TSP Lay Out
TSP Lay Out
TRAINING
SESSION
Sector: CONSTRUCTION
OBJECTIVE:
Learning Outcomes: Upon completion of this module the students/ trainees will be able to:
LO1: Stake-out building lines are properly secured for reference in excavating building foundation
LO2: Marking lines are squared and plumbed from the batterboard lines with tolerance of 3 mm on all measurement, plumbness, squareness and rigid
.
LO3: Worksite is cleaned and kept in safe state according to OSHC regulations.
LO4: Daily work report is accomplished in accordance with company rules and regulations.
A. INTRODUCTION: This module covers the knowledge, skills, and attitudes in preparing construction materials and tools, observing procedures,
Specifications and Manuals of Instructions, measuring and calculation and how to maintain equipments and tools.
B. LEARNING ACTIVITIES
LO 1. Stake-out building lines are properly secured for reference in excavating building foundation.
LO 2. Marking lines are squared and plumbed from the batterboard lines with tolerance of 3 mm on all measurement, plumbness, squareness and rigid
Learning Content Methods Presentation Practice Feedback Resources Time
1. Manifested full
Read Information
understanding Audio Visual Sheet 1-1-1 on
Simulation Definition of Evaluating
of legal Prepare / Answer CBLM
Discussion Stakeout
their answers Tools and equipment in carpentry 1Hr.
requirements for Self-Check
building lines. or responds Pencil 4Hrs.
alcohol service Practical Exercise 3-2-1 Learning materials
on 1-1-1.
and Powerpoint
Demonstration
Presentation
consumption.
2. Demonstrated Audio Visual Read Information Answer Evaluating CBLM 1Hr.
Simulation Sheet 1-1-1 on their answers Tools and equipment in carpentry
ability to Definition of Self-Check Pencil 5Hrs
manage Discussion Prepare / 3-2-2 or responds Learning materials
Stakeout on 1-1-1.
intoxicated
person using
appropriate
communication, building lines.
Practical Exercise
conflict Powerpoint
Demonstration
resolution and Presentation
anger
management
technique.
C. ASSESSMENT PLAN
The trainee was able to apply appropriate procedures on dealing with intoxicated guest.
LO 3. Worksite is cleaned and kept in safe state according to OSHC regulations.
Learning Content Methods Presentation Practice Feedback Resources Time
1. Manifested full Audio Visual Read Information Answer Evaluating CBLM 1Hr.
Simulation Sheet 1-1-1 on their answers Tools and equipment in carpentry
knowledge of the Self-Check 30mins
Definition of Pencil
effect of alcohol Discussion Prepare / Learning materials
Stakeout
and factors or responds
Practical Exercise building lines. 3-3-1 3Hrs
which influence on 1-1-1.
Demonstration Powerpoint
effects.
Presentation
2. Discussed the CBLM
Tools and equipment in carpentry
knowledge of the Pencil
benefits in Read Information Learning materials
Audio Visual Sheet 1-1-1 on
creating a Simulation Definition of Evaluating
Prepare / Answer
responsible Discussion their answers 1Hr.
Stakeout Self-Check
licensed building lines. or responds 5Hrs.
Practical Exercise 3-3-2
drinking on 1-1-1.
Powerpoint
Demonstration
environment to Presentation
self, colleagues
and guests.
3. Demonstrated Read Information
Audio Visual Sheet 1-1-1 on
knowledge of Simulation Definition of Evaluating
Prepare / Answer CBLM 30mins
ways of Discussion their answers Tools and equipment in carpentry
Stakeout Self-Check 3Hrs.
assessing building lines. or responds Pencil
Practical Exercise 3-3-3 Learning materials
intoxicated on 1-1-1.
Powerpoint
Demonstration
guests. Presentation
C. ASSESSMENT PLAN
Learners will be given the following:
Observation
Interview
Written examination
Demonstration of practical skills.
D. TEACHER’S SELF-REFLECTION OF THE SESSION
The trainee was able to comply with legislation on dealing with intoxicated guest.
LO 1. Stake-out building lines are properly secured for reference in excavating building foundation.
E. ASSESSMENT PLAN
Learners will be given the following:
Observation
Interview
Written examination
Demonstration of practical skills