.20 Filler Material m3 1.1 981.11 1079.22 Tools and plant 3.00% of L.C. 16.41
Sub total of A = 547.20 Sub total of B = 1079.22 Sub total of C = 16.41
Sub total of A +B + C = 1642.83 Contractor's overhead expenses 15% = 246.42 Unit Rate = 1889.25

Prepared By Checked By Approved By


9 of 323

RATE ANALYSIS
Description of works: Backfilling in layers in foundation pits,trenches etc including compaction and watering etc complete,lead 10 m
a) Depth of foundation upto 1.5m Unit : 1 m3
Spec. cl. No: 908
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.10.a Unskilled md 1.140 480.00 547.20 Tools and plant 3.00% of L.C. 16.41

Sub total of A = 547.20 Sub total of B = 0.00 Sub total of C = 16.41


Sub total of A +B + C = 563.61 Contractor's overhead expenses 15% = 84.54 Unit Rate = 648.15

Description of works: Excavation and disposal of slides including haulage distance upto 50m (by machine)
Unit : 1 m3

Spec. cl. No: 905

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

9.11.a Unskilled md 0.00315 480.00 1.51 Diesel Ltr 0.1512 89.38 13.514256 Wheel Loader hr. 0.0084 1000 0.01

Transporatation cost 1 145.38 145.38

Sub total of A = 1.51 Sub total of B = 13.51 Sub total of C = 145.39


Sub total of A +B + C = 160.41 Contractor's overhead expenses 15% = 24.06 Unit Rate = 184.47

Transportation Cost As per clause 8.04.03 1(a) as shown in transporatation rate chart for up to 1 km 290.75
Basic Haulage Rate included in slide removal is assumed to be half of the transportation rate 145.38

NB: Refrence taken from RIP C

Description of works: Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in common soil.
Unit : 1 m2
Spec. cl. No: 1003
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

10.05.a Unskilled md 0.10 480.00 48.00 Diesel lit 0.122 89.38 10.90 Grader (75 hp) hr 0.040 1600.00 64.00
skilled md 0.01 775.00 7.75 Roller 8-10t hr 0.017 500.00 8.50

Sub total of A = 55.75 Sub total of B = 10.90 17.00 64.00


Sub total of A +B + C = 130.65 Contractor's overhead expenses 15% = 19.60 Unit Rate = 30.05

Note: Considering subgrade of 20 cm thickness

Prepared By Checked By Approved By


10 of 323

RATE ANALYSIS
Description of works: Preparation of sub-grade for rehabilitation or other similar works (filling or cutting depth of 10 to 20 cm) in gravel & boulder mixed soil.
Unit : 1 m2
Spec. cl. No: 1003
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

10.05.b Unskilled md 0.30 480.00 144.00 Tools and Plant 3% of LC 4.32

Sub total of A = 144.00 Sub total of B = 0.00 Sub total of C = 4.32


Sub total of A +B + C = 148.32 Contractor's overhead expenses 15% = 22.25 Unit Rate = 170.57

Description of works: Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as per table 12.1 of standard specification lead upto 10m.
Unit : 1 m3
Spec. cl. No: 1201

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
12.01
Skilled md 0.0050 775.00 3.87 Subbase agg. cu.m. 1.2800 981.11 1255.82 Grader hr 0.0220 1600.00 35.20

Unskilled md 0.0400 480.00 19.20 Diesel lit 0.7920 89.38 70.78 Vibrator Rolller hr 0.0220 700.00 15.40

Water bowser hr 0.0380 550.00 20.90

Loader hr 0.0110 1000.00 11.00

Sub total of A = 23.07 Sub total of B = 1326.60 Sub total of C = 82.50


Sub total of A +B + C = 1432.17 Contractor's overhead expenses 15% = 214.83 Unit Rate = 1647.00
Unit : 1 m3
Description of works: Providing, laying, spreading, watering, levelling and compaction of natural sand gravel subbase grading as per table 12.1 of standard specification lead upto 10m (for manual
works).
Description of works: Providing and spraying bituminous prime coat MC30/MC70 including cleaning the road surface using wire, brushes, broom etc. before applying prime coat.
Unit : 1 lit.
Spec. cl. No: 1301,1302
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

13.03 Skilled md 0.0030 775.00 2.32 Bitumen MC30/MC70 lit. 1.0500 98.29 103.20 Boiler hr 0.0025 180 0.45

Unskilled md 0.0460 480.00 22.08 kerosene lit 0.1000 89.38 8.93 Sprayer hr 0.0025 260.00 0.65

Diesel lit 0.2750 89.38 24.57 Air compresser hr 0.0030 250.00 0.75

Sub total of A = 24.40 Sub total of B = 136.70 Sub total of C = 1.85


Sub total of A +B + C = 162.95 Contractor's overhead expenses 15% = 24.44 Unit Rate = 187.39

Prepared By Checked By Approved By


11 of 323

RATE ANALYSIS
Description of works: Providing, laying, spreading, watering, levelling and compaction of crusher run materials for base course with lead up to 10 m (1202)
Spec. cl. No: 1202 Unit : 1 m3
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
12.06
Skilled md 0.0050 775.00 3.87 Base agg. cu.m. 1.2000 1895.67 2274.80 Grader hr 0.0330 1600.00 52.80

Unskilled md 0.0200 480.00 9.60 Diesel lit 0.9900 89.38 88.48 Vibrator Rolller hr 0.0330 700.00 23.10

Water bowser hr 0.0330 550.00 18.15

Stone crusher hr 0.0650 155.00 10.07

Loader hr 0.0110 1000.00 11.00

Sub total of A = 13.47 Sub total of B = 2363.28 Sub total of C = 115.12


Sub total of A +B + C = 2491.87 Contractor's overhead expenses 15% = 373.78 Unit Rate = 2865.65

Description of works: Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Bitumen binder for surface
dressing Unit : 1 ltr
Spec. cl. No: 1301

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
13.05.01
Skilled md 0.0020 775.00 1.55 Bitumen 80/100 lit 1.0500 98.29 103.20 Boiler hr 0.0025 180.00 0.45

Unskilled md 0.0140 480.00 6.72 Kerosene lit 0.1000 89.38 8.93 Distributor hr 0.0025 1300.00 3.25

Diesel lit 0.2700 89.38 24.13 Air Compressor hr 0.0025 250.00 0.62

Sub total of A = 8.27 Sub total of B = 136.26 Sub total of C = 4.32


Sub total of A +B + C = 148.85 Contractor's overhead expenses 15% = 22.33 Unit Rate = 171.18

Description of works: Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Cutter for bitumen grade
Spec. cl. No: 1301 80/100 Unit : 1 ltr

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
13.05.03
Skilled md 0.0010 775.00 0.77 Tools and plants 3% of 0.04

Unskilled md 0.0010 480.00 0.48 labour costs

Kerosene or Diesel lit 1.0000 89.38 89.38

Sub total of A = 1.25 Sub total of B = 89.38 Sub total of C = 0.04


Sub total of A +B + C = 90.67 Contractor's overhead expenses 15% = 13.60 Unit Rate = 104.27

Prepared By Checked By Approved By


12 of 323

RATE ANALYSIS
Description of works: Laying of single/double/multiple bituminious coats for surface dressing using river gravels(grits), shingles or broken stone chips including compaction, Chipping for surface
Spec. cl. No: 1301 1303 dressing for 1st coat size, 20 mm dia Unit : 1 ton

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount
13.05.04
Skilled md 0.0010 775.00 0.77 Chips t 1.0500 648.48 Chips spreader hr 0.1000 300.00 30.00

Unskilled md 0.2100 480.00 100.80 Diesel lit 3.6000 89.38 Tyred Roller hr 0.2000 1200.00 240.00

680.90

321.76

Sub total of A = 101.57 Sub total of B = 1002.66 Sub total of C = 270.00


Sub total of A +B + C = 1374.23 Contractor's overhead expenses 15% = 206.13 Unit Rate = 1580.36

Note: Unit weight of stone chips = 1.65 gm/cc, 1 ton chips = 1m3/1.65

Description of works:
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel angle nut and bolit etc.
complete Unit : 1 no.
Spec. cl. No: 1501 a)60 cm dia circular,60cm.equilateral triangle and 60cm x 45cm rectangular shaped sign(single post)
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.01.b Skilled md 0.033 775.00 25.57 Enamel paint lit 0.100 550.00 55.00

Unskilled md 0.088 480.00 42.24 M10/40 PCC m 3


0.030 9202.05 276.06

Steel plate m2 0.25 3885.75 971.43

Formwork (F1) m 2
0.36 457.25 164.61

Steel tube m 2.50 532.00 1330.00

Sub total of A = 67.81 Sub total of B = 2797.10 Sub total of C = 0.00


Sub total of A +B + C = 2864.91 Contractor's overhead expenses 15% = 429.74 Unit Rate = 3294.65

Note: considering form work can be used for 10 repeated times

Prepared By Checked By Approved By


13 of 323

RATE ANALYSIS
Description of works:
Supplying and erecting traffic sign in place including 50mm dia. Steel tube, 2mm. thick steel plate, cement concrete, painting, writing and supporting steel angle nut and bolit etc.
complete Unit : 1 no.
Spec. cl. No: 1501 b) 1.2m.x 0.75m. Size bigger traffic sign with back support and two or more post.
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.01.b Skilled md 0.085 775.00 65.87 Enamel paint lit 0.400 550.00 220.00

Unskilled md 0.300 480.00 144.00 M10/40 PCC m3 0.120 8001.78 960.21

Steel plate m2 1.00 3885.75 3885.75

Formwork (F1) m 2
1.00 457.25 457.25

Steel tube m 5.00 532.00 2660.00

Sub total of A = 209.87 Sub total of B = 8183.21 Sub total of C = 0.00


Sub total of A +B + C = 8393.08 Contractor's overhead expenses 15% = 1258.96 Unit Rate = 9652.04

Description of works: Unit : 1 m.


Supplying and applying paint for Road marking including cleaning, watering, brooming etc. all complete (10cm. wide strip)
Description of works:
a) Two coats
Supplying andover old R.C.C.
placing paintedkilometer
surface post including excavation, back filling, painting and writing etc. all complete as per specification
a) Standard KM post placed at each kilometer. Unit : 1 no.
Spec. cl. No: 1503
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.03.a Skilled md 0.030 775.00 23.25 M15/40 RCC m3 0.060 8687.39 521.24

Unskilled md 0.116 480.00 55.68 M10/40 PCC m 3


0.090 8001.78 720.16

Formwork (F2) m2 0.500 457.25 228.62

Enamel paint lit 0.120 550.00 66.00


Reinforcement bar
kg 7.500 78.93 591.97

Sub total of A = 78.93 Sub total of B = 2127.99 Sub total of C = 0.00


Sub total of A +B + C = 2206.92 Contractor's overhead expenses 15% = 331.04 Unit Rate = 2537.96

Prepared By Checked By Approved By


14 of 323

RATE ANALYSIS
Description of works: Supplying and placing R.C.C. kilometer post including excavation, back filling, painting and writing etc. all complete as per specification
b) Bigger kilometer post (placed at each 5 km.) Unit : 1 no.
Spec. cl. No: 1503
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.03.b Skilled md 0.080 775.00 62.00 M15/40 RCC m3 0.170 8687.39 1476.85

Unskilled md 0.300 480.00 144.00 M10/40 PCC m 3


0.230 8001.78 1840.40

Formwork (F2) m2 1.300 457.25 594.42

Enamel paint lit 0.400 550.00 220.00


Reinforcement bar
kg 8.600 78.93 678.79

Sub total of A = 206.00 Sub total of B = 4810.46 Sub total of C = 0.00


Sub total of A +B + C = 5016.46 Contractor's overhead expenses 15% = 752.47 Unit Rate = 5768.93

