C22-YS20-S-7956 - A - Dryer Layout - PS2

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ENGINEER’S STICKER: CONTRACTOR’S STICKER:

A FOR INFORMATION ACC OA SAA 22-07-19


‫تنقيح‬ ‫سبب اإلصدار‬ ‫بواسطة‬ ‫راجعها‬ ‫وافق عليها‬ ‫التاريخ‬
REV. ISSUED FOR PREPARED CHECKED APPROVED DATE

‫المملكة العربيـــة الســـــعوديــــة‬


KINGDOM OF SAUDI ARABIA
‫المؤسسة الـعـامـــة لتحليــة الميـــاه المالحـــــة‬
SALINE WATER CONVERSION CORPORATION (SWCC)

Project No. ‫رقم المشروع‬


‫مشروع أنظمة نقل مياه الشقيق – المرحلة الثالثة‬
20407 SHUQAIQ WATER TRANSMISSION SYSTEMS PHASE-3

‫المهندس‬
ENGINEER

‫المقـــاول‬
CONTRACTOR

AIR DRYER LAYOUT


FOR HIGH PRESSURE COMPRESSORS
IN SA3 -PS2

DOCUMENT NO Sheet Rev.


C 2 2 - Y S 2 0 - S - 7 9 5 6 1 of 2 A
SUB
CONTRACTOR ATLAS COPCO
Floor fixing screws are located into 4 holes Ø14
We recommand 50 cm of clearance all around dryer

Identification
Label

REFERENCE DRAWING:
DRAWING No. TITLE
C22-YS20-H-4950 SPECIFICATION OF HIGH PRESSURE COMPRESSOR IN SA3-PS2
C22-YS20-S-7952 LAYOUT OF HIGH PRESSURE COMPRESSOR IN SA3-PS2
C22-YS20-D-7954 P&ID - AUX OIL & WATER OF HIGH PRESSURE COMPRESSOR IN SA3-PS2
C22-YS20-D-7953 P&ID - AIR OF HIGH PRESSURE COMPRESSOR IN SA3-PS2

ENGINEER'S STAMP: CONTRACTOR'S STAMP:

2 x PG11
CLP on floor pannel
sur le plancher
A FOR INFORMATION ACC OA SAA 22/07/2019

REV. ISSUED FOR BY CHECKED APPROVED DATE

Project No.
20407 KINGDOM OF SAUDI ARABIA

SALINE WATER CONVERSION CORPORATION ( SWCC )

‫ننننا اثنامةنمنمارننهوينورااهانمنورن ةرمنورشورشم‬


SHUQAIQ WATER TRANSMISSION SYSTEMS PHASE-3

‫سدنهملا‬
ENGINEER

CONTRACTOR

AIR DRYER LAYOUT


SCALE

FOR HIGH PRESSURE COMPRESSORS


IN SA3-PS2
DRAWING NO. SHEET REV.

C 2 2 - Y S 2 0 - S - 7 9 5 6 2 of 2 A