Professional Documents
Culture Documents
SALESMAN LOG (01 - 17 November 16)
SALESMAN LOG (01 - 17 November 16)
Period: 01 - 17 Nov 16
AJAY DANAND JUGUN KERVIN MAHEN MILAZAR NIZAAM PURGASS SANJAY
Total Volume / m3 564 196 340 197 1214 339 383 1038 155
SPP VOLUME
STATISTICS Ave Casting Volume / m3 18 13 16 28 49 18 20 20 14
Total No of Castings / m3 32 15 21 7 25 19 19 52 11
Projected Speed / min per m3 3.0 3.0 2.8 3.0 2.8 3.0 2.8 3.0 3.9
Actual Speed / min per m3 3.4 4.1 3.0 3.2 3.9 3.1 3.2 3.4 4.2
Discrepancy / min per m3 0.4 1.1 0.1 0.3 1.1 0.1 0.3 0.5 0.3
CASTING Discrepancy / min 209 215 43 49 1376 19 134 512 43
OPERATIONS Ave Discrepancy per casting / min 7 14 2 7 55 1 7 10 4
STATISTICS Discrepancy / % 12% 36% 4% 8% 40% 2% 12% 17% 7%
OVERALL Rate Quoted / Rs per m3 4049 4243 4121 3999 4134 4116 4090 4196 4338
CASTING RATE Contractor Pricelist / Rs per m3 4049 4243 4121 4005 4135 4110 4090 4196 4338
QUOTED Pricelist / Rs per m3 4135 4285 4179 4057 4137 4158 4053 4165 4341
Only Casting Operations Discrepancy exceeding 15% of our projection are included in final balance
SALESMAN SUMMARY - AJAY SALESMAN SUMMARY - AJAY
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVE RALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - P rojecte d Price lis t +
M3 OTHER ContractorPri Casting Other Pricelist - Projecte d - Casting Othe r OVE RALL Price + Other
LOSS / Datum ce list Pricelist Actual Projected Neutral Datum Projected Actual Loss Loss Actual Actual Loss Los s LOSS Other Loss
Loss
M IN
1 1-Nov D DARUTTY Capricorn Construction Ltd 21.0 PITCH 20 25 A 0 4000.00 3950.00 4270.00 3950.00 4270.00 4324.29 2.6 4.4 4.8 0.4 0.0 320 320 54 0.0 374 7860 320
2 1-Nov D TRIOLET NOORANI JAFFUR 12.0 FLAT 25 A Concrete batched for 3 team at LTK 0 4150.00 4100.00 4150.00 4100.00 4150.00 4277.50 2.9 2.9 3.8 0.9 0.0 50 50 128 0.0 178 2130 50
3 1-Nov D COTTAGE Siven Rayapen 17.5 FLAT 25 A 0 4100.00 4000.00 4100.00 4000.00 4100.00 3879.29 2.9 2.9 1.4 -1.5 0.0 100 100 -221 0.0 -121 -2112 100
4 3-Nov R P MAGNIEN Phenix Steel Work Ltd 22 BASES 25 A 0 4000.00 4000.00 4000.00 4000.00 4000.00 3985.00 2.6 2.6 2.5 -0.1 0.0 0 0 -15 0.0 -15 -330 0
5 3-Nov R MAHEBOURG Dookhee Sanjay 13.5 FLAT + PITCH(25) 30 A 3.5M3 ^25 / POLICE AT 10:35 60 4350.00 4481.48 4419.99 4481.48 4410.00 5359.44 2.9 3.3 5.2 1.9 4.4 -61 -71 283 666.7 878 11853 8938.51
6 3-Nov R TYACK Phenix Steel Work Ltd 12 FLAT 25 A 0 4150.00 4050.00 4150.00 4050.00 4150.00 4340.00 2.9 2.9 4.2 1.3 0.0 100 100 190 0.0 290 3480 100
7 3-Nov M NOTRE DAME Videssen Carpen 21.8 FLAT 25 A 0 4000.00 3899.08 4000.00 3899.08 4000.00 3988.44 2.6 2.6 2.5 -0.1 0.0 101 101 -12 0.0 89 1948 100.92
8 3-Nov M PEREYBERE Ally Abdoolah Construction Co. Ltd 16 FLAT 25 A WAITED 2nd TRUCK TO START 19:40-20:30/CASTING AT NIGHT 0 4100.00 4100.00 4100.00 4100.00 4100.00 4227.50 2.9 2.9 3.8 0.9 0.0 0 0 128 0.0 128 2040 0
9 4-Nov M ARSENAL Poomallay Manaroo 25.5 FLAT 25 A 7632 + 3 PIPES/CASTING AT NIGHT 0 3950.00 3882.35 4130.00 3882.35 4130.00 4236.47 2.6 3.8 4.5 0.7 0.0 248 248 106 0.0 354 9030 247.65
10 5-Nov D SOREZE Ally Abdoolah Construction Co. Ltd 19.7 FLAT 25 A TEAM DOLIZER AND TEAM RAVI ON SITE/CASTING AT NIGHT 0 3900.00 3850.89 3900.00 3850.89 3900.00 4049.92 2.3 2.3 3.3 1.0 0.0 49 49 150 0.0 199 3921 49.11
11 5-Nov R PTE RAFFRAY BEEKHARRY SOOGOON 11 FLAT 25 A CONCRETE NOT GOOD 0 4150.00 4090.91 4150.00 4090.91 4150.00 4533.18 2.9 2.9 5.5 2.6 0.0 59 59 383 0.0 442 4865 59.09
12 5-Nov R SOREZE Ally Abdoolah Construction Co. Ltd 19.7 FLAT 25 A TEAM DOLIZER AND TEAM RAVI ON SITE/CASTING AT NIGHT 0 3900.00 3850.89 3900.00 3850.89 3900.00 4316.42 2.3 2.3 5.1 2.8 0.0 49 49 416 0.0 466 9171 49.11
13 5-Nov M MONT IDA Rughoo Sunil 22.7 FLAT 25 A 0 4000.00 4008.81 4000.00 4008.81 4000.00 4072.56 2.6 2.6 3.1 0.5 0.0 -9 -9 73 0.0 64 1447 -8.81
14 5-Nov M VACOAS COMO Construction Ltd 17.5 BEAM + FLAT 35 A POLICE 15:20 20 4500.00 4300.00 4670.85 4300.00 4545.00 5050.71 2.9 3.2 5.4 2.2 1.1 371 245 334 171.4 751 13138 3370.85
15 5-Nov M NEW GROVE Julien Soobamah Shunmoogum 14.2 FLAT 25 A CASTING AT NIGHT 0 4150.00 4084.51 4150.00 4084.51 4150.00 4084.72 2.9 2.9 2.5 -0.4 0.0 65 65 -65 0.0 0 3 65.49
ACCESS TIGH T / WAITED 2 nd TRU CK TO COME TO START / M IXER TRU CK 4 754
16 7-Nov R ROSE HILL Maheswar Narain 11.5 FLAT 25 A
BROKE D OW N NEAR SITE WAITED FOR 7 0MIN
0 4150.00 4100.00 4420.00 4100.00 4420.00 4171.52 2.9 4.7 3.0 -1.7 0.0 320 320 -248 0.0 72 822 320
17 9-Nov D VALLEE PITOT RAHIM SOOKARIAH 10 FLAT 25 A 0 4300.00 4400.00 4300.00 4400.00 4300.00 4240.00 2.9 2.9 2.5 -0.4 0.0 -100 -100 -60 0.0 -160 -1600 -100
18 9-Nov D PORT LOUIS NARENA COURT 27.5 COLUMN/WALL 25/30 A POLICE LATE 40 4050.00 4387.97 4230.89 4387.97 4275.00 4641.82 2.6 4.1 5.1 1.0 1.5 -157 -113 149 218.2 254 6981 5842.92
19 9-Nov D TERRE ROUGE Shariff Peerbaccus 20 FLAT 25 A 0 4000.00 3950.00 4000.00 3950.00 4000.00 3947.50 2.6 2.6 2.3 -0.4 0.0 50 50 -53 0.0 -3 -50 50
20 9-Nov M ST PIERRE Jean Francois 11 TOPPING 25 A 0 4150.00 4300.00 4515.00 4300.00 4510.00 4533.18 2.9 5.3 5.5 0.2 0.0 215 210 23 0.0 233 2565 215
21 10-Nov R V DES PRETES Luchmun Sharla devi 12.5 FLAT 25 A CASTING AT NIGHT 0 4150.00 4240.00 4150.00 4240.00 4150.00 4135.00 2.9 2.9 2.8 -0.1 0.0 -90 -90 -15 0.0 -105 -1313 -90