Description of works: Supplying and fixing in place R.C.C. delineator and guard post including excavation, back filling, painting and erection etc. all complete as per drawing.
Unit : 1 no.
Spec. cl. No: 1504
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.04 Skilled md 0.021 775.00 16.27 M20/20 PCC m3 0.030 9957.75 298.73

Unskilled md 0.055 480.00 26.40 Formwork (F2) m 2


0.540 563.19 304.12

Enamel paint lit 0.180 550.00 99.00


Reinforcement bar
kg 2.82 78.93 222.58

Sub total of A = 42.67 Sub total of B = 924.43 Sub total of C = 0.00


Sub total of A +B + C = 967.10 Contractor's overhead expenses 15% = 145.07 Unit Rate = 1112.17

Description of works: Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings
(a) using timber ( soft wood) - Class F1 finish. Unit : 10 m2
Spec. cl. No: 1804,1805

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

18.01 Skilled md 1.50 775.00 1162.50 Planks 38mm thick. m 3


0.42 4333.33 1819.99

Unskilled md 2.00 480.00 960.00 struts, ballies, etc. m3 0.18 2888.89 520.00

Nails,spikes,etc. kg 1.00 110.00 110.00

Sub total of A = 2122.50 Sub total of B = 2449.99 Sub total of C = 0.00


Sub total of A +B + C = 4572.49 Contractor's overhead expenses 15% = 685.87 Rate (10 m2) = 5258.36

Unit Rate (1 m2) = 525.84

Prepared By Checked By Approved By


15 of 323

RATE ANALYSIS
Description of works: Providing and placing machine mixed M10/40 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per specification and
drawing. Unit : 1 m3
Spec. cl. No: 2000
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.01.a.1 Skilled md 0.50 775.00 387.50 cement mt 0.220 16331.09 3592.83 mixer (0.28/ 0.20 m3 ) hr 0.60 470 282.00

Unskilled md 3.50 480.00 1680.00 aggregate 20-40mm m 3


0.650 1009.58 656.22 vibrator hr 0.25 100 25.00

aggregate 10 -20mm m3 0.250 1070.00 267.50 of Cost of


Mix Design and Quality Control 2.50% 195.16
coarse sand m3 0.480 385.23 concrete
802.58
petrol lit 0.100 100.88 10.08

diesel lit 3.000 89.38 268.14

water lit 132.000 1.91 252.12

Sub total of A = 2067.50 Sub total of B = 5432.12 Sub total of C = 502.16


Sub total of A +B + C = 8001.78 Contractor's overhead expenses 15% = 1200.27 Unit Rate = 9202.05

Description of works: Providing and placing machine mixed M15/40 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per
specification and drawing. Unit : 1 m3
Spec. cl. No: 2000
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.01.a.2 Skilled md 0.50 775.00 387.50 cement mt 0.260 16331.09 4246.08 mixer (0.28/ 0.20 m )
3
hr 0.60 470 282.00

Unskilled md 3.50 480.00 1680.00 aggregate 20-40mm m3 0.530 1009.58 535.07 vibrator hr 0.25 100 25.00

aggregate 10-20mm m 3
0.240 1070.00 256.80
of Cost of
Mix Design and Quality Control 2.50% 211.88
aggregate 10mm & down m3 0.110 117.70 concrete
1070.00
coarse sand m3 0.460 802.58 369.18

petrol lit 0.100 100.88 10.08

diesel lit 3.000 89.38 268.14

water lit 156.000 1.91 297.96

Sub total of A = 2067.50 Sub total of B = 6101.01 Sub total of C = 518.88


Sub total of A +B + C = 8687.39 Contractor's overhead expenses 15% = 1303.11 Unit Rate = 9990.50

Prepared By Checked By Approved By


16 of 323

RATE ANALYSIS
Description of works: Providing and placing machine mixed M20/20 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per specification and
drawing. Unit : 1 m3
Spec. cl. No: 2000
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.01.a.4 Skilled md 0.50 775.00 387.50 cement mt 0.330 16331.09 5389.25 mixer (0.28/ 0.20 m )
3
hr 0.60 470 282.00

Unskilled md 3.50 480.00 1680.00 aggregate 10-20mm m3 0.580 1070.00 620.60 vibrator hr 0.25 100 25.00

aggregate 10mm & down m3 0.300 1070.00 321.00 of Cost of


Mix Design and Quality Control 2.50% 242.87
concrete
coarse sand m 3
0.440 802.58 353.13

petrol lit 0.100 100.88 10.08

diesel lit 3.000 89.38 268.14

water lit 198.000 1.91 378.18

Sub total of A = 2067.50 Sub total of B = 7340.38 Sub total of C = 549.87


Sub total of A +B + C = 9957.75 Contractor's overhead expenses 15% = 1493.66 Unit Rate = 11451.41

Description of works: Unit : 1 m3


Providing and placing machine mixed M25/20 cement concrete for the foundation and footing etc. including compaction, curing, testing and lead 30m. etc. all complete as per specification and
drawing.
Description of works: Providing and laying Reinforcement ( diameter upto 8 mm) including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per specification and drawing.
Unit : 1 mt.
Spec. cl. No: 2000

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.07.1 Skilled md 15.00 775.00 11625.00 Reinforcement t 1.150 78927.09 90766.15

Unskilled md 15.00 480.00 7200.00 Binding wire kg 12.000 101.93 1223.16

Sub total of A = 18825.00 Sub total of B = 91989.31 Sub total of C = 0.00


Sub total of A +B + C = 110814.31 Contractor's overhead expenses 15% = 16622.15 Unit Rate = 127436.46

Description of works: Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm) including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per
specification and drawing. Unit : 1 mt.
Spec. cl. No: 2000

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.07.2 Skilled md 12.00 775.00 9300.00 Reinforcement t 1.150 78927.09 90766.15

Unskilled md 12.00 480.00 5760.00 Binding wire kg 10.000 101.93 1019.30

Sub total of A = 15060.00 Sub total of B = 91785.45 Sub total of C = 0.00


Sub total of A +B + C = 106845.45 Contractor's overhead expenses 15% = 16026.82 Unit Rate = 122872.27

Prepared By Checked By Approved By


17 of 323

RATE ANALYSIS
Description of works: Providing and laying Reinforcement ( diameter above 16 mm) including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per specification and
drawing. Unit : 1 mt.
Spec. cl. No: 2000

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

20.07.3 Skilled md 9.00 775.00 6975.00 Reinforcement t 1.150 78927.09 90766.15

Unskilled md 9.00 480.00 4320.00 Binding wire kg 9.000 101.93 917.37


Sub total of A = 11295.00 Sub total of B = 91683.52 Sub total of C = 0.00

Sub total of A +B + C = 102978.52 Contractor's overhead expenses 15% = 15446.78 Unit Rate = 118425.30

Providing and laying Reinforcement including cutting, bending, binding, fixing in position and lead 30m. etc. all complete as per specification and drawing.(2000)
Unit : 1 mt
Description of works: Quantity Rate Average Rate Average
diameter upto 8mm 127436.46

diameter above 8 mm and upto 16 mm 122872.27 122911.34 122911.34


diameter above 16 mm 118425.30

Unit : 1 box
Description of works: assembling Gabion
Assembling machineboxes
mademattresses, palcing in position
Gabion boxes/mattresses, including
palcing stretching,
in position forming
including compartments;
stretching, forming tying with bracing
compartments; wires
tying withand tie wires;
bracing wirestying
and down the lid
tie wires; complete;
tying down theandlid
providing and
complete; andfilling stoneand
providing / boulder in gabion
filling stone boxesin/ gabion
/ boulder mattresses
boxesetc. including dressing,
/ mattresses beding,
etc. including bondingbeding,
dressing, and allbonding
transporation
and allastransporation
per specification.
as per[specification.
3 x 1 x 1 : (16[ sq.
3 x m)]
1x1: Unit : 1 box
(16 sq. m)]
Spec. cl. No: 2401
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Filling of stones : Activity no : 24.02.04

Skilled md 0.75 775.00 581.25 Block stone m3 3.00 1895.67 5687.01

Unskilled md 2.25 480.00 1080.00 Bond stone m3 0.30 1895.67 568.70


Machine made gabion crates

Machine made gabion crates m2 16.00 283.00 4528.00

Tying and bracing wires: Activity no : 24.02.01

Unskilled md 1.04 480.00 499.20 Binding wire(12 SWG) Kg 1.81 101.93 184.49

Sub total of A = 2160.45 Sub total of B = 10968.20 Sub total of C = 0.00


Sub total of A +B + C = 13128.65 Contractor's overhead expenses 15% = 1969.30 Unit Rate = 15097.95

Prepared By Checked By Approved By


18 of 323

RATE ANALYSIS
Description of works: Assembling machine made Gabion boxes/mattresses palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying down the lid
complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per specification. [ 2 x 1 x 1 :
(11sq. m)] Unit : 1 box

Spec. cl. No: 2401


Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Filling of stones : Activity no : 24.02.04

Skilled md 0.50 775.00 387.50 Block stone m3 2.00 1895.67 3791.34

Unskilled md 1.50 480.00 720.00 Bond stone m3 0.20 1895.67 379.13


Machine made gabion crates

Machine made gabion crates m2 11.00 283.00 3113.00

Tying and bracing wires: Activity no : 24.02.01

Unskilled md 0.75 480.00 360.00 Binding wire(12 SWG) Kg 1.30 91.93 119.50

Sub total of A = 1467.50 Sub total of B = 7402.97 Sub total of C = 0.00


Sub total of A +B + C = 8870.47 Contractor's overhead expenses 15% = 1330.57 Unit Rate = 10201.04

Description of works: Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying down the lid
complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per specification. [ 1.5 x 1 x 1 :
(9 sq. m)] Unit : 1 box

Spec. cl. No: 2401


Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Filling of stones : Activity no : 24.02.04

Skilled md 0.38 775.00 294.50 Block stone m3 1.50 1895.67 2843.50

Unskilled md 1.13 480.00 542.40 Bond stone m3 0.15 1895.67 284.35


Machine made gabion crates

Machine made gabion crates m2 9.00 283.00 2547.00

Tying and bracing wires: Activity no : 24.02.01

Unskilled md 0.68 480.00 326.40 Binding wire(12 SWG) kg 1.25 91.93 114.91

Sub total of A = 1163.30 Sub total of B = 5789.76 Sub total of C = 0.00


Sub total of A +B + C = 6953.06 Contractor's overhead expenses 15% = 1042.96 Unit Rate = 7996.02

Prepared By Checked By Approved By


19 of 323

RATE ANALYSIS
Assembling machine made Gabion boxes/mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying down the lid complete; and
Spec. cl. No: 2401 Unit : 1 m3
providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per specification. [average]

Box size Unit Qty. Amount


1.5 x 1 x1 Box m3 1.5 7996.02
2 x 1 x 1 Box m3 2 10201.04
3 x 1 x 1 Box m3 3 15097.95
Total : 33295.01

Average (1m3) 5122.31

Providing and filling stones into Gabion crates all complete as per specification along with reuse of stones/rubbles from existing ones.as per Engineers direction (SS/SP-2400).
Description of works:

Unit : 1 m2
Spec. cl. No: Norms 2041(1st
ammendment 2050)

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.02.04 skilled md 0.25 775.00 193.75 stone m3 0.44 1895.67 834.09

Unskilled md 0.75 480.00 360.00

Sub total of A = 553.75 Sub total of B = 834.09 Sub total of C = 0.00


Sub total of A +B + C = 1387.84 Contractor's overhead expenses 15% = 208.18 Unit Rate : 1596.02

Note = 60 % of the boulder/stone can be used from dismantled quantity

Description of works: Providing, laying and fixing of Geo-textile (filter fabrics), lead 30m
Unit : 1 m2
Spec. cl. No: 2404,3110
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.09 Unskilled md 0.017 480.00 8.16 Geotextile m2 1.20 128.00 153.60

