This document contains notes for a wastewater pipeline project. It lists the project name in Arabic as the strategic wastewater storage tank study and design consultancy services project. It provides details on the drawing such as the name of the wastewater pipeline being L12, the drawing name as Wadi Crossing Pipe Protection, and details on who designed, drew, checked and approved the drawing. It also lists the scale as not to scale, date in both Gregorian and Hijri calendars, and sheet, project and drawing numbers.
This document contains notes for a wastewater pipeline project. It lists the project name in Arabic as the strategic wastewater storage tank study and design consultancy services project. It provides details on the drawing such as the name of the wastewater pipeline being L12, the drawing name as Wadi Crossing Pipe Protection, and details on who designed, drew, checked and approved the drawing. It also lists the scale as not to scale, date in both Gregorian and Hijri calendars, and sheet, project and drawing numbers.
This document contains notes for a wastewater pipeline project. It lists the project name in Arabic as the strategic wastewater storage tank study and design consultancy services project. It provides details on the drawing such as the name of the wastewater pipeline being L12, the drawing name as Wadi Crossing Pipe Protection, and details on who designed, drew, checked and approved the drawing. It also lists the scale as not to scale, date in both Gregorian and Hijri calendars, and sheet, project and drawing numbers.