22 0 0
23 11-Nov R PTE AUX SABLES Boute Patrick 24.5 FLAT 25 A 0 4000.00 3902.04 4000.00 3902.04 4000.00 3885.51 2.6 2.6 1.8 -0.8 0.0 98 98 -114 0.0 -17 -405 97.96
24 11-Nov R GRNW Habiboollah Russun 23.5 FLAT 30 A 0 4200.00 4085.11 4200.00 4085.11 4200.00 4320.64 2.6 2.6 3.4 0.8 0.0 115 115 121 0.0 236 5535 114.89
25 12-Nov D V DES PRETES Nabeebacus Reza 15.6 FLAT 25 A ACCESS DIFFICULT 0 4100.00 4038.46 4370.00 4038.46 4370.00 4097.69 2.9 4.7 2.9 -1.8 0.0 332 332 -272 0.0 59 924 331.54
26 12-Nov R STE CROIX Chan sin Shin Pawfoon 22.5 FLAT 25 A POLICE 35 4000.00 4088.89 4000.00 4088.89 4000.00 4243.33 2.6 2.6 2.7 0.1 1.6 -89 -89 10 233.3 154 3475 5161.11
27 12-Nov R TERRE ROUGE Gary Scipion 10 FLAT 25 A 0 4300.00 4250.00 4300.00 4250.00 4300.00 4315.00 2.9 2.9 3.0 0.1 0.0 50 50 15 0.0 65 650 50
28 14-Nov D PLAINE MAGNIEN Thumiah D. 18.5 FLAT 25 A Late confirmation from foreman./casting at night. 0 4100.00 4000.00 4100.00 4000.00 4100.00 3989.32 2.9 2.9 2.2 -0.7 0.0 100 100 -111 0.0 -11 -197 100
29 14-Nov M TYACK Jeetun Thumiah 11 FLOOR 25 A 0 4150.00 4090.91 4150.00 4090.91 4150.00 4124.09 2.9 2.9 2.7 -0.2 0.0 59 59 -26 0.0 33 365 59.09
30 15-Nov R BEAU BASSIN Veeramootoo Prateema 15 BASES 30 A 0 4300.00 4100.00 4300.00 4100.00 4300.00 4215.00 2.9 2.9 2.3 -0.6 0.0 200 200 -85 0.0 115 1725 200
31 15-Nov M PEREYBERE NOORANI JAFFUR 34 FLAT 25 A 0 3900.00 3852.94 3900.00 3852.94 3900.00 4106.47 2.3 2.3 3.7 1.4 0.0 47 47 206 0.0 254 8620 47.06
32 16-Nov D COROMANDEL Suffee Nawshadally 10 FLAT 25 A 0 4300.00 4250.00 4300.00 4250.00 4300.00 4390.00 2.9 2.9 3.5 0.6 0.0 50 50 90 0.0 140 1400 50
33 17-Nov R EAU COULEE Naima Devi Bundhun 20.7 FLAT 25 A SURPLUS 10:30-11:30 60 4000.00 3811.88 4000.00 3811.88 4000.00 4443.33 2.6 2.6 2.7 0.1 2.9 188 188 9 434.8 631 13071 9188.12
34 0 0
35 0 0
AVERAG E / 18 564 A 215 4081 4049 4135 4049 4133 4245 2.7 3.0 3.4 0.4 0.4 86 84 56 57.2 196.9 3469 1002
TOTAL
4 300.0 0
SPP Casting Price Quoted
4 .5
4 .0
3 .5
3 .0
2 .5
2 .0
1 .5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projected Pricelist +
M3 OTHER ContractorPri Cas ting Other P ricelist - P rojected - Cas ting Other OVERALL P rice + Other
LOSS / Datum celist Pricelist Actual Projected Neutral Datum Projected Actual Loss Loss Actual Actual Loss Loss LOSS Other Loss
Los s
MIN
1 1-Nov D TRIOLET Aukharry Kevin 15.2 FLAT 25 D Concrete batched for 3 team at LTK 0 4100.00 4177.63 4100.00 4177.63 4100.00 4158.42 2.9 2.9 3.3 0.4 0.0 -78 -78 58 0.0 -19 -292 -77.63
2 3-Nov M PAMPLEMOUSSES Boodoo Kalim 17.5 FLAT 25 D SURPLUS 30MIN 30 4100.00 4050.00 4100.00 4050.00 4100.00 4436.43 2.9 2.9 3.4 0.5 1.7 50 50 79 257.1 386 6763 4550
3 4-Nov D PORT LOUIS Jameel Z. 7.5 FLAT + PITCH(10) 25 D ACCESS TIGHT/CASTING AT NIGHT 0 4600.00 4733.33 5000.79 4733.33 4705.00 4705.00 3.3 4 4.0 0.0 0.0 267 -28 0 0.0 -28 -212 267.46
HAD TO WAIT FOR SMALL TRUCKS TO RETURN AS SALESMAN SAID TO SEND SMALL
4 5-Nov D PORT LOUIS Nizam Doomun 17 FLAT 25 D MIXERS. 0 4100.00 4205.88 4100.00 4205.88 4100.00 4238.53 2.9 2.9 3.8 0.9 0.0 -106 -106 139 0.0 33 555 -105.88
5 7-Nov D PTE RIVIERE SVP Ltd 26 FLAT 30 D DIFFICULTY TO DO THE CASTING 0 4150.00 4100.00 4150.00 4100.00 4150.00 4365.77 2.6 2.6 4.0 1.4 0.0 50 50 216 0.0 266 6910 50
6 8-Nov D ARSENAL Harry Heman 7 FLAT 25 D 0 4600.00 4571.43 4600.00 4571.43 4600.00 4533.57 3.3 3.3 2.9 -0.4 0.0 29 29 -66 0.0 -38 -265 28.57
7 8-Nov R EAU COULEE Nicklaus Somorowa 9 FLAT 25 D 0 4400.00 4444.44 4400.00 4444.44 4460.00 4381.67 2.9 3.3 2.8 -0.5 0.0 -44 16 -78 0.0 -63 -565 -44.44
8 10-Nov R TRIOLET Boodram Sachin Kumar 13 FLAT 25 D 0 4150.00 4269.23 4150.00 4269.23 4150.00 4118.85 2.9 2.9 2.7 -0.2 0.0 -119 -119 -31 0.0 -150 -1955 -119.23
9 0 0
10 11-Nov R RIV NOIRE Beechoo Subiraj 12.5 FLOOR + PITCH 25 25 D FLOOR INSIDE BUILDING 0 4150.00 4556.00 4550.00 4556.00 4420.00 5155.00 2.9 4.7 9.6 4.9 0.0 -6 -136 735 0.0 599 7487 -6
11 12-Nov M QUATRE COCO Sachin Manoruth 7 FLAT 25 D 0 4600.00 4714.29 4600.00 4714.29 4600.00 4533.57 3.3 3.3 2.9 -0.4 0.0 -114 -114 -66 0.0 -181 -1265 -114.29
12 12-Nov M ST JULIEN Veesasen Rengasammy 7.5 FLAT 25 D casting at night. 0 4600.00 4600.00 4600.00 4600.00 4600.00 4705.00 3.3 3.3 4.0 0.7 0.0 0 0 105 0.0 105 787 0
13 15-Nov D ROSE HILL Vimal Rajkumar 10.5 FLAT 30 D 0 4500.00 4000.00 4500.00 4000.00 4500.00 4422.14 2.9 2.9 2.4 -0.5 0.0 500 500 -78 0.0 422 4432 500
14 15-Nov R ALBION Robert Lam 10.3 FLOOR 35 / 25 D SURPLUS 45MIN 0 4500.00 4224.70 4622.32 4224.70 4500.00 5666.94 2.9 2.9 10.7 7.8 0.0 398 275 1167 0.0 1442 14855 397.62
15 16-Nov D PTE AUX PIMENT Seegobin Veeraj 22 FLAT + PITCH 25 D 0 4000.00 3954.55 4014.31 3954.55 4000.00 4019.09 2.6 2.6 2.7 0.1 0.0 60 45 19 0.0 65 1420 59.76
16 16-Nov M CONGOMAH Kressoon Pohoroo 13.5 FLAT 25 D casting at night. 0 4150.00 4222.22 4150.00 4222.22 4150.00 4326.11 2.9 2.9 4.1 1.2 0.0 -72 -72 176 0.0 104 1403 -72.22
17 0 0
18 0 0
AVERAG E /
13 196 D 30 4236 4243 4285 4243 4260 4448 2.9 3.0 4.1 1.1 0.2 42 17 165 23.0 204.9 2671 295
TOTAL
Casting Operations gives an indication of the speed and ease with which the castings are being done
Projected Speed is the ideal spe ed, with which the
ca sting should be done.