Sub total of A = 8.16 Sub total of B = 153.60 Sub total of C = 0.00


Sub total of A +B + C = 161.76 Contractor's overhead expenses 15% = 24.26 Unit Rate : 186.02

Prepared By Checked By Approved By


20 of 323

RATE ANALYSIS
Description of works: Providing and placing concrete with 60% M 15/40 concrete and 40% boulders/stones as per specification Lead 30m, lift 1.5m , using concrete mixer and vibrator.
Unit : 1 m3
Spec.cl.No: 2406: 2, 4

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.01.a Skilled md 0.30 775.00 232.50 cement t 0.169 16331.09 2759.95 Concrete mixer ( 0.28 / 0.20 m3 ) hr. 0.50 470 235.00

Unskilled md 3.00 480.00 1440.00 Aggregates 20-40(mm) m 3


0.345 1852.20 639.00 Concrete vibrator hr. 0.10 100 10.00
Aggregates 10-20 (mm) m3 0.156 1852.20 288.94
Aggregates 5-10(mm) m3 0.072 1852.20 133.35
sand m 3
0.299 802.58 239.97
petrol lit 0.100 100.88 10.08
diesel lit 3.000 89.38 268.14
Boulder/Stone m3 0.440 1895.67 834.09

Sub total of A = 1672.50 Sub total of B = 5173.52 Sub total of C = 245.00


Sub total of A +B + C = 7091.02 Contractor's overhead expenses 15% = 1063.65 Unit Rate = 8154.67

Description of works: Providing and placing concrete with 60% M 15/40 concrete and 40% boulders/stones as per specification Lead 30m, lift 1.5m , without using concrete mixer and vibrator.
Unit : 1 m3
Spec.cl.No: 2406: 2, 4
Labour (A) Material (B) Equipment (C)
Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.01.b Skilled md 0.30 775.00 232.50 cement t 0.185 16331.09 3021.25

Unskilled md 4.00 480.00 1920.00 Aggregates 20-40(mm) m3 0.345 1009.58 348.30


Aggregates 10-20 (mm)
m3 0.156 1070.00 166.92

Aggregates 5-10(mm) m3 0.072 1070.00 77.04


sand m 3
0.299 802.58 239.97
Boulder/Stone m3 0.440 1895.67 834.09

Sub total of A = 2152.50 Sub total of B = 4687.57 Sub total of C = 0.00


Sub total of A +B + C = 6840.07 Contractor's overhead expenses 15% = 1026.01 Unit Rate = 7866.08

Prepared By Checked By Approved By


21 of 323

RATE ANALYSIS
Description of works: Providing and placing plum-concrete with 70% M 15/40 concrete and 30% boulders/stones as per specification. Lead 30m, lift 1.5m using concrete mixer and vibrator.
Unit : 1 m3
Spec.cl.No: 2406: 2, 4

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.02.a Skilled md 0.30 775.00 232.50 cement t 0.195 16331.09 3184.56 Concrete mixer ( 0.28 / 0.20 m3 ) hr. 0.50 470 235.00
Aggregates 20-40(mm)
Unskilled md 3.00 480.00 1440.00 m3 0.398 1009.58 401.81 Concrete vibrator hr. 0.10 100 10.00

Aggregates 10-20 (mm)


m3 0.180 1009.58 181.72

Aggregates 5-10(mm)
m3 0.082 1009.58 82.78
sand m3 0.345 802.58 276.89
petrol lit 0.100 100.88 10.08
diesel lit 3.000 89.38 268.14
Boulder/Stone m3 0.330 1895.67 625.57

Sub total of A = 1672.50 Sub total of B = 5031.55 Sub total of C = 245.00


Sub total of A +B + C = 6949.05 Contractor's overhead expenses 15% = 1042.36 Unit Rate = 7991.41

Description of works: Providing and placing concrete with 70% M 15/40 concrete and 30% boulders/stones as per specification Lead 30m, lift 1.5m , without using concrete mixer and vibrator.
Unit : 1 m3
Spec.cl.No: 2406: 2, 4

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.14.02.b Skilled md 0.30 775.00 232.50 cement t 0.214 16331.09 3494.85

Unskilled md 4.00 480.00 1920.00 Aggregates 20-40(mm) m3 0.398 1852.20 737.17


Aggregates 10-20 (mm) m 3
0.180 1852.20 333.39
Aggregates 5-10(mm) m3 0.082 1852.20 151.88
sand m 3
0.345 802.58 276.89
Boulder/Stone m3 0.330 1895.67 625.57

Sub total of A = 2152.50 Sub total of B = 5619.75 Sub total of C = 0.00


Sub total of A +B + C = 7772.25 Contractor's overhead expenses 15% = 1165.84 Unit Rate = 8938.09

Prepared By Checked By Approved By


22 of 323

RATE ANALYSIS
Description of works: Providing, laying and levelling of dry stone soling works in the foundation all complete.

Spec. cl. No: Norms 2041(1st Unit : 1 m3


ammendment 2050)

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

24.02.04 Unskilled md 0.75 480.00 360.00 Blockstone m 3


1.00 1895.67 1895.67

Skilled md 0.25 775.00 193.75 Bond stone m3 0.10 1895.67 189.56

Sub total of A = 553.75 Sub total of B = 2085.23 Sub total of C = 0.00


Sub total of A +B + C = 2638.98 Contractor's overhead expenses 15% = 395.85 Unit Rate : 3034.83

Description of works: Providing and laying Random rubble stone masonry in cement mortar [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. complete, masoned height 0-
5m, lead 30m (machine mixing), mortar 35% Unit : 1 m3
Spec. cl. No: 2602,2603,2607

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

26.03.b Skilled md 1.50 775.00 1162.50 Cement t 0.155 16331.09 2531.31 Concrete mixer (0.28/0.2 m3) hr. 0.15 470 70.50

Unskilled md 3.50 480.00 1680.00 Sand m 3


0.450 802.58 361.16

Stone m 3
1.150 1895.67 2180.02

weepholes m3 0.800 230.00 184.00

Diesel lit 1.000 89.38 89.38

water lit 100.00 1.91 191.00

Sub total of A = 2842.50 Sub total of B = 5536.87 Sub total of C = 70.50


Sub total of A +B + C = 8449.87 Contractor's overhead expenses 15% = 1267.48 Unit Rate = 9717.35

Prepared By Checked By Approved By


23 of 323

RATE ANALYSIS
Description of works: Providing and laying semi-grouting with compaction 50mm thickness.
Unit : 10 m2.
Spec. cl. No: 1301,1304

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

13.06.01 Skilled md 0.2100 775.00 162.75 Bitumen lit 35.0000 98.29 3440.15 Boiler hr 0.0700 180 12.60

Unskilled md 1.8000 480.00 864.00 Kerosene lit 0.1700 89.38 15.19 Roller hr 0.0700 500.00 35.00

Diesel lit 2.5200 89.38 225.23 Sprayer hr 0.0700 260.00 18.20

Coarse agg. m3 0.6000 1070.00 642.00 Agg. Spreader hr 0.0700 300.00 21.00

Key agg. m3 0.1500 1070.00 160.50

Sub total of A = 1026.75 Sub total of B = 4483.07 Sub total of C = 86.80


Sub total of A +B + C = 5596.62 Contractor's overhead expenses 15% = 839.49 Rate (10m2) = 6436.11

Unit Rate(1 m2) = 643.61

Description of works: Provide and erecting "W" metal beam crashbarrier comprising of 3.43mm thick corrugated sheet metal beam rail, 70cm above road/ground level,fixed on ISMC serises channel
vertical post, 150*75*5 mm spaced 2m c/c,1.8m high,1.1m below ground/road level,all steel paetsand fitment to be galvanized by hot dip process,all fittings to confirm to IS 1367
and IS 1364,metal beam rail to be fixed on the vertical post with a spacer of chaneel section 150*75*5mm 330mm long, all complete Unit : 4.5m
IRC 7.08

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

Skilled md 0.393 775.00 304.57 Corrugated sheet, 3.43 mm


thick, "W" beam section
railing, 4.5 m in length kg 64.375 145.789 9385.160

Channel post 150x75x5 mm,


Unskilled md 0.786 377.28 1.8 m long, 2 Nos @ 16.4 kg
480.00 per meter kg 64.940 81.079 5265.270

Spacer 150x75x5mm channel


0.33 m long, 3 Nos. @16.4 kg
per meter kg 11.906 81.079 965.320

Nuts and bolts kg 2.000 200.000 400.000


Add 25% of material for Tractor-Trolly Hr 0.1 450 45
fabrication 100.000
Hot dip galvanization type I as
per AASHTO 180-12 kg 131.610 55.079 7248.940

Excavation Cum 0.269 0.000 0.000

M20 grade concrete Cum 0.269 Unit : 1 m3 9957.750

Sub total of A = 681.85 Sub total of B = 33322.44 Sub total of C = 45.00


Sub total of A +B + C = 34049.29 Contractor's overhead expenses 15% = 5107.39 Unit Rate = 39156.68

Prepared By Checked By Approved By


24 of 323

RATE ANALYSIS
Unit Rate per meter= 8701.48

Prepared By Checked By Approved By


25 of 323

RATE ANALYSIS
Description of works:
Supplying and applying Thermoplastic Paint for Road marking including cleaning,watering,brooming etc. all complete Unit : 10 m2.
Spec. cl. No: 1502

Labour (A) Material (B) Equipment (C)


Norms No.
Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount

15.02.a Skilled md 0.660 775.00 511.50 Thrmoplastic paint kg 50.000 170.00 8500.00 Compresser hr 2.33 250 582.5

Unskilled md 1.660 480.00 796.80 Glass beads kg 3 154.00 462.00 Sprayer hr 2.33 260 605.8

Lp Gas kg 7.5 115 862.50

Sub total of A = 1308.30 Sub total of B = 8962.00 Sub total of C = 1188.30


Sub total of A +B + C = 11458.60 Contractor's overhead expenses 15% = 1718.79 Unit Rate = 13177.39

Unit rate per m2 1317.739

Prepared By Checked By Approved By


Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

RATE ANALYSIS FOR MAINTENANCE WORKS

Name of the road:…………………………….


Chainage:0+000 to ….
RA No. : 1
Description of item : Carrying out the routine maintenance of the existing road during Defect Liability Period.

