BRIEF: BIM LEVEL 0 – DESIGN MODEL GIS

WHAT CAN WE DO WITH THE MODEL


LOCATION AND CLIENT RESPONSIBILITIES, SOFTALANDINGS,
BIM GRADING - RETURN ON INVESTMENT TOOLS,
COMMON DATA ENVIRONMENT – 4 GATES WIP, SHARED, PUBLISHED, ARCHIVE
BIM – AIM - GIS STRATEGY
BUILT ASSET SECURITY – STRATEGY
SOFT LANDINGS
PROJECT LIFECYCLE PROCESS MAP

CONCEPT: BIM LEVEL 0 – DESIGN (FEDERATED)MODEL

WHAT CAN WE DO WITH THE MODEL


CIM -OIR – AIR
EIR – TECHNICAL – MANAGEMENT- COMMERCIAL –
PROJECT TECHNOLOGY SYSTEMS
CONTRACT REQUEREMENTS
TEST SUPPLY CHAIN CAPABILITY AND CAPACITY – ASSESMENTS

DEFINITION / DESIGN: DESIGN - FEDERATED MODEL

BIM EXECUTION PLAN


TIDP MIDP RACI
BIM PROTOCOL
PIM DATA EXCHANGE AND VALIDATION

BUILD AND COMMISSIONING: CONSTRUCTION MODEL – UPDATE TO THE MANUFACTURER INFO

MODEL REVIEW MEETINGS


PIM DATA EXCHANGE AND VALIDATION

HANDOVER AND CLOSE OUT: CONSTRUCTION MODEL – ALL DATA AS PER MANUFACTURER

DATA TRANSFER TO AIM – COBIE OR AMS ASSET MANAGEMENT SYSTEM


DETERMINE THE SOFTLANDING APPROACH – graduated handover from the design and construction
team to the operation and maintaianance team

OPERATION IN USE: ASSET MODEL MANAGEMENT

ACTUAL IN USE COST – AIM IS SINGLE SOURCE OF APPROVED AND VALIDATED INFORMATION
UPDATE AIM – CHANGES AND DATA TO SUPPORT THE ORGANISATIONAL NEEDS
POST OCCUPANCY EVALUATION