Download as pdf
Download as pdf
You are on page 1of 2
Page 1 of 2 Facsimile Transmission ty OIL & GAS DEVELOPMENT COMPANY LIMITED PRODUCTION DEPARTMENT (NORTH ZONE-A) ISLAMABAD No: ID: Facsimile Transmission ‘TO: | PE / OM Rig N-4 at Dakhni Deep # 01 From: | Chief Engineer (Production) North-A C.C: [1._GM (Production) _[2. GM (DO) _[3._GM (HSEQ) 4._GM (RMD), |S. AGM Gs) 6. M 4/C (DS) |7. M(P) NA 8. M (CMT & Stim.) 9._M (Drilling Fluids) [40.M (D0) -T_|44.M(P & D) 42, AM (WO & EOR) |___[43. PM Dakhni 14.\/c(P) Dakhni a SUBJECT: COMPLETION PROGRAM FOR DAKHNI DEEP # 01 (WDW) FORMATION Lockhart / Patala (Lime Stone) INTERVAL, 4587 — 4581 = 6 M (Lockhart) 4576 — 4567 = 9 M (Lockhart) 4559-4555 = 4 M (Lockhart) 4543 — 4536 = 7 M (Lockhart) 4517-4502 = 15 M (Lockhart) 4496 — 4477 = 19 M (Lockhart) M (Patala) M Catala) Gross = 208M COMPLETION FLUID: BRINE OF S.G.= 1.0 After UCI/ CBLIVDL logs, please proceed as under. Hold safety meeting with all concemed and discuss the following program. identify all the possible hazards, make necessary arrangements and adopt all precautions. Only job related personnel should be at site. Ny RIH 7” wire line set packer with tail assembly and set at 4350 + 1 M (avoid setting against zzsing collar). POOH and rig down wireline. 3. RIH 3-1/2” PH-6, 12.95 PPF, L-80 tubing with locater seal assembly down to top of Packer. Note: i, Each component of Packer tail assembly (SBE, MOE, Casing sub, spacer tube, Top NGN and 1% MS) should be properly cleaned, drifted and measured prior to RIH. |i, Each component of completion string (LSA, Tubing, X-Overs, Pup joints and tubing hanger ) should be properly cleaned, drifted and measured prior to RI. NE a 10. UL. 12, 13, Page 2 of 2 Tag packer top and gently insert full length of LSA into the packer bore. Close BOP and test integrity of Packer and LSA insertion at 500 Psi. Pull LSA out of packer bore. Space out and adjust length of completion string including effective Tubing Hanger length to be installed later on, Reverse circulate calculated annular volume with H2S Scavenger containing inhibited brine, Install Tubing Hanger with BPV. Note up and down String weight. Land Tubing Hanger into Tubing Head Spool & Lock Tubing Hanger with Tubing Head Tie- down Screws. N/D BOP and N/Up pre-tested X-Mass Tree. Energize Bonnet Flange and Pressure Test at 5000 Psi. Fill annulus (casing x tubing) with H2S Scavenger containing inhibited brine. Close all the valves of WH / X-mass tree and recover hand wheels. Release the rig for next location. Regards,

You might also like