Unit: 3.00 km/day

Resources
Norms Specification
Labour (A) Materials (B) Equipment (C)
activity Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount

DoR 107 Unskilled md 1.000 480.00 480.00 tools 12 % of labour cost 0.00

Sub - total (A) 480.00 Sub - total (B) 0.00 Sub total (c) 0.00

NB: As per DoR Maintenace Norms Direct Cost (A+B+C) = NRs. 480.00

Contractor's Overhead @ 15 % of (A+B+C) = NRs. 72.00

Total Item Rate = NRs. 552.00

Say NRs. per 3km/day X= 552.00

NRs. Per1km/Day Y=X/3= 184.00

Say NRs. per 1km/month Z=Y*30= 5520.00


RA No. : 2
Description of item : Carrying out the routine maintenance of the existing road during the construction Period
Unit: 2.00 km/day
Resources
Norms Specification
Labour (A) Materials (B) Equipment (C)
activity Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount

DoR 107 Unskilled md 1.000 480.00 480.00 tools 12 % of labour cost 0.00

Sub - total (A) 480.00 Sub - total (B) 0.00 Sub total (c) 0.00
NB: As per DoR Maintenace Norms Direct Cost (A+B+C) = NRs. 480.00
Contractor's Overhead @ 15 % of (A+B+C) = NRs. 72.00
Total Item Rate = NRs. 552.00
Say NRs. per 2km/day X= 552.00
NRs. Per1km/Day Y=X/2= 276.00
Say NRs. per 1km/month Z=Y*30= 8280.00
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

Chart for collection of materials


Activity Labour
S.N. Description Unit Amount Remarks
no Type Unit Qty. Rate
Collection and seiving gravel including stacking within
1 8.01.02
10m. Hauling distance.
a ( 5 - 70 mm size) m3 Unskilled md 2 480 960.00
b ( 5 - 40 mm size) m3 Unskilled md 3.2 480 1536.00
c ( 5 - 20 mm size) m3 Unskilled md 4.7 480 2256.00
d ( 5 - 8 mm size) m3 Unskilled md 8 480 3840.00
Collection of rubble of required size, hauling
2 m3 8.01.03 Unskilled md 1.4 480 672.00
distance10m. and stacking.
Collection and seiving sand within 10m. hauling
3 8.01.04
distance.
a ( Quarry output less than 33%) m3 Unskilled md 4 480 1920.00
b ( Quarry output 33 - 66 %) m3 Unskilled md 3 480 1440.00
c ( Quarry output more than 66%) m3 Unskilled md 1.43 480 686.40
Collection, quarring and seiving sand in hilly areas
4 m3 8.01.05 Unskilled md 1.5 480 720.00
within 10m. hauling distance.
5 Washing broken stone, gravel and sand. m3 8.01.07 Unskilled md 1.5 480 720.00
6 Washing rubble m3 8.01.08 Unskilled md 0.4 480 192.00
Breaking stones including Collection, seiving and
7 8.02.01
stacking within 10m.
a ( 70 - 100 mm size) m3 Unskilled md 6 480 2880.00
b ( 40 - 70 mm size) m3 Unskilled md 8 480 3840.00
c ( 20 - 40 mm size) m3 Unskilled md 12 480 5760.00
d ( 10 - 20 mm size) m3 Unskilled md 18 480 8640.00
e ( 5 - 10 mm size) m3 Unskilled md 25 480 12000.00
Making rubbles of required size including breaking with
8 m3 8.02.03 Unskilled md 5.5 480 2640.00
distance 10m. and stacking.
Transportation of water by manpower including loading,
9 1000 lit 8.03.17 Unskilled md 0.47 480 225.60
hauling, unloading and stacking.

Prepared by: Checked by: Approved by:


Norms for collection of materials by machine
DOR Norms
Activity Spec Material Equipments Total
S.N. Description Unit
no No. Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Amount
Collection of Sand from river by Bulldozer,Loader and 807
1 Screening Plant including haulage upto 20m: 808
809

a Quarry capacity 31% to 60%


m3 Diesel Ltr 0.7935 68.14 Bull Dozer 100-150 HP Hr 0.0193 1800.00 88.81

Wheel Loader 1.5-2 m3


Hr 0.031 1200.00 37.20
bucket

Screening Plant 40t/m3 Hr 0.031 100.00 3.10

Total 129.11

Collection of Gravel from a quarry by


2 Bulldozer,Loader and Screening Plant including
haulage upto 20m:
a Gravel size:5-70mm up
m3 Diesel Ltr 0.56495 68.14 Bull Dozer 100-150 HP Hr 0.0087 1800.00 54.16

Wheel Loader 1.5-2 m3


Hr 0.0278 1200.00 33.36
bucket

Screening Plant 40t/m3 Hr 0.0139 100.00 1.39

Total 88.91

a Gravel size:5-40mm up
m3 Diesel Ltr 0.7456 68.14 Bull Dozer 100-150 HP Hr 0.0115 1800.00 71.51

Wheel Loader 1.5-2 m3


Hr 0.0367 1200.00 44.04
bucket

Screening Plant 40t/m3 Hr 0.0183 100.00 1.83

Total 117.38
Norms for collection of materials by machine
DOR Norms
Activity Spec Material Equipments Total
S.N. Description Unit
no No. Type Unit Qty. Rate Amount Type Unit Qty. Rate Amount Amount
a Gravel size:5-20mm up
m3 Diesel Ltr 1.1298 68.14 Bull Dozer 100-150 HP Hr 0.0174 1800.00 108.30

Wheel Loader 1.5-2 m3


Hr 0.0556 1200.00 66.72
bucket

Screening Plant 40t/m3 Hr 0.0278 100.00 2.78

Total 177.80

a Gravel size:40-70mm up
m3 Diesel Ltr 2.2596 68.14 Bull Dozer 100-150 HP Hr 0.0348 1800.00 216.61

Wheel Loader 1.5-2 m3


Hr 0.1112 1200.00 133.44
bucket

Screening Plant 40t/m3 Hr 0.1112 100.00 11.12

Total 361.17

a Gravel size:70-100mm up
m3 Diesel Ltr 5.0841 68.14 Bull Dozer 100-150 HP Hr 0.0783 1800.00 487.37

Wheel Loader 1.5-2 m3


Hr 0.2502 1200.00 300.24
bucket

Screening Plant 40t/m3 Hr 0.2502 100.00 25.02

Total 812.63
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

TRANSPORTATION RATES FOR HAULAGE OF SOIL AT DISPOSAL SITES


Name of the road:…………………………….
Transportation by Truck
Speed of Truck: 10 km/hr Average Speed of the Vehicle in the EW/G Roads 20 km/hr Average Speed of the Vehicle in Black Tops 40 km/hr
Capacity of truck: 8 tons
Specification clause no: 800
Activity No: 8.04.03

1.a. Excavated earth work (Soil Material) Average Speed of the Vehicle in E/W Road = 10 km/hr In Black Top = 20 km/hr Unit :1 cu.m
Unskilled labour skilled labour Diesel Truck
Description Cost Remark
unit Quantity Rate Amount unit Quantity Rate Amount unit Quantity Rate Amount unit Quantity Rate Amount
First one km md 0.4 480.00 192 ltr 0.40 89.38 35.75 hr 0.14 450.00 63.00 290.75
First two km md 0.4 480.00 192 ltr 0.80 89.38 71.50 hr 0.17 450.00 76.50 340.00 49.25
First three km md 0.4 480.00 192 ltr 1.20 89.38 107.26 hr 0.20 450.00 90.00 389.26 49.26
First four km md 0.4 480.00 192 ltr 1.60 89.38 143.01 hr 0.23 450.00 103.50 438.51 49.25
First five km md 0.4 480.00 192 ltr 2.00 89.38 178.76 hr 0.26 450.00 117.00 487.76 49.25

RA No. : 31
Description of item : Haulage of excessive cut materials using Machinary beyond 1 km length

Unit: 1.00 cu.m.


Resources
Specification
Norms activity Labour (A) Materials (B) Equipment (C)
Clause
Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount Category Unit Quantity Rate Amount

Transportation cost up to 1 km 1.0000 290.75 290.75


8.04.03 1(a) Transporatation cost up to 2km 1.0000 340.00 340.00

Sub - total (A) 0.00 Sub - total (B) 0.00 Sub total (c) 49.25
NB: Transportation Cost As per clause 8.04.03 1(a) as shown in transportation rate chart for additional km/cum Direct Cost (A+B+C) = NRs. 49.25
Contractor's Overhead @ 15 % of (A+B+C) = NRs. 7.39
The rate has been calculated by deducting total transportation cost from origin up to two km and up to 1km respectively , to find out the haulage cost
beyond 1 km. Total Item Rate = NRs. 56.64
Say NRs. per cu.m. 57.00
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

Transportation Analysis of Construction Materials :


Labour Rate Fuel per ltr. 89.38
Unskilled 480 Truck Rate 450
Skilled 775 Truck capactiy 8 mt

Labour Total
Earthen Km Gravel Km Blacktop Km Total Travel Fuel Fuel, Truck Load / Unload Truck,
Material Type Unit Transportation
(10 kmph) (20 Kmph) (40 kmph) Time (T) Coefficient Ltr. Coefficient Time Hr.
Unskilled Skilled Cost per unit

1)Excavated earth work


a)Soil Material m3 0.00 0.00 0.40 0.00 2.00 0.00 0.15 0.75 0.11 0.00
b)Rock Material m3 0.00 0.50 0.00 2.30 0.00 0.18 0.75 0.14 0.00
2) Sand m3 1.00 20.00 2.00 2.30 0.30 0.00 1.70 3.91 0.13 0.75 0.40 673.47
3) Gravel, river shingle, broken stone aggregates,
and bats.
a) Gravel m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10 4.83 0.16 0.75 0.49 892.20
b) River shingle m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10 4.83 0.16 0.75 0.49 892.20
c) Broken stone aggregates m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10 4.83 0.16 0.75 0.49 892.20
d) Brick bats m3 1.00 20.00 2.00 2.30 0.50 0.00 2.10 4.83 0.16 0.75 0.49 892.20
4) Boulder, Cobbles, quarry stone m3 1.00 20.00 2.00 2.30 0.50 0.00 2.70 6.21 0.21 0.75 0.64 1083.04
5)Dressed Stone m3 1.00 20.00 2.00 2.30 0.60 0.00 2.60 5.98 0.20 0.75 0.61 1096.99
6)Bricks 1000 nos 25.00 120.00 8.50 0.60 0.00 4.00 34.00 0.31 0.75 2.87 4618.42
7)Cement t 25.00 120.00 8.50 0.40 0.00 1.50 12.75 0.12 0.75 1.11 1831.09
8)Reinforcement Steel and gabion wire t 25.00 120.00 8.50 0.60 0.00 1.50 12.75 0.12 0.75 1.11 1927.09
Machine made gabion wire t 25.00 120.00 8.50 1.00 0.00 2.60 22.10 0.20 0.75 1.85 3287.79
gabion wire t 25.00 120.00 8.50 0.60 0.00 1.50 12.75 0.12 0.75 1.11 1927.09
9) Bitumen 1000 lit 25.00 120.00 8.50 1.00 0.00 2.60 22.10 0.20 0.75 1.85 3287.79
10) GI, CI, Pipe and fittings t 25.00 120.00 8.50 1.00 0.00 1.50 12.75 0.12 0.75 1.11 2119.09
11)Timber for temporary works m3 25.00 120.00 8.50 0.30 0.00 1.40 11.90 0.11 0.75 1.02 1666.62
12) Fabricated Structural Timber m3 25.00 120.00 8.50 0.50 0.00 2.00 17.00 0.15 1.25 1.46 2416.46
13) Fabricated Structural Steel t 25.00 120.00 8.50 4.00 0.40 1.50 12.75 0.12 1.25 1.17 3896.09
14)RCC Precast Element t 25.00 120.00 8.50 1.00 0.00 1.50 12.75 0.12 0.75 1.11 2119.09
15)Equiptment & accessoriesetc. requiring careful
truck 25.00 120.00 8.50 20.00 4.00 13.00 110.50 1.00 1.75 10.25 27188.99
handling
16) RCC hume pipe
a) 900mm dia m 25.00 120.00 8.50 0.40 0.04 0.78 6.63 0.06 1.75 0.62 1094.58
b) 750 mm dia m 25.00 120.00 8.50 0.33 0.03 0.69 5.87 0.06 1.75 0.62 985.31
c) 600mm dia m 25.00 120.00 8.50 0.25 0.02 0.60 5.10 0.05 1.75 0.51 820.83
17) Water 1000 lit 25.00 120.00 8.50 0.10 0.01 1.50 12.75 0.12 0.50 1.08 1681.34
18) Petrol / Diesel / Kerosene 1000 lit 25.00 120.00 8.50 0.10 0.01 1.50 12.75 0.12 0.50 1.08 1681.34
Fuel =Total Travel Time (T)*Fuel Coefficient
Truck, Hr.=Truck Coefficient *(Total Travel Time (T)+Load / Unload Time)
Total Transportation Cost per unit = Labour, md. * Labour Rate + Fuel, Ltr.* Fuel Rate + Truck, Hr.* Truck Rate

