ENGINEER’S STICKER: CONTRACTOR’S STICKER:

ISSUED FOR CONSTRUCTION (EH-RR-C-


0 I.D M.L G.C 28/06/2019
0844)
A FOR APPROVAL I.D M.L G.C 29/05/2019
‫ﺗﻧﻘﻳﺢ‬ ‫ﺳﺑﺏ ﺍﻹﺻﺩﺍﺭ‬ ‫ﺑﻭﺍﺳﻁﺔ‬ ‫ﺭﺍﺟﻌﻬﺎ‬ ‫ﻭﺍﻓﻖ ﻋﻠﻳﻬﺎ‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
CHECKE
REV. ISSUED FOR PREPARED APPROVED DATE
D

‫ﺍﻟﻤﻤﻠﻜﺔ ﺍﻟﻌﺮﺑﻴـــﺔ ﺍﻟﺴـــــﻌﻮﺩﻳــــﺔ‬


KINGDOM OF SAUDI ARABIA
‫ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟـﻌـﺎﻣـــﺔ ﻟﺘﺤﻠﻴــﺔ ﺍﻟﻤﻴـــﺎﻩ ﺍﻟﻤﺎﻟﺤـــــﺔ‬
SALINE WATER CONVERSION CORPORATION (SWCC)

‫ﻣﺷﺭﻭﻉ ﺃﻧﻅﻣﺔ ﻧﻘﻝ ﻣﻳﺎﻩ ﺍﻟﺷﻘﻳﻖ – ﺍﻟﻣﺭﺣﻠﺔ ﺍﻟﺛﺎﻟﺛﺔ‬


Project No. ‫ﺭﻗﻡ ﺍﻟﻣﺷﺭﻭﻉ‬
SHUQAIQ WATER TRANSMISSION SYSTEMS PHASE-3
20407

‫ﺍﻟﻣﻬﻧﺩﺱ‬
ENGINEER

‫ﺍﻟﻣﻘـــﺎﻭﻝ‬
CONTRACTOR

SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES

DOCUMENT NO Sheet Rev.


C 2 2 - Y B 6 0 - F - 4 7 6 1 1 of 23 0
SUB
CONTRACTOR Orton S.r.L
KINGDOM OF SAUDI ARABIA Page: 2 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

TABLE OF CONTENT

1  NDE-DP PROCEDURE..............................................................................3 
2  NDE-PMI PROCEDURE ............................................................................11  

3  NDE-MT PROCEDURE ...................................................................................................... 17 

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 3 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 4 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 5 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 6 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 7 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 8 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 9 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 10 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 11 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 12 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 13 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 14 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 15 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 16 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 17 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 18 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 19 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 20 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 21 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 22 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON


KINGDOM OF SAUDI ARABIA Page: 23 of 23
Saline Water Conversion Corporation
-
SHUQAIQ PHASE 3 WATER TRANSMISSION SYSTEMS
Spec. No. -
Subject:
SA3-PS2, BUTTERFLY VALVE, NDE PROCEDURES
PÖYRY

First Rev. A 0 Document Number


Revision
Index

Issue Date: 29-05-19 28-06-19 C22-YB60-F-4761

Final Engineering Contractor Subcontractor

PÖYRY AL-RASHID TRADING & CONTRACTING CO. ORTON