Actual Speed is the speed with which the casting has
be en completed
8.5
7.5
6.5
5.5
4.5
3.5
2.5
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projected Pricelist +
M3 OTHER ContractorPri Ca sting Other P ricelist - Projected - Cas ting Other OVERALL P rice + Other
LOSS / Datum celist Pricelist Actual Projected Neutral Datum Projected Actual Loss Loss Actual Actual Loss Loss LOSS Other Los s
Loss
MIN
1 4-Nov M V DES PRETES Fokeerbux Golden Aluminium 9.7 FLAT 25 J SLAB NOT READY - STARTED LATE 20 4400.00 4329.90 4400.00 4329.90 4460.00 4738.20 2.9 3.3 3.1 -0.2 2.1 70 130 -31 309.3 408 3960 3070.1
2 4-Nov M TRIOLET Allymamod Waliid 10.0 FLAT 25 J 0 4300.00 4300.00 4300.00 4300.00 4300.00 5290.00 2.9 2.9 9.5 6.6 0.0 0 0 990 0.0 990 9900 0
3 4-Nov M ARSENAL Bhantooa Videsh 13.5 FLAT + PITCH(20) 30 J 2M3 ^20 0 4350.00 4444.44 4389.99 4444.44 4380.00 4303.89 2.9 3.1 2.6 -0.5 0.0 -54 -64 -76 0.0 -141 -1897 -54.45
4 4-Nov M CAP MALHEUREUX Veerapapillay Marie 18.6 FLAT 25 J WAITED 2nd TO START / WAITED 3rd MIXER FOR 35MIN 0 4100.00 4032.26 4100.00 4032.26 4100.00 4068.23 2.9 2.9 2.7 -0.2 0.0 68 68 -32 0.0 36 669 67.74
5 7-Nov M P DES PAPAYES Gopaul Sanjay 24 FLAT 25 J MASON LATE ON SITE 0 4000.00 4083.33 4000.00 4083.33 4000.00 4297.50 2.6 2.6 4.6 2.0 0.0 -83 -83 298 0.0 214 5140 -83.33
6 8-Nov D BELLE VUE MAUREL Gooljar Mayur 25.5 FLAT 25 J ACCESS DIFFICULT 0 3950.00 3921.57 4130.00 3921.57 3950.00 3854.12 2.6 2.6 2.0 -0.6 0.0 208 28 -96 0.0 -67 -1720 208.43
7 8-Nov D TRIOLET Gopaul Sanjay 7 FLAT 25 J 0 4600.00 4571.43 4600.00 4571.43 4600.00 4747.86 3.3 3.3 4.3 1.0 0.0 29 29 148 0.0 176 1235 28.57
8 8-Nov D PTE AUX PIMENT Damri Jairajsingh 7 FLAT 25 J 0 4600.00 4571.43 4600.00 4571.43 4600.00 4640.71 3.3 3.3 3.6 0.3 0.0 29 29 41 0.0 69 485 28.57
9 8-Nov D ARSENAL Coonjah Anil 7 FLAT 25 J ACCESS DIFFICULT 0 4600.00 4571.43 4960.00 4571.43 4600.00 4533.57 3.3 3.3 2.9 -0.4 0.0 389 29 -66 0.0 -38 -265 388.57
10 10-Nov R TRIOLET SANJEEV JUNGALEE 15 FLAT 25 J LIFT BACK OF PUMP TO COMPLETE SLAB 8:15-8:50 35 4100.00 4100.00 4100.00 4100.00 4100.00 4465.00 2.9 2.9 3.0 0.1 2.3 0 0 15 350.0 365 5475 5250
11 10-Nov M GOODLANDS Chowtee Yashin 25 FLAT 30 J LATE CONFIRMATION FROM FOREMAN 0 4150.00 4060.00 4150.00 4060.00 4150.00 4210.00 2.6 2.6 3.0 0.4 0.0 90 90 60 0.0 150 3750 90
12 10-Nov M PAMPLEMOUSSES Khaitoo Ajay 8 FLAT 25 J ACCESS TIGHT 0 4450.00 4500.00 4810.00 4500.00 4810.00 4798.75 3.3 5.7 5.6 -0.1 0.0 310 310 -11 0.0 299 2390 310
13 0 0
14 12-Nov D PEREYBERE Dhunputh Koombhrajsingh 29 FLAT 30 J No Payment.No Approval. 0 4150.00 4137.93 4150.00 4137.93 4150.00 4096.21 2.6 2.6 2.2 -0.4 0.0 12 12 -54 0.0 -42 -1210 12.07
P revious Site Balaclava- Problem with Syndic- Casting cancelled.Thus Operation
15 12-Nov D M S ANDRE Tupsy Parvez 8.6 FLAT 25 J
Dept deciding what casting to do.
0 4450.00 4418.60 4450.00 4418.60 4450.00 4303.84 3.3 3.3 2.3 -1.0 0.0 31 31 -146 0.0 -115 -987 31.4
16 15-Nov D ROSE HILL Techno Construction 24.5 FLAT 25 J 0 4000.00 3959.18 4000.00 3959.18 4000.00 3854.90 2.6 2.6 1.6 -1.0 0.0 41 41 -145 0.0 -104 -2555 40.82
17 16-Nov M FLACQ B & L Construction Co. Ltd 14 FLAT 25 J 0 4150.00 4142.86 4150.00 4142.86 4150.00 4357.86 2.9 2.9 4.3 1.4 0.0 7 7 208 0.0 215 3010 7.14
18 16-Nov M B VUE MAUREL Rughoobeer Sujata 17.5 FLAT 25 J 0 4100.00 4057.14 4100.00 4057.14 4100.00 4136.43 2.9 2.9 3.1 0.2 0.0 43 43 36 0.0 79 1388 42.86
19 17-Nov D ARSENAL Benidin Bhedenchakumar 40 FLAT + FLOOR 25 J 0 3900.00 3800.00 3900.00 3800.00 3900.00 3870.00 2.2 2.2 2.0 -0.2 0.0 100 100 -30 0.0 70 2800 100
20 17-Nov D GRAND BAIE Boojhawoonah Ahmad 17 FLAT 25 J 0 4100.00 4029.41 4100.00 4029.41 4100.00 3973.82 2.9 2.9 2.1 -0.8 0.0 71 71 -126 0.0 -56 -945 70.59
21 17-Nov D TRIOLET Gungaram Deoraj 8 FLAT 25 J Wait for return of concrete Truck. 0 4450.00 4625.00 4450.00 4625.00 0.00 -213.75 3.3 3.3 1.9 -1.4 0.0 -175 -4625 -214 0.0 -4839 -38710 -175
22 17-Nov R Q BORNES Sunil Savaruth 10.6 FLAT 25 J 0 4300.00 4198.11 4300.00 4198.11 4300.00 4218.77 2.9 2.9 2.4 -0.5 0.0 102 102 -81 0.0 21 219 101.89
23 0 0
24 0 0
AVERAG E /
TOTAL 16 340 J 55 4148 4121 4179 4121 4054 4098 2.8 2.8 3.0 0.1 0.2 58 -66 19 24.3 -23.2 -375 397
Discrepancy / min 43
Ave Discrepancy per casting / min 2
Discrepancy / % 4%
4500 .00
Casting Loss / Gain / Rs per m3 0
Casting Loss / Gain / Rs 0
4300 .00
SPP Casting Price Quoted
Balance / Rs per m3 82
8.5
Total Balance / Rs 27970
7.5
6.5
5.5
4.5
3.5
2.5
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projecte d Price lis t +
M3 OT HER ContractorPri Casting Other Pricelist - Projected - Casting Other OVERALL Price + Other
LOSS / Datum ce lis t Pricelist Actual Projected Neutral Datum Projected Actual Loss Los s Actual Actual Loss Loss LOSS Other Loss
Loss
MI N
1 1-Nov M Q BORNES Hampton School 40.0 PITCH 15 25 KER Concrete batched for 3 team at LTK 0 3900.00 3980.00 4005.00 3980.00 4005.00 4113.75 2.2 2.9 3.6 0.7 0.0 25 25 109 0.0 134 5350 25
2 10-Nov D LA CHAUMIERE Keystone Timber Co Ltd 10.0 FLOOR 25 KER NO ADDRESS ON SYSTEM- CONCRETE TRUCK LOST 10 4300.00 4200.00 4300.00 4200.00 4300.00 4390.00 2.9 2.9 2.5 -0.4 1.0 100 100 -60 150.0 190 1900 1600
3 0 0
4 14-Nov M GROS BOIS Sheila and Clarel Dallais 21.0 BEAM + FLAT 25 KER 0 4000.00 4114.29 4065.71 4114.29 4060.00 4110.00 2.6 3 3.3 0.3 0.0 -49 -54 50 0.0 -4 -90 -48.58
5 14-Nov M SURINAM Emamdeen Bashir Khan 36.0 FLAT 25 KER 0 3900.00 3825.00 3900.00 3825.00 3900.00 3909.17 2.3 2.3 2.4 0.1 0.0 75 75 9 0.0 84 3030 75
6 15-Nov D SADALLY Societe Heenoor Building Contractor 24.0 FLAT 30 KER POLICE LATE 5 4200.00 4050.00 4200.00 4000.00 4200.00 4278.75 2.6 2.6 2.9 0.3 0.2 200 200 47 31.3 279 6690 950
7 15-Nov D CAMP FOUQUEREAUX Bhoone Parwez 31.0 PITCH 30 25 KER 0 3900.00 4249.35 4290.00 4249.35 4290.00 4159.84 2.3 4.9 4.0 -0.9 0.0 41 41 -130 0.0 -90 -2775 40.65
8 17-Nov M BEAU VALLON Jm Bouic Construction 35.0 BASES 25 KER Concrete Truck not Available. 0 3900.00 3850.00 3900.00 3850.00 3900.00 4047.86 2.3 2.3 3.3 1.0 0.0 50 50 148 0.0 198 6925 50
9 0 0
10 0 0
AVERAG E /
28 197 KER 15 3968 4005 4057 3999 4057 4106 2.4 3.0 3.2 0.3 0.1 58 58 38 11.4 106.8 3004 269
TOTAL
Casting Operations gives an indication of the speed and ease with which the castings are being done 4 300.0 0
Projected Speed is the idea l s peed, with which the
casting s hould be done.
Actual Spe ed is the spe ed with which the cas ting has
been completed
Discrepancy / % 8%
Balance / Rs per m3 91
4.0
3.5
3.0
2.5
2.0
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projected Pricelist +
M3 OTHER ContractorPri Cas ting Other P ricelist - P rojected - Cas ting Other OVERALL P rice + Other
LOSS / Datum celist Pricelist Actual Projected Neutral Datum Projected Actual Loss Loss Actual Actual Loss Loss LOSS Other Loss
Los s
MIN
1 1-Nov R EBENE HYVEC & PARTHERS LTD 84.0 Flat+Water Tank 35/30 M 0 4200.00 4278.00 4197.13 4278.00 4230.00 4286.79 2.1 2.3 2.7 0.4 0.0 -81 -48 57 0.0 9 738 -80.87
2 3-Nov D RIV NOIRE Inter Island Construction Ltd 26.4 FLOOR 30 M DISPLACE PUMP THRICE 0 4150.00 4234.30 4330.00 4234.30 4330.00 4555.45 2.6 3.8 5.3 1.5 0.0 96 96 225 0.0 321 8478 95.7
3 3-Nov R EBENE Hyvec Partners Ltd 24.5 POOL 35 M 0 4400.00 4416.00 4630.00 4416.00 4625.00 4438.57 2.6 4.1 2.9 -1.2 0.0 214 209 -186 0.0 23 553 214
4 3-Nov M VALE Furreed Kawsar 36.5 FLAT 25 M 0 3900.00 3800.00 3900.00 3800.00 3900.00 3945.41 2.3 2.3 2.6 0.3 0.0 100 100 45 0.0 145 5308 100
5 4-Nov D FLIC EN FLAC Casquette France 15 FLOOR 25 M 0 4100.00 4000.00 4100.00 4000.00 4100.00 4115.00 2.9 2.9 3.0 0.1 0.0 100 100 15 0.0 115 1725 100
6 4-Nov D ALBION SDR Construction 15 FLAT 25 M 0 4100.00 4100.00 4100.00 4100.00 4100.00 4165.00 2.9 2.9 3.3 0.4 0.0 0 0 65 0.0 65 975 0
7 5-Nov D COROMANDEL Canakiah Associates 27 BEAM 30 M NO SECURITY / DISPLACE PUMP TWICE 0 4150.00 4291.80 4380.00 4291.80 4555.00 4648.89 2.6 5.3 5.9 0.6 0.0 88 263 94 0.0 357 9641 88.2
8 5-Nov M ANAHITA Zafir Construction Company Ltd 15 FLOOR 30 M 0 4300.00 4250.00 4300.00 4250.00 4300.00 4465.00 2.9 2.9 4.0 1.1 0.0 50 50 165 0.0 215 3225 50
9 7-Nov D Black River Inter Islands Const 102.5 Wall/Floor/Col/Base/Blind 30/15 M DISPLACE PUMP 7 TIMES 0 3915.00 4046.85 4115.35 4046.85 4050.00 4228.17 2.4 3.3 4.5 1.2 0.0 69 3 178 0.0 181 18585 68.5
10 7-Nov R QUARTIER MILITAIRE Gunnoo Rajesh-CIM 18.5 FLAT 25 M CASTING AT NIGHT 0 4100.00 4324.32 4100.00 4324.32 4100.00 4151.49 2.9 2.9 3.2 0.3 0.0 -224 -224 51 0.0 -173 -3197 -224.32
11 7-Nov M G BAIE Black Rock Luxury Ltd 10 Floor/Beam 25 M DISPLACE PUMP ONCE 0 4300.00 4300.00 4357.50 4300.00 4360.00 4765.00 2.9 3.3 6.0 2.7 0.0 58 60 405 0.0 465 4650 57.5
12 8-Nov M TRIANON Mega Builders Ltd 39 FLAT 30 M 0 4100.00 4000.00 4100.00 4000.00 4100.00 4139.62 2.3 2.3 2.6 0.3 0.0 100 100 40 0.0 140 5445 100
13 9-Nov D NORTHFIELD Hyvec Partners Ltd 35 FLAT 30 M SLAB NOT COMPLETELY READY / DISPLACE PUMP TWICE 0 4100.00 4140.00 4100.00 4140.00 4250.00 4162.14 2.3 3.3 2.7 -0.6 0.0 -40 110 -88 0.0 22 775 -40
14 9-Nov R EBENE Hyvec Partners Ltd 38.5 BASES 30 M WAITED SURPLUS 35MIN 35 4100.00 4186.00 4100.00 4140.00 4100.00 4280.97 2.3 2.3 2.6 0.3 0.9 -40 -40 45 136.4 141 5427 5210
15 9-Nov R EBENE Hyvec Partners Ltd 59 Bases/Floor/Col 30/35 M WAITED LAST TRUCK FOR 35 MINS/SURPLUS 20MINS 0 4200.00 4278.00 4123.70 4278.00 4275.00 4533.31 2.1 2.6 4.3 1.7 0.0 -154 -3 258 0.0 255 15063 -154.3
16 9-Nov M SEBASTOPOL Hammer Construction & Co. Ltd 22 FLAT 30 M DISPLACE PUMP THRICE / FLAT + BASE 0 4200.00 4100.00 4380.00 4100.00 4380.00 4594.09 2.6 3.8 5.2 1.4 0.0 280 280 214 0.0 494 10870 280
17 10-Nov D HIGHLANDS Dilloo Salim 15.5 FLAT 25 M 0 4100.00 4000.00 4100.00 4000.00 4100.00 4294.03 2.9 2.9 4.2 1.3 0.0 100 100 194 0.0 294 4558 100
18 0 0
19 11-Nov D ST JEAN AKGM CO LTEE 78 FLAT 30 M 3 PIPES + 2 RACORD / DISPLACE PUMP ONCE/casting on 10th floor 0 4100.00 4242.31 4280.00 4242.31 4280.00 4477.31 2.1 3.3 4.6 1.3 0.0 38 38 197 0.0 235 18330 37.69
2 P IPES USED / WAITED CON CRETE 9:1 5-10:1 5 / PU MP BLOCK ED, LOSS SOME
20 11-Nov M ST JEAN AKGM CO LTEE 85 FLAT 30 M MIN UTES W ITH IT / DISP LACE P UMP AND PU MP BLOCK ED AGAIN AN D AN OT HER 0 4100.00 4242.31 4280.00 4242.31 4190.00 4658.53 2.1 2.7 5.8 3.1 0.0 38 -52 469 0.0 416 35379 37.69
PUM P WEN T TO SITE T O REPLACE IT.casting at 10th floor.
21 12-Nov R PHOENIX Canakiah Associates 82 FLAT 30 M WAITED CONCRETE FOR 30MIN / LAST TRUCK OF 7M3 WAS DIVERTED 0 4100.00 4291.80 4100.00 4291.80 4100.00 4205.73 2.1 2.1 2.8 0.7 0.0 -192 -192 106 0.0 -86 -7058 -191.8
22 14-Nov D TRIANON R S K Construction Ltd 115 FLAT 25 M CONCRETE NOT REGULAR/Only 5 Truck available. 0 3900.00 3800.00 3900.00 3800.00 3900.00 4074.13 2.1 2.1 3.3 1.2 0.0 100 100 174 0.0 274 31525 100
23 15-Nov D EBENE Hyvec & Parthers Ltd 69.5 Floor+Column 30/35 M No Approval./casting at night. 0 4200.00 4278.00 4127.83 4278.00 4200.00 4295.07 2.1 2.1 2.7 0.6 0.0 -150 -78 95 0.0 17 1187 -150.17
24 15-Nov M NORTHFIELD Hyvec Partners Ltd 54 FLAT 30 M 0 4100.00 4140.00 4100.00 4140.00 4100.00 4271.11 2.1 2.1 3.2 1.1 0.0 -40 -40 171 0.0 131 7080 -40
25 16-Nov R Black River Inter Island Const 116.5 Blind/Bases/Flat/G Beam 15/30 M Displace Pump 8 Times/Surplus 30 mins. 0 3915.00 4046.85 4107.00 4046.85 4110.00 4501.35 2.4 3.7 6.3 2.6 0.0 60 63 391 0.0 455 52949 60.15
26 17-Nov D GRAND BAIE Black Rock Luxury Ltd 31 FLAT 25 M SURPLUS 14:50-16:45 110 3900.00 4050.00 3900.00 4050.00 3900.00 4450.16 2.3 2.3 2.4 0.1 3.5 -150 -150 18 532.3 400 12405 16350
27 0 0
28 0 0
AVERAG E / 49 1214 M 145 4068 4135 4137 4134 4147 4335 2.3 2.8 3.9 1.1 0.1 3 14 170 17.9 201.4 9785 792
TOTAL
4700.00
Casting Operations gives an indication of the speed and ease with which the castings are being done
Projected Speed is the ideal spe ed, with which the
ca sting should be done.
Actual Speed is the speed with which the casting has
be en completed 4500.00
4100.00
SPP Casting Price Quoted
3900.00
Discrepancy / Rs per m3(Pricelist/Rate Quoted) 3
Discrepancy / Rs 3947
3700.00
Operation Loss
5.5
4.5
3.5
2.5
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projecte d Price lis t +
M3 OT HER ContractorPri Casting Other Pricelist - Projected - Casting Other OVERALL Price + Other
LOSS / Datum ce lis t Pricelist Actual Projected Neutral Datum Projected Actual Loss Los s Actual Actual Loss Loss LOSS Other Loss
Loss
MI N
1 1-Nov R MOKA Corebat Ltd 21.6 FLAT 30 MIL 0 4200.00 4100.00 4200.00 4197.22 4200.00 4573.89 2.6 2.6 5.1 2.5 0.0 3 3 374 0.0 377 8136 2.78
2 1-Nov R TAMARIN Adolphe Jean Cume 18.0 FLOOR 30 MIL 0 4300.00 3999.00 4300.00 3999.00 4300.00 4198.33 2.9 2.9 2.2 -0.7 0.0 301 301 -102 0.0 199 3588 301
3 3-Nov D RIV NOIRE Tutteea Ram 25.5 FLAT 25 MIL 0 3950.00 4274.51 3950.00 4274.51 3950.00 3912.94 2.6 2.6 2.4 -0.2 0.0 -325 -325 -37 0.0 -362 -9220 -324.51
4 4-Nov D PTE AUX SABLES Rochimally Pazvege 13 FLAT 25 MIL 0 4150.00 4146.15 4150.00 4146.15 4150.00 4638.08 2.9 2.9 6.2 3.3 0.0 4 4 488 0.0 492 6395 3.85
5 5-Nov D ROCHE BOIS Joseph Jean Claude Perrine 14.3 FLAT 25 MIL ACCESS TIGHT 0 4150.00 4097.90 4420.00 4097.90 4420.00 4187.03 2.9 4.7 3.1 -1.6 0.0 322 322 -233 0.0 89 1275 322.1
6 7-Nov R COUTEAU RAFFIN Suddul Raftan 17 FLAT 25 MIL 0 4100.00 4100.00 4100.00 4100.00 4100.00 3929.71 2.9 2.9 1.8 -1.1 0.0 0 0 -170 0.0 -170 -2895 0
7 8-Nov D ARSENAL Moutou Gerard 14.5 FLAT 25 MIL 0 4150.00 4220.69 4150.00 4220.69 4150.00 3921.90 2.9 2.9 1.4 -1.5 0.0 -71 -71 -228 0.0 -299 -4333 -70.69
8 8-Nov R MOKA Corebat Ltd 35.5 FLAT 30 MIL CASTING AT NIGHT 0 4100.00 4100.00 4100.00 4100.00 4100.00 4114.15 2.3 2.3 2.4 0.1 0.0 0 0 14 0.0 14 502 0
9 10-Nov R BALACLAVA Corebat Ltd 12.5 FLAT 30 MIL PUMP DISPLACE PUMP ONCE 0 4350.00 4100.00 4350.00 4100.00 4350.00 4395.00 2.9 2.9 3.2 0.3 0.0 250 250 45 0.0 295 3688 250
10 0 0
11 11-Nov R BAMBOUS Juste Benjamin 27.8 FLAT 25 MIL casting at night. 0 3950.00 3949.64 3950.00 3949.64 3950.00 4099.57 2.6 2.6 3.6 1.0 0.0 0 0 150 0.0 150 4168 0.36
12 12-Nov D PTE AUX SABLES Mohes Jafmath 13.3 FLAT 25 MIL ACCESS DIFFICULT 0 4150.00 4150.38 4420.00 4150.38 4420.00 3996.95 2.9 4.7 1.9 -2.8 0.0 270 270 -423 0.0 -153 -2041 269.62
13 15-Nov M PTE AUX SABLES Isabelle Aldo 13.5 FLAT 25 MIL casting AT night. 0 4150.00 4148.15 4150.00 4148.15 4150.00 4270.56 2.9 2.9 3.7 0.8 0.0 2 2 121 0.0 122 1652 1.85
14 16-Nov D B DU TOMBEAU Sammuel Chamoiry 20.5 FLAT 25 MIL ACCESS DIFFICULT./casting at night. 0 4000.00 4000.00 4180.00 4000.00 4180.00 4231.95 2.6 3.8 4.1 0.3 0.0 180 180 52 0.0 232 4755 180
15 16-Nov R RIV NOIRE Ram Dhacoojee 11 FLAT 25 MIL ACCESS DIFFICULT./casting at night. 0 4150.00 4145.45 4420.00 4145.45 4420.00 4124.09 2.9 4.7 2.7 -2.0 0.0 275 275 -296 0.0 -21 -235 274.55
16 17-Nov D ARSENAL Govind Sanvinjay 9.5 FLAT 25 MIL 0 4400.00 4400.00 4400.00 4400.00 4460.00 4359.74 2.9 3.3 2.6 -0.7 0.0 0 60 -100 0.0 -40 -383 0
18 17-Nov R RIV NOIRE Papeche Jean 7 FLAT 25 MIL ACCESS TIGHT 0 4600.00 4700.00 4960.00 4700.00 4960.00 4533.57 3.3 5.7 2.9 -2.8 0.0 260 260 -426 0.0 -166 -1165 260
19 17-Nov R FLIC EN FLAC Sanjay Choytun 17.5 FLAT 25 MIL Casting at night. 0 4100.00 4097.14 4100.00 4097.14 4100.00 4007.86 2.9 2.9 2.3 -0.6 0.0 3 3 -92 0.0 -89 -1562 2.86
20 17-Nov M GLEN PARK Muntasir Khodadin 30.7 FLAT 25 MIL 0 3900.00 3967.43 3900.00 3967.43 3900.00 4068.03 2.3 2.3 3.4 1.1 0.0 -67 -67 168 0.0 101 3088 -67.43
21 0 0
22 0 0
AVERAG E /
18 339 MIL 0 4109 4110 4158 4116 4160 4168 2.7 3.0 3.1 0.1 0.0 42 43 8 0.0 51.5 919 64
TOTAL
4 700.0 0
SPP Casting Operations Statistics
Casting Operations gives an indication of the speed and ease with which the castings are being done
Projected Speed is the idea l s peed, with which the
casting s hould be done.
Actual Spe ed is the spe ed with which the cas ting has
been completed 4 500.0 0
Discrepancy / % 2%
4 100.0 0
SPP Casting Price Quoted
3 900.0 0
Discrepancy / Rs per m3(Pricelist/Rate Quoted) 42
Discrepancy / Rs 14090
Casting Loss / Rs 0 0
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVE RALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Proje cted P ricelist +
M3 OTHER ContractorPri Casting Other P ricelis t - Proje cted - Casting Other OVERALL P rice + Other
LOSS / Datum celist Pricelist Actual Projected Neutral Datum Projected Actual Los s Loss Actual Actual Los s Loss LOSS Othe r Los s
Loss
MIN
1 1-Nov M EBENE Ramasawmy & Ramasawmy co ltd 11.0 BLIND 15 N 0 3980.00 3996.25 3980.00 3996.25 3980.00 3714.09 4.5 4.5 2.7 -1.8 0.0 -16 -16 -266 0.0 -282 -3104 -16.25
2 3-Nov D FOREST SIDE Jean Patrick Murphoise 11.0 FLAT 25 N CONCRETE NOT REGULAR / ACCESS TIGHT/CASTING AT NIGHT 0 4150.00 4272.73 4420.00 4272.73 4420.00 4396.82 2.9 4.7 4.5 -0.2 0.0 147 147 -23 0.0 124 1365 147.27
3 3-Nov R HIGHLANDS Gilbert Laguette 15 FLOOR 20 N CASTING AT NIGHT 0 4020.00 3950.00 4020.00 3950.00 4020.00 3985.00 2.9 2.9 2.7 -0.2 0.0 70 70 -35 0.0 35 525 70
4 4-Nov R MTE LONGUE Hawoldar Reshmee 25.6 FLAT + PITCH(20) 25 N 0.5M3 ^20/CASTING AT NIGHT 0 3950.00 4062.50 3950.00 4062.50 3950.00 4028.75 2.6 2.6 3.1 0.5 0.0 -113 -113 79 0.0 -34 -864 -112.5
5 5-Nov D TERRE ROUGE Alladeen G. 12 PITCH 15 25 N FORMWORK NOT WELL CONDITIONED 0 4150.00 4250.00 4285.00 4250.00 4555.00 4840.00 2.9 5.6 7.5 1.9 0.0 35 305 285 0.0 590 7080 35
6 8-Nov D B DU TOMBEAU Vetta Construction Ltd 17 BASES 25 N 0 4100.00 4100.00 4100.00 4100.00 4100.00 4062.06 2.9 2.9 2.6 -0.3 0.0 0 0 -38 0.0 -38 -645 0
7 8-Nov R UNION PARK T K Construction Ltd 27 FLAT 25 N 0 3950.00 3950.00 3950.00 3950.00 3950.00 3893.33 2.6 2.6 2.2 -0.4 0.0 0 0 -57 0.0 -57 -1530 0
8 8-Nov R ROSE BELLE Nardeo Bukhury 7 FLAT 25 N WAITED FOR REMOVAL OF VEHICLE 0 4600.00 4857.14 4600.00 4857.14 4600.00 4533.57 3.3 3.3 2.9 -0.4 0.0 -257 -257 -66 0.0 -324 -2265 -257.14
9 8-Nov M FLOREAL Hesteford Carpen 11 FLAT 25 N CASTING AT NIGHT 0 4150.00 4181.82 4150.00 4181.82 4150.00 4260.45 2.9 2.9 3.6 0.7 0.0 -32 -32 110 0.0 79 865 -31.82
