Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 9

Printed 11/30/2020 RBG Ltd 501367214.

xls
ON / OFFSHORE : OFFSHORE LABOUR NORM :- SCAFFOLD NO. :- 0
REQUEST BY : Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0
OVERALL HEIGHT : M 0 0 CARRY TIME : Hrs Per Tonne
OVERALL LENGTH : M 0 0 NO. x SCAFFOLDERS : Off
WIDTH (Max. 2.349M) : M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
MAX. LIFT HEIGHT : M 0 0 INCREASED DIFFICULTY % : ENTER %
BOARDED LIFTS : Off INCREASED MAT'L FACTOR % : ENTER %
MAX. WORKING LIFTS : Off 0 NO. x WORKING HRS/DAY : Hrs
RAILS : SIDES : ONSHORE
LIVE-LOAD : Kn/M2 0.0 0 0 OFFSHORE
0 0 0 0
MAX. BAY LENGTH : 0.00 M, As Calcs 0 0 0
0 0
0 RBG
0.00 0 0.00
0 0 0.00 0 0.00 0.00
0.00 0 0 0 0 0 0.00
0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
0 0.00 0.0% 0 0 0 0.0 0.0% 0.00
0 0.00 0.0% 0.0 0 0 0.0 0.00
0 0.00 0.0% 0 0 0 0.00
0 0.00 0.0% 0.0 0 0 Shell
0.00 0.00 0 0.00

BOARDED LIFTS & LIVE LOAD 0


0 0.00 0.0 0
No. Lift Kn/M2 0 OVERALL 0
1 SIDE HEIGHT 0
2 SIDES 0.00 0.00
0 M 0
Offshore, 3 Course Rails 0
0 0 0
0.75 MAX. 0.00
1.5 LIFT HEIGHT 0
2 SEE 0.00
3 NOTE M

CONCEPTUAL SKETCH OF
INDEPENDENT SCAFFOLD
Not To Scale
OVERALL
LENGTH
0.00
MAX. M 0
BAY LENGTH
WIDTH 0.00
0.00 M M 0 0
0 0 0.00 0
NOTE : 1 Off Bay @ 0.00 M
2 x Inter. Transoms @ Max.Centres 0.00 Suggested Bay Length & No.
M 1 Off Bays @ 0.00 M
MATERIAL TAKE-OFF
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 3.0 M 0 0.0 0.0 0.0 0
0 0 0 0 0 0 0
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0.0 0.0
0 0 0

Programmed By Bill Abbott, RBG Scaffold Design Engineer Page 1 of 9


Printed 11/30/2020 RBG Ltd 501367214.xls

ON / OFFSHORE : 0 LABOUR NORM :- 0 SCAFFOLD NO. :-


REQUEST BY : 0 Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 M2 Inc.10.0%
SCAFFOLD DETAILS 0 0 OPERATIONAL DETAILS 0 0
OVERALL HEIGHT : 0.0 M 0 0 CARRY TIME : 0.0 Hrs Per Tonne
OVERALL LENGTH : 0.00 M 0 0 NO. x SCAFFOLDERS : 0 Off
OVERALL WIDTH : 0.00 M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
MAX. LIFT HEIGHT : 0.00 M 0 0 INCREASED DIFFICULTY % : 0% ENTER %
BAY WIDTH(Max.2.349M): 0.000 M 0 0 INCREASED MAT'L FACTOR % : 0% ENTER %
BOARDED LIFTS : 0.00 Off 0.00 NO. x WORKING HRS/DAY : 0 Hrs
MAX. WORKING LIFTS : 0.00 Off 0 0
LIVE-LOAD : 0.00 Kn/M2 0.0 0 0 0
0 0 0 0 0
MAX.BAY LENGTH : 0.00 M, As Calcs 0 0 0 0
0
0 RBG
0.00 8.00 0 0 0.00
8 0 0.00 0 0.00 0.00
0.00 0 0 0 0 0 0.00
0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
0 0.00 0.0% 0 0 0 0.0 0.0% 0.00
0 0.00 0.0% 0.0 0 0 0.0 0.00
0 0.00 0.0% 0 0 0 0.00
0 0.00 0.0% 0.0 0 Shell
0.00 0.00 0 0.00
BOARDED LIFTS & LIVE LOAD 0
0 0.00 0.0 0
No. Lift Kn/M2 0

0
0 0
0 OVERALL 0
0.75 HEIGHT 0
1.5 0.00 0.00
2 M 0
3 0
0 0
0.00
MAX. 0
LIFT HEIGHT
SEE 0.00
NOTE M

CONCEPTUAL SKETCH OF
BIRDCAGE SCAFFOLD
Not To Scale

OVERALL
LENGTH
0.00
OVERALL MAX. 0.0
WIDTH MAX. BAY LENGTH 0
0.00 BAY WIDTH 0.00 0 0 0.00 0
M 0.00 M 0 1 Off Bay @ 0.00 M
M 0 Suggested Bay Length & No.
1 Off Bays @ 0.00 M
NOTE :- 0
2 x Inter. Transoms @ Max.Centres 0.00 0 0 0.00 0
M 1 Off Bay @ 0.00 M
Suggested Bay Length & No.
MATERIAL TAKE-OFF 1 Off Bays @ 0.00 M
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 3.0 M 0 0.0 0.0 0.0 0
0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0.0 0.0
0 0 0

Programmed By Bill Abbott, RBG Scaffold Design Engineer Page 2 of 9


Printed 11/30/2020 RBG Ltd. 501367214.xls
ON / OFFSHORE : ONSHORE LABOUR NORM :- RBG SCAFFOLD NO. :-
REQUEST BY : Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0.0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0 0
OVERALL HEIGHT : M 0 0 CARRY TIME : 1.0 Hrs Per Tonne
WIDTH (Max. 2.349M) : M 0 0 NO. x SCAFFOLDERS : 3 Off
MAX. LIFT HEIGHT : M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
BOARDED LIFTS : Off INCREASED DIFFICULTY % : 10% ENTER %
MAX. WORKING LIFTS : Off 0 INCREASED MAT'L FACTOR % : 10% ENTER %
LIVE-LOAD : Kn/M2 0.0 0 NO. x WORKING HRS/DAY : 8 Hrs
Total No.Off 0 0 0 0
MAX.BAY LENGTH : 0.00 M, As Calcs 0 0 0 0
0
0
Total No.Off 0
0 RBG
0.00 0 RBG LABOUR NORMS BEING USED 0.00
0 Erect Days 0.00 Dis'm Days 0.00 0.00
0.00 0 0 0 0 0 0.00
0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
0 0.00 0.0% 0 0 0 0.0 0.0% 0.00
0 0.00 0.0% 0.0 0 0 0.0 0.00
0 0.00 0.0% 0 0 0 0.00
0 0.00 0.0% 0.0 0 Shell
0.00 0.0 0 0.00
0 0.00
BOARDED LIFTS & LIVE LOAD 0
0 0.00
No. Lift Kn/M2
0.0 0
Onshore, 2 Course Rails 0 0
0
0 OVERALL 0
0.75 0 HEIGHT 0.00
1.5 0.00 0
2 M 0
3 0
SEE 0.00
NOTE 0
MAX.
LIFT HEIGHT 0
0.00
M

CONCEPTUAL SKETCH OF
TOWER SCAFFOLD
OVERALL Not To Scale
LENGTH
WIDTH 0.00 0
0.00 M M 0
NOTE : 0
MAXIMUM TRANSOM CENTRES @ 0.00 0
M
MATERIAL TAKE-OFF
SCAFFOLD TUBES 3 Ft 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
SCAFFOLD LADDERS 3.0 M 0 0.0 0.0 0.0 0
1 0 0 0 0 0 0
0 Doubles #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
30 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0.0 0.0
0 0 0

Programmed By Bill Abbott, RBG Scaffold Design Engineer Page 3 of 9


Printed 11/30/2020 RBG Ltd. 501367214.xls
ON / OFFSHORE : 0 LABOUR NORM :- 0 SCAFFOLD NO. :-
REQUEST BY : 0 Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0 0
OVERALL LENGTH : 0.0 M 0 0 CARRY TIME : 0.0 Hrs Per Tonne
WIDTH (Max. 2.349M) : M 0 0 NO. x SCAFFOLDERS : 0 Off
MAX. LIFT HEIGHT : 0.0 M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
BOARDED LIFTS : 0.0 Off INCREASED DIFFICULTY % : 0% ENTER %
LIVE-LOAD : 0.00 Kn/M2 0.0 0 INCREASED MAT'L FACTOR % : 0% ENTER %
0 0 0 NO. x WORKING HRS/DAY : 0 Hrs
MAX. BAY LENGTH : 0.00 M, As Calcs 0 0 0 ` `
0 0
0
0 0
0 0 0 0
0 RBG
RBG 0 0 0.00
0.00 0 0.00 0 0.00 0.00
0.00 0 0 0 0 0 0.00
0.00 0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
Mobil 0 0.00 0.0% 0 0 0 0.0 0.0% M
M 0 0.00 0 0.0
0 0 0.00 0.0% 0 0 0 0.00
0.00 0 0.00 0.0% 0.0 0 Shell
Shell 0.00 0.0 0 0.00
0.00 BOARDED LIFTS & LIVE LOAD MAX.
0 0.00 0.0 LIFT HEIGHT
No. Lift Kn/M2 0 0.00
NOTE M
OUTLINE OF ADJOINING SCAFFOLD,
SEPARATE SPREADSHEET TO BE 0
COMPILED FOR ASSOCIATED
MATERIAL & MANHOURS
0
0.75 0.75
1.5
2 CONCEPTUAL SKETCH OF
3 CANTILEVER SCAFFOLD
Not To Scale
WIDTH
0.00 M SEE
NOTE

OVERALL
LENGTH
MAX. 0.00
BAY LENGTH M 0
0.00
NOTE : M 0
MAXIMUM TRANSOM CENTRES @ 0.00
M 0 Off Bays @ 0.00 M
0 0 0.00 0
0 0
0 0 0 0.00 0 0
MATERIAL TAKE-OFF
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0
0 0
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0.0 0.0
0 0 0

Compiled By Bill Abbott, Scaffold Design Engineer, Rigblast Page 4 of 9


Printed 11/30/2020 RBG Ltd 501367214.xls
ON / OFFSHORE : 0 LABOUR NORM :- 0 SCAFFOLD NO. :-
REQUEST BY : 0 Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0 0
OVERALL DROP : 0.00 M 0 0 CARRY TIME : 0.0 Hrs Per Tonne
OVERALL LENGTH : 0.00 M 0 0 NO. x SCAFFOLDERS : 0 Off
WIDTH (Max. 2.349M) : M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
MAX. LIFT HEIGHT : 0.0 M 0 0 INCREASED DIFFICULTY % : 0% ENTER %
BOARDED LIFTS : 0.0 Off INCREASED MAT'L FACTOR % : 0% ENTER %
MAX. WORKING LIFTS : 0.0 Off 0 NO. x WORKING HRS/DAY : 0 Hrs
RAILS : SIDES : 0 0 0
LIVE-LOAD : 0.00 Kn/M2 0.0 0 0 0 0
0 0 0 0 0
MAX. BAY LENGTH : 0.00 M, As Calcs 0 0 0 0
0 0
0 RBG
0 0 0 0.00
0.00 0 0.00 0 0.00 0.00
0.00 0 0 0 0 0 0.00
0.00 0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
Mobil 0 0.00 0.0% 0 0 0 0.0 0.0% 0.00
0.00 0 0.00 0.0% 0.0 0 0 0.0 0.00
0.00 0 0.00 0.0% 0 0 0.00
0 0.00 0.0% 0.0 0 0 Shell
Shell 0.00 0.0 0 0 0.00
0.00
0 OVERALL 0
0 LENGTH 0.0 0
0 0.00 0 OVERALL 0
M DROP 0
1 SIDE 0.00 0.00
2 SIDES M 0
0 0
0.75 0 0
1.5 MAX. 0.00
2 LIFT HEIGHT 0
3 0.00 0.00
M
0
0

BOARDED LIFTS
0
No. Lift
LIVE LOAD SEE CONCEPTUAL SKETCH OF
0.00 NOTE INDEPENDENT HANGER SCAFFOLD
Kn/M2 Not To Scale
0.0
0 MAX.
WIDTH BAY LENGTH
0.00 M 0.00
M 0 0
NOTE : 0 0 0.00 0
MAXIMUM TRANSOM CENTRES @ 0.00 0 0 0.00 0
M 0
MATERIAL TAKE-OFF MATERIAL TAKE-OFF 0 0 0.00 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 3.0 M 0 0.0 0.0 0.0 0
0 0 0 0 0 0 0
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0.0 0.0
0 0 0 0

Compiled By Bill Abbott, Rigblast Scaffold Design Engineer Page 5 of 9


Printed 11/30/2020 RBG Ltd 501367214.xls
ON / OFFSHORE : 0 LABOUR NORM :- 0 SCAFFOLD NO. :-
REQUEST BY : 0 Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : M x No. : 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0 0
OVERALL DROP : 0.00 M 0 0 CARRY TIME : 0.0 Hrs Per Tonne
OVERALL LENGTH : 0.00 M 0 0 NO. x SCAFFOLDERS : 0 Off
OVERALL WIDTH : 0.00 M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
MAX. LIFT HEIGHT : 0.00 M 0 0 INCREASED DIFFICULTY % : 0% ENTER %
BAY WIDTH(Max.2.349M): 0.000 M 0 0 INCREASED MAT'L FACTOR % : 0% ENTER %
BOARDED LIFTS : 0.00 Off NO. x WORKING HRS/DAY : 0 Hrs
MAX. WORKING LIFTS : 0.0 Off 0 0 0
LIVE-LOAD : 0.00 Kn/M2 0.0 0 0 0
0 0 0 0 0
MAX.BAY LENGTH : 0.00 M, As Calcs 0 0 0 0
0 0
0 M
0 0 0.00
0.00 0 0 0.00 0 0.00 0.00
0.00 0 0 0 0 0 0.00
0.00 0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
Mobil 0 0.00 0.0% 0 0 0 0.0 0.0% 0.00
0.00 0 0.00 0.0% 0.0 0 0 0.0 0.00
0.00 0 0.00 0.0% 0 0 0.00
0.00 0 0.00 0.0% 0.0 0 0 Shell
Shell 0.00 0.0 0 0 0.00
0.00 OVERALL
0 LENGTH
0 0.00
0 M
TUBE
Wt. Of Tube 0 0
0
0 OVERALL 0
0.75 DROP 0
1.5 0.00 0.00
2 M 0
3 0
0 0
0.00
BOARDED LIFTS MAX. 0
0 LIFT HEIGHT LIFT HEIGHT
No. Lift 0.00 0.00
LIVE LOAD M
0.00
Kn/M2
0.0 CONCEPTUAL SKETCH OF
0 BIRDCAGE HANGER SCAFFOLD
Not To Scale

0
SEE
NOTE 0
0 0 0.00 0
OVERALL MAX. 1 Off Bay @ 0.00 M
WIDTH MAX. BAY LENGTH Suggested Bay Length & No.
0.00 BAY WIDTH 0.00 1 Off Bays @ 0.00 M
M 0.00 M 0 BAY WIDTH CONFIGURATION
M 0 0 0 0.00 0
1 Off Bay @ 0.00 M
NOTE : Suggested Bay Length & No.
MAXIMUM TRANSOM CENTRES @ 0.00 0.00 1 Off Bays @ 0.00 M
MATERIAL TAKE-OFF M Ft
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#DIV/0! 3.0 M #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
3 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0.0 0.0
#DIV/0! 0 0 0

Compiled By Bill Abbott, Rigblast Scaffold Design Engineer Page 6 of 9


Printed 11/30/2020 RBG Ltd. 501367214.xls
ON / OFFSHORE : 0 LABOUR NORM :- 0 SCAFFOLD NO. :-
REQUEST BY : 0 Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0
OVERALL DROP : 0.0 M 0 0 CARRY TIME : 0.0 Hrs Per Tonne
WIDTH (Max. 2.349M) : M 0 0 NO. x SCAFFOLDERS : 0 Off
MAX. LIFT HEIGHT : 0.0 M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
BOARDED LIFTS : 0.0 Off INCREASED DIFFICULTY % : 0% ENTER %
MAX. WORKING LIFTS : 0.0 Off 0 INCREASED MAT'L FACTOR % : 0% ENTER %
LIVE-LOAD : Kn/M2 0.0 0 NO. x WORKING HRS/DAY : 0 Hrs
0 0 0 0 0
MAX.BAY LENGTH : 0.00 M, As Calcs 0 0 0 0
0
0 0
0 0 0
0 M
M 0 0 0.00
0.00 0 0 0.00 0 0.00 0.00
0.00 0 0 0 0 0 0.00
0.00 0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
Mobil 0 0.00 0.0% 0 0 0 0.0 0.0% 0.00
0.00 0 0.00 0.0% 0.0 0 0 0.0 0.00
0.00 0 0.00 0.0% 0 0 0.00
0.00 0 0.00 0.0% 0.0 0 0 Shell
Shell 0.00 0.0 0 0 0.00
0.00 0 0 0.00
0.00
0 0
OVERALL 0 0
HEIGHT 0
0.00 0
M 0.00
0 0
0.75 0 0
1.5 0
2 0.00
3 0 0
MAX. MAX.
BOARDED LIFTS LIFT HEIGHT
0 0.00
No. Lift M
LIVE LOAD
0.00 0
Kn/M2
0.0
0
0 OVERALL
OVERALL LENGTH
WIDTH 0.00
0.00 M M 0
SEE
NOTE CONCEPTUAL SKETCH OF
TOWER SCAFFOLD
NOTE : Not To Scale 0
MAXIMUM TRANSOM CENTRES @ 0.00 0
M 0
MATERIAL TAKE-OFF 0
SCAFFOLD TUBES 4 Ft 3 Ft 0 0 0 0 0 0 0
6 4 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
SCAFFOLD LADDERS 21 Ft 0.0 0
1 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0
0 0 0

Compiled by Bill Abbott, Rigblast Scaffold Design Engineer Page 7 of 9


Printed 11/30/2020 RBG Ltd 501367214.xls
ON / OFFSHORE : 0 LABOUR NORM :- 0 SCAFFOLD NO. :-
REQUEST BY : 0 Aluminium Beams : 0.0 M x No. : 0 0.0 Total M
Additional Beams : 0.0 M x No. : 0 0.0 Total M
SCAFFOLD LOCATION :
Sheeting : 0 0.0 0 M2 Inc.10.0%
SCAFFOLD DETAILS M2 Inc.10.0% 0 0 OPERATIONAL DETAILS 0 0
OVERALL LENGTH : 0.0 M 0 0 CARRY TIME : 0.0 Hrs Per Tonne
WIDTH (Max. 2.349M) : 0 0 0 NO. x SCAFFOLDERS : 0 Off
MAX. LIFT HEIGHT : 0.0 M 0 0 No. x Safety Watch : 0 Off (Req'd For Overside)
BOARDED LIFTS : 0.0 Off INCREASED DIFFICULTY % : 0% ENTER %
LIVE-LOAD : 0.00 Kn/M2 0.0 0 INCREASED MAT'L FACTOR % : 0% ENTER %
0 0 0 NO. x WORKING HRS/DAY : 0 Hrs
MAX.BAY LENGTH :- 0.00 M, As Calcs 0 0 0 0
0 0
0
0 0
0 0 0
0 RBG
RBG 0 0 0.0
0.0 0 0 0.00 0 0.00 0.0
0.0 0 0 0 0 0 0.00
0.00 0 0.00 0.0% 0 0 0 0.0 0.0% Mobil
Mobil 0 0.00 0.0% 0 0 0 0.0 0.0%
0 0 0.00 0 0.0
0 0 0.00 0.0% 0 0 0 0.00
0.00 0 0.00 0.0% 0.0 0 Shell
Shell 0.00 0.0 0 0.00
0.00 CONCEPTUAL SKETCH OF SCAFFOLDING
NOTE Not To Scale
OUTLINE OF ADJOINING SCAFFOLD,
SEPARATE SPREADSHEET TO BE
COMPILED FOR ASSOCIATED
MATERIAL & MANHOURS MAX.
0 LIFT HEIGHT
0.75 0.00
1.5 M
2 0.0 0.0
3 0

BOARDED LIFTS & LIVE LOAD


0 0.00
CONCEPTUAL SKETCH OF No. Lift Kn/M2
CANTILEVER HANGER SCAFFOLD 0.0
Not To Scale 0

SEE
NOTE

0
OVERALL
MAX. BAY LENGTH LENGTH
WIDTH 0.00 0.0 0.00 0.0
0.00 0 M M
0 Off Bays @ 0.00 M
0 0 0.00 0
NOTE : 0
MAXIMUM TRANSOM CENTRES @ 0.00 0.00 0.00 0 0 0.00 0
MATERIAL TAKE-OFF M Ft
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0
0 0
0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0 0 0
0 0 0

Page 8 of 9
RBG NORMS NOTE :- OFFSHORE @ 3 Man Shift (12 Hr Shift) & ONSHORE @ 3 Man Shift (8 Hr Shift) INCREASE

DECREASE

VARIATION %:- 0% 0 : INCREASE/DECREASE 0

Offshore Shift Shown


ERECTION Erection of Tube 1200 Ft / 3 Man Shift (12 Hr Shift) 33.3 Ft/Hr
Independent & Tower Erection of Boards 240 No x 13Ft Boards / 3 Man Shift (12 Hr Shift) 86.7 Ft/Hr
Birdcage Erection of Boards 300 No x 13Ft Boards / 3 Man Shift (12 Hr Shift) 108.3 Ft/Hr
Erection of Ladders 12.6 M/Hr Erection of Beams 18.3 M/Hr
Erection of Tarpaulins 10.0 M2/Hr Erection of Netting 18.3 M2/Hr

DISMANTLING Offshore Shift Shown


Dismantling of Tube 2400 Ft / 3 Man Shift (12 Hr Shift) 66.7 Ft/Hr
Independent & Tower Dismantling of Boards 240 No x 13Ft Boards / 3 Man Shift (12 Hr Shift) 86.7 Ft/Hr
Birdcage Dismantling of Boards 300 No x 13Ft Boards / 3 Man Shift (12 Hr Shift) 108.3 Ft/Hr
Dismantling of Ladders 12.6 M/Hr Dismantling of Beams 18.3 M/Hr
Dismantling of Tarpaulins 20.0 M2/Hr Dismantling of Netting 36.6 M2/Hr

MOBIL NORMS
Erect Dismantle
Deck 1.18 0.61
Independent
Hanger 1.57 1.05
Deck 0.31 0.18
Birdcage
Hanger 0.37 0.25
Deck 0.81 0.42
Tower
Hanger 1.19 0.8
Deck 0.89 0.46
Cantilever
Hanger 1.35 0.91
Deck 0.94 0.46
Suspended
Hanger 1.43 0.95
Deck 0.17 0.1
Additional Boards
Hanger 0.27 0.27
Deck 0.47 0.24
Pole Ladder
Hanger 0.74 0.49
Deck 0.26 0.14
Sheeting
Hanger 0.38 0.25
2.0 Kn/M2 : General Purpose 2.5 Kn/M2 : Heavy Duty
SHELL NORMS Tube Volume Boarded Lift Sheeting Tube Volume Boarded Lift Sheeting Ladder Beam
Complete (Erect & Dism) Complete Complete Complete (Erect & Dism) Complete Complete Complete
Deck 0.71 1.31 0.15 0.73 1.32 0.15 0.56
Independent
Hanger
Deck 0.24 1.01 0.14 0.26 1.05 0.14 0.56
Birdcage
Hanger
Deck 0.80 2.06 0.18 0.83 2.16 0.18 0.56
Tower
Hanger
Deck 1.13 2.02 0.18 1.16 2.04 0.18 0.56
Cantilever
Hanger
Deck 0.69 0.93 0.20 0.84 1.1 0.23 0.56
Suspended
Hanger

You might also like