Prepared By Checked By Recommended By Approved By


Remarks

Prepared By Checked By Recommended By Approved By


Page 12
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0.00

1) District rate : Materials


Collection Transportation Total Rate
S.N. Description Unit District Rate (D) Remarks
Rate (C) Rate ( Tp ) ( C + R + Tp)
1 Gravel
1.a ( 5 - 70 mm ) m3 88.91 892.20 981.11 Collection by machine
1.b ( 5 - 40 mm) m3 117.38 892.20 1009.58 Collection by machine
1.c ( 5 - 20 mm) m3 177.80 892.20 1070.00 Collection by machine
1.d ( 5 - 10 mm) m3 177.80 892.20 1070.00 Collection by machine
2 Broken Aggregates
2.a ( 70 - 100 mm) m3 812.63 892.20 1704.83 Collection by machine
2.b ( 40 - 70 mm) m3 361.17 892.20 1253.37 Collection by machine
2.c ( 20 - 40 mm) m3 1200.00 117.38 892.20 1009.58 Collection by machine
2.d ( 10 - 20 mm) m3 1500.00 177.80 892.20 1070.00 Collection by machine
2.e ( 5 - 10 mm) m3 1000.00 177.80 892.20 1070.00 Collection by machine
3 Sand m3 129.11 673.47 802.58 Collection by machine
4 Brick nos. 11.00 4.62 15.62 Kailali
5 Wood
5.a wood Local m3 33000.00 1666.62 34666.62 Bajhang
5.b Sal wood m3 136000.00 1666.62 137666.62 Kailali
6 Stone dust m3 500.00 500.00 Kailali
7 Rubble m3 812.63 1083.04 1895.67 Collection by machine
8 Cement mt. 14500.00 1831.09 16331.09 Kailali
9 Water lt. 0.23 1.68 1.91 Kailali
10 Bitumen 80/100 lit. 95.00 3.29 98.29 Kailali
11 Reinforcement (Tor Steel)
11.a 8 mm dia mt. 77000.00 1927.09 78927.09 Kailali
11.b 10 - 22 mm dia mt. 77000.00 1927.09 78927.09 Kailali
11.c 25 - 32 mm dia mt. 77000.00 1927.09 78927.09 Kailali
11.d 4.75 - 7 mm dia mt. 80000.00 1927.09 81927.09 Kailali
12 Binding Wire kg 100.00 1.93 101.93 Kailali
Machine made gabion wire Sq.m 283.00 0.00 283.00 Kailali
13 G.I Wire heavy coated
13.a 8 gauge kg 90.00 1.93 91.93 Kailali
13.b 10 gauge kg 90.00 1.93 91.93 Kailali
13.c 12 gauge kg 92.00 1.93 93.93 Kailali
14 RCC Hume Pipes
14.c 600 mm diameter m 6280.00 820.83 7100.83 Kailali
14.e 900 mm diameter m 10320.00 1094.58 11414.58 Kailali
15 Jute kg 100.00 0.00 100.00 Kailali
16 Nails kg 110.00 0.00 110.00 Kailali
17 Ply wood
17.a plywood 3 mm m2 217.39 7.25 224.64 Kailali
17.b plywood 4 mm m2 217.39 9.67 227.06 Kailali
17.c plywood 6 mm m2 380.43 14.50 394.93 Kailali
17.d plywood 8 mm m2 423.91 19.33 443.24 Kailali
17.e plywood 10 mm m2 489.13 24.16 513.29 Kailali
17.f plywood 12 mm m2 652.17 29.00 681.17 Kailali
17.g plywood 20 mm m2 815.22
18 Road Paint lit. 450.00 450.00 Kailali
19 Enamel Paint lit. 550.00 550.00 Kailali
20 Lime kg 22.00 22.00 Kailali
21 Gum/Fevicol kg 336.00 336.00 Kailali
22 Snow cem kg 96.00 96.00 Kailali
23 Primer lit. 360.00 360.00 Kailali
24 Steel Plate(2 mm ) Sq. m 635.00 635.00 Kailali
25 Steel tube(50 mm dia GI) Rm 555.00 555.00 Kailali
26 GI Pipe Medium Class
26.a 38 mm m 340.00 7.63 347.63 Kailali
26.b 50 mm m 467.00 10.81 477.81 Kailali
Prepared By Checked By Approved By
Page 13

1) District rate : Materials


Collection Transportation Total Rate
S.N. Description Unit District Rate (D) Remarks
Rate (C) Rate ( Tp ) ( C + R + Tp)
26.c 75 mm m 741.00 18.08 759.08 Kailali
26.d 100 mm m 1100.00 26.49 1126.49 Kailali
27 HDPE 110mm m 230.00 230.00 Kailali
29 Geotextile m2 128.00 128.00 Kailali
31 Round Aggregates
(Used in Analysis) 70 to 100 mm m3 960.00 892.20 1852.20 collection
40 to 70mm m3 960.00 892.20 1852.20 collection
20 to 40 mm m3 960.00 892.20 1852.20 collection
10 to 20 mm m3 960.00 892.20 1852.20 collection
10 mm and down m3 960.00 892.20 1852.20 collection
32 Earth m3 300.00 0.00 300.00 Kailali
Anti-stripping agent kg 325.00
33 Tarfelt m2 156.52 156.52
2) District Rate : Labour
S.N. Description Unit District Rate Remarks
1 Skilled md 775.00
2 Unskilled (Labour) md 480.00
3 Blaster md Bajhang
4 Road Supervisor md 570.00
5 Road Length Worker md 570.00

3) District Rate : Fuel and Lubricant


S.N. Description Unit District Rate Lead According to latest updates of NOC
1 Diesel lit. 89.38
2 Kerosene lit. 89.38
3 Petrol lit. 100.88

4) DOR's Equipment Hire Rate


Operator's DOR Hire
S.N. Description Unit Allowance rate
1 Truck ( 3 tonnes) hr. 250.00
2 Truck ( 5 tonnes) hr. 300.00
3 Truck ( 8 tonnes) hr. 450.00
4 Grader ( 75 HP) hr. 1600.00
5 Pump 10cm dia hr. 200.00
6 Vibrating Roller ( 8 - 10 ton) hr. 700.00
7 3 Wheel roller hr. 500.00
8 Water bowser hr. 550.00
9 Loader Wheel hr. 1000.00
10 Boiler hr. 180.00
11 Sprayer Emulsion hr. 260.00
12 Air compressor hr. 250.00
13 Hand Sprayer hr. 250.00
14 Aggregate Spreader hr. 300.00
15 Pneumatic Tyred Roller hr. 1200.00
16 mixer hr. 470.00
17 Vibrating needle hr. 100.00
18 Blasting machine hr. 1400.00
19 Generator hr. 150.00
20 Screw Jack hr.
21 Electric Heating Plate hr.
22 Bitumen Distributor hr. 1300.00
23 Chip Spreader hr. 300.00
24 Tractor hr. 300.00
25 Asphalt plant hr. 400.00
26 Asphalt mixer hr. 1000.00
27 Asphalt paver hr. 1400.00
28 Excavator hr. 1800.00

Prepared By Checked By Approved By


Page 14

1) District rate : Materials


Collection Transportation Total Rate
S.N. Description Unit District Rate (D) Remarks
Rate (C) Rate ( Tp ) ( C + R + Tp)
29 Stone Crusher hr. 155.00

Prepared By Checked By Approved By


Earthwork Calculation for Roadway Structure

Earthwork Calculation
Total Length (Km): 38.4
Err:509
Err:509

Earthwork in Roadway including drain Structure E/W for Retaining wall / Gabion Road Way Cutting Soil type
e Excess filling Pro.

ks
Length
ag
Length

ar
Road way Cutting Filling Cutting Back filling BMS Soft Rock Hard Rock
in

(m)

em
ha

R
C

Av area Av area Area


Area (m2)
(m2)
Volume (m3) Area (m2)
(m2)
Volume (m3) Volume (m3) L (m) Area (m2) Vol (m3) Vol (m3) Volume (m3) Volume (m3) Volume (m3)
(m2) % % %

Total

15 of 323
Gabion Retaining Breast Structure Quantity Calculation
Err:509

Err:509
District: Dhadhing
Structure quantity
Chainage Gabion Retaining wall Gabion Retaining Wall Remarks
Total Volume Geotextile(m
Length (m) Left side Right side (m3) 2)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

- 6.00 17.00 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- 2.00 3.00 - - -
- 2.00 3.00 - - -
- 2.00 3.00 - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- 1.00 1.00 - - -
- - - -
- - - -
- - - -
- - - -
- 1.00 1.00 - - -
- 5.00 12.50 - - -
- - - -
- 1.00 1.00 - - -
- - - -
- - - -
- - - -
- - - -
- 2.00 3.00 - - -
- - - -
- - - -
- 3.00 5.50 - - -
- 8.00 27.50 - - -
- 7.00 22.00 - - -
- 3.00 5.50 - - -
- - - -
- - - -
- 10.00 40.00 - - -
- 10.00 40.00 - - -
- 6.00 17.00 - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 1.00 1.00 - - -

10.00 0.00 0.00 0.00 0.00


Gabion Retaining Breast Structure Quantity Calculation
Err:509

Err:509
District: Dhadhing
Structure quantity
Chainage Gabion Retaining wall Gabion Retaining Wall Remarks
Total Volume Geotextile(m
Length (m) Left side Right side (m3) 2)
Height Area(m2) Volume (m3) Height Area(m2) Volume (m3)

ok
Government of Nepal
Ministry of Physical Infrastructure and Transport
Department of Roads
0

Err:509

###

Component: RCC Causeway


Detailed of Quantity
S.N. Description No Length Breadth Height Quantity Unit Remarks
1 Earth work
a Causeway portion 10.00 8.00 0.80 64.00
b wall @ u/s 10.00 0.60 0.20 1.20
c ret wall @ d/s 10.00 0.60 1.00 6.00
d Apron @ d/s 10.00 3.00 0.80 24.00
e ret wall to apron@ d/s 10.00 0.60 1.00 6.00
101.2

2 Stone Pitching
a Causeway portion 10.00 8.00 0.20 16.00
b Apron @ d/s 10.00 3.00 0.20 6.00
22.00

3 PCC ( M15) 10.00 8.00 0.10 8.00


4 Concrete ( M20) 10.00 8.00 0.20 16.00

5 Reinforcement Steel @ 0.8% of RCC 1004.80

6 Masonry Wall
a wall @ u/s 10.00 0.60 1.00 6.00
b ret wall @ d/s 10.00 1.00 1.50 15.00
c ret wall to apron@ d/s 10.00 0.60 1.00 6.00
27.00
7 Formwork 36.00 0.30 10.80

8 Back filling 10.00 0.60 0.50 3.00


10.00 0.60 0.50 3.00
6.00

GeoCom Nepal Consult Pvt.Ltd 18 of 323


Individual Group
Initial Group Final
S.N. startindex endindex checkbox checkbox
Condition Condition Condition
number number
1 0 6 13 1 0 201
2 0 14 21 0 58
3 1 22 29 1 60
4 0 30 37 0 6
5 0 38 45 0 7
6 0 46 53 0 8
7 0 54 61 0 9
8 0 62 69 0 203
9 0 70 77 0 204
10 0 78 85 0 205
11 0 86 93 0 206
12 0 94 101 0 207
13 0 102 109 0 208
14 0 110 118 0 209
15 0 119 127 0 210
16 0 128 136 0 211
17 1 137 145 1 212
18 0 146 154 0 213
19 0 155 164 0 214
20 0 165 173 0 215
21 0 174 190 0 216
22 1 191 200 1 217
23 1 201 211 1 1 218
24 0 212 223 0 219
25 0 224 235 0 220
26 1 236 247 1 221
27 1 248 256 1 1 222
28 1 257 265 1 223
29 1 266 346 1 10
30 1 347 355 1 69
31 1 356 364 1 70
32 1 365 405 1 224
33 0 406 416 0 225
34 1 417 435 1 226
35 0 436 444 0 227
36 0 445 453 0 228
37 0 454 462 0 229
38 0 463 471 0 230
39 0 472 482 0
40 0 483 493 0
41 0 494 504 0
42 0 505 515 0
43 0 516 542 0
44 1 543 551 1
45 1 552 560 1 231
46 0 561 569 0 232
47 0 570 578 0 233
48 0 579 587 0 234
49 0 588 609 0 235
50 0 610 618 0 236
51 0 619 627 0 237
52 0 628 638 1 0 238
53 0 639 649 0 239
54 0 650 660 0 240
55 1 661 671 1 241
56 0 672 679 0 242
57 1 680 690 1 1 243
58 0 691 710 0 244
59 0 711 722 0 245
60 0 723 731 0 246
61 0 732 743 0 247
62 0 744 753 0 248
63 0 754 766 0 249
64 0 767 776 0 250
65 0 777 788 0 251
66 0 789 799 0 252
67 0 800 811 0 253
68 0 812 822 0 254
69 0 823 834 0 255
70 0 835 844 0 256
71 0 845 855 0 0 257
72 0 856 867 0 277
73 0 868 878 0 259
74 0 879 888 0 260
75 0 889 899 0 261
76 0 900 910 0 262
77 0 911 920 0 263
78 0 921 930 0 264
79 0 931 941 0 265
80 0 942 955 0 266
81 0 956 969 0 267
82 0 970 983 0 268
83 0 984 996 0 269
84 0 997 1010 0 270
85 0 1011 1024 0 271
86 0 1025 1038 0 272
87 0 1039 1049 0 273
88 0 1050 1063 0
89 1 1064 1157 1 1 66
90 1 1158 1170 1 278
91 0 1171 1180 0 279
92 0 1181 1190 0 280
93 0 1191 1203 0 281
94 0 1204 1216 0 282
95 0 1217 1228 0 283
96 1 1229 1240 1 1 285
97 0 1241 1252 0 286
98 0 1253 1264 0 287
99 0 1265 1275 0
100 0 1276 1288 0
101 0 1289 1300 0
102 0 1301 1312 0
103 0 1313 1323 0 288
104 0 1324 1334 0 289
105 0 1335 1345 0 290
106 0 1346 1356 0 291
107 0 1357 1365 0
108 0 1366 1374 0 0 292
109 0 1375 1383 0
110 0 1384 1398 1 0 293
111 1 1399 1414 1 294
112 1 1415 1430 1 295
113 1 1431 1445 1 296
114 1 1446 1460 1 297
115 0 1461 1473 0 298
116 0 1474 1487 0 299
117 0 1488 1501 0 300
118 0 1502 1514 0 301
119 0 1515 1527 0 302
120 0 1528 1543 0 303
121 0 1544 1559 0 304
122 0 1560 1574 0 305
123 0 1575 1589 0 306
124 0 1590 1604 0 307
125 0 1605 1619 0 308
126 0 1620 1632 0 309
127 0 1633 1645 0 310
128 0 1646 1658 0 311
129 1 1659 1668 1 312
130 1 1669 1678 1 313
131 1 1679 1695 1 314
132 0 1696 1806 1 0 315
133 0 1807 1817 0
134 1 1818 1826 1
135 0 1827 1842 0 316
136 0 1843 1856 0 317
137 0 1857 1872 0 318
138 0 1873 1886 0 319
139 0 1887 1898 0 0
140 0 1899 1910 0
141 1 1911 1920 1
142 0 1921 1930 1 0 320
143 0 1931 1943 0 321
144 0 1944 1957 0 322
145 0 1958 1970 0 323
146 0 1971 1982 0 324
147 1 1983 1994 1 325
148 0 1995 2006 0 326
149 0 2007 2019 0 327
150 0 2020 2032 0 328
151 0 2033 2045 0 329
152 0 2046 2058 0 330
153 0 2059 2071 0 331
154 0 2072 2084 0 332
155 0 2085 2095 0 0 333
156 0 2096 2107 0
157 0 2108 2119 0
158 0 2120 2132 0
159 0 2133 2142 0 0 334
160 0 2143 2152 0 335
161 0 2153 2162 0 336
162 0 2163 2176 0 337
163 0 2177 2185 0 0 338
164 0 2186 2194 0 339
165 0 2195 1889 0 340
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)
ACTIVITY GROUP 2 : SITE
A
CLEARANCE
Clearing and grubbing of forest including uprooting, carrying and disposing of
vegetation, grass, bush, spaling and trees of girth upto 300 mm (measured at a
1 2.01.a 201 height of 1m above the ground level), lead 10m for (a) Trees and spaling less m2 17.05
than 15 numbers per 100 sq. m.
Clearing and grubbing of forest including uprooting, carrying and disposing of
vegetation, grass, bush, spaling and trees of girth upto 300 mm (measured at a
2 2.01.b 201 height of 1m above the ground level), lead 10m for (a) Trees and spaling m2 22.74
more than 15 numbers per 100 sq. m.

Clearing of grass, removing roots breaking sods, levelling the surface and
3 2.02 201 disposal 10 m.
m2 13.08

Feeling and uprooting of bamboo, clearing the area, stacking of bamboo, and
4 2.03 201 disposing of wastes to 10 m. (Voulme of the excavated area should be m3 1591.97
measured)

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
5 2.04.a 201 serviceable materials to 10m distance and back filling the depression/pits. (a)
no 523.07
above 300 mm to 600 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
6 2.04.b 201 serviceable materials to 10m distance and back filling the depression/pits. (b)
no 1989.96
above 600 mm to 900 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
7 2.04.c 201 serviceable materials to 10m distance and back filling the depression/pits. (c)
No 5543.46
above 900 mm to 1800 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
8 2.04.d 201 serviceable materials to 10m distance and back filling the depression/pits. (d)
No 9096.96
above 1800 mm to 2400 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
9 2.04.e 201 serviceable materials to 10m distance and back filling the depression/pits. (e) No 22742.40
above 2400 mm to 3000 mm.

Feeling trees (the girth measured at a height of 1m above the ground level)
including cutting of trunks and branches, removing the roots, stacking
10 2.04.f 201 serviceable materials to 10m distance and back filling the depression/pits. (e)
No 44751.35
above 3000 mm.

Dressing and levelling of the construction surface including cutting and filling of
11 2.05 201,909 small undulation.
m2 5.68

Excavation of top soil (sub grade) and carrying away from construction site,
12 2.06 201,1003 lead 10m and thickness upto 100mm.
m2 90.97

13 2.07 201,2800 Spreading, shaping and light compacting of top soil on slopes. m2 28.43

Dismantling Bridge, culvert and other structures including stockpiling the


14 2.08.01 202 reusable materials and diposal of usable materials within 50 m lead for m3 841.88
(a) Plain cement concrete, 1:4:8 or leaner mix

Dismantling Bridge, culvert and other structures including stockpiling the


15 2.08.02 202 reusable materials and diposal of usable materials within 50 m lead for m3 1353.58
(b) Plain cement concrete, 1:3:6 or richer mix

Dismantling Bridge, culvert and other structures including stockpiling the


16 2.08.03 202 reusable materials and diposal of usable materials within 50 m lead for m3 1893.72
(c) Reinforced cement concrete work

Dismantling Bridge, culvert and other structures including stockpiling the


17 2.08.05 202 reusable materials and diposal of usable materials within 50 m lead for m3 1371.05
(e) Random rubble masonry in cement mortar

Excavation of metalled road and removal of all materials including soling and
screening, sorting out reusable materials and disposing unusable materials
18 2.15.a 202 upto 20m lead
m3 515.19
(a) Water bound macadam materials including soling / sub-base.

Excavation of metalled road and removal of all materials including soling and
screening, sorting out reusable materials and disposing unusable materials
19 2.15.b 202 upto 20m lead
m3 1385.09
(b)Bitumenous Materials

Dismantling of RCC pipes (excluding excavation and refilling).


20 2.17.i 202 i) upto 600 mm dia.
m 236.60

Dismantling of RCC pipes (excluding excavation and refilling).


21 2.17.ii 202 ii) above 600 mm dia.
m 464.03

Dismantling gabion works including stockpiling the reusable materials and


22 2.18 202 disposal of reusable materials within 50m lead.
m3 660.35

ACTIVITY GROUP 7 : PIPE


DRAINS, PIPE CULVERTS
B
AND CONCRETE
CHANNELS

Providing, jointing and laying HDP pipes (110 mm/125mm outer diameter) with
23 7.01.a 701 or without collar etc. complete in place as per specification.
m 351.10
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)

Proving and laying RCC pipes of diameter 600 mm (internal) with or without
24 7.02.i 701 collars jointed with stiff mixture of cement mortar in the proportion of m 9457.15
1 : 2 ( 1 cement : 2 fine sand ) , lead upto 100m.

Proving and laying RCC pipes of diameter 750 mm (internal) with or without
25 7.02.ii 701 collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 m 12202.68
cement : 2 fine sand ) , lead upto 100m.

Proving and laying RCC pipes of diameter 900 mm (internal) with or without
26 7.02.iii 701 collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 m 14956.50
cement : 2 fine sand ) , lead upto 100m.

ACTIVITY GROUP 9 :
C
EARTHWORKS
Road way excavation in soft soil including disposal upto 10 m and lift upto 1.5
27 9.01.a 905 m etc. all complete as per specification.
m3 426.42

Road way excavation in Hard soil / Gravel / Boulder mixed soil including
28 9.01.b 905 disposal upto 10 m and lift upto 1.5 m etc. all complete as per specification.
m3 568.56

Road way excavation in Soft rock including disposal upto 10 m and lift upto 1.5
29 9.01.c 905 m etc. all complete as per specification.
m3 1563.54

Earthwork excavation in soft soil for drain and trenches including shoring,
30 9.02.a 905 struting, bracing, sheeting and disposal upto 10 m and lift upto 1.5 m etc. all m3 511.7
complete as per specification

Earthwork excavation in Hard soil/Gravels/Boulder mixed soil for drain and


31 9.02.b 905 trenches including shoring, struting, bracing, sheeting and disposal upto 10 m m3 852.84
and lift upto 1.5 m etc. all complete as per specification

Earthwork excavation in soft rock for drain and trenches including shoring,
32 9.02.c 905 struting, bracing, sheeting and disposal upto 10 m and lift upto 1.5 m etc. all m3 1705.68
complete as per specification

Formation of embankment including compaction in layers not exceeding 150


33 9.05.a 909 mm compacted depth, watering and haulage 10 m etc. all complete as per m3 972.96
specification (i)manual methods

Formation of embankment including compaction in layers not exceeding 150


34 9.05.b 909 mm compacted depth, watering and haulage 10 m etc. all complete as per m3 45.56
specification (ii)using equipments.