10 9-Nov R EBENE Ramasawmy & Ramasawmy 28.5 Bases/Blind 15/30 N 0 3965.00 4125.62 3965.00 4125.62 3965.00 3921.05 3.1 3.1 2.8 -0.3 0.0 -161 -161 -44 0.0 -205 -5830 -160.62
11 10-Nov D PAILLES Shakeel Moonuen 40.2 FLAT 25 N 0 3900.00 3855.72 3900.00 3855.72 3900.00 3961.79 2.2 2.2 2.6 0.4 0.0 44 44 62 0.0 106 4264 44.28
12 10-Nov D R HILL Kandasamy Tagadassen 15.8 FLAT 25 N ISSUES WITH NEIGHBOURS TO POSITION PUMP 0 4100.00 4177.22 4100.00 4177.22 4100.00 4092.22 2.9 2.9 2.8 -0.1 0.0 -77 -77 -8 0.0 -85 -1343 -77.22
13 10-Nov R GRAND BAIE Desire Jean Laval Simon 9 FLAT 25 N 0 4400.00 4500.00 4400.00 4500.00 4460.00 4381.67 2.9 3.3 2.8 -0.5 0.0 -100 -40 -78 0.0 -118 -1065 -100
14 0 0
15 11-Nov R PAMPLEMOUSSES Rajiv Dauhoo 19.2 FLAT 25 N 0 4100.00 4166.67 4100.00 4166.67 4100.00 4055.63 2.9 2.9 2.6 -0.3 0.0 -67 -67 -44 0.0 -111 -2132 -66.67
16 12-Nov R V PITOT Nabeebux Iqbal 19 FLAT 25 N 0 4100.00 4210.53 4100.00 4210.53 4100.00 4257.11 2.9 2.9 3.9 1.0 0.0 -111 -111 157 0.0 47 885 -110.53
17 12-Nov M PONT BON DIEU R D Construction ltd 31.3 FLAT 25 N SURPLUS 9:10-11:10(1 MASON & 1 HELPER REMAINED ON SITE) 125 3900.00 4000.00 3900.00 4000.00 3900.00 4633.27 2.3 2.3 3.2 0.9 4.0 -100 -100 134 599.0 633 19822 18650
18 16-Nov D P LOUIS Abedeen Mohamed 20 FLAT 25 N 0 4000.00 4000.00 4000.00 4000.00 4000.00 4472.50 2.6 2.6 5.8 3.2 0.0 0 0 473 0.0 473 9450 0
19 16-Nov M PTE AUX CANNONIER Nobeen Prithiviratsing 47 FLAT 30 N Change in planning Team Michel to cast Pte aux cannonier instead of Pte aux Piments. 0 4100.00 4106.38 4100.00 4106.38 4100.00 4152.98 2.2 2.2 2.6 0.4 0.0 -6 -6 53 0.0 47 2190 -6.38
20 17-Nov D T A BICHES Beemanique Stone Crusher Ltd 16.5 FLAT 25 N Foreman late in releasing concrete. 0 4100.00 4121.21 4100.00 4121.21 4100.00 4165.00 2.9 2.9 3.3 0.4 0.0 -21 -21 65 0.0 44 723 -21.21
21 0 0
22 0 0
AVERAG E /
20 383 N 125 4041 4090 4053 4090 4063 4164 2.7 2.8 3.2 0.3 0.3 -37 -27 52 48.9 74.1 1494 818
TOTAL
4900 .00
Casting Operations gives an indication of the speed and ease with which the castings are being done
Projecte d Spee d is the ideal speed, with which the
casting should be done. 4700 .00
Actual Speed is the s peed with which the casting has
been comple te d
4300 .00
Casting Loss / Gain / Rs per m3 31
Casting Loss / Gain / Rs 11872
Balance / Rs per m3 43
5.5
4.5
3.5
2.5
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projected P ricelis t +
M3 OTH ER ContractorP ri Casting Othe r Price lis t - Projected - Casting Other OVERALL Price + Othe r
LOSS / Datum celis t Pricelist Actual Projected Neutral Datum Projected Actual Loss Los s Actual Actual Loss Loss LOSS Other Loss
Loss
MIN
1 1-Nov D T ROUGE JOOTUN Ramesh 23.0 FLAT 30 P ACCESS TIGHT 0 4200.00 4200.00 4380.00 4200.00 4200.00 4136.09 2.6 2.6 2.2 -0.4 0.0 180 0 -64 0.0 -64 -1470 180
2 1-Nov D PORT LOUIS Bike Passion Ltd 13.0 BASES 25 P ACCESS TIGHT/CASTING AT NIGHT 0 4150.00 4400.00 4420.00 4400.00 4150.00 4176.54 2.9 2.9 3.1 0.2 0.0 20 -250 27 0.0 -223 -2905 20
3 1-Nov R PAILLES Ismet Mohamed 14 FLAT 25 P POLICE AT 7H30 15 4150.00 4285.71 4150.00 4285.71 4150.00 4357.86 2.9 2.9 3.2 0.3 1.1 -136 -136 47 160.7 72 1010 2114.29
4 1-Nov M Q BORNES Samy Vencatasamy 16.5 FLAT 25 P Concrete batched for 3 team at LTK 0 4100.00 4242.42 4100.00 4242.42 4100.00 4165.00 2.9 2.9 3.3 0.4 0.0 -142 -142 65 0.0 -77 -1277 -142.42
5 1-Nov M ROSE BELLE Apavou Immobilier Ltee 35 FLOOR 30 P WAITED CONCRETE 15:10-15:45 / STARTED LATE 0 4100.00 4000.85 4100.00 4000.00 4100.00 4397.86 2.3 2.3 4.3 2.0 0.0 100 100 298 0.0 398 13925 100
6 3-Nov M FLACQ GUNGAH MOONEERAMSING 20.5 FLAT 25 P 0 4000.00 4000.00 4000.00 4000.00 4000.00 3975.85 2.6 2.6 2.4 -0.2 0.0 0 0 -24 0.0 -24 -495 0
7 3-Nov M F DU SAC Ghoorbin Chaviranand 20.8 FLAT 25 P Road Restriction 0 4000.00 3990.38 4000.00 3990.38 4000.00 4042.69 2.6 2.6 2.9 0.3 0.0 10 10 43 0.0 52 1088 9.62
8 4-Nov D PORT LOUIS Azad Ally Ooddin Boodoo 45 BASE + FLOOR 35 P 0 4300.00 4300.00 4300.00 4300.00 4300.00 4353.33 2.2 2.2 2.6 0.4 0.0 0 0 53 0.0 53 2400 0
9 4-Nov R P LOUIS Island Builders & Co Ltd 27 FLOOR 30 P 0 4150.00 4200.00 4150.00 4200.00 4150.00 4343.33 2.6 2.6 3.9 1.3 0.0 -50 -50 193 0.0 143 3870 -50
10 4-Nov M PEREYBERE A.G Aluminium Ltd 17 BASES 25 P 0 4100.00 4000.00 4100.00 4000.00 4100.00 4150.29 2.9 2.9 3.2 0.3 0.0 100 100 50 0.0 150 2555 100
11 5-Nov R PEREYBERE Bonnet des Arnoux 15.5 FLOOR 25 P WAITED FOR MASON TO COME ON SITE TO START 0 4100.00 4200.00 4100.00 4200.00 4100.00 4245.65 2.9 2.9 3.9 1.0 0.0 -100 -100 146 0.0 46 708 -100
12 5-Nov M LALLMATIE Sohorye Hemchant Sanjeev 8 PITCH 40/30 30 P 0 4650.00 5500.00 5434.00 5500.00 5430.00 5748.75 3.3 8.5 10.6 2.1 0.0 -66 -70 319 0.0 249 1990 -66
13 7-Nov R Q BORNES Luchmun Construction Ltd 24 FLAT + PITCH 30 30 P 15.5M3 ^30 / MUST CLEAN ACCESS TO POSITION PUMP 30 4200.00 4666.67 4452.00 4666.67 4440.00 4591.25 2.6 4.2 4.0 -0.2 1.3 -215 -227 -36 187.5 -75 -1810 4285.33
14 7-Nov R LA GAULETTE N M JINA CONSTRUCTION LTD 18 FLAT 25 P 0 4100.00 4100.00 4100.00 4100.00 4100.00 4040.00 2.9 2.9 2.5 -0.4 0.0 0 0 -60 0.0 -60 -1080 0
15 7-Nov M MTE BLANCHE Rakesh Rye Purgass 29 FLAT 25 P 0 3950.00 4103.45 3950.00 4103.45 3950.00 4103.10 2.6 2.6 3.6 1.0 0.0 -153 -153 153 0.0 0 -10 -153.45
16 7-Nov M FLACQ Valaydon Vassen 25 FLAT + PITCH 25 30 P 3M3 ^25 0 4150.00 4080.00 4182.40 4080.00 4180.00 4210.00 2.6 2.8 3.0 0.2 0.0 102 100 30 0.0 130 3250 102.4
17 7-Nov M BON ACCEUIL Raj Maunick 10 FLAT 25 P CASTING AT NIGHT 0 4300.00 4200.00 4300.00 4200.00 4300.00 4390.00 2.9 2.9 3.5 0.6 0.0 100 100 90 0.0 190 1900 100
18 8-Nov R CHEMIN GRENIER Jaikishan Ujoopa 23.5 FLAT 25 P WAITED LAST TRUCK 45MIN 0 4000.00 4127.66 4000.00 4127.66 4000.00 3992.98 2.6 2.6 2.6 0.0 0.0 -128 -128 -7 0.0 -135 -3165 -127.66
19 8-Nov R CUREPIPE Juggessur Sunilduth 16 FLAT + PITCH 25 P ACCESS TIGHT 0 4100.00 4375.00 4370.00 4375.00 4370.00 4649.38 2.9 4.7 6.6 1.9 0.0 -5 -5 279 0.0 274 4390 -5
