S.PCM - For Drain Drum
S.PCM - For Drain Drum
S.PCM - For Drain Drum
The Head of the team responsible for construction work or the work supervisor is required to attend S-PCM or
the meeting needs to be held at site.
ITEM No DESCRIPTION OF DISCUSSION
1. Activity: scaffolding erection and dismantling for insulation activity
DETAIL DRAWING: