DIVISION 01: GENERAL AND SITE FACILITIES

Item No. Description of Item Unit Unit Rate

01.1 Erection and maintenance of site office and removal of the same after completion of work in accordance with
the conditions of contract. In addition to the office required for his own use, the contractor shall provide and
maintain furnished field office for the use of the Engineer-in-charge and his staff. The field office is to have a
concrete floor, adequate foundation, brick walls, false ceiling of hard board with seasoned Garjan wood frame
and painted, and all windows are to be glazed and provided with steel grill. Outside and inside wall surface are
to be painted on plaster acceptable to the Engineer-in-charge. The field office shall be maintained in a secure
and watertight condition by the contractor until the completion of the contract and shall be provided with
electricity, running water and sewerage. All doors shall be fitted with approved locks and windows shall be
provided with screen/blinds. Before construction the contractor shall submit plans and drawings showing
proposed details and location for the field office, including foundations, access roads, shades, layout of
electrical and water supply and hard standings thereto for the approval of the Engineer-in-charge. The
Engineer-in-charge may require revision of the plans prior to giving approval for construction. The contractor
shall also submit details proposed furniture, fittings and other items of equipment and plant to the Engineer-in-
charge for approval. These items shall be of the standard quality suitable for site. The office, complete with
furnishings, fittings, access roads and hard standings shall be ready for occupation by the Engineer-in-charge
within 28 days of the date when the contractor first occupies the site. The contractor will provide day and night
guards and a tea boy for the field office. At the end of the project all materials, equipment and plant, furniture,
fittings recovered from dismantling the office and removing access road will be the property of the contractor.
No interim payment shall be certified unless engineer’s office with required facilities are constructed and
accepted by the Engineer-in-charge.
(This is a time related item; proportionate payment for this item shall be made distributing in each bill on the
basis of percentage progress of the whole works under contract)

1
01.1.1 Engineer’s site office of minimum 15 sqm plinth area with providing furniture, first aid-box, safety helmet, level / LS Tk. 144,894.00
theodolite, consumables, stationeries etc. 2
01.1.2 Engineer’s site office of minimum 38 sqm plinth area with providing security fencing, 5 KVA stand-bye LS Tk. 440,718.00
generator, furniture, first aid-box, safety helmet, level / theodolite, consumables, stationeries etc.
3
01.1.3 Engineer’s site office of minimum 38 sqm plinth area with providing security fencing, 5 KVA stand-bye LS Tk. 561,463.00
generator, IBM compatible PC with monitor, uninterruptible power supply (UPS), laserjet printer (minimum 25
ppm), furniture, first aid-box, safety helmet, level/theodolite/EDM, consumables, stationeries etc. 4
01.1.4 Engineer’s site office of minimum 38 sqm plinth area with providing security fencing, 5 KVA stand-bye LS Tk. 602,999.00
generator, IBM compatible PC with monitor, uninterruptible power supply (UPS), laserjet printer (minimum 25
ppm), photocopier, 6 cft. Freeze, furniture, first aid-box, safety helmet, level/theodolite/EDM, consumables,
stationeries etc. 5
01.1.5 Engineer’s site office of minimum 10 sqm plinth area with providing furniture, first aid-box, safety helmet, LS Tk. 27,168.00
consumables, stationeries etc for low value simple work of short duration (not more than six months).
6
01.1.6 Providing and maintenance one project profile signboards of the size not exceeding 1 m x 2 m, to be placed at a sqm Tk. 2,670.00
suitable place of the site including submission of proposals for the materials of the signboards and text layout to
the Engineer-in-charge for approval which will be positioned as directed by the Engineer-in-charge and
removing the same on completion of the works or as instructed by the Engineer-in-charge.
7
01.2.1 Providing 3 sets as-built drawings subject to Engineer’s approval produced in AutoCAD software in 584.5 mm x per tender Tk. 24,423.00
413.5 mm (A-2 size) standard drawing paper, and operating and maintenance manual of the equipment and
plant incorporated in the works, if any, in original by the date stated in the particular conditions of contract
(PCC). If the contractor does not supply the as-built drawings and operating and maintenance manuals by the
date stated in the particular conditions of contract (PCC), or they do not receive the Engineer-in-charge’s
approval, the Engineer-in-charge shall withhold the amount stated in the PCC from the payments due to the
contractor.
The as-built drawings must show the permanent works as actually constructed and reflect the revision of Tender
drawings and drawings supplied to the contractor during the Contract as well as revisions of drawings supplied
to the contractor during the contract.
(One set of as-built drawings shall be considered for measurement and payment)

8
01.2.2 Providing additional copy of as-built drawing produced in AutoCAD software in 584.5 mm x 413.5 mm (A-2) sqm of Tk. 293.00
standard drawing paper accepted by the Engineer-in-charge. drawing
sheet 9
01.2.3 Providing minimum ten (10) copies coloured post-card size progress photograph of ‘works under contract’ taken per month Tk. 1,413.00
by professional photographer which record the progress of the Works. 10
01.2.4 Preparation & submission of implementation schedule to the Engineer-in-charge for approval prior ground per tender Tk. 35,158.00
breaking showing the events (works) and successive sub-events of works including all the management &
control parameters like Earliest Start Time (EST), Earliest Finish Time (EFT), float events on critical path,
resource allocation etc. with description of general method of works, in orderly manner all in the form network
diagram prepared in computer software like MS project/ Primavera and presenting in displayable hard and soft
copy minimum 3 (three) sets. (This is a time related item. Proportionate payment for this item shall be made
distributing in each bill on the basis of percentage progress of the whole works under contract)

11
01.2.5 Updating the Implementation Schedule and submission to the Engineer-in-charge at intervals no longer than 28 per month Tk. 14,752.00
days showing actual physical and financial progress achieved, on each activity and the effect of the progress on
the timing of the remaining work, including any changes to the sequence of the activities.However, Engineer’s
approval of the programme shall not alter the contractor’s obligations. The contractor may revise the programme
and submit it to the Engineer-in-charge again at any time. A revised programme shall show the variations and
events related to change of contract price. Month wise documentation shall be the basis of payments on this
item.

12
01.2.6 Providing all necessary logistic support to frame ‘monthly progress meeting’ between contractor/contractor’s per month Tk. 2,475.00
representatives and employer / employer’s representatives at the Engineer-in-charge's office at site. Month
wise documentation shall be the basis of payments on this item.
13
Item No. Description of Item Unit Unit Rate

01.3 Providing layout and carry over PWD bench-mark (BM) at site from nearby BM pillar, property lines, existing sqm Tk. 24.00
ground level (EGL), formation ground level (FGL), highest flood levels (HFL), plinth levels (PL), mean sea level
(MSL), setting and marking all pillars, marker, pegs etc. showing and maintaining reduced levels (RL’s)
including locating, establishing, protecting all public utilities within the premise of work and finally all to be
presented in black and white.
14
01.4 Mobilization and cleaning site before commencing actual physical work and during contract period and sqm Tk. 169.00
demobilization after completion of the works under contract to be accepted by the Engineer-in-charge. This
work shall also covers clayey cleaning and clearing, cutting or filling, dressing the project area on and in the
ground to an extent that all the events of works of the project can be executed smoothly in a working
environment with a particular attention on safety and security in all respects, and to stockpile the end outcome
to a place for disposal agreed by the Engineer-in-charge, where, payments are to be based on ground area
determined by the Engineer-in-charge and be proportionate to the percentage progress of work under contract
as a whole in all respects and approved by the Engineer-in-charge.
15
01.5 Providing expertised architect having relevant experience (s) more than 5 years for detail documentation of per month Tk. 70,000.00
architectural themes, drawings, workingout shop drawings, communication with theme architect & getting
approval, specifying architectural needs according to approved master architectural themes & plan, certifying
as built drawing for the approval etc. and any relevant jobs assigned by the HOPE or his official at site (max
man month not greater than 1/4th of project duration & payment for the item subject to submission of CV &
approved by HOPE or his authorized officer.

16
01.6 Providing expertised engineer having relevant experience(s) more than 10 years, for the project documentation, per month Tk. 120,000.00
progress study & adjustment, preparation of project material schedule and testing schdule for approval etc. &
jobs assigned by the HOPE or his official, at site (max man month not greater than 1/4th of Project duration &
payment for the item subject to submission of CV & approved by HOPE or his authorized officer.
17
01.7 Pick-up (double cab) for transport of test samples, work samples & emergency services etc. including cost of per month Tk. 70,000.00
fuel etc. (Total usage not more than 1/6th of project duration.)
18
01.8 Supplying, fitting, fixing, operating and maintenance of the costruction supervision lift (1000Kg capacity) for
supervision of building construction work during the entire construction period including all necessary
components like, steel frame, car, guide rails. push button, driving motor, gear box, car door, travelling cable,
RCC base for steel frame, necessary connections with the building, electric supply & electricity bill and
dismantling the same after completion of the building construction etc. all complete complying all safety factors
and accepted by the Engineer-in-charge. (The construction supervision lift shall be the contractor property after
completion of work). Number of month shall be calculated as 1/2 (half) of the project period for new
construction and full project period for vertical extension work. The contractor must submit detail structural
drawing of supporting frame with foundation and lift specification prior to supply on site.

19
01.8.1 6th to 10th floor, hoisting speed 40 m/min per month Tk. 28,287.00
20
01.8.2 11th to 15th floor, hoisting speed 40 m/min per month Tk. 37,661.00
21
01.8.3 16th to 20th floor, hoisting speed 50 m/min per month Tk. 44,911.00
22
01.8.4 21th to 25th floor, hoisting speed 60 m/min per month Tk. 49,426.00
23
01.8.5 26th to 30th floor, hoisting speed 60 m/min per month Tk. 55,589.00
24
25
26
27
………………….. END OF DIVISION ONE ………………….. 28
DIVISION 02: EXCAVATION, FILLING & SITE DEVELOPMENT AND PALISADING 29
Item No. Description of Item Unit Unit Rate
30
02.1 Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local
bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with
chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking,
cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and
accepted by the Engineer-in-charge, subject to submit method statement of carrying out excavation work to the
Engineer-in-charge for approval. However, engineer’s approval shall not relieve the contractor of his
responsibilities and obligations under the contract.

31
02.1.1 Layout and marking for earthwork in excavation in foundation accepted by the Engineer-in-charge. [Plinth area sqm Tk. 15.00
of the structure shall be considered for measurement]
32
02.1.2 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in soft clayey soil / cum Tk. 88.00
loose sand / silt
33
02.1.3 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in medium stiff cum Tk. 126.00
clayey soil.
34
02.1.4 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very stiff (hard) cum Tk. 189.00
clayey soil/ rubbish etc. 35
02.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very soft / cum Tk. 217.00
saturated / organic clayey soil / soil of semi-liquid state. 36
02.1.6 Extra rate for each additional 0.5 meter depth exceeding 1.5 meter. cum Tk. 20.00 37
Item No. Description of Item Unit Unit Rate

02.1.7 Extra rate for each 1 m additional lead beyond 10 m. cum Tk. 3.00 38
02.2 Bailing out of trapped water caused by inundation or rain, by pump from foundation trenches. hour Tk. 424.00
39
02.3 Supplying of straight and strong borrak bamboo posts of having minimum 75 mm diameter althrough and driving meter Tk. 80.00
the same vertically in the ground up to required depth by any means shaping the top of the post, all complete
and accepted by the Engineer-in-charge. 40
02.4 Supplying of wooden ballah having an average diameter not less than 150 mm (without barks) at one third meter Tk. 592.00
distance from larger end with a minimum end diameter of 100 mm for retaining purpose and driving to a depth
as per design and drawing by any method including all arrangement for staging, hoisting, carrying etc. complete
and accepted by the Engineer-in-charge.
41
02.5 Palisading work by supplying of bitumen drum sheet walling tied with 20 BWG G.I. wire fixing the same with sqm Tk. 520.00
already driven borrak bamboo posts with half split borrak bamboo runners @ 450mm c/c horizontally with iron
nails, G.I wire etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of bamboo
post).
42
02.6 Supplying and fitting-fixing horizontal bracing in palisading with half split wooden ballah having an average meter Tk. 180.00
diameter not less than 150 mm with a minimum end diameter of 100 mm @ 450 mm including supply of iron
nails, gazals etc. complete approved and accepted by the Engineer-in-charge.
43
02.7.1 Shore protection work during excavation in foundation trenches up to 1.5 m depth to protect loss due to damage sqm Tk. 609.00
of property by palisading accepted by the Engineer-in-charge. [The rate is including the cost of vertical post]
44
02.7.2 Shore protection work during excavation in foundation trenches beyond 1.5 m depth to protect loss due to sqm Tk. 877.00
damage of property by palisading accepted by the Engineer-in-charge, [The rate is including the cost of vertical
post] 45
02.8 Supply of 2 mm thick best quality geo-textile from approved manufacturer/origin and laying as per sqm Tk. 143.00
manufacturer’s instructions approved and accepted by the Engineer-in-charge. Before commencement of laying
of geo-textile, the contractor must submit the method statement for carrying out this work including sample with
evidence of origin and compliance certificate from independent testing laboratory for approval.
46
02.9 Removing sludge or semi-liquid clay/substances etc not suitable for pumping out or carrying by head load from cum Tk. 879.00
the bottom of any marshy land, lake, ditch, pond by mixing fine local sand of F.M. 0.8 or less to a proportion
such that it can be carried to an intermediate point of disposal and cutting the same including stacking and
spreading properly on a suitable place to dry in the sun for a certain days and dispose the dried sludge or clay
to a safe distance etc. complete and accepted by Engineer-in-charge subject to submit method statement to the
engineer in charge for carrying out the works including ultimate disposal of the sludge under this item for
approval. However, engineer’s approval shall not relieve the Contractor of his responsibilities and obligations
under the contract.

47
02.10.1 Sand filling in foundation trenches and plinth with sand having F.M. 0.5 to 0.8 in 150 mm layers including cum Tk. 635.00
leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office
only, all complete and accepted by the Engineer-in-charge.
48
02.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M. 1.2 in 150 mm in layers including cum Tk. 913.00
leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office
only, all complete and accepted by the Engineer-in-charge.
49
02.10.3 Sand filling in foundation trenches and plinth with sand having min. F.M. 2.2 in 150 mm layers including leveling, cum Tk. 2,631.00
watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified
proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all
complete and accepted by the Engineer-in-charge.

50
02.11 50 mm down graded picked jhama khoa consolidation in foundation trenches by mixing the same with best cum Tk. 4,239.00
quality local sand (F.M. 1.2) in (2:1) (khoa: sand) proportion to achieve minimum dry density of 95% with
optimum moisture content (Modified proctor test) including breaking and screening chips, laying and spreading
in 150 mm layers uniformly and compacting etc. all complete and accepted by the Engineer-in-charge.
51
02.12 50 mm down graded picked jhama khoa consolidation in foundation trenches by mixing in mixer machine with cum Tk. 4,931.00
best quality local sand (F.M. 1.2) and cement in (1:6:12) (cement: sand: khoa) proportion to achieve minimum
dry density of 95% with optimum moisture content (Modified proctor test) including breaking and screening
chips, laying and spreading in150 mm layers uniformly and compacting etc. all complete and accepted by
Engineer-in-charge.

52
02.13 Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building cum Tk. 149.00
site to achive minimum dry density of 95% with optimum moisture content (Modified proctor test) including
carrying watering, leveling, dressing and compacting to a specified percentage each layer up to finished level
etc. all complete and accepted by Engineer-in-charge.

53
02.14 Cleaning and disposing of excavated earth from the construction site by truck or by any other means to a place cum Tk. 539.00
within 30 km radius of the city or town area including loading & unloading at both ends, leveling and dressing
the carried earth etc. complete and accepted by the Engineer-in-charge.
54
02.15 Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or by any other
means including loading and unloading at both ends, leveling, watering and compacting to achive minimum dry
density of 95% with optimum moisture content (modified proctor test) including local carriage each layer up to
finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the
Engineer-in-charge
55
Item No. Description of Item Unit Unit Rate

02.15.1 For Dhaka metropolitan area. cum Tk. 622.00 56


02.15.2 For Chittagong / Sylhet metropolitan area and Narayanganj district. cum Tk. 497.00 57
02.15.3 For Rajshahi / Barisal / Khulna metropolitan area. cum Tk. 432.00 58
02.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna metropolitan area and Narayanganj district. cum Tk. 393.00
59
02.16 Site development/Improvement by carted earth or dredged sand, sandy silt (free from any organic, foreign,
environmental hazardous substances) carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the earth/sand, sandy silt in the designated
area, maintaining slopes, breaking lumps, levelling and dressing in layers up to finished level etc. all complete
as per direction and accepted by the engineer in charge.

60
02.16.1 For Dhaka metropolitan area. 61
02.16.1.1 By other method/means than dredgeing. cum Tk. 481.00 62
02.16.1.2 By dredging including necessary systems thereof. cum Tk. 299.00 63
02.16.2 For Chittagong / Sylhet metropolitan area and Narayanganj district. 64
02.16.2.1 By other method/means than dredgeing. cum Tk. 377.00 65
02.16.2.2 By dredging including necessary systems thereof. cum Tk. 247.00 66
02.16.3 For Rajshahi / Barisal / Khulna metropolitan area. 67
02.16.3.1 By other method/means than dredgeing. cum Tk. 352.00 68
02.16.3.2 By dredging including necessary systems thereof. cum Tk. 230.00 69
02.16.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna metropolitan area and Narayanganj district.
70
02.16.4.1 By other method/means than dredgeing. cum Tk. 302.00 71
02.16.4.2 By dredging including necessary systems thereof. cum Tk. 195.00 72
02.17 Mechanical compaction of earth beyond plinth area, required for pre-approved specific engineering purpose in cum Tk. 418.00
150 mm layers including levelling, watering and consolidation each layer with chain dozer, grader, roller etc. to
achieve minimum dry density of 95% with optimum moisture content (modified proctor test) up to finished level
all complete and accepted by the engineer-in-charge subjected to submission of the method statement.
73
02.18 Earthwork in excavation of tank of any dimension in all kinds of soil including cutting up to required depth
including bailing out water and throwing on the embankment, breaking clods, ramming and leveling, dressing in
225 mm layer with maintaining the side slopes and level of both tank and the embankment as per design and
accepted by the Engineer-in-charge.
74
02.18.1 For initial lead of 30 m and lift of 1.5 m cum Tk. 185.00 75
02.18.2 For each additional lift of 0.3 m beyond 1.5 m and up to 3 m cum Tk. 7.00 76
02.18.3 For each additional lift of 0.3 m beyond 3 m and up to 4.5 m cum Tk. 10.00 77
02.18.4 For each additional lift of 0.3 m beyond 4.5 m and up to 6 m cum Tk. 14.00 78
02.18.5 Extra each additional lead of 0.3 m or part thereof beyond initial lead 30 meter cum Tk. 27.00 79
02.19.1 Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and per hour Tk. 538.00
maintenance etc. all complete and accepted by by the Engineer-in-charge.
80
02.19.2 Bailing out water by 1 cusec electricity operated pump including hire charge of pump, fuel, operator, spares and per hour Tk. 433.00
maintenance etc. all complete and accepted by the Engineer-in-charge. 81
82
83
84
………………….. END OF DIVISION TWO ………………….. 85
DIVISION 03: BRICK SOLING, CC, DPC ETC. 86
Item No. Description of Item Unit Unit Rate 87
03.1 One layer brick flat soling in foundation or in floor with first class/picked jhama bricks including preparation of sqm Tk. 420.00
bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge
88
03.2 One layer Herringbone bond (HBB) brick soling in foundation or in floor with first class/picked jhama bricks sqm Tk. 662.00
including preparation of bed and filling the interstices with local sand, leveling including supply of water, other
charges, costs of tools and plants etc. all complete and accepted by the Engineer-in-charge
89
03.3 Brick on end edging including preparation of bed and filling the interstices with local sand, leveling, maintaining meter Tk. 104.00
alignment and grid etc. all complete and accepted by the Engineer-in-charge
90
03.4 Mass concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips
including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and
accepted by the Engineer-in-charge.(Cement: CEM-II/A-M)
91
03.4.1 Mass concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 cum Tk. 6,647.00 92
03.4.2 Mass concrete in floor (1:3:6) with cement, brick chips and sand of F.M. 1.2 cum Tk. 6,579.00 93
03.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips
including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and
accepted by Engineer-in-charge. (Cement: CEM-II/A-M)
94
Item No. Description of Item Unit Unit Rate

03.5.1 Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2. cum Tk. 7,643.00 95
03.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2. cum Tk. 7,575.00 96
03.6 Damp proof course (DPC) (1:1.5:3) of cement concrete with cement, sand and picked jhama brick chips or
stone chips including breaking of chips, screening, centering, shuttering, casting, curing and finishing with a
coat of bitumen including the supply of water, electricity, costs of tools & plants and other charges etc. all
complete and accepted by Engineer-in-charge. (Cement: CEM-II/A-M)
97
03.6.1 75 mm thick damp proof course (1:1.5:3) with cement, 50% Sylhet sand (F.M. 2.2) & 50% local sand (F.M. 1.2) sqm Tk. 1,095.00
and picked jhama brick chips. 98
03.6.2 75 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2) and stone chips. sqm Tk. 1,330.00
99
03.6.3 150 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2), stone chips and water-proofing cum Tk. 14,413.00
admixture/agent approved by Engineer-in-charge. 100
03.7 Supplying and laying of single layer polythene sheet weighing one kilogram per 6.5 square meter in floor or any sqm Tk. 42.00
where below cement concrete complete in all respect and accepted by Engineer-in-charge.
101
03.8 Extra rate for mass concrete work in additional floor: 102
03.8.1 Add for each additional floor up to 5th floor cum Tk. 102.00 103
03.8.2 Add for each additional floor for 6th floor to 9th floor cum Tk. 136.00 104
03.8.3 Add for each additional floor for 10th floor & above cum Tk. 171.00 105
106
107
108
………………….. END OF DIVISION THREE ………………….. 109
DIVISION 04: BRICK WORKS, PATENT STONE IN FLOOR AND FANCY SCREEN BLOCK WORKS 110
Item No. Description of Item Unit Unit Rate
111
04.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:6) in foundation and plinth, filling the cum Tk. 6,040.00
joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours
before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)
112
04.2 Brick works of width one brick or one and a half brick length of first class bricks with cement sand (F.M. 1.2) cum Tk. 6,443.00
mortar (1:6) in superstructure including raking out joints, filling the interstices with mortar, cleaning and soaking
the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days
etc. all complete (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a
half brick length) and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

113
04.3 Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) in exterior walls including filling the cum Tk. 6,769.00
interstices with mortar, raking out joints, cleaning and socking the bricks at least for 24 hours before use and
washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete including cost of water,
electricity and other charges (measurement to given as 250 mm width for one brick length and 375 mm for one
brick and a half brick length) accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

114
04.4 Exposed brick works (for exterior wall without outside plaster) with special quality sorted out first class bricks, cum Tk. 7,894.00
very carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of
joints, true to vertical and horizontal lines including raking out joints, scaffolding, soaking the bricks at least for
24 hours before use, washing and screening of sand, curing at least for 7 days and high class flush pointing
with cement sand (F.M. 1.2) mortar (1:1) including cost of water, electricity and other charges etc all complete
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

115
04.5 Exposed brick works (for exterior wall without outside plaster) with automatic machine made first class bricks, cum Tk. 7,218.00
very carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of
joints, true to vertical and horizontal lines including raking out joints, scaffolding, soaking the bricks at least for
24 hours before use, washing and screening of sand, curing at least for 7 days and high class flush pointing
with cement sand (F.M. 1.2) mortar (1:1) including cost of water, electricity and other charges etc all complete
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

116
04.6 Brick works with 10 holes machine made bricks of approved size (241 mm x 114 mm x 70 mm) having uniform cum Tk. 11,862.00
colour carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of
joints, true to vertical and horizontal lines including raking out joints, filling the interstices with mortar, cleaning
and soaking bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding,
curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of water,
electricity and other charges etc. complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In
ground floor

117
04.7 Brick work with 241 mm x 114 mm x 70 mm size machine made solid klinker facing bricks having uniform colour cum Tk. 9,286.00
carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform width and depth of joints, true
to vertical and horizontal lines including raking out joints, filling the interstices with mortar, cleaning and soaking
bricks at least for 24 hours before use and washing and screening of sand, necessary scaffolding, curing at
least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of water, electricity and
other charges etc. complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

118
Item No. Description of Item Unit Unit Rate

04.8 Brick works with 241 mm x 114 mm x 70 mm size 10 hole machine made rock-face or textured klinker facing cum Tk. 9,167.00
bricks having uniform colour carefully laid in cement sand (F.M. 1.2) mortar (1:4) in superstructure with uniform
width and depth of joints, true to vertical and horizontal lines including raking out joints, filling the interstices with
mortar, cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand,
necessary scaffolding, curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including
cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement:
CEM-II/A-M) In ground floor

119
04.9 Brick works with 241 mm x 114 mm x 70 mm size 3 hole machine made reinforced klinker facing bricks having cum Tk. 13,380.00
uniform colour carefully laid in cement sand (F.M.1.2) mortar (1:4) in superstructure with uniform width and
depth of joints, true to vertical and horizontal lines including raking out joints, filling the interstices with mortar,
cleaning and soaking bricks at least for 24 hours before use and washing and screening of sand, necessary
scaffolding, curing at least for 7 days and pointing with cement sand (F.M. 1.2) mortar (1:2) including cost of
water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-
II/A-M) In ground floor

120
04.10 Extra cost shall be incorporated in the estimate for each additional floor for brick works (item No.- 4.2 to 4.9)
121
04.10.1 Add for each additional floor up to 5th floor cum Tk. 171.00 122
04.10.2 Add for each additional floor from 6th floor to 9th floor cum Tk. 239.00 123
04.10.3 Add for each additional floor for 10th floor and above cum Tk. 273.00 124
04.11 Extra cost for brick-work for each additional meter (or part of meter) free height of brick wall beyond 4 m from cum Tk. 174.00
the respective floor in auditorium, go-down, overhead water tank etc. as description of the item No. 4.2 to 4.9
including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge.
(Extra cost shall be incorporated in the estimate only when both sides of wall is uninterruptedly free beyond 4.0
meter)

125
04.12 Providing brick works for 200 mm x 100 mm facing in superstructure with 200 mm x 100 mm x 50 mm machine sqm Tk. 1,703.00
made klinker hard pressed facing bricks of approved quality with cement sand (F.M. 1.2) mortar (1:4), including
racking out joints, cutting the bricks to required size wherever necessary including high class recessed pointing,
cleaning and soaking the bricks at least for 24 hours before use and washing and screening of sand, necessary
scaffolding, curing at least for 7 days for all floors up to 4th floor including cost of water, electricity and other
charges etc. all complete and accepted by the Engineer-in-charge. (100x200 mm face should be placed for
facing). (Cement: CEM-II/A-M) In ground floor

126
04.13 Providing brick works for 200 mm x 50 mm facing in superstructure with 200 mm x 50 mm x 50 mm machine sqm Tk. 2,401.00
made hard pressed klinker facing red or maroon strips of approved quality with 20 mm thick cement sand
(F.M.1.2) mortar (1:4), 10 mm thick cement mortar in adjacent sides including racking out joints and cutting the
bricks to required sizes wherever necessary with high class recessed pointing, cleaning and soaking the bricks
for at least 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days for all
floors up to 4th floor including cost of water, electricity and other charges etc. all complete and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

127
04.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%) in superstructure with machine made
hard pressed klinker facing strips of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3) in
adjacent side wall, column, drop wall etc. and racking out joints, cutting to required sizes wherever necessary
with high class recessed pointing, cleaning and soaking at least for 24 hours before use washing and screening
of sand and necessary scaffoldings, curing at least 7 days including cost of water, electricity and other charges
etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor.

128
04.14.1 With 200 mm x 62 mm x 16.51 mm red strip sqm Tk. 2,313.00 129
04.14.2 With 200 mm x 62 mm x 12.7 mm beige strip sqm Tk. 2,542.00 130
04.14.3 With 200 mm x 62 mm x 8.9 mm red strip sqm Tk. 2,121.00 131
04.14.4 With 241 mm x 70 mm x 12.7 mm red strip sqm Tk. 2,585.00 132
04.14.5 With 242 mm x 70 mm x 12.7 mm matt glazed textured strip sqm Tk. 3,006.00 133
04.15 125 mm brick work with first class bricks with cement sand (F.M. 1.2) mortar (1:6) and making bond with sqm Tk. 917.00
connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)
In ground floor
134
04.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with sqm Tk. 948.00
connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water,
electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)
In ground floor
135
04.17 Exposed 125 mm thick pointing ornamental brick work with sorted out first class bricks with cement sand (F.M. sqm Tk. 1,155.00
1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints,
cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days
in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-
in-charge. (Cement: CEM-II/A-M) In ground floor

136
04.18 Exposed 125 mm thick pointing ornamental brick work with automatic machine made first class bricks with sqm Tk. 1,082.00
cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding,
raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at
least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted
by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

137
Item No. Description of Item Unit Unit Rate

04.19 Providing 125 mm thick brick work in superstructure (partition walls) with cement sand (F.M. 1.2) mortar (1:4) sqm Tk. 1,634.00
with 10 hole machine made ceramic bricks of approved size having uniform colour, carefully laid in cement
mortar of uniform width & depth of joints, true to vertical and horizontal lines including racking out joints, filling
the interstices with same mortar, making bond with connected walls, cleaning, soaking brick at least 24 hours
and washing of sand, curing 7 days in all floors, including cost of water, electricity and other charges accepted
by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

138
04.20 Fancy screen work with different size hollow machine made design blocks of uniform colour, carefully laid in
cement sand (F.M. 1.2) mortar (1:3) in all floors in wall with uniform mortar joints, true to vertical and horizontal
line including racking out joints, cleaning and soaking the blocks for minimum 24 hours before use including
washing and screening of sand, scaffolding, curing etc. complete in all respect including supply of all necessary
materials, cost of water, electricity and other charges accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M)

139
04.20.1 With design block size: 114 mm x 114 mm x 114 mm or equivalent volume & design. In ground floor sqm Tk. 4,079.00
140
04.20.2 With design block size: 140 mm x 140 mm x 102 mm or equivalent volume & design. In ground floor sqm Tk. 2,873.00
141
04.20.3 With design block size: 152 mm x 152 mm x 102 mm or 152 mm x 152 mm x 114 mm or equivalent volume sqm Tk. 2,639.00
and design. In ground floor 142
04.20.4 With design block size: 203 mm x 203 mm x 108 mm or equivalent volume and design. In ground floor sqm Tk. 1,953.00
143
04.20.5 With design block size: 203 mm x 121 mm x 102 mm or equivalent volume and design. In ground floor sqm Tk. 2,167.00
144
04.20.6 With design block size: 152 mm x 152 mm x 152 mm or equivalent volume and design. In ground floor sqm Tk. 2,639.00
145
04.20.7 With design block size: 241 mm x 114 mm x 70 mm or equivalent volume and design. In ground floor sqm Tk. 2,062.00
146
04.21 Extra cost shall be incorporated in the estimate for each additional floor for brick and screen block works (item
No.- 4.12 to 4.20) 147
04.21.1 Add for each additional floor up to 5th floor sqm Tk. 31.00 148
04.21.2 Add for each additional floor from 6th floor to 9th floor sqm Tk. 42.00 149
04.21.3 Add for each additional floor for 10th floor and above sqm Tk. 52.00 150
04.22 Klinker paving brick works in floor or pavement with machine made pressed bricks of approved quality with
cement sand (F.M. 1.2) mortar (1:4) on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4) including
raking out joints, cutting the bricks to required size, soaking the same for 24 hours before use wherever
necessary including high class flush pointing in cement mortar (1:2), cleaning, curing at least for 7 days etc.
including washing and screening of sand, cost of water, electricity and other charges complete and accepted by
the Engineer-in-charge. (Cement: CEM-II/A-M)

151
04.22.1 100 mm thick flat brick pavement with 200 mm x 100 mm x 50 mm size klinker facing bricks. sqm Tk. 2,740.00 152
04.22.2 50 mm thick brick on edge pavement with 200 mm x 100 mm x 50 mm klinker paving bricks in 1:4 cement sand sqm Tk. 1,620.00
mortar having 200 mm x 100 mm face at top. 153
04.22.3 50 mm thick brick pavement with 200 mm x 50 mm x 50 mm klinker facing bricks. sqm Tk. 2,315.00 154
04.23 125 mm thick brick pavement or flooring with first class brick on edge with cement sand (F.M. 1.2) mortar (1:4) sqm Tk. 1,079.00
on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4) including cutting the bricks as per requirement,
cleaning and racking out joints, finishing with flush pointing with cement sand (F.M. 1.2) mortar (1:2) and curing
for at least 7 days etc. including cost of water, washing and screening of sand (F.M. 1.2), electricity and other
charges complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)

155
04.24 125 mm thick brick pavement/flooring with 10 hole machine made ceramic bricks with cement sand (F.M. 1.2) sqm Tk. 1,728.00
mortar (1:4) on minimum 12 mm thick cement sand (F.M. 1.2) mortar (1:4) including cutting the bricks as per
requirement, cleaning and racking out joints, finishing with flush pointing with cement sand (F.M. 1.2) mortar
(1:2) and curing for at least 7 days etc. including cost of water, washing and screening of sand (F.M. 1.2),
electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)

156
04.25 75 mm thick cement concrete (1:3:6) flooring with cement, best quality coarse sand and 19 mm down graded sqm Tk. 507.00
picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting, washing and
screening of sand (F.M 1.2) and curing at least for 7 days etc. including cost of water, electricity and other
charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)
157
04.26 25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sqm Tk. 372.00
sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well
graded brick chips including breaking chips, screening, laying the concrete in alternate panels, compacting and
finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity
and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor
158
04.27 38 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sqm Tk. 468.00
sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well
graded brick chips including breaking chips, screening, laying the concrete in alternate panels, compacting and
finishing the top with neat cement and curing at least for 7 days in all floors including cost of water, electricity
and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor
159
Item No. Description of Item Unit Unit Rate

04.28 25 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sqm Tk. 450.00
sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well
graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat cement
and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

160
04.29 38 mm thick artificial patent stone (1:2:4) flooring with cement, best quality coarse sand (50% quantity of Sylhet sqm Tk. 583.00
sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down well
graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat cement
and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete
and accepted by the Engineer-in-charge. Cement: (CEM-II/A-M) In ground floor

161
04.30 25 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50% quantity of sqm Tk. 467.00
Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down
well graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat
cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

162
04.31 38 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50% quantity of sqm Tk. 609.00
Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM 1.2) and 12 mm down
well graded stone chips, laying the concrete in alternate panels, compacting and finishing the top with neat
cement and curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge.(Cement: CEM-II/A-M) In ground floor

163
04.32 Extra cost shall be incorporated in the estimate for each additional floor for patent stone works. 164
04.32.1 Add for each additional floor up to 5th floor sqm Tk. 31.00 165
04.32.2 Add for each additional floor from 6th floor to 9th floor sqm Tk. 42.00 166
04.32.3 Add for each additional floor for 10th floor and above sqm Tk. 52.00 167
168
169
170
………………….. END OF DIVISION FOUR ………………….. 171
DIVISION 05 : MOSAIC WORKS 172
Item No. Description of Item Unit Unit Rate 173
05.1 10 mm thick finished and 12.5 mm laying thickness cast in situ mosaic work on floor with one part of 10 mm
machine crushed well graded dust free and properly washed marble chips and one part of mixture containing
white cement / grey cement including preparation of mix. and laying the same over minimum 25 mm thick
artificial patent stone flooring with brick chips (1:2:4) including making suitable panel, compacting, curing at
least for 7 days, cutting with pumice stone (No. 40, No. 80, No.120) /cutting with mosaic cutting machine and
finishing with minar stone and spreading oxalic acid including breaking of brick chips, screening, washing
mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)

174
05.1.1 With Indian chips and glass strip using 100% white cement In ground sqm Tk. 1,770.00
floor 175
05.1.2 With Indian chips and glass strip using 100% grey cement In ground sqm Tk. 1,470.00
floor 176
05.1.3 With Pakistani chips and glass strip using 100% white cement In sqm Tk. 1,802.00
ground floor 177
05.1.4 With Pakistani chips without glass strip using 100% grey cement In sqm Tk. 1,272.00
ground floor 178
05.1.5 With Indian chips without glass strip using 100% grey cement In sqm Tk. 1,315.00
ground floor 179
05.1.6 With Pakistani chips without glass strip using 100% white cement In sqm Tk. 1,566.00
ground floor 180
5.2 12 mm thick finished and laying thickness 14.5 mm cast in situ mosaic work on floor with one part of 10 mm
machine crushed well graded dust free and properly washed marble chips and one part of mixture containing
100% white cement including preparation of mix and laying the same over minimum 25 mm thick artificial patent
stone flooring with brick-chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days,
cutting with pumice stone (No. 40, No. 80, No. 120)/ cutting with mosaic cutting machine and finishing with
minar stone including breaking of brick chips, screening, spreading oxalic acid, washing of mosaic chips and
supply of all necessary materials and water, electricity and other charges in all respect and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

181
05.2.1 With Indian chips and glass strip sqm Tk. 1,855.00
In ground floor 182
05.2.2 With Pakistani chips and glass strip sqm Tk. 1,892.00
In ground floor 183
05.2.3 With Indian chips without glass strip sqm Tk. 1,620.00
In ground floor 184
05.2.4 With Pakistani chips without glass strip sqm Tk. 1,656.00
In ground floor 185
Item No. Description of Item Unit Unit Rate

5.3 10 mm thick finished and laying thickness 12.5 mm silver grey cast in situ mosaic work on floor with one part of
10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture
containing white cement and grey cement in proportion (1:1) including preparation of mix and laying the same
over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable
panel, compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120) and finishing
with minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all
necessary materials including water, electricity and other charges in all respect and accepted by the Engineer-
in-charge. (Cement: CEM-II/A-M)

186
05.3.1 With Indian chips and glass strip In sqm Tk. 1,623.00
ground floor 187
05.3.2 With Pakistani chips and glass strip In sqm Tk. 1,655.00
ground floor 188
05.3.3 With Indian chips without glass strip In ground sqm Tk. 1,387.00
floor 189
05.3.4 With Pakistani chips without glass strip In ground sqm Tk. 1,419.00
floor 190
05.4 12 mm thick finished and laying thickness 14.5 mm silver grey cast in situ mosaic work on floor with one part of
10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture
containing white cement and grey cement in proportion (1:1) including preparation of mix and laying the same
over minimum 25 mm thick artificial patent stone flooring with brick-chips (1:2:4) including making suitable
panels, compacting, curing at least for 7 days, cutting with pumice stone (No. 40. No. 80, No. 120) and finishing
with minar stone including breaking of brick chips, screening, washing of mosaic chips and supply of all
necessary materials and water, electricity and other charges in all respect and accepted by the Engineer-in-
charge. (Cement: CEM-II/A-M)

191
05.4.1 With Indian chips and glass strip In sqm Tk. 1,691.00
ground floor 192
05.4.2 With Pakistani chips and glass strip In sqm Tk. 1,727.00
ground floor 193
05.4.3 With Indian chips without glass strip In ground sqm Tk. 1,455.00
floor 194
05.4.4 With Pakistani chips without glass strip In ground sqm Tk. 1,491.00
floor 195
5.5 10 mm thick finished and laying thickness 12.5 mm cast in situ mosaic work in wall with one part of 10 mm
machine crushed well graded dust free and properly washed marble chips and one part of mixture containing
100% white cement including preparation of mix and laying the same on 12 mm thick cement plaster (1:4) to
wall including compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120),
finishing the corners and edges and also finishing with minar stone and supplying all necessary materials
including water, electricity and other charges in all respect and accepted by the Engineer-in-charge. (Cement:
CEM-II/A-M)

196
05.5.1 With Indian chips In sqm Tk. 1,724.00
ground floor 197
05.5.2 With Pakistani chips In sqm Tk. 1,757.00
ground floor 198
05.6 10 mm thick finished and laying thickness 12.5 mm silver grey cast in situ mosaic work in wall with one part of
10 mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture
containing white cement and grey cement in proportion (1:1) including preparation of mix. and laying the same
on 12 mm thick cement plaster (1:4) to wall including compacting, curing at least for 7 days, cutting with pumice
stone (No. 40, No. 80, No 120) including finishing the corners and edges and also finishing with minar stone and
supplying all necessary materials and water, electricity and other charges in all respect and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

199
05.6.1 With Indian chips In sqm Tk. 1,577.00
ground floor 200
05.6.2 With Pakistani chips In sqm Tk. 1,610.00
ground floor 201
05.6.3 With Indian chips using 100% grey cement In ground sqm Tk. 1,430.00
floor 202
05.7 10 mm thick finished laying in 12.5 mm thickness coloured cast in situ mosaic work in floor with one part of 10
mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture
containing white and grey cement in proportion (1:9) and necessary quantity of approved colouring materials
including preparation of mix and laying the same over min 25 mm thick artificial patent stone flooring with brick-
chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting with pumice stone
(No. 40, No. 80, No. 120) and finishing with Minar stone including breaking of brick chips, screening, washing of
mosaic chips and supply of all necessary materials and water, electricity and other charges in all respect and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) 203
05.7.1 With Indian chips and glass strip sqm Tk. 1,842.00
In ground floor 204
05.7.2 With Pakistani chips and glass strip sqm Tk. 1,875.00
In ground floor 205
05.7.3 With Indian chips without glass strip sqm Tk. 1,387.00
In ground floor 206
05.7.4 With Pakistani chips without glass strip sqm Tk. 1,492.00
In ground floor 207
Item No. Description of Item Unit Unit Rate

05.8 12 mm thick finished and laying thickness 14 mm coloured cast in situ mosaic work on floor with one part of 10
mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture
containing white cement and grey cement in proportion (9:1) and necessary quantity of approved colouring
materials including preparation of mix and laying the same over minimum 25 mm thick artificial patent stone
flooring with brick-chips (1:2:4) including making suitable panel, compacting, curing at least for 7 days, cutting
with pumice stone (No. 40, No. 80, No. 120) and finishing with minar stone including breaking of brick chips,
screening, washing of mosaic chips and supply of all necessary materials and water, electricity and other
charges in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)

208
05.8.1 With Indian chips and glass strip sqm Tk. 1,928.00
In ground floor 209
05.8.2 With Pakistani chips and glass strip sqm Tk. 1,965.00
In ground floor 210
05.8.3 With Indian chips without glass strip sqm Tk. 1,692.00
In ground floor 211
05.8.4 With Pakistani chips without glass strip sqm Tk. 1,729.00
In ground floor 212
05.9 10 mm thick finished and laying thickness 12.5 mm coloured cast in situ mosaic work in walls with one part of 10
mm machine crushed well graded, dust free and properly washed marble chips and one part of mixture
containing white cement and grey cement in proportion (9:1) and necessary quantity of approved colouring
materials including preparation of mix and laying the same on 12 mm thick cement sand (F.M. 1.2) plaster (1:4)
to walks including compacting, curing at least for 7 days, cutting with pumice stone (No. 40, No. 80, No. 120)
including finishing the corners and edges and also finishing with minar stone and supply of all necessary
materials etc. and water, electricity and other charges complete in all respect and accepted by the Engineer-in-
charge. (Cement: CEM-II/A-M)

213
05.9.1 With Indian chips sqm Tk. 1,797.00
In ground floor 214
05.9.2 With Pakistani chips sqm Tk. 1,829.00
In ground floor 215
05.10 200 mm x 200 mm x 20 mm mosaic terrazzo tiles flooring having 10 mm thick finished mosaic top with one part
of 10 mm machine crushed well graded dust free and properly washed marble chips and one part of mixture
containing white cement and grey cement in 9:1 proportion pressed on 12 mm thick cement sand (F.M. 1.2 and
2.5 by 50% each) mortar (1:2) base including preparing the base; finally, setting the tiles on 40 mm thick
cement sand (F.M.1.2 and 2.5 by 50% each) mortar (1:3) including compacting, cutting with pumice stone (No.
40, No. 80, No. 120) and finishing the corners and edges and also finishing with minar stone including
screening, washing mosaic chips and supply of all necessary materials etc. and water, electricity and other
charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)

216
05.10.1 200 mm x 200 mm x 20 mm (finished) mosaic terrazzo tiles flooring with Indian chips sqm Tk. 1,653.00
In ground floor 217
05.10.2 200 mm x 200 mm x 20 mm (finished) mosaic terrazzo tiles flooring with Pakistani chips sqm Tk. 1,684.00
In ground floor 218
05.11 Extra cost shall be incorporated in the estimate for mosaic and terrazzo tiles work above ground floor (item no.-
5.1 to 5.10). 219
05.11.1 Add for each additional floor up to 5 th floor sqm Tk. 10.00 220
05.11.2 Add for each additional floor for 6th to 9th floor sqm Tk. 21.00 221
05.11.3 Add for each additional floor for 10th floor and above sqm Tk. 31.00 222
………………….. END OF DIVISION FIVE ………………….. 223
224
225
226
DIVISION 06: TILES, MARBLE STONE AND GRANITE STONE WORKS 227
Item No. Description of Item Unit Unit Rate
228
06.1 Supplying, fitting and fixing country made GP(Gress Porcellanto) - glazed or unglazed homogeneous floor tiles
complying BDS ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective
of color &/or design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

229
06.1.1 GP (homogeneous) 300 mm x 300 mm floor tiles sqm Tk. 1,526.00 230
06.1.2 GP (homogeneous) 400 mm x 400 mm floor tiles sqm Tk. 1,663.00 231
06.2 Supplying, fitting and fixing country made mirror polished homogeneous floor tiles complying BDS ISO 13006:
2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with
cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and
laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M) In ground floor

232
06.2.1 GP (mirror polished) 400 mm x 400 mm floor tiles sqm Tk. 1,799.00 233
06.2.2 GP (mirror polished) 500 mm x 500 mm floor tiles sqm Tk. 1,935.00 234
06.2.3 GP (mirror polished) 600 mm x 600 mm floor tiles sqm Tk. 2,072.00 235
06.2.4 GP (mirror polished) 800 mm x 800 mm floor tiles sqm Tk. 2,208.00 236
Item No. Description of Item Unit Unit Rate

06.2.5 GP (mirror polished) 600 mm x 900 mm floor tiles sqm Tk. 2,509.00 237
06.2.6 GP (mirror polished) 600 mm x 1200 mm floor tiles sqm Tk. 2,959.00 238
06.3 Supplying, fitting and fixing country made homogeneous matt finished/ rustic floor tiles complying BDS ISO
13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or
design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-
in-charge. (Cement: CEM-II/A-M) In ground floor

239
06.3.1 Matt or rustic floor tiles of size 400 mm x 400 mm and below sqm Tk. 1,894.00 240
06.3.2 Matt or rustic floor tiles of size 600 mm x 600 mm and below sqm Tk. 2,113.00 241
06.4 Supplying, fitting and fixing foreign (China or equivalent) made polished pocelain/ mirror polished homogeneous
floor tiles complying BDS ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 35 N/mm2,
irrespective of color &/or design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with
white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

242
06.4.1 Polish pocelain/ mirror polished 600 mm x 600 mm floor tiles sqm Tk. 2,413.00 243
06.4.2 Polished pocelain/ mirror polished 800 mm x 800 mm floor tiles sqm Tk. 2,754.00 244
06.4.3 Polished pocelain/ mirror polished 600 mm x 1200 mm floor tiles sqm Tk. 4,801.00 245
06.4.4 Polished pocelain/ mirror polished 1000 mm x 1000 mm floor tiles sqm Tk. 6,166.00 246
06.4.5 Polished pocelain/ mirror polished 1200 mm x 1200 mm floor tiles sqm Tk. 7,531.00 247
06.5 Supplying, fitting and fixing foreign (China or equivalent) made homogeneous matt finished/ rustic floor tiles
complying BDS ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective
of color &/or design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement
including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

248
06.5.1 Matt or rustic floor tiles of size 600 mm x 600 mm sqm Tk. 3,027.00 249
06.6 Supplying, fitting and fixing country made glazed wall tiles complying BDS ISO 13006: 2015, irrespective of
color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with
white cement including cutting, laying and hire charge of machine and finishing with care etc. including cost of
water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement:
CEM-II/A-M). In ground floor

250
06.6.1 Wall tiles less than, equal or equivalent to 250 mm x 330 mm in sizes sqm Tk. 1,271.00 251
06.6.2 Wall tiles more than 250 mm x 330 mm & less than or equal to 250 mm x 400 mm in sizes sqm Tk. 1,571.00 252
06.6.3 Wall tiles more than 250 mm x 400 mm & less than or equal to 300 mm x 600 mm in sizes sqm Tk. 1,817.00 253
06.6.4 Decor wall tiles of any size sqm Tk. 2,090.00 254
06.6.5 Border wall tiles of any size sqm Tk. 4,410.00 255
06.7 Supplying, fitting and fixing country made rustic or matt finished wall tiles complying BDS ISO 13006: 2015,
irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the
joints with white cement including cutting, laying and hire charge of machine and finishing with care etc.
including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M). In ground floor

256
06.7.1 Matt or rustic wall tiles less than or equal to 300 mm x 600 mm size sqm Tk. 1,954.00 257
06.8 Supplying, fitting and fixing foreign (China or equivalent) made glazed wall tiles complying BDS ISO 13006:
2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking
out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc.
including water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M). In ground floor

258
06.8.1 Glazed wall tiles 300 mm x 600 mm in sizes along with maching floor tiles, decor and border (if any) sqm Tk. 2,772.00
259
06.9 Supplying, fitting and fixing foreign (China or equivalent) made rustic or matt finished wall tiles complying BDS
ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing
with care etc. including water, electricity and other charges complete in all respect and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

260
06.9.1 Matt or rustic wall tiles 300 mm x 600 mm in sizes along with matching floor tiles, decor and border titles (if any) sqm Tk. 2,772.00
261
06.10 Supplying, fitting and fixing country made GP homogeneous stair tiles having non skidding offsets, complying
BDS ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color
&/or design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including
cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-
in-charge. (Cement: CEM-II/A-M) In ground floor

262
06.10.1 Glazed stair tiles having size of width 250 mm to 300 mm and length 300 mm sqm Tk. 1,553.00 263
06.10.2 Glazed stair tiles having size of width 250 mm to 300 mm and length 325 mm to 600 mm sqm Tk. 2,004.00 264
Item No. Description of Item Unit Unit Rate

06.11 Supplying, fitting and fixing country made rustic or matt finished stair tiles complying BDS ISO 13006: 2015,
water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with 20 mm
thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting,
laying and hire charge of machine and finishing with care etc. including water, electricity and other charges
complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

265
06.11.1 Rustic stair tiles of size 300 mm x 600 mm sqm Tk. 1,935.00 266
06.12 Supplying, fitting and fixing foreign (China or equivalent) made GP homogeneous stair tiles having non skidding
offsets, complying BDS ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2,
irrespective of color &/or design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with
white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

267
06.12.1 Glazed stair tiles of size 300 mm x 600 mm sqm Tk. 2,072.00 268
06.13 Supplying, fitting and fixing foreign (China or equivalent) made rustic or matt finished stair tiles complying BDS
ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or
design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement
including cutting, laying and hire charge of machine and finishing with care etc. including water, electricity and
other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In
ground floor

269
06.13.1 Rustic stair tiles of size 300 mm x 600 mm sqm Tk. 2,004.00 270
06.14 Supplying, fitting and fixing country made floor tiles complying BDS ISO 13006: 2015, water absorbtion ≤ 0.5%,
modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with adhesives in full thickness of
tiles, filler/tiles grout including cutting, shaping, placing in proper level etc. all complete and accepted by the
Engineer in charge. In ground floor
271
06.14.1 GP glazed / unglazed homogenous floor tiles (400 mm x 400 mm) sqm Tk. 1,864.00 272
06.14.2 GP glazed / unglazed homogenous floor tiles (300 mm x 300 mm) sqm Tk. 1,273.00 273
06.14.3 GP Mirror Polished floor tiles (300 mm x 300 mm) sqm Tk. 1,341.00 274
06.14.4 GP Mirror Polished floor tiles (400 mm x 400 mm) sqm Tk. 1,546.00 275
06.14.5 GP Mirror Polished floor tiles (600 mm x 600 mm) sqm Tk. 1,819.00 276
06.14.6 GP Mirror Polished floor tiles (800 mm x 800 mm) sqm Tk. 1,956.00 277
06.14.7 GP Mirror Polished floor tiles (600 mm x 900 mm) sqm Tk. 2,256.00 278
06.15 Supplying, fitting and fixing foreign made (China or equivalent) floor tiles complying BDS ISO 13006: 2015,
water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with
adhesives in full thickness of tiles, filler/tiles grout including cutting, shaping, placing in proper level etc. all
complete as direction of the Engineer in charge. In ground floor
279
06.15.1 GP Mirror Polished floor tiles (600 mm x 600 mm) sqm Tk. 2,160.00 280
06.15.2 GP Mirror Polished floor tiles (800 mm x 800 mm) sqm Tk. 2,501.00 281
06.15.3 GP Mirror Polished floor tiles (600 mm x 1200 mm) sqm Tk. 4,548.00 282
06.16 Supplying, fitting and fixing 20mm to 25mm thick mchine made cement pavement tiles having minimum
compressive strength of 27 MPa, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2)
mortar (1:4) base and making the joints carefully in true staight line including cutting, laying and hire charge of
machine and finishing with care etc. including water, electricity and other charges complete in all respect and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

283
06.16.1 Pavement tiles of size 300 mm x 300 mm sqm Tk. 2,481.00 284
06.17 Supplying, fitting and fixing mchine made clay roof tiles with ridge tiles on RCC inclined slab, irrespective of
color &/or design, water absorbtion capacity <6% with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base
and making the joints carefully in true staight line including cutting, laying and hire charge of machine and
finishing with care etc. including water, electricity and other charges complete in all respect and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

285
06.17.1 Roof tiles of size 100 mm x 200 mm or equivalent (red colour) sqm Tk. 2,683.00 286
06.17.2 Roof tiles of size 125 mm x 170 mm to 200 mm x 200 mm or equivalent (red colour) sqm Tk. 3,171.00 287
06.17.3 Roof tiles of size 160 mm x 268 mm or equivalent (red colour) sqm Tk. 2,901.00 288
06.17.4 Roof tiles of size 225 mm x 300 mm or larger (red colour) sqm Tk. 2,983.00 289
06.17.5 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (red colour) sqm Tk. 3,832.00 290
06.17.6 Roof tiles of size 100 mm x 200 mm or equivalent (beige colour) sqm Tk. 2,751.00 291
06.17.7 Roof tiles of size 125 mm x170 mm to 200 mm x 200 mm or equivalent (beige colour) sqm Tk. 3,297.00 292
06.17.8 Roof tiles of size 225 mm x 300 mm or larger (beige colour) sqm Tk. 3,229.00 293
06.17.9 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (beige colour) sqm Tk. 3,993.00 294
06.17.10 Roof tiles of size 125 mm x 170 mm to 200 mm x 200 mm or equivalent (grey or black colour) sqm Tk. 3,297.00
295
06.17.11 Flower shaped roof tiles of size 175 mm x 175 mm or equivalent (grey or black colour) sqm Tk. 4,348.00 296
Item No. Description of Item Unit Unit Rate

06.18 Marble stone flooring with Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) marble
stone of approved quality, texture and size with 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including
placing cement slurry below the stone, cutting the marble stone to desired size, grinding and finishing the
edges, setting in position in proper level, filling the gaps with white cement and colouring pigments including
supplying all necessary equipments/materials and finishing the top by pumice stone and necessary auxiliary
materials and water, electricity and other charges complete in all respect and accepted by the Engineer in
charge.(Cement: CEM-II/A-M).

297
06.18.1 18 mm thick marble stone flooring In ground floor sqm Tk. 7,325.00
298
06.18.2 16 mm thick marble stone flooring In ground floor sqm Tk. 6,675.00
299
06.19 Marble stone flooring with Indian superior quality marble stone of approved quality, texture and size with 25 mm
thick cement sand (F.M. 1.2) mortar (1:2) including placing cement slurry below the stone, cutting the marble
stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the gaps with
white cement and colouring pigments including supplying all necessary equipments/materials and finishing the
top by pumice stone and necessary auxiliary materials and water, electricity and other charges complete in all
respect and accepted by the Engineer in charge. (Cement: CEM-II/A-M)

300
06.19.1 18 mm thick marble stone flooring In ground floor sqm Tk. 7,975.00
301
06.19.2 16 mm thick marble stone flooring In ground floor sqm Tk. 6,935.00
302
06.20.1 Supplying and setting 12 mm thick Indian standard quality (Bansowara/ Indian grey/ Indian pink or equivalent) sqm Tk. 6,286.00
marble stone of approved quality, texture and size on wall with 12 mm thick cement sand (F.M. 1.2) mortar (1:2)
including cutting and grinding the marble stone slab/tile, setting in position keeping horizontal and vertical
alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing etc including
water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement:
CEM-II/A-M) In ground floor

303
06.20.2 Supplying and setting 12 mm thick Indian superior quality marble stone of approved quality, texture and size on sqm Tk. 6,676.00
wall with 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding the marble stone
slab/tile, setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement,
cutting and grinding the top surface, finishing etc including water, electricity and other charges complete in all
respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

304
06.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone of approved quality, texture and size sqm Tk. 9,924.00
over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including. placing cement slurry below the stone, cutting
the marble stone to desired size, grinding and finishing the edges, setting in position in proper level, filling the
gaps with white cement and colouring pigments including supplying all necessary equipments/materials and
finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges
complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor.

305
06.21.2 Supplying and setting 12 mm thick Italian or equivalent quality marble stone on wall of approved quality, texture Sqm Tk. 9,276.00
and size on wall with 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding the marble
stone slab/tile, setting in position keeping horizontal and vertical alignment correct, filling the joints with white
cement, cutting and grinding the top surface, finishing etc including water, electricity and other charges
complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

306
06.22 Labour cost for making moulding in marble stone as per architectural drawing including cutting, grinding,
finishing, supplying necessary equipment etc. complete in all respect and accepted by the Engineer in Charge.
(Cement: CEM-II/A-M). 307
06.22.1 18 mm thick marble stone meter Tk. 387.00 308
06.22.2 16 mm thick marble stone meter Tk. 382.00 309
06.22.3 12 mm thick marble stone meter Tk. 331.00 310
06.23 Granite stone flooring with 18mm thick Indian or equivalent granite stone of approved quality, texture and size sqm Tk. 8,624.00
over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including. placing cement slurry below the stone, cutting
the granite stone to desired size, grinding and finishing the edges, setting in position in proper level. filling the
gaps with white cement and colouring pigments including supplying all necessary equipments/materials and
finishing the top by pumice stone and necessary auxiliary materials and water, electricity and other charges
complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

311
06.24 Granite stone flooring with 18mm thick Italian or equivalent origin granite stone of approved quality, texture and sqm Tk. 9,924.00
size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including. placing cement slurry below the stone,
cutting the granite stone to desired size, grinding and finishing the edges, setting in position in proper level,
filling the gaps with white cement and colouring pigments including supplying all necessary
equipments/materials and finishing the top by pumice stone and necessary auxiliary materials and water,
electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-
II/A-M) In ground floor

312
06.25 Supplying and setting 12 mm thick Indian or equivalent granite stone of approved quality, texture and size on sqm Tk. 6,676.00
wall with 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding the granite stone slab,
setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting
and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

313
Item No. Description of Item Unit Unit Rate

06.26 Supplying and setting 12 mm thick Italian or equivalent granite stone of approved quality, texture and size on sqm Tk. 7,976.00
wall with 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including cutting and grinding the granite stone slab,
setting in position keeping horizontal and vertical alignment correct, filling the joints with white cement, cutting
and grinding the top surface, finishing etc including water, electricity and other charges complete in all respect
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

314
06.27 Extra rate for each additional floor for tiles works 315
06.27.1 Add for each additional floor up to 5th floor sqm Tk. 10.00 316
06.27.2 Add for each additional floor for 6th floor to 9th floor sqm Tk. 21.00 317
06.27.3 Add for each additional floor for 10th floor and above sqm Tk. 31.00 318
06.28 Extra rate for each additional floor for marble and granite stone works 319
06.28.1 Add for each additional floor up to 5th floor sqm Tk. 15.00 320
06.28.2 Add for each additional floor for 6th floor to 9th floor sqm Tk. 27.00 321
06.28.3 Add for each additional floor for 10th floor and above sqm Tk. 35.00 322
323
324
325
………………….. END OF DIVISION SIX ………………….. 326
DIVISION 07: REINFORCED CEMENT CONCRETE (RCC) WORKS
327
Item No. Description of Item Unit Unit Rate 328
RCC WORKS: 1:2:4 (measured on gross concrete section)
(f'c = 19 MPa, minimum f'cr = 24 MPa in nominal mix 1:2:4), with brick-chips
(Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) 329
07.1 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having minimum f'cr
= 24 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) /
ASTM-C 150 Type – I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet
sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming
to ASTM C-33 including breaking chips and screening, making and placing shutter in position maintaining true
to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer
machine with hopper fed by standard measuring boxes or in batching plant, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved;
including cost of water, electricity, testing charges of materials and cylinders as required, other charges etc. all
complete, approved and accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and
its fabrication, placing, binding etc. and the cost of shuttering & centering)

330
07.1.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum Tk. 7,517.00
331
07.1.2 Pedestal, column, column capital, lift wall and wall up to ground floor cum Tk. 7,730.00 332
07.1.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and step etc. up to cum Tk. 7,602.00
ground floor 333
07.1.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum Tk. 7,944.00
334
RCC WORKS: 1:2:4 (measured on gross concrete section)
(f 'c = 22 MPa, minimum f 'cr = 27 MPa in nominal mix 1:2:4), with stone chips
(100% sand of F.M. 2.2 ) 335
07.2 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having minimum f'cr
= 27 MPa, satisfying a specified compressive strength f'c = 22 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well
graded stone chips conforming to ASTM C-33, making and placing shutter in position maintaining true to plumb,
making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with
hopper fed by standard measuring boxes or in batching plant, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of
water, electricity, testing charges of materials and cylinders as required, other charges etc. all complete,
approved and accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

336
07.2.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum Tk. 11,817.00
337
07.2.2 Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum Tk. 12,031.00 338
07.2.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to cum Tk. 11,903.00
ground floor 339
07.2.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum Tk. 12,243.00
340
RCC WORKS: 1:1.5:3( measured on gross concrete section)
(f'c = 25MPa, minimum f'cr = 30 MPa in nominal mix 1 : 1.5 : 3), with stone chips
(100% sand of F.M. 2.2) 341
Item No. Description of Item Unit Unit Rate

07.3 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.5:3 having minimum
f'cr = 30 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) /
ASTM-C 150 Type – I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well
graded stone chips conforming to ASTM C-33, making and placing shutter in position and maintaining true to
plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer
machine with hopper, fed by standard measuring boxes or in batching plant, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved;
including cost of water, electricity, testing charges of materials and cylinders as required, other charges etc. all
complete, approved and accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and
its fabrication, placing, binding etc. and the cost of shuttering & centering)

342
07.3.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum Tk. 12,154.00
343
07.3.2 Pedestals, column, column capital, lift wall and RCC wall up to ground floor cum Tk. 12,367.00 344
07.3.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. upto cum Tk. 12,240.00
ground floor 345
07.3.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum Tk. 12,580.00
346
RCC WORKS : 1:1.25:2.5 ( measured on gross concrete section)
(f'c = 32 MPa, minimum f'cr = 40 MPa in nominal mix 1 : 1.25 : 2.5)With Stone Chips and Admixture (high
strength concrete)
(100% sand of F.M. 2.2)
347
07.4 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.25:2.5 having
minimum f'cr = 40 MPa, satisfying a specified compressive strength f’c = 32 MPa at 28 days on standard
cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I,
52.5N (52.5 MPa)/ ASTM-C 150 Type – I, and adding approved high range water reducing admixture of
complying specific type (generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or
coarse sand of equivalent F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33,
including screening sand through proper sieves, making and placing shutter in position and maintaining true to
plumb, making shutter water-tight properly, placing reinforcement in position; mixing with standard mixer
machine with hopper and fed by standard measuring boxes or in batching plant, casting in forms, compacting by
vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved;
including cost of water, electricity, testing charges of materials and cylinders as required, other charges etc. all
complete, approved and accepted by the Engineer-in-charge. (Doses of admixture to be fixed in consultation
with design office) (Rate is excluding the cost of reinforcement and its fabrication, placing, binding etc,
admixture and the cost of shuttering & centering)
348
07.4.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum Tk. 12,451.00
349
07.4.2 Padestal, column, column capital, lift wall and RCC wall up to ground floor cum Tk. 12,664.00 350
07.4.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps etc. up to cum Tk. 12,536.00
ground floor 351
07.4.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor cum Tk. 12,877.00
352
RCC WORKS: 1:1:2 (measured on gross concrete section)
(f'c = 40 MPa, minimum f'cr = 49 MPa in nominal mix 1 : 1 : 2) With stone chips and admixture (high strength
concrete)
(100% sand of F.M. 2.2)
353
07.5 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1:2 having minimum f'cr
= 49 Mpa, satisfying a specified compressive strength f’c = 40 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) /
ASTM-C 150 Type – I, and adding approved high range water reducing admixture of complying specific type
(generally be Type-G) under ASTM-C 494, best quality coarse sand [Sylhet sand or coarse sand of equivalent
F.M. 2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33, making and placing shutter
in position and maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position;
mixing with standard mixer machine with hopper and fed by standard measuring boxes or in batching plant,
casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering
after specified time approved; including cost of water, electricity, testing charges of materials and cylinders
required by engineer, other charges etc. all complete approved and accepted by the Engineer-in-charge.
(Doses of admixture to be fixed in consultation with design office) (Rate is excluding the cost of reinforcement
and its fabrication, placing, binding etc, admixture and the cost of shuttering & centering)

354
07.5.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level cum Tk. 12,920.00
355
07.5.2 Pedestal, column, column capital, lift wall and RCC wall upto ground floor cum Tk. 13,134.00 356
Fair-faced RCC WORKS: 1:1.5:3 (measured on gross concrete section)
(f'c = 25 MPa, minimum f'cr = 30 MPa in nominal mix 1:1.5:3)
(100% sand of F.M. 2.2) 357
Item No. Description of Item Unit Unit Rate

07.6 Cast-in-place fair-faced concrete works with f'cr=30 Mpa and f'c=25 Mpa at 28 days on standard cylinders by
using 75% of OPC and 25% of white cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C
150 Type – I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2, 20 mm down and well graded
stone chips conforming to ASTM C-33 at mix ratio of 1:1.5:3, adding coloring pigment as per architectural
design, conforming to the standard practice of code ACI/BNBC/ASTM including screening sand and chips
through proper sieves, washing, making and placing shutter in position maintaining true to plumb, making
shutter water tight properly, placing reinforcement in position, including pouring of concrete in form, compacting
by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time
approved; including cost of water, electricity, testing charges of materials and cylinders as required, other
charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding the cost of
reinforcement and its fabrication, placing, binding etc, and the cost of shuttering & centering)

358
07.6.1 For column, wall, beam, slab, drop wall, cornice etc. up to ground floor cum Tk. 15,185.00 359
07.7 Extra rate for RCC works/fair-faced concrete works (materials, consumables and laying/placing concrete) in cum Tk. 251.00
column, column capital, lift wall & wall, T- beam, L-beam, rectangular beams, floor / roof slab, cantilever slab,
waffle slab and drop panels where the free height of the structure exceeds 4 meter (rate is considered for each
additional meter height)
360
07.8 Extra rate for RCC work/fair-faced work in additional floor: concrete 361
07.8.1 Add for each additional floor up to 5th floor cum Tk. 108.00 362
07.8.2 Add for each additional floor for 6th floor to 9th floor cum Tk. 145.00 363
07.8.3 Add for each additional floor for 10th floor & above cum Tk. 181.00 364
FORM WORK (Steel) 365
07.9 Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out
of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of
minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for:
366
07.9.1 Individual and combined footing sqm Tk. 438.00 367
07.9.2 In raft/mat/floor slab up to plinth level sqm Tk. 434.00 368
07.9.3 Foundation beam sqm Tk. 380.00 369
07.9.4 Pedestal, column, column capital, lift wall and wall up to ground floor sqm Tk. 408.00 370
07.9.5 Tie beam and lintel: ground floor sqm Tk. 419.00 371
07.9.6 T-beam, L-beam and rectangular beam etc up to ground floor sqm Tk. 455.00 372
07.9.7 Floor and roof slab up to ground floor sqm Tk. 532.00 373
07.9.8 Cornice, railing, drop walls, louver, fins etc.: ground floor sqm Tk. 387.00 374
07.9.9 Sunshade, false ceiling: ground floor sqm Tk. 438.00 375
07.9.10 Stair case slab and steps up to ground floor sqm Tk. 437.00 376
07.9.11 Waffle or ribbed floor upto ground floor sqm Tk. 578.00 377
07.9.12.1 Arches, domes, vaults up to 8m span (for single use) sqm Tk. 1,830.00 378
07.9.12.2 Arches, domes, vaults up to 8 m span (for 2-times use) sqm Tk. 1,281.00 379
07.9.12.3 Arches, domes, vaults up to 8 m span (for 3-times use) sqm Tk. 915.00 380
07.9.12.4 Arches, domes, vaults up to 8 m span (for more than 3-times use) sqm Tk. 641.00 381
07.10 Extra rate for arches, domes, vaults exceeding 8 m span sqm Tk. 458.00 382
07.11 Extra rate for shuttering in circular work sqm Tk. 91.00 383
07.12 Extra rate for additional height in centering, shuttering where ever required with adequate bracing, propping etc. sqm Tk. 45.00
over a height of 4.0 m, for every additional height of 1 metre or part thereof.
384
07.13 Extra rate for formwork/shuttering in additional floor 385
07.13.1 Add for each addl. floor up to 5th floor sqm Tk. 41.00 386
07.13.2 Add for each addl. floor for 6th floor to 9th floor sqm Tk. 61.00 387
07.13.3 Add for each addl. floor for 10th floor & above sqm Tk. 82.00 388
07.14 Extra rate of formwork for making ‘fair-faced’ surface of the concrete as per design, drawing and direction of sqm Tk. 382.00
Engineer-in-charge. (The formwork must be rigid enough both in and out of plane, to make the concrete surface
true to the designed shape and size by using necessary MS sheets of minimum 10 BWG, angles of minimum
size 50 mm x 50 mm x 6 mm, flat bars, formwork releasing agent etc.)
389
FORMWORK (Wooden) for boundary wall, gate, centry post etc. 390
07.15 Centering and shuttering, including strutting, propping etc. and removal of form for: 391
07.15.1 Individual and combined footings sqm Tk. 399.00 392
07.15.2 Foundation beam sqm Tk. 381.00 393
07.15.3 Padestals, column, wall sqm Tk. 429.00 394
07.15.4 Tie beam & lintels sqm Tk. 417.00 395
07.15.5 T-beam, L-beam and rectangular beam sqm Tk. 414.00 396
07.15.6 Floor & roof slab sqm Tk. 456.00 397
07.15.7 Cornice, railing, drop wall, louver, fins etc. sqm Tk. 370.00 398
07.15.8 Sunshade, false ceiling sqm Tk. 399.00 399
07.15.9 Stair case slab and steps upto ground floor sqm Tk. 387.00 400
Item No. Description of Item Unit Unit Rate

07.16 Supply and use of specified type chemical admixture delivered from an authorized local agent or manufacturer,
complying with the ASTM C-494 requirements; conforming the current compliance of the admixture to
specification requirements like physical properties, uniformity and equivalence in composition etc.; performance
(water content, fresh concrete setting time and compressive strength) requirements, delivered in sealed water-
tight containers confirming plainly marked product name & type under this specification, net weight and /or
volume, manufacturing and expiry date, non aggressiveness to environment, aggregates and metals in concrete
etc. and mixing the admixture in non pre-stressed cement concrete mixture in the field in accordance with
manufacturers recommendation and instruction; providing safety provisions in all respects etc. all complete as
per instruction and approved by the Engineer-in-charge. Dose (quantity in mililitres per 50 kg bag cement) and
brand/origin/ manufacturer with respect to particular brand of cement and particular stock of aggregates and
method of use to be determined by mix design / trial mix at the cost of contractor and approved by the Engineer.
(Use of admixture is subjected to prior approval of design office)

401
07.16.1 Supply and use of water reducing chemical admixture in concrete, complying ASTM C-494 Type – A of liter Tk. 193.00
approved brand / origin / manufacturer and supplied by only manufacturer's authorised dealer with certificate of
origin. The admixture is to reduce quantity of mixing water required for normal workability and to maintain low
water-cement (W/C) ratio, for improved concrete quality ensuarance.
402
07.16.2 Supply and use of retarding chemical admixture in concrete, complying ASTM C-494 Type - B of approved liter Tk. 169.00
brand/origin/manufacturer and supplied by only manufacturer’s authorised dealer with certificate of origin. The
admixture for retarding setting time of concrete, there by reducing shrinkage in concrete specially for concrete
laid in thick layers and intended delayed construction for improved construction joints, re-concreting etc.

403
07.16.3 Supply and use of accelerating chemical admixture in concrete, complying ASTM C-494 Type - C of approved liter Tk. 151.00
brand/origin/manufacturer and supplied by only manufacturer's authorised dealer with certificate of origin. An
admixture that is to accelerate the setting time and early strength gain of concrete.
404
07.16.4 Supply and use of water-reducing and retarding chemical admixture in concrete, complying ASTM C-494 Type - liter Tk. 278.00
D of approved brand/origin/manufacturer and supplied by only manufacturer's authorised dealer with certificate
of origin. The admixture to reduce the quantity of mixing water required to produce concrete of given
consistency, i.e. low water-cement (W/C) ratio and intend to retard setting time of concrete, specially for layered,
thick laid concrete etc.
405
07.16.5 Supply and use of water-reducing and accelerating chemical admixture in concrete, complying ASTM C-494 liter Tk. 217.00
Type - E of approved brand/origin/manufacturer and supplied by only manufacturer's authorised dealer with
certificate of origin. The admixture to reduce the quantity of mixing water required to produce concrete of given
consistency, i.e. low water-cement (W/C) ratio and intend to accelerate setting time of concrete, and early
strength gain in concrete etc.
406
07.16.6 Supply and use of water-reducing high range chemical admixture in concrete, complying ASTM C-494 Type - F liter Tk. 290.00
of approved brand/origin/manufacturer and supplied by only manufacturer's authorised dealer with certificate of
origin. The admixture required to produce concrete of consistency by 12% or greater (flowing concrete) and for
higher strength of concrete.
407
07.16.7 Supply and use of water-reducing high range and retarding chemical admixture in concrete, complying ASTM liter Tk. 205.00
C-494 Type - G of approved brand/origin/manufacturer and supplied by only manufacturer's authorised dealer
with certificate of origin. The admixture required to produce concrete of consistency by 12% or greater (flowing
concrete) and for higher strength of concrete and intend to retard setting time of concrete.
408
07.17 Supply and use of best quality pliable, cold applied pre-formed self adhesive rubberized/ bituminous water
proofing membrane of approved brand / origin / manufacturer from an authorized local agent or manufacturer
having minimum thickness 1.5 mm, lined with 2 ply cross laminated high density polyethylene film performances
and properties all conforming to ASTM standards and laying, placing, fixing on made up firm and dry surfaces
free from hollows, sharp protrusions, contaminates etc. laid over-lap by at least 75 mm along the edges and 125
mm at ends ensuring good initial bond with the surfaces all complete under the strict accordance with the
manufacturer recommendations and instructions providing all safety provisions in all respects and accepted by
the Engineer. (supplied by only manufacturer's authorised dealer with certificate of origin) under following
specification:

409
Backing(HDPE) thickness minimum 0.10mm
Membrane thickness minimum 1.40mm
Total thickness minimum 1.50mm
Cold flexibility greater than (-)200C: ASTM D146
Pliability: "No crack" tested in ASTM D146
Tensile strength (film only) min 3.50 MPa(35000kN/m2) testing in ASTM D882
Tensile strength (composite) at least 2.40 MPa or N/mm2
Elongation (composite) min 300%
Cycling over crack at (-) 320C No effect 100 cycles ASTM C836-89a
Puncture resistance greater than 240N ASTM E 154-88
Resistance to hydrostatic head at least 50m ASTM D5385
Tear resistance min 4.0 MPa (N/mm2)
Adhesion to primed concrete min 4.0 N/mm : ASTM D1000
Water vapor transmission Less than 0.10g/m2 per hour : ASTM E96
Water absorption in 24 hour Less than 0.33% ASTM D570
Heat stability (+) 900C
Environmental complience to conform: ASTM D543

410
07.17.1 Water-proofing membrane on external surface of primed vertical or inclined wall /on plastered and primed back- sqm Tk. 999.00
wall and concrete cast against membrane. (Excluding cost of back fill/brick wall on back/plaster when
membrane laid on back-wall and concrete cast against membrane which to be paid as per corresponding items
in this schedule)
411
Item No. Description of Item Unit Unit Rate

07.17.2 Water-proofing membrane on made up surface below the floor or below the horizontal surfaces with temporary sqm Tk. 871.00
protective cover using polysterene/38 mm thick sand-cement mortar in 4:1 /or by equally effective alternative.
(Rate is excluding the cost of protective cover which to be paid as per corresponding items in this schedule)
412
07.17.3 Water-proofing membrane on the floor or on the horizontal surfaces with permanent protective cover & wearing sqm Tk. 908.00
coarse. (Rate is excluding the cost of protective cover and wearing coarse which to be paid as per
corresponding items in this schedule) 413
07.18 Supply of polymer based curing compound as per ASTM C 309 or BS 7542-1992 standard and apply by stirring sqm Tk. 156.00
& spraying with motorized sprayers over the surface of fresh concrete free from surface water and avoiding
bleeding of concrete maintaining the spray nozzle approximately 450 mm away from the concrete surface with
passed back and forth to ensure complete coverage confirming the pump pressure for fine spray and keeping
the concrete surface undisturbed until it has sufficient strength to bear surface loads [The suitability of motorized
sprayer should be ensured by an application trial] ensuring adequate ventilation to avoid inhalation of vapors
and contact with skin and eyes all complete and accepted by Engineer-in-charge.

414
7.19 Supply of epoxy bonding agent following ASTM C881 / C881M - 14 or any international acceptable standard sqm Tk. 978.00
and apply over the old concrete surface after making free of standing water, removal of dust, laitance, grease,
curing compounds, impregnations, waxes and any other contaminants to achieve optimum bonding in between
fresh and old concrete and accepted by the Engineer-in-charge.
415
07.20 Supply of best quality salt guard coating on concrete surface following ASTM B117 delivered from authorized sqm Tk. 36.00
local agent of the manufacturer in a sealed container and apply by a firm experienced in applying salt guard
coating or workers trained and approved by manufacturer to wall and ceiling in 2 coats elapsing specified time
for drying/ recoating including cleaning and sand papering making the surface free from loose and
efflorescence, flaky materials, dirt, grease, wax, polish, scraping all chalked and scaled materials, applying the
paint by brush/spray following manufacturer's written instructions and necessary scaffolding etc. all complete
and accepted by the Engineer-in-charge

416
417
418
419
………………….. END OF DIVISION SEVEN …………………. 420

DIVISION 08: M.S. FABRICATION AND CONSTRUCTION JOINT IN RCC WORKS 421
Item No. Description of Item Unit Unit Rate
422
08.1 Supplying, fabrication and fixing to detail as per design : ribbed or deformed bar reinforcement for Reinforced
cement concrete, produced and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning rust, if any, bending and binding in
position with supply of G.I. wires (excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard mass per unit length of bars, while dia of
bars exceeds its standard)

423
08.1.1 Grade 300 (RB 300 /RB 300W: complying BDS ISO 6935-2:2006) ribbed or deformed bar produced and kg Tk. 79.00
marked according to Bangladesh sandard, with minimum yield strength, fy (ReH)= 300 MPa but fy not
exceeding 330 MPa and whatever is the yield strength within allowable limit as per BNBC/ ACI 318, the ratio of
ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8% respectively : up to ground floor

424
08.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or deformed bar produced and kg Tk. 82.00
marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable limit as per BNBC/ ACI 318, the ratio of
ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture and
minimum total elongation at maximum force is 16% and 8% respectively : up to ground floor.

425
08.2 Extra rate for M.S. Fabrication work in additional floor shall be incorporated in the estimate 426
08.2.1 Add for each additional floor up to 5th floor kg Tk. 0.48 427
08.2.2 Add for each additional floor for 6th floor to 9th floor kg Tk. 0.97 428
08.2.3 Add for each additional floor for 10th floor and above kg Tk. 1.45 429
08.3 Mild steel, Grade 250 with minimum fy = 250 MPa, work in roof truss: supplying and fabrication of mild steel kg Tk. 138.00
sections as per design, hoisting, fitting and fixing in position with bolt and nuts or rivets or welds and providing
two coats of anti-corrosive paint over a prime coat of red oxide paint etc. complete and accepted by the
Engineer-in-charge.(Measurement to be given for truss member only).

430
08.4 Supplying fan hook 300-grade (RB 300) of 16 mm diameter M.S. rod (one meter straight length) having rounded each Tk. 113.00
hook at the middle of bar in proper size so as to be concealed within fan cup including fabrication, fitting and
fixing in all floor accepted by the Engineer-in-charge. 431
08.5 Installtation of water stopper at movable and immovable RCC green joints as per following specification.
432
08.5.1 Supplying, fitting and fixing ribbed PVC water stopper with non centre bulb of width approx. 250 mm and approx meter Tk. 1,017.00
9 mm thick for immovable (non working) RCC joints, having minimum tensile strength of 8.27MPa (approx. 1200
psi) min ultimate elongation 350%, approximate hardness 50, minimum tear resistance 0.0175 kN/mm (100
lbs/inch) at RCC construction green joints in basements, approved and in consultation with design office,
providing 38 mm x 62 mm wooden batten at the top and bottom of water stopper, holding in position and
keeping the water stopper in true horizontal or vertical by appropriate means as where necessary etc; all
complete and accepted by the Engineer-in-charge.

433
Item No. Description of Item Unit Unit Rate

08.5.2 Supplying, fitting and fixing ribbed PVC water stopper with centre bulb of width approx. 250 mm and approx 9 meter Tk. 1,017.00
mm thick for immovable (non working) RCC joints, having minimum tensile of strength 8.27 MPa (approx. 1200
psi) minimum ultimate elongation 350%, approximate hardness 50, minimum tear resistance 0.0175 kN/mm
(100 lbs/inch) at RCC construction green joints in basements, approved and in consultation with design office,
providing 38 mm x 62 mm wooden batten at the top and bottom of water stopper, holding in position and
keeping the water stopper in true horizontal or vertical by appropriate means as where necessary etc; all
complete and accepted by the Engineer-in-charge.

434
08.6 Supplying, fitting and fixing 250 mm wide 16 SWG Aluminium Sheet water stopper in RCC construction joint meter Tk. 331.00
holding in position and keeping the water stopper in true horizontal or vertical by appropriate means as where
necessary etc; all complete and accepted by the Engineer-in-charge.
435
08.7 Providing bearing joints fixed or free with 250 mm x 375 mm x 10 mm M.S. (Grade - A36) shoe plate fitted in the each Tk. 2,298.00
truss angles with 16 mm diameter M.S. rod counter sunk rivets, welded and anchored to 250 x 375 x 10 mm.
M.S shoe plate by two Nos. 19 mm dia M.S. “U” rod embedded in the bed of the lintel around the reinforcement,
cleaning and greasing the joints for all floors etc. all complete and accepted by the Engineer-in-charge
436
437
438
439
………………….. END OF DIVISION EIGHT ………………….. 440
DIVISION 09: PILE WORKS AND PILE TEST
441
Item No. Description of Item Unit Unit Rate
442
09.1 Boring/drilling by wash or percussion method for cast in situ pile up to the required depth and diameter with
minimum 6 m long temporary steel casing, true to vertical, providing bentonite slurry and maintaining water level
in the hole, washing the hole for at least 30 minutes, cleaning the bore hole and making the bore hole ready for
placing steel cage and concreting including hire charge of rig set with winch machine, tripod stand, tremie pipe,
cost of fuel, lubricant, mobilization, demobilization, maintenance, spares, stand-byes, insurance coverage,
water, electricity and other charges all compete, approved and accepted by the Engineer-in-charge. Before
commencing boring operation, contractor shall submit the method statement of cast-in-situ pile work including
sequence of boring and casting, disposal of spoils, test result of materials to the Engineer-in-charge for
approval. However, Engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under contract.

443
09.1.1 400 mm dia meter Tk. 502.00 444
09.1.2 450 mm dia meter Tk. 661.00 445
09.1.3 500 mm dia meter Tk. 794.00 446
09.1.4 550 mm dia meter Tk. 980.00 447
09.1.5 600 mm dia meter Tk. 1,167.00 448
09.2 Auger Boring/Rotary drilling for cast in situ pile up to the required depth and diameter with minimum 6 m long
temporary steel casing, true to vertical, providing bentonite slurry and maintaining water level in the hole,
washing the hole for at least 30 minutes, cleaning the bore-hole and making the bore- hole ready for placing
steel cage and concreting including hire charge of rig set , trimie pipe, cost of fuel, lubricant, mobilization,
demobilization, maintenance, spares, stand-byes, insurance coverage, bentonite, water, electricity and other
charges all compete approved and accepted by the Engineer-in-charge. Before commencing boring operation,
contractor shall submit the method statement of cast-in-situ pile work including sequence of boring and casting,
disposal of spoils, test result of materials to the Engineer-in-charge for approval. However, Engineer’s approval
shall not relieve the contractor of his responsibilities and obligations under contract.

449
09.2.1 600 mm dia meter Tk. 3,388.00 450
09.2.2 750 mm dia meter Tk. 4,065.00 451
09.2.3 1000 mm dia meter Tk. 5,646.00 452
09.3 Removing of spoils / mud accumulated during boring for cast in situ pile by wash boring from working site to a cum Tk. 557.00
safe distance by contractor’s own arrangement i.e. with container set in truck or on cart including loading,
unloading everything complete as per standard practice and accepted by the Engineer-in-charge. (Quantity
should be given three times of solid volume of boring)
453
09.4 Cast in situ pile with reinforced cement concrete works of high slump by adding high range water reducing cum Tk. 13,463.00
admixture (ASTM C494 Type A or F) with minimum cement content relates to mix ratio 1 : 1.5 : 3 having
minimum f'cr = 26 Mpa, and satisfying a specified compressive strength f’c = 21 Mpa at 28 days on standard
cylinders as per standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM
-1,52.5 N / ASTM-C 150 Type – I, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M.2.2],
20 mm down well graded crushed stone chips conforming to ASTM C-33, including breaking chips, screening
through proper sieves, making, placing re-bar cage in position, placing and removing tri-pod as per requirement,
pouring the concrete in bore-hole with the help of a tremie pipe, maintaining the tremie pipe immersed in
concrete by at least 1 meter throughout the period of concreting, maintaining required slump, etc. mixing the
aggregates with standard mixer machine with hopper, casting in forms, all complete including water, electricity,
testing of materials and concrete etc and other charges as per design, drawing etc all complete approved and
accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and its fabrication, binding,
welding, placing and admixture (approx doses 150 to 250 ml per bag of cement which is to be fixed upon
consultation with design office))
454
Item No. Description of Item Unit Unit Rate

09.5 Providing and making point welding at contact point of the spiral binders at reasonable intervals with the main point Tk. 3.00
reinforcements by electric arc welding for construction of cast in situ bored pile carefully with highly oxidized
electrodes, making the points prominent and accepted by the Engineer-in-charge (Rate is inclusive of all
materials labour, tools and plants, electricity and all equipment).
455
09.6 Providing and making welded splice over two sides of contact by welding of minimum 300 mm length at the lap meter of Tk. 570.00
of main reinforcement in re-bar cage to be placed in bore-hole where necessary by electric arc welding with weld
highly oxidized electrodes making the joint prominent all complete and accepted by the Engineer-in-charge.
(Rate is inclusive of all materials labour, tools and plants, electricity and all equipment).

456
09.7 Labour for breaking head of hardened cast in situ bored pile/pre-cast pile up to a required length by any means cum Tk. 4,673.00
but without damaging the rest and removing the dismantled materials such as concrete to a safe distance
including scraps and cleaning concrete from steel/M.S. rods, straightening and bending of pile bars, preparation
and making platform where necessary, carrying, all sorts of handling, stacking the same properly after clearing,
leveling and dressing the situ and clearing the bed etc. complete in all respect and accepted by the Engineer-in-
charge. (Measurement will be given for the actual pile head volume to be broken)

457
09.8 Conducting static load test as per ASTM D1143 or equivalent standard for the cast-in-situ/pre-cast pile providing
required scaffolding, bracing, jacks, pressure test gauge, loading unloading, Kentledge and other plants and
equipment including staging, mobilization, demobilization, hire charge, gunny bags, sand and filling sacs/gunny
bags for loading, record readings and preparation of results in standard forms and other incidental charges as
per standard practice and procedures including submission of load test report, furnishing all graph and chart etc.
complete in all respect approved and accepted by the Engineer-in-charge (Minimum two cyclic loading; one at
service load and another cycle at double the service load then to continue loading till failure of the pile). Before
commencing load test, contractor shall submit method statement for conducting load test to the Engineer-in-
charge for approval. However, Engineer’s approval shall not relieve the Contractor of his responsibilities and
obligations under Contract. Load test and report shall be conducted under the supervision of a professional
Geotechnical Engineer registered in BPERB or Geotechnical firm registerd in PWD. Boring and pouring logs /
driving logs of piles and method statement shall be the part of load test report.

458
09.8.1 Mobilization & de-mobilization of testing equipment per set per Tk. 4,105.00
site 459
09.8.2 Calibration of pressure gauge per set per Tk. 6,520.00
site 460
09.8.3 For 50 tonne load for 1 nos of test per test Tk. 73,338.00 461
09.8.4 For 100 tonne load for 1 nos of test per test Tk. 123,177.00 462
09.8.5 For 150 tonne load for 1 nos of test per test Tk. 173,017.00 463
09.8.6 For 200 tonne load for 1 nos test per test Tk. 224,571.00 464
09.8.7 For 250 tonne load for 1 nos test per test Tk. 276,053.00 465
09.8.8 For 300 tonne load for 1 nos of test per test Tk. 325,121.00 466
09.8.9 For 350 tonne load for 1 nos of test per test Tk. 374,188.00 467
09.8.10 For 400 tonne load for 1 nos of test per test Tk. 423,255.00 468
09.9 Rate for increamental loading 469
09.9.1 For intermediate loading from 50 tonne to 100 tonne for each additional tonne per tonne Tk. 1,349.00
470
09.9.2 For intermediate loading from 100 tonne to 150 tonne for each additional tonne. per tonne Tk. 1,193.00
471
09.9.3 For intermediate loading from 150 tonne to 200 tonne for each additional tonne. per tonne Tk. 1,138.00
472
09.9.4 For intermediate loading from 200 tonne to 250 tonne for each additional tonne. per tonne Tk. 1,114.00
473
09.9.5 For intermediate loading from 250 tonne to 300 tonne for each additional tonne. per tonne Tk. 1,094.00
474
09.9.6 For intermediate loading from 300 tonne to 350 tonne for each additional tonne. per tonne Tk. 1,077.00
475
09.9.7 For intermediate loading from 350 tonne to 400 tonne for each additional tonne. per tonne Tk. 1,064.00
476
09.10 Pre-cast pile made in reinforced cement concrete with minimum cement content relates to mix ratio 1:1.25:2.5
having minimum f'cr = 35 Mpa, and satisfying specified compressive strength f’c = 30 Mpa at 28 days on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1-
CEM-I (52.5 N) / ASTM-C 150 Type – I, best quality coarse sand (F.M.2.2), 20 mm down well graded crushed
stone chips conforming to ASTM C-33, mixing in standard mixture machine and fed by standard measuring
boxes, including all related works like screening through proper sieves, cleaning and washing, centering and
shuttering with M.S sheet, M.S angle, F.I bar, nuts and bolts, champering edges if so, preparation of casting
beds, laying polythene there in, placing reinforcement cages in position, casting, compacting by vibrators and
tapered rods as where necessary, curing for 28 days etc. cost of water, electricity and other charges, providing
fitting and fixing pile shoe in position, tools, plants & equipments, mobilization, demobilization, labour, test of
materials and concrete etc. all complete as per design, drawing and accepted by the Engineer-in-charge. (Rate
is excluding the cost of reinforcement and its fabrication, binding, welding and placing)

477
09.10.1 250 mm x 250 mm size pre-cast pile (1:1.25:2.5) with stone chips meter Tk. 965.00 478
09.10.2 300 mm x 300 mm size pre-cast pile (1:1.25:2.5) with stone chips meter Tk. 1,347.00 479
09.10.3 350 mm x 350 mm size pre-cast pile (1:1.25:2.5) with stone chips meter Tk. 1,777.00 480
09.10.4 400 mm x 400 mm size pre-cast pile (1:1.25:2.5) with stone chips meter Tk. 2,294.00 481
Item No. Description of Item Unit Unit Rate

09.10.5 450 mm x 450 mm size pre-cast pile (1:1.25:2.5) with stone chips meter Tk. 2,866.00 482
09.11 Pre-cast pile shoe making & supplying pre-fabricated frustum of square cone having four sides and a toe made each Tk. 2,725.00
of 6 mm thick ASTM A36 complied MS steel plate jointed by line welding, 4 nos 12 mm dia deformed MS bar
jointed by line welding with MS plate along the four edges of shoe aligning the corner main bar of the pile and 1-
12mm dia bar to fix with and perpendicular to shoe toe plate aligning centre of pile, including cutting, shaping,
sizing of MS plate and bar, all complete as per design & drawing and accepted by the Engineer-in-charge

483
09.12 Mobilization and demobilization of drop hammer type pre-cast pile driving rig. per set per Tk. 8,597.00
site 484
09.13 Driving 250 mm x 250 mm size pre-cast pile with drop hammer type rig, and maintaining driving log in prescibed meter Tk. 404.00
format Before commencing driving operation, contractor shall submit method statement for carrying out the
driving operation including sequence of driving to the Engineer-in-charge for approval. However, Engineer’s
approval shall not relieve the contractor of his responsibilities and obligations under contract.
485
09.14 Driving 300 mm x 300 mm size pre-cast pile with drop hammer type rig, and maintaining driving log in prescibed meter Tk. 531.00
format Before commencing driving operation, contractor shall submit method statement for carrying out the
driving operation including sequence of driving to the Engineer-in-charge for approval. However, Engineer’s
approval shall not relieve the contractor of his responsibilities and obligations under contract.
486
09.15 Driving 350 mm x 350 mm size pre-cast pile with drop hammer type rig, and maintaining driving log in prescibed meter Tk. 708.00
format. Before commencing driving operation, contractor shall submit method statement for carrying out the
driving operation including sequence of driving to the Engineer-in-charge for approval. However, engineer’s
approval shall not relieve the contractor of his responsibilities and obligations under contract.

487
09.16 Mobilization and demobilzation of automatic diesel hammer mounted complete rig set. per set per Tk. 181,117.00
site 488
09.17 Driving 250 mm x 250 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before meter Tk. 628.00
commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit
method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for
approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under contract.
489
09.18 Driving 300 mm x 300 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before meter Tk. 812.00
commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit
method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for
approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under contract.
490
09.19 Driving 350 mm x 350 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before meter Tk. 863.00
commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit
method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for
approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under contract.
491
09.20 Driving 400 mm x 400 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before meter Tk. 920.00
commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit
method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for
approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under contract.
492
09.21 Driving 450 mm x 450 mm size pre-cast pile by rig fitted with automatic diesel operated hammer. Before meter Tk. 986.00
commencing driving operation by rig fitted with automatic diesel operated hammer, contractor shall submit
method statement for carrying out the operation including sequence of driving to the Engineer-in-charge for
approval. However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under contract.
493
09.22 Pre-cast driven micro-pile with reinforced cement concrete works with minimum cement content relates to mix
ratio 1:1.25:2.5 having minimum f'cr = 35 MPa, and satisfying a specified compressive strength f’c = 30 MPa at
28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS
EN-197-1- CEM-I (32.5 to 52.5 N) / ASTM-C 150 Type – I, best quality coarse sand (F.M.2.5) and 20 mm down
well-graded crushed stone chips conforming to ASTM C-33, mixing in standard mixture machine with hopper
and fed by standard measuring boxes, including cost of breaking chips, screening through proper sieves,
cleaning and washing, centering and shuttering with M.S sheet, M.S angle, F.I bar, nuts and bolts, preparation
of bed, laying polythene, placing of reinforcement cage, casting, compacting by vibrators and tapered rods,
curing for 28 days etc. including cost of water, electricity and other charges, providing pile shoe as per design
and drawing, driving the pile up to the design depth as per standard practice or specified method providing head
cushion, all equipments including mobilization, demobilization and hire charge of driving set, champering, test of
materials and concrete etc. including carrying all complete approved and accepted by the Engineer-in-charge.
(Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing)

494
09.22.1 Casting of 180 mm x 180 mm x 7.6 m Pile with reinforced cement concrete (1:1.25:2.5) with stone chips meter Tk. 506.00
495
09.22.2 Casting of 205 mm x 205 mm x 7.6 m Pile with reinforced cement concrete (1:1.25:2.5) with stone chips meter Tk. 634.00
496
09.22.3 Driving of 180 mm x 180 mm x 7.6 m pre-cast pile meter Tk. 159.00 497
09.22.4 Driving of 205 mm x 205 mm x 7.6 m pre-cast pile meter Tk. 189.00 498
Item No. Description of Item Unit Unit Rate

09.22.5 Supply of Cold-Drawn Wire Pre-stressed Concrete (CWPC) micro-pile which is made by using cold drawn wire meter Tk. 1,003.00
minimum cement content relates to mix ratio 1:1.5:3 cement conforming to BDS EN-197-1-CEM-1, 52.5N
(52.5MPa) / ASTM-C 150 type - 1, having minimum f'cr = 35 MPa and satisfying specified compressive strength
f'c= 30 MPa at 28 days best quality coarse sand (F.M. 2.2), 20 mm down well graded stone chips conforming to
ASTM C-33, mixing in standard mixture machine and fed by standard measuring boxes, including cost of all
kind of reinforcement BDS ISO 6935-2:2006 including strengthening and cleaning rust if any bending and
binding in position with supply of GI wires (24 BWG), centering and shuttering with M.S. sheet, M.S. angle, F.I.
bar, nuts and bolts, preparation of bed, supplying & tensioning of cold drawn wire, laying polythene, placing of
reinforcement cage in position, casting, compacting by vibrator and tapered rods, curing at least 28 days etc.
including cost of water, electricity and other charges, proving pile shoe making with 20 BWG plane sheet, as per
design and drawing including an equipments mobilization, demobilization champering edges if so including the
cost of water electricity and other charges all complete as per design, drawing and accepted by the Engineer-in-
charge. (Excluding the cost of carrying and driving of pile). Maximum length: Up to 7620mm (fixed size x-
section: 180 mm x 180 mm)
499
09.23 PIT (Pile integrity test) : Conducting low strain dynamic testing of pile as per ASTM D5882-The standard method
for low-strain integrity testing of pile by a qualified and approved PIT expert, preparing pile heads and providing
all relevant materials, equipment, experts, labour, mobilization, demobilization, data acquisition and analysis,
preparation of results in standard forms and compiling final report with recommendations on the tests etc.
complete in all respect approved and accepted by the Engineer-in-charge. (Report shall contain driving log /
boring and pouring logs, graphs & statement on "Callibration Pile" (pile that tested for its capacity and PIT done
eralier on it, at a place of known soil profiles), soil investigation report. (Caliberation pile shall be made and
tested first). Method statement for conducting PIT shall be submitted to the Engineer for approval, and shall be
the part of PIT report, However, Engineer's approval shall not relieve the contractor of his responsibilities and
obligations under contract

500
09.23.1 Mobilization and demobilization to site and PIT on12(twelve) piles or less upto 1st 12 Tk. 24,149.00
piles 501
09.23.2 For PIT test of each additional pile after 12(Twelve) pile tested at same site per pile Tk. 1,207.00 502
09.24 Pre-cast spliced pile jointing by supplying, fitting, fixing prefabricated square shaped two steel caps made up by
6 mm thick ASTM A36 complied M.S plate, sides formed by bent in channel shape to have only two line of
joinery on faces, having min 50 mm dia hole on its web; capping by min 12 mm thick ASTM A36 complied M.S
plate shaping the edges in 45°, having min 40 mm dia hole at centre to pass 25 mm M.S bar 433 mm in length;
jointed at channels root by welding; caps fitted with 2 nos BDS ISO 6935-2009: B400 DWR complied d20 U-bar
1244mm in length by welding, equidistant from centre holes of cap and shall have min 75 mm clear from pile
faces; and finally, the system to be fitted in correct alignments on pile head positions waiting for concreting; both
the pile heads fitted with the steel caps to be welded together through v-notches in field, while one of the
companion segment of piles drived in ground and other one placed over it maintaining true verticality; all
complete as per direction and stepwise approval leading to final approval of Engineer-in- charge.

503
09.24.1 X-sec of pre cast pile segments :300 mm x 300 mm each Tk. 9,286.00 504
09.24.2 X-sec of pre cast pile segments :350 mm x 350 mm each Tk. 10,610.00 505
09.24.3 X-sec of pre cast pile segments :400 mm x 400 mm each Tk. 12,076.00 506
09.24.4 X-sec of pre cast pile segments :450 mm x 450 mm each Tk. 12,611.00 507
09.25 Pile Driving by Hydraulic Static Pile Driver 508
09.25.1 Mobilization and demobilzation of hydraulic static pile driver(Upto 500 metric ton capacity) per set per Tk. 652,021.00
site 509
09.25.2.1 Driving pre-cast pile of 300 mm x 300 mm X-section made with shoe/ without shoe by Hydraulic static pile driver meter Tk. 808.00
of approx. 500 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining driving
log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all respect
including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc ended with the
submission of pile driving report in three copies duly signed by professional engineer and approved by the
Engineer-in-charge.

510
09.25.2.2 Driving pre-cast pile of 350 mm x 350 mm X-section made with shoe/ without shoe by Hydraulic static pile meter Tk. 870.00
driver of approx. 500 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining
driving log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all
respect including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc ended
with the submission of pile driving report in three copies duly signed by professional engineer and approved by
the Engineer-in-charge.

511
09.25.2.3 Driving pre-cast pile of 400 mm x 400 mm X-section made with shoe/ without shoe by hydraulic static pile meter Tk. 943.00
driver of approx. 500 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining
driving log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all
respect including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc ended
with the submission of pile driving report in three copies duly signed by professional engineer and approved by
the Engineer-in-charge.

512
09.25.2.4 Driving pre-cast pile of 450 mm x 450 mm X-section made with shoe/ without shoe by hydraulic static pile meter Tk. 984.00
driver of approx. 500 tonne (metric ton) capacity; arranged with necessary cranes, power source, maintaining
driving log and record of pressure exerted on piles driven in to desired RL or capacity level ; complete in all
respect including handling of piles, dressing & leveling of site, way making, surveying, layout setting etc ended
with the submission of pile driving report in three copies duly signed by professional engineer and approved by
the Engineer-in-charge.

513
514
515
Item No. Description of Item Unit Unit Rate

516
………………….. END OF DIVISION NINE ………………….. 517
DIVISION 10: STRUCTURAL STEEL WORKS, SHEET ROOFING AND SAFETY CANOPY
518
Item No. Description of Item Unit Unit Rate
519
10.1 Supply and fixing of galvanized anchor bolts of variable dia for rigid frame conforming to ASTM F1554 Grade kg Tk. 180.00
55, Galvanized to A153, Class C or equivalent with minimum yield strength of 380 MPa, manual of steel
construction by American Institute of Steel Construction (AISC) etc. including the cost of washer & bolts,
material testing etc. all complete as per drawing, specification and direction of the Engineer-in-charge.

520
10.2 Supply, fabrication and installation of built-up sections i.e. columns, beams, rafters, bracings etc. from steel kg Tk. 135.00
plates conforming to ASTM A572, with a minimum yield strength of 345 MPa, including the cost of testing of
plates, applicaton of red/grey-oxide primer etc. all complete as per drawing, specification and direction of
Engineer-in-charge.
521
10.3 Supply, fabrication and installation of built-up sections i.e. columns, beams, rafters, bracings etc from steel kg Tk. 129.00
plates conforming to ASTM A36, with a minimum yield strength of 250 MPa, including the cost of testing of
plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and direction of
Engineer-in-charge.
522
10.4 Supply, fabrication and installation of hot-rolled sections (W, H, I-shape, Channel, angle, tube etc.) for columns, kg Tk. 132.00
beams, rafters, bracings etc. conforming to ASTM A36, with a minimum yield strength of 250 MPa, including the
cost of testing of plates, application of red/grey-oxide primer etc. all complete as per drawing, specification and
direction of Engineer-in-charge.
523
10.5 Supply and fixing of connection bolts of variable diameter with nut and washer according to "ASTM A325 Type kg Tk. 314.00
1 or equivalent” with Fu =720 Mpa, including the cost of testing of bolts, all complete as per drawing,
specification and direction of Engineer-In-Charge. 524
10.6 Supply and fixing of connection bolts of variable diameter with nut and washer according to "ASTM A307 Type kg Tk. 259.00
A or equivalent” with Fu =414 Mpa, including the cost of testing of bolts, all complete as per drawing,
specification and direction of Engineer-In-Charge. 525
10.7 Supply and installation of GI purlin & girt of any size conforming to "ASTM A653" grade 45, with a minimum kg Tk. 137.00
yield strength of 310 MPa, including the cost of testing of materials, all complete as per drawing, specification
and direction of Engineer-in-charge. 526
10.8 Supply and fixing of sag rod conforming to grade 40, with a minimum yield strength of 275 MPa, including the kg Tk. 127.00
cost of making threads, nuts and washers, red oxide primer etc. all complete as per drawing, specification and
direction of Engineer-in-charge. 527
10.9 Supply and fixing of cable/wire bracing conforming to "ASTM A475" with a minimum yield strength of 119.3 meter Tk. 214.00
MPa, with I-bolt and hill side washer, all complete as per drawing, specification and direction of Engineer-in-
charge. 528
10.10 Supplying and fixing of shear stud of variable dia conforming to ASTM A108 or equivalent with minimum yield kg Tk. 157.00
strength of 275 MPa, including the cost testing, welding etc. all complete as per drawing, specification and
direction of Engineer-in-charge. 529
10.11 Supply and installation of 0.70 mm thick galvanized decking panel according to ASTM A653, with minimum yield kg Tk. 181.00
strength of 345 MPa, including all necessry accessories (sheeting screws with washers, sealants etc.), testing of
materials etc. all complete as per drawing, specification and direction of Engineer-in-charge.
530
10.12 Supply and installation of 0.47 mm thick zinc alum color coated profile sheet for roof, wall, caping, flashing, kg Tk. 211.00
trimming, gutter etc. conforming to ASTM A792, Grade: 80, AZ150 gm/m2, including the cost of necessary
accessories (sheeting screws with washers, silicon sealant etc.), testing of materials etc. all complete as per
drawing specification and direction of Engineer-in-charge.

531
10.13 Supply and installation of 0.457 mm thick corrugated galvanized iron sheet (Bangladesh made) having min sqm Tk. 555.00
weight 63-65 kg per bundle (2'-6" width, 70 – 72 rft long) fitted and fixed on M.S. sections with 'J' hook or
wooden purlin with screws, limpet washers and putty etc. all complete and accepted by the Engineer-in-charge.
532
10.14 Supply and installation of 2.0 mm thick fiber glass sheet (transparent sheet) for roof, wall etc. on M.S. purlin, sqm Tk. 1,315.00
angle etc. with 'J' hook or screws with washer and putty, all complete as per drawing, specification and direction
of Engineer-in-charge. 533
10.15 Supply and installation of double bubble foil insulation at wall and roof of nominal thickness of 8 mm conforming sqm Tk. 283.00
to Class A in accordance with the ASTM-E84-09 fire test standard, including the cost of lapping, costape,
adhesive and necessary accessories, all complete as per drawing, specification and direction of Engineer-in-
charge.
534
10.16 Premium Synthetic Enamel paint of approved best quality and colour delivered from authorized local agent of kg Tk. 9.00
the manufacturer(Berger robbialac supergloss synthetic enamel/Elite lucky seven/ Asian apcolipe premium paint
or equivalent brand) in a sealed container, having highly water resistant, high bondibilty, flexiblity property; using
specified brand thinner applying to metallic surface by spray in two coats over single coat anti-corrosive coating
including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all
complete in all floors accepted by the Engineer-in-charge. (payment shall be made on strucutral steel weight
basis)

535
10.17 Supply and application of corrosion protection paint to the surface of the structural steel members conforming to kg Tk. 26.00
SA 2.5; Steel members to be shot blasted inside the enclosed shot blasting chamber, final coat paint must be
applied on site after installation, including the cost of primer, testing and necessaey accessories, all complete as
per drawing, specification and direction of Engineer-in-charge.

536
10.18 Supply and pouring of non-shrink grout to steel column bases conforming to ASTM C 109 having compressive cum Tk. 145,213.00
strength not less than 45 MPa, including the cost of shutter and necessary accessories, all complete as per
drawing, specification and direction of Engineer-in-charge.
537
Item No. Description of Item Unit Unit Rate

10.19 0.27 mm thick galvanized iron plain sheet ridging with 300 mm lap on either side fitted and fixed with galvanized
bolts and nuts etc. all complete and accepted by the Engineer-in-charge.
538
10.19.1 Galvanized meter Tk. 422.00 539
10.19.2 Colored meter Tk. 464.00 540
10.20 1.5 mm thick plain fiberglass sheet ridging with 300 mm lap on either side fitted and fixed with galvanized bolts meter Tk. 769.00
and nuts etc. all complete and accepted by the Engineer-in-charge. 541
10.21 Saftey Canopy: Supplying temporary safety canopy around construction work place where public safety is likely sqm Tk. 1,923.00
to be endangered due to construction activities; which shall be made of truss system of steel sections (main
frame) at 1800 mm c/c with purlins @ 750 mm c/c, making flooring system by corrugated galvanized iron sheets
of thickness 0.45 mm, laying wire mesh net on iron sheets, providing continuous gutter along the edges of the
building with downpipe @ 6000 mm c/c, including fitting and fixing in position providing necessary anchors,
cables, wires, ties etc. by standard anchoring and welding, nut-bolts etc, all complete and accepted by the
Engineer-in-charge

542
10.22 Saftey net: Supplying temporary safety net (hessian cloth) around construction work place (along the height of sqm Tk. 42.00
the building) where public safety is likely to be endangered due to construction activities; which shall be
supported using scaffolding around the building for brick work/ plaster; including fitting and fixing in position
providing necessary anchors, wires, ties etc. all complete and accepted by the Engineer-in-charge. (Rate is
excluding the cost of scaffolding)
543
544
545
546
………………….. END OF DIVISION TEN ………………….. 547
DIVISION 11 : WOOD WORKS IN DOOR AND WINDOW FRAME, ROOF TRUSS AND RAILINGS
548
Item No. Description of Item Unit Unit Rate 549
11.1 Supplying and making door and window frames (Chowkat) for all floors with matured seasoned wood of
required size. Painting two coats of coal tar to the surface in contact with wall. Fitting and fixing in position etc.
all complete and accepted by the Engineer-in-charge. (All sizes of wood are finished).
550
11.1.1 Mehgoni cum Tk. 120,461.00 551
11.1.2 Garjan/ Jam/ Local sal cum Tk. 130,410.00 552
11.1.3 Silkarai cum Tk. 154,787.00 553
11.1.4 Teak Chambal /Jarul cum Tk. 200,057.00 554
11.1.5 Chittagong Teak cum Tk. 249,308.00 555
11.1.6 Burma Teak cum Tk. 354,275.00 556
11.2 Supplying, fitting and fixing M.S. flat bar clamp of 225 mm x 38 mm x 6 mm size having bifurcated ends to door each Tk. 97.00
and window frames with necessary screws including cutting grooves in chowkat if necessary and encasing
inside the wall with cement concrete (1:2:4) etc, all complete and accepted by the Engineer-in-charge.
557
11.3 Supplying, fitting and fixing M.S. flat bar clamp of 150 mm x 38 mm x 6 mm size having bifurcated ends to door each Tk. 97.00
and window frames with necessary rowel plug, screws etc. including cutting grooves in chowkat if necessary
etc. all complete and accepted by the Engineer-in-charge.
558
11.4 Supplying, fitting and fixing double leaf door frame for all floors made with 38mm x 38 mm x 6 mm M.S. angle meter Tk. 611.00
fitted with 150 mm long 6 nos. iron clamps of same size M.S. angle (with one end bifurcated) with the vertical
members of the frame, fixing the frame in wall with cement concrete (1:2:4), mending good the damages, fixing
6 Nos. of 100 mm long iron hinges with the vertical members of the frame all complete including making holes in
walls, cutting, sizing, welding, fabricating, carrying from work-shop to site and local carriage, curing etc. all
complete as per plan and drawing and accepted by the Engineer-in-charge.

559
11.5 Supplying, fitting and fixing single leaf door frame for all floors made with 38 mm x 38 mm x 6 mm M.S. angle, meter Tk. 597.00
fixing 125 mm long 6 nos. iron clamps of same size (with one end bifurcated) with the vertical members of the
frame, fixing the frame in wall with cement concrete (1:2:4), mending good the damages, fixing 4 nos. 100 mm
size iron hinges with the vertical members of the frame, all complete including making holes in walls, cutting,
sizing, welding, fabricating, carriage from workshop to site including local carriage, curing etc. as per plan and
drawing etc. all complete and accepted by the Engineer-in–charge.

560
11.6 Supplying matured seasoned wood and making roof truss of any size with wall plates as per design including
supplying, fabricating and hoisting, scaffolding, fitting and fixing in position with bolts, nuts, painting two coats of
coal tar etc. all complete and accepted by the Engineer-in–charge.
(All sizes of wood are finished).
561
11.6.1 Garjan / Jam/ Local Sal wood cum Tk. 111,101.00 562
11.6.2 Mehgoni cum Tk. 102,147.00 563
11.6.3 Silkarai /Chickrashi cum Tk. 133,040.00 564
11.7 Supplying and making hand rail for stair case with matured seasoned wood including necessary moulding with
proper corner, finishing as per design, fitting and fixing in position in all floors etc. all complete and accepted by
the Engineer-in–charge. 565
11.7.1 Mehgoni cum Tk. 123,458.00 566
11.7.2 Local Sal cum Tk. 132,413.00 567
11.7.3 Silkarai / Chikrashi cum Tk. 154,351.00 568
Item No. Description of Item Unit Unit Rate

11.7.4 Teak Chambal wood cum Tk. 195,095.00 569


11.7.5 Chittagong eak wood cum Tk. 239,420.00 570
11.7.6 Burma Teak wood cum Tk. 333,891.00 571
572
573
574
………………….. END OF DIVISION ELEVEN ………………….. 575
DIVISION 12 : DOOR-WINDOW SHUTTER & FLY PROOF WIRE-NET SHUTTER 576
Item No. Description of Item Unit Unit Rate 577
12.1 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) solid wood single
leaf door shutter having top rail style of sections 100mm x 38mm, lock rail 125 mm x 38 mm and bottom rail 225
mm x 38 mm. Closed joints with 25 mm x 12 mm size wooden peg and provided with best quality 4 Nos. 100mm
iron hinges 2 (two) Nos. best quality 12 mm dia 250 mm and 200 mm long iron tower and socket bolts, 2 (two)
Nos. heavy type nickel plated handle,1(one) No best quality hasp bolt, hinged cleats, buffer blocks and finished
by sand papering etc. all complete in all floors and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

578
12.1.1 Kathal sqm Tk. 7,492.00 579
12.1.2 Gamari sqm Tk. 6,390.00 580
12.1.3 Teak Chambal sqm Tk. 9,796.00 581
12.1.4 Chittagong Teak sqm Tk. 11,779.00 582
12.1.5 Chapalish sqm Tk. 7,772.00 583
12.1.6 Burma Teak sqm Tk. 16,007.00 584
12.2 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) solid wood single
leaf flush door shutter having a frame of top, lock and bottom rail of sections 100 mm x 12 mm styles 100 mm x
38 mm covered with 100 mm x 12 mm plank, screwed to each face and provided with best quality 4 Nos. 100
mm iron hinges, 2 (two) Nos. best quality 12 mm dia 250 mm and 200mm long iron tower and socket bolts, 1
(one) No best quality hasp bolt, 2 (two) Nos. heavy type nickel plated handles, hinged cleats, buffer blocks and
finished by sand papering etc. all complete in all floors and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

585
12.2.1 Kathal sqm Tk. 6,366.00 586
12.2.2 Gamari sqm Tk. 5,386.00 587
12.2.3 Teak Chambal sqm Tk. 8,416.00 588
12.2.4 Chittagong Teak sqm Tk. 10,180.00 589
12.2.5 Chapalish sqm Tk. 6,616.00 590
12.1.6 Burma Teak sqm Tk. 13,941.00 591
12.3 Supplying, fitting and fixing 38 mm thick finished well matured seasoned (min. 250 mm wide plank) wooden sqm Tk. 15,393.00
ornamental special design (equivalent hatil) (both sides) single panel flush door shutter with top and middle rail
150 mm x 38 mm bottom rail 225 mm x 38 mm and style 125 mm x 38 mm, having vertical panels 175 mm x 38
mm in./c minimum 12 mm lap to each panel providing 4 nos, best quality 100 mm long brass hinges, 12 mm dia
best quality 200 mm & 250 mm long brass socket and tower bolts, 1 (one) No best quality hasp bolt, 2 (two)
nos heavy type best quality brass handle, hinges cleats, buffer blocks including supply of necessary nails and
screws, making design by machine, finished etc. all complete in all floors and accepted by the Engineer-in-
charge (Chittagong teak wood).
(All sizes of wood are finished)

592
12.4 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) wooden double leaf
panel door shutters. Top rail and styles of sections 100 mm x 38 mm, lock rail 125 mm x 38 mm and bottom rail
225 mm x 38 mm, paneling 38 mm thick both sides raised, provided with best quality 8 Nos. 100 mm long iron
hinges, 2 (two) Nos. best quality 12 mm dia 250 mm and 200 mm long iron tower and socket bolts, 2 (two) Nos.
heavy type nickel plated handle, 1 No. hasp-bolt, hinged cleats, buffer blocks and finished by sand papering,
necessary screws etc. all complete in all floors and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

593
12.4.1 Kathal sqm Tk. 8,930.00 594
12.4.2 Gamari sqm Tk. 7,553.00 595
12.4.3 Teak Chambal sqm Tk. 11,808.00 596
12.4.4 Chittagong Teak sqm Tk. 14,285.00 597
12.4.5 Chapalish sqm Tk. 9,280.00 598
12.4.6 Burma Teak sqm Tk. 19,566.00 599
Item No. Description of Item Unit Unit Rate

12.5 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) wooden double leaf
panel door shutters. Top rail and styles of sections 100 mm x 38 mm. lock rail 125 mm x 38 mm and bottom rail
225 mm x 38 mm. paneling 25 mm thick one side raised, provided with best quality 6 nos. 100mm long iron
hinges, 2 (two) Nos. best quality 12 mm dia 250 mm and 200 mm long iron tower and socket bolts, 1 (one) No
best quality hasp bolt, 2 (two) Nos. heavy type nickel plated handles, 1 (one) No best quality hasp bolt, hinged
cleats, buffer blocks and finished by sand papering, necessary screws etc. all complete in all floors and
accepted by the Engineer-in-charge.
(All sizes of wood are finished)

600
12.5.1 Kathal sqm Tk. 7,784.00 601
12.5.2 Gamari sqm Tk. 6,611.00 602
12.5.3 Teak Chambal sqm Tk. 10,238.00 603
12.5.4 Chittagong Teak sqm Tk. 12,350.00 604
12.5.5 Chapalish sqm Tk. 8,083.00 605
12.5.6 Burma Teak sqm Tk. 16,851.00 606
12.6 Supplying, fitting and fixing 38 mm thick finished well matured seasoned (min. 250 mm wide plank) wooden
grooved single panel flush door shutters with top and middle rail 100 mm x 38 mm, bottom rail 225 mm x 38 mm
and style 100 mm x 38 mm, having vertical panels 100 mm x 38 mm including keeping 6 mm x 12 mm even
groove all around and minimum 12 mm grooved lap to each panel. Providing 4 Nos. best quality 100 mm long
iron hinges, 12 mm dia best quality 200 mm and 250 mm long iron socket and tower bolts, 2 (two) Nos. heavy
type best quality nickel plated handle, 1 (one) No best quality hasp bolt, hinged cleats, wooden buffer blocks
including supply of necessary nails and screws, finished by sand papering etc. complete in all floors as per
drawing and accepted by the Engineer-in-charge.
(All sizes of wood are finished).

607
12.6.1 Kathal sqm Tk. 8,673.00 608
12.6.2 Gamari sqm Tk. 7,373.00 609
12.6.3 Chittagong Teak sqm Tk. 13,731.00 610
12.6.4 Chapalish sqm Tk. 9,004.00 611
12.6.5 Burma Teak sqm Tk. 18,718.00 612
12.7 Supplying, fitting and fixing 36 mm thick and having density 400 kg/cum solid particle board single leaf flush
door for all floors for internal use made of well matured mechanical seasoned Rubber (Malaysian timber) or
other approved wooden frame having finished size 35 mm x 50 mm around upon which 1.2 mm thick veneer
(total two Nos. of veneers one of 0.7 mm horizontally made of garjon and another of 0.5 mm vertically made of
Burma Teak or Champa or Chapalish or Garjan wood) are pested on each side by mechanized process and
provided with best quality 4 Nos. 100mm long iron hinges, 2 Nos. best quality 12 mm dia 250 mm and 200 mm
long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handles, hinged cleats, buffer blocks,
necessary screws etc. all complete and accepted by the Engineer-in-charge

613
12.7.1 Burma Teak veneered sqm Tk. 4,989.00 614
12.7.2 Champ veneered sqm Tk. 3,754.00 615
12.7.3 Chapalish veneered sqm Tk. 3,754.00 616
12.7.4 Garjan veneered sqm Tk. 3,885.00 617
12.8 Manufacturing and supplying, fitting, fixing well matured seasoned (minimum 250 mm wide plank) wooden fixed
louver shutters having 62 mm x 125 mm frame and inner horizontal wooden louver 150 mm x 25 mm size
spaced @ 50 mm c/c fixed with frame in grooves including cost of screws, nails, 12 mm x 12 mm size wooden
bit, preparing the surface by sand papering etc. all complete as per drawing and accepted by the Engineer-in-
charge.
(All sizes of wood are finished).
618
12.8.1 Gamari sqm Tk. 8,930.00 619
12.8.2 Chittagong Teak sqm Tk. 20,624.00 620
12.8.3 Chapalish sqm Tk. 11,930.00 621
12.8.4 Burma Teak sqm Tk. 29,796.00 622
12.9 Supplying, fitting and fixing well matured seasoned (minimum 250 mm wide plank) wooden glazed ventilator
louver shutters for all floors having wooden outer frame of section 62 mm x 125 mm with 62 mm x 125 mm size
vertical divider with inner 50 mm x 38 mm shutter and with 3 Nos. horizontal 38 mm x 38 mm sash bar in each
part and inner horizontal glazed louver of size 150 mm x 6 mm fixed in frame @ 154 mm c/c by cutting grooves
in the frame including cost of screws, wooden bit, pivots, sand papering, 5 mm thick glass, cutting glass to
required size etc. all complete as per design, drawing and accepted by the Engineer-in-charge.
(All sizes of wood are finished).

623
12.9.1 Gamari sqm Tk. 6,185.00 624
12.9.2 Teak Chambal sqm Tk. 10,533.00 625
12.9.3 Chittagong Teak sqm Tk. 13,065.00 626
12.9.4 Chapalish sqm Tk. 7,950.00 627
12.9.4 Burma Teak sqm Tk. 18,462.00 628
Item No. Description of Item Unit Unit Rate

12.10 Supplying fitting and fixing 38 mm thick well matured seasoned (minimum 250 mm wide plank) wooden door
shutters for all floors having styles and rails of section 150 mm x 38 mm and 5 mm glass panes fitted and fixed
with wooden batten, putty and nails including supplying and fitting and fixing 50 mm dia best quality round door
lock, 12 mm dia, 2 Nos. 250 mm long iron tower bolt and 8 Nos. 100 mm long iron hinges to each shutters, 2
Nos. nickel plated handle, 5mm thick glass, glass cutting, hinged cleats, buffer blocks, screws, finished with
necessary sand papering and putty works etc. all complete and accepted by the Engineer-in-charge.

629
12.10.1 Chittagong Teak sqm Tk. 8,476.00 630
12.10.2 Silkarai sqm Tk. 6,336.00 631
12.10.3 Burma Teak sqm Tk. 10,852.00 632
12.11 Supplying, fitting and fixing 25 mm thick well matured seasoned (minimum 250 mm wide plank) Kathal wood sqm Tk. 5,897.00
door and window shutters for all floors having 75 mm x 25 mm ‘Z’ battens, provided with best quality 6 Nos. 100
mm long iron hinges, 2 Nos. 62 mm dia iron ring fitted with nuts, 2 Nos. best quality 12 mm dia, 300 mm and
200 mm long iron tower and socket bolts, hinged cleats, buffer blocks, screws and finished with sand papering
in all floors etc. all complete and accepted by the Engineer-in-charge.
(All sizes of wood are finished).

633
12.12 Supplying, fitting and fixing 38 mm thick well matured seasoned (minimum 250 mm wide plank) wood glazed
window shutters for all floors having horizontal and vertical sections of 87 mm x 38 mm and sash bar 38 mm x
38 mm fitted with 3 mm glass panes with putty and nails and provided with best quality 4 Nos. 75 mm long iron
hinges, 2 (two) Nos. best quality 12 mm dia 250 mm and 150 mm long iron tower and socket bolts, 01 no. nickel
plated handles, 02 nos. 225 mm long catch hooks or hinged cleats, buffer blocks, necessary screws and
finished with sand papering in all floors etc. all complete and accepted by the Engineer-in-charge.
(All sizes of wood are finished).

634
12.12.1 Kathal sqm Tk. 5,981.00 635
12.12.2 Gamari sqm Tk. 5,166.00 636
12.12.3 Teak Chambal sqm Tk. 7,684.00 637
12.12.4 Chittagong Teak sqm Tk. 9,150.00 638
12.12.5 Chapalish sqm Tk. 6,188.00 639
12.12.6 Burma Teak sqm Tk. 12,276.00 640
12.13 Supplying, fitting and fixing 38 mm thick well matured seasoned (minimum 250 mm wide plank) wooden window
shutter one third glazed and two third raised paneling on both sides for all floors having horizontal and vertical
sections of 87 mm x 38 mm and sash bars 38 mm x 38 mm fitted with 3 mm glass panes with putty and nails
and provided with best quality 4 Nos. 75 mm long iron hinges. 2 (two) Nos. best quality 12 mm dia 250 mm and
150 mm long iron tower and socket bolts, nickel plated handles, 3 mm glass, 02 nos. 225 mm long catch hooks,
or hinged cleats, buffer blocks and finished by sand papering in all floors etc. all complete and accepted by the
Engineer-in-charge.
(All sizes of wood are finished).

641
12.13.1 Kathal sqm Tk. 8,582.00 642
12.13.2 Gamari sqm Tk. 7,120.00 643
12.13.3 Teak Chambal sqm Tk. 11,640.00 644
12.13.4 Chittagong Teak sqm Tk. 14,273.00 645
12.13.5 Chapalish sqm Tk. 8,955.00 646
12.13.6 Burma Teak sqm Tk. 19,884.00 647
12.14 Seasoning of timber in a recognized mechanical timber seasoning plant up to 12% - 16% moisture content by cum Tk. 9,125.00
weight as measured by an electric moisture meter or any other moisture measuring device etc. all complete
including loading, unloading, carriage at both ends and accepted by the Engineer-in-charge.

648
12.15.1 Supplying, fitting and fixing steel glazed window shutter for all floors with frames as per design having 25 mm x sqm Tk. 5,397.00
25 mm x 5 mm angle section for Chowkat and shutters and 50 mm x 25 mm x 5 mm T- section used for vertical
member and 25 mm x 5 mm F.I. bar for making box (combining with angle) and 25 mm x 19 mm x 5 mm T-
section used for glass divider etc. including all charges for welding, riveting etc. including cost of supplying all
essential fittings like iron hinges, plate handle, pin-stopper, adjustable cleat and clamps including supplying,
fitting, fixing 3 mm glass panes by pucca putty, for fittig and fixing the frame, making necessary holes in brick
walls and R.C.C works and fitting with C.C. (1:2:4) and mending good the damages including all cost of
carriage, workshop charges, electricity, and labour for fittings, fixing, curing etc. all complete and accepted by
the Engineer-in-charge.
(Rate is excluding the costs of painting).

649
Item No. Description of Item Unit Unit Rate

12.15.2 Supplying, fitting and fixing M.S. door shutter made with 38 mm x 38 mm x 6 mm angle outer frame, inner sqm Tk. 5,870.00
member 25 mm x 6 mm F.I. bar, cladding with 16 BWG M.S. sheet, 04 nos. 75 mm long hinge, 02 nos. locking
arrangement with 50 mm x 50 mm x 6 mm M.S. angle chowkat including all charges for welding, riveting etc.
including cost of supplying all essential fittings like iron hinges, socket bolts, clamps, for fittig and fixing the
frame, making necessary holes in brick walls and R.C.C works and fitting with C.C. (1:2:4) and mending good
the damages including all cost of carriage, workshop charges, electricity, and labour for fittings, fixing, curing
etc. all complete and accepted by the Engineer-in-charge.
(Rate is excluding the costs of painting).

650
12.16 Supplying, fitting and fixing steel glazed window shutter for all floors with frames as per design having 19mm x
19mm x 19mm x 3mm Z-section in frame and 19mm x 3mm F.I. bar for making T-section for horizontal dividers
of shutters and 25mm x 3mm F.I. bar for middle vertical members of frame including all cost of charges for
fabrication and manufacture by welding, riveting etc. Supplying all essential fittings like 2 nos. stopper handle,
300mm long 3 or 2 nos. adjustable iron cleats, 6 or 4 nos. 50mm long iron pin hinges, 150mm long 4 nos.
clamps including supplying, fitting, fixing 3mm glass panes by pucca putty, for fitting and fixing frame making
necessary holes in brick and R.C.C. wall or member as necessary filling with C.C. (1:2:4) and mending good the
damages including all cost of carriage, electricity, workshop charges and labour for fitting, fixing etc. all
complete as per drawing and design and accepted by the Engineer-in-charge. (Rate is excluding the costs of
painting)

651
12.16.1 With provision for fan-light by providing necessary additional materials, 03 nos adjustable 300 mm long iron sqm Tk. 3,557.00
cleats and 6 nos. 50 mm long iron pin hinges (total wt of grill without glass panes is min 28.13 kg for 15 sft)

652
12.16.2 Without provision for fan-light by providing 02 nos adjustable 300 mm long iron cleats and 4 nos. 50 mm long sqm Tk. 3,324.00
iron pin hinges (total wt of grill without glass panes is min 24.84 kg for 15 sft)
653
12.17 Manufacturing, supplying fitting and fixing of fixed glazed frame for all floors with outer member of 19mm x sqm Tk. 3,282.00
19mm x 19mm x 3mm Z-section and vertical and horizontal dividers of 19mm x 19mm x 3mm T-section
including all cost of fabrication and welding, supplying and fixing of 19mm x 19mm x 3mm angle clamps of
150mm long (with one end bifurcated) of required Nos. with the frame, fixing the frame in wall with (1:2:4)
cement concrete in the hole for clamp after making necessary grooves, supplying and fixing of 3mm glass
panes with pucca putty, mending good all damages, painting iron face with two coats of synthetic enamel paint
over a coat of anti-corrosive priming of approved colour and quality etc. cost of electricity, workshop charges,
carriage etc. all complete as per drawing and accepted by the Engineer-in-charge. [Rate is excluding the cost of
painting]
(Scope of work of this item is in staircase and over partition wall etc.)

654
12.18 Supplying, fitting and fixing 25 mm thick wooden double leaf fly proof wire mesh window shutter for all floors
with 75 mm x 25 mm vertical and horizontal style and sash bar of 38 mm x 25 mm section provided with 24
B.W.G. G.I wire mesh netting of 20 mm mesh fitted and fixed with shutter by 12 mm x 12 mm wooden bit, brass
screws, nails etc. including supply of all necessary fittings such as 2 Nos. 150 mm long brass tower and socket
bolt of best quality 4 Nos. 75mm long brass hinges, heavy type 2 Nos. 150 mm long catch hook and 2 Nos. 100
mm long brass handle including fitting and fixing the same in position with frame with supply of necessary
screws and nails etc. complete and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

655
12.18.1 Kathal sqm Tk. 5,136.00 656
12.18.2 Teak Chambal sqm Tk. 6,228.00 657
12.18.3 Chittagong Teak sqm Tk. 7,168.00 658
12.18.4 Burma Teak sqm Tk. 9,171.00 659
12.19 Supplying, fitting and fixing of well matured seasoned wooden louver shutter (Chittagong Teak) having 75.50 sqm Tk. 15,058.00
mm x 38 mm size all around frame and inner horizontal wooden louver blade 65 mm x 20 mm spaced @ 38 mm
c/c, fixed with frame in grooves including cost of nails, handle, tower bolt, screws (brass fitting) etc. all complete
as per drawing and accepted by the Engineer-in-charge.
660
12.20 Supplying, fitting and fixing 75 mm X 19 mm well matured seasoned Chittagong Teak wood moulding bit as per meter Tk. 1,333.00
design etc. all complete approved and accepted by the Engineer-in-charge.
661
12.21 Extra cost for using brass/ SS fittings in place of iron fittings in doors & windows for all floors (super quality
local). 662
12.21.1 Brass fittings of door sqm Tk. 638.00 663
12.21.2 SS fittings of door sqm Tk. 329.00 664
12.21.3 Brass fittings of windows sqm Tk. 842.00 665
12.21.4 SS fittings of windows sqm Tk. 459.00 666
12.22 Supplying, fitting and fixing hydraulic door closer (big size) of approved quality including all necessary tools and each Tk. 1,808.00
accessories etc. all complete and accepted by the Engineer-in-charge.
667
12.23.1 Supplying, fitting and fixing mortice door lock of approved quality including all necessary tools and accessories each Tk. 1,023.00
etc. all complete approved and accepted by the Engineer-in-charge.
668
12.23.2 Supplying, fitting and fixing rim/round door lock of approved quality including all necessary tools and each Tk. 963.00
accessories etc. all complete and accepted by the Engineer-in-charge.
669
12.24 Supplying, fitting and fixing of best quality magnetic door shock absorber of approved quality including all each Tk. 420.00
necessary tools and accessories etc. all complete and accepted by the Engineer-in-charge.

670
Item No. Description of Item Unit Unit Rate

12.25 Supplying, fitting and fixing best quality heavy type 19 mm dia and 300 mm long brass hasp bolt including each Tk. 525.00
cutting grooves in door shutter and frames, screws etc. all complete approved and accepted by the Engineer-in-
charge.
671
12.26 Supplying, fitting and fixing approved best quality foreign made stainless steel/brass door viewer/eye viewer each Tk. 595.00
from 12 mm to 20 mm diameter with adjustable thickness suitable for fitting from 37 mm to 50 mm thick door
shutter in/c all necessary work as per direction and accepted by the Engineer-in-charge.
672
673
674
675
………………….. END OF DIVISION TWELVE ………………….. 676
DIVISION 13 : WINDOW GRILL, VERANDAH GRILL & NETTING 677
Item No. Description of Item Unit Unit Rate
678
13.1 Supplying, fitting and fixing window grills made of 16 mm dia M.S. rod @ 100 mm c/c fitted with 3 (three) nos. sqm Tk. 2,206.00
horizontal M.S. flat bar (38 mm x 6 mm) including fabrication, welding, riveting, cost of electricity, workshop
charges, carriage, fixing with pre-placed clamps in wall/RCC member for all floors etc. complete and accepted
by the Engineer-in-charge. (Total weight per sqm should be approx. 22.8 kg and add or deduct @ Tk. 97.00 for
each kg/sqm excess or less respectively)

679
13.2 Supplying, fitting and fixing window grills of any design made of 20 mm x 3 mm mild steel section with outer sqm Tk. 1,610.00
frame of 25 mm x 6 mm F.I. bar including fabricating, welding, cost of electricity, workshop charges, carriage,
fixing with pre-placed clamps in walls or RCC member, all necessary tools and plants etc complete for all floors
and accepted by the Engineer-in-charge. (Total weight per sqm should be approx 11.0 kg. and add or deduct
@ Tk. 146.00 for each kg/sqm excess or less respectively)

680
13.3 Supplying, fitting and fixing window grills of any design made with 20 mm x 5 mm F.I. bar as inner and outer sqm Tk. 1,719.00
section; including fabricating, welding, cost of electricity and tools and plants etc. complete for all floors
accepted by the Engineer-in-charge.
(Total weight per sqm should be min 12 kg. and add or deduct. @ Tk. 143.00 for each kg/sqm excess or less
respectively)
681
13.3.1 Supplying, fitting and fixing window grills of any design made with 20 mm x 5 mm F.I. bar as inner members but sqm Tk. 1,596.00
no outer frame; including fabricating, welding, cost of electricity and tools and plants etc. complete for all floors
accepted by the Engineer-in-charge. (Total weight per sqm should be approx 10 kg. and add or deduct. @ Tk.
160.00 for each kg/sqm excess or less respectively)

682
13.4.1 Supplying, fitting, fixing window grills of any design made with 25 mm x 6 mm F.I. bar as both outer and inner sqm Tk. 2,334.00
section; including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves, mending
good the damages, tools and plants etc. complete for all floors accepted by the Engineer-in-charge. (Total
weight per sqm should be approx 21 kg. and add or deduct @ Tk. 111.00 for each kg/sqm excess or less
respectively)
683
13.4.1.1 Supplying, fitting, fixing window grills of any design made with 25 mm x 6 mm F.I. bar as inner section but no sqm Tk. 2,115.00
outer frame; including fabrication, welding, cost of electricity workshop charges, carriage, cutting grooves,
mending good the damages, tools and plants etc. complete for all floors accepted by the Engineer-in-charge.
(Total weight per sqm should be approx 18 kg. and add or deduct @ Tk. 118.00 for each kg/sqm excess or less
respectively)
684
13.4.2 Supplying, fitting and fixing window grill made of M.S. section 25 mm x 6mm outer frame and 20 mm x 5 mm sqm Tk. 1,825.00
inner member as per drawing and design approved and accepted by the Engineer-in-charge. (Total weight per
sqm should be min 14 kg. and add or deduct @ Tk. 130.00 for each kg/sqm excess or less respectively)
685
13.5.1 Supplying, fitting and fixing window grill made of 12 mm x 12 mm M.S. solid bar 140 mm c/c with outer frame of sqm Tk. 2,442.00
38 mm x 6mm F.I. bar as per design approved and accepted by the Engineer-in-charge.
686
13.5.2 Supplying, fitting and fixing window grill made of 10 mm x 10 mm M.S. solid bar 140mm c/c with outer frame of sqm Tk. 2,473.00
38 mm x 6mm F.I. bar as per design approved and accepted by the Engineer-in-charge.
687
13.5.3 Supply, fitting and fixing window grill made of 12 mm x 12 mm hollow M.S. box made of minimum 16 BG M.S. sqm Tk. 2,002.00
sheet @ 100mm c/c with outer frame of 38 mm x 6 mm F.I. bar as per drawing approved and accepted by the
Engineer-in-charge. 688
13.6 Supplying, fitting and fixing window grills made of mild steel section of 25 mm x 3 mm including fabrication, sqm Tk. 1,764.00
welding, cost of electricity, workshop charges, carriage, fixing with pre-placed clamps in walls or RCC member,
all necessary tools and plants etc complete for all floors and accepted by the Engineer-in-charge. (Total weight
per sqm should be min 8.0 kg. and add or deduct @ Tk. 220.00 for each kg/sqm excess or less respectively)

689
13.7 Supplying, fitting and fixing veranda grill made of 10 mm dia M.S. rods provided @ 100 mm c/c in any position sqm Tk. 2,087.00
both ways as per design with outside frame 25 mm x 25 mm x 6 mm M.S. angle including fabricating, welding in
each point, painting 2 coats of synthetic enamel paint over a coat of anti-corrosive priming, including cost of
electricity, tools and plants, workshop charges, carriage of the same including cutting groves in the R.C.C. or
brick work, mending good the damages with C.C. (1:2:4) etc. complete for all floors accepted by the Engineer-
in-charge. [Rate is excluding the cost of painting] (Total weight per sqm should be min 16.80 kg. and add or
deduct @ Tk. 124.00 for each kg/sqm excess or less respectively)

690
Item No. Description of Item Unit Unit Rate

13.8 Supplying, fitting and fixing verandah grill made of 10 mm dia M.S. rod provided @ 75 mm c/c in any position sqm Tk. 2,357.00
both ways as per design with outside frame of 25 mm x 25 mm x 6 mm M.S. angle including fabricating, welding
in each point , painting 2 coats of synthetic enamel paint over a coat of anti-corrosive priming including cost of
electricity, tools and plants, workshop charges, carriage of the same including cutting groves in the R.C.C. or
brick work, mending good the damages with C.C. (1:2:4) etc, all complete for all floors accepted by the
Engineer-in-charge. [Rate is excluding the cost of painting] (Total weight per sqm should be min 21.00 kg. and
add or deduct @ Tk. 112.00 for each kg/sqm excess or less respectively)

691
692
693
694
………………….. END OF DIVISION THIRTEEN ………………….. 695
DIVISION 14: ALUMINIUM DOOR, WINDOW FRAME & GLASS WORKS 696
Item No. Description of Item Unit Unit Rate
697
14.1 Supplying fitting and fixing of aluminium swing door with spandrel as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.8 mm thick wall frame
(size 101.60 mm, 44.45 mm, 83.21 mm), 2.33 mm thick shutter (size 54 mm, 46 mm), 0.99 mm thick door glass
bit (size 16.54 mm, 14.49 mm, 0.115 kg/m), 2.5 mm thick clousure section (size 101.60 mm, 42.93 mm,1.2
mm), 106.60 mm clousure cover (0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm, 12.70 mm, 1 kg/m), 1.8
mm thick shutter bottom (size 82.6 mm, 43.99 mm, 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99
mm, 1.88 kg/m) and 2.3 mm to 4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m)
section of all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less
than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness
and density of 4 mg per square cm etc. including all accessories like swing door clousure, swing door lock,
swing door mohiar, labour charge, fabrication, fitting fixing in position, carriage and electricity charge keeping
provision for fitting 5 mm thick glass including neoprene sealant etc. complete in all respect as per drawing and
accepted by the Engineer-in-charge. (Total weight min 23 kg/m2)

698
14.1.1 Anodized to s.s colour/ black colour sqm Tk. 6,849.00 699
14.1.2 Anodized to bronze colour sqm Tk. 6,613.00 700
14.1.3 Anodized to silver colour sqm Tk. 6,592.00 701
14.1.4 Powder coated to any colour sqm Tk. 6,863.00 702
14.2 Supplying fitting and fixing of aluminium swing door as per the U.S. Architectural Aluminium Manufacturer’s
Association (AAMA) standard specification and BDS 1879:2014 having 1.8 mm thick wall frame (size 101.60
mm. 44.45 mm. 83.21 mm). 2.33 mm thick shutter (size 54 mm, 46 mm), 0.99 mm thick door glass bit (size
16.54 mm. 14.49 mm 0.115 kg/m), 2.5 mm thick clousure section (size 101.60 mm, 42.93 mm 1.2 mm), 106.60
mm clousure cover (0.45 kg/m), 4 mm thick floor bottom (size 101.60 mm. 12.70 mm 1 kg/m), 1.8 mm thick
shutter bottom (size 82.6 mm, 43.99 mm, 0.60 kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88
kg/m) and 2.3 mm to 4.01 mm thick handle (size 101.60 mm, 38.10 mm, 25.40 mm short, 1.35 kg/m) section of
all aluminum members will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15
micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and
density of 4 mg per square cm etc. including all accessories like swing door clousure, swing door lock, swing
door mohiar, labour charge, fabrication, fitting fixing in position, carriage and electricity charge keeping provision
for fitting 5 mm thick glass including neoprene sealant etc. complete in all respect as per drawing and accepted
by the Engineer-in-charge. (Total weight min 23 kg/m2)

703
14.2.1 Anodized to s.s colour/ black colour sqm Tk. 6,379.00 704
14.2.2 Anodized to bronze colour sqm Tk. 6,302.00 705
14.2.3 Anodized to silver colour sqm Tk. 6,165.00 706
14.2.4 Powder coated to any colour sqm Tk. 6,516.00 707
14.3 Supplying, fitting and fixing of aluminium composite swing doors with fixed partition as per the U. S.
Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having
1.5 mm thick wall frame (size 101.60, 44.45 mm, 0.86 kg/m), 1.8 mm thick shutter side (size 54 mm, 46 mm,
1.2 kg/m ), 1 mm thick door glass bit (size 16.54 mm, 14. 49 mm, 0.115 kg/m), 1.8 mm thick closure section
(size 101.54 mm, 42.93 mm, 1.20 kg/m), 1.5 thick closure cover (101.60 mm, 0.45 kg/m), 4 mm thick floor
bottom (size 101.60 mm, 12.70 mm, 1 kg/m), 1.8 mm thick shutter bottom (size 86.60 mm, 43.99 mm , 0.60
kg/m), 1.8 mm thick shutter top (size 51 mm, 43.99 mm, 1.88 kg/m) 2.3mm to 4.01mm thick handle (short) (size
101.60 mm, 38.10 mm, 25.40 mm, 1.35 kg/m), 1.5 mm thick top and side (size 101.60 mm, 44.45 mm, 1.3
kg/m), 1.50 mm thick bottom (size 101.35 mm, 44.45 mm, 1.10 kg/m), 1.50 mm thick bottom cover (44.32 mm,
19.61mm, 0.392 kg/m), 1.50 mm thick grouve cover (size 83.21 mm, 16.00 mm, 0.57 kg/m), 0.99 mm thick
fixed glass protector (size 39.09 mm, 14.81 mm, 0.188 kg/m), 0.99 mm thick fixed glass protector bit (size
15.75 mm, 14.81 mm, 0.13 kg/m) section of all aluminum members will be anodized to aluminium
bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour
with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. (Total weight min
69.699 kg) keeping provision for 5 mm of glass panes with cost including all accessories like swing door
clouser, swing door lock , swing door mohair, flush bolt , bolts and nuts including sealants, labour charge for
fitting , fixing by angles, screws, mohiar, washer, machinery, cost of fabrication, making the grooves, mending
good the damages, electricity etc. complete in all respect as per drawing and accepted by the Engineer-in-
charge.

708
14.3.1 Anodized to s.s colour/ black colour sqm Tk. 3,416.00 709
14.3.2 Anodized to bronze colour sqm Tk. 3,358.00 710
14.3.3 Anodized to silver colour sqm Tk. 3,283.00 711
Item No. Description of Item Unit Unit Rate

14.3.4 Powder coated to any colour sqm Tk. 3,494.00 712


14.4 Supplying, fitting and fixing of aluminium sliding doors as per the U.S. Architectural Aluminium Manufacturer’s
Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm thick outer bottom (size 75.50
mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer top (size 75.50 mm, 26.80 mm, 0.78 kg/m) 1.2 mm thick
shutter top (size 33 mm, 26.80 mm, 0.536 kg/m), 1.2 mm shutter bottom (size 60 mm, 24 mm, 0.736 kg/m), 1.2
mm thick outer side(size 75.50 mm, 19.90 mm, 0.616 kg/m) 1.5 mm thick shutter lock (size 49.20 mm, 26.20
mm, 0.661 kg/m), 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm, 0.665 kg/m), 1.2 mm thick shutter divider
(size 31.75 mm, 0.535 kg/m) sections all aluminum members(Total weight 14.789 kg) will be anodized to
aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to
any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including
all accessories like handle, sliding door key lock , sliding door wheel, sliding door mohiar, sliding door
neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick glass including labour
charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity
complete in all respect as per drawing and accepted by the Engineer-in-charge.
Size up to: 2100 mm x 2100 mm

713
14.4.1 Anodized to s.s colour/ black colour sqm Tk. 2,928.00 714
14.4.2 Anodized to bronze colour sqm Tk. 2,841.00 715
14.4.3 Anodized to silver colour sqm Tk. 2,831.00 716
14.4.4 Powder coated to any colour sqm Tk. 3,014.00 717
14.5 Supplying, fitting and fixing of aluminium sliding doors as per the U.S. Architectural Aluminium Manufacturer’s
Association (AAMA) standard specification and BDS 1879:2014 having 1.2 m mm thick outer bottom (size 75.50
mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer top (size 75. 50 mm, 26.80 mm 0.78 kg/m), 1.2 mm thick
shutter top (size 33 mm, 26.80 mm, 0.536 kg/m), 1.2 mm thick shutter bottom (size 60 mm, 24 mm, 0.736
kg/m), 1.2 mm thick side (size 75.50 mm, 19.90 mm, 0.616 kg/m), 1.2 mm thick sliding fixed side (size 31 mm,
26 mm , 0.422 kg/m) 1.2 mm thick shutter lock (size 49.20 mm , 26. 20 mm , 0.661 kg/m), 1.2 mm thick inter
lock (size 34.40 mm, 32.10 mm, 0.665 kg/m) 1.2 mm thick shutter divider (size 31.75 mm, 0.535 kg/m) and 1.4
mm to 1.5 mm thick spandrel (7.14 mm, 0.70 kg/m) sections all aluminium members (total weight 19.72 kg) will
be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or
powder coated to any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square
cm etc. including all accessories like sliding door key lock, sliding door whee , sliding door mohiar, sliding door
neoprene, bolts and nuts including sealants, keeping provision for fitting 5mm thick glass including labour
charge for fitting of accessories, making grooves and mending good damages, carriage, and electricity
complete in all respect as per drawing and accepted by the Engineer-in-charge.
Size up to: 1800 mm x 2100 mm

718
14.5.1 Anodized to s.s colour/ black colour sqm Tk. 4,021.00 719
14.5.2 Anodized to bronze colour sqm Tk. 3,951.00 720
14.5.3 Anodized to silver colour sqm Tk. 3,886.00 721
14.5.4 Powder coated to any colour sqm Tk. 4,146.00 722
14.6 Supplying, fitting and fixing of aluminium sliding window as per the U.S. Architectural Aluminium Manufacturer’s
Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm thick outer bottom (size 75.50
mm, 32mm), 1.2 mm thick outer top (size 75.50 mm, 16.80 mm), 1.2 mm thick shutter top (size 33 mm.26.80,
22 mm), 1.2 mm thick shutter bottom (size 60mm, 24.40 mm), 1.2 mm thick outer side (size 75.50 mm,19.90
mm), 1.2 mm thick shutter lock (size 49.20 mm 26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10
mm) sections all aluminium members (total weight kg/sqm) will be anodized to aluminium bronze/silver/ss/black
colour with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less
than 25 micrones in thickness and density of 4 mg per square cm etc. including all accessories like sliding door
key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts including sealants,
keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves
and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by
the Engineer-in-charge.

723
14.6.1 Size up to: 1500 mm x 1400 mm. (total weight minimum 9.081 kg) 724
14.6.1.1 Anodized to s.s colour/ black colour sqm Tk. 3,611.00 725
14.6.1.2 Anodized to bronze colour sqm Tk. 3,563.00 726
14.6.1.3 Anodized to silver colour sqm Tk. 3,485.00 727
14.6.1.4 Powder coated to any colour sqm Tk. 3,720.00 728
14.6.2 Size up to: 900 mm x 1400 mm (total weight minimum 7.409 kg) 729
14.6.2.1 Anodized to s.s colour/ black colour sqm Tk. 5,042.00 730
14.6.2.2 Anodized to bronze colour sqm Tk. 4,950.00 731
14.6.2.3 Anodized to silver colour sqm Tk. 4,841.00 732
14.6.2.4 Powder coated to any colour sqm Tk. 5,198.00 733
Item No. Description of Item Unit Unit Rate

14.7 Supplying, fitting and fixing of aluminium sliding composite window with mosquito mesh as per the U.S.
Architectural Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having
1.2 mm thick outer bottom (size 95.00 mm, 38 mm, 0.870 kg/m), 1.2 mm thick outer top (size 95.00 mm, 28.50
mm, 0.97kg/m), 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 22 mm, 0.536 kg/m), 1.2 mm thick shutter
bottom (size 60 mm, 24.40 mm, 0.736 kg/m), 1.2 mm thick outer side (size 95.00 mm, 19.50 mm, 0.738 kg/m),
1.2 mm thick shutter lock (size 49.20 mm, 26.2 mm, 0.661 kg/m), 1.2 mm thick shutter lock (size 34.40 mm,
32.10 mm, 0.665 kg/m), 1.2 mm thick mesh section (size 42.20 mm, 13.20 mm 0.460 kg/m), all aluminium
members (total weight 12.79 kg) will be anodized to aluminium bronze/silver/ss/black colour with a coat not less
than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness
and density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door wheel,
sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping provision for fitting fiber
mesh including labour charge for fitting of accessories, making grooves and mending good damages, carriage,
and electricity complete in all respect as per drawing and accepted by the Engineer-in-charge.

734
14.7.1 Size up to: 1524 mm x 1372 mm 735
14.7.1.1 Anodized to s.s colour/ black colour sqm Tk. 4,626.00 736
14.7.1.2 Anodized to bronze colour sqm Tk. 4,518.00 737
14.7.1.3 Anodized to silver colour sqm Tk. 4,423.00 738
14.7.1.4 Powder coated to any colour sqm Tk. 4,755.00 739
14.7.2 Size up to: 1280 mm x 1372 mm 740
14.7.2.1 Anodized to s.s colour/ black colour sqm Tk. 5,231.00 741
14.7.2.2 Anodized to bronze colour sqm Tk. 5,112.00 742
14.7.2.3 Anodized to silver colour sqm Tk. 5,009.00 743
14.7.2.4 Powder coated to any colour sqm Tk. 5,372.00 744
14.7.3 Size up to: 762 mm x 610 mm 745
14.7.3.1 Anodized to s.s colour/ black colour sqm Tk. 10,553.00 746
14.7.3.2 Anodized to bronze colour sqm Tk. 10,340.00 747
14.7.3.3 Anodized to silver colour sqm Tk. 10,156.00 748
14.7.3.4 Powder coated to any colour sqm Tk. 10,810.00 749
14.8 Supplying, fitting and fixing of aluminium fixed composite window as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm thick outer
bottom (size 75.50 mm, 32 mm, 0.695 kg/m), 1.2 mm thick outer top (size 75.50mm, 26.80 mm, 0.78 kg/m), 1.2
mm thick shutter top (size 33 mm, 26.80 mm, 0.536 kg/m), 1.25 mm thick shutter bottom (size 60 mm, 24.40
mm, 0.736 kg/m), 1.2 mm thick outer side (size 75.50 mm, 19.90 mm, 0.616 kg/m), 1.2 mm thick sliding fixed
side (size 31 mm, 26 mm, 0.422 kg/m), 1.2 mm thick shutter lock (size 49.20 mm, 26.20 mm, 0.661 kg/m), 1.2
mm thick inter lock (size 34.40 mm, 32.10 mm 0.665 kg/m) 1.2 mm thick bottom cover (size 37.78 mm, 31.78
mm, 0.313 kg/m), 1.2 mm thick grouve cover (size 76.20 mm, 38.10 mm, 0.912 kg/m), 1.2 mm thick grouve
cover ( size 57.15 mm, 15.80 mm, 0.452 kg/m) and 1.2 mm thick top and side (size 76.20 mm, 38.10 mm, 0.3
kg/m) sections all aluminium members (total weight 12.297 kg) will be anodized to aluminium
bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour
with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc.including all
accessories like sliding door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and
nuts including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting of
accessories, making grooves and mending good damages, carriage, and electricity complete in all respect as
per drawing and accepted by the Engineer-in-charge.
Size up to: 1500 mm x 2100 mm.

750
14.8.1 Anodized to s.s colour/ black colour sqm Tk. 3,474.00 751
14.8.2 Anodized to bronze colour sqm Tk. 3,409.00 752
14.8.3 Anodized to silver colour sqm Tk. 3,355.00 753
14.8.4 Powder coated to any colour sqm Tk. 3,581.00 754
14.9 Supplying, fitting and fixing of aluminium top hung/casement windows as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm thick casement
outer (size 38.86 mm, 36.36 mm, 0.395kg/m), 1.9 mm thick casement shutter (size 47.62 mm, 28.57 mm, 0.692
kg/m), and 1.245 mm thick shutter glass clip (size 15.87 mm, 27 mm, 0.188 kg/m) sections of all aluminium
members (total weight 7.584 kg) will be anodized to aluminium bronze/silver/ss/black colour with a coat not less
than 15 micrones in thickness or powder coated to any colour with a coat not less than 25 micrones in thickness
and density of 4 mg per square cm etc.including all accessories 4-bar hinge, casement handle, bolts and nuts
keeping provision for fitting 5 mm thick glass including labour charge for fitting of accessories, making grooves
and mending good damages, carriage, and electricity complete in all respect as per drawing and accepted by
the Engineer-in-charge.

755
14.9.1 Anodized to s.s colour/ black colour sqm Tk. 11,099.00 756
14.9.2 Anodized to bronze colour sqm Tk. 10,980.00 757
14.9.3 Anodized to silver colour sqm Tk. 10,871.00 758
14.9.4 Powder coated to any colour sqm Tk. 11,237.00 759
Item No. Description of Item Unit Unit Rate

14.10 Supplying fitting and fixing of aluminium corrugated curtain wall as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm thick bottom
cover (size 37.78 mm 31.78 mm, 0.313 kg/m), 1.2 mm thick grouve cover (size 76.20 m 38.10 mm, 0.912 kg/m),
1.2 mm thick grouve cover (size 57.15 mm, 15.80 mm 0.45 kg/m), 1.2mm thick top and side (size 76.2 mm,
57.15 mm, 0.153 kg/m) and 1.8 mm thick spandrel (7.14 mm, 0.70 kg/m) sections of will be anodized to
aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to
any colour with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including
all accessories like rivet, screws fixed neoprene etc. complete in all respect as per drawing and accepted by the
Engineer-in-charge.

760
14.10.1 Size up to: 3000 mm x 2100 mm (Total weight 50.228 kg) 761
14.10.1.1 Anodized to s.s colour/ black colour sqm Tk. 5,868.00 762
14.10.1.2 Anodized to bronze colour sqm Tk. 5,761.00 763
14.10.1.3 Anodized to silver colour sqm Tk. 5,612.00 764
14.10.1.4 Powder coated to any colour sqm Tk. 6,001.00 765
14.10.2 Size up to: 3000 mm x 750 mm (Total weight 26.136 kg) 766
14.10.2.1 Anodized to s.s colour/ black colour sqm Tk. 7,366.00 767
14.10.2.2 Anodized to bronze colour sqm Tk. 7,202.00 768
14.10.2.3 Anodized to silver colour sqm Tk. 7,025.00 769
14.10.2.4 Powder coated to any colour sqm Tk. 7,513.00 770
14.11 Supplying fitting and fixing of aluminium fixed fan light as per the U.S. Architectural Aluminium Manufacturer’s
Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm thick bottom cover (size 76.2
mm, 38.10 mm, 0.76 kg/m) and 2.5 mm thick grouve cover section (size 57.15mm, 15.80 mm, 0.425 kg/m) and
1.2 thick top and side section (76.20 mm, 16 mm, 38.10 mm, 0.961 kg/m) fixed with above mentioned frames
and all aluminium members (Total weight 5.365kg) will be anodized to aluminium bronze/silver/ss/black colour
with a coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25
micrones in thickness and density of 4 mg per square cm etc. including all accessories, neoprene, sealant, nut
and bolt etc. complete in all respect as per drawing and accepted by the Engineer-in-charge.

771
14.11.1 Anodized to s.s colour/ black colour sqm Tk. 4,304.00 772
14.11.2 Anodized to bronze colour sqm Tk. 4,241.00 773
14.11.3 Anodized to silver colour sqm Tk. 3,917.00 774
14.11.4 Powder coated to any colour sqm Tk. 4,149.00 775
14.12 Supplying fitting and fixing of aluminium fixed louver as per the U.S. Architectural Aluminium Manufacturer’s
Association (AAMA) standard specification and BDS 1879:2014 having 1.2mm thick wall frame (size 76.20 mm,
38.10 mm, 0.707 kg/m), 5 mm thick louver section (size 55.02 mm, 37.39 mm, 0.22kg/m) and 2.50 mm thick
louver outer section (size 39.67 mm, 15.06 mm, 0.265 kg/m) and inner inclined aluminium louver section fixed
with above mentioned frame and all aluminium members (total weight 7.992 kg) will be anodized to aluminium
bronze/silver/ss/black colour with a coat not less than 15 micrones in thickness or powder coated to any colour
with a coat not less than 25 micrones in thickness and density of 4 mg per square cm etc. including all
accessories, neoprene, sealant, nuts and bolts etc. complete in all respect as per drawing and accepted by the
Engineer-in-charge.

776
14.12.1 Anodized to s.s colour/ black colour sqm Tk. 7,168.00 777
14.12.2 Anodized to bronze colour sqm Tk. 6,992.00 778
14.12.3 Anodized to silver colour sqm Tk. 6,948.00 779
14.12.4 Powder coated to any colour sqm Tk. 7,621.00 780
14.13 Supplying, fitting, fixing of aluminium sliding fly proof Netting shutter as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.2mm thick outer frame
(size 38mm x 18mm), 1.2mm thick mosquito net shutter frame mesh section (size 38mm x 12mm). All
aluminium members (total weight 12.79 kg) will be anodized to aluminium bronze/silver/ss/black colour with a
coat not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25
micrones in thickness and density of 4 mg per square cm etc. including all accessories like wheel, sealent,
rubber, bolts and nuts keeping provision for fitting fiber mesh including labour charge for fitting of accessories,
making grooves and mending good damages, carriage, and electricity, all complete in all respect as per drawing
and accepted by the Engineer-in-charge.

781
14.13.1 Anodized to s.s colour/ black colour sqm Tk. 3,045.00 782
14.13.2 Anodized to bronze colour sqm Tk. 2,961.00 783
14.13.3 Anodized to silver colour sqm Tk. 2,866.00 784
14.13.4 Powder coated to any colour sqm Tk. 3,158.00 785
14.14 Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall distortion free glass
of approved quality and shade including cost of fitting fixing all necessary accessories etc. complete in all
respect as per drawing and accepted by the Engineer-in-charge.
786
14.14.1.1 5 mm thick clear glass sqm Tk. 1,133.00 787
14.14.1.2 6 mm thick clear glass sqm Tk. 1,380.00 788
14.14.2.1 5 mm thick tinted glass sqm Tk. 1,352.00 789
14.14.3.1 5 mm thick ambushed/ frosted glass sqm Tk. 1,120.00 790
14.14.4.1 5 mm thick reflecting glass sqm Tk. 1,350.00 791
Item No. Description of Item Unit Unit Rate

14.14.4.2 6 mm thick reflecting glass sqm Tk. 1,493.00 792


14.15 Supplying, fabrication and Installation of approved colour (4 mm thick) Aluminium composite panel sqm Tk. 6,944.00
(Alucobond/Alcopanel/Alpolic) as per US Architectural Aluminium Manufacturer's Association (AAMA) in
column, beam and wall surface providing with 44 mm x 44 mm x 1.5 mm aluminum section including supply of
necessary hardwares, consumables, scaffolding etc. fitted with necessary accessories like rivet, screw, rowel
bolt etc. all complete in all respect as per drawing and direction of the Engineer-in-charge.

793
14.16 Supplying, fitting and fixing of aluminium curtain wall with aluminium top hung/casement windows as per the US sqm Tk. 9,240.00
Architectural Aluminium Manufacturer's Association (AAMA) standard specification and BDS 1879:2014 having
100 mm , 50mm, 2mm curtain wall sub-mullim outer and inner frame, 15 mm thick casement outer frame (size
38.86 mm 36.6 mm), 1.9 mm thick casement shutter (size 47.62 mm, 28.57 mm,) 1.2 mm thick shutter glass
strips, all aluminium member will be powder coated with coat not less than 1.5 micron in thickness including all
accessories 4 bar hinge casement handle, 50 mm x 50 mm x 6 mm aluminium angle, steel rowel bolt, screws ,
rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per
drawing and direction of the Engineer-in-charge.

794
14.17 Supplying, fitting and fixing of aluminium curtain wall and aluminium top hung/casement windows ad per the US sqm Tk. 7,832.00
Architectural Aluminium Manufacturer's Association (AAMA) standard specification and BDS 1879:2014 having
50 mm , 50 mm, 2 mm curtain wall sub-mullim outer and inner frame, 15 mm thick casement outer frame (size
38.86 mm 36.6 mm), 1.9 mm thick casement shutter (size 47.62mm, 28.57mm,) 1.2 mm thick shutter glass
strips, all aluminium member will be powder coated with coat not less than 1.5 micron in thickness including all
accessories 4 bar hinge casement handle, 50 mm x 50 mm x 6 mm aluminium angle, steel rowel bolt, screws ,
rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per
drawing and direction of the Engineer-in-charge.

795
14.18 Supplying, fitting and fixing of aluminium curtain wall along with 10 mm thick clear tempered glass as per the US sqm Tk. 10,303.00
Architectural aluminium Manufacturer's Association (AAMA) Standard Specification and BDS 1879:2014 having
115 mm , 64 mm, 3 mm curtain wall sub-mullim outer and inner frame, 15 mm thick casement outer frame (size
38.86 mm 36.6mm), 1.9 mm thick casement shutter (size 47.62 mm, 28.57 mm,) 1.2 mm thick shutter glass
strips, all aluminium member will be powder coated with coat not less than 1.5 micron in thickness including all
accessories 4 bar hinge casement handle, 50 m x 50mm x 6m aluminium angle, steel rowel bolt, screws , rivets
norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect as per drawing and
direction of the Engineer-in-charge.

796
14.19 Supplying, fitting and fixing of 12 mm thick clear tempered glass wall upto 3.0 m height with vertical fin glass sqm Tk. 19,790.00
support of same thickness and support shall be at least 1.2 m c/c fixed properly with glass by silicon glue with
supply and fittings of all required accessories such as SS u channel, nut bolts, aluminium angle, steel rowel
bolt, screws , rivets norton tape masking tape, structural sealant, gum bracket rod etc. all complete in all respect
as per drawing and direction of the Engineer-in- charge.

797
14.20 Supplying, fitting and fixing of 12 mm thick tempered glass wall from 3.0 m to 6.0 m height with spider point sqm Tk. 19,782.00
fixing joint and vertical fin glass support of same thickness, support shall be at least 1.2 m c/c fixed properly with
main glass by silicon glue with supply and fittings of all required accessories such as SS u chennel, nut bolts,
aluminium angle, steel rowel bolt, screws , rivets norton tape masking tape, structural sealant, gum bracket rod
etc. all complete in all respect as per drawing and direction of the Engineer-in-charge.

798
14.21 Supplying, fitting and fixing of 12 mm thick clear tempered glass wall from 6.0 m to 8.2 m height with spider sqm Tk. 20,076.00
point fixing joint and vertical/ horizontal fin glass support of double thickness, support shall be at least 2 m c/c
fixed properly with main glass by silicon glue with supply and fittings of all required accessories such as SS u
chennel, nut bolts, aluminium angle, steel rowel bolt, screws , rivets norton tape masking tape, structural
sealant, gum bracket rod etc. all complete in all respect as per drawing and direction of the Engineer-in-charge.

799
800
801
802
………………….. END OF DIVISION FOURTEEN ………………….. 803
DIVISION 15 : CEMENT PLASTER, FAIR-FACE PLASTER AND POINTING WORKS 804
Item No. Description of Item Unit Unit Rate 805
15.1 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to both inner-and outer surface of sqm Tk. 243.00
wall, finishing the corner and edges including washing of sand, cleaning the surface, curing at least for 7 days,
cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.
806
15.2 Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall with cement (1:4) sqm Tk. 280.00
up to 150 mm below ground level including washing of sand, finishing the edges and corners and curing at least
for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.

807
15.3 Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to dado with cement (1:4) up to sqm Tk. 295.00
150 mm including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water,
electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.
808
Item No. Description of Item Unit Unit Rate

15.4 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:6) having with fresh cement to both inner and outer sqm Tk. 228.00
surface of wall, finishing the edges and corners including washing of sand, cleaning the surface, curing at least
for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.
809
15.5 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling, R.C.C. columns, beams, sqm Tk. 225.00
surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges
including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding
and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M) ground floor.
810
15.6 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:3) with fresh cement to ceiling, R.C.C. columns, beams, sqm Tk. 222.00
surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges
including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding
and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M) ground floor.
811
15.7 Flush pointing to brick wall with cement sand (F.M. 1.2) mortar (1:2) with cement including raking out the joints, sqm Tk. 141.00
curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect
as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.
812
15.8 Rule pointing to brick wall with cement sand (F.M. 1.2) mortar (1:2) with fresh cement and raking out the joints, sqm Tk. 179.00
curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect
as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.
813
15.9 Raised or tack pointing work to brick wall with cement sand (F.M. 1.2) mortar (1:2) with fresh cement of sqm Tk. 441.00
minimum 12 mm x 20 mm in size including raking out the joints and necessary scaffolding, curing at least for 7
days, cleaning each and every brick, cutting the bricks with pumice stone where necessary etc. all complete in
all floors, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.

814
15.10 Providing drip course or nosing at the edge of sunshade or cornice with cement sand (F.M. 1.2) mortar (1:2) meter Tk. 116.00
with fresh cement, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all
complete in all respect as per drawing and accepted by the Engineer-in-charge.
815
15.11.1 Making groove in plaster on outside wall upto 50 mm X 6 mm size including scaffolding, curing etc. complete as meter Tk. 22.00
per drawing and accepted by the Engineer-in-charge. 816
15.11.2 Making groove in plaster on outside wall upto 38 mm X 6 mm size including scaffolding, curing etc. complete as meter Tk. 35.00
per drawing and accepted by the Engineer-in-charge. 817
15.12 Minimum 10 mm thick fair face plaster using premix cement plaster (CP2 LGT/Stucco base premix or sqm Tk. 1,775.00
equivalent); initial background should be 19 mm rough cement plaster (1:4); then after passing 7 days curing
time surface of newly constructed rough plaster should be throughly cleaned using a stiff brush to remove any
dust, loose particles, wood pieces, mould oil etc, then the backgound needs to be throughly neutralized by
applying potable water; Mixing premix cement plaster with water at water/powder ratio according to the
specification of the manufacturer to form paste and apply on rough plaster surface; powder for making paste
must be mixed with potable water only; apply the paste on the rough plaster surface by trowel to get smooth
and shiny surface and cure the finished plaster suface for 2-3 days(3-4 times daily); finally water repellent
coating to protect concrete surface; all complete with necessary scaffolding etc. accepted by the Engineer-in-
charge.(Rate is excluding the cost of 19 mm thick rough cement plaster and water repellent paint)
Ground Floor

818
15.13.1 Making groove in fair face plaster on outside wall upto 50 mm X 6 mm size including scaffolding, curing etc. meter Tk. 44.00
complete as per drawing and accepted by the Engineer-in-charge. 819
15.13.2 Making groove in fair face plaster on outside wall upto 38 mm X 6 mm size including scaffolding, curing etc. meter Tk. 54.00
complete as per drawing and accepted by the Engineer-in-charge. 820
15.14 Minimum 1mm thick fair face coating using Master Emaco N 303 Rendroc FC/Top Crete 220 or equivalent sqm Tk. 1,362.00
product micro toping skim coat, a high performance single component polymer fortified, colored, cementitious
micro topping that can be applied on a variety of horizontal and vertical plaster surfaces; initially background
should be thoroughly cleaned using a stiff brush to remove any dust, loose particles, mould oil etc.; then the
background needs to be thoroughly neutralized by applying potable water ; The ratio of fair face coating and
water is 1.5:1 to 2:1 or as required for workability ; powder will be mixed with potable water in a drum by
blending machine; the mixture can be spread to any horizontal and vertical plaster surface using trowel to get
smooth and shiny surface; all complete with necessary scaffolding etc. accepted by the Engineer-in-charge.
(Rate is excluding the cost of 19 mm thick rough cement plaster)
Ground floor.

821
15.15.1 Minimum 12mm thick cement sand (F.M-1.2) water proof, damp proof, dry and breathable plaster (1:4) with sqm Tk. 504.00
water proof Izonil Cement (STN-EN -1015-11 , Compressive Strength 34 MPa ,Max depth of water penetration
into hardened plaster is < 1 mm) or equivalent compound to wall surface, finishing the corner and edges
including washing of sand, cleaning the surface, scaffolding and curing at least for 3 days, cost of water,
electricity and other charges etc. all complete in all respect as per drawing and accepted by the Engineer –in-
charge. (Izonil Cement/equivalent compound: Water proof, damp proof, dry and breathable cement).

822
15.15.2 Minimum 19mm thick cement sand (F.M-1.2) water proof, damp proof, dry and breathable plaster (1:4) with sqm Tk. 655.00
water proof Izonil Cement (STN-EN -1015-11 , Compressive Strength 34 MPa ,Max depth of water penetration
into hardened plaster is < 1 mm) /equivalent compound to wall surface, finishing the corner and edges including
washing of sand, cleaning the surface, scaffolding and curing at least for 3 days, cost of water, electricity and
other charges etc. all complete in all respect as per drawing and accepted by the Engineer –in-charge. (Izonil
Cement/equivalent compound: Water proof, damp proof, dry and breathable cement).
823
Item No. Description of Item Unit Unit Rate

15.16 Extra rate for plaster and all types of pointing shall be incorporated in the estimate 824
15.16.1 Add for each additional floor up to 5th floor. sqm Tk. 14.00 825
15.16.2 Add for each additional floor for 6th floor to 9th floor sqm Tk. 21.00 826
15.16.3 Add for each additional floor 10th floor and above sqm Tk. 28.00 827
15.17 Pre-cast ventilators of minimum 25 mm thick of any design with cement sand (F.M.1.2) mortar (1:4) fitted and sqm Tk. 2,103.00
fixed in position, finishing with cement sand (F.M. 1.2) plaster (1:6) including necessary scaffolding and curing,
in all floors accepted by the Engineer-in-charge. (Cement: CEM-II/A-M)
828
15.18 75 mm x 75 mm cornice of brick masonry in cement sand (F.M. 1.2) mortar (1:6) having minimum 12 mm thick meter Tk. 216.00
cement sand (F.M. 1.2) plaster (1:6) including scaffolding and curing at least for 7 days in all floors accepted by
the Engineer-in-charge. (Cement: CEM-II/A-M) 829
15.19 Supplying, fitting, fixing of broken and sharp glass 19 mm to 32 mm height, av. 19 mm width placed at a sqm Tk. 223.00
distance approximately 25 mm center to center, embedding the same to 12 mm to 19 mm thick cement plaster
with neat cement finishing including necessary scaffolding approved and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M)
830
831
832
833
………………….. END OF DIVISION FIFTEEN ………………….. 834
DIVISION 16 : PAINTING AND POLISHING
835
Item No. Description of Item Unit Unit Rate 836
16.1.1 Exterior standard acrylic emulsion paint of approved best quality and color having water resisting properties and sqm Tk. 238.00
resistance properties against fungi, fading & flaking delivered from authorized local agent of the manufacturer
(Berger weather coat smooth/ Elite smooth exterior/ Asian apex weather coat or equivalent brand) in a sealed
container; applying to exterior surface with surface preparation including cleaning, drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand
paper and necessary scaffolding; applying 1 coat of exterior sealer of specified brand on prepared surface; then
applying 1 coat of exterior putty of specified brand for levelling, spot filling, crack filling and cutting by sand
paper/zero water paper; finally applying 2 coats of exterior emulsion paint spreading by brush/roller/spray &
necessary scaffolding etc. upto desired finishing, elapsing specified time for drying or recoating; all complete in
all floors and accepted by the Engineer-in-charge.

837
16.1.2 Exterior premium acrylic emulsion paint of approved best quality and color with high performance against dirt sqm Tk. 261.00
picking tendency and efflorosence resistence properties along with water resisting properties and resistance
properties against fungi, fading and flaking from authorized local agent of the manufacturer (Berger Weather
Coat Antidirt Long Life/ Elite Master Coat/ Asian Apex Ultima or equivalent brand) in a sealed container;
applying to exterior surface with surface preparation including cleaning drying, making free from dirt, grease,
wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper
and necessary scaffolding; applying 1 coat of exterior sealer of specified brand on prepared surface; then
applying 1 coat of exterior putty of specified brand for levelling, spot filling, crack filling and cutting by sand
paper/zero water paper; finally applying 2 coats of exterior emulsion paint spreading by brush/roller/spray &
necessary scaffolding etc. upto desired finishing, elapsing specified time for drying or recoating; all complete in
all floors and accepted by the Engineer-in-charge.

838
16.2.1 Interior standard acrylic emulsion paint (plastic or matt finish) of approved best quality and colour delivered sqm Tk. 234.00
from authorized local agent of the manufacturer (Berger robbialac plastic emulsion/Asian apcolite plastic
emulsion or equivalent brand) in a sealed container; applying to interior wall and ceiling with surface preparation
including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials,
fungus, mending good the surface defects using sand paper and necessary scaffolding; applying 1 coat of
interior sealer of specified brand on prepared surface; then applying 1 coat of interior putty of specified brand for
levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of interior
emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing
specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge.

839
16.2.2 Interior premium acrylic emulsion painting (silky finish) of approved best quality and colour delivered from sqm Tk. 259.00
authorized local agent of the manufacturer(Berger luxury silk emulsion/Elite super aclose silky finish/Asian royal
luxury silk emulsion or equivalent brand) in a sealed container; applying to interior wall and ceiling with surface
preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled
materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying 1
coat of interior sealer of specified brand on prepared surface; then applying 1 coat of interior putty of specified
brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats
of interior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. upto desired finishing,
elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-in-charge.

840
Item No. Description of Item Unit Unit Rate

16.2.3 Interior super premium acrylic emulsion painting (odorless) of approved best quality and colour delivered from sqm Tk. 273.00
authorized local agent of the manufacturer(Berger breath easy or equivalent brand) in a sealed container;
applying to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand
paper and necessary scaffolding; applying 1 coat of interior sealer of specified brand on prepared surface;
then applying 1 coat of interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand
paper/zero water paper, finally applying 2 coats of interior emulsion paint spreading by brush/roller/spray &
necessary scaffolding etc. upto desired finishing, elapsing specified time for drying or recoating; all complete in
all floors accepted by the Engineer-in-charge.

841
16.3.1 Standard Synthetic Enamel paint of approved best quality and colour delivered from authorized local agent of sqm Tk. 189.00
the manufacturer (Berger jhilik synthetic enamel/Elite quick drying/Asian decora synthetic enamel or equivalent
brand) in a sealed container, having high water resistance, high bondibility, flexibility property; using specified
brand thinner applying to metallic or wooden surface by brass/roller/spray in 2 coats over single coat anti-
corrosive coating including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled
materials, all complete in all floors and accepted by the Engineer-in-charge.

842
16.3.2 Premium Synthetic Enamel paint of approved best quality and colour delivered from authorized local agent of sqm Tk. 198.00
the manufacturer(Berger robbialac supergloss synthetic enamel/Elite lucky seven/ Asian apcolipe premium paint
or equivalent brand) in a sealed container, having high water resistance, high bondibility, flexiblity property;
using specified brand thinner applying to metallic or wooden surface by brass/roller/spray in two coats over
single coat anti-corrosive coating including cleaning, drying, making free from dirt, grease, wax, removing all
chalked and scaled materials, all complete in all floors and accepted by the Engineer-in-charge.

843
16.4 Interior design paint of approved best quality and colour delivered from authorized local agent of the sqm Tk. 706.00
manufacturer (Berger illusion/Elite elunima/Asian royal play or equivalent brand) in a sealed container; applying
to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax,
removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and
necessary scaffolding; applying 1 coat of interior sealer of specified brand on prepared surface; then applying
1 coat of interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero
water paper; applying 3 coats of interior design paint; 1st coat on prepared suface , then applying 1 design coat
on the 1st coat and finally applying 1 protection coat on the design coat for protecting the design spreading by
brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing specified time for drying or
recoating; all complete in all floors and accepted by the Engineer-in-charge.

844
16.5 Textured paint of approved best quality and colour delivered from authorized local agent of the manufacturer in sqm Tk. 620.00
a sealed container; applying to interior wall and ceiling including surface preparation including cleaning drying,
making free from dirt, grease, wax, removing all chalked and scaled materials, fungus if required must be
treated with fungicidal solution, mending good the surface defects using sand paper and necessary scaffolding;
applying 1 coat of interior sealer of specified brand on prepared surface; then applying 1 coat of interior putty of
specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; applying 3
coats of texture paint; 1st coat on prepared suface , then applying 1 texture coat on the 1st coat and finally
applying 1 top coat on the texture coat upto desired finishing by brush/roller/spray etc. with necessary
scaffolding ; all complete in all floors and accepted by the Engineer-in-charge.

845
16.6 Chlorinated rubber paint of approved quality and colour delivered from authorized local agent of the sqm Tk. 329.00
manufacturer in a sealed container; surface preparation including cleaning, drying, making free from dirt,
grease, wax, removing all chalked and scaled materials, fungus (if required must be treated with fungicidal
solution) flaking paints, washing the surface with soap water/caustic soda, mending good the surface defects,
smoothening the surface by putty, sand papering the surface; applying to concrete surfaces and walls in three
coats by brush/roller/spray etc. upto desired finishing, elapsing specified time for drying and re-coating; with
necessary scaffolding all complete in all floors and accepted by the Engineer-in-charge.

846
16.7 Epoxy Enamel paint of approved quality and colour delivered from authorized local agent of the manufacturer in sqm Tk. 418.00
a sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing
all chalked and scaled materials, fungus (if required must be treated with fungicidal solution) flaking paints,
washing the surface with soap water/caustic soda, mending good the surface defects, smoothening the surface
by putty, sand papering the surface; applying to concrete surfaces and walls in three coats by brush/roller/spray
etc. upto desired finishing;elapsing specified time for drying and re-coating; with necessary scaffolding all
complete in all floors and accepted by the Engineer-in-charge.

847
16.8 Silicon based water repellent of approved quality delivered from authorized local agent of the manufacturer in a sqm Tk. 226.00
sealed container; surface preparation including cleaning, drying, making free from dirt, grease, wax, removing
all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary
scaffolding; applying 3 coats of silicon based water repellent on exposed brick surface/fair face surface
spreading by brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing specified time for
drying or recoating; all complete in all floors and accepted by the Engineer-in-charge.

848
16.9 French polishing to door and window frames and shutter by three coats over a coat of priming including putty, sqm Tk. 372.00
cleaning, finishing and polishing with sand paper etc. all complete in all floors and accepted by the Engineer-in-
charge. 849
16.10 Wood varnishing of approved quality and colour delivered from authorized local agent of the manufacturer in a
sealed container using brand specified thinner to door and window frame and shutter in three coats, applied
with brush including cleaning oil, grease, dirt, making dry, sand papering, if required washing with weak
detergent solution, stripping out the colour straps, finishing the surface, etc. all complete in all floors and
accepted by the Engineer-in-charge.
850
Item No. Description of Item Unit Unit Rate

16.10.1 Yacht sqm Tk. 188.00 851


16.10.2 Egg-shell sqm Tk. 189.00 852
16.10.3 Matt sqm Tk. 188.00 853
16.11 Approved best quality and colour synthetic polyvinyl distemper delivered from authorized local agent of the sqm Tk. 196.00
manufacturer in a sealed container, applying to wall and ceiling with surface preparation including cleaning
drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good
the surface defects using sand paper and necessary scaffolding; applying 1 coat of interior sealer of specified
brand on prepared surface; then applying 1 coat of interior putty of specified brand for levelling, spot filling,
crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of synthetic polyvinyl distemper
spreading by brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing specified time for
drying or recoating; all complete in all floors and accepted by the Engineer-in-charge.

854
16.12 White washing by three coats, lime mixture prepared at least 12 hours before use, slacking stone lime, sqm Tk. 22.00
supplying of gums, blue, stirring thoroughly, removing the floating materials from the mixer, surface cleaning to
free from all foreign materials before application of each coat, applying one vertical and one horizontal wash for
each coat and successive coat is to be applied after drying up of previous coat including hair brass, providing
necessary scaffolding and cleaning plinth, floors, doors, windows, portions and ventilators by washing, rubbing,
oiling if necessary after white wash for all floors including cost of water, electricity and other charges etc.
complete in all respect in all floors and accepted by the Engineer-in-charge.

855
16.13 Colour wash with yellow orchard/any other colour pigment by two coats over a prime coat of white wash, lime sqm Tk. 25.00
mixture prepared at least 12 hours before use, slacking stone lime, supplying of gums, blue, stirring thoroughly,
removing the floating materials from the mixer, surface cleaning to free from all foreign materials before
application of each coat, applying one vertical and one horizontal wash for each coat and successive coat is to
be applied after drying up of previous coat including hair brass, providing necessary scaffolding and cleaning
plinth, floors, doors, windows, portions and ventilators by washing, rubbing, oiling if necessary after white wash
for all floors including cost of water, electricity and other charges etc. complete in all respect in all floors and
accepted by the Engineer-in-charge.

856
16.14 Application of 02 coats of self leveling epoxy compound (4 mm thick) as base coat & finishing coat over a single sqm Tk. 2,079.00
layer of screet coat (primer) for making smooth floor surface; all chemicals delivered from authorized local agent
of the manufacturer in sealed container; materials having high water resistence, high bondibility, flexibility
property; applying by applicator machine after being mixed by force action mixer elapsing time for drying;
surface preparation including surface cleaning from dust, oil or dirt, preparing underlying surface having
minimum moisture content, smoothening, finishing & polishing by grinding machine & necessary tools, repairing
significant ups/downs in floor before application with sacaffolding, testing charges etc. all complete in all floors
approved & accepted by the Engineer-in-charge.

857
858
859
860
………………….. END OF DIVISION SIXTEEN ………………….. 861
DIVISION 17: LIME TERRACING, ROOF TOP WATER PROOFING FOR GARDEN & SWIMMIMG POOL 862
Item No. Description of Item Unit Unit Rate 863
17.1 Supply and application of non-toxic two components acrylic polymer modified cementitious coating (minimum sqm Tk. 758.00
1.5 mm thickness) for water proofing of roof/ roof garden/ swimmimg pool which consists of powder and liquid
acrylic emulsion; under a protective cover of plaster/ cement concrete/ tiles etc. as per standard specification
and accepted by the Engineer-in-charge. (Rate is excluding the cost of protective cover)

864
17.2 Preparation and making gravel pack for roof top gardening with supply of 25 mm down graded pea gravels cum Tk. 4,392.00
including sieving, washing, compacting etc. complete as per standard specification and accepted by the
Engineer-in-charge. Ground floor 865
17.2.1 Extra rate for gravel pack work in additional floor: 866
17.2.1.1 Add for each additional floor up to 5th floor cum Tk. 102.00 867
17.2.1.2 Add for each additional floor for 6th floor to 9th floor cum Tk. 136.00 868
17.2.1.3 Add for each additional floor for 10th floor and above cum Tk. 171.00 869
17.3 Supply and application of 19mm thick (9.5 mm X 2 layer) water proof, damp proof, dry and breathable plaster on sqm Tk. 1,002.00
roof slab/ underground water reservoir/ overhead water reservoir/ basement/retaining wall with water proof,
damp proof, dry and breathable Izonil cement (STN-EN -1015-11 , compressive strength 34 MPa ,max depth of
water penetration into hardened plaster is < 1 mm) or equivalent compound in a proportion of 1:2.4 (Izonil
cement or equivalent compound 1: sand 2.4) after cement grouting on existing concrete surface including
finishing the corner and edges, washing sand, cleaning the surface scaffolding and curing at least 3 days etc. all
completed in all respects as per direction of Engineering-in-charge. Above mentioned plaster includes glass
fiber mesh of 10 mm X 10 mm grid and weight 110 gm/sqm placed in between two layers.

870
Item No. Description of Item Unit Unit Rate

17.4 Average 100 mm thick finished lime terracing with 20 mm down graded first class brick chips (khoa), surki from cum Tk. 13,165.00
1st class bricks and minimum lime content 500 kg per 2.83 cubic meter (stone lime brought at site, not being
powdered in open air and to be slaked in presence of engineer-in-charge and to be measured in volume three
days after slaking for using in the mix) in the proportion 7:2:2 (brick chips : surki : lime) including preparation of
the mix on the ground by making a suitable platform under proper polythene cover. Cutting the mix twice daily
with limewater (1:10) at least for 7 days until the mix attain desirable consistency. Laying the mix in proper
slope, beating the same with standard ‘koppa’ for minimum 7 days to gain maximum consolidation, making
ghoondy and neat finishing with lime Surki mortar (1:2) and curing for 21 days providing polythene cover after
each day work and cleaning etc. complete in all respect accepted by the Engineer-in-charge. Ist Floor

871
17.4.1 Extra rate for lime terracing work in additional floor: 872
17.4.1.1 Add for each additional floor up to 5th floor cum Tk. 102.00 873
17.4.1.2 Add for each additional floor for 6th floor to 9th floor cum Tk. 136.00 874
17.4.1.3 Add for each additional floor for 10th floor and above cum Tk. 171.00 875
17.5.1 25 mm thick ferrocement treatment work for water proofing on roof having minimum cement content relates to sqm Tk. 1,265.00
mix ratio 1:2 cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5MPa)/ASTM-C 150 type–1, and best
quality coarse sand (F.M. 2.2) including, the supply of all materials, cutting, binding of one layer of 20 BWG
galvanized wire mesh having minimum yield strength fy = 450 MPa & having 2 mesh per 25 mm in both ways,
clear cover 12 mm at the middle of the ferrocement lining, with washing of sand, chipping, cleaning the surface,
watering, grouting, casting, laying on proper level of roof top or floor in panels (1.25 m x 1.25 m). Compaction
including leveling, curing at least for 21 days including cost of water, electricity, in all respect as per drawing,
design and accepted by the Engineer-in-charge.

876
17.5.2 25 mm thick ferrocement treatment work for heat and water proofing on roof having minimum cement content sqm Tk. 1,603.00
relates to mix ratio 1:2 cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5MPa)/ASTM-C 150 type–1, and
best quality coarse sand (F.M. 2.2) including, the supply of all materials, cutting, binding of one layer of 20 BWG
galvanized wire mesh having minimum yield strength fy = 450 Mpa & having 2 mesh per 25mm in both ways,
clear cover 12mm at the middle of the ferrocement lining, applying 62 mm thick EPS sheet having density 15 kg
per cum, with washing of sand, chipping, cleaning the surface, watering, grouting, casting, laying on proper level
of roof top or floor in panels (1.25 m x 1.25 m). Compaction including leveling, curing at least for 21 days
including cost of water, electricity, in all respect as per drawing, design and accepted by the Engineer-in-charge.

877
878
879
880
………………….. END OF DIVISION SEVENTEEN ………………….. 881
DIVISION 18 : FALSE CEILING, WALL PANELING
882
Item No. Description of Item Unit Unit Rate
883
18.1.1 Supplying, fitting and fixing plain particle board ceiling (complying unit wt 499 to 550 kg/m3, bending strength sqm Tk. 2,913.00
0.35 N/mm2, max swelling 8%, moisture content not more than 10%), of 12 mm thick with best quality and well
seasoned Garjan wood frame of section 75 mm x 38 mm at 600 mm x 600 mm in grid suspended from ceiling or
roof or beam by 12 SWG double ply G.I. wire fixed to the ceiling by rowel plug, screws, hooks, nails etc,
maintaining straight lines and desired finished level at bottom face including vertical strut as required, cutting
holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the
work, also including cost and carriage of all materials, accessories, labour for installation, electricity charge,
scaffolding, screws, nails, painting 2 coats over a coat of priming with best quality and approved colour
synthetic enamel paint etc. all complete, as per drawing design and accepted by the Engineer-in-charge. (All
sizes of wood are finished)

884
18.1.2 Supplying, fitting and fixing plain particle board as in item 18.1.1. for ceiling of 12 mm for auditorium and other sqm Tk. 3,147.00
type of tall structures beyond 4 m up to 8 m, which do not cover the above item [Item No. 18.1.1]. Description of
item is the same as in item No. 18.1.1 above. 885
18.1.3 Supplying, fitting and fixing of 12 mm thick melamine board ceiling laminated by mechanical hot press milk white sqm Tk. 1,765.00
PVC membrane, framing by aluminium T-bar of natural anodized finish suspended in 600 mm x 600 mm grid
from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining
straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes
in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work,
also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc.
all complete as per drawing, design and accepted by the Engineer-in-charge.

886
18.2.1 Supplying, fitting and fixing gypsum board ceiling of 9 mm thick board laminated by mechanical hot press with sqm Tk. 2,130.00
milk white PVC membrane, framing by aluminium T-bar of natural anodized finish suspended in 600 mm x 600
mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc.,
maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required,
making holes in slabs or beams by electric drill machine and mending good the damages, if any during
execution of the work, also including cost of all materials, electricity, accessories, scaffoldings, labour for
installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge.

887
Item No. Description of Item Unit Unit Rate

18.2.2 Supplying, fitting and fixing veneered board ceiling of 12 mm thick board laminated by mechanical hot press sqm Tk. 2,546.00
with a milk white PVC membrane, framing by aluminium T-bar of natural anodized finish suspended in 600 mm
x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails
etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as
required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during
execution of the work, also including cost of all materials, electricity, accessories, scaffoldings, labour for
installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge.

888
18.2.3 Supplying, fitting and fixing of 9 mm thick perforated gypsum board false ceiling, framing by aluminium T-bar of sqm Tk. 2,208.00
natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to
the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at
bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine
and mending good the damages, if any during execution of the work, also including cost of all materials,
electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing,
design and accepted by the Engineer-in-charge.

889
18.2.4 Supplying, fitting and fixing of best quality 6 mm thick PVC board false ceiling of size 600 mm x 600 mm of sqm Tk. 3,153.00
approved design, minimumn PVC content of 35%, framing by aluminium T-bar of natural anodized finish
suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug,
screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical
wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the
damages, if any during execution of the work, also including cost of all materials, electricity, accessories,
scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the
Engineer-in-charge.

890
18.2.5 Supplying, fitting and fixing of 0.6 mm thick best quality solid aluminium metal board false ceiling of size 600 mm sqm Tk. 2,936.00
x 600 mm, powder coated of approved design, framing by aluminium T-bar of natural anodized finish
suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug,
screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical
wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the
damages, if any during execution of the work, also including cost of all materials, electricity, accessories,
scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the
Engineer-in-charge.

891
18.2.6 Supplying, fitting and fixing of 0.6 mm thick best quality perforated aluminium metal board false ceiling of size sqm Tk. 2,676.00
600 mm x 600 mm, powder coated of approved design, inner side is coverd by black tissue/ fabric to protect the
hole from air circulation, framing by aluminium T-bar of natural anodized finish suspended in 600 mm x 600
mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc.,
maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required,
making holes in slabs or beams by electric drill machine and mending good the damages, if any during
execution of the work, also including cost of all materials, electricity, accessories, scaffoldings, labour for
installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge.

892
18.2.7 Supplying, fitting & fixing of designed seamless false ceiling with 6 mm thick fiber cement board, framing by sqm Tk. 2,980.00
furring channel/ G. I. angle suspended in 600 mm x 600 mm grid from ceiling using G.I fitting angle, locking clips
etc. including plastic paint of desired colour, cost of all materials, electricity, accessories, scaffoldings, labour for
installation, screws, nails etc. all complete as per drawing, design and accepted by the Engineer-in-charge.
893
18.3.1 Supplying, fitting and fixing 12 mm thick burma teak (BT) veneered board in walling with best quality and well sqm Tk. 3,317.00
seasoned garjan wood frame of section 75 mm x 38 mm at 600 x 600 mm in grid, fitted and fixed to wall by
plugs, nails, screws etc. including treatment of inner surface with termite and damp proofing agent maintaining
leveled and finished exposed faces including. making holes in wall and mending good the damages, if any
during execution of the work, also including cost and carriage of all materials, electricity, accessories, labour for
installation, scaffolding, screws, nails etc. including french polishing by 3 coats over a coat of priming etc. all
complete as per design, approved sample and accepted by the Engineer-in-charge.

894
18.3.2 Supplying, fitting and fixing 12 mm thick particle board in walling with best quality and well seasoned Garjan sqm Tk. 2,661.00
wood frame of section 75 mm x 38 mm at 600 mm x 600 mm in grid, fitted and fixed to wall by plugs, nails,
screws etc. including treatment of inner surface with termite and damp proofing agent maintaining leveled and
finished exposed faces including. making holes in wall and mending good the damages, if any during execution
of the work, also including cost and carriage of all materials, electricity, accessories, labour for installation,
scaffolding, screws, nails etc. including french polishing by 3 coats over a coat of priming etc. all complete as
per design, approved sample and accepted by the Engineer-in-charge.

895
18.3.3 Supplying, fitting and fixing best quality wall paper along with 12 mm thick PVC solid board in walling with furring sqm Tk. 3,706.00
chanel frame of section 75 mm x 38 mm at 600 mm x 600 mm in grid, fitted and fixed to wall by plugs, nails,
screws etc. including treatment of inner surface with termite and damp proofing agent maintaining leveled and
finished exposed faces including making holes in wall and mending good the damages, if any during execution
of the work, also including cost and carriage of wall paper and other materials, electricity, accessories, labour for
installation, scaffolding, screws, nails etc. all complete as per design, approved and accepted by the Engineer-
in-charge.

896
18.3.4 Supplying, fitting and fixing best quality wall paper on finished plaster surface including cost and carriage of wall sqm Tk. 1,048.00
paper and other materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc. all
complete as per design, approved and accepted by the Engineer-in-charge.
897
………………….. END OF DIVISION EIGHTEEN ………………….. 898
Item No. Description of Item Unit Unit Rate

899
900
901
DIVISION 19 : COLLAPSIBLE GATE, M.S. GATE, ROLLING SHUTTER ETC.
902
Item No. Description of Item Unit Unit Rate
903
19.1.1 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 25 mm x 25 mm x sqm Tk. 17,525.00
3 mm S.S. angle placed @ 112 mm c/c vertically and connecting the same with each other by 25 mm x 3 mm
S.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including cutting the different S.S. members to
required sizes, fabricating, welding, riveting with required size rivets, providing required size wheels, pulling
handles on both sides, suitable locking arrangement, electrodes, grease and finally placing the same in position
in between 2 (two) nos. 50 mm x 50 mm x 6 mm S.S. tee rail made by welding 2 nos. 50 mm x 6 mm S.S. flat
bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall with required nos. 150 mm
to 225 mm long 38 mm x 6 mm S.S. flat bar clamps one end welded with the gate member and the other end
bifurcated and embedded in C.C. at the respective point including cutting holes and mending good the damages
by pouring concrete (1:2:4) into the holes and finishing, both end carriage, including greasing, electrodes, curing
etc. complete as per drawing and design and accepted by the Engineer-in-charge .

904
19.1.2 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 20 mm x 20 mm x sqm Tk. 14,217.00
3 mm S.S. angle placed @ 112 mm c/c vertically and connecting the same with each other by 20 mm x 3 mm
S.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including cutting the different S.S. members to
required sizes, fabricating, welding, riveting with required size rivets, providing required size wheels, pulling
handles on both sides, suitable locking arrangement, electrodes, grease and finally placing the same in position
in between 2 (two) nos. 50 mm x 50 mm x 6 mm S.S. tee rail made by welding 2 nos. 50 mm x 6 mm S.S. flat
bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall with required Nos. 150
mm to 225 mm long 38 mm x 6 mm S.S. flat bar clamps one end welded with the gate member and the other
end bifurcated and embedded in C.C. at the respective point including cutting holes and mending good the
damages by pouring concrete (1:2:4) into the holes and finishing, both end carriage, including greasing,
electrodes, curing etc. complete as per drawing and design and accepted by the Engineer-in-charge.

905
19.1.3 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 25 mm x 25 mm x sqm Tk. 5,299.00
3 mm M.S. angle placed @ 112 mm c/c vertically and connecting the same with each other by 25 mm x 3 mm
M.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including cutting the different M.S. members to
required sizes, fabricating, welding, riveting with required size rivets, providing required size wheels, pulling
handles on both sides, suitable locking arrangement, electrodes, grease and finally placing the same in position
in between 2 (two) Nos. 50 mm x 50 mm x 6 mm M.S. tee rail made by welding 2 nos. 50 mm x 6 mm M.S. flat
bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall with required nos. 150 mm
to 225 mm long 38 mm x 6 mm M.S. flat bar clamps one end welded with the gate member and the other end
bifurcated and embedded in C.C. at the respective point including cutting holes and mending good the damages
by pouring concrete (1:2:4) into the holes and finishing, etc complete, painting 2 (two) coats with approved best
quality synthetic enamel paint over a coat of anticorrosive painting, both end carriage, including greasing,
electrodes, curing etc. complete as per drawing and design and accepted by the Engineer-in-charge.
(Rate is excluding the cost of painting)

906
19.1.4 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 20 mm x 20 mm x sqm Tk. 4,494.00
3 mm M.S. angle placed @ 112 mm c/c vertically and connecting the same with each other by 20 mm x 3 mm
M.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including cutting the different M.S. members to
required sizes, fabricating, welding, riveting with required size rivets, providing required size wheels, pulling
handles on both sides, suitable locking arrangement, electrodes, grease and finally placing the same in position
in between 2 (two) nos. 50 mm x 50 mm x 6 mm M.S. tee rail made by welding 2 nos. 50 mm x 6 mm M.S. flat
bar fitted and fixed at top and bottom with R.C.C. lintel/roof slab, floors and side wall with required Nos. 150
mm to 225 mm long 38 mm x 6 mm M.S. flat bar clamps one end welded with the gate member and the other
end bifurcated and embedded in C.C. at the respective point including cutting holes and mending good the
damages by pouring concrete (1:2:4) into the holes and finishing, etc complete, painting 2 (two) coats with
approved best quality synthetic enamel paint over a coat of anticorrosive painting, both end carriage, including
greasing, electrodes, curing etc. complete as per drawing and design and accepted by the Engineer-in-charge.
(Rate is excluding the cost of paint).

907
19.2.1 Supplying, fitting, fixing, and installation of ordinary type M.S. gate (double leaf) of any design and shape with sqm Tk. 6,036.00
38 x 38 x 6 mm M.S. Angle outer frame having 16 mm dia M.S. rod placed vertically @ 75 mm c/c. at bottom
part and top part (200 mm long arrows) and also placed horizontally at bottom for interconnection of 16 mm dia
M.S. rod placed vertically as per design, the top part covered with 18 BWG M.S. sheet and fixed with 4 nos. 38
mm x 6 mm F.I. bars placed diagonally and 4 Nos. 38 mm x 6 mm F.I. bars placed horizontally and vertically
all passing through the center, providing locking arrangements on 3 mm thick M.S. plate one for main gate and
one for minimum 600 mm x 1025 mm pocket gate with 38 mm x 38 mm x 6 mm M.S. angle and 16 mm dia M.S.
rod placed vertically @ 75 mm c/c, providing 38 mm x 38 mm x 6 mm M.S. angle clamps fitted and fixed with
the outer frame of the main gate, the clamp being embedded in R.C.C. or R.C.C. core pillar with cement
concrete (1:2:4) in masonry including cutting holes and mending good the damages, finishing, curing etc.
including riveting, welding as and where necessary, painting two coats with approved quality of synthetic
enamel paint over a coat of priming of anti-corrosive paint etc. all complete as per drawing, design and
accepted by the Engineer-in-charge(Rate is excluding the cost of paint).

908
Item No. Description of Item Unit Unit Rate

19.2.2 Manufacturing, supplying and fitting-fixing security door with 25 mm dia M.S. rod and outer frame with 50 mm x sqm Tk. 10,767.00
50 mm x 6 mm M.S. angle including locking arrangement as per approved design and drawing providing 38 mm
x 38 mm x 6 mm M.S. angle clamps fitted and fixed with the outer frame of the main gate, the clamp being
embedded in R.C.C. or R.C.C. core pillar with cement concrete (1:2:4) in masonry including cutting holes and
mending good the damages, finishing, curing etc. including riveting, welding as and where necessary, painting
two coats with approved quality of synthetic enamel paint over a coat of priming of anti-corrosive paint etc. all
complete as per drawing, design and accepted by the Engineer-in-charge. (Rate is excluding the cost of paint).

909
19.3 Supplying, fitting, fixing, and installation of ordinary type M.S. security gate of any design and shape with 50 mm sqm Tk. 5,283.00
x 50 mm x 6 mm M.S. angle outer frame and 02 (two) 50 mm x 50 mm x 6 mm angle placed diagonally having
22 mm dia M.S. rod placed vertically @ 115 mm c/c. and also 38 mm x 6 mm F.I placed horizontally, the bottom
part covered with 3 mm thick M.S. sheet providing locking arrangements on 3 mm thick M.S. plate providing
heavy type clamps fitted and fixed with the outer frame of the main gate, the clamp being embedded in R.C.C.
or R.C. core pillar with cement concrete (1:2:4) in masonry including cutting holes and mending good the
damages, finishing, curing etc. including fabrication, riveting, welding as and where necessary, etc. all complete
as per drawing, design and accepted by the Engineer-in-charge.

910
19.4 Supplying, fitting, fixing and installation of ordinary type M.S. gate (double leaf) of any design and shape with 38 sqm Tk. 7,843.00
mm x 38 mm x 6 mm M.S. angle box (made by welding 2 nos. 38 mm x 38 mm x 6 mm angle) outer frame
having 25 mm x 50 mm x 25 mm x 5 mm M.S. channel (made by welding 2 nos. of channel) placed part
diagonally after cutting and shaping as per requirement, part horizontally @ 75 mm c/c, the two part of each leaf
being separated by a vertical member of 38 mm x 38 mm x 6 mm M.S. box and welded the each ends of
diagonal and horizontal members properly with the box frame as per architectural drawing providing full locking
arrangement on 3 mm thick M.S. plates providing 38 mm x 38 mm x 6 mm M.S. angle clamps, fitting fixing with
the outer frame of the gate, the clamp being embedded in R.C.C. pillars with cement concrete (1:2:4) including.
cutting holes and mending good the damages, finishing, curing and where necessary painting two coats with
approved quality of synthetic enamel paint over a coat of priming of anticorrosive paint etc. all complete
including making and providing 50 mm x 6 mm M.S. rail and 38 mm wheel for smooth movement of the gate etc.
all complete as per drawing, design and accepted by the Engineer-in-charge. [Rate is excluding the cost of
painting]

911
19.5 Manufacturing, supplying, fitting and fixing G.I. pipe gate of any design and shape having 38 mm dia G.I. pipe sqm Tk. 9,011.00
outer frame and 19 mm dia. G.I. pipe vertical member placed @ 75 mm c/c by welding at top and bottom of G.I.
pipe frame, cutting the pipes in proper shape and size including making semicircular band at the corners of the
outer frame without damaging the pipe, covering 50% of the gate area with 18 BWG M.S. sheet, providing also
two extra horizontal 38 mm dia G.I. pipes welded with vertical post, providing 6 nos. huskle domney with R.C.C.
or R.C.C core pillar with cement concrete (1:2:4) in masonry including cutting holes, mending good the
damages, making provision for minimum 0.61 m x 1.4 m pocket gate having its outer frame and inner vertical
members made with 19 mm dia G.I. pipe including necessary locking arrangements. Painting the gate with 2
(two) coats of synthetic enamel paint over a coat of anti-corrosive priming, welding as and where necessary
including necessary locking arrangement and providing 2 Nos. 16 mm M.S. socket bolts etc. all complete as per
design and drawing and accepted by the Engineer-in-charge. [Rate is excluding the cost of painting]

912
19.6 Supplying, fitting and fixing of rolling shutter of any design and shape made of 24 SWG G.P. sheet unit sqm Tk. 5,461.00
minimum 69 mm width having 10 mm and 12 mm dia circular folding at ends, rolled in machine, locked together
properly to form rolling shutter, top of the shutter to be fitted with circular spring box made of 22 BWG sheet,
containing best quality spring made in China, nutted with 38 mm G.I. pipe at one end and the other end nutted
to shutter including fitting the G.I. pipe again with 375 mm x 300 mm x 6 mm pankha at ends with side guide
channel (side channel consist of 50 mm x 100 mm x 6 mm M.S. plate with 2 mm x 19 mm x 3 mm F.I. bar,
middle channel consist of 2 mm x 150 mm x 6 mm M.S. plate with 2 mm x19 mm x 6 mm fixed to wall or column
with clamps embedded in R.C.C. part by cement concrete (1:2:4) including cutting holes (minimum 3 mm x 25
mm x 6 mm) mending the damages, finishing, curing, bottom end of shutter fitted to folded G.P. sheet (min 125
mm width in two layers), which is again fitted to 25 mm x 25 mm x 3 mm angle, providing handle with F.I. bar 25
mm x 6 mm and locking arrangement in both sides, painting two coats with approved colour and brand of
synthetic enamel paint over a coat of priming etc. complete in all respect accepted by the Engineer-in-charge.
[Rate is excluding the cost of painting]

913
19.7 Manufacturing, supplying, fitting, fixing of ordinary type M.S. folding gate with 12mm x 12mm MS square solid sqm Tk. 5,116.00
bar and 25 mm x 25mm x 6 mm MS angle box frame and two nos outer side fixed box post made with 40 mm x
40 mm x 6 mm angle at both ends attached to column/wall side including locking arrangement providing 38 mm
x 38 mm x 6 mm M.S. angle clamps fitted and fixed with the outer frame of the main gate, the clamp being
embedded in R.C.C. or R.C.C. core pillar with cement concrete (1:2:4) in masonry including cutting holes and
mending good the damages, finishing, curing etc. including riveting, welding as and where necessary, painting
two coats with approved quality of synthetic enamel paint over a coat of priming of anti-corrosive paint etc. all
complete as per drawing, design and accepted by the Engineer-in-charge. (Rate is excluding the cost of paint)

914
915
916
917
………………….. END OF DIVISION NINETEEN ………………….. 918
DIVISION 20 : STAIR & VERANDAH RAILING AND STAIR NOSING 919
Item No. Description of Item Unit Unit Rate
920
Item No. Description of Item Unit Unit Rate

20.1 Manufacturing, supplying, fitting and fixing of stair railing of any standard height of any design and shape with sqm Tk. 3,441.00
square box (2 nos.in each tread) made by thorough welding of 2 nos. 19 mm x 19 mm x 3 mm M.S. angle to
provide hand-rail, engraving each box 150 mm in the concrete by 50 mm x 50 mm x 6 mm anchor plate at base,
welding 38 mm x 6 mm F.I. bar inclined plain with the top of the box to fit in the grooved wooden rail by
necessary screws including cutting grooves in concrete, mending good the damages with cement concrete
(1:2:4), applying first class polish to hand rail, 2 (two) coats of synthetic enamel paint of approved quality over a
prime coat etc. finished in all respect for all floors and accepted by the Engineer-in-charge.(Exposed area of
railing will be considered for measurement, rate is excluding the cost of hand-rail and cost of painting).

921
20.2 Manufacturing, supplying, fitting and fixing of stair railing of standard height of any design and shape with sqm Tk. 6,614.00
square box (2 nos. box in each tread) made by thorough welding of 2 nos. 25 mm x 25 mm x 5 mm M.S. angle,
engraving each box 150 mm in the concrete by 50 mm x 50 mm x 6 mm anchor plate at base, welding 50 mm x
50 mm x 6 mm F.I. bar in inclined plain with the top of the box fitted in the grooved wooden rail and 2 Nos. 225
mm x 25 mm finished section of wooden strip fitted and fixed at mid height of railing at both side of M.S. angle
box in inclined plain parallel to the hand rail etc. fitted and fixed by necessary screws, nails including cutting
grooves in concrete, mending good the damages with cement concrete (1:2:4) applying 1st class french polish
to wooden hand rail and inclined wooden strip and painting to F.I bar and square box with 2 (two) coats of
synthetic enamel paint of approved quality and colour over a prime coat etc. complete in all respect for all floors
and accepted by the Engineer-in-charge.

922
20.3 Supplying, fitting and fixing 12 mm dia G.I pipe stair railing of any standard height of any design and shape with
50 mm x 50 mm x 6 mm M.S. plate at the base of 12 mm dia G.I. Pipe and fitted and fixed by welding. Placing
the pipes vertically @ 250 mm c/c (1 nos. in each steps) 150 mm embedded into the R.C.C tread of stair case
after cutting grooves and mending good the damages with C.C. and providing 38 mm x 6 mm F.I. bar on the top
of G.I. pipe to provide wooden hand rail of any design including polishing, painting etc. all complete and
accepted by the Engineer-in-charge. (Exposed area of railing will be considered for measurement, rate is
excluding the cost of paint, wood for railing)

923
20.3.1 With the provision of hand rail of size: 150 mm x 62 mm (finished) sqm Tk. 2,193.00 924
20.3.2 With the provision of hand rail of size: 112 mm x 62 mm (finished) sqm Tk. 2,895.00 925
20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard height with 2 mm thick 62 mm dia pipe sqm Tk. 5,361.00
for hand-rail, 2 mm thick 40 mm dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos horizontal
pipes as per drawing, design including carrying, polishing fabricating, welding and fixing with tread by 25 mm
long royal bolt etc. all complete and accepted by the Engineer-in-charge.
926
20.5.1 Supplying, fitting and fixing of 12 mm dia G.I pipe stair railing of any standard height and design and shape with sqm Tk. 3,736.00
50 mm x 50 mm x 6 mm M.S. plate at the base of 12 mm dia G.I. Pipe and fitting & fixing by welding. Placing
the pipes vertically @ 125 mm c/c (2 nos. in each steps) 150 mm embedded into the R.C.C tread of stair case
after cutting grooves and mending good the damages with C.C. and providing 38 mm x 6 mm F.I. bar on the top
of G.I. pipe to provide 37 mm G.I. pipe hand rail of any design including polishing, painting etc. all complete and
accepted by the Engineer-in-charge.(Exposed area of railing will be considered for measurement, rate is
excluding the cost of paint, wood for railing)

927
20.5.2 Supplying, fitting and fixing 12 mm dia G.I pipe stair railing of any standard height of any design and shape with sqm Tk. 4,333.00
50 x 50 x 6 mm M.S. plate at the base of 12 mm dia G.I. Pipe and fitting & fixing by welding. Placing the pipes
vertically @ 125 mm c/c (2 nos. in each steps) 150 mm embedded into the R.C.C tread of stair case after
cutting grooves and mending good the damages with C.C. and providing 38 mm x 6 mm F.I. bar on the top of
G.I. pipe to provide 50 mm G.I. pipe hand rail of any design including polishing, painting etc. all complete and
accepted by the Engineer-in-charge.(Exposed area of railing will be considered for measurement, rate is
excluding the cost of paint, wood for railing)

928
20.6 Supplying, fitting and fixing verandah railing with 2 mm thick 50 mm dia SS hand rail, 2 mm thick 20 mm dia 5 sqm Tk. 10,268.00
nos SS horizontal pipes, 2 mm thick 50 mm x 25 mm SS box vertical post @ 450 mm c/c. Among the vertical
box post 5 nos box posts will be fitted with floor bed by 65 mm x 55 mm x 6 mm SS plate, remaining no SS box
post will be fitted and fixed with 50 mm x 25 mm x 2 mm SS horizontal box at bottom (50 mm above from floor
bottom) including all fittings, fixtures, polishing, carrying etc. all complete as per approved design and drawing
and accepted by the Engineer-in-charge.

929
20.7 Supplying, fitting and fixing 10 mm thick tempered glass railing in stair with 62 mm dia 2 mm thick SS pipe for sqm Tk. 9,787.00
hand rail, 5 nos 62 mm x 50 mm x 2 mm vertical pipe in each flight fitted and fixed with 65 mm x 55 mm x 6 mm
SS base plate including welding, bending, fabricating, polishing all complete as per drawing, desing and
specification etc all complete in all respect and accepted by Engineer-in-charge.

930
20.8 Supplying, fitting and fixing 10 mm thick tempered glass railing in verandah with 62 mm dia 2 mm thick SS pipe sqm Tk. 11,717.00
for hand rail, 5 nos 62 mm x 50 mm x 2 mm vertical box fitted with concrete slab by 65 mm x 55 mm x 6 mm SS
plate @ 600 mm c/c including all fittings, fixtures as per drawing, desing and specification etc all complete in all
respect and accepted by Engineer-in-charge.
931
20.9 Providing nosing to the nose of tread of stair including supplying 3 nos. of 75 mm long 12 mm x 3 mm F.I./SS
bar clamps with bifurcated ends in each treads including fitting and fixing with the angle by welding and fitting
and fixing the angle by cutting grooves in R.C.C, fixing and finishing and the same with C.C. (1:2:4) etc. cost of
electricity and other charges all complete and accepted by the Engineer-in-charge.

932
20.9.1 Providing 38 mm x 38 mm x 6 mm M.S. angle to the nosing of steps of staircase meter Tk. 372.00 933
20.9.2 Providing nosing 32 mm x 32 mm x 6 mm M.S. angle to the nosing of steps of stair case. meter Tk. 327.00 934
20.9.3 Providing 25 mm x 25 mm x 6 mm size M.S. angle to the nosing of stair case. meter Tk. 283.00 935
20.9.4 Providing 38 mm x 38 mm x 6 mm brass angle to the nosing of steps of stair case meter Tk. 1,439.00 936
Item No. Description of Item Unit Unit Rate

20.9.5 Providing 38 mm x 38 mm x 6 mm S.S. angle to the nosing of steps of staircase meter Tk. 1,252.00 937
20.9.6 Providing 32 mm x 32 mm x 6 mm S.S. angle to the nosing of steps of stair case.. meter Tk. 1,002.00 938
20.9.7 Providing 25 mmx 25 m x 6 mm size S.S. angle to the nosing of stair case. meter Tk. 919.00 939
20.10 Supplying, fitting & fixing of column guard made of 50 mm x 50 mm x 6 mm M.S. angle around column & 50 mm meter Tk. 504.00
x 6 mm F.I. bar for Tie at the top including fitting and fixing with the angle by welding, fitting and fixing the angle
by cutting grooves in R.C.C, fixing and finishing the same with C.C. (1:2:4) etc. cost of electricity and other
charges all complete and accepted by the Engineer-in-charge.

940
20.11 Supplying, fitting & fixing of column guard made of 75 mm x 75 mm x 3 mm S.S. angle at corner of column meter Tk. 1,633.00
including supplying 3 Nos. of 75 mm long 12 mm x 3 mm SS bar clamp with bifurcated ends, fitting and fixing
with the angle by welding, fitting and fixing the angle by cutting grooves in R.C.C, fixing and finishing the same
with C.C. (1:2:4) etc. cost of electricity and other charges all complete and accepted by the Engineer-in-charge.
941
942
943
944
………………….. END OF DIVISION TWENTY ………………….. 945
DIVISION 21 : GRILL FENCING AND BARBED WIRE FENCING
946
Item No. Description of Item Unit Unit Rate
947
21.1 Supplying, fitting and fixing steel grill fencing of any design and shape in boundary wall with 31 mm x 6 mm F.I. sqm Tk. 2,173.00
bar @ 150 mm c/c placed vertically after cutting as per required measurement. Welding the said F.I. bar with 2
nos. horizontal 30 mm x 6 mm F.I. bar placed one at top and another at bottom including embedding/fixing the
horizontal F.I. bar in position with cutting grooves in wall up to 150 mm depth and mending good the damages
with C.C. (1:2:4), finishing with two coats of painting with synthetic enamel paint over a coat of anti-corrosive
paint etc. complete as per drawing and design and accepted by the Engineer-in-charge. (Rate is excluding the
cost of painting)

948
21.2 Supplying, fitting and fixing steel grill fencing of any design and shape made with 19 mm x 6 mm box tube (box sqm Tk. 4,685.00
made with 2 nos.19 mm x 19 mm x 6 mm angle by continuous welding) placed vertically @ 150 mm c/c and
welding the said vertical boxes with two Nos. horizontal 25 x 25 x 6 mm angle box (made with 2 Nos. 25 x 25 x
6 mm angle by welding), placing one at bottom and another at top and again fitting & fixing by welding the said
horizontal tube box (with vertical 38 mm x 38 mm x 6 mm angle box post made with 2 nos. 38 mm x 38 mm x 6
mm angle by welding) provided @ 1800 mm c/c including embedding the tube box post in brick R.C.C. pillar or
core wall up to 375 mm depth after cutting grooves in wall/pillar including mending good the damages with C.C.
(1:2:4) and finishing, curing, 2 coats of approved synthetic enamel paint over a coat of anti-corrosive paint etc.
all complete as per design, drawing and accepted by the Engineer-in-charge. (Rate is excluding the cost of
painting)

949
21.3 Manufacturing, supplying, fitting and fixing M.S. grill fencing as per design with outer frames having 38 mm x 38 sqm Tk. 2,431.00
mm x 6 mm M.S. angle and inner members having 6 mm dia M.S. rod placed @ 110 mm c/c diagonally on both
direction, welding each cris-cross end of rod with corners of outer frame including cutting rods and size angles
to required shapes and size and setting the entire fence with the previously installed box tube (box tube made
with 2 nos. angle) post including thorough and full welding the frame with the angle box posts, painting 2 coats
of synthetic enamel paint over a coat of anti-corrosive priming etc. all complete as per drawing and accepted by
the Engineer-in-charge.(Rate is excluding the cost of angle box tube post and its installation and excluding the
cost of paint)

950
21.4 Manufacturing, supplying, fitting and fixing M.S. box tube (made with 2 nos angle) post (bottom end bifurcated) sqm Tk. 934.00
made by thorough welding of two Nos. 38 x 38 x 6 mm M.S. angle and vertically placing the post into C.C. or
R.C.C. foundation including cutting angle to required shape and size including covering the top of the post with
6 mm thick M.S. plate etc. all complete as per drawing and accepted by the Engineer-in-charge.(Rate is
excluding the cost of C.C./R.C.C. foundation and paint)

951
21.5 Providing barbed wire fencing with R.C.C (1:2:4) pillars @ 2.43 m c/c. and of section 100 mm x 100 mm at top sqm Tk. 155.00
and 150 mm x 150 mm at bottom of 2.13 m total height (1.37 m above G.L. and 0.76 m below G.L.) including
150 mm thick, 450 mm square spread footings (pillars reinforced with 4 Nos. 10 mm dia main rod and 6 mm dia
stirrups @ 150 mm c/c, footing reinforced with 5 Nos. 10 mm dia rod both ways) supplying, fitting and fixing 8
lines of barbed wire horizontally (fixed with the post through 6 mm dia rods embedded in to the post) and 2 lines
diagonally from post to post with 12 BWG 2 ply barbed wire, with 4 points barbs @ at least 112 mm c/c
including 6 mm thick (1:4) cement plaster up to 1500 mm length of the pillars etc. complete and accepted by
the Engineer-in-charge. (Rate is excluding the cost of concrete and reinforcement which is to be paid as per
corresponding items in the schedule)

952
21.6 Providing barbed wire fencing with average 100 mm dia best quality local ballah post of 1.98 m total height sqm Tk. 270.00
(1.37 m above G.L. and min. 0.60 m embedded in the ground) placed at 1800 mm c/c with 9 nos. horizontal
lines and 2 nos. diagonal lines of 12 BWG 2 ply barbed wire with 4 points barbs @ at least 112 mm c/c in each
way of 1.8 m including embedding the post tightly in ground and providing a cement concrete base of 200 mm x
200 mm x 300 mm around ballah at E.G.L, stretching the wires and fixing with the post with the help of minimum
62 mm long G.I. nails including supply of all materials etc. all complete and accepted by the Engineer-in-charge.
(Rate is excluding the cost of ballah and its driving/fixing and concrete which is to be paid as per corresponding
items in the schedule)

953
Item No. Description of Item Unit Unit Rate

21.7 Supplying, fitting and fixing 12 BWG barbed wire (2 ply, 4 points) in fencing work @ 150 mm c/c in both sqm Tk. 831.00
horizontally and vertically, supported by 38 mm x 38 mm x 6 mm M.S. L-shape angle post (300 mm embedded
in R.C.C. or in brick work with a cement concrete base of 75 mm x 75 mm x 300 mm) 600 mm vertical and 450
mm inclined or as per requirement @ 2.4 m c/c including straightening, binding the joints with 18 BWG wire,
making holes in the angle etc. including supplying all necessary materials complete in all respect and accepted
by the Engineer-in-charge. (Rate is excluding the cost of R.C.C or brick work or C.C. which is to be paid as per
corresponding items in the schedule)

954
21.8 Supplying, fitting and fixing 12 BWG barbed wire (2 ply, 4 points) in fencing work @ 150 mm c/c both sqm Tk. 887.00
horizontally and vertically, supported by 38 mm x 38 mm x 6 mm M.S. Y-shape angle post (300 mm embedded
in R.C.C. or in brick work with a cement concrete base of 75 mm x 75 mm x 300 mm) 600 mm vertical and 450
mm inclined or as per requirement @ 2.4 m c/c including straightening, binding the joints with 18 BWG wire,
making holes in the angle etc. including supplying all necessary materials complete in all respect and accepted
by the Engineer-in-charge. (Rate is excluding the cost of R.C.C or brick work or C.C. which is to be paid as per
corresponding items in the schedule)

955
21.9 Supplying, fitting and fixing 12 BWG barbed wire fencing in a circular shape of 600 mm dia and 76 mm pitch meter Tk. 2,427.00
fitted with MS rod casing (made by 8 nos. 10 mm dia plain bar in a circular pattern and placed at equal
interval ), 38 x 38 x 6 mm M.S. angle post (300 mm embedded in R.C.C. or in brick work with a cement concrete
base of 75 mm x 75 mm x 300 mm) and 600 mm vertical and 450 mm inclined placed @ 3.0 m c/c including
straightening, binding the joints with 18 BWG wire, making holes in the angle etc. including supply of all
necessary materials complete in all respect and accepted by the Engineer-in-charge. (Rate is excluding the
cost of R.C.C or brick work or C.C. which is to be paid as per corresponding items in the schedule)

956
` 957
958
959
………………….. END OF DIVISION TWENTY ONE ………………….. 960
DIVISION 22 : MISCELLANEOUS ITEMS
961
Item No. Description of Item Unit Unit Rate
962
22.1 Supplying, fitting and fixing of wooden wedge (12 mm base x 12 mm height) instead of putty for fixing glass meter Tk. 68.00
panes with wooden frame by nails or by any other approved method including the cost of necessary wood,
painting/polishing, nails etc. and excluding the cost of wooden frame, and painting and 5 mm thick glass panes
all complete and accepted by the Engineer-in-charge.

963
22.2 Supplying, fitting and fixing of 20 mm dia foreign made aluminium pipe curtain rail for door and window including meter Tk. 655.00
cutting and fitting fixing as per required measurement and supplying necessary screws, electric drill and rowel
plug including charge of electricity etc. complete and accepted by the Engineer-in-charge.
964
22.3 Supplying, fitting and fixing 10mm thick clear tempered glass door including all accessories, 1 set floor mounted sqm Tk. 15,604.00
auto door closure, special quality 2 nos clamping devices, 1 set locking device, top hinge and handle etc.
complete in all respect as per drawing and direction of the Engineer-in-charge.
965
22.4 Supplying, fitting and fixing 10 mm thick clear glass partition with 44 mm, 44 mm, 1.5 mm aluminium box, sqm Tk. 2,861.00
protector bit (single), protector bit (double) including all accessories etc. all complete and as per drawing and
direction of the Engineer-in-charge. 966
22.5 Supplying, fitting and fixing of C.T wood strip (62 mm x 25 mm x 20 mm) for fixing of aluminium curtain rails as meter Tk. 743.00
per design and drawing, fitting and fixing coat of priming etc. all complete and accepted by the Engineer-in-
charge.(Rate is excluding the cost of polishing and painting etc.)
967
22.6 Supplying, fitting and fixing vertical venetian blinds made with glass fiber fabrics (foreign made) with supply of all sqm Tk. 1,896.00
materials (foreign made) such as head rail (aluminium), end cap-set, rod tilt, sigger (stopper), runner, spacer
(link), handling cord, ball chain, link chain, cord-weight weight-plate plastic washer, glass fiber fabrics, and head
cap-set etc. all complete and accepted by the Engineer-in-charge.
968
22.7 Supplying, fitting and fixing horizontal venetian blinds of 25 mm width made with aluminium foils/ strips (foreign sqm Tk. 1,440.00
made) with supply of all materials (foreign made) such as head rail, bottom rail, rod tilt, head cap, bottom cap,
gear box, stick, support and cap, cord drum and support, bracket, cord lock, cord equalizer, top holder, ladder,
cord, handling cord and aluminium foils etc. all complete and accepted by the Engineer-in-charge.

969
22.8 Supplying, fitting and fixing of horizontal zebra blind made with polyester fabrics, synthetic net with 3 inch sqm Tk. 3,260.00
vinyl/upvc coated strips (foreign made) with supply of all materials (foreign made) such as head rail, bottom rail,
rod tilt, head cap, bottom cap, gear box, stick, support and cap, cord drum and support, bracket, cord lock, cord
equalizer, top holder, ladder, cord, handling cord and aluminium foils etc. all complete and accepted by the
Engineer-in-charge.
970
22.9 Supplying, fitting and fixing of blackout/ translucent roller blind of PVC/ vinyl laminated fiberglass fabrics (foreign sqm Tk. 2,594.00
made) with supply of all materials (foreign made) such as head rail (aluminium), end cap-set, rod tilt, sigger
(stopper), runner, spacer (link), handling cord, ball chain, link chain, cord-weight weight-plate plastic washer,
glass fiber fabrics, and head cap-set etc. all complete and accepted by the Engineer-in-charge.
971
22.10 Supplying, fitting & fixing of steel iron rack made of 50 mm x 50 mm x 6.35 mm vertical and horizontal angle sqm Tk. 9,578.00
post, welding 63.5 mm x 6.35 mm F.I. bar placed horizontally as bracing for the posts, 38 mm x 6.35 mm cross
F.I. bars welded with vertical post, 12.7 mm thick M.S plate welded as cup shape at the bottom of post,
supplying and fitting rivets, charge for welding, drilling, carrying, cutting, straightening in required sizes etc in all
respect as per drawing, design and accepted by the Engineer-in-charge.

972
Item No. Description of Item Unit Unit Rate

22.11 Supplying fitting & fixing of uPVC plastic door or window frame having specific gravity 1.35 - 1.45, and other meter Tk. 278.00
physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or
ASTM, BS/ISO/IS standards fitted and fixed in brick wall/ R.C.C wall with 6 Nos. GI clamp, 4 nos inner joint GI
clamp, 2 nos. outer GI joint clamp, 16 nos. rivet making necessary grooves and mending good the damages,
finishing, curing, carriage etc complete in all respect accepted by the Engineer-in-charge.

973
22.12 Supplying, fitting, fixing of uPVC hollow or solid plastic door shutter having specific gravity of 1.35 - 1.45,
thickness 1.7 mm-2.2 mm, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI
approved manufacturer standards or ASTM, BS/ISO/IS standards of different sizes, fitted fixed with uPVC
plastic door frame weighing 5.82 kg/m2 with at least 3 Nos. SS hinges by min 64 Nos. Ø 3.17 mm and 3.97 mm
12.7 mm long rivets, 12 nos. 25.4 mm SS screws, Ø 9.38 mm, 150 mm long SS tower bolts 2 nos., 146 mm SS
handle by rivet 2 Nos., G.I inner joint, 234.95 mm x 127 mm clamp, 76.2 mm x 57.15 mm, 25 mm dia 1 no ss
haspbolt, special type round lock, carrying the same to the site and local carriage etc. complete in all respect
and accepted by the Engineer-in-charge.

974
22.12.1 760 mm x 1980 mm uPVC plastic shutter (hollow). each Tk. 3,650.00 975
22.12.2 760 mm x 2130 mm uPVC plastic shutter (solid). each Tk. 3,762.00 976
22.12.3 910 mm x 2130 mm uPVC plastic shutter (hollow). each Tk. 3,955.00 977
22.12.4 990 mm x 2130 mm uPVC plastic shutter (solid). each Tk. 4,130.00 978
22.13 Supplying, fitting & fixing of uPVC plastic or glass partition in plastic frame fabricated by 70 mm x 50 mm x 2
mm T and 50 mm x 40 mm x 2 mm / 50 mm x 30 mm x 2 mm L-sections, providing partition with 156 mm x 25
mm uPVC hollow section having wall thickness of 2.5 mm / partition with 5 mm thick glass. physical, chemical,
thermal, fire resistivity properties etc of the materials as per BSTI approved manufacturer standards or ASTM,
BS/ISO/IS standards, fitted and fixed in brick wall or R.C.C wall with 6 nos. GI clamps, 4 nos. inner joint GI
clamps, 2 nos. outer GI joint clamps, 16 nos. rivets, making necessary grooves and mending good the
damages, finishing, curing, carriage etc complete in all respect and accepted by the Engineer-in-charge.

979
22.13.1 With partition of uPVC hollow section sqm Tk. 2,666.00 980
22.13.2 With 5 mm glass sqm Tk. 2,175.00 981
22.14 Supplying, fitting & fixing of uPVC Profile for door, window and fixed partition frames applications having specific meter Tk. 527.00
gravity of 1.36-1.43, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved
manufacturer standards or ASTM, BS/ISO/IS standards including all accessories, fittings with 6 nos. steel
clamps complete in all respect as per drawing and accepted by the Engineer-in-charge.
982
22.15 Supplying, fitting & fixing of swing door shutter made of low density free foam (LDFF) sheet having standard
size 1200 mm x 3200 mm. Physical properties: density: 0.55-0.68 g/cm3, weighing 1.3 kg/sft, providing new
sash (100 mm), sliding glass bead, rubber, screws, 75 mm hinges 4 Nos., 100 mm tower bolt 2 Nos., 150 mm
handle 2 nos. etc. including all accessories complete in all respect as per drawing and accepted by the
Engineer-in-charge.
983
22.15.1 1950 mm x 750 mm size 8 mm thick uPVC swing door shutter each Tk. 9,832.00 984
22.15.2 2100 mm x 750 mm size 8 mm thick uPVC swing door shutter each Tk. 10,109.00 985
22.15.3 2100 mm x 900 mm size 8 mm thick uPVC swing door shutter each Tk. 10,387.00 986
22.16 Supplying, fitting & fixing of plastic wall paneling with 3 mm sheet, weighing 0.188 kg/sft, fitting and mending sqm Tk. 1,268.00
good the damages, carriage to the site including glass bead, partition frame, rubber, 5 mm clear glass fitted and
fixed with screws, steel clamp etc all complete and accepted by the Engineer-in-charge.
987
22.17 Supplying, fitting & fixing of uPVC profile fixed partition with 5 mm clear glass, weighing 1.032 kg/sft, fitting and sqm Tk. 3,385.00
mending good the damages, carriage etc. complete in all respect and accepted by the Engineer-in-charge.
988
22.18. Supplying, fitting & fixing of uPVC profile sliding window having gross weight of 14.00 kg/sqm (including 5 mm
glass) fitting and mending good the damages, carries etc complete in all respect accepted by the Engineer-in-
charge. 989
22.18.1 uPVC sliding window with 5 mm glass (1200 mm x 1200 mm size) sqm Tk. 4,667.00 990
22.18.2 uPVC sliding window without glass (1200 mm x 1200 mm size) sqm Tk. 3,815.00 991
22.19 Supplying, fitting & fixing of plastic wood paneling in false ceiling with 6 mm sheet, weighing 3.85 kg/sqm, fitting sqm Tk. 1,332.00
and mending good the damages, carries etc complete in all respect and accepted by the Engineer-in-charge
992
22.20 Supplying, fitting and fixing of approved quality 190 mm x 190 mm size glass bricks in round stair wall including sqm Tk. 14,910.00
all accessories & charges, complete in all respect and accepted by the Engineer-in-charge.
993
22.21 Supplying, fitting & fixing 50 mm thick rock or glass wool padding of approved quality and accepted by the sqm Tk. 3,843.00
Engineer-in-charge. 994
22.22 Manufacturing supplying, fitting and fixing of single leaf louver door shutter made with 16 gauge thick 50 mm x sqm Tk. 22,545.00
50 mm SS hollow box as outer frame, 16 gauge thick 50 mm x 38 mm SS hollow box as pannel frame and 18
gauge thick 50 mm x 12 mm SS hollow box as louver with 150 mm long 12 mm dia SS handle, 300 mm long 20
mm dia ss hasp bolt, 100 mm hings etc, comple in all respect and accepted by the Engineering-in charge.

995
22.23.1 Supplying, laying, fitting & fixing best quality 225 mm dia (internal) machine made R.C.C. pipe over 100 mm meter Tk. 1,359.00
thick cement concrete (1:3:6) at base and sides including single brick flat soling and gasket with cement mortar
(1:4) joints, cutting and filling trenches up to required depth including excavation of soil etc. all complete in all
respect as per type plan and accepted by the Engineer-in-charge (average depth of trench is 1050 mm ).
(Cement: CEM-II/A-M)
996
Item No. Description of Item Unit Unit Rate

22.23.2 Supplying, laying, fitting & fixing best quality 300 mm dia (internal) machine made R.C.C. pipe over 100 mm meter Tk. 2,214.00
thick cement concrete (1:3:6) at base and sides including single brick flat soling and gasket with cement mortar
(1:4) joints, cutting and filling trenches up to required depth including excavation of soil etc. all complete in all
respect as per type plan and accepted by the Engineer-in-charge (average depth of trench is 1050 mm).
(Cement: CEM-II/A-M)
997
22.23.3 Supplying, laying and fitting-fixing 900 mm dia RCC pipe of approved quality and accepted by the Engineer-in- meter Tk. 10,009.00
charge. [Rate is excluding cost for excavation, back-fill, materials for back-fill and bedding]
998
22.24 Supplying, making, fitting & fixing of R.C.C. door/window frame of 155 mm x 65 mm which is made by using meter Tk. 136.00
M.S. rod (fy = 400 MPa) fabrication work with 24 BWG G.I. wire, steel formworks with minimum cement
concrete relates mix ratio (1:2:4) having minimum f'cr = 27 MPa & satisfying a specified compressive strength,
f'c= 22 MPa at 28 days and cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5MPa)/ ASTM-C 150 type–
1, best quality 50% quantity of local sand (F.M. 1.2) and 50% quantity of coarse sand (F.M. 2.2), 6 mm down
well graded stone chips, screening, making, placing in position, making shutter/formworks water-tight properly,
jute hassian, polythene sheet, placing of 100 mm long welded iron hinges with 6 mm dia M.S. rod clamp in
position and mixing with mixer machine, casting in forms, compacting properly and curing at least for 21 days,
removing shuttering and demoulding etc. all complete including the cost of water, electricity and other charges
as per design, drawing and accepted by the Engineer-in-charge. (Considering cross section of the frame 153
mm x 64 mm).

999
22.25 Supply & installation of fire rated door complete & accepted by the Engineer-in-charge with the following sqm Tk. 48,217.00
specification: 1000
Standard(s) for safety : UL Certified, NFPA 80 standard 1001
ANSI / UL 10C: Positive pressure of fire tests of door assemblies. 1002
ANSI / UL 10B: Fire tests of door assemblies. 1003
UL Subject 63: Outline of investigation for fire frames. 1004
Shutter materials: Mild steel. 1005
Fire resistivity (Door & frame): Two hours. 1006
Fire resistivity (accessories): Three hours (panic bar, pul handle, ceramic fibre tape for sealing smoke, hinge,
bolt and screw, mortice lock, door closer 1007
Door frame: 2 vertical fire resisting jamb and 1 fire resisting horizontal jamb made with single rabbet hollow steel
chanel frame made of 2.3 mm imported cold rolled mild steel sheet. Four SS hinges (size: 112 mm x 100 mm x
3.4mm) are used on each leaf screwd with frame 1008
Door leaf: Door leaf faces consists of 1.6 mm thick imported cold rolled MS sheet attached together using
interlocking mechanism and tack welding which is filled with imported 100kg/m3 rock wool cake. Stiffeners
should be used inside to strengthen structure.
1009
Vision Panel: Made of UL certified 5 mm glass. It has clear vision area of 150 mm x 100 mm. Its frame is mae of
1.6 mm imported cold rolled MS sheet and SS pop rivet used for fixing. Ceramic fibre tape is used for sealing
smoke. 1010
Internal insulation: Rock wool. 1011
Surface treatment: All MS sheets are chemically treated coated with zinc phosphate before assembly in highly
equipped chemical treatment plant. All chemicals are imported. 1012
Paint Finish: Epoxy powder coated paint finish and curing in temperature controlled gas oven. 1013
1014
1015
1016
………………….. END OF DIVISION TWENTY TWO ………………….. 1017
DIVISION 23 : FERROCEMENT WORKS
1018
Item No. Description of Item Unit Unit Rate
1019
23.1 Supplying, fitting & fixing of pre-cast ferrocement roof panel which is made by using vibration table & steel
shutter with minimum cement content relates to mix ratio 1:2 for flange having minimum compressive strength
30 MPa (28 days standard cube strength) and cement conforming to BDS EN-197-1-CEM-I, 52.5N
(52.5MPa)/ASTM-C150 type- 1, best quality coarse sand of equivalent F.M. 2.2, 2 layers of 18 BWG
galvanized/epoxy coated wire mesh having minimum yield strength fy= 450 MPa & having 2 meshes per 25 mm
and reinforced cement concrete works for rib with minimum cement content relates to mix ratio 1:1.5:3 having
minimum f’cr = 30 MPa and satisfying a specified compressive strength f'c = 25 MPa, best quality coarse sand
of equivalent F.M. 2.2 and 12 mm down well graded stone chips conforming to ASTM C-33, supplying,
fabrication and fixing to details as per design, deformed bar reinforcement BDS ISO 6935-2:2006, including
straightening and cleaning rust, if any, bending and binding in position with supply of 24 nos GI wires, remove
the shuttering, lifting the panel to floor/roof level, keeping on proper position, filling the interstices with cement
concrete (1:1.5:3), satisfying a specified compressive strength f'c = 25 MPa, stitching overlapped wire meshes
with 18 BWG GI wire, filling with mortar (1:2), casting of 25 mm thick as screeding (1:1.5:3) using 6 mm down
stone chips and M.S. rod (fy=400 MPa) with fabrication over F.C. panel including the cost of reinforcement &
wire mesh, curing at least for 7 days including the cost of water, electricity and other charges all complete as
per design, drawing and accepted by the Engineer-in-charge.

1020
23.1.1 For ground floor, span up to 3810 mm for floor/roof slab. sqm Tk. 2,354.00 1021
23.1.2 Extra cost shall be incorporated in the estimate for each additional floor 1022
23.1.2.1 Add for each additional span length of 150 mm long direction (3810 mm<span ≤ 4800 mm) sqm Tk. 9.00 1023
23.1.2.2 Add for each additional floor up to 5th floor sqm Tk. 35.00 1024
23.1.2.3 Add for each additional floor from 6th floor sqm Tk. 40.00 1025
Item No. Description of Item Unit Unit Rate

23.2 Supplying, fitting & fixing of 20 mm thick ferrocement folded plate roof which is made by using vibration table &
steel shutter with minimum cement content relates to mix ratio 1:2, having minimum compressive strength of 30
MPa (28 days standard cube strength) and cement conforming to BDS EN-197-1-CEM-I, 52.5N
(52.5MPa)/ASTM-C 150 type- 1, best quality coarse sand of equivalent F.M. 2.2, 1 layer of 20 BWG
galvanized/epoxy coated wire mesh having minimum yield strength fy=450 MPa & having 2 meshes per 25 mm,
fabrication and fixing to details as per design, deformed bar reinforcement BDS ISO 6935-2:2006, including
straightening and cleaning the rust, if any, bending and binding in position with supply of 24 BWG GI wires,
removing the shutter, lifting, keeping on proper position, curing at least for 7 days including the cost of water,
electricity and other charges all complete as per design, drawing and accepted by the Engineer-in-charge.

1026
23.2.1 For ground floor, span up to 3810 mm sqm Tk. 1,890.00 1027
23.2.1.1 Add for each additional span length of 150 mm long direction (3810 mm < span ≤ 4800 mm) sqm Tk. 9.00 1028
23.2.2.1 Add for each additional floor up to 5th floor sqm Tk. 35.00 1029
23.2.2.2 Add for each additional floor from 6th floor sqm Tk. 40.00 1030
23.3 Supplying, fitting & fixing of 20 mm thick ferrocement corrugated sheet roof which is made by using vibration
table & steel shutter with minimum cement content relates to mix ratio 1:2, having minimum compressive
strength of 30 MPa (28 days standard cube strength) and cement conforming to BDS EN-197-1-CEM-I, 52.5N
(52.5MPa)/ASTM-C 150 type-1, best quality coarse sand of equivalent F.M. 2.2, 1 layer of 20 BWG
galvanized/epoxy coated wire mesh having minimum yield strength fy=450 Mpa & having 2 meshes per 25 mm
and supplying, fabrication and fixing to details as per design, deformed bar reinforcement BDS ISO 6935-
2:2006 including straightening and cleaning rust, if any, bending and binding in position with supply of 24 nos GI
wires, removing the shutter, lifting on ground floor roof, keeping on proper position, curing at least for 28 days
including the cost of water, electricity and other charges all complete as per design, drawing and accepted by
the Engineer-in-charge.

1031
23.3.1 For ground floor, span up to 3810 mm for floor/roof slab. sqm Tk. 1,626.00 1032
 23.3.2 Extra cost shall be incorporated in the estimate for each additional floor 1033
23.3.2.1 Add for each additional floor up to 5th floor sqm Tk. 35.00 1034
23.3.2.2. Add for each additional floor from 6th floor sqm Tk. 40.00 1035
23.4 Supplying, fitting & fixing of pre-cast Ferrocement L-Panel which is made by using vibration table & steel shutter
with minimum cement content relates to mix ratio 1:2 for flange having minimum compressive strength of 30
MPa (28 days standard cube strength) and cement conforming to BDS EN-197-1-CEM-I, 52.5N
(52.5MPa)/ASTM-C 150 type- 1, best quality coarse sand of equivalent F.M. 2.2, 2 layers of 20 BWG
galvanized/epoxy coated wire mesh having minimum yield strength fy=450 Mpa & having 2 meshes per 25 mm
and reinforced cement concrete works for rib with minimum cement content relates to mix ratio 1:1.5:3 having
minimum f’cr = 30 MPa and satisfying a specified compressive strength f'c = 25 MPa, best quality coarse sand
of equivalent F.M. 2.2 and 12 mm down well graded stone chips conforming to ASTM C-33, supplying,
fabrication and fixing to details as per design, deformed bar reinforcement BDS ISO 6935-2:2006 including
straightening and cleaning rust, if any, bending and binding in position, curing at least for 28 days with supply of
GI wires, remove the shuttering of ferrocement L-panel, lifting the panel to floor/roof level, keeping on proper
position, the cost of water, electricity and other charges all complete as per design, drawing and accepted by
the Engineer-in-charge.

1036
23.4.1 For ground floor, span up to 3810 mm for floor/roof slab. sqm Tk. 1,375.00 1037
 23.4.2 Extra cost shall be incorporated in the estimate for each additional floor 1038
23.4.2.1 Add for each additional floor up to 5th floor sqm Tk. 35.00 1039
23.4.2.2 Add for each additional floor from 6th floor sqm Tk. 40.00 1040
23.5 Supplying, making and fitting fixing of ferrocement door/window frame 155 mm x 65 mm which is made by using meter Tk. 567.00
M.S. rod (fy = 400 MPa) fabrication work minimum cement content relates to mix ratio 1:2 cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5MPa)/ ASTM-C 150 type–1, coarse sand (F.M. 2.2), cutting, bending, binding
of one layer 20 BWG galvanized / epoxy coated wire mesh having minimum yield strength fy=450 MPa & 12
mm c/c gap in both directions with 24 BWG. G.I. wire, jute hassain, polythene sheet, placing of 100 mm long
welded iron hinges including 6 mm dia M.S. rod clamp fittings, fixing in position, casting with neat cement
finishing demoulding and lean cement sand (1:8) cement, sand (F.M. 1:2) and curing at least for 28 days etc. all
complete including the cost of water, electricity, testing and other charge as per design, drawing and accepted
by the Engineer-in-charge. (Considering x- section of the frame is 153 mm x 64 mm).

1041
23.6 25mm thick cast-in-situ ferrocement wall with minimum cement content relates to mix ratio 1:2, cement sqm Tk. 1,719.00
conforming to BDS EN-197-1-CEM-I, 52.5N (52.5MPa)/ASTM-C 150 type–1, and best quality coarse sand (F.M.
2.2) M.S. rod fabrication in accordance with BDS, ISO 6935-2:2006 straighting and cleaning rust if any, bending
and binding in position with supply of 8 mm dia M.S. rod 250 mm c/c vertically, 6 mm dia 250 mm c/c
horizontally, 24 nos G.I. wire splices laps etc. 2 layers of 20 BWG galvanized wire mesh having minimum yield
strength fy=450 Mpa & 2 mesh per 25 mm, casting and finishing the both surfaces with cement sand (F.M.-1.2)
mortar (1:3) and curing at least for 21 days, including the cost of water, electricity and other charges in all
complete as per drawing, design and accepted by the Engineer-in-charge.

1042
Item No. Description of Item Unit Unit Rate

23.7 Supplying, fitting & fixing of 25 mm thick pre-cast ferrocement wall panel with minimum cement content relates
to mix ratio 1:2, cement conforming to BDS EN-197-1-CEM-1, 52.5N (52.5MPa)/ ASTM-C 150 type–1 and best
quality coarse sand (F.M. 2.2) and 2 layers of 20 BWG galvanized wire mesh having minimum yield strength
fy=450 Mpa & 2 mesh per 25 mm, including cutting, binding, bending, with 24 B.W.G. G.I. wire, casting and
finishing the both surfaces with cement sand (F.M.-1.2) Mortar (1:3) and curing at least for 21 days before lifting,
fitting & fixing the Ferrocement plate in proper position with making rib, supply of 8 mm dia M.S. rod 250 mm c/c
vertically, 6 mm dia 250 mm c/c horizontally fabrication in accordance with BDS, ISD 6935-2.2006 straighting
and cleaning rust if any, bending and binding in position with supply of G.I. wire etc. the cost of water, electricity
and other charges, complete in all respect and accepted by the Engineer-in-charge

1043
23.7.1 Ground Floor sqm Tk. 1,572.00 1044
23.7.2 Add for each additional floor up to 5th floor sqm Tk. 18.00 1045
23.7.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 28.00 1046
23.7.4 Add for each additional floor for 10th floor and above sqm Tk. 32.00 1047
23.8 90 mm thick partition wall with ferrocement sandwich panel wall (cast in situ) using mortar having compressive
strength not less than 15.0 N/mm2 and fitting-fixing of EPS sheet size (3000 mm x 1200 mm x 63 mm),8 mm
M.S. bar and its fabrication in both side with 20 BWG galvanized wire mesh having minimum yield strength
fy=450 Mpa & 2 mesh per 25 mm, in compliance with ASTM C129 fairly uniform thickness and water
absorption not more than 7% including necessary scaffolding, cleaning and curing at least for 7 days including
cost of water, electricity and other charges etc. in all complete accepted by the Engineer-in-charge.

1048
23.8,1 Ground Floor sqm Tk. 2,037.00 1049
23.8.2 Add for each additional floor up to 5th floor sqm Tk. 13.00 1050
23.8.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 18.00 1051
23.8.4 Add for each additional floor for 10th floor and above sqm Tk. 21.00 1052
23.9 40 mm ferro-cement slab on soil-cement stabilized sub-grade in ground floor etc. with minimum cement content sqm Tk. 1,247.00
relates to mix ratio 1:2 having minimum compressive strength of 30 MPa (28 days standard cube strength) and
cement conforming to BDS EN-197-1-CEM-1, best quality coarse (F.M. 2.2) sand, 2 layer of 20 BWG
galvanized/epoxy coated wire mesh having minimum yield strength fy=450 Mpa & having 2 mesh per 25 mm
with minimum clear cover 12 mm both top & bottom, true to desired level, placing, compacting, curing at least
for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the
Engineer-in-charge.

1053
1054
1055
1056
………………….. END OF DIVISION TWENTY THREE ………………….. 1057
DIVISION 24: ROAD AND PAVEMENT WORKS 1058
Item No. Description of Item Unit Unit Rate 1059
24.1 Earth work in road embankment up to a lift of 1.5 m in all kinds of soil including cutting and throwing earth in
layers not exceeding 150 mm in thickness, breaking clods up to 40 mm size in each layer, ramming, leveling
and dressing as per required side slope and alignment with earth borrowed from the road side govt. acquired
land for any leads and maintaining the embankment true to level and side slopes as per profiles for one year
from the date of completion including making dug, bailing, profiling etc. complete and accepted by the Engineer-
in-charge.
1060
24.1.1 For initial lift of 1.5 m cum Tk. 145.00 1061
24.1.2 For additional lift of 1 m beyond 1.5 m up to 2.5 m cum Tk. 165.00 1062
24.1.3 For additional lift of 1 m beyond 2.5 m up to 3.5 m cum Tk. 186.00 1063
24.1.4 For additional lift of 1 m beyond 3.5 m up to 4.5 m cum Tk. 206.00 1064
24.1.5 For additional lift of 1 m beyond 4.5 m up to 5.5 m cum Tk. 227.00 1065
24.1.6 For additional lift of 1 m beyond 5.5 m up to 6.5 m cum Tk. 247.00 1066
24.2 Earthwork in box cutting in all types of soil. Removing soil to a safe distance, maintaining proper alignment,
camber and grade including leveling, dressing and compacting the sub grade as per drawing and accepted by
the Engineer-in-charge. 1067
24.2.1 Depth up to 300 mm sqm Tk. 50.00 1068
24.2.2 Depth up to 450 mm sqm Tk. 71.00 1069
24.3 Creating turf on the side slopes and top of embankment with good quality turf not less than 225 mm square sqm Tk. 17.00
chunk, watering till the grass grown including all leads and lifts etc. complete and accepted by the Engineer-in-
charge. 1070
24.4 Single layer brick flat soling in road work with first class or picked jhama bricks as per alignment, camber and sqm Tk. 438.00
grade including filling joints with sand (F.M. 0.80) etc. complete including cost of all materials and accepted by
the Engineer-in-charge. 1071
24.5 Brick on edges pavement in herring bone bond (HBB) with first class or picked jhama bricks as per alignment, sqm Tk. 713.00
camber and grade over 12 mm thick sand cushion (F.M. 0.80) including filling the joints with the same sand
including cost of all materials and accepted by the Engineer-in-charge.
1072
24.6 Double brick flat soling in roadwork with first class or picked jhama bricks as per alignment, camber and grade sqm Tk. 884.00
including filling the joints with fine sand (F.M. 0.80) and also providing 12 mm thick sand cushion in between the
two layers of brick flat soling with the same quality of sand including cost of all materials and accepted by the
Engineer-in-charge.
1073
Item No. Description of Item Unit Unit Rate

24.7 Brick on end edging (75 mm across the road) with first class or picked jhama bricks and filling the gaps with fine meter Tk. 111.00
sand (F.M. 0.80) including cutting trenches, true to level and grade, removing earth, refilling and ramming the
sides properly including cost of all materials and accepted by the Engineer-in-charge.
1074
24.8 Breaking picked jhama, first class bricks or bats including cost of bricks and bats and stacking in measurable
sizes at site accepted by the Engineer-in-charge. 1075
24.8.1 For 62 mm to 40 mm size cum Tk. 3,631.00 1076
24.8.2 For 40 mm to 25 mm size cum Tk. 3,767.00 1077
24.9.1 Labour charge for compacted water bound macadam base course (including the cost of sand ) with graded cum Tk. 544.00
material of crushed well burnt, picked jhama or first class bricks and bats having compacted thickness made as
per specifications including local handling and spreading uniformly to proper grade, camber and super
elevation, hand packing,watering,dry rolling followed by wet rolling in layers of specified thickness with 8 to 10
ton capacity power driven road roller to attain minimum soaked CBR 80% or design CBR at minimum degree of
compaction of 98% MDD (Modified Proctor), including supplying and blinding with sand (F.M. 0.80) @ 0.012 m3
per sqm or as required etc.all complete as per direction of the Engineer-in-charge. After adequate dry rolling,
spreading of sand on the surface, sprinkling of water and rolling is to be continued untill all the voids are filled.
thickness of each layer should not be more than 100 mm loose and payment will be made on compacted
thickness. [The rate excludes the cost of brick aggregates.]

1078
24.9.2 Providing compacted water bound macadam base course with graded material of crushed well burnt, picked cum Tk. 4,955.00
jhama or first class bricks and bats (50 mm downgraded brick chips having LAA value not exceeding 40%)
including supplying of 12 mm downgraded chips made of same quality bricks, having compacted thickness
made as per specifications including local handling and spreading uniformly to proper grade, camber and super
elevation, hand packing watering,dry rolling followed by wet rolling in layers of specified thickness with 8 to 10
ton capacity power driven road roller to attain minimum soaked CBR of 80% or design CBR at minimum degree
of compaction of 98% of MDD (Modified Proctor), including supplying and blinding with sand (F.M. 0.80) @
0.012 m3 per sqm or as required etc. all complete as per direction of of the Engineer-in-charge. After adequate
dry rolling, spreading of sand on the surface, sprinkling of water and rolling is to be continued untill all the voids
are filled. thickness of each layer should not be more than 100 mm loose and payment will be made on
compacted thickness.

1079
24.10 Providing compacted sub-base course with well graded material of crushed well burnt picked jhama / 1st class cum Tk. 4,041.00
brick bats and sand (FM 0.8) with mixing proportion 2 : 1 having compacted thickness made as per specification
including local handling, spreading uniformly to proper grade camber and super elevation, packing, rolling
properly with 8 to 10 ton capacity power driven road roller and watering properly for compaction of 100% MDD
(standard) blinding with sand including cost of fuel, lubricants, spares, maintenance, driver etc. all complete
and accepted by the Engineer-in-charge.

1080
24.11 50 mm thick compacted pre-mixed bituminous carpeting with 20 mm down graded stone-chips (having LAA sqm Tk. 846.00
value <= 30%, water absorption not greater than 2%, flakiness index not greater than 35) of gradation as
specified @ 0.68 cum of stonechips mixed with 46 kg of heated bitumen of 60/70 penetration grade heated
straight run bitumen satisfying the requirements of ASTM/AASHTO. Bitumen content % by wt. of total is 4.5% to
5.50% or as determined by job mix design. The bitumen and stone-chips shall be separately heated to a
temperature of 140°C – 155°C and 150°C – 170°C respectively before mixing. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the fire. The bitumen and stone-chips
mixture shall be laid uniformly over 10 sqm of surface in proper camber, grade and super-elevation only on the
prepared and accepted base or surface in a single appropriate layer to give the specified compacted thickness.
The mixture should be rolled with appropriate steel drum roller (3-5 tons) & pneumatic multiple tire roller (8-10
tons) to full compaction. The rolling temperature shall be maintained not below 90°C including supplying of all
materials, their carriage, labourers, tools and equipment etc. all complete as per direction of the Engineer-in-
charge. (In order to achieve the specified grading a blending of nominal maximum size of 20 mm, 12 mm
crushed stone chips and stone dust is suggested and proportion will have to be determined by the laboratory
analysis). 1081
24.12 38 mm thick compacted pre-mixed bituminous carpeting with 20 mm down graded stone-chips (having LAA sqm Tk. 687.00
value <= 30%, water absorption not greater than 2%, flakiness index not greater than 35) of gradation as
specified @ 0.63 cum of stonechips mixed with 37 kg heated bitumen of 60/70 penetration grade heated
straight run bitumen satisfying the requirements of ASTM/AASHTO. Bitumen content % by wt. of total is 4.5% to
5.50% or as determined by job mix design. The bitumen and stone-chips shall be separately heated to a
temperature of 140°C – 155°C and 150°C – 170°C respectively before mixing. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the fire. The bitumen and stone-chips
mixture shall be laid uniformly over 10 sqm of surface in proper camber, grade and super-elevation only on the
prepared and accepted base or surface in a single appropriate layer to give the specified compacted thickness.
The mixture should be rolled with appropriate steel drum roller (3-5 tons) & pneumatic multiple tire roller (8-10
tons) to full compaction. The rolling temperature shall be maintained not below 90°C including supplying of all
materials, their carriage, labourers, tools and equipment etc. all complete as per direction of the Engineer-in-
charge. (In order to achieve the specified grading a blending of nominal maximum size of 20 mm, 12 mm
crushed stone chips and stone dust is suggested and proportion will have to be determined by the laboratory
analysis). 1082
24.13 25 mm thick compacted pre-mixed bituminous carpeting with 12 mm down graded stone-chips (having LAA sqm Tk. 437.00
value <= 30%, water absorption not greater than 2%, flakiness index not greater than 35) of gradation as
specified @ 0.34 cum of stone chips mixed with 23 kg heated bitumen of 60/70 penetration grade heated
straight run bitumen satisfying the requirements of ASTM/AASHTO. Bitumen content % by wt. of total is 4.5% to
5.50% or as determined by job mix design. The bitumen and stone-chips shall be separately heated to a
temperature of 140°C – 155°C and 150°C – 170°C respectively before mixing. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the fire. The bitumen and stone-chips
mixture shall be laid uniformly over 10 sqm of surface in proper camber, grade and super-elevation only on the
prepared and accepted base or surface in a single appropriate layer to give the specified compacted thickness.
The mixture should be rolled with appropriate steel drum roller (3-5 tons) & pneumatic multiple tire roller (8-10
tons) to full compaction. The rolling temperature shall be maintained not below 90°C including supplying of all
materials, their carriage, labourers, tools and equipment etc. all complete as per direction of the Engineer-in-
charge. (In order to achieve the specified grading a blending of nominal maximum size of 20 mm, 12 mm
crushed stone chips and stone dust is suggested and proportion will have to be determined by the laboratory
analysis). 1083
Item No. Description of Item Unit Unit Rate

24.14 38 mm thick compacted pre-mixed dense bituminous carpeting with 20 mm down graded stone-chips (having sqm Tk. 731.00
LAA value <= 30%, water absorption not greater than 2%, flakiness index not greater than 35) of gradation as
specified @ 0.56 cum of stone chips mixed with 45 kg heated bitumen of 60/70 penetration grade heated
straight run bitumen satisfying the requirements of ASTM/ AASHTO. Bitumen content % by wt. of total is 4.5%
to 5.50% or as determined by job mix design. The bitumen and stone-chips shall be separately heated to a
temperature of 140°C – 155°C and 150°C – 170°C respectively before mixing. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the fire. The bitumen and stone-chips
mixture shall be laid uniformly over 10 sqm of surface in proper camber, grade and super-elevation only on the
prepared and accepted base or surface in a single appropriate layer to give the specified compacted thickness.
The mixture should be rolled with appropriate steel drum roller (3-5 tons) & pneumatic multiple tire roller (8-10
tons) to full compaction. The rolling temperature shall be maintained not below 90°C including supplying of all
materials, their carriage, labourers, tools and equipment etc. all complete as per direction of the Engineer-in-
charge. (In order to achieve the specified grading a blending of nominal maximum size of 20 mm, 12 mm
crushed stone chips and stone dust is suggested and proportion will have to be determined by the laboratory
analysis). 1084
24.15 25 mm thick compacted pre-mixed dense bituminous carpeting with 12 mm down graded stone-chips (having sqm Tk. 464.00
LAA value <= 30%, water absorption not greater than 2%, flakiness index not greater than 35) of gradation as
specified, @ 0.35 cum of stonechips mixed with 29.8 kg heated bitumen of 60/70 penetration grade heated
straight run bitumen satisfying the requirements of ASTM/AASHTO. Bitumen content % by wt. of total is 4.5% to
5.50% or as determined by job mix design. The bitumen and stone-chips shall be separately heated to a
temperature of 140°C – 155°C and 150°C – 170°C respectively before mixing. The mixing shall be done at
temperature between 140°C – 160°C at a separate place away from the fire. The bitumen and stone-chips
mixture shall be laid uniformly over 10 sqm of surface in proper camber, grade and super-elevation only on the
prepared and accepted base or surface in a single appropriate layer to give the specified compacted thickness.
The mixture should be rolled with appropriate steel drum roller (3-5 tons) & pneumatic multiple tire roller (8-10
tons) to full compaction. The rolling temperature shall be maintained not below 90°C including supply of all
materials, their carriage, labourers, tools and equipments etc. all complete as per direction of the Engineer-in-
charge. (In order to achieve the specified grading, a blending of nominal maximum size of 20mm, 12mm
crushed stone chips and stone dust is suggested and proportion will have to be determined by the laboratory
analysis). 1085
24.16 Providing and laying pre-mixed dense bituminous carpeting with hot mix plant using coarse aggregate, fine cum Tk. 19,555.00
aggregate, filler and bituminous binder as per design Job Mix Formula conforming Marshall Method as per
specification, LAA value of aggregate should be <=30%, water absorption not >2%, flakiness index not >35
mixed with 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO.
including screening, cleaning of chips and preparing a uniform and quality mix in hot mix plant and ensuring
a homogenous mix, in which all particles of the mineral aggregates are coated uniformly, carrying the hot
premixed materials by means of dump/tipper truck, spreading the mixed materials at specified laying
temperature with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over
the prepared surface, tamping and finishing the mix at specified compacted thickness, maintaining specified
camber, grade, super-elevation and cross section, through rolling with appropriate steel drum roller & pneumatic
multiple tire roller (8-10 tons) to full compaction, for break down, inter - mediate and finished rolling to achieve
the desired density of at least 98% of that of Laboratory Marshall specimen, hand packing and pinning to give
an even surface, including cost of all materials, their carriages, hire charges of hot mix plant and all other
machines, equipments for construction and quality control as per specification, fuels, lubricants and wages of
operational staff etc. all complete as per the direction of the Engineer-in-charge. (Carpeting work by using
asphalt plant is mandatory for all divisional headquarter & capital city)

1086
24.17 Providing tack coat @ 7.50 kg of bitumen (60/70 penetration grade) per 10 sqm including heating bitumen up to sqm Tk. 71.00
175°C to 185°C etc. all complete (cost of bitumen included) and accepted by the Engineer-in-charge.
1087
24.18.1 Providing seal coat with 4 cft of Sylhet sand (FM 2.2) mixed with @ 7.32 kg of bitumen (60/70 penetration sqm Tk. 108.00
grade) per 10 sqm of road surface including supplying and spreading of dry sand (F.M. 0.80) @ 0.09 cum per
10 sqm, including heating bitumen upto 176°C to 190°C, and spreading, rolling at a temperature not below
90°C celsius with appropriate steel drum roller (3 -5 ton) and pneumatic multiple tire roller (8-10 tons) to the
desired compaction etc. all complete (cost of bitumen included ) and accepted by the Engineer-in-charge.

1088
24.18.2 Premixed bituminous seal coat with 0.12 cum of pea gravels mixed with 80 kg of bitumen (60/70 penetration sqm Tk. 152.00
grade) per cum of pea gravels and laid over 10 sqm road surface, spreading with proper camber, grade, surface
blinding with dry sand (F.M. 1.2) @ 0.09 cum per 10 sqm, rolling at a temperature not below 90°C with
appropriate steel drum roller (3-5 ton) and pneumatic multiple tire roller (8-10 tons) to the desired compaction
etc. all complete and accepted by the Engineer-in-charge.

1089
24.19.1 Providing prime coat @ 1.2 liter/sqm with cutback bitumen to be prepared by cutting back 60/70 penetration sqm Tk. 99.00
grade bitumen in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending
on the porosity of surface and will be decided by field trials, carefully cleaning of the surface of base material to
be primed and spraying cutback bitumen at a temperature from 100 degree celcius to 120 degree celcius by
appropriate hand device etc.all complete as per direction of the Engineer-in-charge.

1090
24.19.2 Providing prime coat @1.2 liter/sqm with cutback bitumen to be prepared by cutting back 60/70 penetration sqm Tk. 101.00
grade bitumen in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending
on the porosity of surface and will be decided by field trials, carefully cleaning of the surface of base material to
be primed and spraying cutback bitumen at a temperature from 100°C to 120°C by mechanical distributor etc.
all complete as per direction of the Engineer-in-charge.

1091
24.20 Providing painting at the top of the road surface as road marking in two coats with approved best quality and sqm Tk. 287.00
colour of synthetic paint from authorized local agent of the manufacturer in a sealed container having high water
resistance, high bondability & flexibility, using specific brand thinner applied by brass/ roller or others over a
coat of priming, providing elapsing time for drying including surface cleaning from dust, oil or dirt, smoothening,
finishing necessary tools etc. all complete & approved and accepted by the Engineer-in-charge.

1092
Item No. Description of Item Unit Unit Rate

24.21 Providing expansion joints across the R.C.C. road pavement with 20 mm gap between the adjacent panels. meter Tk. 390.00
Supplying dowel bars of size 12 mm dia and 600 mm long M.S rod placed @ 750 mm c/c. 300 mm of the bar
being fixed within one slab keeping remaining portion the bar free within the adjacent slab being inserted in 20
mm dia and 300 mm long P.V.C. pipe embedded in the slab, inside of pipe fully greased, filling the gap between
the slabs (with admixture) of hot bitumen and coarse sand (F.M. 2.2) in proportion of 2:1, finishing the top with
bitumen, spreading coarse sand over the joint, all complete as per plan, drawing and accepted by the Engineer-
in-charge.

1093
1094
1095
1096
………………….. END OF DIVISION TWENTY FOUR ………………….. 1097
DIVISION 25 : ARBORICULTURE WORKS
1098
Item No. Description of Item Unit Unit Rate
1099
25.1 Labour charge for scraping lawn surface up to 38 mm depth by spade, picking up all sorts of brick bats, rubbish sqm Tk. 9.00
by suitable tools, removing the same by head load or by any other means and stacking the same to a safe
distance beyond 300 m including supply of tools and plants etc. all complete and accepted by the Engineer-in-
charge.
1100
25.2 Preparation of ground to make ready for plantation by spading the ground to a depth of 150 mm to 230 mm sqm Tk. 20.00
beyond 38 mm deep scrapped ground by spade, breaking earth clods to powder by hammers, picking up all
sorts of rubbish, unwanted grasses by suitable tools, carrying and spreading the surplus earth into low lying
area including supply of tools and plants etc. all complete and accepted by the Engineer-in-charge.

1101
25.3 Leveling and dressing of lawn area to proper slope and grade by spading the same up to 150 mm including sqm Tk. 6.00
supplying tools and plants etc. all complete and accepted by the Engineer-in-charge.
1102
25.4 Supply of best and approved quality alluvial loamy silty soil including loading, unloading at both ends, properly cum Tk. 843.00
stacking at site including supply of tools and plants etc. all complete and accepted by the Engineer-in-charge.
1103
25.5 Supply well decomposed cow dung carried by trucks or any other means including loading, unloading at both cum Tk. 1,507.00
ends, stacking the same at site including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge 1104
25.6 Labour charge for spreading the alluvial loamy silty soil from the stacks at site on the lawn surface, leveling, cum Tk. 152.00
dressing the same including supply all necessary tools and plants etc. all complete and accepted by the
Engineer-in-charge. 1105
25.7 Extra rate for lifting alluvial loamy silty soil/ decomposed cow dung work in additional floor:
1106
25.7.1 Add for each additional floor up to 5th floor cum Tk. 89.00 1107
25.7.2 Add for each additional floor from 6th floor to 9th floor cum Tk. 109.00 1108
25.7.3 Add for each additional floor for 10th floor & above cum Tk. 136.00 1109
25.8 Supply of lawn grass of approved quality by truck or by any other means, sorting the grass to proper size, sqm Tk. 54.00
washing the grass, dibbling the grass 6 mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing the lawn grass by lawn mower up to
two months after plantation, applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm including supply of
tools and plants etc. all complete and accepted by the Engineer-in-charge.

1110
25.9 Labour charge for mixing well decomposed cow dung with alluvial loamy silty soil and excavated earth, cum Tk. 141.00
removing the excess earth to safe distance including supply of tools and plants etc. all complete and accepted
by the Engineer-in-charge. 1111
25.10 Supplying and providing, fitting & fixing bamboo jafry fencing by best quality muli bamboo split 20 mm in width, sqm Tk. 505.00
having 75 mm x 75 mm mesh placed horizontally and diagonally doing 25 mm framing a square shape in both
ways and both sides tightened with G.I wire fitted with Borrak bamboo post of 100 mm dia and placed firmly in
position at 1800 mm apart including supply of tools and plants, digging hole and filling back etc. all complete
and accepted by the Engineer-in-charge.

1112
25.11 Supplying and providing, fitting & fixing muli bamboo tree guard of 1200 mm length and 500 mm dia fixing with each Tk. 647.00
best quality muli bamboo split 20 mm in size having 75 mm x 75 mm a square holes with 20 mm wide bamboo
splits strengthen with 4 Nos. 20 mm wide bamboo split in both sides tightened with G.I wire fitted with 3 Nos. 63
mm dia borrak bamboo post of 1800 mm long of which 600 mm will be driven into earth by digging hole followed
by fill back including supply of tools and plants all complete as per direction of the Engineer-in-charge.

1113
25.12 Earth work in excavation to make a pit of 600 x 600 x 450 mm (depth) for plantation, applying cow dung mixing each Tk. 137.00
with loamy silty soil and excavated earth, planting the plants, tightened with 1800 mm long borrak bamboo post
with jute rope including supply of tools and plants all complete and accepted by the Engineer-in-charge.
1114
25.13 Spading for preparation of flower beds in pits up to 600 mm depth, re-molding, picking up and placing and sqm Tk. 465.00
removing the spaded earth to a safe distance, mixing @ 1 cft well decomposed cow dung with 20% loamy silty
soil and 6 cft excavated soil and fill back the pit including supply of tools and plants, all complete and accepted
by the Engineer-in-charge.
1115
25.14 Preparation of hedge beds by excavation of earth up to 300 mm depth, filling up the bed by a mixture of cow sqm Tk. 234.00
dung, loamy silty soil, cutted earth @ 1 cft cow dung manure per 6 cft of cutted earth and 20% loamy silty soil
including supply of tools and plant etc. all complete and accepted by the Engineer-in-charge.
1116
25.15 Carrying of rubbish, taking up all sorts of bricks, brick-bats and rubbish gravel chips, loading and unloading at cum Tk. 146.00
both ends including supply of tools and plants etc. all complete and accepted by the Engineer-in-charge.
1117
Item No. Description of Item Unit Unit Rate

25.16 Supply and carrying of 12.20 m long 100 mm dia borrak bamboo at site, loading and unloading at both end, each Tk. 476.00
stacking the same at site including supply of tools and plants etc. all complete and accepted by the Engineer-
in-charge. 1118
25.17 Supply and carrying of 7.62 m long 50 mm to 62.5 mm dia muli bamboo at site, loading and unloading at both each Tk. 261.00
end, stacking the same at site including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge. 1119
25.18 Supply and carrying of 4.5 h.p., 550 mm blade 4 stroke, finger trip 3 position height adjuster 200 mm x 38 mm each Tk. 54,335.00
star tread wheels grass cutting (Power Lawn Mower Machine): YARDMAN No. 060A
1120
25.19 Supply and carrying of 6.5 h.p., 550 mm blade 4 stroke, finger trip 3 position height adjuster 200 mm x 38 mm each Tk. 72,447.00
star tread wheels grass cutting (Power Lawn Mower Machine): YARDMAN No. 060A
1121
25.20 Supply and carrying of 22 h.p. 1150 mm cutting blade power riding lawn yardman mower machine made in each Tk. 543,351.00
USA. Model No.13 BT 793G678 or equivalent. 1122
25.21 Supply and carrying of 450 mm blade Hand Lawn Moar, Model No.1403-106(USA) each Tk. 15,093.00 1123
1124
1125
1126
………………….. END OF DIVISION TWENTY FIVE ………………….. 1127
DIVISION 26 : SANITARY & WATER SUPPLY WORKS 1128
Unit
Item No. Description of Item Unit Rate
1129
26.1 Supplying, fitting and fixing of European type glazed porcelain commode "S" type 465 mm x 340 mm x 415 mm
in size, approximately 14 kg by weight, plastic seat cover and preparing the base with cement concrete and with
wire mesh or rods, if necessary, in all floors including making holes wherever required and mending good the
damages, fitting, fixing, finishing etc. complete with all necessary fittings and connections approved and
accepted by the Engineer- in- charge.
1130
26.1.1 White each Tk. 3,158.00 1131
26.1.2 Coloured each Tk. 3,255.00 1132
26.1.3 Special colour each Tk. 3,424.00 1133
26.2 Supplying, fitting and fixing of European type glazed porcelain low-down, capacity 10 liter, 490 mm x 190 mm x
350 mm in size, approximately 14 kg of weight, on walls by screws and F.I. bar clamps, rowel plugs, making
holes wherever required and mending good the damages and fitting, fixing & finishing etc. complete with all
necessary fittings and connections approved and accepted by the Engineer- in- charge.
1134
26.2.1. White each Tk. 2,228.00 1135
26.2.2 Coloured each Tk. 2,409.00 1136
26.2.3 Special colour each Tk. 2,650.00 1137
26.3 Supplying, fitting and fixing of European type glazed porcelain combi closet, including plastic seat cover, cistern
system, preparing the base with cement concrete and with wire mesh or rods if necessary, in all floors including
making holes wherever required and mending good the damages and fitting, fixing, finishing etc. complete with
all necessary fittings and connections approved and accepted by the Engineer- in- charge.

1138
26.3.1 670 mm x 365 mm x 755 mm, 31.0 kg 1139
26.3.1.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 8,320.00 1140
26.3.1.2 Coloured (Marble Shaded) each Tk. 10,505.00 1141
26.3.1.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 11,966.00 1142
26.3.2 700 mm x 370 mm x 795 mm, 32.5kg 1143
26.3.2.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 9,636.00 1144
26.3.2.2 Coloured (Marble Shaded) each Tk. 12,220.00 1145
26.3.2.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 13,941.00 1146
26.3.3 700 mm x 360 mm x 785 mm, 38 kg 1147
26.3.3.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 13,041.00 1148
26.3.3.2 Coloured (Marble Shaded) each Tk. 17,853.00 1149
26.3.3.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 19,048.00 1150
26.3.4 Supplying, fitting and fixing of European type glazed porcelain combi closet of white or ivory color and size of each Tk. 15,305.00
approx. 340 mm x 730 mm x 785 mm, 36.75 kg of weight including plastic seat cover with soft closing, cistern
system, water consumption 6 litter, siphon jet flushing system, mending good the damages and fitting, fixing,
finishing etc. complete with all necessary fittings and connection approved and accepted by the Engineer- in-
charge.
1151
26.4 Supplying, fitting and fixing of European type glazed combi closet, 725 mm x 360 mm x 840 mm size, 42.7 kg of
weight, including plastic seat cover, cistern system, preparing the base with cement concrete and with wire
mesh or rods if necessary, in all floors including making holes wherever required and mending good the
damages and fitting, fixing, finishing complete with all necessary fittings and connections approved and
accepted by the Engineer- in- charge
1152
26.4.1 725 mm x 360 mm x 840 mm size, 42.7 kg 1153
26.4.1.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 16,289.00 1154
26.4.1.2 Coloured (Marble Shaded) each Tk. 20,865.00 1155
26.4.1.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 23,908.00 1156
Item No. Description of Item Unit Unit Rate

26.4.2 Supplying, fitting and fixing of European type glazed combi closet, of white color , 370 mm x 760 mm x 800 each Tk. 17,919.00
mm size, 44.69 kg of weight, including plastic seat cover with soft closing ,cistern system, water consumption 6
litter, siphon wash down dual flashing system which reduce water consumption, hygienic glaze in toilet bowl
,glaze in inner waste line, round bowl, outlet range 305 mm , preparing the base with cement concrete and with
wire mesh or rods if necessary, in all floors including making holes wherever required and mending good the
damages and fitting, fixing, finishing, complete with all necessary fittings and connection approved and
accepted by the Engineer Engineer- in- charge.

1157
26.5 Supplying, fitting and fixing of Bangladesh pattern, long pan with foot-rest, made of vitreous China clay and
preparing the base of pan with cement mortar (1:4) and with wire mesh or rods, if necessary in all floors
including making holes wherever required and mending good the damages and fitting, fixing, finishing etc.
complete with all necessary fittings and connections approved and accepted by the Engineer- in- charge.
1158
26.5.1 530 mm x 430 mm x 210 mm size & 12.5 kg of weight 1159
26.5.1.1 White each Tk. 1,737.00 1160
26.5.1.2 Coloured each Tk. 2,058.00 1161
26.5.1.3 Special coloured each Tk. 2,272.00 1162
26.5.2 530 mm x 450 mm x 290 mm size & 14.5 kg of weight 1163
26.5.2.1 White each Tk. 2,254.00 1164
26.5.2.2 Coloured each Tk. 2,650.00 1165
26.5.2.3 Special coloured each Tk. 3,047.00 1166
26.6 Supplying, fitting and fixing of Bangladesh pattern long pan, made of vitreous China light color 525 mm x 295 each Tk. 1,330.00
mm x 285 mm size, 5.7kg of weight and preparing the base of pan with cement concrete and with wire mesh or
rods if necessary in all floors including making holes wherever required and mending good the damages and
fitting, fixing, finishing etc. complete with all necessary fittings and connections approved and accepted by the
Engineer- in- charge.

1167
26.7 Supplying, fitting and fixing plastic low-down including all fittings and accessories each Tk. 1,920.00 1168
26.8 Supplying of 280 mm x 140 mm x 30 mm size glazed porcelain foot rest, 1.5 kg of weight including fitting, fixing each Tk. 328.00
in position with cement mortar (1:4) if necessary in all floors including making holes wherever required and
mending good the damages and fitting, fixing, finishing etc. complete with all necessary fittings and connection
approved and accepted by the Engineer- in- charge.
1169
26.9 Supplying, fitting and fixing of white glazed vitreous W/H wash basin excluding pedestal, fitting, fixing the same
in position with heavy type C.I. Brackets. 30 mm dia PVC waste water pipe with brass coupling (not exceeding
750 mm in length), basin waste with chain plug including making holes in walls and floors and fitting with wall,
screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer-in-
charge.
1170
26.9.1 600 mm x 465 mm x 225 mm in size ,14kg of weight 1171
26.9.1.1 White each Tk. 2,687.00 1172
26.9.1.2 Coloured each Tk. 2,929.00 1173
26.9.1.3 Special coloured each Tk. 3,050.00 1174
29.9.2 595 mm x 430 mm x190 mm, 10kg of weight 1175
26.9.2.1 White each Tk. 2,308.00 1176
26.9.2.2 Coloured each Tk. 2,551.00 1177
26.9.2.3 Special coloured each Tk. 2,832.00 1178
26.9.3 510 mm x 450 mm x 203 mm, 9.5kg of weight 1179
26.9.3.1 White each Tk. 2,273.00 1180
26.9.3.2 Coloured each Tk. 2,330.00 1181
26.9.3.3 Special coloured each Tk. 2,457.00 1182
26.9.4 450 mm x 405 mm x180 mm, 7kg of weight 1183
26.9.4.1 White each Tk. 1,945.00 1184
26.9.4.2 Coloured each Tk. 1,985.00 1185
26.9.4.3 Special coloured each Tk. 2,027.00 1186
26.9.5 465 mm x 340 mm x180 mm, 6kg of weight 1187
26.9.5.1 White each Tk. 1,871.00 1188
26.9.5.2 Coloured each Tk. 1,909.00 1189
26.9.5.3 Special coloured each Tk. 1,945.00 1190
26.9.6 535 mm x 465 mm x 210 mm, 10.5kg of weight each 1191
26.9.6.1 White each Tk. 2,308.00 1192
26.9.6.2 Coloured each Tk. 2,366.00 1193
26.9.6.3 Special coloured each Tk. 2,427.00 1194
26.9.7 White or Ivory Color, 560 mm x 410 mm x 205 mm in size, 7.90kg of weight each Tk. 4,945.00 1195
29.9.8 Cabinet Basin 500 mm x 450 mm x180 mm, 9 kg of weight 1196
26.9.8.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 4,297.00 1197
26.9.8.2 Coloured (Marble Shade) each Tk. 5,243.00 1198
26.9.8.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 5,874.00 1199
26.9.9 Corner Basin 440 mm x 360 mm x 195 mm, 7.0kg of weight 1200
Item No. Description of Item Unit Unit Rate

26.9.9.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 2,093.00 1201
26.9.9.2 Coloured (Marble Shade) each Tk. 2,379.00 1202
26.9.9.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 2,569.00 1203
26.10 Supplying of glazed vitreous W/H wash basin including pedastal of size 660 mm x 545 mm x 850 mm, 29kg of
weight including fitting, fixing the same in position with heavy type C.I. brackets, 30 mm dia PVC waste water
pipe with brass coupling (not exceeding 750 mm in length), 12mm plastic lead (connection) pipe with brass
coupling, basin waste with chain plug including making holes in walls and floors and fitting with wooden blocks,
screws and mending good the damages, finishing etc. all complete approved and accepted by the Engineer- in-
charge.
1204
26.10.1 660 x 545 x 850 mm in size , 29 kg of weight 1205
26.10.1.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 5,120.00 1206
26.10.1.2 Coloured ( Marble Shaded) each Tk. 6,310.00 1207
26.10.1.3 Special coloured (Deep Colour) each Tk. 7,107.00 1208
26.10.2 Supplying of glazed vitreous W/H wash basin including pedastal of approx. size 600 mm x 500 mm x 855 mm, each Tk. 6,756.00
26.92 kg of weight including fitting, fixing the same in position with heavy type C.I. brackets, 30 mm dia PVC
waste water pipe with brass coupling (not exceeding 750 mm in length) used hygienic glaze, 12mm plastic lead
(connection) pipe with brass coupling, basin waste with chain plug including making holes in walls and floors
and fitting with wooden blocks, screws and mending good the damages, finishing etc. all complete approved
and accepted by the Engineer- in- charge.

1209
26.11 Supplying of white glazed vitreous W/H wash basin including pedastal and fitting, fixing the same in position
with heavy type C.I. brackets, 32 mm dia PVC waste water pipe with brass coupling (not exceeding 750 mm in
length), 32 mm dia C.P. basin waste with chain plug, bracket including making holes in walls and floors and
fitting with wooden blocks, screws and mending good the damages with cement mortar (1:4), etc. all complete
approved and accepted by the Engineer- in- charge.

1210
26.11.1 665 mm x 490 mm x 840 mm in size, 29.5 kg of weight 1211
26.11.1.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 6,889.00 1212
26.11.1.2 Coloured (Marble Shade) each Tk. 8,610.00 1213
26.11.1.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 9,757.00 1214
26.12 Supplying, fitting and fixing basin pedestal, with rowel plug and screws etc. all complete approved and accepted
by the Engineer- in- charge. 1215
26.12.1 670 mm x 186 mm x 170 mm size 1216
26.12.1.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 1,846.00 1217
26.12.1.2 Coloured (Marble Shaded) each Tk. 2,335.00 1218
26.12.1.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 2,661.00 1219
26.12.2 670 mm x 186 mm x 170 mm size 1220
26.12.2.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 2,443.00 1221
26.12.2.2 Coloured (Marble Shaded) each Tk. 3,110.00 1222
26.12.2.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 3,554.00 1223
26.12.3 670 mm x186 mm x 170 mm size 1224
26.12.3.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) each Tk. 2,612.00 1225
26.12.3.2 Coloured (Marble Shaded) each Tk. 3,330.00 1226
26.12.3.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green) each Tk. 3,808.00 1227
26.13 Supplying, fitting and fixing of glazed vitreous standing bowl urinal , fitting, fixing the same in position after
making holes in walls and floors, providing 32 mm dia plastic waste pipe with brass coupling up to grading
below, 12 mm dia plastic connection pipe with brass coupling, 12 mm dia brass stop cock including mending
good the damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer- in-
charge.
1228
26.13.1 445 mm x 355 mm x 330 mm size, 11.5kg of weight 1229
26.13.1.1 Light Colored each Tk. 2,278.00 1230
26.13.1.2 Coloured each Tk. 2,683.00 1231
26.13.1.3 Special coloured (Deep Colour) each Tk. 2,949.00 1232
26.13.2 445 mm x 355 mm x 330 mm, 10kg of weight (partition Type) 1233
26.13.2.1 Light Colored each Tk. 2,924.00 1234
26.13.2.2 Coloured (Marble Shaded) each Tk. 3,554.00 1235
26.13.2.3 Special coloured (Deep Colour) each Tk. 3,957.00 1236
26.14 Supplying, fitting and fixing of glazed vitreous china flat or squatting urinal 510 mm x 380 mm x 85 mm in size,
approx. 9.5 kg of weight with flushing inlet fitted in cement mortar (1:4) with painted cast iron body: one gallon
capacity, automatic flushing cistern in each group etc. including 12 mm brass controlling valve, 32 mm dia PVC
flush pipe with brass coupling, 12 mm dia plastic lead (connection) pipe including mending good the damages
with 1:4 cement mortar etc. all complete approved and accepted by the Engineer- in- charge.

1237
26.14.1 White each Tk. 1,700.00 1238
26.14.2 Coloured each Tk. 1,760.00 1239
26.14.3 Special coloured each Tk. 1,881.00 1240
Item No. Description of Item Unit Unit Rate

26.15 Supplying, fitting and fixing of porcelain sink, 635 mm x 480 mm x195 mm size, 19.5 kg of weight fitted and
fixed with heavy type C.I. brackets, 12 mm dia C.P. bib cock, 40 mm dia C.P. chain plug. 40 mm dia. C.P.
waste, 40 mm dia PVC waste pipe with brass coupling (750 mm length) including making holes in walls and
floors and mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the
Engineer- in- charge.
1241
26.15.1 White each Tk. 2,936.00 1242
26.15.2 Colored each Tk. 3,299.00 1243
26.16 Supplying, fitting and fixing of single bowl stainless steel sink with sink tray (size 450 mm x 1050 mm) with each Tk. 4,144.00
heavy type CI steel brackets, 12 mm dia C.P. bib-cock, 40 mm dia C.P. chain plug, 40 mm dia C.P. waste, 40
mm dia PVC waste pipe with brass coupling (750 mm length) including making hole in walls and floors and
mending good the damages, finishing with 1:4 cement mortar etc. all complete approved and accepted by the
Engineer-in-charge. (Malaysia / Singapore / Thailand made or equivalent).

1244
26.17 Supplying, fitting and fixing of double bowl stainless steel sink with sink tray with heavy type CI or steel each Tk. 7,390.00
brackets, 12 mm dia C.P. chain plug, 40 mm dia C.P. waste, 40 mm dia PVC waste pipe with brass coupling
(750 mm length) including making hole in walls and floors and mending good the damages, finishing etc. all
complete approved and accepted by the Engineer-in-charge. (Malaysia / Singapore / Thailand made or
equivalent).
1245
26.18 Supplying, fitting and fixing of 450 mm x 600 mm size and 5 mm thick unframed super quality mirror with hard each Tk. 886.00
boards at the back with all necessary fitting including making holes in walls and mending good the damages
with cement mortar (1:4) etc. all complete approved and accepted by the Engineer-in-charge. (Made in Japan or
equivalent).
1246
26.19 Supplying, fitting and fixing of 450 mm x 350 mm size and 5 mm thick unframed super quality mirror with hard each Tk. 675.00
boards at the back with all necessary fitting including making holes in walls and mending good the damages
with cement mortar (1:4) etc. all complete approved and accepted by the Engineer-in-charge (Made in Japan or
equivalent).
1247
26.20 Supplying, fitting and fixing of super quality 600 mm x 125 mm coloured glass (plate) shelf having 5 mm each Tk. 1,412.00
thickness with fancy C.P. brackets, screws and frames including making holes in walls and mending good the
damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer- in- charge.
1248
26.21 Supplying, fitting and fixing of super quality 600 x 125 mm white glass (plate) shelf having 5 mm thickness with each Tk. 989.00
fancy C.P. brackets, screws and frames including making holes in walls and mending good the damages with
cement mortar (1:4) etc. all complete approved and accepted by the Engineer- in- charge.
1249
26.22 Supplying, fitting and fixing of super quality C.P. towel rail of 600 mm long and 20 mm in dia with C.P. holder each Tk. 711.00
including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer- in- charge. 1250
26.23 Supplying, fitting and fixing of medium quality C.P. towel rail of 600 mm long and 20 mm in dia with C.P. holder each Tk. 627.00
including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer- in- charge. 1251
26.24 Supplying, fitting and fixing of standard porcelain toilet paper holder of 150 mm x 150 mm x 126 mm size
including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer- in- charge. 1252
26.24.1 Light Colored each Tk. 353.00 1253
26.24.2 Colored each Tk. 444.00 1254
26.25 Supplying, fitting and fixing of special toilet paper holder with cover of size (150 mm x 150 mm x 126 mm)
including making holes in walls and mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer- in- charge. 1255
26.25.1 white (porcelain) each Tk. 438.00 1256
26.25.2 colored (porcelain) each Tk. 558.00 1257
26.25.3 Standard size stainless steel bracket and holder rod with cover. each Tk. 592.00 1258
26.25.4 Standard size, C.P iron bracket with plastic holder rod. each Tk. 405.00 1259
26.26 Supplying, fitting and fixing of standard size soap tray including making holes in walls and mending good the
damages with cement mortar (1:4) etc. all complete approved and accepted by the Engineer- in- charge.
1260
26.26.1 C.P. soap tray each Tk. 242.00 1261
26.26.2 Porcelain soap tray (white) each Tk. 363.00 1262
26.26.3 Porcelain soap tray (coloured) each Tk. 417.00 1263
26.26.4 Stainless steel soap tray each Tk. 363.00 1264
26.27 Supplying, fitting and fixing of Automatic liquid soap dispenser to hold and dispense up to min 600 ml of liquid
and lotion soaps, synthetic detergents and antibacterial soaps. Dispenser shall be powered by batteries and
shall operate automatically from IR sensor that shall activate soap dispensing when hands are placed in sensor
zone. Sensor detection range shall be adjustable by owner. Dispenser shall pump a drop volume of 0.8 ml to
1.0 ml of soap during each activation. A tamper resistant soap level-viewing window shall be provided. Unit shall
have a swing open body secured with side-mounted lock that is opened with special key provided, all complete
and accepted by the Engineer- in- charge.

1265
26.27.1. Surface mounted automatic liquid soap dispenser each Tk. 7,097.00 1266
26.27.2 Wall-mounted automatic liquid soap dispenser each Tk. 7,700.00 1267
26.27.3 Supplying, fitting and fixing of Liquid soap dispenser (push-up type) to dispense 16 oz (.47 liters) of soap, each Tk. 1,060.00
detergent or lotion. Unit shall be fabricated of tamper resistant, chrome plated plastic, a translucent white
polyethylene soap container, and a corrosion resistant dispensing valve which can provide no more than 5 lbs
(22.2 Newtons) pressure and unit can be reloaded by unscrewing base from bracket collar, inverting unit, and
unscrewing soap container in which soap will continue to feed properly until empty with a continuously visible
soap level etc. all complete approved and accepted by the Engineer- in- charge.

1268
Item No. Description of Item Unit Unit Rate

26.28 Supplying, fitting and fixing of Stainless steel floor grating of following type 1269
26.28.1 Supplying, fitting and fixing of 125 mm dia stainless steel floor grating in traps or in drains including making each Tk. 257.00
holes in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete approved and
accepted by the Engineer- in- charge. 1270
26.28.2 Supplying, fitting and fixing of 150 mm X 150 mm stainless steel floor grating in traps or in drains including each Tk. 1,023.00
making holes in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer- in- charge. 1271
26.28.3 Supplying, fitting and fixing of 75 mm X 75 mm stainless steel floor grating in traps or in drains including making each Tk. 365.00
holes in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete approved and
accepted by the Engineer- in- charge. 1272
26.28.4 Supplying, fitting and fixing of 62 mm dia stainless steel floor grating in traps or in drains including making holes each Tk. 167.00
in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete approved and
accepted by the Engineer- in- charge. 1273
26.29 Supplying, fitting and fixing of plastic grating with hinged cover size 150 x 150 mm in traps or in drains including each Tk. 220.00
making holes in walls/floors and mending good the damages with cement mortar (1:4) etc. all complete
approved and accepted by the Engineer- in- charge. 1274
RAIN WATER DOWN, SOIL WASTE AND VENTILATION PIPES 1275
26.30 Supplying, fitting and fixing of 125 mm dia convex cast iron grating on rain water down pipe (roof top) mending each Tk. 531.00
good the damages with cement morter (1:4) etc., all complete approved and accepted by the Engineer- in-
charge.
1276
26.31 Supplying, fitting and fixing of 100 mm inside diameter & wall thickness 2.7 mm - 3.4 mm best quality uPVC rain meter Tk. 701.00
water down pipe fitting, fixed in position with head and shoes, bends, min.20 mm width F.I. Bar clamp and nails,
and including all accessories such as round grating/domed roof grating, bands, sockets approved and accepted
by the Engineer- in- charge.
1277
26.32 Supplying, laying, fitting and fixing of best quality HDPE soil, waste and ventilation pipe having PE-100
(Hydrostatic Strength for PE-100 is 5.0 MPa & 12.4 Mpa at 80°c & 20°c respectively according to ISO
4427:2007(E)), PN-6 (nominal pressure for PN-6 is 0.6 MPa according to ISO 4427:2007(E) ) & SDR 26 for soil,
waste and ventilation pressure pipe having density 0.940 – 0.970 gm/cm3 and other physical, chemical, thermal,
fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM/BS/ISO/IS standards
,fitted and fixed in position with necessary joints and fittings with all accesories complete approved and
accepted by the Engineer- in- charge.
1278
26.32.1 For underground including earth cutting & preperation of bed 1279
26.32.1.1 HDPE pipe of 110 mm outside dia with wall thickness 4.2 mm - 4.8 mm meter Tk. 1,102.00 1280
26.32.1.2 HDPE pipe of 160 mm outside dia with wall thickness 6.2 mm - 7.0 mm meter Tk. 1,755.00 1281
26.32.1.3 HDPE pipe of 200 mm outside dia with wall thickness 7.7 mm - 8.6 mm meter Tk. 2,917.00 1282
26.32.1.4 HDPE pipe of 250 mm outside dia with wall thickness 9.6 mm -10.7 mm meter Tk. 4,822.00 1283
26.32.1.5 HDPE pipe of 280 mm outside dia with wall thickness 10.7 mm -11.9 mm meter Tk. 5,837.00 1284
26.32.1.6 HDPE pipe of 315 mm outside dia with wall thickness 12.1 mm -13.5 mm meter Tk. 7,241.00 1285
26.32.1.7 HDPE pipe of 400 mm outside dia with wall thickness 15.3 mm -17.0 mm meter Tk. 11,452.00 1286
26.32.1.8 HDPE pipe of 630 mm outside dia with wall thickness 24.2 mm - 26.7 mm meter Tk. 26,598.00 1287
26.32.1.9 HDPE pipe of 710 mm outside dia with wall thickness 27.2 mm - 30.1 mm meter Tk. 35,415.00 1288
26.32.1.10 HDPE pipe of 900 mm outside dia with wall thickness 34.4 mm - 38.3 mm meter Tk. 56,811.00
1289
26.32.2 For in house system 1290
26.32.2.1 HDPE pipe 110 mm outside dia with wall thickness 4.2 mm - 4.8 mm meter Tk. 1,530.00 1291
26.32.2.2 HDPE pipe 160 mm outside dia with wall thickness 6.2 mm -7.0 mm meter Tk. 2,500.00 1292
26.32.2.3 HDPE pipe 200 mm outside dia with wall thickness 7.7 mm -8.6 mm meter Tk. 3,888.00 1293
26.32.2.4 HDPE pipe 250 mm outside dia with wall thickness 9.6 mm -10.7 mm meter Tk. 6,667.00 1294
26.33 Supplying 50 mm inside dia best quality uPVC soil, waste and ventilation pipe having specific gravity 1.35 - meter Tk. 407.00
1.45, wall thickness 2.5 mm - 3.0 mm, and other physical, chemical, themal, fire resistivity properties etc. as per
BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitting and fixing in position with sockets,
bends, of uPVC Pipe with all accessories such as Round grating /domed roof grating bands, sockets etc.
approved and accepted by the Engineer- in- charge.

1295
26.34 Supplying 100 mm inside dia best quality uPVC waste and ventilation pipe having specific gravity 1.35-1.45, meter Tk. 617.00
wall thickness 3.4- 4.0 mm, and other physical, chemical, themal, fire resistivity properties etc. as per BSTI
approved manufacturer standards or ASTM, BS/ISO/IS standards fitting and fixing in position with sockets,
bends, with all accessories such as round grating/domed roof grating bands, sockets etc. approved and
accepted by the Engineer- in- charge.

1296
26.35 Supplying 150 mm inside dia best quality uPVC soil, waste and ventilation pipe having specific gravity 1.35 - meter Tk. 1,075.00
1.45, wall thickness 4.5 mm - 5.2 mm, and other physical, chemical, thermal, fire resistivity properties etc. as per
BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitting and fixing in position with sockets,
bends, with all accessories such as Round grating/domed roof grating bands, sockets etc. approved and
accepted by the Engineer- in- charge.

1297
26.36 Supplying, fitting and fixing of G.I. pipe with all special fittings, such as bends, elbows, sockets, reducing
sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting the same with earth
duly rammed and fixing in walls with holder bats and making hole in floors, walls and consequent mending good
the damages etc. all complete in all respects approved and accepted by the Engineer- in- charge.

1298
26.36.1 12.5 mm dia G.I. pipe with wall thickness 2.65 mm, outside diameter min 17.8 mm, weight 1.31 kg/m, can meter Tk. 259.00
withstand min 50 kg/cm2 hydraulic pressure. 1299
Item No. Description of Item Unit Unit Rate

26.36.2 20 mm dia G.I. pipe with wall thickness 2.65 mm, outside diameter min 25.3 mm, weight 1.7 kg/m, can meter Tk. 336.00
withstand min 50 kg/cm2 hydraulic pressure. 1300
26.36.3 25 mm dia G.I. pipe with wall thickness 3.35 mm, outside diameter min 31.7 mm, weight 2.59 kg/m, can meter Tk. 424.00
withstand min 50 kg/cm2 hydraulic pressure. 1301
26.36.4 32 mm dia G.I. pipe with wall thickness 3.25 mm, outside diameter min 38.5 mm, weight 3.33 kg/m, can meter Tk. 529.00
withstand min 50 kg/cm2 hydraulic pressure. 1302
26.36.5 40 mm dia G.I. pipe with wall thickness 3.25 mm, outside diameter min 46.5 mm, weight 3.83 kg/m, can meter Tk. 669.00
withstand min 50 kg/cm2 hydraulic pressure. 1303
26.36.6 50 mm dia G.I. pipe with wall thickness 3.65 mm, outside diameter min 57.3 mm, weight 5.38 kg/m, can meter Tk. 860.00
withstand min 50 kg/cm2 hydraulic pressure. 1304
26.36.7 62-65 mm dia G.I. pipe with wall thickness 3.25 mm, outside diameter min 71.5 mm, weight 6.15 kg/m, can meter Tk. 1,340.00
withstand min 50 kg/cm2 hydraulic pressure. 1305
26.36.8 75 -80 mm dia G.I. pipe with wall thickness 3.25 mm, outside diameter min 86.5 mm, weight 7.22 kg/m, can meter Tk. 1,526.00
withstand min 50 kg/cm2 hydraulic pressure. 1306
26.36.9 100 mm dia G.I. pipe with wall thickness 3.65 mm, outside diameter min 107.3 mm, weight 10.42 kg/m, can meter Tk. 2,262.00
withstand min 50 kg/cm2 hydraulic pressure. 1307
26.37 Supplying different inside dia best quality uPVC pressure pipe for water supply having specific gravity 1.35 -
1.45, and other physical, chemical, themal, fire resistivity properties etc. as per BSTI approved manufacturer
standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories
such as Round grating/domed roof grating, bends, sockets etc. approved and accepted by the Engineer-in-
charge.
1308
26.37.1 12 mm dia wall thickness 1.7 mm - 2.8 mm meter Tk. 102.00 1309
26.37.2 19 mm dia wall thickness 1.9 mm - 2.9 mm meter Tk. 140.00 1310
26.37.3 25 mm dia wall thickness 2.2 mm - 3.4 mm meter Tk. 164.00 1311
26.37.4 32 mm dia wall thickness 2.7 mm - 3.6 mm meter Tk. 180.00 1312
26.37.5 37 mm dia wall thickness 2.5 mm - 3.1 mm meter Tk. 157.00 1313
26.37.6 60 mm dia wall thickness 3.0 mm - 3.9 mm meter Tk. 360.00 1314
26.37.7 75 mm dia wall thickness 2.9 mm - 3.5 mm meter Tk. 449.00 1315
26.37.8 88 mm dia wall thickness 3.5 mm - 4.1 mm meter Tk. 503.00 1316
26.37.9 114 mm dia wall thickness 4.5 mm - 5.2 mm meter Tk. 615.00 1317
26.38 Supplying different inside dia best quality CPVC pressure pipe for water supply having specific gravity 1.35 -
1.45, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer
standards or ASTM, BS/ISO/IS standards fitting and fixing in position with sockets, bends, with all accessories
such as round grating/domed roof grating, bends, sockets etc. approved and accepted by the Engineer-in-
charge (length: 6000 mm each).

1318
26.38.1 12 mm dia wall thickness 2.8 mm - 3.3 mm meter Tk. 229.00 1319
26.38.2 19 mm dia wall thickness 2.9 mm - 3.4 mm meter Tk. 340.00 1320
26.38.3 25 mm dia wall thickness 3.4 mm - 4.0 mm meter Tk. 385.00 1321
26.38.4 32 mm dia wall thickness 3.6 mm - 4.2 mm meter Tk. 586.00 1322
26.38.5 37 mm dia wall thickness 3.7 mm - 4.3 mm meter Tk. 792.00 1323
26.38.6 50 mm dia wall thickness 3.9 mm - 4.5 mm meter Tk. 1,374.00 1324
26.39 Supplying, fitting and fixing of PP-R Pipe meeting the perfomance & long-tem strength requirements as per DIN
8077 /78 or ASTM F 2983 including nipple, elbow, reducers, Tee, end cap, plug, socket etc as per
manufacturer instruction. all complete accepted by the Engineer- in- charge.
1325
26.39.1 12 mm dia, minimum wall thickness 2.8 mm, sustaining minimum water pressure PN 16, standard dimension meter Tk. 244.00
ratio (SDR) 7.4 1326
26.39.2 19 mm dia, minimum wall thickness 3.5 mm, sustaining minimum water pressure PN 16, standard dimension meter Tk. 273.00
ratio (SDR) 7.4 1327
26.39.3 25 mm dia, minimum wall thickness 4.4 mm, sustaining minimum water pressure PN 16, standard dimension meter Tk. 316.00
ratio (SDR) 7.4 1328
26.39.4 32 mm dia, minimum wall thickness 5.5 mm, sustaining minimum water pressure PN 16, standard dimension meter Tk. 426.00
ratio (SDR) 7.4 1329
26.39.5 38 mm dia, minimum wall thickness 6.9 mm, sustaining minimum water pressure PN 16, standard dimension meter Tk. 502.00
ratio (SDR) 7.4 1330
26.39.6 50 mm dia, minimum wall thickness 8.6 mm, sustaining minimum water pressure PN 16, standard dimension meter Tk. 680.00
ratio (SDR) 7.4 1331
26.40 Supplying, fitting and fixing of PP-R Union meeting the perfomance & long-tem strength requirements of ASTM
F 2389 in accordance with the manufacturer’s specifications all complete accepted by the Engineer- in- charge.
1332
26.40.1 12 mm PP-R Union each Tk. 270.00 1333
26.40.2 19 mm PP-R Union each Tk. 306.00 1334
26.40.3 25 mm PP-R Union each Tk. 342.00 1335
26.40.4 32 mm PP-R Union each Tk. 557.00 1336
26.40.5 37 mm PP-R Union each Tk. 844.00 1337
26.40.6 50 mm PP-R Union each Tk. 1,035.00 1338
26.41 Supplying, fitting and fixing of PP-R Gate-Valve meeting the perfomance & long-tem strength requirements of
ASTM F 2389 in accordance with the manufacturer’s specifications all complete accepted by the Engineer- in-
charge. 1339
26.41.1 12 mm PP-R Gate-Valve each Tk. 333.00 1340
26.41.2 19 mm PP-R Gate-Valve each Tk. 452.00 1341
Item No. Description of Item Unit Unit Rate

26.41.3 25 mm PP-R Gate-Valve each Tk. 491.00 1342


26.41.4 32 mm PP-R Gate-Valve each Tk. 797.00 1343
26.41.5 37 mm PP-R Gate-Valve each Tk. 853.00 1344
26.41.6 50 mm PP-R Gate-Valve each Tk. 1,109.00 1345
26.42 Supplying, fitting and laying up to depth of invert 100 mm inside dia best quality uPVC pressure soil pipe having
specific gravity 1.3 -1.45, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI
approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets,
bends, with all accessories such as Round grating/domed roof grating etc. complete approved and accepted by
the Engineer- in- charge.

1346
26.42.1 uPVC soil pipe of 100 mm dia and wall thickness 2.7 mm - 3.4 mm, meter Tk. 497.00 1347
26.42.2 uPVC soil pipe of 150 mm dia and wall thickness 4.5 mm - 6.6 mm meter Tk. 855.00 1348
26.43 Supplying, fitting and laying of Pipes up to depth of invert dia R.C.C pipe having 1.83 meter in length made of
stone chips with 40 mm cement joint including all fittings and specials like plain bend, Tees, reducing sockets,
junctions, door bends cowls, anti-siphon, gasket and cement joints, making holes in walls and mending good
the damages etc. all complete approved and accepted by the Engineer- in- charge.

1349
26.43.1 R.C.C pipe of 150 mm dia with thickness 40mm meter Tk. 897.00 1350
26.43.2 R.C.C pipe of 225 mm dia with thickness 40mm meter Tk. 1,404.00 1351
26.43.3 R.C.C pipe of 300 mm dia with thickness 50mm meter Tk. 2,293.00 1352
26.43.4 R.C.C pipe of 375 mm dia with thickness 50mm meter Tk. 2,940.00 1353
26.44 Supplying of 100 mm dia with wall thickness 2.7 mm - 3.4 mm uPVC pipe for waste including fitting, fixing etc. Tk. 489.00
all complete approved and accepted by the Engineer- in- charge. 1354
26.45 Supplying and laying uPVC pipe for for underground including fitting, fixing etc. all complete approved and
accepted by the Engineer- in- charge. 1355
26.45.1 150 mm dia with wall thickness 4.5 mm - 6.6 mm uPVC pipe meter Tk. 913.00 1356
26.45.2 200 mm dia with wall thickness 5.3 mm - 7.8 mm uPVC pipe meter Tk. 1,364.00 1357
26.45.3 250 mm dia with wall thickness 6.6 mm - 7.6 mm uPVC pipe meter Tk. 1,947.00 1358
Item No. Description of Item Unit Unit Rate

26.45.4 280 mm dia with wall thickness 6.9 mm - 8.6 mm uPVC pipe meter Tk. 2,514.00 1359
26.45.5 315 mm dia with wall thickness 7.8 mm - 9.0 mm uPVC pipe meter Tk. 2,553.00 1360
26.46 Supplying, fitting and fixing of G.I. Union with sealant etc. complete in all respects approved and accepted by
the Engineer- in- charge. 1361
26.46.1 12 mm dia G.I. Union each Tk. 125.00 1362
26.46.2 20 mm dia G.I. Union each Tk. 158.00 1363
26.46.3 25 mm dia G.I. Union each Tk. 195.00 1364
26.46.4 32 mm dia G.I. Union each Tk. 246.00 1365
26.46.5 40 mm dia G.I. Union each Tk. 356.00 1366
26.46.6 50 mm dia G.I. Union each Tk. 416.00 1367
26.46.7 62 mm dia G.I. Union each Tk. 598.00 1368
26.46.8 75 mm dia G.I. Union each Tk. 691.00 1369
26.46.9 100 mm dia G.I. Union each Tk. 902.00 1370
26.47 Supplying, fitting and fixing of best quality G.I. gate valve with sealant etc. complete approved and accepted by
the Engineer- in- charge. 1371
26.47.1 12 mm brass gate valve each Tk. 409.00 1372
26.47.2 20 mm brass gate valve each Tk. 484.00 1373
26.47.3 25 mm brass gate valve each Tk. 650.00 1374
26.47.4 32 mm brass gate valve each Tk. 812.00 1375
26.47.5 40 mm brass gate valve each Tk. 1,072.00 1376
26.47.6 50 mm brass gate valve each Tk. 1,714.00 1377
26.47.7 62 mm brass gate valve each Tk. 3,387.00 1378
26.47.8 75 mm brass gate valve each Tk. 4,519.00 1379
26.47.9 100 mm brass gate valve each Tk. 7,344.00 1380
26.48 Supplying, fitting and fixing of best quality G.I. globe valve, threaded joint with sealant etc. complete approved
and accepted by the Engineer- in- charge. 1381
26.48.1 12 mm dia brass globe valve each Tk. 324.00 1382
26.48.2 20 mm dia brass globe valve each Tk. 400.00 1383
26.48.3 25 mm dia brass globe valve each Tk. 602.00 1384
26.48.4 32 mm dia brass globe valve each Tk. 932.00 1385
26.48.5 40 mm dia brass globe valve each Tk. 1,229.00 1386
26.48.6 50 mm dia brass globe valve each Tk. 1,654.00 1387
26.48.7 62 mm dia brass globe valve each Tk. 3,508.00 1388
26.48.8 75 mm dia brass globe valve each Tk. 4,760.00 1389
26.48.9 100 mm dia brass globe valve each Tk. 6,378.00 1390
26.49 Supplying, fitting and fixing of best quality G.I. check valve, threaded joint with sealant etc. complete approved
and accepted by the Engineer- in- charge. 1391
26.49.1 12 mm brass check valve each Tk. 300.00 1392
26.49.2 20 mm brass check valve each Tk. 436.00 1393
26.49.3 25 mm brass check valve each Tk. 602.00 1394
26.49.4 32 mm brass check valve each Tk. 836.00 1395
26.49.5 40 mm brass check valve each Tk. 1,024.00 1396
26.49.6 50 mm brass check valve each Tk. 1,533.00 1397
26.49.7 62 mm brass check valve each Tk. 2,783.00 1398
26.49.8 75 mm brass check valve each Tk. 3,734.00 1399
26.49.9 100 mm brass check valve each Tk. 6,016.00 1400
26.50 Supplying, fitting and fixing of best quality G.I. float valve, threaded joint Pit valve etc. complete approved and
accepted by the Engineer- in- charge. 1401
26.50.1 12 mm brass float valve each Tk. 350.00 1402
26.50.2 20 mm brass float valve each Tk. 468.00 1403
26.50.3 25 mm brass float valve each Tk. 568.00 1404
26.50.4 32 mm brass float valve each Tk. 888.00 1405
26.50.5 40 mm brass float valve each Tk. 1,023.00 1406
26.51 Supplying different inside dia best quality uPVC clean out / trap having specific gravity 1.35 -1.45 and other
physical, chemical, themal, fire resistivity properties etc. as per BSTI approved manufacturer standards or
ASTM, BS/ISO/IS standards, fitting and fixing in position etc. complete approved and accepted by the Engineer-
in- charge.
1407
26.51.1 50 mm dia uPVC Y or T - Y Cleanout each Tk. 546.00 1408
26.51.2 100 mm dia uPVC ‘P’ or ‘S’ trap each Tk. 611.00 1409
26.51.3 100 mm dia uPVC Y or T - Y Cleanout each Tk. 679.00 1410
26.51.4 50 mm dia uPVC Y or T - Y Cleanout each Tk. 509.00 1411
26.52 Supplying, fitting and fixing of best quality faucets etc. complete approved and accepted by the Engineer- in-
charge. 1412
26.52.1 12 mm CP bib cock each Tk. 1,014.00 1413
26.52.2 12 mm special quality CP bib cock each Tk. 1,104.00 1414
Item No. Description of Item Unit Unit Rate

26.52.3 12 mm plastic bib cock with internal brass thread each Tk. 226.00 1415
26.53 Supplying, fitting and fixing of best quality CP pillar cock etc. complete approved and accepted by the Engineer-
in- charge. 1416
26.53.1 12 mm CP medium quality pillar cock each Tk. 1,231.00 1417
26.53.2 12 mm CP special heavy duty pillar cock each Tk. 1,280.00 1418
26.54 Supplying, fitting and fixing of best quality CP self closing pillar pillar cock (Sensor Type) with necessary
hardware etc. complete approved and accepted by the Engineer- in- charge. 1419
26.54.1 Standard CP self closing pillar cock (without mixture) each Tk. 5,557.00 1420
26.54.2 Exclusive CP self closing pillar cock (without mixture) each Tk. 18,235.00 1421
26.54.3 Standard CP self closing pillar cock (with mixture) each Tk. 7,971.00 1422
26.54.4 Exclusive CP self closing pillar cock (with mixture) each Tk. 24,272.00 1423
26.55 Supplying, fitting and fixing of CP Self closing pillar cock (push type) with all necessary hardware and each Tk. 1,137.00
consumables approved and accepted by the Engineer- in- charge. 1424
26.56 Supplying, fitting and fixing of best quality concealed fixed sink cock etc. complete approved and accepted by
the Engineer-in-charge. 1425
26.56.1 12 mm CP concealed fixed cock each Tk. 1,141.00 1426
26.56.2 12 mm CP concealed moving cock each Tk. 1,504.00 1427
26.57 Supplying, fitting and fixing of CP basin mixture with all necessary hardware and consumables approved and
accepted by the Engineer.of following type 1428
26.57.1 CP basin mixture each Tk. 2,732.00 1429
26.57.2 CP single handle basin mixture each Tk. 3,464.00 1430
26.58 Supplying, fitting and fixing of CP shower mixture including shower head only with all necessary hardware and each Tk. 4,529.00
consumables approved and accepted by the Engineer- in- charge. 1431
26.59 Supplying, fitting and fixing of CP shower mixture including shower head and faucet with all necessary hardware each Tk. 5,435.00
and consumables approved and accepted by the Engineer- in- charge.
1432
26.60 Supplying, fitting and fixing of CP bath tub mixture with shower head only including all necessary hardware and each Tk. 4,770.00
consumables approved and accepted by the Engineer- in- charge. 1433
26.61 Supplying, fitting and fixing of stop cock with all necessary hardware and consumables approved and accepted
by the Engineer- in- charge. 1434
26.61.1 12 mm brass stop cock for surface mount (general quality) each Tk. 412.00 1435
26.61.2 12 mm CP stop cock for surface mount (medium quality) each Tk. 406.00 1436
26.61.3 12 mm CP stop cock for surface mount (special type) each Tk. 1,136.00 1437
26.61.4 Stop cock concealed (medium) each Tk. 1,197.00 1438
26.61.5 Stop cock concealed (heavy) each Tk. 1,245.00 1439
26.63 Supplying, fitting and fixing of angle stop cock etc. complete approved and accepted by the Engineer- in-
charge. 1440
26.63.1 12 mm CP surface mounted angle stop cock (Heavy Type) each Tk. 853.00 1441
26.63.2 12 mm CP medium quality surface & Standard angle stop cock each Tk. 804.00 1442
26.63.3 12 mm surface special heavy type angle stop cock each Tk. 877.00 1443
26.63.4 12 mm CP concealed mount angle stop cock each Tk. 853.00 1444
26.63.5 Medium concealed angle stop cock each Tk. 913.00 1445
26.63.6 Special concealed heavy type angle stop cock each Tk. 1,197.00 1446
26.64 Groove cutting in brick work and R.C.C work, including cost for concealing of G.I. pipe work (12 mm and 20 mm
dia) in brick wall by cutting groove in wall, lintel, beam etc. by any means carefully without damaging the
structure and filling the grooves with C.C (4:2:1) after laying of pipe including cost of scaffolding, finishing,
curing etc. all complete approved and accepted by the Engineer- in- charge.
1447
26.64.1 Groove size 40 mm x 40 mm (For laying 12 mm to 20 mm dia pipes) meter Tk. 65.00 1448
26.64.2 Groove size 75 mm x 75 mm (For 25 mm to 40 mm dia pipes) meter Tk. 98.00 1449
26.65 Supplying and fitting-fixing cleansing shower for ablution including holder etc. all complete approved and
accepted by the Engineer- in- charge. 1450
26.65.1 Fixed type 100 mm CP shower rose each Tk. 658.00 1451
26.65.2 Moving type 100 mm CP shower rose each Tk. 1,396.00 1452
26.66 Supplying and fitting-fixing hand / push shower for ablution including holder etc. all complete approved and
accepted by the Engineer- in- charge. 1453
26.66.1 Moving type hand shower each Tk. 1,571.00 1454
26.66.2 Moving type push shower each Tk. 967.00 1455
26.67 Supplying, fitting and fixing of food graded plastic overhead water reservoir tank including all necessary fittings,
hardware and consumables etc. all complete approved and accepted by the Engineer- in- charge.
1456
26.67.1 1000 liter capacity each Tk. 10,912.00 1457
26.67.2 1500 liter capacity each Tk. 15,295.00 1458
26.67.3 2000 liter capacity each Tk. 20,064.00 1459
26.68 Supply and installation of food-graded plastic internal mini water tank for the use in kitchen, bathroom and toilet
for emergency storage and supply of water manufactured from liner low density polyethylene (ILDPE) roto-
grade (ultra violet) stabilized which complies FDA (Federal Department of Agriculture, USA) regulations 21 CFR
1277. 152, having food grade quality where no recycled material is used carrying, lifting, fitting, fixing in position
including supply of necessary hardware, consumables, fittings etc. all complete approved and accepted by the
Engineer- in- charge.

1460
Item No. Description of Item Unit Unit Rate

26.68.1 150 liter capacity each Tk. 3,365.00 1461


26.68.2 300 liter capacity each Tk. 4,277.00 1462
26.68.3 500 liter capacity each Tk. 6,334.00 1463
26.69 Supply and installation of foreign made food graded stainless steel water tank including supply of hardware,
consumables, fittings etc. all complete approved and accepted by the Engineer- in- Charge.
1464
26.69.1 500 liter capacity each Tk. 11,187.00 1465
26.69.2 1000 liter capacity each Tk. 19,520.00 1466
26.69.3 2000 liter capacity each Tk. 32,101.00 1467
26.69.4 4000 liter capacity each Tk. 63,030.00 1468
26.69.5 6000 liter capacity each Tk. 68,596.00 1469
26.70 Supply and installation of 400 gallon capacity ferro-cement water tank including necessary hardware, fittings each Tk. 8,017.00
and consumables etc. all complete approved and accepted by the Engineer- in- charge.
1470
26.71 Supplying, fitting and fixing of 12 mm dia, 450 mm long plastic flexible lead (connection) pipe approved and each Tk. 57.00
accepted by the Engineer- in- charge. 1471
26.72 Supplying, fitting and fixing of 12 mm dia, 600 mm long plastic flexible lead (connection) pipe approved and each Tk. 101.00
accepted by the Engineer- in- charge. 1472
26.73 Supplying, fitting and fixing of 12 mm dia 450 mm long metal cover connection pipe approved and accepted by each Tk. 162.00
the Engineer- in- charge. 1473
26.74 Supplying, fitting and fixing of 12 mm dia 600 mm long metal cover connection pipe approved and accepted by each Tk. 186.00
the Engineer- in- charge. 1474
26.75 Supply, fitting & fixing of 600 mm dia C.I. man hole cover etc. all complete approved by the Engineer- in- each Tk. 1,869.00
charge. 1475
26.76 Supply, installation, testing and commissioning of auto control booster pump system to maintain a pressure
0.8~2.2 bar in the water pipe line in the top floor(s). The booster pump system consists of the following
components -
(i) Single phase pump motor - 01 no.
HP 0.5~1.0, IP : 65, RPM : 2900
(ii) Easy press switch : a device which control the pressure etc. all complete approved by the Engineer- in-
charge.
1476
26.76.1 Made in or assembled in Bangladesh each Tk. 9,551.00 1477
26.76.2 Made in Italy/ Spain/ India etc. each Tk. 20,176.00 1478
26.77 Suppy, fitting and fixing of Water pressure reducing valve to reduce static and flowing pressures in water
distribution systems and it shall be a diaphragm/balanced piston type with integral stainless steel strainer and a
built-in bypass to relieve pressure build-up downstream of the assembly. The valve shall be spring loaded to
open and shall be diaphragm actuated to close under pressure conditions. The valve shall be suitable for supply
pressure up to 400 psi and water temperatures from 33º to 180ºF. The valve’s internal parts such as the
cartridge assembly, strainer, diaphragm, and spring shall be accessible for inspection, repair or replacement
without disconnecting the device from the pipeline. In addition, the valve shall have a clean-out feature to allow
for removal of the strainer and seat disc without disturbing the pressure setting etc. all complete accepted by the
Engineer- in- charge.

1479
26.77.1 12 mm dia water pressure reducing valve each Tk. 2,384.00 1480
26.77.2 19 mm dia water pressure reducing valve each Tk. 3,226.00 1481
26.77.3 25 mm dia water pressure reducing valve each Tk. 3,948.00 1482
26.77.4 32 mm dia water pressure reducing valve each Tk. 7,557.00 1483
26.77.5 38 mm dia water pressure reducing valve each Tk. 8,399.00 1484
26.77.6 50 mm dia water pressure reducing valve each Tk. 12,129.00 1485
26.77.7 62 mm dia water pressure reducing valve each Tk. 20,550.00 1486
26.77.8 75 mm dia water pressure reducing valve each Tk. 29,574.00 1487
26.78 Manufacturing, supplying, fitting & fixing of adjustable hanger made of 38 mm x 38 mm x 6 mm m.s. angle with meter Tk. 676.00
600 mm long 12 mm dia nut-bolt for having pvc pipe from ceiling as per direction of the Engineer-in-charge.
1488
26.79 Supplying, fitting and installation of automatic hand drier of high speed, energy efficient, rapid drying, automatic each Tk. 6,094.00
sensor, adjustable speed and sound control, adjustable heat control, electric hand dryer; surface mounted or
semi‐recessed which can eliminate over 99% of airborne bacteria and particles as small as 0.3 microns with
the removable Super Filter System and it shall be powered by 220v AC supply/ batteries and shall operate
automatically from IR sensor that shall activate it when hands are placed in sensor zone etc. all complete
accepted by the Engineer- in- charge.

1489
1490
INSPECTION PIT & SOAK WELL 1491
1492
26.80 Construction of masonry inspection pit with 250 mm thick brick work in cement mortar (1:4) including necessary
earth work, side filling and one layer brick flat soling, 75 mm thick (1:3:6) base concrete for making invert
channel and 12 mm thick (1:2) cement plaster with neat finishing etc. all complete up to a depth of 700 mm
approved and accepted by the Engineer- in- charge.
1493
26.80.1 Clear 450 mm x 450 mm and depth 450 mm to 600 mm, average 525 mm for single 150 mm dia R.C.C. pipes each Tk. 3,530.00
and 400 mm PVC pipe. 1494
26.80.2 Clear 525 mm x 525 mm and depth 675 mm to 825 mm, average 750 mm for single 225 mm dia R.C.C. pipes each Tk. 5,262.00
and 400 mm PVC pipe. 1495
Item No. Description of Item Unit Unit Rate

26.80.3 Clear 600 x 600 mm and depth 750 mm to 900 mm, average 825 mm for single 300 mm dia R.C.C. pipes and each Tk. 7,321.00
400 mm PVC pipe. 1496
26.80.4 Master-pit of Size: Clear 600 mm x 500 mm and average 750 mm depth for Septic tank. each Tk. 3,825.00 1497
26.81 Construction and placement M.H. cover with locking/unlocking arrangement including necessary earth work,
side filling, shuttering, curing, cement plaster (1:4) with neat finishing on edges and top etc. all complete
approved and accepted by the Engineer- in- charge. 1498
26.81.1 900 mm x 900 mm x 75 mm R.C.C. pit cover each Tk. 1,365.00 1499
26.81.2 1025 mm x 1025 mm x 75 mm R.C.C. pit cover each Tk. 1,575.00 1500
26.81.3 1100 mm x 1100 mm x 75 mm R.C.C. pit cover each Tk. 1,804.00 1501
26.82 Construction and placing of R.C.C inspection pit cover (slab) with supplying and provisions for placing, fitting,
fixing 450 mm dia C.I. man-hole cover with locking/un-locking arrangement including concrete (1:2:4) with
approx. 1% re-enforcement, necessary earth cutting, or cleaning, side filling, curing etc. with minimum 12 mm
cement plaster (1:4) and neat cement finishing on edges and top all complete and accepted by the Engineer- in-
charge.
1502
26.82.1 950 mm x 950 mm x 75 mm R.C.C. pit cover with 450 mm dia C.I. manhole cover. each Tk. 2,280.00 1503
26.82.2 1025 mm x 1025 mm x 75 mm R.C.C. pit cover with 450 mm dia C.I. manhole cover. each Tk. 2,443.00 1504
26.82.3 1100 mm x 1100 mm x 75 mm R.C.C. pit cover with 450 mm dia C.I. manhole cover. each Tk. 2,672.00 1505
26.83 Construction of masonry inspection pits up to a depth of 700 mm with 250 mm thick brick work in cement mortar
(1:4) including 100 mm thick R.C.C. top slab (1:2:4) with 1% reinforcement, man-hole cover with locking
arrangement including necessary earth work, side filling and one brick flat soling. 75 mm thick (1:3:6) base
concrete for making invert channel and 12 mm thick (1:2) cement plaster with neat finishing etc. all complete
approved and accepted by the Engineer- in- charge.
1506
26.83.1 Clear 450 mm x 450 mm and depth 450 mm to 600 mm, average 525 mm for single 150 mm dia R.C.C. pipes each Tk. 5,810.00
and 400 mm PVC pipe with pit cover and 450 mm dia C.I. man-hole cover.
1507
26.83.2 Clear 525 mm x 525 mm and depth 675 mm to 825 mm, average 750 mm for single 225 mm dia R.C.C. pipes each Tk. 7,705.00
and 400 mm PVC pipe with pit cover and 450 mm dia C.I. man-hole cover.
1508
26.83.3 Clear 600 mm x 600 mm and depth 750 mm to 900 mm, average 825 mm for single 300 mm dia R.C.C. pipes each Tk. 9,993.00
and 375 mm and 400 mm PVC pipe with pit cover and 450 mm dia C.I. man-hole cover.
1509
26.84 Construction of septic tank of different sizes with walls of brick work in cement mortar (1:6) having a lining of
minimum 125 mm R.C.C cast against the walls as per approved type plan over a brick flat soling and 150 mm
thick reinforced cement concrete flooring (1:2:4) with 125 mm thick walls in partition and 12 mm thick cement
plaster (1:4) with N.C.F. to insides of walls on floor and all around outside walls by 450 mm height at top
including supplying, fitting and fixing of two R.C.C. Tees and providing 450 mm dia water sealed heavy type C.I.
manhole cover with locking/unlocking arrangement and 100 mm thick R.C.C (1:2:4) top slab, including
centering, shuttering, fabricating, casting and curing etc. complete up to required depth including necessary
earth work in excavation and shoring, bailing out water and side filling including the cost of all materials,
operations and incidental charges. etc. all complete as per type plan approved and accepted by the Engineer-
in-charge (Rate is including cost of reinforcement and its fabrication, binding and placing).

1510
26.84.1 For 200 users each Tk. 233,848.00 1511
26.84.2 For 100 users each Tk. 183,728.00 1512
26.84.3 For 50 users each Tk. 121,120.00 1513
26.84.4 For 30 users each Tk. 84,995.00 1514
26.84.5 For 20 users each Tk. 80,255.00 1515
26.84.6 For 10 users each Tk. 46,023.00 1516
26.85 Construction of soak well of different sizes (medium and large sizes) with 250 mm thick solid brick work and 250
mm honey comb brick work with cement mortar (1:6) as per design over R.C.C. (1:2:4) well curb with 1%
reinforcement up to the depth as per drawing with 450 mm dia water sealed heavy type. C.I. manhole cover with
locking arrangement, filling the well up to the required depth with graded khoa and sand including supplying and
fabricating M.S. rod, casting, curing including necessary earth work in excavation, side filling and bailing out
water including cost of all materials etc. all complete as per drawing, design approved and accepted by the
(Rate is including cost of reinforcement and its fabrication, binding and placing) Engineer- in- charge.

1517
26.85.1 200 users each Tk. 86,069.00 1518
26.85.2 100 users each Tk. 76,264.00 1519
26.85.3 50 users each Tk. 64,420.00 1520
26.86 Construction of soak well of different sizes (small sizes) with 250 mm thick solid brick work and 250 mm honey
comb brick work with cement mortar (1:6) as per design over R.C.C. (1:2:4) well curb with 1% reinforcement up
to the depth as per drawing with 450 mm dia water sealed heavy type. C.I. manhole cover with locking
arrangement, filling the well up to the required depth with graded khoa and sand including supplying and
fabricating M.S. Rod, casting, curing including necessary earth work in excavation, side filling and bailing out
water including cost of all materials etc. all complete as per drawing, design approved and accepted by the
Engineer- in- charge.

1521
26.86.1 20 to 30 users each Tk. 54,765.00 1522
26.86.2 10 users each Tk. 37,667.00 1523
Item No. Description of Item Unit Unit Rate

26.87 Supplying, fitting, fixing of foreign made best quality Reverse Osmosis Water Purifier (Kent / Unilever / Vapor
water purifier or equivalent brand) for purification of water by reverse osmosis system to have potable water
conforming WHO standard and Bangladesh concentration parameters including installation charge, carriage,
sundries etc. complete approved and accepted by the Engineer- in- charge.
1524
26.87.1 Water purification volume: 50 gallon /day water reserve capacity each Tk. 12,920.00 1525
26.87.2 Water purification volume: 75 gallon per day each Tk. 19,279.00 1526
26.87.3 Water purification volume: 75 gallon per day (touch type) each Tk. 25,437.00 1527
26.87.4 Water purification volume: 100 gallon per day (with hot, cold & warm option) each Tk. 69,418.00 1528
26.87.5 Water purification volume: 200 gallon per day each Tk. 51,035.00 1529
26.87.6 Water purification volume: 400 gallon per day each Tk. 75,546.00 1530
26.88 Supply, installation and commissioning of 50 liter capacity best quality ‘Water dispenser’ with container of each Tk. 4,468.00
approved brand/origin. 1531
26.89 Punching or cutting hole of any diameter for sanitary works. each Tk. 325.00 1532
1533
1534
1535
………………….. END OF DIVISION TWENTY SIX ………………….. 1536
DIVISION 27: DEEP TUBE-WELL
1537
Item No. Description of Item Unit Unit Rate 1538
Note: Tender for test & observation well must be called before hand. Tender for main production well will then
be called on the basis of required data obtained from the test well. Requirements of water must be the guiding
factor for dimensioning the main well.
1539
SINKING OF 38 mm DIA TEST AND OBSERVATION WELL 1540
27.1 Mobilization of test boring or observation well: Transportation of materials, equipments, tools and plants and per set Tk. 7,913.00
boring rig to work site. Construction of derrick and dismantling the same. Cleaning the site after completion of
the work accepted by the Engineer-in-charge. 1541
27.2 Boring by using 100 mm dia cutter and 40 mm dia heavy type G.I pipe (wall thickness 2.9 mm, outside diameter
min 47.8 mm, weight 3.517 kg/m, capable to withstand 50 kg/cm2 pressure) and other equipments capable of
drilling up to a depth of 500 meter by water jet system through all sorts of soil strata providing protection of
caving by supplying necessary casing pipe. Collection of soil samples at every 3 meter interval and at every
change of soil strata and preserving them in a controlled environment for analysis and laboratory test. Finally,
withdrawal of boring and casing pipes etc. complete and accepted by the Engineer-in-charge.

1542
27.2.1 From 0.0 m to 50 m = 50 m meter Tk. 191.00 1543
27.2.2 Above 50 m to 100 m = 50 m meter Tk. 219.00 1544
27.2.3 Above 100 m to 152 m = 52 m meter Tk. 252.00 1545
27.2.4 Above 152 m to 200 m = 48 m meter Tk. 290.00 1546
27.2.5 Above 200 m to 250 m = 50 m meter Tk. 334.00 1547
27.2.6 Beyond 250 m meter Tk. 384.00 1548
27.3 Installation of tube-well fixture for observation well: Supplying and lowering of 40/38 mm inside dia best quality
uPVC pressure tube well pipe (specific gravity 1.35 - 1.45, wall thickness 2.5 mm - 3.0 mm capable to withstand
a minimum hydrostatic pressure of 170 psi for 1 hr). Fitting and fixing in position with all accessories, uPVC
sand trap of length 3.00m with uPVC strainer of desired slot installing in or at mid depth of the most suitable
water bearing strata, 38 mm dia, best quality G.I. pipe of length 1.52 m with M.S. welded flat bar welded on
each side to prevent from rotation up to desired depth, fitting, fixing the best quality no. 6 C.I. head hand-pump
etc including the cost of solvent cement, socket adapter, filling medium sand up to 18.00 m above strainer and
the remaining portion with available soil from boring etc. complete as per standard specification and accepted
by the Engineer-in-charge.

1549
27.3.1 Fitting & fixing of no. 6 Hand-pump set including all necessary accessories etc per set Tk. 2,968.00 1550
27.3.2 Supplying and fitting 38/40 mm dia heavy type G.I pipe conforming to standard BS-1387 & BDS-1031, having meter Tk. 770.00
chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060
max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a)
manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe
having wall thickness 2.9 mm, weight 3.517 kg/m capable to withstand 50 kg/cm2 hydraulic pressure

1551
27.3.3 38/40 mm dia water grade uPVC pipe having wall thickness 2.5 mm -3.00 mm meter Tk. 162.00 1552
27.3.4 38/40 mm dia water grade uPVC strainer having wall thickness 2.5 mm -3.00 mm meter Tk. 204.00 1553
27.3.5 38/40 mm dia uPVC socket adapter each Tk. 100.00 1554
27.3.6 Best quality 38 mm dia uPVC cap each Tk. 79.00 1555
27.3.7 Supplying, fitting & fixing observation well inside the housing pipe of the deep tube well:100'-0" depth each Tk. 19,802.00
1556
27.3.8 Supplying, fitting & fixing tube-well log describing technical information of the tube-well each Tk. 4,105.00 1557
27.3.9 Filling the top 0.6 meter of the bore hole around the top pipe with sanitary seal of 1:2:4 (Cement: 1.2 FM sand: each Tk. 51.00
20 mm downgraded brick chips) concrete 1558
Item No. Description of Item Unit Unit Rate

27.4 Complete development of the tube well to obtain sand and turbidity free water at a satisfactory yield confirmed
by tests as per specification and accepted by the Engineer-in-charge. Water sample must be taken from 3
separate aquifers from three tube-wells 1559
27.4.1 Wells up to 200 meter depth 1560
27.4.1.1 For 1 No. test tube-well LS Tk. 7,024.00 1561
27.4.1.2 For 2 Nos. test tube-wells LS Tk. 10,536.00 1562
27.4.1.3 For 3 Nos. test tube-wells LS Tk. 14,048.00 1563
27.4.2 Wells beyond 200 meter depth 1564
27.4.2.1 For 1 No. test tube-well meter Tk. 40.00 1565
27.4.2.2 For 2 Nos. test tube-wells meter Tk. 61.00 1566
27.4.2.3 For 3 Nos. test tube-wells meter Tk. 81.00 1567
27.5 "Furnishing design of a production well by testing of water and soil samples from test bores up to 350 m depth
collecting samples of water from the best suitable aquifer, filling in sterilized air-tight glass bottles having no air
space inside; collecting soil (sand, solids etc) at every 3 m interval and at each change of soil strata from the
bores, arranging them in the cell of a box in an orderly manner. Carrying out test of water for (1) pH, (2) CO 2 (3)
Chloride, (4) Fluoride, (5) Iron, (6) Manganese, (7) Nitrate-Nitrogen, (8)Total alkalinity, (9) Total hardness, (10)
Arsenic, (11) Turbidity, followed by test reports along with Bangladesh Standards of potable water and (12)
sieve analysis on soils throughout a bore, leading to ascertain the best suitable sustained aquifers, depths and
slot sizes of strainer, types and dia of tube well for specific yield, thickness of shrouding around strainer,
fineness modulus of shrouding materials, mechanical units (pumps, compressor) for testing and operation of the
tube well, maintaining test bore functional till tube well installation, testing etc. is finished, finally filling and
sealing the left over test bore permanently, including carrying water and soil samples under direct responsibility
of Engineer-in-charge to BRTC, BUET or other reputed laboratory, approved by the authority, submitting the
report and design details all complete and accepted by the Engineer-in-charge and maintaining the mobilized
tools and plants at site till satisfactory test results are found (if not, next test bore may be executed with the 1568
approval
Total No.ofofconcern
test onS.E. / Design
water: Office)
11 types of test x 1 test bore x one set sample (3 specimen) = 11 Nos. test (each
specimen 1.5 liter of water) 1569
Sieve analysis: min 9 Nos. Sample x one test x One bore = 9 Nos. test (Samples are of 1 kg dry wt. each)"
1570
There are about 55 (fifty-five) tests for potable water quality standard according to Bangladesh Environment
Conservation Rules-12 (Schedule-3), 1997, under ECA 1995 of Ministry of Environment and Forest. Therefore,
additional test/ tests on water or sieve analysis of soil if required, other than the above specified 12 (twelve)
tests, may be carried out for public interest as per direction of the design engineer on actual payment including
profit, VAT and all other charges.
1571
27.5.1 Furnishing design considering 1 No. test bore LS Tk. 43,227.00 1572
27.5.2 Furnishing design considering 2 Nos. test bores LS Tk. 72,930.00 1573
27.5.3 Furnishing design considering 3 Nos. test bores LS Tk. 109,395.00 1574
27.6 Disinfections of the well by using minimum 3 kg of bleaching powder of 33% strength or any other disinfectant each Tk. 433.00
as per standard specification and accepted by the Engineer-in-charge. 1575
PRODUCTION WELL 1576
27.7 Mobilization: Preparation for installation of tube-well and transportation of complete boring equipments, labour
and materials to the work site and remove the materials after completion of the works. Installation of drilling rig
and accessories, making arrangements for electricity, water, labour shed, site office and stores, digging mud pit
etc, leveling, dressing and clearing of the site as per original condition and a testing for discharge using
minimum 1000 liter water tub etc. all complete as per specifications and accepted by the Engineer-in-charge.

1577
27.7.1 For Tube-wells up to 100 meter depth per set Tk. 39,232.00 1578
27.7.2 For Tube-wells up to 200 meter depth per set Tk. 42,034.00 1579
27.7.3 For Tube-wells beyond 200 meter depth per set Tk. 44,836.00 1580
27.8 Preparation and making gravel pack around the tube well fixtures with supply of designed graded pea gravels cum Tk. 4,725.00
free from any substance harmful to pipe and health confirmed by test (Passing through #10 mesh and retained
on #40 mesh) including sieving, washing etc. complete as per standard specification and accepted by the
Engineer-in-charge.
(The rate is inclusive of the cost of extra amount required for caving and extra depth below the tube well
fixtures, shrouding should not be more than 15 m above the strainer and measurement should be allowed from
bottom of the tube-well fixture to top of the gravel pack)
1581
27.9 Making a sanitary seal up to a minimum depth of 6 meter from G.L. or as specified including the supply of cum Tk. 8,293.00
approved quality of cement, sand and khoa (12 mm down graded) in a ratio of (1:1:5:3) as per standard
specification and accepted by the Engineer-in-charge. 1582
INSTALLATION OF 50 mm x 125 mm DIA SHROUDED 1583
PRODUCTION WELL WITH PVC PIPE 1584
27.10 Boring: Execution of 325 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for
325 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as
required and at every change in soil stratum including sinking and with drawing necessary casing pipe and all
necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement
will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of
further boring required due to caving and siltation)

1585
27.10.1 From 0.0 m to 50 m = 50 m meter Tk. 939.00 1586
27.10.2 From 50 m to 100 m = 50 m meter Tk. 1,080.00 1587
27.10.3 From 100 m to 152 m = 52 m meter Tk. 1,242.00 1588
27.10.4 From 152 m to 200 m = 48 m meter Tk. 1,428.00 1589
27.10.5 From 200 m to 250 m = 50 m meter Tk. 1,642.00 1590
Item No. Description of Item Unit Unit Rate

27.10.6 Beyond 250 m meter Tk. 1,889.00 1591


27.11 Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as
per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per
standard practice and accepted by the Engineer-in-charge. Note : Pipe size (Wall Thickness) will be chosen as
per table page no: )
1592
27.11.1 Best quality 50 mm dia uPVC cap each Tk. 107.00 1593
27.11.2.1 50 mm dia water grade (Class C) uPVC blind pipe/sand trap of wall thickness 2.5 mm to 3.00 mm meter Tk. 163.00
1594
27.11.2.2 50 mm dia water grade (Class D) uPVC blind pipe/sand trap of wall thickness 3.1 mm to 3.7 mm meter Tk. 192.00
1595
27.11.2.3 50 mm dia water grade (Class E) uPVC blind pipe/sand trap of wall thickness 3.9 mm to 4.5 mm meter Tk. 255.00
1596
27.11.3.1 50 mm dia strainer of any slot as per design made with grade(Class C) uPVC pipe of wall thickness 2.5 mm to 3 meter Tk. 215.00
mm 1597
27.11.3.2 50 mm dia strainer of any slot as per design made with grade(Class D) uPVC pipe of wall thickness 3.1 mm to meter Tk. 244.00
3.7 mm 1598
27.11.3.3 50 mm dia strainer of any slot as per design made with grade(Class E) uPVC pipe of wall thickness 3.9 mm to meter Tk. 307.00
4.5 mm 1599
27.11.4 Best quality 50 mm x 125 mm dia uPVC Reducer meter Tk. 691.00 1600
27.11.5.1 125mm dia water grade (Class C) uPVC housing pipe of wall thickness 5.5 to 6.4mm meter Tk. 786.00 1601
27.11.5.2 125mm dia water grade (Class D) uPVC housing pipe of wall thickness 7.3 to 8.4mm meter Tk. 977.00 1602
27.11.5.3 125mm dia water grade (Class E) uPVC housing pipe of wall thickness 9.0 to 10.4mm meter Tk. 1,158.00 1603
27.11.6 Supplying centralizer made with 12 mm dia M.S. rod of approved design each Tk. 379.00 1604
27.12 Complete installation of 50 mm dia uPVC tube well fixtures such as expanded top or furnishing pipe, reducer, meter Tk. 80.00
tube well pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality PVC solution, iron screws
and PVC tape, sockets and placing in position with proper size M.S. centralizer @ 3.0 meter c/c in strainer
portion including blind pipe etc. complete as per standard practice and accepted by the Engineer-in-charge.
1605
27.13 Complete development of the tube well by air compressor and pump of suitable capacity by alternate surging
and pumping or any specified method until satisfactory yield is achieved in sand and turbid free water confirmed
by laboratory test using necessary quantity of cologne and conducting step drawn-down test before and after
the development as per specification and accepted by the Engineer-in-charge.
(Development should be started within 24 hours of completion of shrouding)

1606
27.13.1 Wells up to 200 m depth each Tk. 23,272.00 1607
27.13.2 Wells beyond 200 m depth each Tk. 29,478.00 1608
27.14 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ per hour Tk. 760.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1609
27.15 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) to obtain each Tk. 1,244.00
chlorinated water having 150 ppm free chlorine in the well complete as per standard specification and accepted
by the Engineer-in-charge. 1610
27.16 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 31.00
withdrawn selected soil or by local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1611
27.17 Protective top cover: Supplying and fitting fixing of best quality 150 mm dia 4 mm thick MS. Pipe 1.0 m (3'-4") each Tk. 4,549.00
long one end blocked with 200 mm dia 4 mm thick M.S. plate and other end minimum 300 mm (1'-0") embedded
in sanitary seal for protection of uPVC Housing Pipe as per standard specification and accepted by the
Engineer-in-charge.
1612
INSTALLATION OF 75 mm x 150 mm DIA SHROUDED 1613
PRODUCTION WELL WITH PVC PIPE 1614
27.18 Boring: Execution of 350 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for
350 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as
required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and all
necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement
will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of
further boring required due to caving and siltation)

1615
27.18.1 From 0.0 m to 50 m = 50 m meter Tk. 988.00 1616
27.18.2 From 50 m to100 m = 50 m meter Tk. 1,136.00 1617
27.18.3 From 100 m to 152 m = 52 m meter Tk. 1,307.00 1618
27.18.4 From 152 m to 200 m = 48 m meter Tk. 1,503.00 1619
27.18.5 From 200 m to 250 m = 50 m meter Tk. 1,728.00 1620
27.18.6 Beyond 250 m meter Tk. 1,987.00 1621
27.19 Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as
per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per
standard practice and accepted by the Engineer-in-charge.
1622
27.19.1 Best quality 75 mm dia uPVC cap each Tk. 145.00 1623
27.19.2.1 75 mm dia water grade(Class C) uPVC blind pipe/sand trap of wall thickness 3.5 mm to 4.1 mm meter Tk. 313.00
1624
27.19.2.2 75 mm dia water grade(Class D) uPVC blind pipe/sand trap of wall thickness 4.6 mm to 5.3 mm meter Tk. 403.00
1625
Item No. Description of Item Unit Unit Rate

27.19.2.3 75 mm dia water grade(Class E ) uPVC blind pipe/sand trap of wall thickness 5.7 mm to 6.6 mm meter Tk. 878.00
1626
27.19.3.1 75 mm dia strainer of any slot as per design made with water grade (Class C) uPVC pipe of wall thickness 3.5 meter Tk. 359.00
to 4.1 mm 1627
27.19.3.2 75 mm dia strainer of any slot as per design made with water grade (Class D) uPVC pipe of wall thickness 4.6 meter Tk. 450.00
mm to 5.3 mm 1628
27.19.3.3 75 mm dia strainer of any slot as per design made with water grade (Class E) uPVC pipe of wall thickness 5.7 meter Tk. 924.00
mm to 6.6 mm 1629
27.19.4 Best quality 75 mm x 150 mm dia uPVC Reducer each Tk. 881.00 1630
27.19.5.1 150 mm dia water grade(Class C) uPVC housing pipe having wall thickness 6.6 mm to 7.6 mm meter Tk. 1,138.00
1631
27.19.5.2 150 mm dia water grade(Class D) uPVC housing pipe having wall thickness 8.8 mm to 10.2 mm meter Tk. 1,540.00
1632
27.19.5.3 150 mm dia water grade(Class E) uPVC housing pipe having wall thickness 10.8 mm to 12.5 mm meter Tk. 1,842.00
1633
27.19.6 Supplying of centralizer made with 12 mm dia M.S. rod of approved design meter Tk. 379.00 1634
27.20 Complete installation of 75 mm dia uPVC tube-well fixtures such as expanded top pipes, reducer, tube-well meter Tk. 89.00
pipes, strainer, blind pipe, pipe cap etc fitting and fixing with best quality uPVC solution, iron screws and uPVC
tape and placing in position with proper size M.S. centralizer @ 3 meter c/c .in strainer portion including blind
pipe etc. complete as per standard practice and accepted by the Engineer-in-charge.
1635
27.21 Complete development of the well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping untill satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of
completion of shrouding)
1636
27.21.1 Wells up to 200 m depth each Tk. 31,419.00 1637
27.21.2 Wells beyond 200 m depth each Tk. 37,702.00 1638
27.22 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 935.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer. 1639
27.23 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 1,511.00
water having 150 ppm available free chlorine complete as per standard specification and accepted by the
Engineer-in-charge. 1640
27.24 Filling of the bore-hole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 37.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1641
27.25 Protective top cover: Supplying and fitting fixing best quality 200 mm dia 4 mm thick M.S. pipe 1.0 m (3'-4") each Tk. 6,113.00
long, one end blocked with 250 mm dia 4 mm thick M.S. plate and other end minimum 300 mm (1'-0) embedded
in sanitary seal for protection of uPVC housing pipe as per standard specification and accepted by the
Engineer-in-charge.
1642
INSTALLATION OF 100 mm x 200 mm DIA SHROUDED 1643
PRODUCTION WELL WITH PVC PIPE 1644
27.26 Boring: Execution of 400 mm dia of boring through all sorts of strata by reverse circulation or any other
approved method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter)
Boring for 400 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval
or as required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and
all necessary arrangements complete as per specification and accepted by the Engineer-in-charge.
(Measurement will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of
extra depth or of further boring required due to caving and siltation)

1645
27.26.1 From 0.0 m to 50 m = 50 m meter Tk. 1,031.00 1646
27.26.2 From 50 m to 100 m = 50 m meter Tk. 1,186.00 1647
27.26.3 From 100 m to 152 m = 52 m meter Tk. 1,364.00 1648
27.26.4 From 152 m to 200 m = 48 m meter Tk. 1,569.00 1649
27.26.5 From 200 m to 250 m = 50 m meter Tk. 1,804.00 1650
27.26.6 Beyond 250 m meter Tk. 2,074.00 1651
27.27 Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as
per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per
standard practice and accepted by the Engineer-in-charge.
1652
27.27.1 Best quality 100 mm dia uPVC cap each Tk. 226.00 1653
27.27.2.1 100 mm dia water grade (Class C) uPVC blind pipe/ sand trap having wall thickness 4.5mm to 5.2mm meter Tk. 498.00
1654
27.27.2.2 100 mm dia water grade (Class D) uPVC blind pipe/ sand trap having wall thickness 6.0 mm to 6.9 mm meter Tk. 649.00
1655
27.27.2.3 100 mm dia water grade (Class E) uPVC blind pipe/ sand trap having wall thickness 7.3 mm to 8.4 mm meter Tk. 811.00
1656
27.27.3.1 100 mm dia strainer of any slot as per design made with water grade(Class C) uPVC pipe having wall thickness meter Tk. 544.00
4.5 mm to 5.2 mm 1657
27.27.3.2 100 mm dia strainer of any slot as per design made with water grade(Class D) uPVC pipe having wall thickness meter Tk. 695.00
6.0 mm to 6.9 mm 1658
27.27.3.1 100 mm dia strainer of any slot as per design made with water grade(Class E) uPVC pipe having wall thickness meter Tk. 857.00
7.3 mm to 8.4 mm 1659
27.27.4 Best quality 100 mm x 200 mm dia uPVC reducer each Tk. 980.00 1660
Item No. Description of Item Unit Unit Rate

27.27.5.1 200 mm dia water grade (Class C) uPVC housing pipe having wall thickness 7.8 mm to 9.0 mm meter Tk. 1,138.00
1661
27.27.5.2 200 mm dia water grade (Class D ) uPVC housing pipe having wall thickness 10.3 mm to 11.9 mm meter Tk. 1,540.00
1662
27.27.5.3 200 mm dia water grade( Class E ) uPVC hjousing pipe having wall thickness 12.6 mm to 14.8 mm meter Tk. 1,842.00
1663
27.27.6 Supplying centralizer made with 12 mm dia M.S. rod of approved design each Tk. 379.00 1664
27.28 Complete installation of 100 mm dia uPVC tube-well fixtures such as expanded top pipes,. reducer, tube-well meter Tk. 103.00
pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality PVC solution, iron screws and uPVC
tape and placing in position with proper size M.S. centralizer @ 3 meter c/c. in strainer portion including blind
pipe etc. complete as per standard practice and accepted by the Engineer-in-charge.
1665
27.29 Complete development of the tube-well by air compressor and pump of suitable capacity by alternate surging
and pumping until satisfactory yield of sand free water and the turbidity condition is reached using necessary
quantity of calgon and conducting step draw down test before and after the development as per specification
and accepted by the Engineer-in-charge. (Development should be started within 24 hours of completion of
shrouding)
1666
27.29.1 Wells up to 200 m depth each Tk. 38,560.00 1667
27.29.2 Wells beyond 200 m depth each Tk. 46,272.00 1668
27.30 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 984.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1669
27.31 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 1,777.00
water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the
Engineer-in-charge. 1670
27.32 Filling of the borehole around the tube-well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 42.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1671
27.33 Protective top cover: Supplying and fitting fixing best quality 250 mm dia 4 mm thick M.S. pipe, 1.0 m (3'-4") each Tk. 9,356.00
long one, end blocked with 300 mm dia 4 mm thick M.S. plate and other end minimum 300 (1'-0") embedded in
sanitary seal for protection of uPVC Housing pipe as per standard specification and accepted by the Engineer-
in-charge.
1672
INSTALLATION OF 150 mm x 200 mm & 150 mm x 250 mm DIA SHROUDED 1673
PRODUCTION WELL WITH uPVC PIPE 1674
27.34 Boring: Execution of 600 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). Boring for
600 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval or as
required and at every change in soil stratum including sinking and withdrawing necessary casing pipe and all
necessary arrangements complete as per specification and accepted by the Engineer-in-charge. (Measurement
will be allowed from E.G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra depth or of
further boring required due to caving and siltation)

1675
27.34.1 From 0.0 m to 50 m = 50 m meter Tk. 1,279.00 1676
27.34.2 From 50 m to 100 m = 50 m meter Tk. 1,470.00 1677
27.34.3 From 100 m to 152 m = 52 m meter Tk. 1,691.00 1678
27.34.4 From 152 m to 200 m = 48 m meter Tk. 1,945.00 1679
27.34.5 From 200 m to 250 m = 50 m meter Tk. 2,236.00 1680
27.34.6 Beyond 250 m meter Tk. 2,572.00 1681
27.35 Supplying the following tube well fixtures and pipes having density 1350 kg/m3, opacity 0.2% of visible light as
per ISO 7686, minimum required strength 25 MPa conforming to BDS-1:2013, 4.4.1, 4.4.2 at working site as per
standard practice and accepted by the Engineer-in-charge.
1682
27.35.1 Best quality 150 mm dia uPVC cap for blind pipe/ sand trap. each Tk. 537.00 1683
27.35.2.1 150 mm dia water grade(Class C) uPVC blind pipe/ sand trap having wall thickness 6.6 mm to 7.6 mm meter Tk. 1,138.00
1684
27.35.2.2 150 mm dia water grade(Class D) uPVC blind pipe/ sand trap having wall thickness 8.8 mm to 10.2 mm meter Tk. 1,339.00
1685
27.35.2.3 150 mm dia water grade(Class E) uPVC blind pipe/ sand trap having wall thickness 10.8 mm to 12.5 mm meter Tk. 1,842.00
1686
27.35.3.1 150 mm dia strainer of any slot as per design made with water grade(Class C) uPVC pipe of wall thickness 6.6 meter Tk. 1,196.00
to 7.6 mm 1687
27.35.3.2 150 mm dia strainer of any slot as per design made with water grade(Class D) uPVC pipe of wall thickness 8.8 meter Tk. 1,397.00
to 10.2 mm 1688
27.35.3.3 150 mm dia strainer of any slot as per design made with water grade(Class E) uPVC pipe of wall thickness 10.8 meter Tk. 1,900.00
to 12.5 mm 1689
27.35.4.1 Best quality 150 mm x 200 mm dia uPVC Reducer each Tk. 1,246.00 1690
27.35.4.2 Best quality 150 mm x 250 mm dia uPVC Reducer each Tk. 1,488.00 1691
27.35.5.1 200 mm dia water grade(Class C) uPVC housing pipe of wall thickness 7.8 mm to 9.0 mm meter Tk. 1,721.00 1692
27.35.5.2 200 mm dia water grade(Class D) uPVC housing pipe of wall thickness 10.3 mm to 11.9 mm meter Tk. 2,295.00 1693
27.35.5.3 200 mm dia water grade(Class E) uPVC housing pipe of wall thickness12.6 mm to 14.8 mm meter Tk. 2,687.00 1694
27.35.5.4 250 mm dia water grade(Class C) uPVC housing pipe of wall thickness 9.7 mm to 11.2 mm meter Tk. 2,687.00 1695
27.35.5.5 250 mm dia water grade(Class D) uPVC housing pipe of wall thickness 12.8 mm to 14.8 mm meter Tk. 3,753.00 1696
27.35.5.6 250 mm dia water grade(Class E) uPVC housing pipe of wall thickness 15.7 mm to 18.1 mm meter Tk. 4,458.00 1697
Item No. Description of Item Unit Unit Rate

27.35.6 Supplying of centralizer made with 12 mm dia M.S. rod of approved design meter Tk. 379.00 1698
27.36 Complete installation of 150 mm dia uPVC tube-well fixtures such as expanded top pipes, reducer, tube-well meter Tk. 106.00
pipes, strainer, blind pipe, pipe cap etc. fitting and fixing with best quality uPVC solution, iron screws and uPVC
tape and placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind
pipe etc. complete as per standard practice and accepted by the Engineer-in-charge.
1699
27.37 Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge. (Development should be started within 24 hours of
completion of shrouding)
1700
27.37.1 Wells up to 200 m depth each Tk. 46,104.00 1701
27.37.2 Wells beyond 200 m depth each Tk. 52,252.00 1702
27.38 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 1,120.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1703
27.39 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 2,133.00
water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the
Engineer-in-charge. 1704
27.40 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 57.00
withdrawn selected soil or local clay as free from any substances harmful to pipes and health per standard
specification and accepted by the Engineer-in-charge. 1705
27.41 Protective top cover: Supplying fitting and fixing of best quality 250 mm dia 4 mm thick M.S. pipe 1.0 m (3'-4") each Tk. 9,261.00
long one end blocked with 300 dia 4 mm thick M.S. plate and other end minimum 300 (1'-0") embedded in
sanitary seal for protection of uPVC Housing pipe as per standard specification and accepted by the Engineer-
in-charge.
1706
INSTALLATION OF 150 mm x 300 mm DIA SHROUDED 1707
PRODUCTION WELL WITH G.I. PIPE 1708
27.42 Boring: Execution of 600 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring
600 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at
every change of formation including sinking and withdrawing necessary casing pipe and all necessary
arrangements complete as per specification and accepted by the Engineer-in-charge.
(Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra
depth of boring required for caving and siltation)
1709
27.42.1 From 0.0 m to 50 m = 50 m meter Tk. 1,279.00 1710
27.42.2 From 50 m to 100 m = 50 m meter Tk. 1,470.00 1711
27.42.3 From 100 m to 152 m = 52 m meter Tk. 1,691.00 1712
27.42.4 From 152 m to 200 m = 48 m meter Tk. 1,945.00 1713
27.42.5 From 200 m to 250 m = 50 m meter Tk. 2,236.00 1714
27.42.6 Beyond 250 m meter Tk. 2,572.00 1715
27.43 Supplying the following tube well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having
chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060
max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a)
manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at
working site as per standard practice and accepted by the Engineer-in-charge.

1716
27.43.1 150 mm dia M.S. cap 6 mm thick for blind pipe/sand trap each Tk. 1,362.00 1717
27.43.2 150 mm dia G.I. Pipe having wall thickness 5.4 mm, weight 21.2 kg/m can withstand 50 kg/ cm2 hydraulic meter Tk. 3,509.00
pressure for blind pipe/sand trap 1718
27.43.3 150 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously.
1719
27.43.3.1 Stainless steel strainer of continuous slot having weight 28.84 kg per meter. meter Tk. 16,003.00 1720
27.43.3.2 2.50 mm thick stainless steel Bridge type strainer. meter Tk. 11,836.00 1721
27.43.4 150 mm x 300 mm dia M.S. reducer of minimum thickness of 6 mm. each Tk. 2,850.00 1722
27.43.5 300 mm dia 6 mm minimum thick M.S. housing pipe (Welded) meter Tk. 6,772.00 1723
27.43.6 300 mm dia 6 mm minimum thick M.S. housing pipe (Seamless) meter Tk. 9,249.00 1724
27.43.7 Centralizer made with 12 mm dia M.S. rod of approved design. each Tk. 379.00 1725
27.43.8 350 mm dia M.S. cap having 6 mm thick for housing pipe covering. each Tk. 2,275.00 1726
27.44 Complete installation of 150 mm dia deep tube-well fixtures such as expanded top pipes, reducer, tube-well meter Tk. 461.00
pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and
placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including. blind pipe etc.
complete as per standard practice and accepted by the Engineer-in-charge.
1727
27.45 Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge.
(Development should be started within 24 hours of completion of shrouding)
1728
27.45.1 Wells up to 200 m depth each Tk. 46,104.00 1729
27.45.2 Wells beyond 200 m depth each Tk. 52,252.00 1730
Item No. Description of Item Unit Unit Rate

27.46 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 1,153.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1731
27.47 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 2,177.00
water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the
Engineer-in-charge. 1732
27.48 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 57.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1733
INSTALLATION OF 200 mm x 400 mm DIA SHROUDED 1734
PRODUCTION WELL WITH G.I. PIPE 1735
27.49 Boring: Execution of 800 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter). For
boring 800 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval
and at every change of formation including sinking and withdrawing necessary casing pipe and all necessary
arrangements complete as per specification and accepted by the Engineer-in-charge.
(Measurement will be allowed form G.L. to bottom of the blind pipe and the rate is required for caving and
siltation)

1736
27.49.1 From 0.0 m to 50 m = 50 m meter Tk. 1,518.00 1737
27.49.2 From 50 m to 100 m = 50 m meter Tk. 1,745.00 1738
27.49.3 From 100 m to 152 m = 52 m meter Tk. 2,007.00 1739
27.49.4 From 152 m to 200 m = 48 m meter Tk. 2,308.00 1740
27.49.5 From 200 m to 250 m = 50 m meter Tk. 2,655.00 1741
27.49.6 Beyond 250 m meter Tk. 3,053.00 1742
27.50 Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having
chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060
max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a)
manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at
working site as per standard practice and accepted by the Engineer-in-charge.

1743
27.50.1 200 mm dia M.S. cap 6mm thick for blind pipe/ sand strap each Tk. 1,747.00 1744
27.50.2 200 mm dia 6 mm thick tube well pipe and blank G.I. pipe of wt. 33.45 kg per meter can withstand minimum 700 meter Tk. 7,505.00
psi hydraulic pressure. 1745
27.50.3 200 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. meter
1746
27.50.3.1 200 mm dia stainless steel strainer of continuous slot having 38.36 kg per meter. meter Tk. 18,719.00 1747
27.50.3.2 200 mm dia 2.5 mm thick stainless steel bridge type strainer meter Tk. 12,529.00 1748
27.50.4 200 mm x 400 mm dia 6 mm thick M.S. reducer. each Tk. 2,932.00 1749
27.50.5 400 mm dia 6 mm thick M.S. housing pipe (Welded) meter Tk. 10,536.00 1750
27.50.6 400 mm dia 6 mm thick M.S. housing pipe (Seamless) meter Tk. 12,871.00 1751
27.50.7 Centralizer made with 12 mm dia M.S. rod of approved design each Tk. 379.00 1752
27.50.8 450 mm dia M.S. cap of 6 mm thick for housing pipe covering. each Tk. 490.00 1753
27.51 Complete installation of 200 mm dia deep tube well fixtures such as expanded top pipes, reducer, and tube well meter Tk. 503.00
pipes, strainer, blind pipe. pipe cap etc. Fitting and fixing socket, welding and additional welding with fibre and
placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer position including blind pipe etc.
complete as per standard practice and accepted by the Engineer-in-charge.
1754
27.52 Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge.
(Development should be started within 24 hours of completion of shrouding).
1755
27.52.1 Wells up to 200 m depth each Tk. 42,896.00 1756
27.52.2 Wells beyond 200 m depth each Tk. 47,943.00 1757
27.53 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 1,198.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1758
27.54 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 2,488.00
water having 150 ppm available free chlorine complete as per standard specification and accepted by the
Engineer-in-charge. 1759
27.55 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 57.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1760
INSTALLATION OF 50 mm x 150 mm DIA SHROUDED 1761
PRODUCTION WELL WITH G.I. PIPE 1762
Item No. Description of Item Unit Unit Rate

27.56 Boring: Execution of 325 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring
325 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at
every change of formation including sinking and withdrawing necessary casing pipe and all necessary
arrangements complete as per specification and accepted by the Engineer-in-charge.
(Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra
depth of boring required for caving and siltation)

1763
27.56.1 From 0.0 m to 50 m = 50 m meter Tk. 939.00 1764
27.56.2 From 50 m to 100 m = 50 m meter Tk. 1,080.00 1765
27.56.3 From 100 m to 152 m = 52 m meter Tk. 1,242.00 1766
27.56.4 From 152 m to 200 m = 48 m meter Tk. 1,428.00 1767
27.56.5 From 200 m to 250 m = 50 m meter Tk. 1,642.00 1768
27.56.6 Beyond 250 m meter Tk. 1,889.00 1769
27.57 Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having
chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060
max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a)
manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at
working site as per standard practice and accepted by the Engineer-in-charge.

1770
27.57.1 150 mm dia 6mm thick M.S. cap for blind pipe/ sand trap. each Tk. 1,362.00 1771
27.57.2 50 mm dia 4.85 mm thick tube well pipe and blank G.I. pipe meter Tk. 592.00 1772
27.57.3 50 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. meter
1773
27.57.3.1 50 mm dia stainless steel strainer of continuous slot having 28.84 kg per meter. meter Tk. 6,283.00 1774
27.57.3.2 50 mm dia 2.5 mm thick stainless steel bridge type strainer meter Tk. 6,283.00 1775
27.57.4 50 mm x 150 mm dia 6 mm thick M.S. reducer. each Tk. 1,099.00 1776
27.57.5 150 mm dia 6 mm thick M.S. housing pipe (Welded). meter Tk. 5,023.00 1777
27.57.6 150 mm dia 6 mm thick M.S. housing pipe (Seamless). meter Tk. 4,419.00 1778
27.57.7 Centralizer made with 12 mm dia M.S. rod of approved design. each Tk. 379.00 1779
27.57.8 150 mm dia M.S. cap of 6 mm thick for housing pipe covering. each Tk. 1,795.00 1780
27.58 Complete installation of 50 mm dia deep tube-well fixtures such as expanded top pipes, reducer, tube-well meter Tk. 461.00
pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and
placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including. blind pipe etc.
complete as per standard practice and accepted by the Engineer-in-charge
1781
27.59 Compete development of the tube well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge
(Development should be started within 24 hours of completion of shrouding)
1782
27.59.1 Wells up to 200 m depth each Tk. 23,272.00 1783
27.59.2 Wells beyond 200 m depth each Tk. 26,375.00 1784
27.60 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 962.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1785
27.61 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 1,244.00
water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the
Engineer-in-charge. 1786
27.62 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 33.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1787
INSTALLATION OF 75 mm x 150 mm DIA SHROUDED 1788
PRODUCTION WELL WITH G.I. PIPE 1789
27.63 Boring: Execution of 350 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring
350 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at
every change of formation including sinking and withdrawing necessary casing pipe and all necessary
arrangements complete as per specification and accepted by the Engineer-in-charge.
(Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra
depth of boring required for caving and siltation)

1790
27.63.1 From 0.0 m to 50 m = 50 m meter Tk. 988.00 1791
27.63.2 From 50 m to 100 m = 50 m meter Tk. 1,136.00 1792
27.63.3 From 100 m to 152 m = 52 m meter Tk. 1,307.00 1793
27.63.4 From 152 m to 200 m = 48 m meter Tk. 1,503.00 1794
27.63.5 From 200 m to 250 m = 50 m meter Tk. 1,728.00 1795
27.63.6 Beyond 250 m meter Tk. 1,987.00 1796
Item No. Description of Item Unit Unit Rate

27.64 Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having
chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060
max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a)
manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at
working site as per standard practice and accepted by the Engineer-in-charge.

1797
27.64.1 150 mm dia 6mm thick M.S. cap for blind pipe/ sand trap. each Tk. 1,357.00 1798
27.64.2 75 mm dia 4.85 mm thick tube well pipe and blank G.I. pipe meter Tk. 883.00 1799
27.64.3 75 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. meter
1800
27.64.3.1 75 mm dia stainless steel strainer of continuous slot having 28.84 kg per meter. meter Tk. 8,411.00 1801
27.64.3.2 75 mm dia 2.5 mm thick stainless steel bridge type strainer meter Tk. 8,411.00 1802
27.64.4 75 mm x 150 mm dia 6 mm thick M.S. reducer. meter Tk. 1,099.00 1803
27.64.5 150 mm dia 6 mm thick M.S. housing pipe (Welded) meter Tk. 5,023.00 1804
27.64.6 150 mm dia 6 mm thick M.S. housing pipe (Seamless) meter Tk. 4,419.00 1805
27.64.7 Centralizer made with 12 mm dia M.S. rod of approved design each Tk. 379.00 1806
27.64.8 150 mm dia M.S. cap of 6 mm thick for housing pipe covering. meter Tk. 1,795.00 1807
27.65 Complete installation of 75 mm dia deep tube-well fixtures such as expanded top pipes, reducer, tube-well meter Tk. 447.00
pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and
placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind pipe etc.
complete as per standard practice and accepted by the Engineer-in-charge.
1808
27.66 Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge(Development should be started within 24 hours of
completion of shrouding).
1809
27.66.1 Wells up to 200 m depth each Tk. 31,419.00 1810
27.66.2 Wells beyond 200 m depth each Tk. 35,608.00 1811
27.67 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 1,041.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge.
1812
27.68 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 1,511.00
water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the
Engineer-in-charge. 1813
27.69 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 38.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge. 1814
INSTALLATION OF 100 mm x 200 mm DIA SHROUDED 1815
PRODUCTION WELL WITH G.I. PIPE 1816
27.70 Boring: Execution of 400 mm dia boring through all sorts of strata by reverse circulation or any other approved
method (Method other than reverse circulation is to be applied only for wells deeper than 152 meter) for boring
400 mm dia vertical hole up to designed depth and collection of soil samples at every 3 meter interval and at
every change of formation including sinking and withdrawing necessary casing pipe and all necessary
arrangements complete as per specification and accepted by the Engineer-in-charge.
(Measurement will be allowed from G.L. to bottom of the blind pipe and the rate is inclusive of the cost of extra
depth of boring required for caving and siltation)

1817
27.70.1 From 0.0 m to 50 m = 50 m meter Tk. 1,031.00 1818
27.70.2 From 50 m to 100 m = 50 m meter Tk. 1,186.00 1819
27.70.3 From 100 m to 152 m = 52 m meter Tk. 1,364.00 1820
27.70.4 From 152 m to 200 m = 48 m meter Tk. 1,569.00 1821
27.70.5 From 200 m to 250 m = 50 m meter Tk. 1,804.00 1822
27.70.6 Beyond 250 m meter Tk. 2,074.00 1823
27.71 Supplying the following tube-well fixtures and pipes conforming to standard BS-1387 & BDS-1031, having
chemical composition (in%) carbon 0.17-0.25, manganese 0.95-1.20, sulphur 0.060 max, phosphorous 0.060
max, tensile properties: miminum yield strength 188 MPa, minimum tensile strength 313 MPa and marking for a)
manufacturer b) material c) wall thickness d) nominal outside dia e) intended use etc. on the body of the pipe at
working site as per standard practice and accepted by the Engineer-in-charge.

1824
27.71.1 Supplying 150 mm dia 6mm thick M.S. cap for blind pipe/ sand trap. each Tk. 1,362.00 1825
27.71.2 Supplying 100 mm dia 6 mm thick tube well pipe and blank G.I. pipe meter Tk. 1,325.00 1826
27.71.3 100 mm dia strainer of slot opening as per design including tagging 4 Nos. 12 mm dia M.S. rod continuously. meter
1827
27.71.3.1 Supplying 100 mm dia stainless steel strainer of continuous slot having 28.84 kg per meter. meter Tk. 7,256.00 1828
27.71.3.2 Supplying 100 mm dia 2.5 mm thick stainless steel bridge type strainer meter Tk. 7,256.00 1829
27.71.4 Supplying 100 mm x 200 mm dia 6 mm thick M.S. reducer. each Tk. 1,362.00 1830
27.71.5 Supplying 200 mm dia 6 mm thick M.S. housing pipe (Welded) meter Tk. 4,184.00 1831
27.71.6 Supplying 200 mm dia 6 mm thick M.S. housing pipe (Seamless) meter Tk. 4,585.00 1832
27.71.7 Supplying centralizer made with 12 mm dia M.S. rod of approved design each Tk. 227.00 1833
Item No. Description of Item Unit Unit Rate

27.71.8 Supplying 200 mm dia M.S. cap of 6 mm thick for housing pipe covering. each Tk. 2,320.00 1834
27.72 Complete installation of 100 mm dia deep tube-well fixtures such as expanded top pipes, reducer, and tube-well meter Tk. 503.00
pipes, strainer, blind pipe, pipe cap etc. fitting and fixing socket, welding and additional welding with fibre and
placing in position with proper size M.S. centralizer @ 3 meter c/c in strainer portion including blind pipe etc.
complete as per standard practice and accepted by the Engineer-in-charge
1835
27.73 Complete development of the tube well by suitable air compressor and pump of suitable capacity by alternate
surging and pumping until satisfactory yield, sand free water and the turbidity condition is reached using
necessary quantity of calgon and conducting step draw down test before and after the development as per
specification and accepted by the Engineer-in-charge
(Development should be started within 24 hours of completion of shrouding)
1836
27.73.1 Wells up to 200 m depth each Tk. 38,560.00 1837
27.73.2 Wells beyond 200 m depth each Tk. 43,701.00 1838
27.74 Pumping test of the well by designed turbine/submersible pump with supply of testing equipments for pressure/ hour Tk. 1,086.00
velocity/ discharge etc. and all materials for 72 hours including yield drawn and recovery test etc. complete as
per specification and accepted by the Engineer-in-charge
1839
27.75 Disinfections of the well including supply of sufficient quantity of bleaching powder (33% strength) chlorinated each Tk. 1,777.00
water having 150 ppm available free chlorine etc. complete as per standard specification and accepted by the
Engineer-in-charge 1840
27.76 Filling of the borehole around the tube well from top of the shrouding up to the bottom of sanitary seal by meter Tk. 43.00
withdrawn selected soil or local clay free from any substances harmful to pipes and health as per standard
specification and accepted by the Engineer-in-charge 1841
INSTALLATION OF 40 MM DIA uPVC HAND TUBE WEL 1842
27.77 Supplying and sinking of 40 mm dia water grade uPVC tube well pipe having wall thickness 2.5 mm to 3.0 mm
including trial boring and with all necessary fittings as required etc. all complete and accepted by the Engineer-
in-charge. 1843
27.77.1 40 mm dia pipe up to 60 m depth meter Tk. 182.00 1844
27.77.2 40 mm dia pipe beyond 60 m depth meter Tk. 329.00 1845
27.78 Supplying and sinking of 3 m long uPVC strainer with all necessary fittings as required etc. complete and each Tk. 500.00
accepted by the Engineer-in-charge. 1846
27.79 Supplying, fitting and fixing of No. 6 pump for 40 mm dia tube well with all necessary fittings including 0.61 m each Tk. 3,252.00
long 40 mm dia G.I. Pipe etc. all complete as per accepted by the Engineer-in-charge.
1847
27.80 Construction of platform of size 1.4 m x 1.0 m and outlet drain up to1 meter long, as per drawing with 75 mm each Tk. 4,946.00
thick cement concrete of f'c min 17 MPa with brick chips and cement content relates to 1:2:4, over a brick flat
soling and providing 125 mm x 75mm brick band in 1:6 all around, including finished with 12 mm thick cement
plaster in 1:4 followd by neat cement finishing all complete and accepted by the Engineer-in-charge.

1848
DEEP SET HAND OPERATED TUBE WELL 1849
27.81 Supplying and sinking uPVC, tube well pipe, uPVC strainer including trial boring with all necessary fittings as
required etc. all complete and accepted by the Engineer-in-charge. 1850
27.81.1 50 mm dia water grade uPVC pipe having wall thickness 2.5 mm to 3 mm meter Tk. 466.00 1851
27.81.2 40 mm dia water grade uPVC pipe having wall thickness 2.5 mm to 3 mm meter Tk. 266.00 1852
27.81.3 40 mm dia uPVC strainer 3.0 m long each Tk. 500.00 1853
27.82 Supplying, fitting and fixing of deep set tube well pump (Hand set) with all necessary fittings as required such as each Tk. 6,187.00
No. 6 pump, 50 mm dia G.I. pipe 0.61 m long, 50 mm x 40 mm reducing socket, 40 mm dia pipe Nipple 1.22 m
long cylinder, tie foot ball, tie plunger, 3 Nos. 10 mm dia sockets, 4 Nos. 10mm dia nuts, 5 Nos. end threaded
10 mm dia M.S. rod 3 m long, necessary quantity of solution and tape etc. complete and accepted by the
Engineer-in-charge.

1854
1855
1856
1857
………………….. END OF DIVISION TWENTY SEVEN ………………….. 1858
DIVISION 28 : GAS CONNECTION WORKS 1859
Item No. Description of Item Unit Unit Rate
1860
PART-A (LOW PRESSURE LINE) 1861
28.1 Pipe line installation: Installation of 50 psi, APl, 5L, Grade-B, ERW Natural pipe line for supplying Titas Gas
including, supplying, fitting, fixing and laying different sizes M.S. pipes with necessary tape and primer including
cutting trenches (450 mm x 910 mm) in all kinds of soil, cleaning, cutting, applying coal-tar, wrapping the pipes
and back filling the trenches, excavating earth including. leveling, dressing and removing excess earth in all
respect as per specification of Titas Gas T and D Co. Ltd. and accepted by the Engineer-in-charge. [Rate is
excluding the cost of welding and back filling with sand at the bottom by 300 mm in thickness (compacted)]
(Pipes manufactured by National Tubes Limited under Steel & Engineeing Corporation, Ministry of Industries,
Government of Bangladesh shall be given priority)

1862
28.1.1 75 mm N.D (88.90 mm O.D) M.S pipe, weight of min 8.3 kg/m, standard test pressure 176 kg/ m2, wall thickness meter Tk. 1,768.00
of min 11.29 mm 1863
28.1.2 50 mm N.D. (60.30 mm O.D) M.S pipe, weight of min 5.44 kg/m, standard test pressure 176 kg/ m2, wall meter Tk. 1,198.00
thickness of min 3.91 mm 1864
Item No. Description of Item Unit Unit Rate

28.1.3 25 mm N.D. (33.40 mm O.D) M.S pipe weight of min 2.50 kg/m, standard test pressure 50 kg/ m , wall thickness
2
meter Tk. 682.00
of min 3.38 mm 1865
28.1.4 20 mm N.D. (26.70 mm O.D) M.S pipe weight of min 1.68 kg/m, standard test pressure 50 kg/ m2, wall thickness meter Tk. 522.00
of min 2.87 mm 1866
28.2 Back filling the trenches with sand (F.M 0.8) in 150 mm layer, compaction of each layer up to finished level as cum Tk. 683.00
per standard practice and accepted by the Engineer-in-charge. 1867
28.3 Providing Butt welded joints with pipes to Tees, Elbows, Saddles, end caps etc above or below ground
including. cutting and V-leveling in each end of the pipe, grinding by machine etc. complete as per specification
of Titas Gas T and D C Ltd. and accepted by the Engineer-in-charge.
1868
28.3.1 75 mm N.D (88.90 mm O.D) each Tk. 192.00 1869
28.3.2 50 mm N.D (60.30 mm O.D) each Tk. 163.00 1870
28.3.3 25.mm N.D (33.40 mm O.D) each Tk. 128.00 1871
28.3.4 20 mm N.D (26.70 mm O.D) each Tk. 109.00 1872
28.4 Supplying, fitting and fixing the following materials including carriage to the work site from Titas Gas Store as
per specification of Titas Gas (T and D) Co. Ltd. and accepted by the Engineer-in-charge. (Rate is excluding the
cost of welding) 1873
28.4.1 50 mm x 50 mm x 50 mm (N.D) equal tee each Tk. 303.00 1874
28.4.2 50 mm x 50 mm x 25 mm (N.D) reducing tee each Tk. 337.00 1875
28.4.3 25 mm x 25 mm x 25 mm (N.D) equal tee each Tk. 208.00 1876
28.4.4 50 mm x 90º elbow each Tk. 241.00 1877
28.4.5 25 mm x 90º elbow each Tk. 88.00 1878
28.4.6 50 mm x 25 mm 45º elbow each Tk. 116.00 1879
28.4.7 50 mm x 25 mm reducer. each Tk. 126.00 1880
28.4.8 20 mm plug, socket each Tk. 353.00 1881
28.4.9 50mm X 20 mm saddle each Tk. 275.00 1882
28.4.10 50 mm dia end cap each Tk. 103.00 1883
28.4.11 25 mm dia end cap each Tk. 72.00 1884
28.5 Supplying, welding, fitting and fixing of different size valve tee/ service tee to connect the pipe line with the Titas
Gas Main pipe line etc. all complete in all respect as per specification of Titas Gas T and D Co. Ltd. approved
and accepted by the Engineer-in-charge. 1885
28.5.1 50 mm x 50 mm Valve Tee (50 mm and above 50 mm low pressure line) each Tk. 24,007.00 1886
28.5.2 50 mm x 25 mm Valve Tee each Tk. 3,199.00 1887
28.5.3 25 mm x 25 mm Service Tee each Tk. 4,262.00 1888
28.5.4 50 mm x 25 mm Service Tee each Tk. 5,787.00 1889
28.6 Supplying, fitting and fixing in position different dia I/F (Insulated Flange) etc. all complete in all respect as per each Tk. 7,305.00
specification of Titas Gas T and D Co. Ltd. approved and accepted by the Engineer-in-charge. 50 mm N.D.
(60.30 mm O.D) Insulation Flange. 1890
28.7 Construction of 1520 mm x 1520 mm x 1370 mm (depth) water-tight valve pit, enclosed by 250 mm thick brick each Tk. 74,053.00
wall in 1:6, plastered on each face in 1:4 with net cement finishing, having a 75 mm thick C.C (1:3:6) bed upon a
layer of brick flat soling, over laid by 38 mm thick patent stone flooring including standard M.S. sheet valve pit
cover as per drawing and specification of Titas Gas T and D Co. Ltd. etc. all complete in all respect and
accepted by the Engineer-in-charge.

1891
28.8 Testing and purging the pipe lines properly as per specification of Titas Gas T and D Co. Ltd. and accepted by meter Tk. 28.00
the Engineer. 1892
28.9 Supplying, fitting and fixing of ball valve class 150 RF including supplying of 2 Nos. flange along with necessary
nuts and bolts, welding the flange etc. all complete in all respect as per specification of Titas Gas T and D Co.
Ltd. approved and accepted by the Engineer-in-charge.
1893
28.9.1 50 mm ball valve class 150 RF. 2" dia each Tk. 17,234.00 1894
28.9.2 25 mm ball valve class 150 RF.1" dia each Tk. 12,233.00 1895
28.10 Cutting of permanent pucca (rigid/flexible) road and mending good the damages etc. all complete in all respect
and accepted by the Engineer-in-charge. 1896
28.10.1 Bituminous Road sqm Tk. 756.00 1897
28.10.2 R.C.C. Road sqm Tk. 1,131.00 1898
Part - B (Domestic & Commercial line) 1899
28.11 Installation of Domestic or Commercial House line for supplying Titas Gas including supplying, fitting and fixing
in position different dia best quality G.I. Pipe (NT or equivalent) along with all necessary G.I. fitting and
accessories, cutting trenches, walls and floors etc. and back filling the trenches, restoring walls and floors etc.
all complete in all respect as per specification of Titas Gas T and D Co. Ltd. and accepted by the Engineer-in-
charge.
1900
28.11.1 20 mm N.D meter Tk. 246.00 1901
28.11.2 12 mm N.D. meter Tk. 212.00 1902
28.12 Supplying, fitting and fixing in position different dia one-way brass stop cock (best quality and heavy type) etc. meter
complete in all respect as per specification of Titas Gas T and D Co. Ltd. approved and accepted by the
Engineer-in-charge. 1903
28.12.1 12 mm x 6 mm N.D. each Tk. 268.00 1904
28.12.2 20 mm x 20 mm N.D. each Tk. 428.00 1905
28.13 Testing and purging of the house line properly as per specifications Titas Gas T and D Co. Ltd. and accepted by meter Tk. 20.00
the Engineer-in-charge. 1906
Item No. Description of Item Unit Unit Rate

1907
1908
1909
………………….. END OF DIVISION TWENTY EIGHT ………………….. 1910
DIVISION 29 : TERMITE TREATMENT WORKS
1911
Item No. Description of Item Unit Unit Rate
1912
29.1 Supplying anti-termite chemicals named DURS BAN 20 EC and mixing the same with pure water in required sqm Tk. 287.00
proportion (For DURSBAN 20 EC I Ltd. in 19 liters of pure water) and spraying the emulsified mixture @ 5 liters
per square meter of soil surface by chemical sprayer or by any other means to the sides and bottom of the
foundation trench and over plinth filling or floor bed accepted by the Engineer-in-charge.
1913
29.2 Extra cost for supplying anti termite chemicals named DURS BAN 20 EC and mixing the same with pure water cum Tk. 2,113.00
as per specification in item No. 1 and using the same emulsified water as mixing water in cement-sand mortar of
brick works in foundation and up to plinth and accepted by the Engineer-in-charge.
1914
29.3 Supplying anti-termite chemicals named DURS BAN 20 EC and mixing the same with pure water as per sqm Tk. 431.00
specification in item No. 1 and spraying the emulsified mixture with hand sprayer over both outside and inside
back fill in foundation trenches @ 7.50 liters per sqm of the vertical surface area of the foundation wall accepted
by the Engineer-in-charge. (The maximum depth of the back fill to be treated is 500 mm. and the measurement
for depth should not be given more than 500 mm)

1915
29.4 Anti-termite treatment in existing super structures by making downwardly slanting holes at a required depth of 9" per hole Tk. 51.00
from the existing finished F.L/G.L inside and outside the building and applying the emulsion of anti termite
chemicals, named DURS BAN 20 EC into the holes preparing chemical solution mixing with water at the ratio of
chemical: water = 1:19 maintaining a dosage rate of 250 ml per hole including supplying all materials and
repairing the holes all complete and accepted by the Engineer-in-charge.

1916
29.5 Trench treatment for protection against incoming termites to the establishment through underground by making meter Tk. 279.00
trench around existing building /structures at a required depth of 750 mm from existing level including supplying
anti-termite chemicals named DURS BAN 20 EC preparing the solution to be mixed with water in the ratio of
chemical: water = 1:19, applying the solution into trench with the help of a chemical sprayer in three layers and
each layer follows a 250 mm thick back-fill in trench etc all complete and accepted by the Engineer-in-charge.

1917
29.6 Fumigation treatment (Pest Control) against mosquitoes, flies, bees, cockroaches, spiders, silver fishes, lizards cum Tk. 32.00
and other common pests and insects in wooden walls, bricks walls, floors, doors and windows, furniture fanlight,
carpets, records, curtains, electrical conduits etc. with the application of fumigants such as Syngeata or
NEOCIDOL-60 EC or similar chemically equivalent govt. registered pest control products preparing chemical
solution mixing with water in the ratio of chemical: water = 1:100, applying with the help of
electrically/mechanically operated jet fogging machine, swing fog, dyna fog, pneumatic hand sprayer, knap sac
hand sprayer in air-tight position, after fumigation the surface will be kept remain at air-tight condition at least for
3 (three) hours etc. complete and accepted by the Engineer-in-charge.
(Volume of the room will be considered towards measurement.)

1918
29.7 Anti termite treatment of all wooden doorframes, window frames, wood paneling etc. by using DURS BAN 20 sqm Tk. 175.00
EC emulsion in the ratio of 1 liter. DURS BAN 20 EC + 19 liters of Kerosene oil suitable for wood, plywood,
particle board, hard board etc. on both surfaces by brush on both surfaces by brush-on-method etc. complete
and accepted by the Engineer-in-charge.
1919
29.8 Anti-termite treatment of electric telephone wiring system by inserting a plugging materials (cotton, foam etc.) per board Tk. 328.00
soaked in anti-termite chemical DURS BAN 20 EC to an electric switch board point for all floors and spraying
the emulsion (to be mixed at the ratio of 1 liters DURS BAN 20 EC + 19 liter of water) to the casings and
grooving of electric wirings, telephone cables utility pipes etc. for all floors etc. complete and accepted by the
Engineer-in-charge.
1920
29.9 Destruction of termite nest around an infested building, tree stumps in lawn with the treatment of DURS BAN 20 each nest Tk. 2,043.00
EC by excavation of soil in affected area up to a depth of 1.5 meter, mixing the DURS BAN 20 EC solution to be
mixed with water in 1:19 ratio with the soil and laying the same in same place etc. all complete as per direction
including. cost of all materials and chemicals etc. complete and accepted by the Engineer-in-charge.
1921
1922
1923
1924
………………….. END OF DIVISION TWENTY NINE ………………… 1925
DIVISION 30 : CONCRETE HOLLOW BLOCK, FACINGS AND PAVING STONE, NON FIRE BLOCK
1926
Item No. Description of Item Unit Unit Rate
1927
Item No. Description of Item Unit Unit Rate

30.1 70 mm thick partition wall excluding plaster thickness with concrete hollow block having compressive strength of
4.14~5 N/mm2, size 390 mm x 70 mm x 190 mm, in compliance with ASTM C129, fairly uniform thickness and
texture and individual block shell thickness should not be less than 16 mm, water absorption not more than 7%,
laying with 8-10 mm thick mortar (with admixture) of cement, lime and sand in a ratio of 1:1:6 (sand not less
than 1.2 F.M), filling the interstices with mortar and making bond with connecting walls including necessary
scaffolding and curing for minimun 3 (three) days on mortar joints by jute /brush in wet, followed by
impervious /wet covering for another 4 (four) days etc all complete and accepted by the Engineer-in-charge.

1928
30.1.1 Ground floor sqm Tk. 699.00 1929
30.1.2 Add for each additional floor up to 5th floor sqm Tk. 31.00 1930
30.1.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 42.00 1931
30.1.4 Add for each additional floor for 10th floor and above sqm Tk. 52.00 1932
30.2 70 mm thick partition wall excluding plaster thickness with concrete hollow block having compressive strength of
4.14~5 N/mm2, size 390 mm x 70 mm x 190 mm, in compliance with ASTM C129, thickness of individual Block
shell should not be less than 16 mm, water absorption not more then 7 % lying with 8 to 10 mm thick mortar
(with admixture) of cement and sand in a ratio of 1:6 (sand not less than 1.2 F.M), filling the interstices with
mortar and making bond with connecting walls including necessary scaffolding and curing for minimun 3 (three)
days on mortar joints by jute/brush in wet, followed by impervious/wet covering for another 4 (four) days etc all
complete and accepted by the Engineer-in-charge.

1933
30.2.1 Ground floor sqm Tk. 677.00 1934
30.2.2 Add for each additional floor up to 5th floor sqm Tk. 31.00 1935
30.2.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 42.00 1936
30.2.4 Add for each additional floor for 10th floor and above sqm Tk. 52.00 1937
30.3 90 mm thick partition wall with concrete hollow block having strength of 4.14~5 N/mm2, size 390 mm x 90 mm x
190 mm, in compliance with ASTM C129, thickness of individual block shell should not be less than 16 mm,
water absorption not more then 7%, lying with specified mortar (with admixture) of cement, lime and sand in a
ratio of 1:1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with connecting
walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by jute /brush in
wet, followed by impervious /wet covering for another 4 (four) days curing etc all complete and accepted by the
Engineer-in-charge.

1938
30.3.1 Ground floor sqm Tk. 887.00 1939
30.3.2 Add for each additional floor up to 5th floor sqm Tk. 31.00 1940
30.3.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 42.00 1941
30.3.4 Add for each additional floor for 10th floor and above sqm Tk. 52.00 1942
30.4 90 mm thick partition wall with concrete hollow block having compressive strength of 4.14~5 N/mm2, size 390
mm x 90 mm x 190 mm, in compliance with ASTM C129, thickness of individual block shell should not be less
than 16 mm, water absorption not more than 7%, lying with specified mortar (with admixture) of cement, and
sand in a ratio of 1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with
connecting walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4 (four) days curing etc. all complete and
accepted by the Engineer-in-charge

1943
30.4.1 Ground floor sqm Tk. 1,121.00 1944
30.4.2 Add for each additional floor up to 5th floor sqm Tk. 31.00 1945
30.4.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 42.00 1946
30.4.4 Add for each additional floor for 10th floor and above sqm Tk. 52.00 1947
30.5 140 mm thick non load bearing wall with concrete hollow block having compressive strength of 13~18 N/mm2,
size 390 mm x 140 mm x 190 mm, in compliance with ASTM C90, thickness of individual block shell should not
be less then 25 mm, water absorption not more than 7%, laying with mortar (with admixture) of cement, lime
and sand in ratio of 1:1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with
connecting walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc all complete and accepted
by the Engineer-in-charge.

1948
30.5.1 Ground floor sqm Tk. 1,291.00 1949
30.5.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 1950
30.5.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 1951
30.5.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 1952
30.6 140 mm thick partition wall with concrete hollow block having compressive strength of 4.14~5 N/mm2, size 390
mm x 140 mm x 190 mm, in compliance with ASTM C129, thickness of individual Block shell should not be less
than 16 mm, water absorption not more than 7%, laying with specified mortar (with admixture) of cement and
sand in a ratio of 1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with
connecting walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4( four) days curing etc all complete and
accepted by the Engineer-in-charge.

1953
30.6.1 Ground floor sqm Tk. 1,261.00 1954
30.6.2 Add for each addl. floor up to 5th floor sqm Tk. 42.00 1955
30.6.3 Add for each addl floor for 6th floor to 9th floor sqm Tk. 52.00 1956
30.6.4 Add for each addl floor for 10th floor and above sqm Tk. 62.00 1957
Item No. Description of Item Unit Unit Rate

30.7 140 mm thick load bearing wall with concrete hollow block having compressive strength of 13~18 N/mm , size 2

390 mm x 140 mm x 190 mm compliance with ASTM C90, thickness of individual Block shell should not be less
then 25 mm, water absorption not more than 7%, laying with mortar (with admixture) of cement, lime and sand
in a ratio of 1:1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with
connecting walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc all complete and accepted
by the Engineer-in-charge.

1958
30.7.1 Ground floor sqm Tk. 1,337.00 1959
30.7.2 Add for each additional. floor up to 5th floor sqm Tk. 42.00 1960
30.7.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 1961
30.7.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 1962
30.8 140 mm thick load bearing wall with concrete hollow block having compressive strength of 13~18 N/mm2, size
390 mm x140 mm x 190 mm, in compliance with ASTM C90, thickness of individual block shell should not be
less than 25 mm, water absorption not more than 7%, laying with mortar (with admixture) of cement and sand in
a ratio of 1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with connecting
walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by jute /brush in
wet, followed by impervious /wet covering for another 4 (four) days etc all complete and accepted by the
Engineer-in-charge. (Rate is excluding the cost of grouting and reinforcement)

1963
30.8.1 Ground floor sqm Tk. 1,307.00 1964
30.8.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 1965
30.8.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 1966
30.8.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 1967
30.9 190 mm thick load bearing wall with concrete hollow block having compressive strength of 4.14~5 N/mm2, size
390 mm x 190 mm x 190 mm, in compliance with ASTM C90, thickness of individual block shell should not be
less than 25 mm, water absorption not more than 7%, laying with mortar (with admixture) of cement, lime and
sand in a ratio of 1:1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with
connecting walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc all complete and accepted
by the Engineer-in-charge. (Rate is excluding the cost of grouting and reinforcement)

1968
30.9.1 Ground floor sqm Tk. 1,410.00 1969
30.9.2 Add for each additional floor up to 5th floor sqm Tk. 52.00 1970
30.9.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 62.00 1971
30.9.4 Add for each additional floor for 10th floor and above sqm Tk. 73.00 1972
30.10 190 mm thick load bearing wall with concrete hollow block having compressive strength of 13~18 N/mm2, size
390 mm x 190 mm x 190 mm, in compliance with ASTM C90, thickness of individual block shell should not be
less than 25 mm, water absorption not more than 7%, laying with mortar (with admixture) of cement and sand in
a ratio of 1:6 (sand not less than 1.2 F.M), filling the interstices with mortar and making bond with connecting
walls including necessary scaffolding and curing for minimun 3 (three) days on mortar joints by jute /brush in
wet, followed by impervious /wet covering for another 4 (four) days etc all complete and accepted by the
Engineer-in-charge. (Rate is excluding cost of grouting and reinforcement)

1973
30.10.1 Ground floor sqm Tk. 1,381.00 1974
30.10.2 Add for each additional floor up to 5th floor sqm Tk. 52.00 1975
30.10.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 62.00 1976
30.10.4 Add for each additional floor for 10th floor and above sqm Tk. 73.00 1977
30.11 100 mm thick partition wall with sand cement hollow block wall (SCHB) having compressive strength of
4.14~5N/mm2, size 400 mm x 200 mm x 100 mm, in compliance with ASTM C129, thickness of individual Block
shell should not be less than 20 mm, water absorption not more than 7%, lying with specified mortar (with
admixture) of cement, and sand in a ratio of 1:6 (sand not less than F.M = 1.2), filling the interstices with mortar
and making bond with connecting walls including necessary scaffolding and curing for minimun 14 days on
mortar joints by jute /brush in wet, followed by impervious /wet covering for another 7 days including cost of
water, electricity and other charges etc. in all complete accepted by the Engineer-in-charge.

1978
30.11.1 Ground Floor sqm Tk. 736.00 1979
30.11.2 Add for each additional floor up to 5th floor sqm Tk. 25.00 1980
30.11.3 Add for each additional floor up to 6th floor to 9th floor sqm Tk. 37.00 1981
30.11.4 Add for each additional floor for 10th floor and above sqm Tk. 45.00 1982
30.12 Supplying, carrying and placing of 600 mm x 200 mm x 150 mm concrete ceiling block on properly leveled
shutter accepted by the Engineer-in-charge. 1983
30.12.1 Ground floor each Tk. 104.00 1984
30.12.2 Add for each additional floor up to 5th floor each Tk. 4.00 1985
30.12.3 Add for each additional floor for 6th floor to 9th floor each Tk. 5.00 1986
30.12.4 Add for each additional floor for 10th floor and above each Tk. 6.00 1987
30.13 Supplying, carrying and placing of 600 mm x 200 mm x 200 mm concrete ceiling block on properly leveled
shutter accepted by the Engineer-in-charge. 1988
Item No. Description of Item Unit Unit Rate

30.13.1 Ground floor each Tk. 140.00 1989


30.13.2 Add for each additional floor up to 5th floor each Tk. 5.00 1990
30.13.3 Add for each additional floor for 6th floor to 9th floor each Tk. 9.00 1991
30.13.4 Add for each additional floor for 10th floor and above each Tk. 10.00 1992
30.14 Minimum 10 mm thick cement plaster in cement : sand =1:5 in outer surface of external wall with specified
external plaster mix applied in two coats (first coat 6/7 mm and second coat 4/3 mm), finishing the corner and
edge including washing of sand, cleaning the surface, scaffolding and curing for minimun 3 (three) days on
mortar joints by jute/brush in wet, followed by impervious/wet covering for another 4 (four) days etc. all complete
etc. all complete and accepted by the Engineer-in-charge. (Rate is excluding the cost of grouting and
reinforcement)

1993
30.14.1 Ground floor sqm Tk. 246.00 1994
30.14.2 Add for each additional floor up to 5th floor sqm Tk. 14.00 1995
30.14.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 21.00 1996
30.14.4 Add for each additional floor for 10th floor and above sqm Tk. 28.00 1997
30.15.1 Supplying and placing of approx. 60 mm thick grey uni-block paving for walk way having compressive strength sqm Tk. 1,074.00
of 15 N/mm2 on compacted sand bed of 50 mm on stabilized soil base, and filling all interstices with sand,
cleaning etc. accepted by the Engineer-in-charge.
1998
30.15.2 Supplying and placing of approx. 60 mm thick coloured uni-block for paving walk way having compressive sqm Tk. 1,276.00
strength of 15 N/mm2 on compacted sand bed of 50 mm on stabilized soil base, and filling all interstices with
sand, cleaning etc. accepted by the Engineer-in-charge.
1999
30.16.1 Supplying and placing of 60 mm thick grey uni-block for paving foot-path, major walk way, car porch having sqm Tk. 1,226.00
compressive strength of 49 N/mm2 on compacted sand bed of 50 mm on stabilized soil base, and filling all
interstices with sand, cleaning etc. accepted by the Engineer-in-charge.
2000
30.16.2 Supplying and placing of 60 mm thick coloured uni-block for paving foot-path, major walk way, car porch having sqm Tk. 1,377.00
compressive strength of 49 N/mm2 on compacted sand bed of 50 mm on stabilized soil base, and filling all
interstices with sand, cleaning etc. accepted by the Engineer-in-charge.
2001
30.17.1 Supplying and placing of 80 mm grey uni-block for paving heavy trafic areas, roads rounds abuts, industrial sqm Tk. 1,478.00
yards etc having compressive strength of 49 N/mm2 on compacted sand bed of 50 mm on stabilized soil base,
and filling all interstices with sand, cleaning etc. accepted by the Engineer-in-charge.
2002
30.17.2 Supplying and placing of 80 mm thick coloured uni-block for paving heavy trafic areas, road, industrial yard etc sqm Tk. 1,780.00
having compressive strength of 49 N/mm2 on compacted sand bed of 50 mm on stabilized soil base, and filling
all interstices with sand, cleaning etc. accepted by the Engineer-in-charge.
2003
30.18.1 Supplying and placing of grey 200 mm x 100 mm x 60 mm rectangular block having compressive strength of 15 sqm Tk. 1,258.00
N/mm2 on 50 mm thick compacted sand bed, and filling all interstices with sand, cleaning etc. accepted by the
Engineer-in-charge.
2004
30.18.2 Supplying and placing of coloured 200 mm x 100 mm x 60 mm rectangular block having compressive strength sqm Tk. 1,443.00
of 15 N/mm2 on 50 mm thick compacted sand bed, and filling all interstices with sand, cleaning etc. accepted by
the Engineer-in-charge.
2005
30.19.1 Supplying and placing of grey engraved cement concrete tiles (250 mm x 250 mm in size) having minimum
thickness of 24 mm over 12 mm sand cement mortar (4:1) each at a distance of 6 mm apart and filling the joints
with cement sand mortar (1:4) including raking out joints and cutting the tiles to required sizes wherever
necessary with high class recessed pointing, cleaning and washing of sand, curing for minimun 3 (three) days
on mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all
complete and accepted by the Engineer-in-charge.

2006
30.19.1.1 Ground floor sqm Tk. 1,084.00 2007
30.19.1.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2008
30.19.1.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2009
30.19.1.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2010
30.19.2 Supplying and placing of coloured engraved cement concrete tiles (250 mm x 250 mm in size) having minimum
thickness of 24 mm over 12 mm sand cement mortar (4:1) each at a distance of 6 mm apart and filling the joints
with cement sand mortar (1:4) including raking out joints and cutting the tiles to required sizes wherever
necessary with high class recessed pointing, cleaning and washing of sand, curing for min 3 (three) days on
mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all
complete and accepted by the Engineer-in-charge.

2011
30.19.2.1 Ground floor sqm Tk. 1,217.00 2012
30.19.2.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2013
30.19.2.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2014
30.19.2.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2015
30.20.1 225 mm thick wall with 215 mm x 100 mm x 65 mm concrete solid block having minimum compressive strength
of 21 N/mm2 with 6 mm thick cement sand mortar in 1:6 in superstructure including racking out the joints, filling
the interstices with mortar and making bond with connecting walls including necessary scaffolding and curing for
minimun 3 (three) days on mortar joint by jute/ brush in wet followed by impervious covering for another 4 (four)
days etc. all complete and accepted by the Engineer-in-charge.

2016
30.20.1.1 Ground floor sqm Tk. 2,700.00 2017
Item No. Description of Item Unit Unit Rate

30.20.1.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2018
30.20.1.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2019
30.20.1.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2020
30.20.2 112 mm thick wall with 215 mm x 100 mm x 65 mm concrete solid block having minimum compressive strength
of 21 N/mm2 with 6 mm thick cement sand mortar in 1:6 in superstructure including racking out the joints, filling
the interstices with mortar and making bond with connecting walls including necessary scaffolding and curing for
minimun 3 (three) days on mortar joint by jute/ brush in wet followed by impervious covering for another 4 (four)
days etc. all complete and accepted by the Engineer-in-charge.

2021
30.20.2.1 Ground floor sqm Tk. 1,385.00 2022
30.20.2.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2023
30.20.2.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2024
30.20.2.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2025
30.21 115 mm thick partition wall with Sand-Cement Solid Block Wall (SCSB) having compressive strength of 4.0–5.0
N/mm2 and of size 250 mm x 115 mm x 115 mm, in cement sand (F.M. 1.2) mortar (1:4) and making bond with
connected walls including necessary scaffolding, raking out, joints, cleaning, at least 24 hours before use and
washing of sand curing at least for 7 days in all floors including cost of water, electricity and other charges etc.
all complete and accepted by the Engineer-in-charge.

2026
30.21.1 Ground Floor sqm Tk. 658.00 2027
30.21.2 Add for each additional floor up to 5th floor sqm Tk. 32.00 2028
30.21.3 Add for each additional floor up to 6th floor to 9th floor sqm Tk. 40.00 2029
30.21.4 Add for each additional floor for 10th floor and above sqm Tk. 50.00 2030
30.22 115 mm thick partition wall with Thermal Block having compressive strength 4.0–5.0 N/mm2 and of size 300 mm
x 115 mm x 115 mm, in compliance with ASTM C129 fairly uniform thickness and texture and each side of
thermal block not be less than 12mm (1 part cement with 2 parts and having F.M.>2.0) thick, water absorption
not more than 7%, laying with 8-10mm thick mortar of cement and sand in ratio 1:4 (sand not less than 1.2
F.M), filling the interstices with mortar and making bond with connecting walls including scaffolding and curing
for minimum 3 (three) days on mortar joints by jute/brush, followed by impervious/wet covering for another 4
(four) days including cost of water, electricity and other charges all complete and accepted by the Engineer-in-
charge.

2031
30.22.1 Ground Floor sqm Tk. 993.00 2032
30.22.2 Add for each additional floor up to 5th floor sqm Tk. 18.00 2033
30.22.3 Add for each additional floor up to 6th floor to 9th floor sqm Tk. 24.00 2034
30.22.4 Add for each additional floor for 10th floor and above sqm Tk. 28.00 2035
30.23 100 mm thick partition wall with compressed stabilized earth block wall (CSEB) having compressive strength of
4.14~5 N/mm2 and of size 240 mm x 115 mm x 70 mm, in cement sand (F.M. 1.2) mortar (1:4) and making bond
with connected walls including necessary scaffolding, raking out, joints, cleaning, at least 24 hours before use
and washing of sand curing at least for 7 days in all floors including cost of water, electricity and other charges
etc. all complete and accepted by the Engineer-in-charge.

2036
30.23.1 Ground Floor sqm Tk. 756.00 2037
30.23.2 Add for each additional floor up to 5th floor sqm Tk. 30.00 2038
30.23.3 Add for each additional floor up to 6th floor to 9th floor sqm Tk. 39.00 2039
30.23.4 Add for each additional floor for 10th floor and above sqm Tk. 50.00 2040
30.24 100 mm thick soil-cement stabilization bed for sub-grade preparation of ground floor etc. with minimum cement sqm Tk. 444.00
content relates to mix ratio 1:6 having minimum compressive strength of 3.0 N/mm2 and cement conforming to
BDS EN-197-1-CEM-1, best quality fine sand (F.M. = 0.5), placing, compacting at least for 7 days in all floors
including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge.

2041
30.25 One layer of sand cement solid block 250 mm x 115 mm x 70 mm Soling in floor/foundation including sqm Tk. 410.00
preparation of bed and filling the interstices with fine sand (F.M. = 0.5), leveling etc. all complete and accepted
by the Engineer-in-charge. 2042
30.26.1 38 mm thick grey cladding work in facing on superstructure with 200 mm x 90 mm x 38 mm size concrete clad
pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same mortar,
raking out joints and cutting the clad to required sizes wherever necessary with high class recessed pointing,
cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted
by the Engineer-in-charge.

2043
30.26.1.1 Ground floor sqm Tk. 1,474.00 2044
30.26.1.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2045
30.26.1.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2046
30.26.1.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2047
30.26.2 38 mm thick coloured cladding work in facing on superstructure with 200 mm x 92 mm x 38 mm size concrete
clad pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same
mortar, raking out joints and cutting the clad to required sizes wherever necessary with high class recessed
pointing, cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar
joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and
accepted by the Engineer-in-charge.

2048
Item No. Description of Item Unit Unit Rate

30.26.2.1 Ground floor sqm Tk. 1,599.00 2049


30.26.2.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2050
30.26.2.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2051
30.26.2.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2052
30.26.3 50 mm thick grey cladding work in facing on superstructure with 400 mm x 100 mm x 50 mm size concrete clad
pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same mortar,
raking out joints and cutting the clad to required sizes wherever necessary with high class recessed pointing,
cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar joints by
jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and accepted
by the Engineer-in-charge.

2053
30.26.3.1 Ground floor sqm Tk. 1,121.00 2054
30.26.3.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2055
30.26.3.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2056
30.26.3.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2057
30.26.4 50 mm thick coloured cladding work in facing on superstructure with 400 mm x 100 mm x 50 mm size concrete
clad pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with same
mortar, raking out joints and cutting the clad to required sizes wherever necessary with high class recessed
pointing, cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on mortar
joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all complete and
accepted by the Engineer-in-charge.

2058
30.26.4.1 Ground floor sqm Tk. 1,259.00 2059
30.26.4.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2060
30.26.4.3 Add for each additional addl floor for 6th floor to 9th floor sqm Tk. 52.00 2061
30.26.4.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2062
30.26.5 15 mm thick grey/coloured cladding work in facing on superstructure with 420 mm x 330 mm x 15 mm size
concrete clad pested with 20 mm thick cement mortar (1:4) to be placed at 6 mm apart, filling the interstices with
same mortar, raking out joints and cutting the clad to required sizes wherever necessary with high class
recessed pointing, cleaning and washing of sand, necessary scaffolding, curing for minimum 3 (three) days on
mortar joints by jute /brush in wet, followed by impervious /wet covering for another 4 (four) days etc. all
complete and accepted by the Engineer-in-charge

2063
30.26.5.1 Ground floor sqm Tk. 805.00 2064
30.26.5.2 Add for each additional floor up to 5th floor sqm Tk. 42.00 2065
30.26.5.3 Add for each additional floor for 6th floor to 9th floor sqm Tk. 52.00 2066
30.26.5.4 Add for each additional floor for 10th floor and above sqm Tk. 62.00 2067
30.27.1 Supplying, carrying, placing, providing 418 mm x 330 mm x 17 mm size of red colour concrete roof tiles on pre- sqm Tk. 206.00
fixed and pre-fabricated truss and fixing each tile to the roof members of truss accepted by the Engineer-in-
charge. 2068
30.27.2 Supplying, carrying, placing, providing 418 mm x 330 mm x 17 mm size of oriental colour concrete roof tiles on sqm Tk. 74.00
pre-fixed and pre-fabricated truss and fixing each tile to the roof members of truss accepted by the Engineer-in-
charge. 2069
30.27.3 Supplying, carrying, placing, providing 418 mm x 330 mm x 17 mm size of antique red colour concrete roof tiles sqm Tk. 80.00
on pre-fixed and pre-fabricated truss and fixing each tile to the roof members of truss accepted by the Engineer-
in-charge. 2070
30.27.4 Supplying, carrying, placing, providing 418 mm x 330 mm x 17 mm size of green colour concrete roof tiles on sqm Tk. 85.00
pre-fixed and pre-fabricated truss and fixing each tile to the roof members of truss accepted by the Engineer-in-
charge. 2071
30.28 Supplying, carrying, placing, providing of concrete Kerb stone size 600 mm x 300 mm x 100 mm approved and sqm Tk. 238.00
accepted by the Engineer-in-charge. 2072
2073
2074
2075
………………….. END OF DIVISION THIRTY ………………….. 2076
DIVISION 31 : SUB-SOIL INVESTIGATION WORKS 2077
Item No. Description of Item Unit Unit Rate 2078
2079
31.1 Mobilization and demobilization of boring equipment and man-power: at site (drilling rig comprising drilling pipe, per site Tk. 11,693.00
drop hammer, tripod, pulley, chain, wrange, sample collection devices etc tools and plants; tripol for temporary
camp, necessary work-force etc) (Once for one site)
2080
31.2 Sub - Soil investigation by 100 mm dia wash boring and / or by CPT, DCP etc. including collecting disturbed and
undisturbed soil samples in numbers as required for classification of soil, conducting SPT, stratification of
layers, analysing physical parameters of soils like Atterberg limits, specific gravity, gain size distribution(by wet
seive, hydrometer if required) , ground water table location, direct shear test, unconfined compression test, unit
weight(dry/weight), natural moisture content ; C - ф values and other strength parameters to ascertain bearing
capacity , skin friction, end bearings etc at every 1.5m intervel as per respective national/international
standards and entering all these data & information in necessary tables & graphs and finally furnishing them in
the form of standard sub-soil investigation report duly signed by competent engineer & exploratory office.

2081
Item No. Description of Item Unit Unit Rate

31.2.1 Bore hole depth from 0 to 20 m per bore Tk. 26,528.00


hole 2082
31.2.2 Additional charge for bore hole depth above 20.0 m and upto 30.0 m meter Tk. 389.00 2083
31.2.3 Additional charge for bore hole depth above 30.0 m and upto 40.0 m meter Tk. 424.00 2084
31.2.4 Additional charge for bore hole depth above 40.0 m and upto 50.0 m meter Tk. 448.00 2085
31.3 Sub-soil investigation by 100 mm dia wash boring and/ or by CPT, DCP etc.including collecting disturbed and
undisturbed soil samples in numbers as required for classification of soil, conducting SPT, stratification of
layers, and entering all these data & information in necessary tables & graphs , furnishing them in the form of
standard sub-soil investigation report duly signed by competent engineer & exploratory office.(Only after written
advice from concerned design division/circle)

2086
31.3.1 Bore hole depth from 0 to 20m per bore Tk. 7,644.00
hole 2087
31.3.2 Additional charge for bore hole depth above 20.0 m and upto 30.0 m meter Tk. 216.00 2088
31.3.3 Additional charge for bore hole depth above 30.0 m and upto 40.0 m meter Tk. 239.00 2089
31.3.4 Additional charge for bore hole depth above 40.0 m and upto 50.0 m meter Tk. 255.00 2090
31.4 Extra cost per bore hole, if the same is under water by more than 1.5 m in depth per bore Tk. 5,089.00
hole 2091
31.5 Carrying out different tests on soil samples in BUET laboratory collected from the sub-soil investigation site
accepted by the Engineer-in-Charge. (Only after written advice from concern design division/circle)
2092
31.5.1 Void ratio per set of Tk. 3,600.00
test 2093
31.5.2 Organic matter content per set of Tk. 3,300.00
test 2094
31.5.3 Permeability for cohesive soil per set of Tk. 24,000.00
test 2095
31.5.4 Permeability non-cohesive soil per set of Tk. 9,500.00
test 2096
31.5.5 Consolidation test for cohesive soil per set of Tk. 22,000.00
test 2097
31.5.6 Triaxial shear Test 2098
31.5.6.1 Consolidated undrained triaxial test with pore pressure for cohesive and non co-hesive soil per set of Tk. 52,000.00
test 2099
31.5.6.2 Consolidated undrained triaxial test without pore pressure for cohesive soil per set of Tk. 46,000.00
test 2100
31.5.6.3 Consolidated drained triaxial test per set of Tk. 52,000.00
test 2101
31.5.6.4 Unconsolidated undrained triaxial test without pore pressure per set of Tk. 24,000.00
test 2102
31.5.7 One dimensional swelling / settlement potential of cohesive soil. per set of Tk. 10,000.00
test 2103
31.5.8 Modified proctor compaction test per set of Tk. 1,6500.00
test 2104
31.6 Conducting plate load test as per ASTM D1194 or equivalent standard providing required arrangement of three per test Tk. 90,592.00
circular steel plates with minimum thickness of 25 mm and varying in diameter from 305 mm to 762 mm
respectively or square steel bearing plates of equivalent area for minimum 50 tons loading capacity of hydraulic
or mechanical jack assembly and applying load in 2 cycles with maintainging time interval of each loading
increment of not less than 15 minutes. Continue each test until a peak load is reached or until the ratio of load
increment to settlement increment reaches a minimum, steady magnitude. If sufficient load is available,
continue the test until the total settlement reaches at least 10 percent of the plate diameter, unless a well
defined failure load is observed and all other required materials, excavation, protection against collapse,
preparation of test pit, calibration of hydrauic jacks with pressure guage (with an error not exceeding ± 2 % of
the load increment used ) & dial gauges (an accuracy of at least 0.25 mm.) including plants and equipment,
platform for loading & unloading, mobilization, demobilization, hire charge of load testing equipment (joist, jacks
and other necessary devices), gunny bags, filling with sand & stiching gunny bags, execution of tests by
engineer, data acquisition and preparation of test results in standard forms and other incidental charges as per
standard practice and procedures including submission of plate load test report, furnishing all graphs and charts
etc. all complete and accepted by the Engineer-in-charge. At least 03 no of tests must be conducted at one site.
(Only after written advice from concern design division/circle)

2105
31.6.1 Per test rate for conducting additional plate load test at the same site after first 03(Three) tests. per test Tk. 20,543.00 2106
31.6.2 Additional charge per km (beyond 25 Km) outside Dhaka city (two ways)/any city for mobilization & demobilization per km Tk. 192.00
2107
2108
2109
2110
………………….. END OF DIVISION THIRTY ONE………………….. 2111
DIVISION 32: REPAIR WORKS
2112
Item No. Description of items Unit Unit rate
2113
32.1 Stripping of unserviceable plaster including racking out joints, cleaning etc. sqm Tk. 25.00 2114
32.2.1 Picking-up of unserviceable patent stone from floor and dado etc. and removal of debris to a safe distance. sqm Tk. 39.00
2115
Item No. Description of Item Unit Unit Rate

32.2.2 Picking-up of unserviceable tiles including bonding mortar from floor, walls and dado etc. and removal of debris sqm Tk. 51.00
to a safe distance. 2116
32.3 Picking up of damaged/unserviceable terraced (lime concrete) floor or roof etc. and removal of debris to a safe sqm Tk. 53.00
distance. 2117
32.4 Dismantling of unserviceable/damaged terraced roof including beam, column, borga & tiles etc. and removal of sqm Tk. 138.00
debris to a safe distance. 2118
32.5.1.1 Dismantling of unserviceable/damaged brick works (with cement or lime mortar) of thickness 250 mm in cum Tk. 434.00
foundation and superstructure and removal of debris to a safe distance. 2119
32.5.1.2 Dismantling of unserviceable/damaged brick works (with cement or lime mortar) of thickness 75/125 mm in sqm Tk. 53.00
foundation and superstructure and removal of debris to a safe distance. 2120
32.5.2 Dismantling of plain concrete made of lime or cement and removal of debris to a safe distance. cum Tk. 1,325.00
2121
32.5.3 Dismantling of brick flat soling and removal of debris to a safe distance and removal of debris to a safe distance. sqm Tk. 15.00
2122
32.5.4 Dismantling of H.B.B. Brick soling and removal of debris to a safe distance and removal of debris to a safe sqm Tk. 21.00
distance. 2123
32.6.1.1 Dismantling of R.C.C. beam, lintel, column, drop wall, sun shade from any height and removal of debris to a cum Tk. 3,347.00
safe distance. 2124
32.6.1.2 Dismantling of R.C.C. Railing of any kind, jally brickwork, and hollow block wall from any height and removal of sqm Tk. 183.00
debris to a safe distance. 2125
32.6.2 Dismantling of R.C.C. in roof slab and removal of debris to a safe distance. cum Tk. 2,790.00 2126
32.6.3 Recovery of reinforcing bars and metals during dismantling of RCC including cleaning, making bundle, stacking quintal Tk. 442.00
or storing as per direction of engineer in charge and removal of debris to a safe distance.
2127
32.6.4 Recovery of bricks during dismantling of brick works including cleaning, stacking or storing etc. all complete as % 0 nos Tk. 1,275.00
per direction of engineer in charge and removal of debris to a safe distance.
2128
32.6.5 Recovery of bricks during dismantling of soling including cleaning, stacking or storing all complete as per % 0 nos Tk. 811.00
direction of engineer in charge and removal of debris to a safe distance. 2129
32.6.6 Recovery of brick bats during dismantling of soling, brick works, HBB etc. including cleaning, stacking or storing cum Tk. 213.00
as per direction of engineer in charge and removal of debris to a safe distance.
2130
32.7 Repairs to minor/fine (non-structural affecting aesthetic) cracks in brick walls, floor and roof etc. meter Tk. 34.00
2131
32.8.1 Cutting and polishing of old mosaic on wall with pumice stone etc. sqm Tk. 87.00 2132
32.8.2 Cutting and polishing of old mosaic on floor with pumice stone and mosaic cutting machine etc. sqm Tk. 79.00
2133
32.8.3 Cleaning and washing the mosaic floor etc. sqm Tk. 17.00 2134
32.8.4 Cleaning and refilling of wornout joints between glazed tiles, marble etc. in floor or walls. sqm Tk. 64.00 2135
32.9 Repairing of terraced roof cracks by cutting in 'traphozoided' shape meter Tk. 452.00 2136
32.10 Taking out and relaying of old brick soling including replacement of 10% brick sqm Tk. 106.00 2137
32.11 Taking out and relaying of brick soling after redressing the surfaces sqm Tk. 68.00 2138
32.12.1 Taking out of old brick on edge pavement and resetting (Herring bone bond) including replacement of 10% brick sqm Tk. 170.00
2139
31.12.2 Taking out of old brick on edge pavement and restting Herring bone bond and redressing the surface sqm Tk. 96.00
2140
32.13 Taking out of old roof tiles and ridges sqm Tk. 59.00 2141
32.14 Supplying and fitting-fixing of wind tie with M.S. Flat bar clamp meter Tk. 459.00 2142
32.15 Supplying and fitting-fixing of J-hook including nuts, washers each Tk. 40.00 2143
32.16 Supplying and fitting-fixing of M.S. U-hook including nuts, washers each Tk. 60.00 2144
32.17 Taking out of old & unserviceable wooden chowkat /door or window frame each Tk. 274.00 2145
32.18 Taking out of old wooden chowkat/door or window frame and refitting and refixing after minor repair (excluding each Tk. 857.00
the cost of wood and M.S. clamp) 2146
32.19 Taking out and refitting of wooden shutter after easing excluding the cost of wood sqm Tk. 408.00 2147
32.20.1 Thorough repairs to wooden door and window Pannel shutter excluding the cost of wood sqm Tk. 669.00 2148
32.20.2 Thorough repairs to wooden door and window Batten shutter excluding the cost of wood sqm Tk. 620.00 2149
32.20.3 Thorough repairs to wooden door and window Venetian shutter excluding the cost of wood sqm Tk. 602.00 2150
32.20.4 Thorough repairs to wooden door and window Glazed shutter excluding the cost of glass & wood sqm Tk. 535.00
2151
32.21.1 Renewing of 3 mm glass panes in wooden frame including supply of glass sqm Tk. 869.00 2152
32.21.2 Renewing of 3 mm glass panes in steel frame including supply of glass sqm Tk. 989.00 2153
32.22 Renewing of 5 mm glass panes including supply of glass sqm Tk. 1,101.00 2154
32.23 Cleaning and washing of glass panes including supply of necessary fresh putty, pins etc. per pane Tk. 3.00 2155
32.24.1 Replacing / renewing of fly proof wire net (with all new materials) the excluding cost of wood sqm Tk. 659.00 2156
32.24.2 Replacing / renewing of synthetic fly proof net (with all new materials) the excluding cost of wood sqm Tk. 713.00
2157
32.25 Renewing of fly proof wire netting (with old and new materials) the excluding cost of wood sqm Tk. 630.00 2158
32.26 Renewing of 12 x 12 mm mesh wire netting the excluding cost of wood sqm Tk. 540.00 2159
32.27 Taking out of hard board ceiling, walling sqm Tk. 18.00 2160
32.28 Renewing of hard board ceiling or walling excluding cost of wood sqm Tk. 576.00 2161
32.29 Replacing of wooden cleat, making, finishing and fixing with chowkat by means of 40 mm hinge each Tk. 75.00
2162
Item No. Description of Item Unit Unit Rate

32.30 Replacing of cleat with brass hinge each Tk. 79.00 2163
32.31 Replacing of wooden buffer block each Tk. 55.00 2164
32.32 Replacig of wooden catcher block each Tk. 81.00 2165
32.33.1 Replacing of 75 mm long galvanized iron catch hook each Tk. 14.00 2166
32.33.2 Replacing of 100 mm long galvanized iron catch hook each Tk. 16.00 2167
32.33.3 Replacing of 150 mm long galvanized iron catch hook each Tk. 19.00 2168
32.33.4 Replacing of 200 mm long galvanized iron catch hook each Tk. 21.00 2169
32.33.5 Replacing of 225 mm long galvanized iron catch hook each Tk. 27.00 2170
32.34 Replacing of iron socket bolt : 50 mm dia, 100 mm long each Tk. 26.00 2171
32.35.1 Replacing of iron socket bolt : 50 mm dia, 100 mm long (SS) each Tk. 58.00 2172
32.35.2 Replacing of iron socket bolt : 50 mm dia, 150 mm long each Tk. 31.00 2173
32.35.3 Replacing of iron socket bolt : 50 mm dia, 150 mm long(SS) each Tk. 84.00 2174
32.35.4 Replacing of iron socket bolt : 50 mm dia, 200 mm long each Tk. 45.00 2175
32.35.5 Replacing of iron socket bolt : 50 mm dia, 200 mm long(SS) each Tk. 106.00 2176
32.36.1 Replacing of brass socket bolt: 50 mm dia, 150 mm long each Tk. 153.00 2177
32.36.2 Replacing of brass socket bolt : 50 mm dia, 200 mm long each Tk. 192.00 2178
32.36.3 Replacing of brass socket bolt : 50 mm dia, 250 mm long each Tk. 246.00 2179
32.37.1 Replacing of 75 mm long iron hinge each Tk. 46.00 2180
32.37.2 Replacing of 100 mm long iron hinge each Tk. 78.00 2181
32.38.1 Replacing of 75 mm long brass hinge each Tk. 153.00 2182
32.38.2 Replacing of 100 mm long brass hinge each Tk. 204.00 2183
32.39.1 Replacing of 50 mm dia iron ring each Tk. 29.00 2184
32.39.2 Replacing of 75 mm dia brass ring each Tk. 60.00 2185
32.40.1 Supplying, fitting and fixing of 25 x 25 mm expanded mesh metal net of wooden or steel frame (excluding the sqm Tk. 917.00
cost of wood or steel sections and painting) 2186
32.40.2 Supplying, fitting and fixing of 25 x 25 mm expanded mesh metal net in F.I. Bar frame ( including the cost of F.I. sqm Tk. 1,687.00
Bar) 2187
32.41.1 Renewing of white washing: 1 coat sqm Tk. 12.00 2188
32.41.2 Renewing of white washing: 2 coats sqm Tk. 18.00 2189
32.42.1 Renewing of colour washing with yellow ochre: 1 coat sqm Tk. 19.00 2190
32.42.2 Renewing of colour washing with yellow ochre: 2 coats sqm Tk. 21.00 2191
32.43.1 Renewing of Exterior standard acrylic emulsion paint of approved brand and quality sqm Tk. 132.00 2192
32.43.2 Renewing of Exterior premium acrylic emulsion paint of approved brand and quality sqm Tk. 146.00 2193
32.44.1 Renewing of standard synthetic enamel paint to door-windows frame and shutter:1coats sqm Tk. 96.00 2194
32.44.2 Renewing of premium synthetic enamel paint to door-windows frame and shutter: 1coats sqm Tk. 100.00 2195
32.45.1 Renewing of standard synthetic enamel paint to door-windows frame and shutter: 2 coat sqm Tk. 148.00 2196
32.45.2 Renewing of premium synthetic enamel paint to door-windows frame and shutter: 2coat sqm Tk. 154.00 2197
32.46.1 Renewing of synthetic polyvinyl distemper : 1 coats sqm Tk. 82.00 2198
32.46.2 Renewing of synthetic polyvinyl distemper : 2 coat sqm Tk. 115.00 2199
32.47.1 Renewing of Interior standard acrylic emulsion paint (Plastic) to walls and ceiling: 1 coat sqm Tk. 92.00 2200
32.47.2 Renewing of Interior Premium acrylic emulsion painting (silky finish)to walls and ceiling: 1 coat sqm Tk. 108.00 2201
32.47.3 Renewing of Interior super premium acrylic emulsion painting (odorless) to walls and ceiling: 1 coat sqm Tk. 117.00
2202
32.48.1 Renewing of Interior standard acrylic emulsion paint (Plastic) to walls and ceiling: 2 coat sqm Tk. 130.00 2203
32.48.2 Renewing of Interior Premium acrylic emulsion painting (silky finish)to walls and ceiling: 2 coat sqm Tk. 152.00 2204
32.48.3 Renewing of Interior super premium acrylic emulsion painting (odorless) to walls and ceiling 2 coat sqm Tk. 165.00
2205
32.49 Washing of painted wall surface with suitable soap or any other detergent sqm Tk. 30.00 2206
32.50.1 Renewing of chlorinated rubber paint: 1 coats sqm Tk. 166.00 2207
32.50.2 Renewing of chlorinated rubber paint: 2 coat sqm Tk. 221.00 2208
32.51.1 Renewing of french polishing: 1 coats sqm Tk. 117.00 2209
32.51.2 Renewing of french polishing: 2 coat sqm Tk. 183.00 2210
32.51.3 Providing of 2 coats laqure spray painting with spray machine to high decorative Teak or similar wooden furniture sqm Tk. 147.00
2211
32.52.1 Renewing of painting with synthetic black enamel Paint to plinth and skirting :1 coats sqm Tk. 103.00 2212
32.52.2 Renewing of painting with synthetic black enamel Paint to plinth and skirting :2 coat sqm Tk. 144.00 2213
32.53 Renewing of painting to C.I. Roof with red corrugal paint: 2 coats sqm Tk. 142.00 2214
32.54.1 Renewing earth oiling with solignum or equivalent materials: 1 coat sqm Tk. 80.00 2215
32.54.2 Renewing earth oiling with solignum or equivalent materials: 2 coat sqm Tk. 119.00 2216
32.55.1 Renewing of wood varnishing with varnish (yacht) sqm Tk. 103.00 2217
32.55.2 Renewing of wood varnishing with varnish (egg-shell) sqm Tk. 103.00 2218
32.55.3 Renewing of wood varnishing with varnish (matt) sqm Tk. 103.00 2219
32.56 Scrapping of old paint from wood sqm Tk. 39.00 2220
32.57 Scrapping of old mosses from wall and roof sqm Tk. 28.00 2221
Item No. Description of Item Unit Unit Rate

32.58 Renewing of painting to old 100 mm dia rain-water pipe meter Tk. 31.00 2222
32.59 Renewing of painting to old 50mm dia G.I. Pipe: 1 coat meter Tk. 16.00 2223
32.60 Stopping of roof leakage of C.I. sheet roof with putty sqm Tk. 26.00 2224
32.61 Labour for taking out C.I. sheet roofing sqm Tk. 32.00 2225
32.62 Labour for taking out and refitting of old G.I. Ridge/valley meter Tk. 128.00 2226
32.63 Labour for C.I. Sheet roofing including supply of limpet, washer, screws, putty etc. sqm Tk. 103.00 2227
32.64 Labour for C.I. Sheet walling including supply of limpet, washer, screws, putty etc. sqm Tk. 77.00 2228
32.65 Labour for taking out barbed wire fencing meter Tk. 7.00 2229
32.66 Labour charge for refitting of barbed wire fencing meter Tk. 16.00 2230
32.67 Labour charge for tightening of old loose barbed wire fencing meter Tk. 2.00 2231
32.68 Renewing, supplying and fitting-fixing of 300 mm long F.I. Clamp in CC (1:2:4) each Tk. 96.00 2232
32.69 Renewing, supplying and fitting-fixing of 150 mm long F.I. Clamp in CC (1:2:4) each Tk. 63.00 2233
32.70 Cutting jungles and shrub including removing and cleaning the spot/site sqm Tk. 6.00 2234
32.71 Supplying of the following items related to ARBORICULTURE work approved by the officer-in-charge
2235
32.71.1 200mm size earthen tub each Tk. 39.00 2236
32.71.2 250mm size earthen tub each Tk. 48.00 2237
32.71.3 300mm size earthen tub each Tk. 68.00 2238
32.71.4 350mm size earthen tub each Tk. 99.00 2239
32.71.5 400mm size earthen tub each Tk. 175.00 2240
32.71.6 300 mm x 300 mm size earthen plate each Tk. 29.00 2241
32.71.7 Supply of mustard oil-cake kg Tk. 48.00 2242
32.71.8 Supply of Bone mele kg Tk. 48.00 2243
32.71.9 Supply of steel spade each Tk. 543.00 2244
32.71.10 Supply of Urea fertilizer kg Tk. 24.00 2245
32.71.11 Supply of Murate of potash kg Tk. 24.00 2246
32.71.12 Supply of T. S. P. kg Tk. 36.00 2247
32.71.13 Supply of 5 liter capacity spray machine (plaotic) each Tk. 2,173.00 2248
32.71.14 Supply of 450 mm size Steel funna with wooden handle each Tk. 423.00 2249
32.71.15 Supply of 225 mm long hand hoe with wooden handle each Tk. 109.00 2250
32.71.16 Supply of standard steel hand trolly as per direction of officer-in-charge each Tk. 7,245.00 2251
32.71.17 Supply of China made or equivalent Hedge Scissors each Tk. 1,449.00 2252
32.71.18 Supply of 250 mm size China made or equivalent Secature each Tk. 785.00 2253
32.71.19 Supply of 2.5 gallon capacity 22 BWG G.I. Water cane each Tk. 423.00 2254
32.71.20 Supply of 350 mm size G.I. bucket each Tk. 302.00 2255
32.71.21 Supply of best quality 19 mm dia plastic hose pipe each Tk. 22.00 2256
32.71.22 Supply of insecide perfecthion 40 EC 1 pics, 100ml bottle each Tk. 278.00 2257
32.71.23 Supply of Redomil gold 68WG (metalexil+mencojeb) 1 pack, 500gm pack each Tk. 869.00 2258
32.71.24 Supply of Ripcord 400EC, 1 pics, 100ml bottle each Tk. 241.00 2259
32.71.25 Supply of Proclaim 5SG(emamectin benzoet) 1 box, (10 pack, each pack 10gm) each Tk. 724.00 2260
32.71.26 Supply of Vertimec 018ECG (ebamectin) 1 pics, 50ml bottle each Tk. 145.00 2261
32.72 Painting to earthen tub: 2 coats over a prime coat 2262
32.72.1 200mm and 250mm size tub each Tk. 16.00 2263
32.72.2 300 mm, 350mm and 400 mm size tub each Tk. 27.00 2264
32.73.1 Levelling & dressing the compound or plant/flower bed as per direction of Engineer-in-charge. sqm Tk. 7.00 2265
32.73.2 Lawn grass cutting, dressing, brooming and removing debris etc. as per direction of Officer in charge sqm Tk. 15.00
2266
32.73.3 Spading, pulverizing soil lump etc. as per direction of Officer in charge sqm Tk. 5.00 2267
32.74.1 Labour for picking-up and cleaning damaged bituminous road surface sqm Tk. 67.00 2268
32.74.2 Repairing the potholes of the road by picking up and removing damaged materials with stone chips cum Tk. 24,489.00
2269
31.75 Applying necessary coat of bitumenous aluminium paint seal-coat on top surface of newly laid roofing felt sqm Tk. 89.00
2270
32.76.1 Supplying timber (unfinished) for repairing in wood works: Garjan/Jam/local Sal cum Tk. 85,282.00 2271
32.76.2 Supplying timber (unfinished) for repairing in wood works: Jarul cum Tk. 76,754.00 2272
32.76.3 Supplying timber (unfinished) for repairing in wood works: Shilkorai/Chickrashi cum Tk. 106,176.00 2273
32.76.4 Supplying timber (unfinished) for repairing in wood works: Teak Chambal cum Tk. 144,979.00 2274
32.76.5 Supplying timber (unfinished) for repairing in wood works: Chittagong Teak cum Tk. 187,194.00 2275
32.76.6 Supplying timber (unfinished) for repairing in wood works: Kathal cum Tk. 95,942.00 2276
32.76.7 Supplying timber (unfinished) for repairing in wood works: Gamari cum Tk. 72,490.00 2277
32.76.8 Supplying timber (unfinished) for repairing in wood works: Chapalish cum Tk. 101,912.00 2278
32.76.9 Supplying timber (unfinished) for repairing in wood works: Loha/Pyiankado cum Tk. 110,867.00 2279
32.76.10 Supplying timber (unfinished) for repairing in wood works: Burma teak cum Tk. 277,166.00 2280
Item No. Description of Item Unit Unit Rate

32.76.11 Supplying timber (unfinished) for repairing in wood works: Ordinary timber (Mehogoni) cum Tk. 76,754.00 2281
32.77 Labour charge for cleaning, washing, brooming from all heights and stacking of debris at a place beyond plinth cum Tk. 1,256.00
area of the the site during execution of repair works as per direction of the engineer-in-charge
2282
32.78 Cleaning, washing, brooming and taking away of debris from the site during and or after the completion of the cum Tk. 716.00
repair works in all heights by truck or by any other means as per direction of the engineer-in-charge
2283
32.79 Repairing of steel grill/window frame and shutter/stair railing, veranda grill, rolling shutter excluding the cost of sqm Tk. 739.00
steel materials. 2284
32.80 Supply of steel materials for repairing work: 2285
32.80.1 40-grade deform bar kg Tk. 70.00 2286
32.80.2 60-grade deform bar kg Tk. 73.00 2287
32.80.3 M.S. angle, T, and Z - section, Channel etc. kg Tk. 66.00 2288
32.80.4 M.S. plain bar, F.I. Bar kg Tk. 66.00 2289
32.80.5 M.S. sheet, plate used in repairing work kg Tk. 73.00 2290
32.80.6 38mm dia G.I. Pipe used in repairing work meter Tk. 586.00 2291
32.80.7 25mm dia G.I. Pipe used in repairing work meter Tk. 297.00 2292
32.80.8 20 mm dia G.I. Pipe used in repairing work meter Tk. 277.00 2293
32.80.9 12mm dia G.I. Pipe used in repairing work meter Tk. 206.00 2294
32.80.10 Spring for rolling shutter used in repairing work meter Tk. 59.00 2295
32.80.11 Spring box for rolling shutter used in repairing work each Tk. 145.00 2296
32.81 Cleaning and mending good the damages surrounding the mouth of spout/rain water down pipe each Tk. 146.00
2297
32.82 Cleaning rain water down pipe meter Tk. 5.00 2298
32.83 Cleaning, renewing of drain and apron with cement concrete or cement mortar etc as per direction of Engineer- meter Tk. 193.00
in-charge. 2299
32.84.1 Reexcavation of kutcha drain of 0.30 m width and average 0.6 m deep meter Tk. 18.00 2300
32.84.2 Reexcavation of kutcha drain of 0.61 m width and average 1.22 m deep meter Tk. 68.00 2301
32.85 Clearing chocked up masonry surface drain meter Tk. 28.00 2302
32.86 Clearing silt from soak well up to1.4 m dia each Tk. 2,009.00 2303
32.87 Clearing sludges & night soil from septic tank removing to a safe place/distance without affecting environment
2304
32.87.1 10 usser septic tank each Tk. 1,956.00 2305
32.87.2 20 user septic tank each Tk. 2,922.00 2306
32.87.3 30 user septic tank each Tk. 3,405.00 2307
32.87.4 50 user septic tank each Tk. 5,458.00 2308
32.87.5 100 user septic tank each Tk. 9,563.00 2309
32.87.6 200 user septic tank each Tk. 16,808.00 2310
32.87.7 Clearing sewege or similar hazardous substances & removing to a safe place/ distances cum Tk. 1,461.00 2311
32.88 Clearing sludges & night soil from Inspection pit each Tk. 502.00 2312
32.89 Clearing sludges & night soil from RCC soil pipe & sewer line meter Tk. 103.00 2313
32.90 Supplying, fitting-fixing of 400 gallon capacity ferro-cement water tank each Tk. 8,235.00 2314
32.91 Taking out 40 mm dia tube-well pipe and strainer up to 70 m depth meter Tk. 102.00 2315
32.92 Labour for re-sinking 40 mm dia tube-well pipe meter Tk. 273.00 2316
32.93 Renewing Check Valve each Tk. 881.00 2317
32.94 Renewing of 40 mm dia best quality G.I. Socket each Tk. 223.00 2318
32.95 Taking out broken Long Pan each Tk. 196.00 2319
32.96 Taking out broken European type Commode each Tk. 176.00 2320
32.97 Providing 37 mm dia and 600 mm long PVC spout each Tk. 228.00 2321
32.98 Providing 25 mm dia and 450 mm long PVC spout each Tk. 214.00 2322
32.99 Supplying and fitting-fixing of plastic low-down including necessary internal and external fittings each Tk. 1,541.00 2323
32.100 Supplying and fitting fixing of syphone for plastic low-down each Tk. 674.00 2324
32.101 250mm and above thick brick work (1:6) in old/unserviceable septic tank cum Tk. 6,743.00 2325
32.102 125mm thick brick work (1:6) in old/unserviceable septic tank sqm Tk. 1,069.00 2326
32.103 12 mm plaster (1:4) with neat cement finishing in old/dilapitated septic tank sqm Tk. 391.00 2327
32.104 Hire charge of welding set including welder cum fabricator and helper per day Tk. 1,397.00 2328
32.105 Hire charge of suspended scaffolding (gondula) made of rope per day Tk. 382.00 2329
32.106 Per day rate for Aluminium fabricator (labour rate) per day Tk. 1,207.00 2330
32.107 Supply of essential hard wares and consumables for repairing aluminium door-widow frame and shutter,
partition etc. 2331
32.107.1 Swing door clouser each Tk. 3,260.00 2332
32.107.2 Swing door lock each Tk. 755.00 2333
32.107.3 Swing door Mohiar meter Tk. 20.00 2334
32.107.4 Fixed Neoprene meter Tk. 10.00 2335
32.107.5 Flush bolt each Tk. 386.00 2336
Item No. Description of Item Unit Unit Rate

32.107.6 Sliding door /window key lock each Tk. 241.00 2337
32.107.7 Sliding door /window wheel each Tk. 85.00 2338
32.107.8 Sliding door /window Mohiar meter Tk. 5.00 2339
32.107.9 Sliding Neoprene meter Tk. 11.00 2340
32.107.10 Sealant gm Tk. 4.00 2341
32.107.11 Sliding door key lock (for window) each Tk. 97.00 2342
32.107.12 4-bar hinge each Tk. 845.00 2343
32.107.13 Casement handle each Tk. 314.00 2344
32.107.14 Rivet for Aluminium work each Tk. 6.00 2345
32.107.15 Screws for Aluminium work each Tk. 1.50 2346
2347

………………….. END OF DIVISION THIRTY TWO …………………..


Name of Works:-Construction of 3 Storied Building with 4 storied Foundation Sreepur UPZilla Model M
Islamic Cultural center for Islamic Foundation Bangladesh under PWD Division Gazipur, Type-B (FY-

Part-A Civil Work


Sl No CE's Item
Description of Item
No
1 01.1 Erection and maintenance of site office and removal of the same after completion of work in
accordance with the conditions of contract. In addition to the office required for his own use, the
contractor shall provide and maintain furnished field office for the use of the Engineer-in-charge and
his staff. The field office is to have a concrete floor, adequate foundation, brick walls, false ceiling of
hard board with seasoned Garjan wood frame and painted, and all windows are to be glazed and
provided with steel grill. Outside and inside wall surface are to be painted on plaster acceptable to
the Engineer-in-charge. The field office shall be maintained in a secure and watertight condition by
the contractor until the completion of the contract and shall be provided with electricity, running
water and sewerage. All doors shall be fitted with approved locks and windows shall be provided
with screen/blinds. Before construction the contractor shall submit plans and drawings showing
proposed details and location for the field office, including foundations, access roads, shades, layout
of electrical and water supply and hard standings thereto for the approval of the Engineer-in-charge.
The Engineer-in-charge may require revision of the plans prior to giving approval for construction.
The contractor shall also submit details proposed furniture, fittings and other items of equipment and
plant to the Engineer-in-charge for approval. These items shall be of the standard quality suitable for
site. The office, complete with furnishings, fittings, access roads and hard standings shall be ready
for occupation by the Engineer-in-charge within 28 days of the date when the contractor first
occupies the site. The contractor will provide day and night guards and a tea boy for the field office.
At the end of the project all materials, equipment and plant, furniture, fittings recovered from
dismantling the office and removing access road will be the property of the contractor. No interim
payment shall be certified unless engineer’s office with required facilities are constructed and
accepted by the Engineer-in-charge.
(This is a time related item; proportionate payment for this item shall be made distributing in each
bill on the basis of percentage progress of the whole works under contract)

01.1.1 Engineer’s site office of minimum 15 sqm plinth area with providing furniture, first aid-box, safety
helmet, level / theodolite, consumables, stationeries etc.
1.000 nos
2 (a) 01.2.1 Providing 3 sets as-built drawings subject to Engineer’s approval produced in AutoCAD software in
584.5 mm x 413.5 mm (A-2 size) standard drawing paper, and operating and maintenance manual of
the equipment and plant incorporated in the works, if any, in original by the date stated in the
particular conditions of contract (PCC). If the contractor does not supply the as-built drawings and
operating and maintenance manuals by the date stated in the particular conditions of contract (PCC),
or they do not receive the Engineer-in-charge’s approval, the Engineer-in-charge shall withhold the
amount stated in the PCC from the payments due to the contractor.
The as-built drawings must show the permanent works as actually constructed and reflect the
revision of Tender drawings and drawings supplied to the contractor during the Contract as well as
revisions of drawings supplied to the contractor during the contract.
(One set of as-built drawings shall be considered for measurement and payment)

= 1.000
(b) 01.2.2 Providing additional copy of as-built drawing produced in AutoCAD software in 584.5 mm x 413.5
mm (A-2) standard drawing paper accepted by the Engineer-in-charge.
50×1'-4''×2'-0'' = 133.33 sft
= 12.387
3 01.2.3 Providing minimum ten (10) copies coloured post-card size progress photograph of ‘works under
contract’ taken by professional photographer which record the progress of the Works.

= 18.000
4 01.2.6 Providing all necessary logistic support to frame ‘monthly progress meeting’ between
contractor/contractor’s representatives and employer / employer’s representatives at the Engineer-in-
charge's office at site. Month wise documentation shall be the basis of payments on this item.

= 18.000
5 01.1.6 Providing and maintenance one project profile signboards of the size not exceeding 1 m x 2 m, to be
placed at a suitable place of the site including submission of proposals for the materials of the
signboards and text layout to the Engineer-in-charge for approval which will be positioned as
directed by the Engineer-in-charge and removing the same on completion of the works or as
instructed by the Engineer-in-charge.

1×4'-0''×12'-0'' = 48.00 sft


= 4.459
6 01.3 Providing layout and carry over PWD bench-mark (BM) at site from nearby BM pillar, property
lines, existing ground level (EGL), formation ground level (FGL), highest flood levels (HFL), plinth
levels (PL), mean sea level (MSL), setting and marking all pillars, marker, pegs etc. showing and
maintaining reduced levels (RL’s) including locating, establishing, protecting all public utilities
within the premise of work and finally all to be presented in black and white.

Floor Area 1×156'-9''×87'-6'' = 13715.63 sft


Mark "A"= = 13715.63 sft
= 1,274.213

7 01.4 Mobilization and cleaning site before commencing actual physical work and during contract period
and demobilization after completion of the works under contract to be accepted by the Engineer-in-
charge. This work shall also covers clayey cleaning and clearing, cutting or filling, dressing the
project area on and in the ground to an extent that all the events of works of the project can be
executed smoothly in a working environment with a particular attention on safety and security in all
respects, and to stockpile the end outcome to a place for disposal agreed by the Engineer-in-charge,
where, payments are to be based on ground area determined by the Engineer-in-charge and be
proportionate to the percentage progress of work under contract as a whole in all respects and
approved by the Engineer-in-charge.

G.F AREA = 1,274.213


8 09.10 Pre-cast pile made in reinforced cement concrete with minimum cement content relates to mix ratio
1:1.25:2.5 having minimum f'cr = 35 Mpa, and satisfying specified compressive strength f’c = 30
Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & cement
conforming to BDS EN-197-1- CEM-I (52.5 N) / ASTM-C 150 Type – I, best quality coarse sand
(F.M.2.2), 20 mm down well graded crushed stone chips conforming to ASTM C-33, mixing in
standard mixture machine and fed by standard measuring boxes, including all related works like
screening through proper sieves, cleaning and washing, centering and shuttering with M.S sheet,
M.S angle, F.I bar, nuts and bolts, champering edges if so, preparation of casting beds, laying
polythene there in, placing reinforcement cages in position, casting, compacting by vibrators and
tapered rods as where necessary, curing for 28 days etc. cost of water, electricity and other charges,
providing fitting and fixing pile shoe in position, tools, plants & equipments, mobilization,
demobilization, labour, test of materials and concrete etc. all complete as per design, drawing and
accepted by the Engineer-in-charge. (Rate is excluding the cost of reinforcement and its fabrication,
binding, welding and placing)

(A) 09.10.3 350 mm x 350 mm size pre-cast pile (1:1.25:2.5) with stone chips

test pile 2×90'-0''' = 180.00 rft


Service pile 162×90'-0''' = 14580.00 rft
= 14760.00 rft
= 4,498.628

9 09.11 Pre-cast pile shoe making & supplying pre-fabricated frustum of square cone having four sides and a
toe made of 6 mm thick ASTM A36 complied MS steel plate jointed by line welding, 4 nos 12 mm
dia deformed MS bar jointed by line welding with MS plate along the four edges of shoe aligning the
corner main bar of the pile and 1-12mm dia bar to fix with and perpendicular to shoe toe plate
aligning centre of pile, including cutting, shaping, sizing of MS plate and bar, all complete as per
design & drawing and accepted by the Engineer-in-charge

test pile 2
Service pile 162
164.0000

10 09.24 Pre-cast spliced pile jointing by supplying, fitting, fixing prefabricated square shaped two steel caps
made up by 6 mm thick ASTM A36 complied M.S plate, sides formed by bent in channel shape to
have only two line of joinery on faces, having min 50 mm dia hole on its web; capping by min 12
mm thick ASTM A36 complied M.S plate shaping the edges in 45°, having min 40 mm dia hole at
centre to pass 25 mm M.S bar 433 mm in length; jointed at channels root by welding; caps fitted
with 2 nos BDS ISO 6935-2009: B400 DWR complied d20 U-bar 1244mm in length by welding,
equidistant from centre holes of cap and shall have min 75 mm clear from pile faces; and finally, the
system to be fitted in correct alignments on pile head positions waiting for concreting; both the pile
heads fitted with the steel caps to be welded together through v-notches in field, while one of the
companion segment of piles drived in ground and other one placed over it maintaining true
verticality; all complete as per direction and stepwise approval leading to final approval of
Engineer-in- charge.

09.24.2 X-sec of pre cast pile segments :350 mm x 350 mm


test pile 2.000
Service pile 162.000
164.000

11 09.25.1 Mobilization and demobilzation of hydraulic static pile driver(Upto 500 metric ton capacity)

test pile 1
Service pile 1
2.000

12 09.25.2.2 Driving pre-cast pile of 350 mm x 350 mm X-section made with shoe/ without shoe by Hydraulic
static pile driver of approx. 500 tonne (metric ton) capacity; arranged with necessary cranes, power
source, maintaining driving log and record of pressure exerted on piles driven in to desired RL or
capacity level ; complete in all respect including handling of piles, dressing & leveling of site, way
making, surveying, layout setting etc ended with the submission of pile driving report in three
copies duly signed by professional engineer and approved by the Engineer-in-charge.

Qty from item no-17


= 4,498.628

13 09.8 Conducting static load test as per ASTM D1143 or equivalent standard for the cast-in-situ/pre-cast
pile providing required scaffolding, bracing, jacks, pressure test gauge, loading unloading, Kentledge
and other plants and equipment including staging, mobilization, demobilization, hire charge, gunny
bags, sand and filling sacs/gunny bags for loading, record readings and preparation of results in
standard forms and other incidental charges as per standard practice and procedures including
submission of load test report, furnishing all graph and chart etc. complete in all respect approved
and accepted by the Engineer-in-charge (Minimum two cyclic loading; one at service load and
another cycle at double the service load then to continue loading till failure of the pile). Before
commencing load test, contractor shall submit method statement for conducting load test to the
Engineer-in-charge for approval. However, Engineer’s approval shall not relieve the Contractor of
his responsibilities and obligations under Contract. Load test and report shall be conducted under the
supervision of a professional Geotechnical Engineer registered in BPERB or Geotechnical firm
registerd in PWD. Boring and pouring logs / driving logs of piles and method statement shall be the
part of load test report.

A) 09.8.1 Mobilization & de-mobilization of testing equipment

2.000
B) 09.8.2 Calibration of pressure gauge

1.000
B) 09.8.5 For 150 tonne load for 1 nos of test

2.000
C) 09.9 Rate for increamental loading
09.9.3 For intermediate loading from 150 tonne to 200 tonne for each additional tonne.

2X50 100.000

14 09.7 Labour for breaking head of hardened cast in situ bored pile/pre-cast pile up to a required length by
any means but without damaging the rest and removing the dismantled materials such as concrete to
a safe distance including scraps and cleaning concrete from steel/M.S. rods, straightening and
bending of pile bars, preparation and making platform where necessary, carrying, all sorts of
handling, stacking the same properly after clearing, leveling and dressing the situ and clearing the
bed etc. complete in all respect and accepted by the Engineer-in-charge. (Measurement will be given
for the actual pile head volume to be broken)

PILE 162×1'-0''×1'-0''×''2'-6'' = 405.00 cft


= 405.00 cft
= 11.468

15 02.1 Earth work in excavation in all kinds of soil for foundation trenches including layout, providing
center lines, local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo
spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and
maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the
area enclosed by the layout etc. all complete and accepted by the Engineer-in-charge, subject to
submit method statement of carrying out excavation work to the Engineer-in-charge for approval.
However, engineer’s approval shall not relieve the contractor of his responsibilities and obligations
under the contract.

(a) 02.1.1 Layout and marking for earthwork in excavation in foundation accepted by the Engineer-in-charge.
[Plinth area of the structure shall be considered for measurement]

G.F AREA = 1,274.213

(b) 02.1.4 Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very
stiff (hard) clayey soil/ rubbish etc.

PC2 27×7'-10''×3'-8'' = 775.50 sft


PC3 4×7'-10''×3'-1'' = 96.61 sft
2×(7'-10''+3'-2'')×''4'-3'' = 93.50 sft
PC4 9×7'-10''×7'-10'' = 552.25 sft
PC6 4×12'-0''×7'-10'' = 376.00 sft
PC10 2×(18'-5''+12'-0.5'')×''6'-0'' = 365.50 sft
PC16 1×16'-2''×16'-2'' = 261.36 sft
= 2520.72 sft
= 12603.61 cft
= 356.891

16 02.2 Bailing out of trapped water caused by inundation or rain, by pump from foundation trenches.

= 175.000

17 03.1 One layer brick flat soling in foundation or in floor with first class/picked jhama bricks including
preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by
the Engineer-in-charge

PC2 27×6'-10''×2'-8'' = 492.00 sft


PC3 4×6'-10''×2'-6.5'' = 69.47 sft
2×(6'-10''+2'-8'')×''3'-9'' = 71.25 sft
PC4 9×6'-10''×6'-11'' = 425.38 sft
PC6 4×11'-0''×6'-10'' = 300.67 sft
PC10 2×(17'-5''+11'-0.5'')×''5'-6'' = 313.04 sft
PC16 1×15'-2''×15'-2'' = 230.03 sft
Mark "A"= = 1901.83 sft

G.F AREA = 13715.63 sft


front entry 1×100'-0''×7'-0'' = 700.00 sft
pass for b/office 1×143'-2''×6'-0'' = 859.00 sft
under G/wall 1×243'-4''×2'-6'' = 608.33 sft
Ramp with lobby 1×36'-10''×5'-10'' = 214.86 sft
Ramp with lobby 1×25'-0''×5'-5'' = 135.42 sft
Mark "B"= = 16233.24 sft
Mark "A+B"= = 18135.07 sft
= 1,684.789

18 03.7 Supplying and laying of single layer polythene sheet weighing one kilogram per 6.5 square meter in
floor or any where below cement concrete complete in all respect and accepted by Engineer-in-
charge.

Quty from Itemno-17


= 1,684.789

19 03.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick
chips including breaking of chips, screening, mixing, laying, compacting to required level and curing
for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges
etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/A-M)

03.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

Quty from Itemno-17 = 1901.83 sft


= 633.94 cft
= 17.948

20 04.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:6) in foundation and
plinth, filling the joints/interstices fully with mortar, racking out the joints, cleaning and soaking the
bricks at least for 24 hours before use and curing at least for 7 days etc. all complete including cost
of water, electricity and other charges and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M)

Over GB
GB1 1×36'-0''' = 36.00 rft
GB2 1×108'-0''' = 108.00 rft
GB3 1×36'-0''' = 36.00 rft
GB4 1×156'-3''' = 156.25 rft
GB5 1×26'-0''' = 26.00 rft
GB5A 1×32'-7''' = 32.58 rft
GB6 1×101'-3''' = 101.25 rft
GB6A 1×26'-0''' = 26.00 rft
GB7 1×8'-0''' = 8.00 rft
GB8 1×54'-11''' = 54.92 rft
GB9 1×20'-7''' = 20.58 rft
GB10 1×54'-11''' = 54.92 rft
GB10 1×101'-3''' = 101.25 rft
GB10B 2×6'-11''' = 13.83 rft
GB11 1×80'-7''' = 80.58 rft
GB12 1×26'-5''' = 26.42 rft
GB13 1×54'-3''' = 54.25 rft
GB14 1×80'-7''' = 80.58 rft
GB15 1×80'-7''' = 80.58 rft
GB16 1×80'-7''' = 80.58 rft
GB17 1×80'-7''' = 80.58 rft
GB18 1×80'-7''' = 80.58 rft
GB19 1×80'-7''' = 80.58 rft
GB20 1×80'-7''' = 80.58 rft
GB20A 1×6'-10''' = 6.83 rft
= 1507.75 rft
= 3441.44 cft
Entry lobby Stair 1×13'-0''×2'-0×''0'-6'' = 13.00 cft
1×13'-0''×1'-0×''0'-6'' = 6.50 cft
1×7'-0''×3'-0×''0'-6'' = 10.50 cft
1×7'-0''×2'-0×''0'-6'' = 7.00 cft
1×7'-0''×1'-0×''0'-6'' = 3.50 cft
Mark "C"= = 3481.94 cft
= 98.580

21 04.3 Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) in exterior walls
including filling the interstices with mortar, raking out joints, cleaning and socking the bricks at least
for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all
complete including cost of water, electricity and other charges (measurement to given as 250 mm
width for one brick length and 375 mm for one brick and a half brick length) accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

(a) Ground Floor


1×107'-4''' = 107.33 rft
1×100'-7''' = 100.58 rft
2×78'-0''' = 156.00 rft
corri 1×26'-11''' = 26.92 rft
stair 4×22'-10''' = 91.33 rft
stair 1×19'-0''' = 19.00 rft
2×11'-4''' = 22.67 rft
toi 1×14'-4''' = 14.33 rft
1×17'-8''' = 17.67 rft
1×23'-8''' = 23.67 rft
front 2×25'-8''' = 51.33 rft
1×36'-8''' = 36.67 rft
2×7'-11''' = 15.83 rft
1×12'-0''' = 12.00 rft
2×15'-5''' = 30.83 rft
2×5'-0''' = 10.00 rft
23×2'-10''' = 65.17 rft
miner 4×7'-8''' = 30.67 rft
= 832.00
Mark "A"= = 7103.82 cft
DEDUCT
open 3×6'-0''×7'-0×''0'-10'' = 105.00 cft
door 1×5'-0''×7'-0×''0'-10'' = 29.17 cft
door 2×4'-0''×7'-0×''0'-10'' = 46.67 cft
win 7×8'-0''×4'-6×''0'-10'' = 210.00 cft
win 1×6'-10''×4'-6×''0'-10'' = 25.63 cft
win 4×7'-0''×4'-6×''0'-10'' = 105.00 cft
HW 1×2'-0''×2'-0×''0'-10'' = 3.33 cft
Mark "B"= = 524.79 cft
Mark "A-B"= = 6579.03 cft
= 186.296
(b) 1st Floor
2×100'-7''' = 201.17 rft
3×78'-0''' = 234.00 rft
corri 1×26'-11''' = 26.92 rft
stair 2×22'-10''' = 45.67 rft
stair 1×19'-0''' = 19.00 rft
2×11'-4''' = 22.67 rft
2×2'-10''' = 5.67 rft
1×16'-5''' = 16.42 rft
toi 2×14'-4''' = 28.67 rft
1×17'-8''' = 17.67 rft
1×23'-8''' = 23.67 rft
1×47'-8''' = 47.67 rft
front 2×25'-8''' = 51.33 rft
3×5'-0''' = 15.00 rft
23×2'-10''' = 65.17 rft
miner 4×7'-8''' = 30.67 rft
= 851.33
Mark "A"= = 8453.20 cft
DEDUCT
door 3×6'-0''×7'-0×''0'-10'' = 105.00 cft
door 1×7'-0''×7'-0×''0'-10'' = 40.83 cft
door 2×5'-0''×7'-0×''0'-10'' = 58.33 cft
door 3×4'-0''×7'-0×''0'-10'' = 70.00 cft
win 7×8'-0''×4'-6×''0'-10'' = 210.00 cft
win 2×6'-2''×4'-6×''0'-10'' = 46.25 cft
win 5×7'-0''×4'-6×''0'-10'' = 131.25 cft
HW 2×2'-0''×2'-0×''0'-10'' = 6.67 cft
Mark "B"= = 668.33 cft
Mark "A-B"= = 7784.86 cft
= 220.441

© 2ND Floor:
2×100'-7''' = 201.17 rft
3×78'-0''' = 234.00 rft
corri 1×26'-11''' = 26.92 rft
stair 2×22'-10''' = 45.67 rft
stair 1×19'-0''' = 19.00 rft
2×11'-4''' = 22.67 rft
2×2'-10''' = 5.67 rft
1×16'-5''' = 16.42 rft
toi 2×14'-4''' = 28.67 rft
1×17'-8''' = 17.67 rft
1×23'-8''' = 23.67 rft
1×47'-8''' = 47.67 rft
3×5'-0''' = 15.00 rft
23×2'-10''' = 65.17 rft
miner 4×7'-8''' = 30.67 rft
= 800.00 sft
Mark "A"= = 7943.49 cft
DEDUCT
door 3×6'-0''×7'-0×''0'-10'' = 105.00 cft
door 3×5'-0''×7'-0×''0'-10'' = 87.50 cft
door 3×4'-0''×7'-0×''0'-10'' = 70.00 cft
win 7×8'-0''×4'-6×''0'-10'' = 210.00 cft
win 2×6'-2''×4'-6×''0'-10'' = 46.25 cft
win 5×7'-0''×4'-6×''0'-10'' = 131.25 cft
HW 2×2'-0''×2'-0×''0'-10'' = 6.67 cft
Mark "B"= = 656.67 cft
Mark "A-B"= = 7286.82 cft
= 206.338
(d) 3RD Floor:
dome-2 2×28'-10''' = 57.67 rft
2×18'-0''' = 36.00 rft
dome-1 1×106'-9''' = 106.75 rft
= 200.42 sft
= 973.30 cft
stair 2×18'-0''' = 36.00 rft
2×9'-6''' = 19.00 rft
miner 4×7'-8''' = 30.67 rft
= 85.67 sft
= 606.56 cft
= 1579.86 cft
= 44.736

(e) 4th Floor:


miner 4×7'-8''' = 30.67 rft
= 30.67 sft
= 217.14 cft
= 6.149
(f) 5th Floor:
miner 4×7'-8''' = 30.67 rft
= 30.67 sft
= 217.14 cft
= 6.149

(g) 6th Floor:


miner 4×7'-8''' = 30.67 rft
= 30.67 sft
= 217.14 cft
= 6.149

(h) 7th Floor:


miner 4×7'-8''' = 30.67 rft
= 30.67 sft
= 217.14 cft
= 6.149
(i) 8th Floor:
miner 4×7'-8''' = 30.67 rft
= 30.67 sft
= 217.14 cft
= 6.149

22 04.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making
bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking
the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors
including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-
in-charge. (Cement: CEM-II/A-M) In ground floor

(a) Ground Floor


corri 1×66'-10''' = 66.83 rft
kit/din 3×19'-0''' = 57.00 rft
pump 1×14'-2''' = 14.17 rft
toi 1×10'-0''' = 10.00 rft
1×5'-0''' = 5.00 rft
1×7'-4''' = 7.33 rft
stair 1×9'-6''' = 9.50 rft
1×48'-4''' = 48.33 rft
2×12'-8''' = 25.33 rft
2×14'-9''' = 29.50 rft
1×9'-3''' = 9.25 rft
1×7'-0''' = 7.00 rft
toi 3×6'-11''' = 20.75 rft
toi 2×14'-0''' = 28.00 rft
1×14'-9''' = 14.75 rft
toi 5×4'-6''' = 22.50 rft
toi 2×7'-4''' = 14.67 rft
outer 4×8'-0''' = 32.00 rft
2×13'-0''' = 26.00 rft
2×19'-7''' = 39.17 rft
pra/dis 2×21'-5''' = 42.83 rft
2×15'-10''' = 31.67 rft
guard 5×6'-5''' = 32.08 rft
1×30'-0''' = 30.00 rft
toi 1×22'-0''' = 22.00 rft
2×6'-7''' = 13.17 rft
E/G/Book 2×36'-6''' = 73.00 rft
guard 2×12'-6''' = 25.00 rft
1×30'-0''' = 30.00 rft
toi 1×22'-0''' = 22.00 rft
= 808.83 rft
= 8225.84 sft
Mark "A"= = 8225.84 sft
Deduct:
Door 1×6'-0''×7'-0'' = 42.00 sft
Door 5×5'-0''×7'-0'' = 175.00 sft
Door 1×4'-6''×7'-0'' = 31.50 sft
Door 3×4'-0''×7'-0'' = 84.00 sft
Door 1×7'-0''×7'-0'' = 49.00 sft
Door 7×3'-4''×7'-0'' = 163.33 sft
Door 10×2'-6''×7'-0'' = 175.00 sft
win 3×5'-0''×4'-6'' = 67.50 sft
win 6×8'-0''×7'-6'' = 360.00 sft
win 4×6'-0''×4'-6'' = 108.00 sft
Mark "B"= = 1255.33 sft
Mark "A-B"= = 6970.50 sft
= 647.575
b) 1st Floor:
corri 1×66'-10''' = 66.83 rft
meeting 3×19'-0''' = 57.00 rft
pump 1×14'-0''' = 14.00 rft
toi 1×9'-1''' = 9.08 rft
2×5'-0''' = 10.00 rft
1×6'-7''' = 6.58 rft
stair 1×9'-6''' = 9.50 rft
2×4'-10''' = 9.67 rft
1×7'-0''' = 7.00 rft
1×34'-3''' = 34.25 rft
toi 3×6'-11''' = 20.75 rft
toi 2×14'-0''' = 28.00 rft
1×9'-4''' = 9.33 rft
toi 10×4'-6''' = 45.00 rft
toi 3×6'-5''' = 19.25 rft
box 2×6'-11''' = 13.83 rft
box 2×10'-4''' = 20.67 rft
outer 4×8'-0''' = 32.00 rft
2×13'-0''' = 26.00 rft
2×19'-7''' = 39.17 rft
2×7'-4''' = 14.67 rft
1×12'-6''' = 12.50 rft
= 505.08 rft
= 6020.59 sft
p/wall 2×12'-6''' = 25.00 rft
p/wall 2×36'-6''' = 73.00 rft
p/wall 2×11'-0''' = 22.00 rft
2×13'-10''' = 27.67 rft
p/wall 2×36'-6''' = 73.00 rft
guard 2×12'-6''' = 25.00 rft
1×30'-0''' = 30.00 rft
toi 1×22'-0''' = 22.00 rft
= 297.67 rft
= 893.00 sft
Mark "A"= = 6913.59 sft
Deduct:
Door 2×6'-0''×7'-6'' = 90.00 sft
Door 3×5'-0''×7'-0'' = 105.00 sft
Door 1×4'-6''×7'-0'' = 31.50 sft
Door 2×4'-0''×7'-0'' = 56.00 sft
Door 5×3'-4''×7'-0'' = 116.67 sft
Door 13×2'-6''×7'-0'' = 227.50 sft
win 3×5'-0''×4'-6'' = 67.50 sft
win 6×8'-0''×7'-6'' = 360.00 sft
win 2×5'-10''×4'-6'' = 52.50 sft
win 2×5'-1''×4'-6'' = 45.75 sft
Mark "B"= = 1152.42 sft
Mark "A-B"= = 5761.18 sft
= 535.226
c) 2nd Floor:
corri 1×66'-10''' = 66.83 rft
meeting 4×19'-0''' = 76.00 rft
pump 1×13'-4''' = 13.33 rft
1×9'-1''' = 9.08 rft
1×15'-5''' = 15.42 rft
2×10'-6''' = 21.00 rft
1×10'-0''' = 10.00 rft
1×4'-10''' = 4.83 rft
4×5'-0''' = 20.00 rft
1×6'-7''' = 6.58 rft
stair 1×9'-6''' = 9.50 rft
2×4'-10''' = 9.67 rft
1×7'-0''' = 7.00 rft
1×10'-4''' = 10.33 rft
1×23'-10''' = 23.83 rft
toi 2×6'-11''' = 13.83 rft
toi 2×14'-4''' = 28.67 rft
4×9'-4''' = 37.33 rft
toi 4×4'-6''' = 18.00 rft
toi 3×6'-5''' = 19.25 rft
box 2×6'-11''' = 13.83 rft
box 2×10'-4''' = 20.67 rft
outer 4×8'-0''' = 32.00 rft
2×13'-0''' = 26.00 rft
2×19'-7''' = 39.17 rft
2×7'-4''' = 14.67 rft
1×12'-6''' = 12.50 rft
= 579.33 rft
Mark "A"= = 6905.65 sft
Deduct:
Door 1×4'-6''×7'-0'' = 31.50 sft
Door 1×3'-0''×7'-0'' = 21.00 sft
Door 9×3'-4''×7'-0'' = 210.00 sft
Door 10×2'-6''×7'-0'' = 175.00 sft
win 1×5'-0''×4'-6'' = 22.50 sft
win 6×8'-0''×7'-6'' = 360.00 sft
win 2×5'-10''×4'-6'' = 52.50 sft
Mark "B"= = 872.50 sft
Mark "A-B"= = 6033.15 sft
= 560.494

23 03.6 Damp proof course (DPC) (1:1.5:3) of cement concrete with cement, sand and picked jhama brick
chips or stone chips including breaking of chips, screening, centering, shuttering, casting, curing and
finishing with a coat of bitumen including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/A-M)

03.6.2 75 mm thick damp proof course (1:1.5:3) with cement, Sylhet sand (F.M. 2.2) and stone chips.

Item-9 OVER 10" WALL = 832.00 rft


= 693.33 sft
Item-10 OVER 5" WALL = 808.83 rft
= 337.01 sft
TOTAL = 1030.35 sft
= 95.722

RCC WORKS: 1:1.5:3( measured on gross concrete section)


(f'c = 25MPa, minimum f'cr = 30 MPa in nominal mix 1 : 1.5 : 3), with stone chips
(100% sand of F.M. 2.2)
24 07.3 Reinforced cement concrete works with minimum cement content relates to mix ratio 1:1.5:3 having
minimum f'cr = 30 MPa, satisfying a specified compressive strength f’c = 25 MPa at 28 days on
standard cylinders as per standard practice of Code ACI/BNBC/ASTM, Cement conforming to BDS
EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best quality Sylhet sand or coarse
sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33,
making and placing shutter in position and maintaining true to plumb, making shutter water-tight
properly, placing reinforcement in position; mixing with standard mixer machine with hopper, fed by
standard measuring boxes or in batching plant, casting in forms, compacting by vibrator machine
and curing at least for 28 days, removing centering-shuttering after specified time approved;
including cost of water, electricity, testing charges of materials and cylinders as required, other
charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding the
cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering)

A) 07.3.1 Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level

PC2 27×6'-10''×2'-8''×''2'-6'' = 1230.00 cft


PC3 4×6'-10''×2'-6.5×''2'-3'' = 156.31 cft
4×4'-9''×3'-9×''2'-3'' = 160.31 cft
PC4 9×6'-10''×6'-11×''2'-3'' = 957.09 cft
PC6 4×11'-0''×6'-10''×''3'-6'' = 1052.33 cft
PC10 2×17'-5''×11'-0×''3'-9'' = 1436.88 cft
PC16 1×15'-2''×15'-2×''3'-0'' = 690.08 cft
= 5683.01 cft
Deduct
PC10 4×5'-6''×3'-2×''3'-9'' = 261.25 cft
= 261.25 cft
Mark "A"= = 5421.76 cft

GB1 1×36'-0''' = 36.00 rft


GB3 1×36'-0''' = 36.00 rft
GB4A 1×36'-0''' = 36.00 rft
GB5 1×26'-0''' = 26.00 rft
GB5A 1×32'-7''' = 32.58 rft
GB6A 1×26'-0''' = 26.00 rft
GB7 1×8'-0''' = 8.00 rft
GB8 1×54'-11''' = 54.92 rft
GB10A 1×54'-11''' = 54.92 rft
GB10B 2×6'-11''' = 13.83 rft
GB12 1×26'-5''' = 26.42 rft
GB17 1×80'-7''' = 80.58 rft
GB18 1×80'-7''' = 80.58 rft
GB19 1×80'-7''' = 80.58 rft
GB20 1×80'-7''' = 80.58 rft
GB20A 1×6'-10''' = 6.83 rft
= 679.83 rft
= 1019.75 cft
GB2 1×108'-0''' = 108.00 rft
GB4 1×120'-3''' = 120.25 rft
GB6 1×101'-3''' = 101.25 rft
GB9 1×20'-7''' = 20.58 rft
GB10 1×101'-3''' = 101.25 rft
GB11 1×80'-7''' = 80.58 rft
GB13 1×54'-3''' = 54.25 rft
GB14 1×80'-7''' = 80.58 rft
GB15 1×80'-7''' = 80.58 rft
GB16 1×80'-7''' = 80.58 rft
= 827.92 rft
= 2069.79 cft
Mark "B"= = 3089.54 cft

Quty from Itemno-16 = 16233.24 sft


Mark "C"= = 8116.62 cft
Mark "A+B+C"= = 16627.92 cft
= 470.846
B) 07.3.2 Pedestals, column, column capital, lift wall and RCC wall up to ground floor
(B-i) Ground
floor
Upto FGLC1 22×1'-5''×1'-5×''5'-0'' = 220.76 cft
C1a 3×1'-5''×1'-5×''5'-0'' = 30.10 cft
C2 5×1'-5''×2'-3×''5'-0'' = 79.69 cft
C3 2×1'-5''×2'-8×''5'-0'' = 37.78 cft
C4 3×1'-10''×1'-10×''5'-0'' = 50.42 cft
C5 4×1'-10''×2'-3×''5'-0'' = 82.50 cft
C6 7×1'-10''×2'-3×''5'-0'' = 144.38 cft
C7 1.57×2'-5''×2'-5×''5'-0'' = 45.85 cft
miner wall 4×2'-1''×1'-2×''5'-0'' = 48.61 cft
4×1'-0''×0'-11×''5'-0'' = 18.33 cft
4×7'-8''×0'-10×''5'-0'' = 127.78 cft
Mark "A"= = 886.19 cft
FGL to Roof 22×1'-3''×1'-3×''13'-0'' = 446.88 cft
C1a 3×1'-3''×1'-3×''13'-0'' = 60.94 cft
C2 5×1'-3''×2'-1×''13'-0'' = 169.27 cft
C3 2×1'-3''×2'-6×''13'-0'' = 81.25 cft
C4 3×1'-8''×1'-8×''13'-0'' = 108.33 cft
C5 4×1'-8''×2'-1×''13'-0'' = 180.56 cft
C6 7×1'-8''×2'-1×''13'-0'' = 315.97 cft
C7 1.57×2'-3''×2'-3×''13'-0'' = 103.33 cft
miner wall 4×2'-1''×1'-2×''12'-3'' = 119.10 cft
4×1'-0''×0'-11×''12'-3'' = 44.92 cft
Mark "B"= = 1630.53 cft
Mark "A+B"= = 2516.73 cft
= 71.265
(B-ii) 1st floor
C1 20×1'-3''×1'-3×''12'-6'' = 390.63 cft
C1a 3×1'-3''×1'-3×''12'-6'' = 58.59 cft
C2 5×1'-3''×2'-1×''12'-6'' = 162.76 cft
C3 2×1'-3''×2'-6×''12'-6'' = 78.13 cft
C4 3×1'-8''×1'-8×''12'-6'' = 104.17 cft
C5 4×1'-8''×2'-1×''12'-6'' = 173.61 cft
C6 7×1'-8''×2'-1×''12'-6'' = 303.82 cft
C7 1.57×2'-3''×2'-3×''12'-6'' = 99.35 cft
miner wall 4×2'-1''×1'-2×''10'-0'' = 97.22 cft
4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 1504.94 cft
= 42.615

(B-iii) 2nd Floor

qty same as 1st floor = 42.615

(B-iv) 3rd Floor

C1a 3×1'-3''×1'-3×''10'-0'' = 46.88 cft


C2 1×1'-3''×2'-1×''10'-0'' = 26.04 cft
dome-1 wall 3.14×27'-8''×0'-10×''7'-8'' = 555.02 cft
dome-3 wall 6.28×10'-10''×0'-10×''3'-0'' = 170.08 cft
wall 2×18'-1''×0'-10×''6'-8'' = 200.93 cft
wall 2×27'-2''×0'-10×''6'-8'' = 301.85 cft
miner wall 4×2'-1''×1'-2×''10'-0'' = 97.22 cft
4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 1434.69 cft
= 40.626

(B-iv) 4th Floor

miner Col 4×2'-1''×1'-2×''10'-0'' = 97.22 cft


4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 133.89 cft
= 3.791
(B-iv) 5th Floor

miner Col 4×2'-1''×1'-2×''10'-0'' = 97.22 cft


4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 133.89 cft
= 3.791
(B-iv) 6th Floor

miner Col 4×2'-1''×1'-2×''10'-0'' = 97.22 cft


4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 133.89 cft
= 3.791
(B-iv) 7th Floor

miner Col 4×2'-1''×1'-2×''10'-0'' = 97.22 cft


4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 133.89 cft
= 3.791
(B-iv) 8th Floor

miner Col 4×2'-1''×1'-2×''10'-0'' = 97.22 cft


4×1'-0''×0'-11×''10'-0'' = 36.67 cft
= 133.89 cft
= 3.791

C) 07.3.3 Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and steps
etc.
(C-i)upto ground
Ground floorfloor
Floor Beam
FB1 1×36'-0''' = 36.00 rft
FB2A 1×9'-3''' = 9.25 rft
FB3 1×36'-0''' = 36.00 rft
FB4A 1×36'-0''' = 36.00 rft
FB5 1×12'-2''' = 12.17 rft
FB5A 1×19'-0''' = 19.00 rft
FB7 1×8'-0''' = 8.00 rft
FB8 1×54'-11''' = 54.92 rft
FB10A 1×54'-11''' = 54.92 rft
FB10B 2×6'-11''' = 13.83 rft
FB12 1×26'-5''' = 26.42 rft
FB17 1×80'-7''' = 80.58 rft
FB18 1×37'-3''' = 37.25 rft
FB19 1×28'-10''' = 28.83 rft
FB19A 1×17'-7''' = 17.58 rft
FB20 1×28'-10''' = 28.83 rft
FB20A 1×24'-5''' = 24.42 rft
= 524.00 rft
(i) = 786.00 cft
FB2 1×98'-9''' = 98.75 rft
FB4 1×120'-3''' = 120.25 rft
FB6 1×101'-3''' = 101.25 rft
FB10 1×101'-3''' = 101.25 rft
FB11 1×80'-7''' = 80.58 rft
FB13 1×54'-3''' = 54.25 rft
FB14 1×80'-7''' = 80.58 rft
FB15 2×80'-7''' = 161.17 rft
FB16 1×80'-7''' = 80.58 rft
SB 3×12'-10''' = 38.50 rft
SB 1×37'-3''' = 37.25 rft
= 954.42 rft
(ii) = 2684.30 cft
FB9 1×20'-7''' = 20.58 rft
= 20.58 rft
(iii) = 51.46 cft
SB1 3×7'-8''' = 23.00 rft
SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
(iv) = 50.91 cft
Mark "A"= = 3572.66 cft

roof slab 1×156'-3''×80'-8'' = 12604.17 sft


1×8'-5''×8'-3'' = 69.44 sft
= 12673.60 sft

Open 1×35'-9''×24'-6'' = 875.88 sft


Open 1×23'-9''×5'-0'' = 118.75 sft
stair case 2×15'-6''×10'-6'' = 325.50 sft
stair case 1×13'-9''×9'-6'' = 130.63 sft
= 1450.75 sft
= 11222.85 sft
Mark "B"= = 6546.66 cft
Lintel
Over 10" wall 1×832'-0''×0'-10×''0'-6'' = 346.67 cft
(Quantity
Over 5" from wall 1×808'-10''×0'-5×''0'-6'' = 168.51 cft
item no 11 (a))
(Quantity from
Mark "C"= = 515.17 cft
item no 9 (a))
stair-2
Landing 2×12'-2''×6'-4×''0'-10'' = 128.43 cft
2×12'-2''×9'-10×''0'-10'' = 199.40 cft
flight 4×11'-6''×5'-10×''0'-10'' = 223.61 cft
1/2×25×5'-10''×1'-0×''0'-6'' = 36.46 cft
stair-1
Landing 1×11'-2''×5'-8×''0'-9.5'' = 50.09 cft
1×11'-2''×4'-7×''0'-9.5'' = 40.52 cft
flight 2×11'-6''×5'-4×''0'-9.5'' = 97.11 cft
1/2×25×5'-4''×1'-0×''0'-6'' = 33.33 cft
stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
front stair
Landing 1×35'-2''×5'-0×''0'-8'' = 117.22 cft
flight 1×11'-9''×35'-2×''0'-8'' = 275.47 cft
flight 2×9'-6''×11'-6×''0'-8'' = 145.67 cft
1/2×12×35'-2''×1'-0×''0'-6'' = 105.50 cft
1/2×22×11'-6''×1'-0×''0'-6'' = 63.25 cft
Mark "D"= = 1590.09 cft
Total = 12224.59 cft
= 346.159

(C-ii) 1st Floor:


FB2A 1×9'-3''' = 9.25 rft
FB12 1×26'-5''' = 26.42 rft
= 35.67 rft
(i) = 53.50 cft
FB2 1×98'-9''' = 98.75 rft
FB4 1×101'-3''' = 101.25 rft
FB6 1×101'-3''' = 101.25 rft
FB10 1×101'-3''' = 101.25 rft
FB11 1×80'-7''' = 80.58 rft
FB13 1×54'-3''' = 54.25 rft
FB14 1×80'-7''' = 80.58 rft
FB15 2×80'-7''' = 161.17 rft
FB16 1×80'-7''' = 80.58 rft
SB 3×12'-10''' = 38.50 rft
= 898.17 rft
(ii) = 2526.09 cft
FB9 1×20'-7''' = 20.58 rft
= 20.58 rft
(iii) = 51.46 cft
SB1 3×7'-8''' = 23.00 rft
SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
(iv) = 50.91 cft
Mark "A"= = 2681.96 cft

roof slab 1×101'-3''×80'-8'' = 8167.50 sft


= 8167.50 sft

Open 1×23'-9''×5'-0'' = 118.75 sft


stair case 2×15'-6''×10'-6'' = 325.50 sft
stair case 1×13'-9''×9'-6'' = 130.63 sft
= 574.88 sft
= 7592.63 sft
Mark "B"= = 4429.03 cft
Lintel
Over 10" wall 1×851'-4''×0'-10×''0'-6'' = 354.72 cft
(Quantity
Over 5" from wall 1×505'-1''×0'-5×''0'-6'' = 105.23 cft
item no 11 (a))
(Quantity from
Mark "C"= = 459.95 cft
item no 9 (a))

stair-2
Landing 2×12'-2''×6'-4×''0'-10'' = 128.43 cft
2×12'-2''×9'-10×''0'-10'' = 199.40 cft
flight 4×11'-6''×5'-10×''0'-10'' = 223.61 cft
1/2×25×5'-10''×1'-0×''0'-6'' = 36.46 cft
stair-1
Landing 1×11'-2''×5'-8×''0'-9.5'' = 50.09 cft
1×11'-2''×4'-7×''0'-9.5'' = 40.52 cft
flight 2×11'-6''×5'-4×''0'-9.5'' = 97.11 cft
1/2×25×5'-4''×1'-0×''0'-6'' = 33.33 cft
stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 882.98 cft
Total = 8453.92 cft
= 239.386

(C-iii) 2nd Floor


FB2A 1×9'-3''' = 9.25 rft
FB12 1×26'-5''' = 26.42 rft
= 35.67 rft
(i) = 53.50 cft
FB2 1×98'-9''' = 98.75 rft
FB4 1×101'-3''' = 101.25 rft
FB6 1×101'-3''' = 101.25 rft
FB10 1×101'-3''' = 101.25 rft
FB11 1×80'-7''' = 80.58 rft
FB13 1×54'-3''' = 54.25 rft
FB14 1×80'-7''' = 80.58 rft
FB15 2×80'-7''' = 161.17 rft
FB16 1×80'-7''' = 80.58 rft
SB 1×12'-10''' = 12.83 rft
= 872.50 rft
(ii) = 2453.91 cft
FB9 1×20'-7''' = 20.58 rft
= 20.58 rft
(iii) = 51.46 cft
SB1 3×7'-8''' = 23.00 rft
SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
(iv) = 50.91 cft
Mark "A"= = 2609.77 cft

roof slab 1×101'-3''×80'-8'' = 8167.50 sft


= 8167.50 sft

Open 1×23'-9''×5'-0'' = 118.75 sft


dome-1 3.14×13'-5''×13'-5'' = 565.22 sft
stair case 1×13'-9''×9'-6'' = 130.63 sft
= 814.60 sft
= 7352.90 sft
Mark "B"= = 4289.19 cft
Lintel
Over 10" wall 1×800'-0''×0'-10×''0'-6'' = 333.33 cft
(Quantity
Over 5" from wall 1×579'-4''×0'-5×''0'-6'' = 120.69 cft
item no 11 (a))
(Quantity from
Mark "C"= = 454.03 cft
item no 9 (a))
stair-1
Landing 1×11'-2''×5'-8×''0'-9.5'' = 50.09 cft
1×11'-2''×4'-7×''0'-9.5'' = 40.52 cft
flight 2×11'-6''×5'-4×''0'-9.5'' = 97.11 cft
1/2×25×5'-4''×1'-0×''0'-6'' = 33.33 cft
stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 295.09 cft
Total = 7648.08 cft
= 216.567

(C-iv) 3rd Floor

FB 2×18'-1''' = 36.17 rft


FB 2×27'-2''' = 54.33 rft
FB 2×11'-9''' = 23.50 rft
FB 2×20'-7''' = 41.17 rft
= 155.17 rft
(i) = 436.41 cft
miner SB1 3×7'-8''' = 23.00 rft
SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
(ii) = 50.91 cft
Mark "A"= = 487.31 cft

roof slab 1×27'-2''×18'-1'' = 491.26 sft


Chilakota 1×23'-7''×15'-10'' = 373.40 sft
= 864.67 sft
= 864.67 sft
(i) = 504.39 cft
dome-1 12.56×13'-5''×13'-5'' = 2260.89 sft
= 2260.89 sft
= 2260.89 sft
(ii) = 942.04 cft
dome-2 12.56×6'-6''×6'-6'' = 530.66 sft
dome-3 25.12×5'-0''×5'-0'' = 628.00 sft
= 4361.58 sft
= 4361.58 sft
(iii) = 1635.59 cft
Mark "B"= = 3082.02 cft
Lintel
Over 10" wall 1×122'-8''×0'-10×''0'-6'' = 51.11 cft
(Quantity from
Mark "C"= = 51.11 cft
item no 11 (a))
stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 74.03 cft
Total = 3694.47 cft
= 104.615

(C-v) 4th Floor

miner SB1 3×7'-8''' = 23.00 rft


SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
Mark "A"= = 50.91 cft

stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 74.03 cft
Total = 124.93 cft
= 3.538
(C-vi) 5th Floor

miner SB1 3×7'-8''' = 23.00 rft


SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
Mark "A"= = 50.91 cft

stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 74.03 cft
Total = 124.93 cft
= 3.538
(C-vii) 6th Floor

miner SB1 3×7'-8''' = 23.00 rft


SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
Mark "A"= = 50.91 cft

stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 74.03 cft
Total = 124.93 cft
= 3.538
(C-viii) 7th Floor

miner SB1 3×7'-8''' = 23.00 rft


SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
Mark "A"= = 50.91 cft

stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 74.03 cft
Total = 124.93 cft
= 3.538
(C-ix) 8th Floor
miner SB1 3×7'-8''' = 23.00 rft
SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
Mark "A"= = 50.91 cft

stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "D"= = 74.03 cft
Total = 124.93 cft
= 3.538
(C-x) 9th Floor

miner SB1 3×7'-8''' = 23.00 rft


SB2 1×7'-8''' = 7.67 rft
= 30.67 rft
Mark "A"= = 50.91 cft

dome 12.56×5'-6''×5'-6'' = 379.94 sft


= 379.94 sft
= 379.94 sft
Mark "B"= = 142.48 cft
stair miner
Landing 1×11'-0''×3'-5×''0'-6'' = 18.79 cft
2×3'-5''×3'-5×''0'-6'' = 11.67 cft
flight 3×5'-6''×3'-5×''0'-6'' = 28.19 cft
1/2×18×3'-5''×1'-0×''0'-6'' = 15.38 cft
Mark "C"= = 74.03 cft
Total = 267.41 cft
= 7.572

D) 07.3.4 Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up
to ground floor
(D-i) Ground
floor
Sunshade 2×100'-4''×2'-10×''0'-3'' = 142.14 cft
Sunshade 5×8'-0''×0'-6×''0'-3'' = 5.00 cft
railing 4×100'-4''×2'-6×''0'-3'' = 250.83 cft
kit shelf 1×30'-0''×2'-0×''0'-3'' = 15.00 cft
False Ceiling 2×14'-10''×5'-9×''0'-3'' = 42.65 cft
False Ceiling 2×7'-9''×6'-9×''0'-3'' = 26.16 cft
False Ceiling 1×10'-4''×5'-10×''0'-3'' = 15.07 cft
= 496.84 cft
= 14.069
(D-ii) 1st floor

Sunshade 2×100'-4''×2'-10×''0'-3'' = 142.14 cft


Sunshade 1×78'-0''×2'-10×''0'-3'' = 55.25 cft
Sunshade 5×8'-0''×0'-6×''0'-3'' = 5.00 cft
railing 4×100'-4''×2'-6×''0'-3'' = 250.83 cft
railing 2×78'-0''×2'-6×''0'-3'' = 97.50 cft
False Ceiling 2×14'-10''×5'-9×''0'-3'' = 42.65 cft
False Ceiling 2×10'-2''×5'-9×''0'-3'' = 29.23 cft
False Ceiling 1×10'-8''×6'-9×''0'-3'' = 18.00 cft
False Ceiling 1×7'-5''×6'-1×''0'-3'' = 11.28 cft
= 651.88 cft
= 18.459

(D-iii) 2nd floor

qty same as 1st floor = 18.459

(D-iv) 3rd floor

railing 1×67'-0''×3'-0×''0'-4'' = 67.00 cft


railing 3×26'-8''×3'-0×''0'-4'' = 80.00 cft
railing 2×23'-5''×3'-0×''0'-4'' = 46.83 cft
railing 1×13'-0''×3'-0×''0'-4'' = 13.00 cft
railing 1×77'-6''×3'-0×''0'-4'' = 77.50 cft
railing 1×41'-4''×3'-0×''0'-4'' = 41.33 cft
railing 2×38'-4''×5'-10×''0'-4'' = 149.07 cft
railing 2×38'-4''×4'-0×''0'-10'' = 255.56 cft
cornice 1×97'-0''×2'-0×''0'-10'' = 161.67 cft
cornice 2×41'-0''×1'-6×''0'-10'' = 102.50 cft
= 994.46 cft
= 28.160

FORM WORK (Steel)


25 07.9 Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough
both in and out of plane, to make the concrete surface true to the designed shape and size by using
necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat
bars etc.) and removal of form for:
A) 07.9.1 Individual and combined footing
PC2 27x1×19'-0''×2'-6'' = 1282.50 sft
PC3 4x1×23'-4''×2'-3'' = 210.00 sft
PC4 9x4×6'-10''×2'-3'' = 553.50 sft
PC6 4x1×35'-8''×3'-6'' = 499.33 sft
PC10 2x1×47'-5''×3'-9'' = 355.63 sft
PC16 1x4×15'-2''×3'-0'' = 182.00 sft
= 3082.96 sft
= 286.414
B) 07.9.2 In raft/mat/floor slab up to plinth level
1×484'-7''×0'-6'' = 242.29 sft
1×35'-10''×4'-6'' = 161.25 sft
1×48'-6''×4'-6'' = 218.25 sft
= 621.79 sft
= 57.766

C) 07.9.3 Foundation beam


1×679'-10''×4'-0'' = 2719.33 sft
1×827'-11''×5'-3'' = 4346.56 sft
= 7065.90 sft
= 656.438
D) 07.9.4 Pedestal, column, column capital, lift wall and wall up to ground floor
(D-i) Ground
floor
Upto FGLC1 44×(1'-5''+1'-5'')×''5'-0'' = 623.33 sft
C1a 6×(1'-5''+1'-5'')×''5'-0'' = 85.00 sft
C2 10×(1'-5''+2'-3'')×''5'-0'' = 183.33 sft
C3 4×(1'-5''+2'-8'')×''5'-0'' = 81.67 sft
C4 6×(1'-10''+1'-10'')×''5'-0'' = 110.00 sft
C5 8×(1'-10''+2'-3'')×''5'-0'' = 163.33 sft
C6 14×(1'-10''+2'-3'')×''5'-0'' = 285.83 sft
C7 2x3.14×2'-5''×5'-0'' = 75.88 sft
miner col 8×(2'-1''+2'-1'')×''5'-0'' = 166.67 sft
wall 8×7'-8''×7'-0'' = 429.33 sft
Upto Floor C1 44×(1'-3''+1'-3'')×''13'-0'' = 1430.00 sft
C1a 6×(1'-3''+1'-3'')×''13'-0'' = 195.00 sft
C2 10×(1'-3''+2'-1'')×''13'-0'' = 433.33 sft
C3 4×(1'-3''+2'-6'')×''13'-0'' = 195.00 sft
C4 6×(1'-8''+1'-8'')×''13'-0'' = 260.00 sft
C5 8×(1'-8''+2'-1'')×''13'-0'' = 390.00 sft
C6 14×(1'-8''+2'-1'')×''13'-0'' = 682.50 sft
C7 2x3.14×2'-3''×13'-0'' = 183.69 sft
miner col 8×(2'-1''+2'-1'')×''12'-3'' = 408.33 sft
= 6382.24 sft
= 592.925
(D-ii) 1st floor
C1 40×(1'-3''+1'-3'')×''12'-6'' = 1250.00 sft
C1a 6×(1'-3''+1'-3'')×''12'-6'' = 187.50 sft
C2 10×(1'-3''+2'-1'')×''12'-6'' = 416.67 sft
C3 4×(1'-3''+2'-6'')×''12'-6'' = 187.50 sft
C4 6×(1'-8''+1'-8'')×''12'-6'' = 250.00 sft
C5 8×(1'-8''+2'-1'')×''12'-6'' = 375.00 sft
C6 14×(1'-8''+2'-1'')×''12'-6'' = 656.25 sft
C7 2x3.14×2'-3''×12'-6'' = 176.63 sft
miner col 8×(2'-1''+2'-1'')×''10'-0'' = 333.33 sft
= 3832.88 sft
= 356.083
(D-iii) 2nd floor
= 356.083
(D-iv) 3rd floor
C1a 14×(1'-3''+1'-3'')×''10'-0'' = 350.00 sft
C2 20×(1'-3''+2'-1'')×''10'-0'' = 666.67 sft
dome-1 wall 2x3.14×27'-8''×7'-8'' = 1332.06 sft
dome-3 wall 4x3.14×10'-0''×3'-0'' = 376.80 sft
wall 4×18'-1''×6'-8'' = 482.22 sft
wall 4×27'-2''×6'-8'' = 724.44 sft
miner wall 8×(2'-1''+2'-1'')×''10'-0'' = 333.33 sft
= 4265.52 sft
= 396.277
(D-v) 4th floor
miner wall 8×(2'-1''+2'-1'')×''10'-0'' = 333.33 sft
= 333.33 sft
= 30.967
(D-vi) 5th floor
miner wall 8×(2'-1''+2'-1'')×''10'-0'' = 333.33 sft
= 333.33 sft
= 30.967
(D-vii) 6th floor
= 30.967
(D-viii)7th floor
= 30.967
(D-ix) 8th floor
= 30.967
E) 07.9.5 Tie beam and lintel: ground floor
(E-i) Ground
floor
1×832'-0''×1'-10'' = 1525.33 sft
1×808'-10''×1'-5'' = 1145.85 sft
= 2671.18 cft
= 248.159
(E-ii) 1st floor
1×851'-4''×1'-10'' = 1560.78 sft
1×505'-1''×1'-5'' = 715.53 sft
= 2276.31 sft
= 211.475
(E-iii) 2nd floor
1×800'-0''×1'-10'' = 1466.67 sft
1×579'-4''×1'-5'' = 820.72 sft
= 2287.39 sft
= 212.504
(E-iv) 3rd floor
1×122'-8''×1'-10'' = 224.89 sft
= 224.89 sft
= 20.893
F) 07.9.6 T-beam, L-beam and rectangular beam etc up to ground floor
(F-i) Ground floor
Side 2×524'-0''×1'-6'' = 1572.00 sft
Bottom 1×524'-0''×1'-0'' = 524.00 sft
Side 2×954'-5''×2'-3'' = 4294.88 sft
Bottom 1×954'-5''×1'-3'' = 1193.02 sft
Side 2×20'-7''×2'-0'' = 82.33 sft
Bottom 1×20'-7''×1'-3'' = 25.73 sft
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 7840.18 sft
= 728.371
(F-ii) 1st floor
Side 2×35'-8''×1'-6'' = 107.00 sft
Bottom 1×35'-8''×1'-0'' = 35.67 sft
Side 2×898'-2''×2'-3'' = 4041.75 sft
Bottom 1×898'-2''×1'-3'' = 1122.71 sft
Side 2×20'-7''×2'-0'' = 82.33 sft
Bottom 1×20'-7''×1'-3'' = 25.73 sft
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 5563.41 sft
= 516.853
(F-iii) 2nd floor
Side 2×35'-8''×1'-6'' = 107.00 sft
Bottom 1×35'-8''×1'-0'' = 35.67 sft
Side 2×872'-6''×2'-3'' = 3926.25 sft
Bottom 1×872'-6''×1'-3'' = 1090.63 sft
Side 2×20'-7''×2'-0'' = 82.33 sft
Bottom 1×20'-7''×1'-3'' = 25.73 sft
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 5415.83 sft
= 503.143

(F-iv) 3rd floor


Side 2×155'-2''×2'-3'' = 698.25 sft
Bottom 1×155'-2''×1'-3'' = 193.96 sft
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 1040.43 sft
= 96.658
(F-v) 4th floor
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 244.88 sft
= 22.75
(F-vi) 5th floor
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 170.97 sft
= 15.884
(F-vii) 6th floor
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 164.11 sft
= 15.246
(F-viii) 7th floor
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 163.47 sft
= 15.187
(F-ix) 8th floor
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 163.41 sft
= 15.181
(F-x) 8th floor
Side 2×30'-8''×2'-0'' = 122.67 sft
Bottom 1×30'-8''×0'-10'' = 25.56 sft
= 163.40 sft
= 15.18
G) 07.9.7 Floor and roof slab up to ground floor
(G-i) Ground
floor
Qty from Concrete Mark "A"= = 11222.85 sft
2×156'-3''×0'-7'' = 182.29 sft
2×80'-8''×0'-7'' = 94.11 sft
front 2×24'-6''×0'-7'' = 28.58 sft
open 1×57'-6''×0'-7'' = 33.54 sft
stair 1×23'-3''×0'-7'' = 13.56 sft
stair 2×52'-0''×0'-7'' = 60.67 sft
= 11635.61 sft
= 1,080.975
(G-ii) 1st floor
Qty from Concrete Mark "A"= = 7592.63 sft
2×101'-3''×0'-7'' = 118.13 sft
2×80'-8''×0'-7'' = 94.11 sft
open 1×57'-6''×0'-7'' = 33.54 sft
stair 1×23'-3''×0'-7'' = 13.56 sft
stair 2×52'-0''×0'-7'' = 60.67 sft
= 7912.63 sft
= 735.101
(G-iii) 2nd floor
Qty from Concrete Mark "A"= = 7352.90 sft
2×101'-3''×0'-7'' = 118.13 sft
2×80'-8''×0'-7'' = 94.11 sft
open 1×57'-6''×0'-7'' = 33.54 sft
dome-1 3.14×26'-10''×0'-7'' = 49.15 sft
stair 1×23'-3''×0'-7'' = 13.56 sft
= 7661.39 sft
= 711.761
(G-iv) 3rd floor
Qty from Concrete (i) = 864.67 sft
Qty from Concrete (ii) = 2260.89 sft
Qty from Concrete (iii) = 4361.58 sft
roof slab 1×90'-6''×0'-7'' = 52.79 sft
Chilakota 1×78'-10''×0'-7'' = 45.99 sft
= 7585.92 sft
= 704.749

(G-v) 9th floor


Qty from Concrete (i) = 4361.58 sft
Qty from Concrete (ii) = 0.00 sft
Qty from Concrete (iii) = 28.19 sft
roof slab 1×90'-6''×0'-7'' = 52.79 sft
Chilakota 1×78'-10''×0'-7'' = 45.99 sft
= 4488.55 sft
= 416.996
H) 07.9.8 Cornice, railing, drop walls, louver, fins etc.: ground floor
(H-i) Ground
floor
bottom 8×100'-3''×2'-6'' = 2005.00 sft
= 2005.00 sft
= 186.269
(H-ii) 1st floor
side 8×100'-3''×2'-6'' = 2005.00 sft
side 4×78'-0''×2'-6'' = 780.00 sft
= 2785.00 sft
= 258.733
(H-iii) 2nd floor
side 8×100'-3''×2'-6'' = 2005.00 sft
side 4×78'-0''×2'-6'' = 780.00 sft
= 2785.00 sft
= 258.733
(H-iv) 3rd floor
railing 2×67'-0''×3'-0'' = 402.00 sft
railing 6×26'-8''×3'-0'' = 480.00 sft
railing 4×23'-5''×3'-0'' = 281.00 sft
railing 2×13'-0''×3'-0'' = 78.00 sft
railing 2×77'-6''×3'-0'' = 465.00 sft
railing 2×41'-4''×3'-0'' = 248.00 sft
railing 4×38'-4''×5'-10'' = 894.44 sft
railing 4×38'-4''×4'-0'' = 613.33 sft
cornice 1×97'-0''×2'-10'' = 274.83 sft
cornice 2×41'-0''×2'-4'' = 191.33 sft
= 3927.94 sft
= 364.915

I) 07.9.9 Sunshade, false ceiling: ground floor


(I-i) Ground floor
Sunshade 2×100'-4''×3'-4'' = 668.89 sft
Sunshade 5×8'-0''×1'-0'' = 40.00 sft
kit shelf 1×30'-0''×2'-9'' = 82.50 sft
False Ceiling 2×14'-10''×5'-9'' = 170.58 sft
2×41'-2''×0'-3'' = 20.58 sft
False Ceiling 2×7'-9''×6'-9'' = 104.63 sft
2×29'-0''×0'-3'' = 14.50 sft
False Ceiling 1×10'-4''×5'-10'' = 60.28 sft
1×32'-0''×0'-3'' = 8.00 sft
= 1169.96 sft
= 108.69
(I-ii) 1st floor
Sunshade 2×100'-4''×3'-4'' = 668.89 sft
Sunshade 1×78'-0''×3'-4'' = 260.00 sft
Sunshade 5×8'-0''×1'-0'' = 40.00 sft
False Ceiling 2×14'-10''×5'-9'' = 170.58 sft
2×41'-2''×0'-3'' = 20.58 sft
False Ceiling 2×10'-2''×5'-9'' = 116.92 sft
2×31'-10''×0'-3'' = 15.92 sft
False Ceiling 1×10'-8''×6'-9'' = 72.00 sft
1×34'-10''×0'-3'' = 8.71 sft
False Ceiling 1×7'-5''×6'-1'' = 45.12 sft
1×27'-0''×0'-3'' = 6.75 sft
= 1425.47 sft
= 132.429
(I-iii) 2nd floor
qty same as 1st floor = 132.429
J) 07.9.10 Stair case slab and steps up to ground floor
(J-i) Ground floor
stair-2 2×12'-2''×6'-4'' = 154.11 sft
4×(12'-2''+6'-4'')×''0'-10'' = 61.67 sft
2×12'-2''×9'-10'' = 239.28 sft
4×(12'-2''+9'-10'')×''0'-10'' = 73.33 sft
4×11'-6''×5'-10'' = 268.33 sft
8×11'-6''×1'-4'' = 122.67 sft
25×5'-10''×0'-6'' = 72.92 sft
stair-1 1×11'-2''×5'-8'' = 63.28 sft
2×(11'-2''+5'-8'')×''0'-9.5'' = 26.65 sft
1×11'-2''×4'-7'' = 51.18 sft
2×(12'-2''+4'-7'')×''0'-9.5'' = 26.52 sft
2×11'-6''×5'-4'' = 122.67 sft
4×11'-6''×1'-4'' = 61.33 sft
25×5'-4''×0'-6'' = 66.67 sft
stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 1705.49 sft
= 158.444 sft
(J-ii) 1st floor
stair-2 2×12'-2''×6'-4'' = 154.11 sft
4×(12'-2''+6'-4'')×''0'-10'' = 61.67 sft
2×12'-2''×9'-10'' = 239.28 sft
4×(12'-2''+9'-10'')×''0'-10'' = 73.33 sft
4×11'-6''×5'-10'' = 268.33 sft
8×11'-6''×1'-4'' = 122.67 sft
25×5'-10''×0'-6'' = 72.92 sft
stair-1 1×11'-2''×5'-8'' = 63.28 sft
2×(11'-2''+5'-8'')×''0'-9.5'' = 26.65 sft
1×11'-2''×4'-7'' = 51.18 sft
2×(12'-2''+4'-7'')×''0'-9.5'' = 26.52 sft
2×11'-6''×5'-4'' = 122.67 sft
4×11'-6''×1'-4'' = 61.33 sft
25×5'-4''×0'-6'' = 66.67 sft
stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 1705.49 sft
= 158.444

(J-iii) 2nd floor


stair-1 1×11'-2''×5'-8'' = 63.28 sft
2×(11'-2''+5'-8'')×''0'-9.5'' = 26.65 sft
1×11'-2''×4'-7'' = 51.18 sft
2×(12'-2''+4'-7'')×''0'-9.5'' = 26.52 sft
2×11'-6''×5'-4'' = 122.67 sft
4×11'-6''×1'-4'' = 61.33 sft
25×5'-4''×0'-6'' = 66.67 sft
stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 713.19 sft
= 66.257

(J-iv) 3rd floor


stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 294.89 sft
= 27.396

(J-v) 4th floor


stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 294.89 sft
= 27.396

(J-vi) 5th floor


stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 294.89 sft
= 27.396
(J-vii) 6th floor
stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 294.89 sft
= 27.396
(J-viii) 7th floor
stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 294.89 sft
= 27.396
(J-ix) 8th floor
stair miner 1×11'-0''×3'-5'' = 37.58 sft
2×(11'-0''+3'-5'')×''0'-6'' = 14.42 sft
2×3'-5''×3'-5'' = 23.35 sft
4×(3'-5''+3'-5'')×''0'-6'' = 13.67 sft
3×5'-6''×3'-5'' = 56.38 sft
6×(5'-6''+3'-5'')×''0'-6'' = 26.75 sft
6×11'-6''×1'-4'' = 92.00 sft
18×3'-5''×0'-6'' = 30.75 sft
= 294.89 sft
= 27.396

26 08.1 Supplying, fabrication and fixing to detail as per design : ribbed or deformed bar reinforcement for
Reinforced cement concrete, produced and marked in accordance with BDS ISO 6935 - 2: 2006 (or
standard subsequentley released from BSTI) including straightening and cleaning rust, if any,
bending and binding in position with supply of G.I. wires (excluding splices or laps) etc. complete
in all respect and accepted by the Engineer-in-charge (Measurement shall be recorded only on
standard mass per unit length of bars, while dia of bars exceeds its standard)

08.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006) ribbed or deformed bar produced
and marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 400 MPa
but fy not exceeding 450 MPa and whatever is the yield strength within allowable limit as per
BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield strength fy, shall be at least 1.25
and minimum elongation after fracture and minimum total elongation at maximum force is 16%
and 8% respectively : up to ground floor.

a) Ground Floor:
Pile 164×1'-2''×1'-2×''90'-0'' = 20090.00 cft
i) Pile = 568.88 cum x2.00% 89,314.17
Quantity from item no-24

ii) Base & GB = 470.85 cum x1.75% 64,682.445


iii) Column = 71.27 cum x3.00% 16,782.933
iv) FB,Slab,stair,linte = 346.16 cum x2.00% 54,346.896
v) lCornice,Sunshade = 14.07 cum x1.25% 1,380.512
226,506.959
b) 1st Floor:
i) Column = 42.61 cum x3.00% 10,035.787
ii) FB,Slab,stair,linte = 239.39 cum x2.00% 37,583.602
v) lCornice,Sunshade = 18.46 cum x1.25% 1,811.281
49,430.670

c) 2nd Floor:
i) Column = 42.61 cum x2.50% 8,363.155
ii) FB,Slab,lintel = 216.57 cum x2.00% 34,001.081
v) Cornice,Sunshade = 18.46 cum x1.25% 1,811.281
44,175.518

d) 3rd Floor:
i) Column = 40.63 cum x2.50% 7,972.761
ii) FB,Slab,lintel = 104.61 cum x2.50% 20,530.650
v) Cornice,Sunshade = 28.16 cum x1.25% 2,763.179
31,266.591
e) 4th Floor:
i) Column = 3.79 cum x2.50% 744.038
ii) FB,Slab,lintel = 3.54 cum x2.50% 694.277
1,438.315

f) 5th Floor:
i) Column = 3.79 cum x2.50% 744.038
ii) FB,Slab,lintel = 3.54 cum x2.50% 694.277
1,438.315

g) 6th Floor:
i) Column = 3.79 cum x2.50% 744.038
ii) FB,Slab,lintel = 3.54 cum x2.50% 694.277
1,438.315

h) 7th Floor:
i) Column = 3.79 cum x2.50% 744.038
ii) FB,Slab,lintel = 3.54 cum x2.50% 694.277
1,438.315

i) 8th Floor:
i) Column = 3.79 cum x2.50% 744.038
ii) FB,Slab,lintel = 3.54 cum x2.50% 694.277
1,438.315

j) 9th Floor:
i) FB,Slab,lintel = 7.57 cum x2.50% 1,486.043
1,486.043

27 02.13 Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of
the building site to achive minimum dry density of 95% with optimum moisture content (Modified
proctor test) including carrying watering, leveling, dressing and compacting to a specified percentage
each layer up to finished level etc. all complete and accepted by Engineer-in-charge.

QUANTITY FROM ITEM NO -15 = 12603.61 cft


Mark "A"= = 12603.61 cft
Deduct:
QTY FROM ITEM NO -17 Marked-A = 1901.83 sft
= 475.46 cft
QTY FROM ITEM NO -24 (A) = 5421.76 cft
QTY FROM ITEM NO -24 (B) = 886.19 cft
Mark "B"= = 6783.41 cft
Mark "A-B"= = 5820.20 cft
= 164.780
28 02.10.1 Sand filling in foundation trenches and plinth with sand having F.M. 0.5 to 0.8 in 150 mm layers
including leveling, watering and compaction to achieve minimum dry density of 95% with optimum
moisture content (Modified proctor test) by ramming each layer up to finished level as per design
supplied by the design office only, all complete and accepted by the Engineer-in-charge.

Floor/plinth
QTY FROM ITEM NO -10 MARK "B"= = 16233.24 cft
Base = 32466.47 cft
QTY FROM ITEM NO-10 MARK "A"= = 1901.83 sft
= 798.77 cft
EGL to FGL 1×170'-0''×100'-0×''3'-6'' = 59500.00 cft
Mark "A"= = 92765.24 cft
Deduct:
QTY FROM ITEM NO -17 Marked-A = 1901.83 sft
= 475.46 cft
QTY FROM ITEM NO -24 (A) = 5421.76 cft
QTY FROM ITEM NO -24 (B) = 886.19 cft
Mark "B"= = 6783.41 cft
Mark "A-B"= = 85981.83 cft
= 2434.298

29 06.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone of approved quality,
texture and size over 25 mm thick cement sand (F.M. 1.2) mortar (1:2) including. placing cement
slurry below the stone, cutting the marble stone to desired size, grinding and finishing the edges,
setting in position in proper level, filling the gaps with white cement and colouring pigments
including supplying all necessary equipments/materials and finishing the top by pumice stone and
necessary auxiliary materials and water, electricity and other charges complete in all respect and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor.

(a) Ground Floor


PANTRY stair 2×11'-6''×10'-3'' = 235.75 sft
riser 22×11'-6''×0'-6'' = 126.50 sft
1×35'-2''×5'-0'' = 175.83 sft
1×35'-2''×12'-1'' = 424.93 sft
riser 13×35'-2''×0'-6'' = 228.58 sft
riser 2×15'-1''×5'-0'' = 150.83 sft
riser 2×12'-0''×5'-0'' = 120.00 sft
stair labding 3×10'-6''×9'-0'' = 283.50 sft
3×10'-6''×5'-6'' = 173.25 sft
trade 72×5'-0''×1'-1'' = 390.00 sft
riser 75×5'-0''×0'-6'' = 187.50 sft
= 2496.68 sft
= 231.947
b) 1st Floor:
ENTRY 1×78'-0''×26'-5'' = 2060.50 sft
courtyard
riser 1×16'-5''×11'-0'' = 180.58 sft
1×16'-5''×15'-1'' = 247.62 sft
ski 1×165'-11''×1'-0'' = 165.92 sft
riser 13×35'-2''×0'-6'' = 228.58 sft
front entry 1×25'-8''×15'-2'' = 389.28 sft
1×47'-2''×6'-0'' = 283.00 sft
ski 2×21'-2''×1'-0'' = 42.33 sft
Main prayer hall 1×47'-2''×16'-10'' = 793.97 sft
1×76'-4''×31'-2'' = 2379.06 sft
1×12'-6''×5'-0'' = 62.50 sft
ski 1×258'-8''×1'-0'' = 258.67 sft
lobby 1×44'-1''×6'-0'' = 264.50 sft
ski 1×100'-2''×1'-0'' = 100.17 sft
corri 1×41'-0''×5'-7'' = 228.92 sft
ski 2×41'-0''×1'-0'' = 82.00 sft
1×6'-5''×5'-0'' = 32.08 sft
ski 1×40'-6''×1'-0'' = 40.50 sft
stair labding 3×10'-6''×9'-0'' = 283.50 sft
3×10'-6''×5'-6'' = 173.25 sft
trade 72×5'-0''×1'-1'' = 390.00 sft
riser 75×5'-0''×0'-6'' = 187.50 sft
= 8874.42 sft
= 824.454
c) 2nd Floor:
Islamic/lib 1×25'-8''×15'-2'' = 389.28 sft
1×47'-2''×6'-0'' = 283.00 sft
ski 2×21'-2''×1'-0'' = 42.33 sft
stair labding 3×10'-6''×9'-0'' = 283.50 sft
3×10'-6''×5'-6'' = 173.25 sft
trade 72×5'-0''×1'-1'' = 390.00 sft
riser 75×5'-0''×0'-6'' = 187.50 sft
= 1748.86 sft
= 824.454

30 06.21.2 Supplying and setting 12 mm thick Italian or equivalent quality marble stone on wall of approved
quality, texture and size on wall with 12 mm thick cement sand (F.M. 1.2) mortar (1:2) including
cutting and grinding the marble stone slab/tile, setting in position keeping horizontal and vertical
alignment correct, filling the joints with white cement, cutting and grinding the top surface, finishing
etc including water, electricity and other charges complete in all respect and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

a) 1st Floor:
ENTRY 1×53'-6''×3'-6'' = 187.25 sft
courtyard
riser 2×27'-1''×10'-0'' = 541.67 sft
front entry 1×78'-0''×12'-0'' = 936.00 sft
offset 4×3'-5''×12'-0'' = 164.00 sft
lobby 2×69'-2''×12'-0'' = 1660.00 sft
Main prayer hall 2×76'-4''×12'-0'' = 1832.00 sft
= 5320.92 sft
= 494.325

31 06.2 Supplying, fitting and fixing country made mirror polished homogeneous floor tiles complying BDS
ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of
color &/or design, with cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white
cement including cutting and laying the tiles in proper way and finishing with care etc. all complete
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground floor

GP (mirror polished) 600 mm x 600 mm floor tiles


(a) GROUND FL
store 1×12'-8''×11'-0'' = 139.33 sft
Mass/E.Prog
ski 1×47'-4''×1'-0'' = 47.33 sft
pro.con 1×12'-8''×6'-2'' = 78.11 sft
ski 1×37'-8''×1'-0'' = 37.67 sft
imam traing 1×31'-2''×27'-10'' = 867.47 sft
ski 1×118'-0''×1'-0'' = 118.00 sft
lobby 1×30'-9''×11'-10'' = 363.88 sft
ski 1×85'-2''×1'-0'' = 85.17 sft
corri 1×41'-0''×5'-7'' = 228.92 sft
ski 2×41'-0''×1'-0'' = 82.00 sft
waiting 1×12'-11''×7'-4'' = 94.72 sft
ski 1×40'-6''×1'-0'' = 40.50 sft
Mass/E.Prog 1×11'-8''×14'-7'' = 170.14 sft
ski 1×58'-6''×1'-0'' = 58.50 sft
Autism 1×10'-6''×14'-2'' = 148.75 sft
ski 1×49'-4''×1'-0'' = 49.33 sft
dining 1×26'-0''×19'-0'' = 494.00 sft
ski 1×90'-0''×1'-0'' = 90.00 sft
prayer disable 1×11'-0''×16'-5'' = 180.58 sft
ski 1×54'-10''×1'-0'' = 54.83 sft
1×11'-5''×5'-0'' = 57.08 sft
ski 1×32'-10''×1'-0'' = 32.83 sft
= 3519.15 sft
= 326.937

(b) 1st FLOOR


meeting hall 1×35'-2''×19'-0'' = 668.17 sft
ski 1×108'-4''×1'-0'' = 108.33 sft
deputy dire 1×14'-0''×9'-6'' = 133.00 sft
ski 1×47'-0''×1'-0'' = 47.00 sft
account 1×10'-0''×9'-1'' = 90.83 sft
ski 1×38'-2''×1'-0'' = 38.17 sft
= 1085.50 sft
= 100.845

(c)2nd Floor:
Male prayer hall 1×35'-10''×12'-2'' = 435.97 sft
1×51'-0''×35'-10'' = 1827.50 sft
1×12'-6''×5'-0'' = 62.50 sft
ski 1×204'-0''×1'-0'' = 204.00 sft
Fale prayer hall 1×24'-11''×35'-10'' = 892.85 sft
1×12'-2''×9'-9'' = 118.63 sft
ski 1×145'-10''×1'-0'' = 145.83 sft
Islamic/rea 1×10'-8''×19'-0'' = 202.67 sft
1×59'-4''×1'-0'' = 59.33 sft
Is General Saff 1×13'-8''×19'-0'' = 259.67 sft
1×65'-4''×1'-0'' = 65.33 sft
Guest 1×14'-11''×9'-7'' = 142.95 sft
1×49'-0''×1'-0'' = 49.00 sft
ver 1×4'-6''×9'-7'' = 43.13 sft
1×28'-2''×1'-0'' = 28.17 sft
Teacher 1×10'-0''×9'-1'' = 90.83 sft
1×38'-2''×1'-0'' = 38.17 sft
Imam 1×10'-0''×10'-7'' = 105.83 sft
1×41'-2''×1'-0'' = 41.17 sft
Muajjin 1×12'-4''×10'-6'' = 129.50 sft
1×45'-8''×1'-0'' = 45.67 sft
lobby 1×30'-9''×11'-10'' = 363.88 sft
ski 1×85'-2''×1'-0'' = 85.17 sft
corri 1×41'-0''×5'-7'' = 228.92 sft
ski 2×41'-0''×1'-0'' = 82.00 sft
pass 1×24'-2''×4'-6'' = 108.75 sft
ski 2×24'-2''×1'-0'' = 48.33 sft
= 5905.73 sft
= 548.656

32 06.14 Supplying, fitting and fixing country made floor tiles complying BDS ISO 13006: 2015, water
absorbtion ≤ 0.5%, modulus of rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with
adhesives in full thickness of tiles, filler/tiles grout including cutting, shaping, placing in proper level
etc. all complete and accepted by the Engineer in charge. In ground floor

GP Mirror Polished floor tiles (300 mm x 300 mm)


(a) GROUND FL
Electric/gen 1×20'-10''×121'-6'' = 2531.25 sft
ski 1×66'-8''×1'-0'' = 66.67 sft
Book sales store 1×15'-8''×12'-6'' = 195.83 sft
ski 1×56'-4''×1'-0'' = 56.33 sft
Guard 1×7'-0''×6'-5'' = 44.92 sft
ski 1×26'-10''×1'-0'' = 26.83 sft
Pump 1×14'-2''×8'-1'' = 114.51 sft
ski 1×44'-6''×1'-0'' = 44.50 sft
= 3080.85 sft
= 286.218

33 06.1 Supplying, fitting and fixing country made GP(Gress Porcellanto) - glazed or unglazed
homogeneous floor tiles complying BDS ISO 13006: 2015, water absorbtion ≤ 0.5%, modulus of
rupture (MOR) ≥ 27 N/mm2, irrespective of color &/or design, with cement sand (F.M. 1.2) mortar
(1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper
way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement:
CEM-II/A-M). In ground floor

06.1.1 GP (homogeneous) 300 mm x 300 mm floor tiles


(a) Ground FL
Male ablution 1×14'-9''×9'-3'' = 136.44 sft
1×4'-6''×13'-7'' = 61.13 sft
toi 6×4'-3''×4'-6'' = 114.75 sft
toi 2×4'-9''×5'-0'' = 47.50 sft
wash 1×10'-0''×6'-6'' = 65.00 sft
toi 1×6'-11''×5'-6'' = 38.04 sft
M/Ablution 1×8'-5''×6'-11'' = 58.22 sft
kit 1×13'-7''×10'-0'' = 135.83 sft
Dead body wash 1×13'-4''×15'-10'' = 211.11 sft
= 868.01 sft
= 80.640
(b) 1st FLOOR
Male ablution 2×14'-9''×9'-3'' = 272.88 sft
2×4'-9''×9'-3'' = 87.88 sft
2×4'-6''×9'-4'' = 84.00 sft
toi 10×4'-3''×4'-6'' = 191.25 sft
toi 2×5'-2''×5'-6'' = 56.83 sft
wash 1×10'-3''×7'-5'' = 76.02 sft
1×3'-3''×6'-1'' = 19.77 sft
= 788.63 sft
= 73.265
c) 2nd Floor:
M/F ablution 2×14'-4''×9'-3'' = 265.17 sft
2×4'-6''×9'-4'' = 84.00 sft
toi 8×4'-3''×4'-6'' = 153.00 sft
toi 2×4'-10''×5'-7'' = 53.97 sft
wash 1×9'-5''×6'-7'' = 61.99 sft
toi 1×11'-8''×5'-0'' = 58.33 sft
= 676.47 sft
= 73.265
34 06.6 Supplying, fitting and fixing country made glazed wall tiles complying BDS ISO 13006: 2015,
irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and
raking out the joints with white cement including cutting, laying and hire charge of machine and
finishing with care etc. including cost of water, electricity and other charges complete in all respect
and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

06.6.3 Wall tiles more than 250 mm x 400 mm & less than or equal to 300 mm x 600 mm in sizes
(a) Ground FL
Male ablution 2×(14'-9''+9'-3'')×''7'-0'' = 336.00 sft
2×13'-7''×7'-0'' = 190.17 sft
toi 12×(4'-3''+4'-6'')×''7'-0'' = 735.00 sft
toi 4×(4'-9''+5'-0'')×''7'-0'' = 273.00 sft
wash 2×(10'-0''+6'-6'')×''7'-0'' = 231.00 sft
toi 2×(6'-11''+5'-6'')×''7'-6'' = 186.25 sft
M/Ablution 2×(8'-5''+6'-11'')×''7'-0'' = 214.67 sft
kit 2×(13'-7''+10'-0'')×''10'-3'' = 483.46 sft
Dead body wash 2×(13'-4''+15'-10'')×''10'-3'' = 597.92 sft
= 3247.46 sft
DEDUCT
DOOR 10×2'-6''×7'-0'' = 175.00 sft
F/L 2×2'-0''×1'-6'' = 6.00 sft
= 5141.75 sft
-= 1894.29 sft
-= 175.984
(b) 1st FLOOR
Male ablution 4×(14'-9''+9'-3'')×''7'-0'' = 672.00 sft
4×9'-4''×7'-0'' = 261.33 sft
toi 20×(4'-3''+4'-6'')×''7'-0'' = 1225.00 sft
toi 4×(5'-2''+5'-6'')×''7'-0'' = 298.67 sft
wash 2×(10'-3''+13'-6'')×''7'-0'' = 332.50 sft
= 2789.50 sft
DEDUCT
DOOR 13×2'-6''×7'-0'' = 227.50 sft
F/L 6×2'-0''×1'-6'' = 18.00 sft
= 5824.50 sft
-= 3035.00 sft
-= 281.958
c) 2nd Floor:
M/F ablution 4×(14'-4''+9'-3'')×''7'-0'' = 660.33 sft
4×9'-4''×7'-0'' = 261.33 sft
toi 16×(4'-3''+4'-6'')×''7'-0'' = 980.00 sft
toi 4×(4'-10''+5'-7'')×''7'-0'' = 291.67 sft
wash 2×(9'-5''+6'-7'')×''7'-0'' = 224.00 sft
toi 2×(11'-8''+5'-0'')×''7'-6'' = 250.00 sft
= 2667.33 sft
DEDUCT
DOOR 12×2'-6''×7'-0'' = 210.00 sft
F/L 4×2'-0''×1'-6'' = 12.00 sft
= 4896.33 sft
-= 2229.00 sft
-= 207.079

35 06.7 Supplying, fitting and fixing country made rustic or matt finished wall tiles complying BDS ISO
13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar
(1:3) base and raking out the joints with white cement including cutting, laying and hire charge of
machine and finishing with care etc. including water, electricity and other charges complete in all
respect and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M). In ground floor

06.7.1 Matt or rustic wall tiles less than or equal to 300 mm x 600 mm size
(a) Ground FL
MINER WALL 2×(11'-10''+11'-10'')×''10'-0'' = 473.33 sft
= 473.33 sft
DEDUCT
W 1×3'-6''×7'-0'' = 24.50 sft
= 971.17 sft
-= 497.83 sft
= 43.974
(b) 1st FLOOR
Qty same as Ground floor
= 43.974
c) 2nd Floor:
Qty same as Ground floor
= 43.974

c) 3rd Floor:
Qty same as Ground floor
= 43.974
c) 4th Floor:
Qty same as Ground floor
= 43.974
c) 5th Floor:
Qty same as Ground floor
= 43.974
c) 6th Floor:
Qty same as Ground floor
= 43.974
c) 7th Floor:
Qty same as Ground floor
= 43.974
c) 8th Floor:
Qty same as Ground floor
= 43.974
36 04.31 38 mm thick artificial patent stone (1:1.5:3) flooring with cement, best quality coarse sand (50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2 and 50% best quality local sand of FM
1.2) and 12 mm down well graded stone chips, laying the concrete in alternate panels, compacting
and finishing the top with neat cement and curing at least for 7 days in all floors including cost of
water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M) In ground floor

(a) Ground FL
miner 1×9'-2''×9'-2'' = 84.03 sft
2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 221.94 sft
= 20.619
(b) 1st FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(c) 2nd FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(d) 3rd FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(e) 4th FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(f) 5th FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(g) 6th FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(h) 7th FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
(i) 7th FL
miner 2×9'-2''×2'-6'' = 45.83 sft
2×2'-6''×2'-6'' = 12.50 sft
18×2'-6''×0'-10'' = 37.50 sft
19×2'-6''×0'-6'' = 23.75 sft
SKIRTING 4×9'-2''×0'-6'' = 18.33 sft
= 137.92 sft
= 12.813
37 11.1 Supplying and making door and window frames (Chowkat) for all floors with matured seasoned
wood of required size. Painting two coats of coal tar to the surface in contact with wall. Fitting and
fixing in position etc. all complete and accepted by the Engineer-in-charge. (All sizes of wood are
finished).
11.1.5 Chittagong Teak
GF
Door Frame D1 4×20'-0''' = 80.00 rft
D2 1×18'-6''' = 18.50 rft
D4 3×18'-4''' = 55.00 rft
D5 5×17'-4''' = 86.67 rft
FF
Door Frame D1 1×20'-0''' = 20.00 rft
D2 1×18'-6''' = 18.50 rft
D4 3×18'-4''' = 55.00 rft
D5 3×17'-4''' = 52.00 rft
2ND F
D2 1×18'-6''' = 18.50 rft
D4 2×18'-4''' = 36.67 rft
D5 8×17'-4''' = 138.67 rft
= 579.50 Rft
Mark "A"= = 72.44 cft
GF
Door Frame D1 1×21'-0''' = 21.00 rft
D1 1×20'-0''' = 20.00 rft
D3 3×19'-0''' = 57.00 rft
FF
Door Frame D9 2×21'-0''' = 42.00 rft
D1 4×20'-0''' = 80.00 rft
D3 3×19'-0''' = 57.00 rft
2ND F
Door Frame D1 5×20'-0''' = 100.00 rft
D3 2×19'-0''' = 38.00 rft
= 415.00 Rft
Mark "B"= = 95.45 cft
Mark "A+B"= = 167.89 cft
= 4.754

38 11.3 Supplying, fitting and fixing M.S. flat bar clamp of 150 mm x 38 mm x 6 mm size having bifurcated
ends to door and window frames with necessary rowel plug, screws etc. including cutting grooves in
chowkat if necessary etc. all complete and accepted by the Engineer-in-charge.

24×6 = 144.00 nos


29×8 = 232.00 nos
= 376.000

39 12.1 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) solid
wood single leaf door shutter having top rail style of sections 100mm x 38mm, lock rail 125 mm x
38 mm and bottom rail 225 mm x 38 mm. Closed joints with 25 mm x 12 mm size wooden peg and
provided with best quality 4 Nos. 100mm iron hinges 2 (two) Nos. best quality 12 mm dia 250 mm
and 200 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle,1(one)
No best quality hasp bolt, hinged cleats, buffer blocks and finished by sand papering etc. all
complete in all floors and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

12.1.4 Chittagong Teak


D4 8×2'-11''×7'-3.5'' = 170.14 sft
D5 16×2'-11''×6'-10'' = 318.89 sft
= 489.03 sft
= 45.432

40 12.4 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) wooden
double leaf panel door shutters. Top rail and styles of sections 100 mm x 38 mm, lock rail 125 mm x
38 mm and bottom rail 225 mm x 38 mm, paneling 38 mm thick both sides raised, provided with
best quality 8 Nos. 100 mm long iron hinges, 2 (two) Nos. best quality 12 mm dia 250 mm and 200
mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle, 1 No. hasp-bolt,
hinged cleats, buffer blocks and finished by sand papering, necessary screws etc. all complete in all
floors and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

12.4.4 Chittagong Teak


D9 3×5'-8''×7'-3.5'' = 123.96 sft
D1 15×4'-8''×7'-3.5'' = 510.42 sft
D2 3×4'-2''×6'-10'' = 85.42 sft
D3 8×3'-8''×7'-3.5'' = 213.89 sft
= 933.68 sft
= 86.741
41 12.15.2 Supplying, fitting and fixing M.S. door shutter made with 38 mm x 38 mm x 6 mm angle outer
frame, inner member 25 mm x 6 mm F.I. bar, cladding with 16 BWG M.S. sheet, 04 nos. 75 mm
long hinge, 02 nos. locking arrangement with 50 mm x 50 mm x 6 mm M.S. angle chowkat
including all charges for welding, riveting etc. including cost of supplying all essential fittings like
iron hinges, socket bolts, clamps, for fittig and fixing the frame, making necessary holes in brick
walls and R.C.C works and fitting with C.C. (1:2:4) and mending good the damages including all
cost of carriage, workshop charges, electricity, and labour for fittings, fixing, curing etc. all complete
and accepted by the Engineer-in-charge.
(Rate is excluding the costs of painting).

1×3'-6''×7'-0'' = 24.50 sft


= 2.276

42 12.21 Extra cost for using brass/ SS fittings in place of iron fittings in doors & windows for all floors
(super quality local).

12.21.1 Brass fittings of door


QTY FROM ITEM-39 = 45.432
QTY FROM ITEM-40 = 86.741
= 132.173

43 12.23.1 Supplying, fitting and fixing mortice door lock of approved quality including all necessary tools and
accessories etc. all complete approved and accepted by the Engineer-in-charge.

16.000

44 12.23.2 Supplying, fitting and fixing rim/round door lock of approved quality including all necessary tools
and accessories etc. all complete and accepted by the Engineer-in-charge.

8.000
45 12.24 Supplying, fitting and fixing of best quality magnetic door shock absorber of approved quality
including all necessary tools and accessories etc. all complete and accepted by the Engineer-in-
charge.

82.000
46 12.25 Supplying, fitting and fixing best quality heavy type 19 mm dia and 300 mm long brass hasp bolt
including cutting grooves in door shutter and frames, screws etc. all complete approved and accepted
by the Engineer-in-charge.

55.000

47 13.5.1 Supplying, fitting and fixing window grill made of 12 mm x 12 mm M.S. solid bar 140 mm c/c with
outer frame of 38 mm x 6mm F.I. bar as per design approved and accepted by the Engineer-in-
charge.

G.F
W1 2×6'-0''×5'-0'' = 60.00 sft
W2 7×5'-0''×6'-6'' = 227.50 sft
W3 1×8'-0''×4'-6'' = 36.00 sft
W4 5×6'-0''×4'-6'' = 135.00 sft
W5 1×4'-0''×4'-6'' = 18.00 sft
F.F
W1 2×5'-0''×6'-6'' = 65.00 sft
W2 3×5'-0''×4'-6'' = 67.50 sft
2nd.F
W1 1×10'-0''×6'-6'' = 65.00 sft
W2 2×5'-0''×6'-6'' = 65.00 sft
W3 1×5'-0''×4'-6'' = 22.50 sft
W4 1×3'-11''×6'-6'' = 25.46 sft
Back side
W 3×6'-0''×5'-0'' = 90.00 sft
2×6'-0''×2'-6'' = 30.00 sft
W2 12×7'-0''×5'-0'' = 420.00 sft
8×7'-0''×2'-6'' = 140.00 sft
north side
W1 11×8'-0''×6'-6'' = 572.00 sft
7.34×8'-0''×2'-6'' = 146.80 sft
south side
W1 11×8'-0''×6'-6'' = 572.00 sft
7.34×8'-0''×2'-6'' = 146.80 sft
Front side
W1 2×6'-3''×6'-6'' = 81.25 sft
1.33×6'-3''×2'-6'' = 20.78 sft
W2 1×11'-0''×4'-0'' = 44.00 sft
0.67×11'-0''×2'-6'' = 18.43 sft
MARK"A"= = 3069.01 sft

HW 7×2'-6''×2'-0'' = 35.00 sft


HW 4×2'-6''×2'-0'' = 20.00 sft
HW1 3×2'-6''×2'-0'' = 15.00 sft
HW2 2×2'-0''×2'-0'' = 8.00 sft
MARK"B"= = 78.00 sft
Back side
north side
W2 1×6'-2''×22'-9'' = 140.29 sft
south side
W2 1×6'-2''×22'-9'' = 140.29 sft
Front side
W2 2×6'-0''×22'-9'' = 273.00 sft
MARK"C"= = 553.58 sft
MARK"A+B+C"= = 3700.60 sft
= 343.794

48 14.6 Supplying, fitting and fixing of aluminium sliding window as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.2 mm
thick outer bottom (size 75.50 mm, 32mm), 1.2 mm thick outer top (size 75.50 mm, 16.80 mm), 1.2
mm thick shutter top (size 33 mm.26.80, 22 mm), 1.2 mm thick shutter bottom (size 60mm, 24.40
mm), 1.2 mm thick outer side (size 75.50 mm,19.90 mm), 1.2 mm thick shutter lock (size 49.20 mm
26.20 mm) and 1.2 mm thick inter lock (size 34.40 mm, 32.10 mm) sections all aluminium members
(total weight kg/sqm) will be anodized to aluminium bronze/silver/ss/black colour with a coat not
less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25
micrones in thickness and density of 4 mg per square cm etc. including all accessories like sliding
door key lock, sliding door wheel, sliding door mohiar, sliding door neoprene, bolts and nuts
including sealants, keeping provision for fitting 5 mm thick glass including labour charge for fitting
of accessories, making grooves and mending good damages, carriage, and electricity complete in all
respect as per drawing and accepted by the Engineer-in-charge.

14.6.1 Size up to: 1500 mm x 1400 mm. (total weight minimum 9.081 kg)
14.6.1.1 Anodized to s.s colour/ black colour
Qty From Item no-47 MARK "A" = 3069.01 sft
= 285.118

14.6.2 Size up to: 900 mm x 1400 mm (total weight minimum 7.409 kg)
14.6.2.1 Anodized to s.s colour/ black colour
Qty From Item no-47 MARK "B" = 78.00 sft
= 7.246
49 14.10 Supplying fitting and fixing of aluminium corrugated curtain wall as per the U.S. Architectural
Aluminium Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having
1.2 mm thick bottom cover (size 37.78 mm 31.78 mm, 0.313 kg/m), 1.2 mm thick grouve cover (size
76.20 m 38.10 mm, 0.912 kg/m), 1.2 mm thick grouve cover (size 57.15 mm, 15.80 mm 0.45 kg/m),
1.2mm thick top and side (size 76.2 mm, 57.15 mm, 0.153 kg/m) and 1.8 mm thick spandrel (7.14
mm, 0.70 kg/m) sections of will be anodized to aluminium bronze/silver/ss/black colour with a coat
not less than 15 micrones in thickness or powder coated to any colour with a coat not less than 25
micrones in thickness and density of 4 mg per square cm etc. including all accessories like rivet,
screws fixed neoprene etc. complete in all respect as per drawing and accepted by the Engineer-in-
charge.

14.10.1 Size up to: 3000 mm x 2100 mm (Total weight 50.228 kg)


14.10.1.1 Anodized to s.s colour/ black colour
Qty From Item no-47 MARK "C" = 553.58 sft
= 51.429
50 14.5 Supplying, fitting and fixing of aluminium sliding doors as per the U.S. Architectural Aluminium
Manufacturer’s Association (AAMA) standard specification and BDS 1879:2014 having 1.2 m mm
thick outer bottom (size 75.50 mm, 17.79 mm, 0.528 kg/m), 1.2 mm thick outer top (size 75. 50 mm,
26.80 mm 0.78 kg/m), 1.2 mm thick shutter top (size 33 mm, 26.80 mm, 0.536 kg/m), 1.2 mm thick
shutter bottom (size 60 mm, 24 mm, 0.736 kg/m), 1.2 mm thick side (size 75.50 mm, 19.90 mm,
0.616 kg/m), 1.2 mm thick sliding fixed side (size 31 mm, 26 mm , 0.422 kg/m) 1.2 mm thick
shutter lock (size 49.20 mm , 26. 20 mm , 0.661 kg/m), 1.2 mm thick inter lock (size 34.40 mm,
32.10 mm, 0.665 kg/m) 1.2 mm thick shutter divider (size 31.75 mm, 0.535 kg/m) and 1.4 mm to 1.5
mm thick spandrel (7.14 mm, 0.70 kg/m) sections all aluminium members (total weight 19.72 kg)
will be anodized to aluminium bronze/silver/ss/black colour with a coat not less than 15 micrones in
thickness or powder coated to any colour with a coat not less than 25 micrones in thickness and
density of 4 mg per square cm etc. including all accessories like sliding door key lock, sliding door
whee , sliding door mohiar, sliding door neoprene, bolts and nuts including sealants, keeping
provision for fitting 5mm thick glass including labour charge for fitting of accessories, making
grooves and mending good damages, carriage, and electricity complete in all respect as per drawing
and accepted by the Engineer-in-charge.
Size up to: 1800 mm x 2100 mm

14.5.1 Anodized to s.s colour/ black colour


G.F
SD-1 1×9'-10''×7'-0'' = 68.83 sft
SD-2 1×6'-0''×7'-6'' = 45.00 sft
SD-3 2×7'-6''×7'-0'' = 105.00 sft
F.F
SD-1 1×11'-0''×8'-6'' = 93.50 sft
SD-2 1×7'-0''×7'-6'' = 52.50 sft
SD-3 1×7'-4''×7'-6'' = 55.00 sft
SD-4 2×9'-5''×7'-0'' = 131.83 sft
2nd.F
SD-1 2×9'-5''×7'-0'' = 131.83 sft
SD-2 1×8'-0''×7'-0'' = 56.00 sft
= 739.50 sft
= 68.701
51 14.14 Supplying, fitting and fixing in Aluminium door frames, windows, partitions and curtain wall
distortion free glass of approved quality and shade including cost of fitting fixing all necessary
accessories etc. complete in all respect as per drawing and accepted by the Engineer-in-charge.

(a) 14.14.1.2 6 mm thick clear glass


Qty From Item no-48(a) = 285.118
Qty From Item no-48(b) = 7.246
Qty From Item no-49 = 51.429
Qty From Item no-50 = 68.701
= 412.495

52 06.16 Supplying, fitting and fixing 20mm to 25mm thick mchine made cement pavement tiles having
minimum compressive strength of 27 MPa, irrespective of color &/or design, with 20 mm thick
cement sand (F.M. 1.2) mortar (1:4) base and making the joints carefully in true staight line
including cutting, laying and hire charge of machine and finishing with care etc. including water,
electricity and other charges complete in all respect and accepted by the Engineer-in-charge.
(Cement: CEM-II/A-M). In ground floor

06.16.1 Pavement tiles of size 300 mm x 300 mm


Front Entry 1×14'-0''×24'-0'' = 336.00 sft
Drive way 1×51'-10''×23'-0'' = 1192.17 sft
1×78'-0''×7'-0'' = 546.00 sft
R/Entry 1×25'-8''×20'-1'' = 515.47 sft
1×47'-3''×48'-4'' = 2283.75 sft
n/Entry 1×13'-0''×5'-10'' = 75.83 sft
1×7'-0''×7'-0'' = 49.00 sft
front entry 1×100'-0''×7'-0'' = 700.00 sft
pass for b/office 1×143'-2''×6'-0'' = 859.00 sft
= 6557.22 sft
= 609.181

53 08.4 Supplying fan hook 300-grade (RB 300) of 16 mm diameter M.S. rod (one meter straight length)
having rounded hook at the middle of bar in proper size so as to be concealed within fan cup
including fabrication, fitting and fixing in all floor accepted by the Engineer-in-charge.

G. FL to 2nd 3×50 = 150.00 nos


floor
= 150.000

54 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard height with 2 mm thick 62
mm dia pipe for hand-rail, 2 mm thick 40 mm dia 5 nos vertical pipes in each flight, 2 mm thick 20
mm dia 5 nos horizontal pipes as per drawing, design including carrying, polishing fabricating,
welding and fixing with tread by 25 mm long royal bolt etc. all complete and accepted by the
Engineer-in-charge.
2×110'-0''' = 220.00 rft
1×145'-0''' = 145.00 rft
M/Stair 1×280'-0''' = 280.00 rft
1×12'-0''' = 12.00 rft
2×35'-0''' = 70.00 rft
Ramp 2×20'-0''' = 40.00 rft
= 767.00 rft
= 2301.00 sft
= 213.768

55 20.6 Supplying, fitting and fixing verandah railing with 2 mm thick 50 mm dia SS hand rail, 2 mm thick
20 mm dia 5 nos SS horizontal pipes, 2 mm thick 50 mm x 25 mm SS box vertical post @ 450 mm
c/c. Among the vertical box post 5 nos box posts will be fitted with floor bed by 65 mm x 55 mm x 6
mm SS plate, remaining no SS box post will be fitted and fixed with 50 mm x 25 mm x 2 mm SS
horizontal box at bottom (50 mm above from floor bottom) including all fittings, fixtures, polishing,
carrying etc. all complete as per approved design and drawing and accepted by the Engineer-in-
charge.

1×13'-3''×3'-6'' = 46.38 sft


1st floor 1×16'-5''×3'-6'' = 57.46 sft
2×13'-11''×3'-6'' = 97.42 sft
1×12'-0''×3'-6'' = 42.00 sft
2nd floor 1×7'-8''×3'-6'' = 26.83 sft
= 270.08 sft
= 25.091

56 15.10 Providing drip course or nosing at the edge of sunshade or cornice with cement sand (F.M. 1.2)
mortar (1:2) with fresh cement, curing at least for 7 days, cost of water, electricity, scaffolding and
other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge.

n/s side 24×6'-2''' = 148.00 rft


n/s side 4×16'-10''' = 67.33 rft
n/s side 2×19'-7''' = 39.17 rft
n/s side 2×38'-3''' = 76.50 rft
8×6'-0''' = 48.00 rft
12×10'-6''' = 126.00 rft
Chilakota 1×64'-8''' = 64.67 rft
railing 1×651'-4''' = 651.33 rft
= 1221.00 rft
= 372.143

57 19.1.1 Manufacturing, supplying, fitting and fixing collapsible gate of any design and shape made of 25
mm x 25 mm x 3 mm S.S. angle placed @ 112 mm c/c vertically and connecting the same with each
other by 25 mm x 3 mm S.S flat bar scissors 525 mm/ 600 mm long provided in 3 rows including
cutting the different S.S. members to required sizes, fabricating, welding, riveting with required size
rivets, providing required size wheels, pulling handles on both sides, suitable locking arrangement,
electrodes, grease and finally placing the same in position in between 2 (two) nos. 50 mm x 50 mm x
6 mm S.S. tee rail made by welding 2 nos. 50 mm x 6 mm S.S. flat bar fitted and fixed at top and
bottom with R.C.C. lintel/roof slab, floors and side wall with required nos. 150 mm to 225 mm long
38 mm x 6 mm S.S. flat bar clamps one end welded with the gate member and the other end
bifurcated and embedded in C.C. at the respective point including cutting holes and mending good
the damages by pouring concrete (1:2:4) into the holes and finishing, both end carriage, including
greasing, electrodes, curing etc. complete as per drawing and design and accepted by the Engineer-
in-charge .

1×13'-0''×9'-3'' = 120.25 sft


1×14'-0''×8'-6'' = 119.00 sft
2×14'-5''×8'-6'' = 245.08 sft
1×14'-2''×8'-6'' = 120.42 sft
= 604.75 sft
= 56.183

58 17.4 Average 100 mm thick finished lime terracing with 20 mm down graded first class brick chips
(khoa), surki from 1st class bricks and minimum lime content 500 kg per 2.83 cubic meter (stone
lime brought at site, not being powdered in open air and to be slaked in presence of engineer-in-
charge and to be measured in volume three days after slaking for using in the mix) in the proportion
7:2:2 (brick chips : surki : lime) including preparation of the mix on the ground by making a suitable
platform under proper polythene cover. Cutting the mix twice daily with limewater (1:10) at least for
7 days until the mix attain desirable consistency. Laying the mix in proper slope, beating the same
with standard ‘koppa’ for minimum 7 days to gain maximum consolidation, making ghoondy and
neat finishing with lime Surki mortar (1:2) and curing for 21 days providing polythene cover after
each day work and cleaning etc. complete in all respect accepted by the Engineer-in-charge. Ist
Floor

3rd floor
TOP SLAB AREA
roof 1×100'-4''×78'-0'' = 7826.00 sft
Porch 1×13'-0''×6'-10'' = 88.83 sft
guard 1×6'-5''×7'-0'' = 44.92 sft
1st floor roof 1×13'-4''×36'-0'' = 480.00 sft
= 8439.75 sft

dome-1 0.785×26'-10''×26'-10'' = 565.22 sft


dome-2 0.785×13'-10''×13'-10'' = 150.22 sft
dome-3 0.785×10'-10''×10'-10'' = 92.13 sft
= 807.57 sft
= 7632.18 sft
Mark "A"= = 2544.06 cft
GHONDI 1×356'-8''' = 356.67 rft
1×65'-8''' = 65.67 rft
1×98'-8''' = 98.67 rft
1×26'-10''' = 26.83 rft
= 547.83 rft
Mark "B"= = 136.96 cft
Mark "A+B"= = 2681.02 cft
= 75.917

59 04.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%) in superstructure with
machine made hard pressed klinker facing strips of approved quality with 20 mm thick cement sand
(F.M.1.2) mortar (1:3) in adjacent side wall, column, drop wall etc. and racking out joints, cutting to
required sizes wherever necessary with high class recessed pointing, cleaning and soaking at least for
24 hours before use washing and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-
in-charge. (Cement: CEM-II/A-M) In ground floor.

04.14.1 With 200 mm x 62 mm x 16.51 mm red strip


(a) ground floor
2×100'-4''×10'-9'' = 2157.17 sft
1×86'-0''×10'-9'' = 924.50 sft
MARK "A"= = 3081.67 sft
DEDUCT
w 4×8'-0''×6'-6'' = 208.00 sft
w 2.67×8'-0''×2'-6'' = 53.40 sft
w 2×7'-4''×6'-6'' = 95.33 sft
w 0.67×7'-4''×2'-6'' = 12.28 sft
sd3 1×7'-6''×7'-0'' = 52.50 sft
D 1×35'-2''×10'-9'' = 378.04 sft
MARK "B"= = 799.56 sft
MARK "A-B"= = 2282.11 sft
= 212.013
(b) 1ST FL
2×100'-4''×12'-6'' = 2508.33 sft
1×86'-0''×12'-6'' = 1075.00 sft
MARK "A"= = 3583.33 sft
DEDUCT
w 4×8'-0''×6'-6'' = 208.00 sft
w 2.67×8'-0''×2'-6'' = 53.40 sft
w 2×7'-4''×6'-6'' = 95.33 sft
w 0.67×7'-4''×2'-6'' = 12.28 sft
d 1×15'-0''×6'-6'' = 97.50 sft
d 0.67×15'-0''×2'-6'' = 25.13 sft
MARK "B"= = 491.64 sft
MARK "A-B"= = 3091.69 sft
= 287.225

( c) 2nd Floor
2×100'-4''×12'-6'' = 2508.33 sft
1×86'-0''×12'-6'' = 1075.00 sft
MARK "A"= = 3583.33 sft
DEDUCT
w 4×8'-0''×6'-6'' = 208.00 sft
w 2.67×8'-0''×2'-6'' = 53.40 sft
w 2×7'-4''×6'-6'' = 95.33 sft
w 0.67×7'-4''×2'-6'' = 12.28 sft
d 1×15'-0''×4'-6'' = 67.50 sft
d 0.67×15'-0''×2'-6'' = 25.13 sft
MARK "B"= = 461.64 sft
MARK "A-B"= = 3121.69 sft
= 290.012

( d ) 3rd Floor
2×20'-8''×10'-0'' = 413.33 sft
2×12'-2''×10'-0'' = 243.33 sft
MARK "A"= = 656.67 sft
DEDUCT
d 1×3'-6''×7'-0'' = 24.50 sft
MARK "B"= = 24.50 sft
MARK "A-B"= = 632.17 sft
= 58.730

60 15.2 Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall with
cement (1:4) up to 150 mm below ground level including washing of sand, finishing the edges and
corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all
complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) ground floor.

OUTSIDE 2×(156'-3''+87'-6'')×''2'-3'' = 1096.88 sft


= 1096.88 sft
= 101.902

61 15.3 Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to dado with
cement (1:4) up to 150 mm including washing of sand, finishing the edges and corners and curing at
least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all
respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground
floor.

(a) ground floor


miner 18×(9'-2''+9'-2'')×''0'-8'' = 220.00 sft
= 220.00 sft
= 20.438

62 15.1 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to both inner-and
outer surface of wall, finishing the corner and edges including washing of sand, cleaning the surface,
curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in
all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground
floor.

a) G.F (INSIDE WALL)


store 2×(12'-8''+11'-0'')×''9'-6'' = 449.67 sft
Mass/E.Prog
pro.con 2×(6'-2''+12'-8'')×''9'-6'' = 357.83 sft
imam traing 2×(31'-2''+27'-10'')×''9'-6'' = 1121.00 sft
lobby 2×(30'-9''+11'-10'')×''9'-6'' = 809.08 sft
corri 2×(41'-0''+5'-7'')×''9'-6'' = 885.08 sft
waiting 2×(14'-7''+7'-4'')×''9'-6'' = 416.42 sft
Mass/E.Prog 2×(14'-7''+11'-8'')×''9'-6'' = 498.75 sft
Autism 2×(10'-6''+14'-2'')×''9'-6'' = 468.67 sft
dining 2×(26'-0''+19'-0'')×''9'-6'' = 855.00 sft
guard 2×(6'-5''+7'-0'')×''9'-6'' = 254.92 sft
car park 2×(67'-0''+47'-2'')×''9'-6'' = 2169.17 sft
drive way 2×(78'-0''+30'-0'')×''9'-6'' = 2052.00 sft
elect/gen 2×(20'-10''+12'-6'')×''9'-6'' = 633.33 sft
book store 2×(12'-6''+15'-8'')×''9'-6'' = 535.17 sft
stair 6×(24'-6''+10'-6'')×''9'-6'' = 1995.00 sft
miner 2×(14'-7''+7'-4'')×''9'-6'' = 416.42 sft
lobby 2×(13'-0''+5'-10'')×''9'-6'' = 357.83 sft
ver 2×(11'-5''+5'-0'')×''9'-6'' = 311.92 sft
toi 2×(14'-9''+24'-0'')×''3'-3'' = 251.88 sft
toi 20×(4'-3''+4'-6'')×''3'-3'' = 568.75 sft
2×(8'-5''+6'-11'')×''3'-3'' = 99.67 sft
prayer disable = 6116.42 sft
DEDUCT
door 1×6'-0''×7'-0'' = 42.00 sft
door 5×5'-0''×7'-0'' = 175.00 sft
door 1×4'-6''×7'-0'' = 31.50 sft
door 2×4'-0''×7'-0'' = 56.00 sft
w1 2×6'-0''×5'-0'' = 60.00 sft
w2 7×5'-0''×6'-6'' = 227.50 sft
w3 1×8'-0''×4'-6'' = 36.00 sft
w4 5×6'-0''×4'-6'' = 135.00 sft
= 763.00 sft
Mark "A"= = 5353.42 sft
OUTSIDE
back side 1×87'-9''' = 87.75 rft
= 87.75 rft
= 943.31 sft
n/s/e side 1×350'-0''×0'-10'' = 291.67 sft
= 1234.98 sft
DEDUCT
w1 1×6'-0''×6'-6'' = 39.00 sft
w2 3×7'-0''×6'-6'' = 136.50 sft
= 175.50 sft
Mark "B"= = 1059.48 sft
MARK "A+B"= = 6412.90 sft
= 595.773

(b) 1ST FL
meeting hall 2×(35'-2''+19'-0'')×''9'-6'' = 1029.17 sft
deputy dire 2×(14'-0''+9'-6'')×''9'-6'' = 446.50 sft
account 2×(10'-0''+9'-1'')×''9'-6'' = 362.58 sft
lobby 2×(44'-1''+6'-0'')×''9'-6'' = 951.58 sft
corri 2×(41'-0''+5'-7'')×''9'-6'' = 885.08 sft
store 2×(11'-8''+5'-0'')×''9'-6'' = 316.67 sft
stair 6×(24'-6''+10'-6'')×''9'-6'' = 1995.00 sft
miner 2×(14'-7''+7'-4'')×''9'-6'' = 416.42 sft
toi 2×(14'-4''+23'-3'')×''3'-3'' = 244.29 sft
toi 20×(4'-3''+4'-6'')×''3'-3'' = 568.75 sft
2×(6'-7''+5'-3'')×''3'-3'' = 76.92 sft
4×(5'-6''+5'-2'')×''3'-3'' = 138.67 sft
prayer disable = 3674.92 sft
DEDUCT
door 3×5'-0''×7'-0'' = 105.00 sft
door 1×4'-6''×7'-0'' = 31.50 sft
door 3×4'-0''×7'-0'' = 84.00 sft
w1 2×5'-0''×6'-6'' = 65.00 sft
w2 3×5'-0''×4'-6'' = 67.50 sft
= 353.00 sft
Mark "A"= = 3321.92 sft
OUTSIDE
back side 1×87'-9''' = 87.75 rft
= 87.75 rft
= 943.31 sft
n/s/e side 1×475'-0''×0'-10'' = 395.83 sft
= 1339.15 sft
DEDUCT
w1 1×6'-0''×6'-6'' = 39.00 sft
w2 3×7'-0''×6'-6'' = 136.50 sft
= 175.50 sft
Mark "B"= = 1163.65 sft
MARK "A+B"= = 4485.56 sft
= 595.773

( c) 2nd Floor Qty Same as Ground Floor


= 595.773

(d) 3rd Floor (INSIDE WALL)


railing 1×67'-0''×3'-0'' = 201.00 sft
railing 3×26'-8''×3'-0'' = 240.00 sft
railing 2×23'-5''×3'-0'' = 140.50 sft
railing 1×13'-0''×3'-0'' = 39.00 sft
railing 1×77'-6''×3'-0'' = 232.50 sft
railing 1×41'-4''×3'-0'' = 124.00 sft
railing 2×38'-4''×5'-10'' = 447.22 sft
railing 2×38'-4''×4'-0'' = 306.67 sft
cornice 1×97'-0''×2'-10'' = 274.83 sft
cornice 2×41'-0''×2'-4'' = 191.33 sft
chilakota 2×(20'-8''+12'-2'')×''10'-0'' = 656.67 sft
= 656.67 sft
DEDUCT
door 2×3'-4''×7'-0'' = 46.67 sft
= 46.67 sft
Mark "A"= = 610.00 sft
OUTSIDE
WALL 2×34'-0''' = 68.00 rft
2×12'-0''' = 24.00 rft
= 92.00 rft
= 1012.00 sft
chilakota 2×(20'-8''+12'-2'')×''10'-0'' = 656.67 sft
= 1668.67 sft
DEDUCT
door 2×3'-4''×7'-0'' = 46.67 sft
Mark "B"= = 1622.00 sft
MARK "A+B"= = 2232.00 sft
= 207.358

63 15.5 Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling, R.C.C.
columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and
finishing the corners and edges including washing of sand, cleaning the surface, curing at least for 7
days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per
drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) ground floor.

(a) G FL
INSIDE QUANTITY FROM = 7840.18 sft
25(E)a(ii)
QUANTITY FROM = 11635.61 sft
25(F)a(ii)
QUANTITY FRO-25M = 1705.49 sft
1(I)a(ii)
MARK "A"= = 21181.28 sft
OUTSIDE QUANTITY FROM = 2005.00 sft
-25(G)a(ii)
QUANTITY FROM = 1169.96 sft
-25(H)a(ii)
MARK "B"= = 3174.96 sft
MARK "A+B"= = 24356.24 sft
= 2262.750

(b) 1ST FL Qty Same as Ground Floor


INSIDE QUANTITY FROM = 5563.41 sft
25(E)a(ii)
QUANTITY FROM = 7912.63 sft
25(F)a(ii)
QUANTITY FRO-25M = 1705.49 sft
1(I)a(ii)
MARK "A"= = 15181.53 sft
OUTSIDE QUANTITY FROM = 2785.00 sft
-25(G)a(ii)
QUANTITY FROM = 1425.47 sft
-25(H)a(ii)
MARK "B"= = 4210.47 sft
MARK "A+B"= = 19392.00 sft
= 1801.561

( c) 2nd Floor Qty Same as Ground Floor


= 1801.561
( d ) 3rd Floor
INSIDE QUANTITY FROM = 1040.43 sft
24(E)a(ii)
QUANTITY FROM = 7585.92 sft
24(F)a(ii)
MARK "A"= = 8626.35 sft
OUTSIDE QUANTITY FROM = 3927.94 sft
-25(G)a(ii)
MARK "B"= = 3927.94 sft
MARK "A+B"= = 12554.29 sft
= 801.407

64 22.14 Supplying, fitting & fixing of uPVC Profile for door, window and fixed partition frames applications
having specific gravity of 1.36-1.43, and other physical, chemical, thermal, fire resistivity properties
etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards including all
accessories, fittings with 6 nos. steel clamps complete in all respect as per drawing and accepted by
the Engineer-in-charge.

(a) GROUND FL
ground floor 11×16'-6''' = 181.50 rft
1st floor 13×16'-6''' = 214.50 rft
2ndfloor 12×16'-6''' = 198.00 rft
= 594.00 rft
= 181.042

65 22.15 Supplying, fitting & fixing of swing door shutter made of low density free foam (LDFF) sheet
having standard size 1200 mm x 3200 mm. Physical properties: density: 0.55-0.68 g/cm3, weighing
1.3 kg/sft, providing new sash (100 mm), sliding glass bead, rubber, screws, 75 mm hinges 4 Nos.,
100 mm tower bolt 2 Nos., 150 mm handle 2 nos. etc. including all accessories complete in all
respect as per drawing and accepted by the Engineer-in-charge.

22.15.2 2100 mm x 750 mm size 8 mm thick uPVC swing door shutter


= 36.000

66 15(i) Surface drain of 300 mm clear width and depth up to 300 mm: Constructing RCC (fc'=22MPa,
Annaxer-A minimum fcr=27MPa in nominal mix1:2:4 with stone chips) surface drain of 300 mm clear width
and depth up to 300 mm with 125 mm thick check walls and 125 mm thick base over one layer of
brick flat soling. The surface having minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:3) and
neat cement finishing with cement curing at least for 7 days including excavation in all kinds of soil,
back filling with fine sand (F.M. 0.8), consolidating and dressing, cost of water, electricity, other
charges etc. complete and accepted by the Engineer in charge. (Cement: CEM-II/A-M)

drain 1×450'-0''' = 450.00 rft


= 450.00 rft
= 137.153

67 15(i) Apron.
Annaxer-A Providing apron with 50 mm thick cement concrete (1:2:4) with cement, coarse sand and picked
jhama chips including breaking chips and one layer brick flat soling at bottom with first class or
picked jhama bricks including cutting earth for preparation of bed and filling the interstices with
local sand (F.M. 0.8) including finishing, dressing, curing at least for 7 days etc. all complete,
including cost of water, electricity, other charges accepted by the Engineer in charge. (Cement:
CEM-II/A-M)
Apron 1×450'-0''×2'-6'' = 1125.00 sft
= 1125.00 sft
= 104.515

68 16.2.3 Interior super premium acrylic emulsion painting (odorless) of approved best quality and colour
delivered from authorized local agent of the manufacturer(Berger breath easy or equivalent brand) in
a sealed container; applying to interior wall and ceiling with surface preparation including cleaning
drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus,
mending good the surface defects using sand paper and necessary scaffolding; applying 1 coat of
interior sealer of specified brand on prepared surface; then applying 1 coat of interior putty of
specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper,
finally applying 2 coats of interior emulsion paint spreading by brush/roller/spray & necessary
scaffolding etc. upto desired finishing, elapsing specified time for drying or recoating; all complete
in all floors accepted by the Engineer-in-charge.

GF Qnty From Item no-62 Marked-A = 5353.42 sft


1st Floor Qty From Item no-62 Marked-BA = 3321.92 sft
2nd Floor Qty From Item no-62 Marked-A = 3321.92 sft
3rd Floor Qnty From Item no-62 Marked-A = 610.00 sft

GF Qnty From Item no-63 Marked-A = 1059.48 sft


1st Floor Qty From Item no-63 Marked-A = 1163.65 sft
2nd Floor Qty From Item no-63 Marked-A = 1163.65 sft
3rd Floor Qnty From Item no-63 Marked-A = 1622.00 sft
= 17616.02 sft
= 1636.568

69 16.1.2 Exterior premium acrylic emulsion paint of approved best quality and color with high performance
against dirt picking tendency and efflorosence resistence properties along with water resisting
properties and resistance properties against fungi, fading and flaking from authorized local agent of
the manufacturer (Berger Weather Coat Antidirt Long Life/ Elite Master Coat/ Asian Apex Ultima or
equivalent brand) in a sealed container; applying to exterior surface with surface preparation
including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled
materials, fungus, mending good the surface defects using sand paper and necessary scaffolding;
applying 1 coat of exterior sealer of specified brand on prepared surface; then applying 1 coat of
exterior putty of specified brand for levelling, spot filling, crack filling and cutting by sand
paper/zero water paper; finally applying 2 coats of exterior emulsion paint spreading by
brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing specified time for
drying or recoating; all complete in all floors and accepted by the Engineer-in-charge.

GF Qnty From Item no-62 Marked-B = 1059.48 sft


1st Floor Qty From Item no-62 Marked-B = 1163.65 sft
2nd Floor Qty From Item no-62 Marked-B = 1163.65 sft
3rd Floor Qnty From Item no-62 Marked-B = 1622.00 sft

GF Qnty From Item no-63 Marked-B = 3174.96 sft


1st Floor Qty From Item no-63 Marked-B = 4210.47 sft
2nd Floor Qty From Item no-63 Marked-B = 4210.47 sft
3rd Floor Qnty From Item no-63 Marked-B = 3927.94 sft
= 20532.60 sft
= 1907.525

70 15.11.1 Making groove in plaster on outside wall upto 50 mm X 6 mm size including scaffolding, curing etc.
complete as per drawing and accepted by the Engineer-in-charge.
Back side 5×86'-0''' = 430.00 rft
Chilakota 2×20'-8''' = 41.33 rft
= 471.33 rft
= 143.655
71 Analysis Supply, fitting & fixing of Chromium steel Grill Pattern Block without any joint made with 12 mm thick
and 40 mm wide cromium steel bar as per approved architechtural drawing. Rate is including cost of
chromium steel, fabrication charge, fitting at the position, electricity cost etc.

Front side 6×8'-6''×37'-0'' = 1887.00 sft


Front side 2×8'-6''×12'-6'' = 212.50 sft
Front side 1×26'-0''×12'-0'' = 312.00 sft
Miner 4×7'-0''×70'-0'' = 1960.00 sft
North & South 8×7'-0''×37'-0'' = 2072.00 sft
North & South 4×8'-0''×42'-0'' = 1344.00 sft
North & South 4×6'-0''×12'-0'' = 288.00 sft
North & South 2×14'-0''×12'-0'' = 336.00 sft
= 8411.50 rft
= 781.447

72 18.3.1 Supplying, fitting and fixing 12 mm thick burma teak (BT) veneered board in walling with best
quality and well seasoned garjan wood frame of section 75 mm x 38 mm at 600 x 600 mm in grid,
fitted and fixed to wall by plugs, nails, screws etc. including treatment of inner surface with termite
and damp proofing agent maintaining leveled and finished exposed faces including. making holes in
wall and mending good the damages, if any during execution of the work, also including cost and
carriage of all materials, electricity, accessories, labour for installation, scaffolding, screws, nails etc.
including french polishing by 3 coats over a coat of priming etc. all complete as per design, approved
sample and accepted by the Engineer-in-charge.

Main prayer hall 2×63'-4''×11'-0'' = 1393.33 sft


2×81'-4''×11'-0'' = 1789.33 sft
2×7'-10''×11'-0'' = 172.33 sft
= 3355.00 sft
= 311.687

73 16.3.2 Premium Synthetic Enamel paint of approved best quality and colour delivered from authorized
local agent of the manufacturer(Berger robbialac supergloss synthetic enamel/Elite lucky seven/
Asian apcolipe premium paint or equivalent brand) in a sealed container, having high water
resistance, high bondibility, flexiblity property; using specified brand thinner applying to metallic or
wooden surface by brass/roller/spray in two coats over single coat anti-corrosive coating including
cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all
complete in all floors and accepted by the Engineer-in-charge.

Qty From Item 41, 2.25 TIMESx24.50 sft = 55.13 sft


Qty From Item 47, 1/2 TIMESx3700.50 sft = 1850.30 sft
Qty From Item 57,1 TIMEx604.75 sft = 604.75 sft
Qty From Item 60,1 TIMEx1236.00 sft = 1096.88 sft
Qty From Item -61 = 220.00 sft
= 3827.05 sft
= 355.542

74 12.1 Supplying, fitting and fixing 38 mm thick well matured seasoned (min. 250 mm wide plank) solid
wood single leaf door shutter having top rail style of sections 100mm x 38mm, lock rail 125 mm x
38 mm and bottom rail 225 mm x 38 mm. Closed joints with 25 mm x 12 mm size wooden peg and
provided with best quality 4 Nos. 100mm iron hinges 2 (two) Nos. best quality 12 mm dia 250 mm
and 200 mm long iron tower and socket bolts, 2 (two) Nos. heavy type nickel plated handle,1(one)
No best quality hasp bolt, hinged cleats, buffer blocks and finished by sand papering etc. all
complete in all floors and accepted by the Engineer-in-charge.
(All sizes of wood are finished)

12.1.2 Gamari
Partation 1×48'-0''×7'-0'' = 336.00 sft
= 336.00 sft
= 31.215

75 16.9 French polishing to door and window frames and shutter by three coats over a coat of priming
including putty, cleaning, finishing and polishing with sand paper etc. all complete in all floors and
accepted by the Engineer-in-charge.

D1 15×5'-0''×7'-6'' = 562.50 sft


D2 3×4'-6''×7'-0'' = 94.50 sft
D3 8×4'-0''×7'-6'' = 240.00 sft
D4 8×3'-4''×7'-6'' = 200.00 sft
D5 16×3'-4''×7'-0'' = 373.33 sft
D9 3×6'-0''×7'-6'' = 135.00 sft
Partation 1×48'-0''×7'-0'' = 336.00 sft
= 1941.33 rft
= 4368.00 sft
= 405.797

76 33.1.1 Conducting laboratory test of engineering materials during construction in progressive manner well
fitted with physical progress of work, by the procuring entity, with all logistic support supposed to be
given by the contractor: where sampling, sample sending to laboratory and collecting test results from
the samples to laboratory shall be under strict control and guidance of procuring entity following the
norms elucidate in respective materials standards like BDS, EN, ASTM, ISO, IS etc. and paid to the
contractor after complete and proper documentation on: (Unit Rates per set of Test in BDT Buet
(BRTC) 1) Laboratory test results in original 2) evidence of receiving samples in the laboratory in
correct order 3) forwarding letter of procuring entity addressed to laboratory for testing 4) evidence of
receiving "forwarding letter" with receipients full address and contact number5) conformation on
samples tested that sent in sealed condition bearing the signature and date of procuring entity 6)
ensurance documents of sealing, signing and sending the samples

BUET
i) Concrete: a) Compressive strength: Concrete cylinders 150x300 mm
5.000
33.2. ii) Cement: a) Compressive strength (3 and 28 days)
5.000
b) Setting time: Initial & Final
4.000
c) Fineness
3.000
33.3 iii) Rebar: a) Tensil strength test: Yield strength ultimate strength % elongation.
5.000
b) Bend
5.000
b) Re-Bend
5.000
iv) Coarse aggregate: a) Sieve analysis
5.000
b) Absorption and specific gravity
1.000
c) Aggregatp crushins value (ACV)
1.000
v) Fine aggregate: a) Sieve analysis
2.000
vi) Bricks: a) Crushing strength
3.000
b) Water Absorption
3.000

Part-B Sanitary Work

1 26.4 Supplying, fitting and fixing of European type glazed combi closet, 725 mm x 360 mm x 840 mm
size, 42.7 kg of weight, including plastic seat cover, cistern system, preparing the base with cement
concrete and with wire mesh or rods if necessary, in all floors including making holes wherever
required and mending good the damages and fitting, fixing, finishing complete with all necessary
fittings and connections approved and accepted by the Engineer- in- charge

26.4.1 725 mm x 360 mm x 840 mm size, 42.7 kg


a) 26.4.1.1 Light Colored (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde)
G.Floor 4.000
F.Floor 4.000
2ND.Floor 7.000
15.000

2 26.5 Supplying, fitting and fixing of Bangladesh pattern, long pan with foot-rest, made of vitreous China
clay and preparing the base of pan with cement mortar (1:4) and with wire mesh or rods, if necessary
in all floors including making holes wherever required and mending good the damages and fitting,
fixing, finishing etc. complete with all necessary fittings and connections approved and accepted by
the Engineer- in- charge.

26.5.2 530 mm x 450 mm x 290 mm size & 14.5 kg of weight


26.5.2.3 Special coloured
G.Floor 5.000
F.Floor 7.000
2ND.Floor 3.000
15.000

3 26.2 Supplying, fitting and fixing of European type glazed porcelain low-down, capacity 10 liter, 490 mm
x 190 mm x 350 mm in size, approximately 14 kg of weight, on walls by screws and F.I. bar clamps,
rowel plugs, making holes wherever required and mending good the damages and fitting, fixing &
finishing etc. complete with all necessary fittings and connections approved and accepted by the
Engineer- in- charge.

26.2.3 Special colour


15.000

4 26.16 Supplying, fitting and fixing of single bowl stainless steel sink with sink tray (size 450 mm x 1050
mm) with heavy type CI steel brackets, 12 mm dia C.P. bib-cock, 40 mm dia C.P. chain plug, 40 mm
dia C.P. waste, 40 mm dia PVC waste pipe with brass coupling (750 mm length) including making
hole in walls and floors and mending good the damages, finishing with 1:4 cement mortar etc. all
complete approved and accepted by the Engineer-in-charge. (Malaysia / Singapore / Thailand made
or equivalent).

1.000

5 26.11 Supplying of white glazed vitreous W/H wash basin including pedastal and fitting, fixing the same in
position with heavy type C.I. brackets, 32 mm dia PVC waste water pipe with brass coupling (not
exceeding 750 mm in length), 32 mm dia C.P. basin waste with chain plug, bracket including
making holes in walls and floors and fitting with wooden blocks, screws and mending good the
damages with cement mortar (1:4), etc. all complete approved and accepted by the Engineer- in-
26.11.1 665 mm x 490 mm x 840 mm in size, 29.5 kg of weight
charge.
26.11.1.3 Special coloured (Deep Blue/ Ruby/ Rain Forest/ Green)
G.Floor 4.000
F.Floor 3.000
2ND.Floor 3.000
10.000
6 26.18 Supplying, fitting and fixing of 450 mm x 600 mm size and 5 mm thick unframed super quality
mirror with hard boards at the back with all necessary fitting including making holes in walls and
mending good the damages with cement mortar (1:4) etc. all complete approved and accepted by the
Engineer-in-charge. (Made in Japan or equivalent).

10.000

7 26.21 Supplying, fitting and fixing of super quality 600 x 125 mm white glass (plate) shelf having 5 mm
thickness with fancy C.P. brackets, screws and frames including making holes in walls and mending
good the damages with cement mortar (1:4) etc. all complete approved and accepted by the
Engineer- in- charge.

10.000

8 26.22 Supplying, fitting and fixing of super quality C.P. towel rail of 600 mm long and 20 mm in dia with
C.P. holder including making holes in walls and mending good the damages with cement mortar
(1:4) etc. all complete approved and accepted by the Engineer- in- charge.

10.000
9 26.25 Supplying, fitting and fixing of special toilet paper holder with cover of size (150 mm x 150 mm x
126 mm) including making holes in walls and mending good the damages with cement mortar (1:4)
etc. all complete approved and accepted by the Engineer- in- charge.

26.25.2 colored (porcelain)

G.Floor 9.000
F.Floor 11.000
2ND.Floor 10.000
30.000

10 26.26 Supplying, fitting and fixing of standard size soap tray including making holes in walls and mending
good the damages with cement mortar (1:4) etc. all complete approved and accepted by the
Engineer- in- charge.
26.26.4 Stainless steel soap tray

Basin 10.000
TOILET 30.000
40.000

11 26.28 Supplying, fitting and fixing of Stainless steel floor grating of following type
26.28.1 Supplying, fitting and fixing of 125 mm dia stainless steel floor grating in traps or in drains
including making holes in walls/floors and mending good the damages with cement mortar (1:4) etc.
all complete approved and accepted by the Engineer- in- charge.

ROOF 8.000
TOILET 42.000
50.000

12 26.31 Supplying, fitting and fixing of 100 mm inside diameter & wall thickness 2.7 mm - 3.4 mm best
quality uPVC rain water down pipe fitting, fixed in position with head and shoes, bends, min.20 mm
width F.I. Bar clamp and nails, and including all accessories such as round grating/domed roof
grating, bands, sockets approved and accepted by the Engineer- in- charge.

6×55'-0''' = 330.00 rft


2×20'-0''' = 40.00 rft
= 370.00 rft
= 112.805
13 26.34 Supplying 100 mm inside dia best quality uPVC waste and ventilation pipe having specific gravity
1.35-1.45, wall thickness 3.4- 4.0 mm, and other physical, chemical, themal, fire resistivity
properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitting
and fixing in position with sockets, bends, with all accessories such as round grating/domed roof
grating bands, sockets etc. approved and accepted by the Engineer- in- charge.

5×42'-0''' = 210.00 rft


7×15'-0''' = 105.00 rft
8×40'-0''' = 320.00 rft
2×10'-0''' = 20.00 rft
= 655.00 rft
= 199.695

14 26.33 Supplying 50 mm inside dia best quality uPVC soil, waste and ventilation pipe having specific
gravity 1.35 - 1.45, wall thickness 2.5 mm - 3.0 mm, and other physical, chemical, themal, fire
resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS
standards fitting and fixing in position with sockets, bends, of uPVC Pipe with all accessories such
as Round grating /domed roof grating bands, sockets etc. approved and accepted by the Engineer- in-
charge.

8×25'-0''' = 200.00 rft


2×10'-0''' = 20.00 rft
1×30'-0''' = 30.00 rft
= 250.00 rft
= 76.220

15 26.36 Supplying, fitting and fixing of G.I. pipe with all special fittings, such as bends, elbows, sockets,
reducing sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting
the same with earth duly rammed and fixing in walls with holder bats and making hole in floors,
walls and consequent mending good the damages etc. all complete in all respects approved and
accepted by the Engineer- in- charge.

a) 26.36.2 20 mm dia G.I. pipe with wall thickness 2.65 mm, outside diameter min 25.3 mm, weight 1.7 kg/m,
can withstand min 50 kg/cm2 hydraulic pressure.

TOILET 35×15'-0''' = 525.00 rft


BASIN 10×7'-0''' = 70.00 rft
wash 2×30'-0''' = 60.00 rft
= 655.00 rft
= 199.695

b) 26.36.3 25 mm dia G.I. pipe with wall thickness 3.35 mm, outside diameter min 31.7 mm, weight 2.59 kg/m,
can withstand min 50 kg/cm2 hydraulic pressure.

VERTICAL 4×32'-0''' = 128.00 rft


3×22'-0''' = 66.00 rft
4×8'-0''' = 32.00 rft
OVERFLOW 3×15'-0''' = 45.00 rft
= 271.00 rft
= 82.622
c) 26.36.5 40 mm dia G.I. pipe with wall thickness 3.25 mm, outside diameter min 46.5 mm, weight 3.83 kg/m,
can withstand min 50 kg/cm2 hydraulic pressure.

VERTICAL 1×50'-0''' = 50.00 rft


ROOF 2×55'-0''' = 110.00 rft
2×25'-0''' = 50.00 rft
= 210.00 rft
= 64.024
16 26.46 Supplying, fitting and fixing of G.I. Union with sealant etc. complete in all respects approved and
accepted by the Engineer- in- charge.
a) 26.46.2 20 mm dia G.I. Union
20.000
b) 26.46.3 25 mm dia G.I. Union
18.000
c) 26.46.5 40 mm dia G.I. Union
10.000
17 26.47 Supplying, fitting and fixing of best quality G.I. gate valve with sealant etc. complete approved and
accepted by the Engineer- in- charge.

a) 26.47.3 25 mm brass gate valve


12.000
b) 26.47.5 40 mm brass gate valve
4.000
18 26.51 Supplying different inside dia best quality uPVC clean out / trap having specific gravity 1.35 -1.45
and other physical, chemical, themal, fire resistivity properties etc. as per BSTI approved
manufacturer standards or ASTM, BS/ISO/IS standards, fitting and fixing in position etc. complete
approved and accepted by the Engineer- in- charge.

a) 26.51.2 100 mm dia uPVC ‘P’ or ‘S’ trap


76.000
b) 26.51.3 100 mm dia uPVC Y or T - Y Cleanout

14.000
19 26.56 Supplying, fitting and fixing of best quality concealed fixed sink cock etc. complete approved and
accepted by the Engineer-in-charge.

26.56.2 12 mm CP concealed moving cock


TOILET 1.000

20 26.52 Supplying, fitting and fixing of best quality faucets etc. complete approved and accepted by the
Engineer- in- charge.

26.52.2 12 mm special quality CP bib cock

TOILET 116.000
21 26.53 Supplying, fitting and fixing of best quality CP pillar cock etc. complete approved and accepted by
the Engineer- in- charge.

26.53.2 12 mm CP special heavy duty pillar cock

10.000

22 26.65 Supplying and fitting-fixing cleansing shower for ablution including holder etc. all complete
approved and accepted by the Engineer- in- charge.
26.65.2 Moving type 100 mm CP shower rose
15.000
23 26.61 Supplying, fitting and fixing of stop cock with all necessary hardware and consumables approved
and accepted by the Engineer- in- charge.
26.61.5 Stop cock concealed (heavy)

15.000

24 26.63 Supplying, fitting and fixing of angle stop cock etc. complete approved and accepted by the
Engineer- in- charge.

26.63.6 Special concealed heavy type angle stop cock


COMMODE 15.000
BASIN 10.000
lowdown 30.000
PUSH SHOWER 15.000
70.000

25 26.64 Groove cutting in brick work and R.C.C work, including cost for concealing of G.I. pipe work (12
mm and 20 mm dia) in brick wall by cutting groove in wall, lintel, beam etc. by any means carefully
without damaging the structure and filling the grooves with C.C (4:2:1) after laying of pipe including
cost of scaffolding, finishing, curing etc. all complete approved and accepted by the Engineer- in-
charge.

26.64.1 Groove size 40 mm x 40 mm (For laying 12 mm to 20 mm dia pipes)


QUANTITY FROM ITEM -18-a = 199.695 rm
QUANTITY FROM ITEM-18-b = 82.622 rm
= 282.317 rm

26 26.66 Supplying and fitting-fixing hand / push shower for ablution including holder etc. all complete
approved and accepted by the Engineer- in- charge.
26.66.2 Moving type push shower
18.000

27 26.67 Supplying, fitting and fixing of food graded plastic overhead water reservoir tank including all
necessary fittings, hardware and consumables etc. all complete approved and accepted by the
Engineer- in- charge.
26.67.3 2000 liter capacity
6.000

28 26.73 Supplying, fitting and fixing of 12 mm dia 450 mm long metal cover connection pipe approved and
accepted by the Engineer- in- charge.

40.000

29 26.83 Construction of masonry inspection pits up to a depth of 700 mm with 250 mm thick brick work in
cement mortar (1:4) including 100 mm thick R.C.C. top slab (1:2:4) with 1% reinforcement, man-
hole cover with locking arrangement including necessary earth work, side filling and one brick flat
soling. 75 mm thick (1:3:6) base concrete for making invert channel and 12 mm thick (1:2) cement
plaster with neat finishing etc. all complete approved and accepted by the Engineer- in- charge.
26.83.2 Clear 525 mm x 525 mm and depth 675 mm to 825 mm, average 750 mm for single 225 mm dia
R.C.C. pipes and 400 mm PVC pipe with pit cover and 450 mm dia C.I. man-hole cover.

20.000

30 26.84 Construction of septic tank of different sizes with walls of brick work in cement mortar (1:6) having
a lining of minimum 125 mm R.C.C cast against the walls as per approved type plan over a brick flat
soling and 150 mm thick reinforced cement concrete flooring (1:2:4) with 125 mm thick walls in
partition and 12 mm thick cement plaster (1:4) with N.C.F. to insides of walls on floor and all
around outside walls by 450 mm height at top including supplying, fitting and fixing of two R.C.C.
Tees and providing 450 mm dia water sealed heavy type C.I. manhole cover with locking/unlocking
arrangement and 100 mm thick R.C.C (1:2:4) top slab, including centering, shuttering, fabricating,
casting and curing etc. complete up to required depth including necessary earth work in excavation
and shoring, bailing out water and side filling including the cost of all materials, operations and
incidental charges. etc. all complete as per type plan approved and accepted by the Engineer-in-
charge (Rate is including cost of reinforcement and its fabrication, binding and placing).

26.84.1 For 200 users


2.000
31 26.85 Construction of soak well of different sizes (medium and large sizes) with 250 mm thick solid brick
work and 250 mm honey comb brick work with cement mortar (1:6) as per design over R.C.C.
(1:2:4) well curb with 1% reinforcement up to the depth as per drawing with 450 mm dia water
sealed heavy type. C.I. manhole cover with locking arrangement, filling the well up to the required
depth with graded khoa and sand including supplying and fabricating M.S. rod, casting, curing
including necessary earth work in excavation, side filling and bailing out water including cost of all
materials etc. all complete as per drawing, design approved and accepted by the (Rate is including
cost of reinforcement and its fabrication, binding and placing) Engineer- in- charge.

26.85.1 200 users


2.000
32 26.45 Supplying and laying uPVC pipe for for underground including fitting, fixing etc. all complete
approved and accepted by the Engineer- in- charge.
26.45.1 150 mm dia with wall thickness 4.5 mm - 6.6 mm uPVC pipe

18×20'-0''' = 360.00 rft


2×15'-0''' = 30.00 rft
= 390.00 rft
= 118.902 rm

33 26.89 Punching or cutting hole of any diameter for sanitary works.


Roof 8.000
Toilet 68.000
76.000
SUB-TOTAL
GRA

(Mizanur Rahman) (Md. Mehbuboor Rahman)


Sub-Assistant Engineer Sub-Divisional Engineer
PWD Sub-Division-2 PWD Sub-Division-2
Gazipurr. Gazipur
(Mizanur Rahman) (Md. Mehbuboor Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
PWD Sub-Division-2 PWD Sub-Division-2
Gazipurr. Gazipur

(Md. Kamrul Alam Khan) ( Ezaz Ahmed Khan) (A.H.M Fayjul Islam)
Sub-Assistant Engineer (Civil) Assistant Engineer (Staff Excutive Engineer
Gazipur PWD Division Officer) Gazipur PWD Divsion
Gazipur. Gazipur PWD Divsion Gazipur.
Gazipur.
reepur UPZilla Model Masjid and
n Gazipur, Type-B (FY-2018-2019).

Unit Unit Rate Amount (Tk.)

2
LS Tk. 144,894.00 Tk.144,894.000

per tender Tk. 24,423.00 Tk.24,423.000

9
50 1 4 2 0
sqm of drawi Tk. 293.00 Tk.3,629.382

10

per month Tk. 1,413.00 Tk.25,434.000

13

per month Tk. 2,475.00 Tk.44,550.000

7
1 4 0 12 0
sqm Tk. 2,670.00 Tk.11,906.355

14
1 156 9 87 6

sqm Tk. 24.00 Tk.30,581.104

15
sqm Tk. 169.00 Tk.215,341.938
477

480
2 90 0
162 90 0

meter Tk. 1,777.00 Tk.7,994,062.786

483

each Tk. 2,725.00 Tk.446,900.000

503
505

each Tk. 10,610.00 Tk.1,740,040.000

509
per set per sit Tk. 652,021.00 Tk.1,304,042.000

511

meter Tk. 870.00 Tk.3,913,806.766

458

459
per set per sit Tk. 4,105.00 Tk.8,210.000

460
per set per sit Tk. 6,520.00 Tk.6,520.000
463
per test Tk. 173,017.00 Tk.346,034.000
469

472
per tonne Tk. 1,138.00 Tk.113,800.000

457
162 1 0 1 0 2
cum Tk. 4,673.00 Tk.53,590.967

31

32
sqm Tk. 15.00 Tk.19,113.190

35
27 7 10 3 8
4 7 10 3 1
2 7 10 3 2 4
9 7 10 7 10
4 12 0 7 10
2 18 5 12 0.5 6
1 16 2 16 2
x5'-0"

cum Tk. 189.00 Tk.67,452.428

39

hour Tk. 424.00 Tk.74,200.000

88
27 6 10 2 8
4 6 10 2 6.5
2 6 10 2 8 3
9 6 10 6 11
4 11 0 6 10
2 17 5 11 0.5 5
1 15 2 15 2

1 32 11 35 0
1 100 0 7 0
1 143 2 6 0
1 243 4 2 6
1 36 10 5 10
1 25 0 5 5

sqm Tk. 420.00 Tk.707,611.405

101

sqm Tk. 42.00 Tk.70,761.141

94

96
x0'-4"

cum Tk. 7,575.00 Tk.135,956.773

112

1 36 0
1 108 0
1 36 0
1 156 3
1 26 0
1 32 7
1 101 3
1 26 0
1 8 0
1 54 11
1 20 7
1 54 11
1 101 3
2 6 11
1 80 7
1 26 5
1 54 3
1 80 7
1 80 7
1 80 7
1 80 7
1 80 7
1 80 7
1 80 7
1 6 10
x0'-10"x2'-9"

1 13 0 2 0 0
1 13 0 1 0 0
1 7 0 3 0 0
1 7 0 2 0 0
1 7 0 1 0 0

cum Tk. 6,040.00 Tk.595,422.378

114

1 107 4
1 100 7
2 78 0
1 26 11
4 22 10
1 19 0
2 11 4
1 14 4
1 17 8
1 23 8
2 25 8
1 36 8
2 7 11
1 12 0
2 15 5
2 5 0
23 2 10
4 7 8
x0'-10"x10'-3"
3 6 0 7 0 0
1 5 0 7 0 0
2 4 0 7 0 0
7 8 0 4 6 0
1 6 10 4 6 0
4 7 0 4 6 0
1 2 0 2 0 0

cum Tk. 6,769.00 Tk.1,261,035.533

2 100 7
3 78 0
1 26 11
2 22 10
1 19 0
2 11 4
2 2 10
1 16 5
2 14 4
1 17 8
1 23 8
1 47 8
2 25 8
3 5 0
23 2 10
4 7 8
x0'-10"x11'-11"

3 6 0 7 0 0
1 7 0 7 0 0
2 5 0 7 0 0
3 4 0 7 0 0
7 8 0 4 6 0
2 6 2 4 6 0
5 7 0 4 6 0
2 2 0 2 0 0

cum Tk. 6,940.00 Tk.1,529,858.162

2 100 7
3 78 0
1 26 11
2 22 10
1 19 0
2 11 4
2 2 10
1 16 5
2 14 4
1 17 8
1 23 8
1 47 8
3 5 0
23 2 10
4 7 8
x0'-10"x11'-11"

3 6 0 7 0 0
3 5 0 7 0 0
3 4 0 7 0 0
7 8 0 4 6 0
2 6 2 4 6 0
5 7 0 4 6 0
2 2 0 2 0 0

cum Tk. 7,111.00 Tk.1,467,268.484

2 28 10
2 18 0
1 106 9
x0'-10"x5'-10"

2 18 0
2 9 6
4 7 8
x0'-10"x8'-6"

cum Tk. 7,282.00 Tk.325,770.127

4 7 8
x0'-10"x8'-6"

cum Tk. 7,453.00 Tk.45,824.993


4 7 8
x0'-10"x8'-6"

cum Tk. 7,624.00 Tk.46,876.392

4 7 8
x0'-10"x8'-6"

cum Tk. 7,863.00 Tk.48,345.891

4 7 8
x0'-10"x8'-6"

cum Tk. 8,102.00 Tk.49,815.389

4 7 8
x0'-10"x8'-6"

cum Tk. 8,341.00 Tk.51,284.888

135

1 66 10
3 19 0
1 14 2
1 10 0
1 5 0
1 7 4
1 9 6
1 48 4
2 12 8
2 14 9
1 9 3
1 7 0
3 6 11
2 14 0
1 14 9
5 4 6
2 7 4
4 8 0
2 13 0
2 19 7
2 21 5
2 15 10
5 6 5
1 30 0
1 22 0
2 6 7
2 36 6
2 12 6
1 30 0
1 22 0
x10'-2"

1 6 0 7 0
5 5 0 7 0
1 4 6 7 0
3 4 0 7 0
1 7 0 7 0
7 3 4 7 0
10 2 6 7 0
3 5 0 4 6
6 8 0 7 6
4 6 0 4 6
1 14 0 15 0

sqm Tk. 948.00 Tk.613,901.485

1 66 10
3 19 0
1 14 0
1 9 1
2 5 0
1 6 7
1 9 6
2 4 10
1 7 0
1 34 3
3 6 11
2 14 0
1 9 4
10 4 6
3 6 5
2 6 11
2 10 4
4 8 0
2 13 0
2 19 7
2 7 4
1 12 6
x11'-11"

2 12 6
2 36 6
2 11 0
2 13 10
2 36 6
2 12 6
1 30 0
1 22 0
x3'-0"

2 6 0 7 6
3 5 0 7 0
1 4 6 7 0
2 4 0 7 0
5 3 4 7 0
13 2 6 7 0
3 5 0 4 6
6 8 0 7 6
2 5 10 4 6
2 5 1 4 6
1 14 0 15 0

sqm. Tk. 979.00 Tk.523,986.618

1 66 10
4 19 0
1 13 4
1 9 1
1 15 5
2 10 6
1 10 0
1 4 10
4 5 0
1 6 7
1 9 6
2 4 10
1 7 0
1 10 4
1 23 10
2 6 11
2 14 4
4 9 4
4 4 6
3 6 5
2 6 11
2 10 4
4 8 0
2 13 0
2 19 7
2 7 4
1 12 6
x11'-11"

1 4 6 7 0
1 3 0 7 0
9 3 4 7 0
10 2 6 7 0
1 5 0 4 6
6 8 0 7 6
2 5 10 4 6
1 14 0 15 0

sqm. Tk. 1,010.00 Tk.566,098.557

97

99
x0'-10"

x0'-5"
sqm Tk. 1,330.00 Tk.127,309.718

341

342

343
27 6 10 2 8 2
4 6 10 2 6.5 2
4 4 9 3 9 2
9 6 10 6 11 2
4 11 0 6 10 3
2 17 5 11 0 3
1 15 2 15 2 3

4 5 6 3 2 3

1 36 0
1 36 0
1 36 0
1 26 0
1 32 7
1 26 0
1 8 0
1 54 11
1 54 11
2 6 11
1 26 5
1 80 7
1 80 7
1 80 7
1 80 7
1 6 10
x1'-0"x1'-6"

1 108 0
1 120 3
1 101 3
1 20 7
1 101 3
1 80 7
1 54 3
1 80 7
1 80 7
1 80 7
x1'-3"x2'-0"

x0'-6"

cum Tk. 12,154.00 Tk.5,722,660.098


344

22 1 5 1 5 5
3 1 5 1 5 5
5 1 5 2 3 5
2 1 5 2 8 5
3 1 10 1 10 5
4 1 10 2 3 5
7 1 10 2 3 5
1.57 2 5 2 5 5
4 2 1 1 2 5
4 1 0 0 11 5
4 7 8 0 10 5

22 1 3 1 3 13
3 1 3 1 3 13
5 1 3 2 1 13
2 1 3 2 6 13
3 1 8 1 8 13
4 1 8 2 1 13
7 1 8 2 1 13
1.57 2 3 2 3 13
4 2 1 1 2 12
4 1 0 0 11 12
18 1 5 1 10 6
cum Tk. 12,367.00 Tk.881,335.616

20 1 3 1 3 12
3 1 3 1 3 12
5 1 3 2 1 12
2 1 3 2 6 12
3 1 8 1 8 12
4 1 8 2 1 12
7 1 8 2 1 12
1.57 2 3 2 3 12
4 2 1 1 2 10
4 1 0 0 11 10

cum Tk. 12,475.00 Tk.531,619.693

cum Tk. 12,583.00 Tk.536,222.092

3 1 3 1 3 10
1 1 3 2 1 10
3.14 27 8 0 10 7
6.28 10 10 0 10 3
2 18 1 0 10 6
2 27 2 0 10 6
4 2 1 1 2 10
4 1 0 0 11 10
18 1 5 1 10 6
cum Tk. 12,691.00 Tk.515,578.655

4 2 1 1 2 10
4 1 0 0 11 10
18 1 5 1 10 6
cum Tk. 12,799.00 Tk.48,524.533

4 2 1 1 2 10
4 1 0 0 11 10
18 1 5 1 10 6
cum Tk. 12,907.00 Tk.48,933.991
4 2 1 1 2 10
4 1 0 0 11 10
18 1 5 1 10 6
cum Tk. 13,052.00 Tk.49,483.726

4 2 1 1 2 10
4 1 0 0 11 10
18 1 5 1 10 6
cum Tk. 13,197.00 Tk.50,033.461

4 2 1 1 2 10
4 1 0 0 11 10
18 1 5 1 10 6
cum Tk. 13,342.00 Tk.50,583.196

345

1 36 0
1 9 3
1 36 0
1 36 0
1 12 2
1 19 0
1 8 0
1 54 11
1 54 11
2 6 11
1 26 5
1 80 7
1 37 3
1 28 10
1 17 7
1 28 10
1 24 5
x1'-0"x1'-6"

1 98 9
1 120 3
1 101 3
1 101 3
1 80 7
1 54 3
1 80 7
2 80 7
1 80 7
3 12 10
1 37 3
x1'-3"x2'-3"

1 20 7
x1'-3"x2'-0"

3 7 8
1 7 8
x0'-10"x2'-0"

1 156 3 80 8
1 8 5 8 3

1 35 9 24 6
1 23 9 5 0
2 15 6 10 6
1 13 9 9 6

x7"

1 832 0 0 10 0
1 808 10 0 5 0

2 12 2 6 4 0
2 12 2 9 10 0
4 11 6 5 10 0
1/2 25 5 10 1 0 0

1 11 2 5 8 0
1 11 2 4 7 0
2 11 6 5 4 0
1/2 25 5 4 1 0 0

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

1 35 2 5 0 0
1 11 9 35 2 0
2 9 6 11 6 0
1/2 12 35 2 1 0 0
1/2 22 11 6 1 0 0

cum Tk. 12,240.00 Tk.4,236,980.972

1 9 3
1 26 5
x1'-0"x1'-6"

1 98 9
1 101 3
1 101 3
1 101 3
1 80 7
1 54 3
1 80 7
2 80 7
1 80 7
3 12 10
x1'-3"x2'-3"

1 20 7
x1'-3"x2'-0"

3 7 8
1 7 8
x0'-10"x2'-0"

1 101 3 80 8

1 23 9 5 0
2 15 6 10 6
1 13 9 9 6
x7"

1 851 4 0 10 0
1 505 1 0 5 0

2 12 2 6 4 0
2 12 2 9 10 0
4 11 6 5 10 0
1/2 25 5 10 1 0 0

1 11 2 5 8 0
1 11 2 4 7 0
2 11 6 5 4 0
1/2 25 5 4 1 0 0

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 12,348.00 Tk.2,955,938.298

1 9 3
1 26 5
x1'-0"x1'-6"

1 98 9
1 101 3
1 101 3
1 101 3
1 80 7
1 54 3
1 80 7
2 80 7
1 80 7
1 12 10
x1'-3"x2'-3"

1 20 7
x1'-3"x2'-0"
3 7 8
1 7 8
x0'-10"x2'-0"

1 101 3 80 8

1 23 9 5 0
3.14 13 5 13 5
1 13 9 9 6

x7"

1 800 0 0 10 0
1 579 4 0 5 0

1 11 2 5 8 0
1 11 2 4 7 0
2 11 6 5 4 0
1/2 25 5 4 1 0 0

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 12,456.00 Tk.2,697,563.498

2 18 1
2 27 2
2 11 9
2 20 7
x1'-3"x2'-3"

3 7 8
1 7 8
x0'-10"x2'-0"
1 27 2 18 1
1 23 7 15 10

x7"

12.56 13 5 13 5

x5"

12.56 6 6 6 6
25.12 5 0 5 0

x4.5"

1 122 8 0 10 0

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 12,564.00 Tk.1,314,380.067

3 7 8
1 7 8
x0'-10"x2'-0"

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 12,672.00 Tk.44,829.939


3 7 8
1 7 8
x0'-10"x2'-0"

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 12,780.00 Tk.45,212.012

3 7 8
1 7 8
x0'-10"x2'-0"

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 12,925.00 Tk.45,724.981

3 7 8
1 7 8
x0'-10"x2'-0"

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 13,070.00 Tk.46,237.950


3 7 8
1 7 8
x0'-10"x2'-0"

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 13,215.00 Tk.46,750.918

3 7 8
1 7 8
x0'-10"x2'-0"

12.56 5 6 5 6

x4.5"

1 11 0 3 5 0
2 3 5 3 5 0
3 5 6 3 5 0
1/2 18 3 5 1 0 0

cum Tk. 13,360.00 Tk.101,164.479

346

2 100 4 2 10 0
5 8 0 0 6 0
4 100 4 2 6 0
1 30 0 2 0 0
2 14 10 5 9 0
2 7 9 6 9 0
1 10 4 5 10 0

cum Tk. 12,580.00 Tk.176,986.957


2 100 4 2 10 0
1 78 0 2 10 0
5 8 0 0 6 0
4 100 4 2 6 0
2 78 0 2 6 0
2 14 10 5 9 0
2 10 2 5 9 0
1 10 8 6 9 0
1 7 5 6 1 0

cum Tk. 12,688.00 Tk.234,206.768

cum Tk. 12,796.00 Tk.236,200.332

1 67 0 3 0 0
3 26 8 3 0 0
2 23 5 3 0 0
1 13 0 3 0 0
1 77 6 3 0 0
1 41 4 3 0 0
2 38 4 5 10 0
2 38 4 4 0 0
1 97 0 2 0 0
2 41 0 1 6 0

cum Tk. 12,904.00 Tk.363,373.923

365

366
367
27 1 19 0 2 6
4 1 23 4 2 3
9 4 6 10 2 3
4 1 35 8 3 6
2 1 47 5 3 9
1 4 15 2 3 0
sqm Tk. 438.00 Tk.125,449.252
368
1 484 7 0 6
1 35 10 4 6
1 48 6 4 6

sqm Tk. 434.00 Tk.25,070.381

369
1 679 10 4 0
1 827 11 5 3

sqm Tk. 380.00 Tk.249,446.341


370

44 1 5 1 5 5
6 1 5 1 5 5
10 1 5 2 3 5
4 1 5 2 8 5
6 1 10 1 10 5
8 1 10 2 3 5
14 1 10 2 3 5
2 3.14 2 5 5 0
8 2 1 2 1 5
8 7 8 7 0
44 1 3 1 3 13
6 1 3 1 3 13
10 1 3 2 1 13
4 1 3 2 6 13
6 1 8 1 8 13
8 1 8 2 1 13
14 1 8 2 1 13
2 3.14 2 3 13 0
8 2 1 2 1 12

sqm Tk. 408.00 Tk.241,913.222

40 1 3 1 3 12
6 1 3 1 3 12
10 1 3 2 1 12
4 1 3 2 6 12
6 1 8 1 8 12
8 1 8 2 1 12
14 1 8 2 1 12
2 3.14 2 3 12 6
8 2 1 2 1 10

sqm Tk. 449.00 Tk.159,881.166

sqm Tk. 490.00 Tk.174,480.560

14 1 3 1 3 10
20 1 3 2 1 10
2 3.14 27 8 7 8
4 3.14 10 0 3 0
4 18 1 6 8
4 27 2 6 8
8 2 1 2 1 10

sqm Tk. 531.00 Tk.210,423.029

8 2 1 2 1 10

sqm Tk. 572.00 Tk.17,713.366

8 2 1 2 1 10

sqm Tk. 613.00 Tk.18,983.030

sqm Tk. 674.00 Tk.20,872.043

sqm Tk. 735.00 Tk.22,761.055

sqm Tk. 796.00 Tk.24,650.068


371

1 832 0 1 10
1 808 10 1 5

sqm Tk. 419.00 Tk.103,978.507

1 851 4 1 10
1 505 1 1 5

sqm Tk. 460.00 Tk.97,278.312

1 800 0 1 10
1 579 4 1 5

sqm Tk. 501.00 Tk.106,464.310


1 122 8 1 10

sqm Tk. 542.00 Tk.11,323.837


372

2 524 0 1 6
1 524 0 1 0
2 954 5 2 3
1 954 5 1 3
2 20 7 2 0
1 20 7 1 3
2 30 8 2 0
1 30 8 0 10

sqm Tk. 455.00 Tk.331,408.598

2 35 8 1 6
1 35 8 1 0
2 898 2 2 3
1 898 2 1 3
2 20 7 2 0
1 20 7 1 3
2 30 8 2 0
1 30 8 0 10

sqm Tk. 496.00 Tk.256,359.274

2 35 8 1 6
1 35 8 1 0
2 872 6 2 3
1 872 6 1 3
2 20 7 2 0
1 20 7 1 3
2 30 8 2 0
1 30 8 0 10

sqm Tk. 537.00 Tk.270,187.548

2 155 2 2 3
1 155 2 1 3
2 30 8 2 0
1 30 8 0 10
sqm Tk. 578.00 Tk.55,868.530

2 30 8 2 0
1 30 8 0 10

sqm Tk. 619.00 Tk.14,082.226

2 30 8 2 0
1 30 8 0 10

sqm Tk. 660.00 Tk.10,483.244

2 30 8 2 0
1 30 8 0 10

sqm Tk. 721.00 Tk.10,992.231

2 30 8 2 0
1 30 8 0 10

sqm Tk. 782.00 Tk.11,875.883

2 30 8 2 0
1 30 8 0 10

sqm Tk. 843.00 Tk.12,797.621

2 30 8 2 0
1 30 8 0 10

sqm Tk. 904.00 Tk.13,723.203


373

2 156 3 0 7
2 80 8 0 7
2 24 6 0 7
1 57 6 0 7
1 23 3 0 7
2 52 0 0 7

sqm Tk. 532.00 Tk.575,078.513

2 101 3 0 7
2 80 8 0 7
1 57 6 0 7
1 23 3 0 7
2 52 0 0 7

sqm Tk. 573.00 Tk.421,213.127

2 101 3 0 7
2 80 8 0 7
1 57 6 0 7
3.14 26 10 0 7
1 23 3 0 7

sqm Tk. 614.00 Tk.437,021.128

1 90 6 0 7
1 78 10 0 7

sqm Tk. 655.00 Tk.461,610.412

1 90 6 0 7
1 78 10 0 7

sqm Tk. 920.00 Tk.383,636.653


374

8 100 3 2 6

sqm Tk. 387.00 Tk.72,086.120

8 100 3 2 6
4 78 0 2 6

sqm Tk. 428.00 Tk.110,737.644

8 100 3 2 6
4 78 0 2 6
sqm Tk. 469.00 Tk.121,345.689

2 67 0 3 0
6 26 8 3 0
4 23 5 3 0
2 13 0 3 0
2 77 6 3 0
2 41 4 3 0
4 38 4 5 10
4 38 4 4 0
1 97 0 2 10
2 41 0 2 4

sqm Tk. 510.00 Tk.186,106.621

375

2 100 4 3 4
5 8 0 1 0
1 30 0 2 9
2 14 10 5 9
2 41 2 0 3
2 7 9 6 9
2 29 0 0 3
1 10 4 5 10
1 32 0 0 3

sqm Tk. 438.00 Tk.47,607.000

2 100 4 3 4
1 78 0 3 4
5 8 0 1 0
2 14 10 5 9
2 41 2 0 3
2 10 2 5 9
2 31 10 0 3
1 10 8 6 9
1 34 10 0 3
1 7 5 6 1
1 27 0 0 3

sqm Tk. 479.00 Tk.63,433.470

sqm Tk. 520.00 Tk.68,863.057


376

2 12 2 6 4
4 12 2 6 4 0
2 12 2 9 10
4 12 2 9 10 0
4 11 6 5 10
8 11 6 1 4
25 5 10 0 6
1 11 2 5 8
2 11 2 5 8 0
1 11 2 4 7
2 12 2 4 7 0
2 11 6 5 4
4 11 6 1 4
25 5 4 0 6
1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 437.00 Tk.69,240.103

2 12 2 6 4
4 12 2 6 4 0
2 12 2 9 10
4 12 2 9 10 0
4 11 6 5 10
8 11 6 1 4
25 5 10 0 6
1 11 2 5 8
2 11 2 5 8 0
1 11 2 4 7
2 12 2 4 7 0
2 11 6 5 4
4 11 6 1 4
25 5 4 0 6
1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 478.00 Tk.75,736.314

1 11 2 5 8
2 11 2 5 8 0
1 11 2 4 7
2 12 2 4 7 0
2 11 6 5 4
4 11 6 1 4
25 5 4 0 6
1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 519.00 Tk.34,387.246

1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 560.00 Tk.15,341.674

1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 601.00 Tk.16,464.904

1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 642.00 Tk.17,588.133

1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 703.00 Tk.19,259.280

1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 764.00 Tk.20,930.427

1 11 0 3 5
2 11 0 3 5 0
2 3 5 3 5
4 3 5 3 5 0
3 5 6 3 5
6 5 6 3 5 0
6 11 6 1 4
18 3 5 0 6

sqm Tk. 825.00 Tk.22,601.573

423

425

164 1 2 1 2 90

kg Tk. 82.00 Tk.18,573,570.654

kg Tk. 82.48 Tk.4,077,041.634

kg Tk. 82.96 Tk.3,664,800.997

kg Tk. 83.44 Tk.2,608,884.315


kg Tk. 83.92 Tk.120,703.359

kg Tk. 84.40 Tk.121,393.750

kg Tk. 85.37 Tk.122,788.915

kg Tk. 86.34 Tk.124,184.080

kg Tk. 87.31 Tk.125,579.245

kg Tk. 88.28 Tk.131,187.840

53

x0'-3"

cum Tk. 149.00 Tk.24,552.239


48

x2'-0"

x0'-5"

1 170 0 100 0 3

x0'-3"

cum Tk. 635.00 Tk.1,545,779.058

305

2 11 6 10 3
22 11 6 0 6
1 35 2 5 0
1 35 2 12 1
13 35 2 0 6
2 15 1 5 0
2 12 0 5 0
3 10 6 9 0
3 10 6 5 6
72 5 0 1 1
75 5 0 0 6
1 14 0 15 0
sqm Tk. 9,924.00 Tk.2,301,844.838

1 78 0 26 5
1 16 5 11 0
1 16 5 15 1
1 165 11 1 0
13 35 2 0 6
1 25 8 15 2
1 47 2 6 0
2 21 2 1 0
1 47 2 16 10
1 76 4 31 2
1 12 6 5 0
1 258 8 1 0
1 44 1 6 0
1 100 2 1 0
1 41 0 5 7
2 41 0 1 0
1 6 5 5 0
1 40 6 1 0
3 10 6 9 0
3 10 6 5 6
72 5 0 1 1
75 5 0 0 6
1 14 0 15 0
sqm Tk. 9,939.00 Tk.8,194,249.003

1 25 8 15 2
1 47 2 6 0
2 21 2 1 0
3 10 6 9 0
3 10 6 5 6
72 5 0 1 1
75 5 0 0 6
1 14 0 15 0
sqm Tk. 9,954.00 Tk.8,206,615.814

306

1 53 6 3 6
2 27 1 10 0
1 78 0 12 0
4 3 5 12 0
2 69 2 12 0
2 76 4 12 0
Sqm Tk. 9,286.00 Tk.4,590,303.992

232
235

1 12 8 11 0
1 47 4 1 0
1 12 8 6 2
1 37 8 1 0
1 31 2 27 10
1 118 0 1 0
1 30 9 11 10
1 85 2 1 0
1 41 0 5 7
2 41 0 1 0
1 12 11 7 4
1 40 6 1 0
1 11 8 14 7
1 58 6 1 0
1 10 6 14 2
1 49 4 1 0
1 26 0 19 0
1 90 0 1 0
1 11 0 16 5
1 54 10 1 0
1 11 5 5 0
1 32 10 1 0

sqm Tk. 2,072.00 Tk.677,414.024

1 35 2 19 0
1 108 4 1 0
1 14 0 9 6
1 47 0 1 0
1 10 0 9 1
1 38 2 1 0

sqm Tk. 2,082.00 Tk.209,960.145


1 35 10 12 2
1 51 0 35 10
1 12 6 5 0
1 204 0 1 0
1 24 11 35 10
1 12 2 9 9
1 145 10 1 0
1 10 8 19 0
1 59 4 1 0
1 13 8 19 0
1 65 4 1 0
1 14 11 9 7
1 49 0 1 0
1 4 6 9 7
1 28 2 1 0
1 10 0 9 1
1 38 2 1 0
1 10 0 10 7
1 41 2 1 0
1 12 4 10 6
1 45 8 1 0
1 30 9 11 10
1 85 2 1 0
1 41 0 5 7
2 41 0 1 0
1 24 2 4 6
2 24 2 1 0

sqm Tk. 2,092.00 Tk.1,147,787.571

271
274

1 20 10 121 6
1 66 8 1 0
1 15 8 12 6
1 56 4 1 0
1 7 0 6 5
1 26 10 1 0
1 14 2 8 1
1 44 6 1 0
sqm Tk. 1,341.00 Tk.383,817.923

229
230

1 14 9 9 3
1 4 6 13 7
6 4 3 4 6
2 4 9 5 0
1 10 0 6 6
1 6 11 5 6
1 8 5 6 11
1 13 7 10 0
1 13 4 15 10

sqm Tk. 1,526.00 Tk.123,057.339

2 14 9 9 3
2 4 9 9 3
2 4 6 9 4
10 4 3 4 6
2 5 2 5 6
1 10 3 7 5
1 3 3 6 1

sqm Tk. 1,536.00 Tk.112,535.117

2 14 4 9 3
2 4 6 9 4
8 4 3 4 6
2 4 10 5 7
1 9 5 6 7
1 11 8 5 0

sqm Tk. 1,546.00 Tk.113,267.768


250
253

2 14 9 9 3 7
2 13 7 7 0
12 4 3 4 6 7
4 4 9 5 0 7
2 10 0 6 6 7
2 6 11 5 6 7
2 8 5 6 11 7
2 13 7 10 0 10
2 13 4 15 10 10

10 2 6 7 0
2 2 0 1 6

sqm Tk. 1,817.00 -Tk.319,762.910

4 14 9 9 3 7
4 9 4 7 0
20 4 3 4 6 7
4 5 2 5 6 7
2 10 3 13 6 7

13 2 6 7 0
6 2 0 1 6

sqm Tk. 1,827.00 -Tk.515,137.960

4 14 4 9 3 7
4 9 4 7 0
16 4 3 4 6 7
4 4 10 5 7 7
2 9 5 6 7 7
2 11 8 5 0 7
12 2 6 7 0
4 2 0 1 6

sqm Tk. 1,837.00 -Tk.380,404.404

256
257

2 11 10 11 10 10

1 3 6 7 0

sqm Tk. 1,954.00 Tk.85,924.687

sqm Tk. 1,964.00 Tk.86,364.425

sqm Tk. 1,974.00 Tk.86,804.162

sqm Tk. 1,984.00 Tk.87,243.899

sqm Tk. 1,994.00 Tk.87,683.637

sqm Tk. 2,004.00 Tk.88,123.374

sqm Tk. 2,025.00 Tk.89,046.823

sqm Tk. 2,046.00 Tk.89,970.271

sqm Tk. 2,067.00 Tk.90,893.720


163

1 9 2 9 2
2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 609.00 Tk.12,557.057

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 640.00 Tk.8,200.173

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 671.00 Tk.8,597.369

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 702.00 Tk.8,994.565

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 733.00 Tk.9,391.761

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 764.00 Tk.9,788.957

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 806.00 Tk.10,327.093

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 848.00 Tk.10,865.230

2 9 2 2 6
2 2 6 2 6
18 2 6 0 10
19 2 6 0 6
4 9 2 0 6

sqm Tk. 890.00 Tk.11,403.366

550
555

4 20 0
1 18 6
3 18 4
5 17 4
1 20 0
1 18 6
3 18 4
3 17 4

1 18 6
2 18 4
8 17 4
x0'-6"x0'-3"

1 21 0
1 20 0
3 19 0

2 21 0
4 20 0
3 19 0

5 20 0
2 19 0
x0'-11"x0'-3"

cum Tk. 249,308.00 Tk.1,185,210.161

558
24 6 0
29 8 0
each Tk. 97.00 Tk.36,472.000

578
582
8 2 11 7 3.5
16 2 11 6 10
sqm Tk. 11,779.00 Tk.535,141.044

593
597
3 5 8 7 3.5
15 4 8 7 3.5
3 4 2 6 10
8 3 8 7 3.5

sqm Tk. 14,285.00 Tk.1,239,095.758

650
1 3 6 7 0
sqm Tk. 5,870.00 Tk.13,360.740

662
663
sqm
sqm
sqm Tk. 638.00 Tk.84,326.265

668
each Tk. 1,023.00 Tk.16,368.000

669
each Tk. 963.00 Tk.7,704.000
670
each Tk. 420.00 Tk.34,440.000

671
each Tk. 525.00 Tk.28,875.000

686

2 6 0 5 0
7 5 0 6 6
1 8 0 4 6
5 6 0 4 6
1 4 0 4 6

2 5 0 6 6
3 5 0 4 6

1 10 0 6 6
2 5 0 6 6
1 5 0 4 6
1 3 11 6 6

3 6 0 5 0
2 6 0 2 6
12 7 0 5 0
8 7 0 2 6

11 8 0 6 6
7.34 8 0 2 6

11 8 0 6 6
7.34 8 0 2 6

2 6 3 6 6
1.33 6 3 2 6
1 11 0 4 0
0.67 11 0 2 6

7 2 6 2 0
4 2 6 2 0
3 2 6 2 0
2 2 0 2 0

1 6 2 22 9

1 6 2 22 9

2 6 0 22 9

sqm Tk. 2,442.00 Tk.839,544.789

723
724
725

sqm Tk. 3,611.00 Tk.1,029,562.585

729
730

sqm Tk. 5,042.00 Tk.36,536.232


760
761
762

sqm Tk. 5,868.00 Tk.301,786.232

718
719

1 9 10 7 0
1 6 0 7 6
2 7 6 7 0

1 11 0 8 6
1 7 0 7 6
1 7 4 7 6
2 9 5 7 0

2 9 5 7 0
1 8 0 7 0
1 3 6 7 0
sqm Tk. 4,021.00 Tk.276,247.631
786
788
sqm
sqm
sqm
sqm
sqm Tk. 1,380.00 Tk.569,243.323

283
284
1 14 0 24 0
1 51 10 23 0
1 78 0 7 0
1 25 8 20 1
1 47 3 48 4
1 13 0 5 10
1 7 0 7 0
1 100 0 7 0
1 143 2 6 0

sqm Tk. 2,481.00 Tk.1,511,377.586

431
3 50 0
each Tk. 113.00 Tk.16,950.000

926
2 110 0
1 145 0
1 280 0
1 12 0
2 35 0
2 20 0
x3'-0"
sqm Tk. 5,361.00 Tk.1,146,010.870

929
1 13 3 3 6
1 16 5 3 6
2 13 11 3 6
1 12 0 3 6
1 7 8 3 6

sqm Tk. 10,268.00 Tk.257,638.022

815
24 6 2
4 16 10
2 19 7
2 38 3
8 6 0
12 10 6
1 64 8
1 651 4

meter Tk. 116.00 Tk.43,168.546

904
1 13 0 9 3
1 14 0 8 6
2 14 5 8 6
1 14 2 8 6

sqm Tk. 17,525.00 Tk.984,600.869

871

1 100 4 78 0
1 13 0 6 10
1 6 5 7 0
1 13 4 36 0

0.785 26 10 26 10
0.785 13 10 13 10
0.785 10 10 10 10

x4"

1 356 8
1 65 8
1 98 8
1 26 10
x0'-6"x0'-6" 2 29 0 17 0

cum Tk. 13,471.00 Tk.1,022,681.681

128

129
2 100 4 10 9
1 86 0 10 9

4 8 0 6 6
2.67 8 0 2 6
2 7 4 6 6
0.67 7 4 2 6
1 7 6 7 0
1 35 2 10 9

sqm Tk. 2,313.00 Tk.490,386.155

2 100 4 12 6
1 86 0 12 6

4 8 0 6 6
2.67 8 0 2 6
2 7 4 6 6
0.67 7 4 2 6
1 15 0 6 6
0.67 15 0 2 6

sqm Tk. 2,323.00 Tk.667,224.056

2 100 4 12 6
1 86 0 12 6

4 8 0 6 6
2.67 8 0 2 6
2 7 4 6 6
0.67 7 4 2 6
1 15 0 4 6
0.67 15 0 2 6

sqm Tk. 2,333.00 Tk.676,598.538


2 20 8 10 0
2 12 2 10 0

1 3 6 7 0

sqm Tk. 2,343.00 Tk.137,603.725

807
2 156 3 87 6 2

sqm Tk. 280.00 Tk.28,532.609

808

18 9 2 9 2 0

sqm Tk. 295.00 Tk.6,029.357

806

2 12 8 11 0 9
2 6 2 12 8 9
2 31 2 27 10 9
2 30 9 11 10 9
2 41 0 5 7 9
2 14 7 7 4 9
2 14 7 11 8 9
2 10 6 14 2 9
2 26 0 19 0 9
2 6 5 7 0 9
2 67 0 47 2 9
2 78 0 30 0 9
2 20 10 12 6 9
2 12 6 15 8 9
6 24 6 10 6 9
2 14 7 7 4 9
2 13 0 5 10 9
2 11 5 5 0 9
2 14 9 24 0 3
20 4 3 4 6 3
2 8 5 6 11 3

1 6 0 7 0
5 5 0 7 0
1 4 6 7 0
2 4 0 7 0
2 6 0 5 0
7 5 0 6 6
1 8 0 4 6
5 6 0 4 6

1 87 9
x10'-9"

1 350 0 0 10

1 6 0 6 6
3 7 0 6 6

sqm Tk. 243.00 Tk.144,772.732

2 35 2 19 0 9
2 14 0 9 6 9
2 10 0 9 1 9
2 44 1 6 0 9
2 41 0 5 7 9
2 11 8 5 0 9
6 24 6 10 6 9
2 14 7 7 4 9
2 14 4 23 3 3
20 4 3 4 6 3
2 6 7 5 3 3
4 5 6 5 2 3

3 5 0 7 0
1 4 6 7 0
3 4 0 7 0
2 5 0 6 6
3 5 0 4 6

1 87 9
x12'-6"

1 475 0 0 10

1 6 0 6 6
3 7 0 6 6

sqm Tk. 257.00 Tk.153,113.548

sqm Tk. 271.00 Tk.161,454.364

1 67 0 3 0
3 26 8 3 0
2 23 5 3 0
1 13 0 3 0
1 77 6 3 0
1 41 4 3 0
2 38 4 5 10
2 38 4 4 0
1 97 0 2 10
2 41 0 2 4
2 20 8 12 2 10

2 3 4 7 0
2 34 0
2 12 0
x11'-0"

2 20 8 12 2 10

2 3 4 7 0

sqm Tk. 285.00 Tk.59,096.990

810

sqm Tk. 225.00 Tk.509,118.793

sqm Tk. 239.00 Tk.430,573.021

sqm Tk. 253.00 Tk.455,794.872


sqm Tk. 267.00 Tk.213,975.690

982

11 16 6
13 16 6
12 16 6

meter Tk. 527.00 Tk.95,409.326

983
985
each Tk. 10,109.00 Tk.363,924.000

982
1 450 0

meter Tk. 2,760.00 Tk.378,543.127

807
1 450 0 2 6

sqm Tk. 917.00 Tk.95,840.301

841

sqm Tk. 273.00 Tk.446,783.137

838
sqm Tk. 261.00 Tk.497,864.148

816
5 86 0
2 20 8

meter Tk. 22.00 Tk.3,160.419

6 8 6 37 0
2 8 6 12 6
1 26 0 12 0
4 7 0 70 0
8 7 0 37 0
4 8 0 42 0
4 6 0 12 0
2 14 0 12 0

sqm Tk. 12,452.00 Tk.9,730,583.240

894
2 63 4 11 0
2 81 4 11 0
2 7 10 11 0

sqm Tk. 3,317.00 Tk.1,033,866.128

843
sqm Tk. 198.00 Tk.70,397.222

578
580
1 48 0 7 0

sqm Tk. 6,390.00 Tk.199,464.883

849
15 5 0 7 6
3 4 6 7 0
8 4 0 7 6
8 3 4 7 6
16 3 4 7 0
3 6 0 7 6
1 48 0 7 0
x2.25 times

sqm Tk. 372.00 Tk.150,956.522

each Tk. 2,200.00 Tk.11,000.000


each Tk. 9,900.00 Tk.49,500.000

each Tk. 4,300.00 Tk.17,200.000

each Tk. 3,100.00 Tk.9,300.000

each Tk. 2,500.00 Tk.12,500.000

each Tk. 1,200.00 Tk.6,000.000

each Tk. 1,700.00 Tk.8,500.000

each Tk. 6,800.00 Tk.34,000.000

each Tk. 6,800.00 Tk.6,800.000

each Tk. 7,700.00 Tk.7,700.000

each Tk. 3,800.00 Tk.7,600.000

each Tk. 4,800.00 Tk.14,400.000

each Tk. 2,400.00 Tk.7,200.000


Tk.137,152,245.079

1152
1153
1154

each Tk. 16,289.00 Tk.244,335.000

1158
1163
1166

each Tk. 3,047.00 Tk.45,705.000

1134
1137
each Tk. 2,650.00 Tk.39,750.000

1244
each Tk. 4,144.00 Tk.4,144.000

1210
1211
1214

each Tk. 9,757.00 Tk.97,570.000

1246
each Tk. 886.00 Tk.8,860.000

1249
each Tk. 989.00 Tk.9,890.000

1250
each Tk. 711.00 Tk.7,110.000
1255

1257

each Tk. 558.00 Tk.16,740.000

1260

1264

each Tk. 363.00 Tk.14,520.000

1269

1270

each Tk. 257.00 Tk.12,850.000

1277
6 55 0
2 20 0

meter Tk. 701.00 Tk.79,076.220

1296
5 42 0
7 15 0
8 40 0
2 10 0
meter Tk. 617.00 Tk.123,211.890

1295
8 25 0
2 10 0
1 30 0

meter Tk. 407.00 Tk.31,021.341

1298

1300
35 15 0
10 7 0
2 30 0

meter Tk. 336.00 Tk.67,097.561

Tk.0.000 1301
4 32 0
3 22 0
4 8 0
3 15 0

meter Tk. 424.00 Tk.35,031.707

1303
1 50 0
2 55 0
2 25 0

meter Tk. 669.00 Tk.42,832.317

1361
1363
each Tk. 158.00 Tk.3,160.000
1364
each Tk. 195.00 Tk.3,510.000
1366
each Tk. 356.00 Tk.3,560.000

1371

1374
each Tk. 650.00 Tk.7,800.000
1376
each Tk. 1,072.00 Tk.4,288.000

1407

1409
each Tk. 611.00 Tk.46,436.000

1410
each Tk. 679.00 Tk.9,506.000

1425

1427
each Tk. 1,504.00 Tk.1,504.000

1412

1414
each Tk. 1,104.00 Tk.128,064.000

1416

1418
each Tk. 1,280.00 Tk.12,800.000

1450
1452
each Tk. 1,396.00 Tk.20,940.000
1434

1439
each Tk. 1,245.00 Tk.18,675.000

1440

1446

each Tk. 1,197.00 Tk.83,790.000

1447

1448

meter Tk. 65.00 Tk.18,350.610

1453
1455
each Tk. 967.00 Tk.17,406.000

1456
1459
each Tk. 20,064.00 Tk.120,384.000

1473
each Tk. 162.00 Tk.6,480.000

1506
1508
each Tk. 7,705.00 Tk.154,100.000

1510

1511
each Tk. 233,848.00 Tk.467,696.000

1517

1518
each Tk. 86,069.00 Tk.172,138.000

1355

1356
18 20 0
2 15 0

meter Tk. 913.00 Tk.108,557.927

1532

each Tk. 325.00 Tk.24,700.000


SUB-TOTAL SANITARY= Tk.2,313,590.573
GRAND TOTAL = Tk.139,465,835.652

Mehbuboor Rahman)
-Divisional Engineer
WD Sub-Division-2
Gazipur
Mehbuboor Rahman)
-Divisional Engineer
WD Sub-Division-2
Gazipur

(A.H.M Fayjul Islam)


Excutive Engineer
Gazipur PWD Divsion
Gazipur.
6
3

6
6
6
6
6
6
10
10
10
10
10
10
10

10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
6
3
3
3
6
9
0

9
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
3
3
1

6
6
6
6
6
6
6
6
0
0

0
0
8
0
8
8
0
0
1

0
0
1

0
0
1
0
0
1

0
0
1

0
0
1
6
6

10
10
10
6

9.5
9.5
9.5
6

6
6
6
6

8
8
8
6
6
6
6

10
10
10
6

9.5
9.5
9.5
6

6
6
6
6
6
6

9.5
9.5
9.5
6

6
6
6
6
6

6
6
6
6

6
6
6
6
6
6
6
6

6
6
6
6

6
6
6
6
6
6
6
6

6
6
6
6

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

4
4
4
4
4
4
4
10
10
10
0
0
0
0
0
0
0

0
0
0
0
0
0
0

6
6
6
6
6
6
6
0

0
0

0
10

10

9.5

9.5

10

10

9.5

9.5

6
6

9.5

9.5

6
6

6
0
6
0

0
0
0
6
0
3
3

0
0
0

0
0
0
6
0
3

6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
3
3
3

6
6
6
6
6
6
6
6
3
3
3
3

0
0
Kv‡Ri bvg knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` Avnmvb Djøvn, wcZv- g„Z
Uz°v wgqv, MÖvg: wbjÿv, †cv: wbjÿv AvgZjx,Dc‡Rjv: ivqcyiv, †Rjv:
biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's Item
Description of Item Unit Unit Rate
No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.
1×8'-0''×4'-0''×2'-6'' = 80.00 cft
2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
b Djøvn, wcZv- g„Z
‡Rjv: ivqcyiv, †Rjv:
20-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118
1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` Aveyj evix, wcZv- Kwjg Dwb
MÖvg: PigiRvj, †cv: giRvj evRvi, Dc‡Rjv: ivqcyiv, biwms`x G
mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.
1×8'-0''×4'-0''×2'-6'' = 80.00 cft
2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
x, wcZv- Kwjg Dwb,
vqcyiv, biwms`x Gi

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118
1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` Avey nvwbd , wcZv- `v‡ivM
Avjx , MÖvg: Avgjv kvnvcyi, †cv: Avgjv,Dc‡Rjv: ivqcyiv, biwms`x G
mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
wbd , wcZv- `v‡ivM
ivqcyiv, biwms`x Gi

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` Avt mvjvg , wcZv- AvivZ
Avjx, MÖvg: KiBcyi, †cv: ga¨bMi,Dc‡Rjv: ivqcyiv, biwms`x G
mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
vjvg , wcZv- AvivZ
vqcyiv, biwms`x Gi

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` nvweR wgqv , wcZv- g„Z Av
ingvb, MÖvg: ev‡niPi, †cv:ivRcÖmv`, Dc‡Rjv: ivqcyiv, biwms`x G
mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
gqv , wcZv- g„Z Avt
ivqcyiv, biwms`x Gi

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` dRjyi ingvb , wcZv-
KvjvMvRx dwKi, MÖvg: ivg cvovZjx, †cv: ga¨gcyi ,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
jyi ingvb , wcZv-
yi ,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` ewQiæj Bmjvg , wcZv- AwjD
ingvb, MÖvg: ivqcyiv, †cv: Kv›`vcvov,Dc‡Rjv:ivqcyiv ,†Rjv: biwms`x
Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
Bmjvg , wcZv- AwjDi
cyiv ,†Rjv: biwms`x
s|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` ‡gvnv¤§` Avjx , wcZv- g„Z
iæcPvb wgqv, MÖvg: g‡bvnvivev`, †cv:bvivqbcyi , Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
§` Avjx , wcZv- g„Z
i , Dc‡Rjv: ivqcyiv,
rmi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri bvg knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- AvjvDwÏb Lvb, wcZv- Avt nvwK
Lvb, MÖvg: wgR©vcyi, †cv: bvivqbcyi,Dc‡Rjv: ivqcyiv, †Rjv:
biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's Item
Description of Item Unit Unit Rate
No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.
1×8'-0''×4'-0''×2'-6'' = 80.00 cft
2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
b, wcZv- Avt nvwKg
jv: ivqcyiv, †Rjv:
20-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118
1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` ggZvR wgqv , wcZv- g„Z
nvRx Avt Mdzi, MÖvg: `yjvjKvw›`, †cv: `yjvjKvw›`,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
wgqv , wcZv- g„Z
w›`,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` mvgQzwÏb , wcZv- Kvjv
MvRx, MÖvg: ev`vjxbMi, †cv: `yjvjKvw›` evRvi,Dc‡Rjv: ivqcyiv, †Rjv
biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif)
(Mizanur Rahman)
(A.K.M. Dildar Hossain)
Sub-Assistant Engineer
Sub-Assistant Engineer Sub-Divisional Engineer
PWD Sub-Division-1
PWD Sub-Division-2 PWD Sub-Division-1
Narsingdi.
Gazipurr. Narsingdi.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWD Division
PWD Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
a¯’j msiÿY I Dbœqb
QzwÏb , wcZv- Kvjv
c‡Rjv: ivqcyiv, †Rjv:
20-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` ‡m‡K›`vi Avjx wmK`vi
wcZv- Avey Zv‡ni wmK`vi, MÖvg: nvBigviv, †cv: nvBigviv
gwbcyi,Dc‡Rjv: ivqcyiv, †Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR
A_© ermi 2020-2021 Bs|
Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
K›`vi Avjx wmK`vi,
viv, †cv: nvBigviv
wa¯’j wbg©vY KvR|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` ‡Mvjvg †gv¯Ídv , wcZv- g„Z
‡gvt Rvdi Avjx, MÖvg: evukMvox, †cv: evukMvox,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
†gv¯Ídv , wcZv- g„Z
vox,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` Avgvb Lvb, wcZv- g„Z
Lwjjyi ingvb Lvb, MÖvg: bwoqvev`, †cv: ivqcyiv,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
vb Lvb, wcZv- g„Z
yiv,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` ‡gvm‡jn DwÏb Lvb, wcZv
g„Z bex †bIqvR Lvb, MÖvg: dzj`x, †cv: gRvj evRvi,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
n DwÏb Lvb, wcZv-
Rvi,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` Zv‡qR DwÏb, wcZv- g„Z
LvRvj DwÏb, MÖvg: PigiRvj, †cv: PigiRvj evRvi,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
R DwÏb, wcZv- g„Z
Rvi,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.
Kv‡Ri knx` gyw³‡hv×v I Ab¨vb¨ exi gyw³‡hv×v‡`i mgvwa¯’j msiÿY I Dbœqb
bvg t (1g ch©vq) kxl©K cÖK‡íi Dc-LvZ:- knx` nv‡Pb Avjx, wcZv- g„Z
‡m‡K›`vi Avjx, MÖvg: iwngve`, †cv: iwngve` evRvi,Dc‡Rjv: ivqcyiv
†Rjv: biwms`x Gi mgvwa¯’j wbg©vY KvR| A_© ermi 2020-2021 Bs|

Sl No CE's
Description of Item Unit Unit Rate
Item No
1 2.1.5 Earthwork in excavation in foundation trenches up to 1.5 m depth and
maximum 10 m lead: in very soft / saturated / organic clayey soil / soil of
semi-liquid state.

1×13'-2''×3'-0''×3'-6'' = 138.25 cft


1×6'-0''×3'-0''×3'-6'' = 63.00 cft
At below
1×5'-0''×2'-6''×0'-7'' = 7.29 cft
marble stone
For path way 2×9'-4''×2'-6''×1'-0'' = 46.67 cft
2×4'-3''×2'-6''×1'-0'' = 21.25 cft
= 276.458 sft
= 7.83 cum Tk. 217.00

2 2.10.2 Sand filling in foundation trenches and plinth with sand having min. F.M.
1.2 in 150 mm in layers including leveling, watering and compaction to
achieve minimum dry density of 95% with optimum moisture content
(Modified proctor test) by ramming each layer up to finished level as per
design supplied by the design office only, all complete and accepted by
the Engineer-in-charge.

1×4'-3''×3'-0''×9'-4'' = 119.00 cft


2×9'-4''×2'-6''×0'-6'' = 23.33 cft
2×4'-3''×2'-6''×0'-6'' = 10.63 cft
= 152.96 cft
= 4.33 cum Tk. 913.00

3 2.15 Earth filling in foundation trenches and plinth in 150 mm layers with
carted earth carried by truck or by any other means including loading and
unloading at both ends, leveling, watering and compacting to achive
minimum dry density of 95% with optimum moisture content (modified
proctor test) including local carriage each layer up to finished level
including cost of water and test (carried from beyond 300 m) etc. all
complete and accepted by the Engineer-in-charge

2.15.4 For other than Dhaka, Chittagong, Sylhet, Rajshahi, Barisal, Khulna
metropolitan area and Narayanganj district.

1×8'-0''×4'-0''×2'-6'' = 80.00 cft


2×4'-0''×2'-6''×1'-9'' = 35.00 cft
2×8'-0''×2'-6''×1'-9'' = 70.00 cft
= 185.00 cft
= 5.24 cum Tk. 393.00

4 3.1 One layer brick flat soling in foundation or in floor with first class/picked
jhama bricks including preparation of bed and filling the interstices with
local sand, leveling etc. complete and accepted by the Engineer-in-charge

2×3'-0''×2'-6'' = 15.000 sft


2×9'-4''×2'-6'' = 46.667 sft
1×2'-6''×2'-6'' = 6.250 sft
= 67.917 sft
= 6.31 sqm Tk. 420.00

5 3.7 Supplying and laying of single layer polythene sheet weighing one
kilogram per 6.5 square meter in floor or any where below cement
concrete complete in all respect and accepted by Engineer-in-charge.

Same as quantity of item no 04 = 67.917 sft


= 6.31 sqm Tk. 42.00

6 3.5 Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M.
1.2) and picked jhama brick chips including breaking of chips, screening,
mixing, laying, compacting to required level and curing for at least 7 days
including the supply of water, electricity, costs of tools & plants and
other charges etc. all complete and accepted by Engineer-in-charge.
(Cement: CEM-II/A-M)

3.5.2 Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2.

1×20'-0''×4'-0''×0'-4'' = 26.67 cft


= 0.76 cum Tk. 7,575.00
7 7.1 Reinforced cement concrete works with minimum cement content relates
to mix ratio 1:2:4 having minimum f'cr = 24 MPa, satisfying a specified
compressive strength f'c= 19 MPa at 28 days on standard cylinders as per
standard practice of Code ACI/BNBC/ASTM, cement conforming to
BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type – I, best
quality sand [50% quantity of best local sand (F.M. 1.2) and 50%
quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm
down well graded picked jhama brick chips conforming to ASTM C-33
including breaking chips and screening, making and placing shutter in
position maintaining true to plumb, making shutter water-tight properly,
placing reinforcement in position; mixing in standard mixer machine
with hopper fed by standard measuring boxes or in batching plant, casting
in forms, compacting by vibrator machine and curing at least for 28 days,
removing centering-shuttering after specified time approved; including
cost of water, electricity, testing charges of materials and cylinders as
required, other charges etc. all complete, approved and accepted by the
Engineer-in-charge. (Rate is excluding the cost of reinforcement and its
fabrication, placing, binding etc. and the cost of shuttering & centering)

7.1.1 (A)Individual & combined footing, pile cap, raft/mat, floor slab and
foundation beam up to plinth level
(a) 2×7'-10''×2'-6''×0'-10'' = 32.64 cft
2×1'-9''×2'-6''×0'-10'' = 7.29 cft
1×2'-6''×2'-6''×0'-10'' = 5.21 cft
= 45.14 cft
= 1.28 cum Tk. 7,517.00
(b)Fromwork/Shutteing,prop and necessary supports (wooden)
2×2×7'-10''×0'-10'' = 26.111 sft
2×2×1'-9''×0'-10'' = 5.833 sft
2×2×2'-6''×0'-10'' = 8.333 sft
= 40.278 sft
= 3.74 sqm Tk. 399.00
b) Formwork/shuttering,prop and necessary supports etc.(wooden)

2×7'-10''×0'-10'' = 13.056 sft


2×2'-6''×0'-10'' = 4.167 sft
2×5'-0''×0'-10'' = 8.333 sft
2×6'-6''×0'-10'' = 10.833 sft
= 36.389 sft
= 3.38 sqm Tk. 456.00
8 8.1 Supplying, fabrication and fixing to detail as per design : ribbed or
deformed bar reinforcement for Reinforced cement concrete, produced
and marked in accordance with BDS ISO 6935 - 2: 2006 (or standard
subsequentley released from BSTI) including straightening and cleaning
rust, if any, bending and binding in position with supply of G.I. wires
(excluding splices or laps) etc. complete in all respect and accepted by the
Engineer-in-charge (Measurement shall be recorded only on standard
mass per unit length of bars, while dia of bars exceeds its standard)

8.1.2 Grade 400 (RB 400 /RB 400W: complying BDS ISO 6935-2:2006)
ribbed or deformed bar produced and marked according to Bangladesh
standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not
exceeding 450 MPa and whatever is the yield strength within allowable
limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to
yield strength fy, shall be at least 1.25 and minimum elongation after
fracture and minimum total elongation at maximum force is 16% and 8%
respectively : up to ground floor.

RCC in footing = 1.27Cum


= 1.27 Cum
1.25% MS Rod of RCC quantity =0.016 Cum =125.60 kg
= 125.60 kg Tk. 82.00

9 4.1 Brick works with first class bricks with cement sand (F.M. 1.2) mortar
(1:6) in foundation and plinth, filling the joints/interstices fully with
mortar, racking out the joints, cleaning and soaking the bricks at least for
24 hours before use and curing at least for 7 days etc. all complete
including cost of water, electricity and other charges and accepted by the
Engineer-in-charge. (Cement: CEM-II/A-M)

2×6'-8''×0'-10''×2'-6'' = 27.78 cft


2×3'-10''×0'-10''×2'-6'' = 15.97 cft
= 43.75 cft
= 1.24 cum Tk. 6,040.00

10 4.16 125 mm brick works with first class bricks with cement sand (F.M. 1.2)
mortar (1:4) and making bond with connected walls including necessary
scaffolding, raking out joints, cleaning and soaking the bricks for at least
24 hours before use and washing of sand, curing at least for 7 days in all
floors including cost of water, electricity and other charges etc. all
complete and accepted by the Engineer-in-charge. (Cement: CEM-II/A-
M) In ground floor

2×6'-8''×3'-0'' = 40.000 sft


2×3'-10''×3'-0'' = 23.000 sft
1×0.5×3'-10''×2'-6'' = 4.792 sft
1×2'-6''×2'-6'' = 6.250 sft
= 74.042 sft
= 6.88 sqm Tk. 948.00
11 4.14 Providing clay wall tile facing strips (water absorption ratio below 4.5%)
in superstructure with machine made hard pressed klinker facing strips
of approved quality with 20 mm thick cement sand (F.M.1.2) mortar (1:3)
in adjacent side wall, column, drop wall etc. and racking out joints,
cutting to required sizes wherever necessary with high class recessed
pointing, cleaning and soaking at least for 24 hours before use washing
and screening of sand and necessary scaffoldings, curing at least 7 days
including cost of water, electricity and other charges etc. all complete and
accepted by the Engineer-in-charge. (Cement: CEM-II/A-M) In ground
floor.

4.14.1 With 200 mm x 62 mm x 16.51 mm red strip

In wall 2×5'-4''×4'-0'' = 42.667 sft


2×4'-3''×4'-0'' = 34.000 sft
Top 2×2'-0''×4'-3'' = 17.000 sft
2×2'-0''×5'-4'' = 21.333 sft
For path way 2×10'-4''×2'-6'' = 51.667 sft
2×9'-4''×2'-6'' = 46.667 sft
= 213.333 sft
= 19.82 sqm Tk. 2,313.00

12 6.21.1 Marble stone flooring with 18mm thick Italian or equivalent marble stone
of approved quality, texture and size over 25 mm thick cement
2×7'-0''×2'-3'' = 31.500sand
sft
2×5'-8''×2'-3'' = 25.500 sft
2×6'-0''×2'-4'' = 28.000 sft
= 85.000 sft
= 7.90 sqm Tk. 9,924.00

13 6.24 Granite stone flooring with 18mm thick Italian or equivalent origin
granite stone of approved quality, texture and size over 25 =mm
1×2'-6''×2'-6'' thick
6.250 sft
2×2'-6''×2'-6'' = 12.500 sft
1×2'-6''×2'-0'' = 5.000 sft
= 23.750 sft
= 2.21 sqm Tk. 9,924.00

14 25.8 Supply of lawn grass of approved quality by truck or by any other means,
sorting the grass to proper size, washing the grass, dibbling the grass 6
mm to 50 mm apart, irrigation of lawn area till the grass grown at least
for two months after plantation, weeding the undesirable grass, mowing
the lawn grass by lawn mower up to two months after plantation,
applying urea fertilizer on the lawn surface @ 1 kg per 9.29 sqm
including supply of tools and plants etc. all complete and accepted by the
Engineer-in-charge.

1×4'-0''×8'-0'' = 32.000 sft


1×2'-5''×1'-0'' = 2.417 sft
= 34.417 sft
Deduction (-) 1×2'-6''×3'-3'' = 8.125 sft
= 26.292 sft
= 2.44 sqm Tk. 54.00
15 20.4 Supplying, fitting and fixing stainless steel (SS) stair railing of standard
height with 2 mm thick 62 mm dia pipe for hand-rail, 2 mm thick 40 mm
dia 5 nos vertical pipes in each flight, 2 mm thick 20 mm dia 5 nos
horizontal pipes as per drawing, design including carrying, polishing
fabricating, welding and fixing with tread by 25 mm long royal bolt etc.
all complete and accepted by the Engineer-in-charge.

2×5'-4''' = 10.667 rft


2×5'-0''' = 10.000 rft
= 20.667 rft x 0'-7"
= 11.980 sft
= 1.11 sqm Tk. 5,361.00

16 2.16 Site development/Improvement by carted earth or dredged sand, sandy


silt (free from any organic, foreign, environmental hazardous substances)
carried by head or truck or any other means including cost of cutting or
by dredging of sand, sandy silt, all; including local carrying, placing the
earth/sand, sandy silt in the designated area, maintaining slopes, breaking
lumps, levelling and dressing in layers up to finished level etc. all
complete as per direction and accepted by the engineer in charge.

2.16.1.1 By other method/means than dredgeing.


2×15'-0''×10'-0''×1'-0'' = 300.00 cft
= 8.49 cum Tk. 481.00
Total

(Abdul Latif) (A.K.M. Dildar Hossain)


(Mizanur Rahman)
Sub-Assistant Engineer Sub-Divisional Engineer
Sub-Assistant Engineer
PWD Sub-Division-1 PWD Sub-Division-1
PWD Sub-Division-2
Narsingdi. Narsingdi.
Gazipurr.

(Md. Jiaur
(Mizanur Rahman)
Rahman) (Md. Khairuzzaman)
Sub-AssistantEngineer
Sub-Assistant Engineer Executive Engineer
PWDPWD Division
Sub-Division-2 Narsingdi PWD Division
Narsingdi.
Gazipurr. Narsingdi.
(Md. Jiaur Rahman)
Sub-Assistant Engineer
PWD Division
Narsingdi.
a¯’j msiÿY I Dbœqb
b Avjx, wcZv- g„Z
Rvi,Dc‡Rjv: ivqcyiv,
mi 2020-2021 Bs|

Amount (Tk.)

2118

1 13 2 3 0 3 6
1 6 0 3 0 3 6

1 5 0 2 6 0 7

2 9 4 2 6 1 0
2 4 3 2 6 1 0

Tk.1,699.110

2118
1 4 3 3 0 9 4
2 9 4 2 6 0 6
2 4 3 2 6 0 6

Tk.3,953.290

2118

1 8 0 4 0 2 6
2 4 0 2 6 1 9
2 8 0 2 6 1 9

Tk.2,059.320

2118
2 3 0 2 6
2 9 4 2 6
1 2 6 2 6

Tk.2,650.200

2118

Tk.265.020

2118

1 20 0 4 0 0 4
Tk.5,757.000
2118

2 7 10 2 6 0 10
2 1 9 2 6 0 10
1 2 6 2 6 0 10

Tk.9,621.760

2 2 7 10 0 10 0 10
2 2 1 9 0 10
2 2 2 6 0 10

Tk.1,492.260

2 7 10 0 10
2 2 6 0 10
2 5 0 0 10
2 6 6 0 10

Tk.1,541.280
2118

Tk.10,299.200

2118
2 6 8 0 10 2 6
2 3 10 0 10 2 6

Tk.7,489.600

2118
2 6 8 3 0
2 3 10 3 0
1 0.5 3 10 2 6
1 2 6 2 6

Tk.6,522.240
2118

2 5 4 4 0
2 4 3 4 0
2 2 0 4 3
2 2 0 5 4
2 10 4 2 6
2 9 4 2 6

Tk.45,843.660

2118
2 7 0 2 3
2 5 8 2 3
2 6 0 2 4

Tk.78,399.600

2118
1 2 6 2 6
2 2 6 2 6
1 2 6 2 0

Tk.21,932.000

2118
1 4 0 8 0
1 2 5 1 0

1 2 6 3 3

Tk.131.760
2118
2 5 4
2 5 0

Tk.5,950.710

2118

2 15 0 10 0 1 0
Tk.4,083.690
Tk.209,691.700

(A.K.M. Dildar Hossain)


Sub-Divisional Engineer
PWD Sub-Division-1
Narsingdi.

(Md. Khairuzzaman)
Executive Engineer
Narsingdi PWD Division
Narsingdi.