Excavation for foundation through all types of soil including relevant lift and
35 9.07.01.a 907 disposal upto 20m. m3 1137.12
(a) Depth upto 1.5 m

Excavation for foundation through all types of soil including relevant lift and
36 9.07.01.b 907 disposal upto 20m. m3 1705.68
(b) Depth 1.5 m upto 3 m

Excavation for foundation through all types of soil including relevant lift and
37 9.07.01.c 907 disposal upto 20m. m3 2274.24
(c) Depth upto 3m upto 4.5 m

Excavation for foundation through all types of soil including relevant lift and
38 9.07.01.d 907 disposal upto 20m. m3 2700.66
(d) Depth 4.5 m upto 6 m

Underwater Excavation for foundation through all types of soil including


39 9.07.1.a 907 relevant lift and disposal upto 20m and dewatering. m3 1364.54
(a) Depth upto 1.5 m

Underwater Excavation for foundation through all types of soil including


40 9.07.01.b 907 relevant lift and disposal upto 20m. m3 2729.09
(b) Depth 1.5 m upto 3 m

Underwater Excavation for foundation through all types of soil including


41 9.07.01.c 907 relevant lift and disposal upto 20m. m3 4321.06
(c) Depth upto 3m upto 4.5 m

Underwater Excavation for foundation through all types of soil including


42 9.07.01.d 907 relevant lift and disposal upto 20m. m3 5131.25
(d) Depth 4.5 m upto 6 m

Underwater Excavation for foundation through all types of soil including


43 9.07.01.e 907 relevant lift and disposal upto 20m. m3 6670.62
(d) Depth 6.0m upto 7.0 m

Backfilling in layers in foundation pits,trenches etc with approved filter


44 9.10.a 908 material including compaction and watering etc complete,lead 10 m m3 1889.25
a) Depth of foundation upto 1.5m

Backfilling in layers in foundation pits,trenches with common excavated


45 9.10.a 908 material etc including compaction and watering etc complete,lead 10 m m3 648.15
a) Depth of foundation upto 1.5m

Backfilling in layers in foundation pits,trenches etc including compaction and


46 9.10.b 908 watering etc complete,lead 10 m m3 921.06
b) Depth of foundation 1.5 m upto 3m

Backfilling in layers in foundation pits,trenches etc including compaction and


47 9.10.c 908 watering etc complete,lead 10 m m3 1193.98
c) Depth of foundation upto 3m upto 4.5 m.

Backfilling in layers in foundation pits,trenches etc including compaction and


48 9.10.d 908 watering etc complete,lead 10 m m3 1466.88
d) Depth of foundation 4.5 m upto 6m.

Excavation and disposal of slides manually haulage distance upto 50m a)Soft
49 9.11.a 908 soil m3 341.14
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)
Excavation and disposal of slides manually haulage distance upto 50m
50 9.11.b 908 b) Hard soil
m3 454.85

Excavation and disposal of slides manually haulage distance upto 50m


51 9.11.c 908 c)Soft Rock
m3 909.70

ACTIVITY GROUP 10 : SUB


C
GRADES
Subgrade construction and preparation of formation in cutting (other than rock
52 10.01 1003 excavation) including disposal of material upto10m .
m3 115.3

Subgrade construction, preparation and formation of subgrade in rock cutting


53 10.02 1003 with regulating course of natural materials.
m3 377.15

Subgrade construction with loose untreated materials; preparation and


54 10.03 1003 formation of subgrade in fill areas.
m3 377.15

Preparation of sub-grade for rehabilitation or other similar works (filling or


55 10.05.a 1003 cutting depth of 10 to 20 cm) in common soil.
m2 30.05

Preparation of sub-grade for rehabilitation or other similar works (filling or


56 10.05.b 1003 cutting depth of 10 to 20 cm) in gravel & boulder mixed soil.
m2 170.57

ACTIVITY GROUP 12 : SUB-


C
BASE, BASE
Providing, laying, spreading, watering, levelling and compaction of natural sand
57 12.01 1201 gravel subbase grading as per table 12.1 of standard specification lead upto m3 1647.00
10m.

Providing, laying, spreading, watering, levelling and compaction of natural sand


58 12.02 1201 gravel subbase grading as per table 12.1 of standard specification lead upto m3 2113.33
10m (for manual works).

Providing, laying, spreading, watering, levelling and compaction of crusher run


59 12.03 1202 materials for subbase course grading SB1* lead upto 10m.
m3 3048.41

Providing, laying, spreading, watering, levelling and compaction of crusher run


60 12.04 1202 materials for subbase course grading SB1* lead upto 10m. m3 2367.06
( for manual works)

Providing, laying, spreading, watering, levelling and compaction of crusher run


61 12.05 1202 materials for subbase course grading SB2*lead upto 10m. m3 1712.12
(for machine works)

Providing, laying, spreading, watering, levelling and compaction of crusher run


62 12.06 1202 materials for subbase course grading SB2*lead upto 10m. m3 2371.66
(for manual works)

Providing, laying, spreading, watering, levelling and compaction of crusher run


63 12.07 1202 materials for base course lead upto 10m. m3 2865.65
(a) Machine works

Providing, laying, spreading, watering, levelling and compaction of crusher run


64 12.08 1202 materials for base course lead upto 10m. m3 3506.40
(b) For manual works.

Providing, laying, spreading, watering, levelling and compaction of waterbound


65 12.09 1203 Macadam base course class D1* grading 1 or grading 2 lead upto 10m.
m3 1870.21

Providing, laying, spreading, watering, levelling and compaction of Waterbound


66 12.10 1203 macadam subbase course class E1* lead upto 10 m m3 2584.95
(b) Manual works.

Providing, laying, spreading, watering, levelling and compaction of waterbound


67 12.11 1203 Macadam base course class D1* grading 1 or grading 2 lead upto 10m. m3 1907.56
(a) Machine works

Providing, laying, spreading, watering, levelling and compaction of waterbound


68 12.12 1203 Macadam base course class D1* grading 1 or grading 2 lead upto 10m. m3 2592.01
(B) Manual works

Providing, laying, spreading, watering, levelling and compaction of natural sand


69 12.13 1205 gravel wearing course class -1 / class -2 lead upto 10m. For machine works
m3 1654.51

Providing, laying, spreading, watering, levelling and compaction of natural sand


70 12.14 1205 gravel wearing course class -1/class -2 lead upto 10m for manual works. m3 2464.21

ACTIVITY GROUP 13 :
C BITUMINOUS SURFACE
AND BASE COURSE

Providing and spraying bituminous tack coat MC30/MC70 including cleaning


71 13.01 1301, 1302 the road surface using wire, brushes, broom etc. before applying tack coat.
Ltr 187.39

Providing and spraying bituminous tack coat MC30/MC70 including cleaning


72 13.02 1301, 1302 the road surface using wire, brushes, broom etc. before applying tack coat, Ltr 163.93
using manual methods.

Providing and spraying bituminous prime coat MC30/MC70 including cleaning


73 13.03 1301, 1302 the road surface using wire, brushes, broom etc. before applying prime coat.
Ltr 187.39

Providing and spraying bituminous prime coat MC30/MC70 including cleaning


74 13.04 1301, 1302 the road surface using wire, brushes, broom etc. before applying prime coat, Ltr 163.93
using manual methods.

Laying of single / double / multiple bituminous coats for surface dressing using
75 13.05.01 1301, 1303 river gravels, shingles or broken stone chips including compaction Ltr 171.18
I) Bituminous binder for surface dressing( mass work).

Laying of single / double / multiple bituminous coats for surface dressing using
76 13.05.02 1301, 1303 river gravels, shingles or broken stone chips including compaction Ltr 179.38
I) Bituminous binder for surface dressing( Patch work).
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)
Laying of single / double / multiple bituminous coats for surface dressing using
77 13.05.03 1301, 1303 river gravels, shingles or broken stone chips including compaction -- II) Cutter Ltr 104.26
for bitumen grade 80/100.

Laying of single / double / multiple bituminous coats for surface dressing using
78 13.05.04 1301, 1303 river gravels, shingles or broken stone chips including compaction -- III) Mt 2089.35
Chipping for surface dressing for 1st coat size or second coat size.

Laying of single / double / multiple bituminous coats for surface dressing using
79 13.05.05 1301, 1303 river gravels, shingles or broken stone chips including compaction -- IV) m3 0
Production of percorated chipping.

80 13.06.01 1301, 1304 Providing and laying semi-grouting with compaction 50mm thickness. m2 836.59
81 13.06.02 1301, 1304 Providing and laying semi-grouting with compaction 75mm thickness. m2 1095.47
82 13.06.03 1301, 1304 Providing and laying full grouting with compaction 50 mm thicknes. m2 1063.68
83 13.07 1301, 1305 Providing and laying sand seal. m2 115.09

84 13.08.01 1301, 1306 Providing, mixing and laying slurry seal with fine slurry mix. m2 181.06
85 13.08.02 1301, 1306 Providing, mixing and laying slurry seal with normal slurry mix. m2 202.34
86 13.08.03 1301, 1306 Providing, mixing and laying slurry seal with coarse slurry mix. m2 235.75
87 13.09 1307, 1308 Providing, mixing, laying and compaction of premix carpet. m3 15373.13
88 13.1 1307, 1308 Providing, mixing, and laying asphalt concrete with compaction. m3 18067.34
ACTIVITY GROUP 15 :
TRAFFIC SIGNS AND ROAD
MARKING

Supplying and erecting traffic sign in place including 50mm dia. Steel tube,
2mm. thick steel plate, cement concrete, painting, writing and supporting steel
89 15.01.a 1501 angle nut and bolit etc. complete a) 60cm. Dia. Circular, 60cm. equilateral
no 2384.33
traingle and 60cm.x 45cm. rectangular shaped sign (single post).

Supplying and erecting traffic sign in place including 50mm dia. Steel tube,
2mm. thick steel plate, cement concrete, painting, writing and supporting steel
90 15.01.b 1501 angle nut and bolit etc. complete b) 1.2m.x 0.75m. Size bigger traffic sign with
no 9652.04
back support and two or more post.

Supplying and applying paint for Road marking including cleaning, watering,
91 15.02.a 1502 brooming etc. all complete (10cm. wide strip) m 27.16
a) Two coats over old painted surface

Supplying and applying paint for Road marking including cleaning, watering,
92 15.02.b 1502 brooming etc. all complete (10cm. wide strip) m 47.13
b) More than two coats over new bitumin surface

Supplying and placing R.C.C. kilometer post including excavation, back filling,
93 15.03.a 1503 painting and writing etc. all complete as per specification no 2537.96
a) Standard KM post placed at each kilometer.

Supplying and placing R.C.C. kilometer post including excavation, back filling,
94 15.03.b 1503 painting and writing etc. all complete as per specification no 5768.93
b) Bigger kilometer post (placed at each 5 km.)

Supplying and fixing in place R.C.C. delineator and guard post including
95 15.04 1504 excavation, back filling, painting and erection etc. all complete as per drawing.
no 1112.17

ACTIVITY GROUP 18 :
FASLEWORK, FORMWORK
& SURFACE FINISH FOR
CONCRETE STRUCTURES

Providing , Preparing and Installing form work including necessary supports


96 18.01 1804, 1805 and removing after completion for foundation and footings m2 525.84
(a) using timber ( soft wood) - Class F1 finish.

Providing , Preparing and Installing form work including necessary supports


97 18.02.1.a.i 1804, 1805 and removing after completion ---For Vertical plain surface [class F2 finish] m2 563.19
height upto 3 m

Providing , Preparing and Installing form work including necessary supports


98 18.02.1.a.ii 1804, 1805 and removing after completion ---For Vertical plain surface [class F2 finish] m2 677.83
height upto 3 m upto 6m.

Providing , Preparing and Installing form work including necessary supports


99 18.02.1.a.iii 1804, 1805 and removing after completion ---For Vertical plain surface [class F2 finish] m2 843.42
height upto 6 m upto 9m.

Providing , Preparing and Installing form work including necessary supports


100 18.02.02.a.i 1804, 1805 and removing after completion ---For Vertical curved surface [class F2 finish] m2 764.07
height upto 3.0 m.

Providing , Preparing and Installing form work including necessary supports


101 18.02.02.a.ii 1804, 1805 and removing after completion ---For Vertical curved surface [class F2 finish] m2 905.31
height 3.0 m upto 6.0 m.

Providing , Preparing and Installing form work including necessary supports


102 18.02.02.a.iii 1804, 1805 and removing after completion ---For Vertical curved surface [class F2 finish] m2 1137.38
height 6.0 upto 9.0m.