20 8-Nov M VERDUN/DAGOTIERE BALGOBIN T 30 FLAT 30 P DISPLACE PUMP ONCE TO CAST 2 FLAT SLAB.(APROX 25 MINS) 0 4100.00 4333.33 4100.00 4333.33 4100.00 4355.00 2.3 2.3 4.0 1.7 0.0 -233 -233 255 0.0 22 650 -233.33
21 8-Nov M M C DES MASQUE Kaviraj Rai Rajroop 7 FLAT + PITCH 25 P 0 4600.00 4857.14 4881.42 4857.14 4675.00 4962.14 3.3 3.8 5.7 1.9 0.0 24 -182 287 0.0 105 735 24.28
22 8-Nov M LALLMATIE Poonith Ravin 8 FLAT 25 P 0 4450.00 4625.00 4450.00 4625.00 4450.00 4611.25 3.3 3.3 4.4 1.1 0.0 -175 -175 161 0.0 -14 -110 -175
23 8-Nov M BON ACCEUIL Sunkur Dev 30.7 FLAT 30 P LIFT BACK OF PUMP TO COMPLETE SLAB 0 4100.00 4234.53 4100.00 4234.53 4100.00 4219.17 2.3 2.3 3.1 0.8 0.0 -135 -135 119 0.0 -15 -472 -134.53
24 9-Nov R HIGHLANDS Muneesamy Daneshwar 29 BASES 25 P 0 3950.00 4000.00 3950.00 4000.00 3950.00 4025.52 2.6 2.6 3.1 0.5 0.0 -50 -50 76 0.0 26 740 -50
25 9-Nov R BELLE VILLAGE Jean noel Mont Roches 7 BASES 25 P CASTING AT NIGHT 0 4600.00 4714.29 4600.00 4714.29 4600.00 4640.71 3.3 3.3 3.6 0.3 0.0 -114 -114 41 0.0 -74 -515 -114.29
26 9-Nov M ROSE HILL murughen gopalen 20 FLAT 25 P WAITED POLICE 10 4000.00 4000.00 4000.00 4000.00 4000.00 4172.50 2.6 2.6 3.3 0.6 0.5 0 0 97 75.0 173 3450 1500
27 9-Nov M CAMP DE MASQUE Heerah Jyotee 17 FLAT 25 P 0 4100.00 4200.00 4100.00 4200.00 4100.00 4062.06 2.9 2.9 2.6 -0.3 0.0 -100 -100 -38 0.0 -138 -2345 -100
28 9-Nov M CAMP ITHIER Ragnuth Nitish Anand 7 PITCH 25 P 0 4600.00 5000.00 4780.00 5000.00 4780.00 4640.71 3.3 4.5 3.6 -0.9 0.0 -220 -220 -139 0.0 -359 -2515 -220
CASTIN G AT NIG HT/DIFFICULTY TO P OSITION P UMP - 50 M INS. USED 1 PIPE./ ACCESS
29 9-Nov M PAILLES Peerally Ahmed 8 FLAT 25 P
TIGHT
30 4450.00 4200.00 4810.00 4200.00 4810.00 5736.25 3.3 5.7 8.1 2.4 3.8 610 610 364 562.5 1536 12290 5110
30 10-Nov D MELROSE Gawtam Enterprise Ltd 32.5 FLAT 25 P ACCESS DIFFICULT 0 3900.00 4000.00 4050.00 4000.00 4050.00 3947.31 2.3 3.3 2.6 -0.7 0.0 50 50 -103 0.0 -53 -1713 50
31 10-Nov R PTE RAFFRAY Jadoo Akshaye 21.8 FLAT 25 P 0 4000.00 4128.44 4000.00 4128.44 4000.00 3988.44 2.6 2.6 2.5 -0.1 0.0 -128 -128 -12 0.0 -140 -3052 -128.44
32 10-Nov M BELVEDERE Auckloo Vikesh Kumar 24 FLAT 25 P 0 4000.00 4166.67 4000.00 4166.67 4000.00 4047.50 2.6 2.6 2.9 0.3 0.0 -167 -167 47 0.0 -119 -2860 -166.67
33 10-Nov M PTE DES LASCARS Lucknarain Vijay 8 FLAT 25 P CONCRETE FROM BMQ 0 4450.00 4625.00 4450.00 4625.00 4450.00 4611.25 3.3 3.3 4.4 1.1 0.0 -175 -175 161 0.0 -14 -110 -175
34 10-Nov M CALEBASSES Seelah Rakesh 24.3 FLAT 25 P USED ONE PIPE 0 4000.00 4197.53 4000.00 4197.53 4000.00 4227.28 2.6 2.6 4.1 1.5 0.0 -198 -198 227 0.0 30 723 -197.53
35 10-Nov M CREVE COEUR Chandrabose Sambhoo 7 FLAT 30 P 0 4800.00 5000.00 4800.00 5000.00 4800.00 4947.86 3.3 3.3 4.3 1.0 0.0 -200 -200 148 0.0 -52 -365 -200
36 10-Nov M CASSIS Clifford Constance 14.5 FLAT 30 P 0 4350.00 4206.90 4350.00 4206.90 4350.00 4432.24 2.9 2.9 3.4 0.5 0.0 143 143 82 0.0 225 3267 143.1
37 0 0
38 11-Nov D DUBREUIL Sonea Ashwin 20.9 FLAT 25 P RAINY WEATHER 0 4000.00 4114.83 4000.00 4114.83 4000.00 3932.97 2.6 2.6 2.2 -0.4 0.0 -115 -115 -67 0.0 -182 -3801 -114.83
39 12-Nov D COTTAGE VA Properties Ltd 22 FLOOR 25 P Water Issues with plant./Nobody present to Open Bohehole. 0 4000.00 3954.55 4000.00 3954.55 4000.00 4019.09 2.6 2.6 2.7 0.1 0.0 45 45 19 0.0 65 1420 45.45
40 12-Nov M ANAHITA Island Builders & Co Ltd 22 FLAT 30 P 0 4200.00 4200.00 4257.50 4200.00 4425.00 4525.91 2.6 4.1 4.8 0.7 0.0 58 225 101 0.0 326 7170 57.5
41 12-Nov M RICHE MARE DEWAN CONTRACTOR 25 BASES/WALL 25 P 0 3950.00 4080.00 3950.00 4080.00 3950.00 3980.00 2.6 2.6 2.8 0.2 0.0 -130 -130 30 0.0 -100 -2500 -130
42 12-Nov M BON ACCEUIL Rikesh Canhia 12.6 FLAT 30 P 0 4350.00 4500.00 4350.00 4500.00 4350.00 4272.14 2.9 2.9 2.4 -0.5 0.0 -150 -150 -78 0.0 -228 -2871 -150
43 14-Nov D DAGOTIERE Ramphul Kishan 17.5 FLAT 25 P 2 MASON LESS 0 4100.00 4000.00 4100.00 4000.00 4100.00 4179.29 2.9 2.9 3.4 0.5 0.0 100 100 79 0.0 179 3138 100
44 14-Nov M ROSE BELLE Apavou Immobilier Ltee 36 FLAT 30 P FLOOR INSIDE BUILDING - 2 PIPES USED 0 4100.00 4000.85 4250.00 4000.00 4250.00 4380.00 2.3 3.3 4.2 0.9 0.0 250 250 130 0.0 380 13680 250
45 15-Nov M MAPOU Safe Build Co. Ltd 40 FLOOR 25 P FLOOR INSIDE BUILDING - 3 PIPES + RACORD EXTENTION USED 0 3900.00 4100.00 4080.00 4100.00 4080.00 4320.00 2.2 3.4 5.0 1.6 0.0 -20 -20 240 0.0 220 8800 -20
46 16-Nov D GRNW Safe Build Co. Ltd 28 FLOOR 25 P REMOVAL OF VEHICLE / DISPLACE PUMP ONCE / 1 PIPE USED/Floor inside Building 0 3950.00 4200.00 3950.00 4200.00 3950.00 3988.57 2.6 2.6 2.9 0.3 0.0 -250 -250 39 0.0 -211 -5920 -250
47 16-Nov M MTE BLANCHE Dyall & sons 25 FLAT 25 P 0 3950.00 4080.00 3950.00 4080.00 3950.00 3950.00 2.6 2.6 2.6 0.0 0.0 -130 -130 0 0.0 -130 -3250 -130
48 16-Nov M GOODLANDS Suresh Maurick Construction Co Ltd 22 BEAM 30 P NO SAFETY TO CAST BEAM 0 4200.00 4350.00 4430.00 4350.00 4425.00 4389.55 2.6 4.1 3.9 -0.2 0.0 80 75 -35 0.0 40 870 80
49 17-Nov D P LOUIS Safe Build Co. Ltd 7 FLAT 25 P Casting at Night 0 4600.00 4714.29 4600.00 4714.29 4600.00 4533.57 3.3 3.3 2.9 -0.4 0.0 -114 -114 -66 0.0 -181 -1265 -114.29
50 17-Nov R MONT IDA Bashir Heerah 16.6 FLAT 25 P 0 4100.00 4216.87 4100.00 4216.87 4100.00 3936.08 2.9 2.9 1.8 -1.1 0.0 -117 -117 -164 0.0 -281 -4661 -116.87
51 17-Nov R HIGHLANDS AJIT JUGBUNDUN 7 FLAT 25 P 0 4600.00 4571.43 4600.00 4571.43 4600.00 4747.86 3.3 3.3 4.3 1.0 0.0 29 29 148 0.0 176 1235 28.57
52 17-Nov R PALMA Kore Construction Ltd 10 BLIND 15 P DISPLACE PUMP ONCE/To check Access first 35 4130.00 4000.00 4130.00 4000.00 4130.00 4655.00 4.5 4.5 4.5 0.0 3.5 130 130 0 525.0 655 6550 5380
53 17-Nov M SALAZIE Crimson Hall 30 FLAT + PITCH 15 30 P 0 4100.00 4000.00 4121.00 4000.00 4115.00 4180.00 2.3 2.4 2.8 0.4 0.0 121 115 65 0.0 180 5400 121
54 0 0
55 0 0
AVERAG E /
TOTAL 20 1038 P 120 4111 4196 4165 4196 4159 4250 2.6 3.0 3.4 0.5 0.1 -31 -37 74 17.3 54.6 1090 297
Casting Operations gives an indication of the speed and ease with which the castings are being done
P rojected Spe ed is the ideal speed, with which the
casting s hould be done.
Actual Spee d is the s pee d with which the cas ting has
been completed
8.5
7.5
6.5
5.5
4.5
3.5
2.5
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projecte d Price lis t +
M3 OT HER ContractorPri Casting Other Pricelist - Projected - Casting Other OVERALL Price + Other
LOSS / Datum ce lis t Pricelist Actual Projected Neutral Datum Projected Actual Loss Los s Actual Actual Loss Loss LOSS Other Loss
Loss
MI N
1 3-Nov D Q BORNES ZUL GOOLZAR 10.0 FLAT 25 S ACCESS DIFFICULT 0 4300.00 4400.00 4570.00 4400.00 4300.00 4315.00 2.9 2.9 3.0 0.1 0.0 170 -100 15 0.0 -85 -850 170
2 3-Nov D FLIC EN FLAC RKLM Pro Services Ltd 10.0 PITCH 25 25 S 0 4300.00 4700.00 4570.00 4700.00 4570.00 4765.00 2.9 4.7 6.0 1.3 0.0 -130 -130 195 0.0 65 650 -130
3 3-Nov R EBENE philibert Sylvain 16 BASES 25 S 0 4100.00 4062.50 4100.00 4062.50 4100.00 4040.00 2.9 2.9 2.5 -0.4 0.0 38 38 -60 0.0 -22 -360 37.5
4 9-Nov D PORT LOUIS Sabin Trading Ltd 15 BASES 25 S ACCESS DIFFICULT / 2 PIPES USED TO CAST 0 4100.00 4466.67 4640.00 4466.67 4640.00 4765.00 2.9 6.5 7.3 0.8 0.0 173 173 125 0.0 298 4475 173.33
5 9-Nov M Q BORNES ZUL GOOLZAR 7 FLAT 25 S 0 4600.00 4714.29 4600.00 4714.29 4600.00 4855.00 3.3 3.3 5.0 1.7 0.0 -114 -114 255 0.0 141 985 -114.29
6 10-Nov D Q BORNES ZUL GOOLZAR 16 FLAT 25 S 0 4100.00 4312.50 4100.00 4312.50 4100.00 3946.25 2.9 2.9 1.9 -1.0 0.0 -213 -213 -154 0.0 -366 -5860 -212.5
7 0 0
8 14-Nov M NOUVELLE FRANCE Jalim Sachin 16 FLOOR 25 S SURPLUS 8:45 - 9:10 40 4100.00 4198.72 4100.00 4198.72 4100.00 4743.13 2.9 2.9 4.7 1.8 2.5 -99 -99 268 375.0 544 8710 5901.28
9 15-Nov R CASSIS Irfan Sheik Mastan 18.5 FLAT 25 S ACCESS TIGHT./casting at night. 0 4100.00 4216.22 4370.00 4216.22 4370.00 4232.57 2.9 4.7 3.8 -0.9 0.0 154 154 -137 0.0 16 302 153.78
10 16-Nov D P LOUIS Sabin Trading Ltd 13.5 BASES 25 S 3 PIPES + RAC EXTENTION / G BEAM & BASES 0 4150.00 4481.48 4690.00 4481.48 4690.00 4992.78 2.9 6.5 8.5 2.0 0.0 209 209 303 0.0 511 6903 208.52
11 17-Nov M MAHEBOURG Ephigene Giovanni 16.3 FLAT 25 S 0 4100.00 4294.48 4100.00 4294.48 4100.00 4125.12 2.9 2.9 3.1 0.2 0.0 -194 -194 25 0.0 -169 -2761 -194.48
12 17-Nov M GROS BOIS Luckoo Maheswar 17 FLAT 30 S casing at night. 0 4300.00 4294.12 4300.00 4294.12 4300.00 4173.82 2.9 2.9 2.1 -0.8 0.0 6 6 -126 0.0 -120 -2045 5.88
13 0 0
14 0 0
AVERAG E / 14 155 S 40 4175 4338 4341 4338 4323 4403 2.9 3.9 4.2 0.3 0.3 3 -15 41 38.6 65.4 923 429
TOTAL
4 900.0 0
Casting Operations gives an indication of the speed and ease with which the castings are being done
Projected Speed is the idea l s peed, with which the
casting s hould be done. 4 700.0 0
Actual Spe ed is the spe ed with which the cas ting has
been completed
4 300.0 0
Casting Loss / Gain / Rs per m3 12
Casting Loss / Gain / Rs 1886
Balance / Rs per m3 53
6.5
5.5
4.5
3.5
2.5
1.5
SUMMARY OF PRICE AND CASTING SPEED
Price per m3 / Rs Speed and Loss / min per m3 Difference and Loss per m3 / Rs
OVERALL LOSS
OVERALL LOSS -
DATE TEAM ADDRESS CLIENT VOL / TYPE GRADE SALESMAN REMARKS - Projecte d Price lis t +
M3 OTH ER ContractorPri Casting Other Pricelist - Projected - Casting Other OVERALL Price + Other
LOSS / Datum ce lis t Pricelist Actual Projected Neutral Datum Projected Actual Loss Los s Actual Actual Loss Loss LOSS Other Loss
Loss
MI N
1 4-Nov R LT KOENIG RT Knits 79.0 WALL 35 O A WATER PIP E BU RST AND N O W ATER W AS AVAILABLE ON P LANT T O BAT CHED 0 4300.00 4197.50 4530.00 4197.50 4300.00 4507.15 2.1 2.1 3.5 1.4 0.0 333 103 207 0.0 310 24463 332.5
CONCRE TE
2 5-Nov R GRAND BAIE Beijing Zhuzong Group Co Ltd 14.5 BASES 30 O 0 4350.00 4197.50 4350.00 4197.50 4350.00 4225.34 2.9 2.9 2.1 -0.8 0.0 153 153 -125 0.0 28 404 152.5
3 5-Nov R PEREYBERE DLB CONST 38 Pool/Beam 35/30 O DISPLACE TWICE/Slump of 1st lorry not good - lorry standby in yard 0 4200.00 4335.50 4430.00 4266.50 4575.00 4782.63 2.3 4.8 6.2 1.4 0.0 164 309 208 0.0 516 19613 163.5
4 7-Nov R RIV NOIRE DLB Construction Co Ltd 20 FLOOR 30 O 0 4200.00 4220.50 4200.00 4220.50 4200.00 4260.00 2.6 2.6 3.0 0.4 0.0 -21 -21 60 0.0 39 790 -20.5
5 8-Nov D PEREYBERE DLB Construction Co Ltd 18 FLAT + BEAM 30 O 0 4300.00 4220.50 4440.55 4151.50 4435.00 4698.33 2.9 3.8 5.6 1.8 0.0 289 284 263 0.0 547 9843 289.05
6 10-Nov R PTE AUX CANNONIER DLB Construction Co Ltd 16.5 FLAT + BEAM 25 O ROAD RESTRICTION 0 4100.00 4151.50 4330.00 4151.50 4325.00 4346.82 2.9 4.4 4.5 0.1 0.0 179 174 22 0.0 195 3223 178.5
7 0 0
8 15-Nov R RIV NOIRE DLB Construction Co Ltd 69.5 FLA + GBM + FLO 30 O DISPLACE PUMP TWICE 0 4100.00 4220.50 4200.00 4220.50 4190.00 4378.53 2.1 2.7 4.0 1.3 0.0 -21 -31 189 0.0 158 10983 -20.5
9 0 0
10 0 0
AVERAG E /
37 256 O 0 4213 4225 4370 4210 4317 4481 2.3 3.0 4.1 1.1 0.0 160 108 164 0.0 271.3 9903 108
TOTAL
4 700.00
SPP Casting Operations Statistics
Casting Operations gives an indication of the speed and ease with which the castings are being done
Projected Speed is the ideal s peed, with which the
casting s hould be done.
Actual Spe ed is the spe ed with which the cas ting has
been completed 4 500.00
Discrepancy / % 36%
4 100.00
SPP Casting Price Quoted
Discrepancy / Rs 41005
5.0
4.5
4.0
3.5
3.0
2.5
2.0
1.5
SUMMARY OF PRICE AND CASTING SPEED