Providing , Preparing and Installing form work including necessary supports


103 18.04.a 1804, 1805 and removing after completion ---For slab structure [class F2 finish] using m2 688.85
timber planks. (Falsework not included)

Providing , Preparing and Installing form work including necessary supports


104 18.05.a 1804, 1805 and removing after completion ---For slab and beam structure [class F2 finish] m2 1028.42
using timber planks. (Falsework not included)
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)
Providing, and assembling in position falsework for the construction of RCC
superstructure and removal after completion including necessary design and
105 18.08.1.a.ii 1803 drawings as per specification.
m2 3167.87
A) For Slabs and Box culverts , using timber for height 2m ~ 4m

Providing, and assembling in position falsework for the construction of RCC


superstructure and removal after completion including necessary design and
106 18.08.2.a.ii 1804, 1805 drawings as per specification.
m2 3093.12
A) For RCC beam bridges , using timber for height 0m ~ 3m

ACTIVITY GROUP 19 :
BEARINGS AND
EXPANSION JOINTS
(BRIDGES, SLABS ETC.)
Providing and fixing in positions, 100 mm diameter drainage spouts with
107 19.01 1901 necessary hardware.
nos 1425.00

Providing and installing Expansion Joints and tarfelt sheet including all
108 19.02 1901 necessaary axilliary and incidental works etc. complete as per drawing and rm 18089.5
specification.

Providing and fixing in positions,reinforced elastomeric bearing pad per


109 19.02 1901 drawing and instructions.
nos 31625.00

ACTIVITY GROUP 20 :
CONCRETE FOR
STRUCTURES

Providing and placing machine mixed M10/40 cement concrete for the
110 20.01.a.01 2000 foundation and footing etc. including compaction, curing, testing and lead m3 9202.05
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M15/40 cement concrete for the
111 20.01.a.02 2000 foundation and footing etc. including compaction, curing, testing and lead m3 9990.5
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M20/40 cement concrete for the
112 20.01.a.03 2000 foundation and footing etc. including compaction, curing, testing and lead m3 11239.76
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M20/20 cement concrete for the
113 20.01.a.04 2000 foundation and footing etc. including compaction, curing, testing and lead m3 11451.41
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M25/20 cement concrete for the
114 20.01.a.05 2000 foundation and footing etc. including compaction, curing, testing and lead m3 13199.3
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M10/40 cement concrete for the
115 20.01.b.01 2000 foundation and footing etc. including compaction, curing, testing and lead m3 10643.03
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M15/40 cement concrete for the
116 20.01.b.02 2000 foundation and footing etc. including compaction, curing, testing and lead m3 11404.48
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M20/40 cement concrete for the
117 20.01.b.03 2000 foundation and footing etc. including compaction, curing, testing and lead m3 12793.44
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M20/20 cement concrete for the
118 20.01.b.04 2000 foundation and footing etc. including compaction, curing, testing and lead m3 13033.65
30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed M25/20 cement concrete for the
119 20.01.b.05 2000 foundation and footing etc. including compaction, curing, testing and lead m3 14063.72
30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M15/40 cement concrete for abutment,
120 20.02.a.i 2000 pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 14316.93
complete as per specification and drawing.

Providing and placing machine mixed M20/40 cement concrete for abutment,
121 20.02.a.iii 2000 pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 15547.02
complete as per specification and drawing.

Providing and placing machine mixed M20/20 cement concrete for abutment,
122 20.02.a.iii 2000 pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 15740.10
complete as per specification and drawing.

Providing and placing machine mixed M25/20 cement concrete for abutment,
123 20.02.a.iv 2000 pier, wall, etc. including compaction, curing, testing and lead 30m. etc. all m3 16697.67
complete as per specification and drawing.

Providing and placing machine mixed M20/20 cement concrete for the
124 20.03.a.ii 2000 superstructure, deckslab, girder etc. including compaction, curing, testing and m3 13139.97
lead 30m. etc. all complete as per specification and drawing.

Providing and placing machine mixed M25/20 cement concrete for


125 20.03.a.ii 2000 superstructure, deckslab, girder, etc. including compaction, curing, m3 15070.57
testing and lead 30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed non structural cement concrete


126 20.06.b.1 2000 [ cement (1): sand (4) : aggregate (8) ] including compaction, curing, testing m3 9293.73
and lead 30m. etc. all complete as per specification and drawing.

Providing and placing manually mixed non structural cement concrete


127 20.06.b.02 2000 [ cement (1): sand (3) : aggregate (6) ] including compaction, curing, testing m3 10303.69
and lead 30m. etc. all complete as per specification and drawing.
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)
Providing and placing manually mixed non structural cement concrete
128 20.06.b.03 2000 [ cement (1): sand (2) : aggregate (4) ] including compaction, curing, testing m3 12421.41
and lead 30m. etc. all complete as per specification and drawing.

Providing and laying Reinforcement ( diameter upto 8 mm) including cutting,


129 20.07.01 2000 bending, binding, fixing in position and lead 30m. etc. all complete as per mt 127436.46
specification and drawing.

Providing and laying Reinforcement ( diameter above 8 mm and upto 16 mm)


130 20.07.02 2000 including cutting, bending, binding, fixing in position and lead 30m. etc. all mt 122872.27
complete as per specification and drawing.

Providing and laying Reinforcement ( diameter above 16 mm) including


131 20.07.03 2000 cutting, bending, binding, fixing in position and lead 30m. etc. all complete as mt 118425.3
per specification and drawing.

ACTIVITY GROUP 24 :
MISCELLANEOUS
STRUCTURES

Fabrication of hexagonal mesh type 100mm x 120 mm Gabion boxes /


mattresses with diapharagms, with binding wire 12 swg, mesh wire 10 swg and
selvedged wire 7 swg , including rolling, cutting and weaving ; assembling
Gabion boxes mattresses, palcing in position including stretching, forming
132 24.02.01 2401 compartments; tying with bracing wires and tie wires; tying down the lid
box 3365.99
complete; and providing and filling stone / boulder in gabion boxes / mattresses
etc. including dressing, beding, bonding and all transporation as per
specification.

2403(5), Providing and laying grouted stone pitching in protection work with stone size
133 24.04 m3 8522.12
2406 -5(b) not less than 0.01 m3 and cement : sand motar (1:3) lead 30m, lift 1.5m

134 24.09 2404,3110 Providing, laying and fixing of Geo-textile (filter fabrics), lead 30m m2 186.02
Providing and placing concrete with 60% M 15/40 concrete and 40%
135 24.14.01.a 2406; 2, 4 boulders/stones as per specification Lead 30m, lift 1.5m , using concrete mixer m3 8154.67
and vibrator.
Providing and placing concrete with 60% M 15/40 concrete and 40%
136 24.14.01.b 2406; 2, 4 boulders/stones as per specification Lead 30m, lift 1.5m , without using m3 7866.08
concrete mixer and vibrator.

Providing and placing plum-concrete with 70% M 15/40 concrete and 30%
137 24.14.02.a 2406; 2, 4 boulders/stones as per specification. Lead 30m, lift 1.5m using concrete mixer m3 7991.41
and vibrator.

Providing and placing concrete with 70% M 15/40 concrete and 30%
138 24.14.02.b 2406; 2, 4 boulders/stones as per specification Lead 30m, lift 1.5m , without using m3 8938.09
concrete mixer and vibrator.

ACTIVITY GROUP 25 :
BRICKWORKS FOR
STRUCTURES
Providing and laying brick masonry in manual mixed cement mortar including
139 25.02.b 2502,3,4,5,7 preparation of mortar as per specification, lead 30 m.
m3 15107.98

Providing and applying 20mm thick cement plaster including mortar mixing,
140 25.06.b 2502,2510 scaffolding, curing etc. complete as per specification lead 30 m (manual m2 406.30
mixing)
ACTIVITY GROUP 26 :
MASONRY WORK FOR
STRUCTURES
Providing, laying and levelling of dry stone masonry works in the foundation all
141 26.01, 6.05 old 2602, 2603 complete.
m3 3034.83

Providing and laying dry stone masonry (coursed rubble) including dressing
142 26.01 2602, 2603, 2068 etc. complete as per specification, lead 30m.
m3 4791.62

Providing and laying Random rubble stone masonry in cement mortar


143 26.03.a 2602, 2603, 2607 [ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. m3 10412.8
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


144 26.03.b 2602, 2603, 2607 [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. m3 9717.35
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


145 26.03.c 2602, 2603, 2607 [ cement(1) : sand(6)] including scaffolding, curing, preparation of mortar etc. m3 8774.71
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


146 26.04.a 2607 [ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. m3 10803.26
complete, masoned height 0-5m, lead 30m (manual mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


147 26.04.b 2607 [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. m3 10138.33
complete, masoned height 0-5m, lead 30m (manual mixing), mortar 35%

Providing and laying Random rubble stone masonry in cement mortar


148 26.04.c 2607 [ cement(1) : sand(6)] including scaffolding, curing, preparation of mortar etc. m3 9165.17
complete, masoned height 0-5m, lead 30m (manual mixing), mortar 35%

Providing and laying Coursed rubble stone masonry in cement mortar


149 26.05.a 2600 [ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. m3 10878.68
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 30%
Specification Rate
S.N. Norms No Description Unit
Clause No. ( NRs.)

Providing and laying Coursed rubble stone masonry in cement mortar


150 26.05.b 2600 [ cement(1) : sand(4)] including scaffolding, curing, preparation of mortar etc. m3 10213.75
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 30%

Providing and laying Coursed rubble stone masonry in cement mortar


151 26.05.c 2600 [ cement(1) : sand(6)] including scaffolding, curing, preparation of mortar etc. m3 9240.58
complete, masoned height 0-5m, lead 30m (machine mixing), mortar 30%

Providing, mixing, and Pointing cement mortar over rubble masonry works in
152 26.07.a 2602, 2603, 2610 cement mortar [ cement(1) : sand(1)] including scaffolding, curing, preparation m2 299.40
of mortar etc. complete, masoned height 0-5m, lead 30m (machine mixing).

Providing, mixing, and Pointing cement mortar over rubble masonry works in
153 26.07.b 2602, 2603, 2610 cement mortar [ cement(1) : sand(2)] including scaffolding, curing, preparation m2 261.16
of mortar etc. complete, masoned height 0-5m, lead 30m (machine mixing).

Providing, mixing, and Pointing cement mortar over rubble masonry works in
154 26.07.c 2602, 2603, 2610 cement mortar [ cement(1) : sand(3)] including scaffolding, curing, preparation m2 241.83
of mortar etc. complete, masoned height 0-5m, lead 30m (machine mixing).

ACTIVITY GROUP 27 :
REPAIR OF STRUCTURES
Removal of old paints by sand blasting, cleaning and repairing of metal
155 27.07 2713 surfaces for the application of new paints as per specification.
m2 1327.01

Double coat whitewash on new surface including supply of materials all


156 complete
m2 39.45

157 Single coat whitewash on old surface including supply of materials all complete m2 26.11

Single coat enamel paint/ readymade emulsion paint with primer including
158 supply of materials all complete.
m2 233.63

ACTIVITY GROUP 29 :
MAINTENANCE WORKS
Restoration of rain cuts in embankment slopes including watering and
159 29.01 2902 compaction etc. all complete lead 10 m.
m3 518.21

Maintenance of earthen shoulders by making irregularities even to the required


160 29.02 2903 level including watering and compaction etc. all complete lead 10m.
m2 132.07

Maintenance of gravel shoulders and gravel carriageway by repairing pot


161 29.03 2904 holes and making iregularities even to the required level including watering and m2 322.21
compaction etc. all complete lead 10m.

Repair of potholes and damaged bituminous surface including cleaning,


162 29.04.b.i 2905 brooming, and rolling etc all complete using hot premix material for 20mm m2 538.81
shallow patching.

ACTIVITY GROUP 31:


MISCELLANEOUS WORKS
163 31.01.a 3105 Providing and installing Railing including Railing Posts -- 100 mm dia m 1567.5
164 31.01.b 3105 Providing and installing Railing including Railing Posts -- 50 mm dia m 664.86
165 31.01.c 3105 Providing and installing Railing including Railing Posts -- 38 mm dia m 483.71